S02 Parking Structure List of Dwgs.pdf
PDF 855 KB Posted
- Attached to
- Y1LZ--693-222 | Parking Structure Solicitation Amendment 2 Federal contract opportunity
- Solicitation number
- 36C24420R0075
About this file
This solicitation package includes drawings and specifications for the construction of a new parking garage at the Wilkes-Barre VA Medical Center in Pennsylvania. The project scope involves providing all labor, materials, tools and equipment to construct a 435-space parking structure according to the drawings and specifications, which adhere to all applicable federal, state and local codes and VA rules. The magnitude of the project is estimated between $10 million to $20 million. This procurement is set aside for verified service-disabled veteran-owned small businesses and will use a tiered evaluation process including large businesses. Offerors should price their proposals in whole dollars. The contractor will be responsible for correct worker classification and wage compliance. The solicitation may be canceled before award if in the best interest of the government.
View the file
Other files for this federal contract opportunity
Show all 50
Y1LZ--693-222 | Parking Structure Solicitation Amendment 2 has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GENERAL
G-001 COVER SHEET
G-002 GENERAL INFORMATION
CC101 CODE COMPLIANCE PARITAL GROUND TIER THROUGH THIRD TIER
CC102 CODE COMPLIANCE FOURTH TIER AND ELEVATIONS
ARCHITECTURAL
A-101 VESTIBULE PLAN AND DETAILS
A-201 OVERALL ELEVATIONS
A-202 OVERALL ELEVATIONS
A-401 LARGE SCALE FLOOR PLANS
A-403 LARGE SCALE STAIR PLANS
A-404 LARGE SCALE CANOPY A &B PLANS - GC ALTERNATE
A-405 CANOPY A & B SECTIONS - GC ALTERNATE
A-406 LARGE SCALE CANOPY C, D,E PLANS & SECTIONS - GC ALTERNATE
A-501 DETAILS
A-502 DETAILS - GUARDRAIL
A-504 LIVING WALL SYSTEM - GC ALTERNATE
A-601 ALUMINUM STOREFRONT, HOLLOW METAL FRAME
ELEVATIONS & DETAILS, DOOR SCHEDULE AND ROOM FINISH
SCHEDULE
STRUCTURAL
SA101 PARTIAL GROUND AND GROUND TIER ARCHITECTURAL PLANS
AND DETAILS
LIST OF DRAWINGS
DEPARTMENT OF VETERANS AFFAIRS
NEW PARKING GARAGE
WILKES-BARRE, PENNSYLVANIA
PROJECT NO. 693-222
WILKES-BARRE
SCRANTON
HAZLETON
ALLENTOWN
BETHLEHEM
READING
NORRISTOWN
PHILADELPHIA
LANCASTER
YORK
CARBONDALE
WILLIAMSPORT
HARRISBURG
GETTYSBURG
CHAMBERSBURG
JOHNSTOWN
ALTOONA
PITTSBURGH
MCKEESPORT
NEW BRIGHTON
BUTLER
NEW CASTLE
FARRELL
MEADVILLE
ERIE
BRADFORD
LOCATION MAP
SCALE: NOT TO SCALE
PROJECT LOCATION
ASSOCIATE DIRECTOR
VALERIE M. BOYTON, RN, MSN
ASSOC. DIRECTOR FOR NURSING SERVICES
CHIEF, FACILITIES MANAGEMENT SERVICES
CHRISTOPHER D. ENGLISH
INFECTION PREVENTION COORDINATOR
KATHLEEN MROZINSKI
SAFETY AND OCCUPATIONAL HEALTH MANAGER
GARY SMITH DONNA GIRMAN-YOUNGBLOOD
PATIENT SAFETY OFFICER
MIRZA Z. ALI, M.D.
CHIEF OF STAFF SUPERVISOR, FACILITIES MAINTENANCE
SUPERVISORY PROJECT ENGINEER
ORLANDO MIRARCHI
LAVONN ANDERSON
CHIEF, ENVIRONMENTAL MANAGEMENT SERVICE
SALLY KASZOWICZ
CHIEF, SPD
JOE SHARON
HENRY O'HOP
DAVID LONGMORE
FACILITY CIO
ORLANDO MIRARCHI
SUPERVISOR, PROJECTS
MICHAEL SOMOGA
PROJECT MANAGER
DATE
DATE
DATE
DATE
DATE DATE DATE
DATEDATE
DATE
DATE DATE
DATE
DATE
D
U N
I T
E D
STAT ES OF
A M
E R
I C A
S
RI
A F
F A
SNARETEVFOTN
E
M T
R A
P E
ELECTRICAL
E-001 ELECTRICAL COVER SHEET
E-100 PARTIAL SITE PLAN - ELECTRICAL
E-101 PARITAL GROUND FLOOR PLAN- ELECTRICAL
E-102 GROUND FLOOR PLAN ELECTRICAL
E-103 ESCOND FLOOR PLAN - ELECTRICAL
E-104 THIRD FLOOR PLAN - ELECTRICAL
E-105 FOURTH FLOOR PLAN - ELECTRICAL
E-501 ELECTRICAL DETAILS
PLUMBING / FIRE PROTECTION
P-FP001 COVER SHEET INFO - PLUMBING / FIRE PROTECTION
P-FP101 PARTIAL GROUND FLOOR PLAN - PLUMBING / FIRE PROTECTION
P-FP102 GROUND FLOOR PLAN - PLUMBING / FIRE PROTECTION
P-FP103 SECOND FLOOR PLAN - PLUMBING / FIRE PROTECTION
P-FP104 THIRD FLOOR PLAN - PLUMBING / FIRE PROTECTION
P-FP105 FOURTH FLOOR PLAN - PLUMBING / FIRE PROTECTION
A
PROJECT NO.
DATE:
DRAWING NO.BUILDING NUMBER CHECKED DRAWN
LOCATION
DRAWING
DWG. OF
PROJECT TITLEDRAWING TITLE
FACILITY PROJECT NAME
REVISIONS DATE V
e te ra n s
A ff a ir s
COVER SHEET
7/10/2020
693-222
G-001
WILKES-BARRE V.A.
MEDICAL CENTER
PARKING GARAGE
WILKES-BARRE V.A. MEDICAL CENTER
GARAGE
1111 EAST END BLVD, WILKES-BARRE, PA
PARKING GARAGE
CIVIL
S1 OVERALL EXISTING CONDITIONS MAP
S2 EXISTING CONDITIONS AND DEMOLITION PLAN
S3 SITE LAY0UT PLAN
S4 GRADING AND UTILITY PLAN
S5 LANDSCAPING PLAN
S6 LIGHTING PLAN
S7 ACCESS CONTROL PLAN
E&SC-1 EROSION & SEDIMENTATION CONTROL PLAN
E&SC-1 EROSION & SEDIMENTATION CONTROL NOTES
E&SC-3 EROSION & SEDIMENTATION CONTROL DETAILS
E&SC-4 EROSION & SEDIMENTATION CONTROL DETAILS
& NOTES (CONTINUED)
PCSM-1 POST-DEVELOPMENT DRAINAGE AREA PLAN
C-1 CONSTRUCTION DETAILS
C-2 CONSTRUCTION DETAILS
A6.2 - SIGNAGE SCHEDULE
T-1 COVER SHEET
PCSM-2 STORMWATER MANAGEMENT DETAILS
SA102 SECOND, THIRD AND FOURTH TIER ARCHITECTURAL PLANS
SA201 BUILDING ELEVATIONS
SA202 BUILDING ELEVATIONS
SA301 WALL SECTIONS AND DETAILS
SA401 STAIR / ELEVATOR #1 PLANS
SA402 STAIR / ELEVATOR #1 PLANS
SA403 STAIR / ELEVATOR #1 PLANS
SA404 STAIR / ELEVATOR #1 PLANS
SA405 STAIR / ELEVATOR #1 PLANS
SA406 STAIR #2 / #3 PLANS, SECTIONS AND DETAILS
S001 GENERAL NOTES
S100 FOUNDATION PLAN AND DETAILS
S101 PARTIAL GROUND TIER STRUCTURAL PLAN
S102 GROUND TIER STRUCTURAL PLAN
S103 SECOND TIER STRUCTURAL PLAN
S104 THIRD TIER STRUCTURAL PLAN
S105 FOURTH TIER STRUCTURAL PLAN
S002 GENERAL DETAILS
S201 ENLARGED FOUNDATION PLANS AND DETAILS
S202 C.I.P. RETAINING WALL DETAILS
S203 BUILDING & FOUNDATION SECTION
S204 BUILDING & FOUNDATION SECTION
S301 PRECAST TEE DETAILS AND COLUMN PLANS
S302 PRECAST SECTION DETAILS
A-402 REFLECTED CEILING PLANS
A
PROJECT NO.
DATE:
DRAWING NO.BUILDING NUMBER CHECKED DRAWN
LOCATION
DRAWING
DWG. OF
PROJECT TITLEDRAWING TITLE
FACILITY PROJECT NAME
REVISIONS DATE V
e te ra n s
A ff a ir s
GENERAL INFORMATION
7/10/2020
693-222
G-002
WILKES-BARRE V.A.
MEDICAL CENTER
PARKING GARAGE
WILKES-BARRE V.A. MEDICAL CENTER
GARAGE
1111 EAST END BLVD, WILKES-BARRE, PA
Checker Author
ABV ABOVE
AC ACOUSTICAL
ACT ACOUSTICAL CEILING TILE
AED AUTOMATED EXTERNAL DEFIBRILLATOR
AFF ABOVE FINISH FLOOR
ALUM ALUMINUM
ALT ALTERNATE
AP ACCESS PANEL
ARCH ARCHITECT(URAL)
BD BOARD
BIT BITUMINOUS
BLDG BUILDING
BLK BLOCK(ING)
BM BENCH MARK
BOT BOTTOM
BRG BEARING
BSMT BASEMENT
CLR CLEAR
CL CENTERLINE
CJ CONTROL JOINT
CLG CEILING
CMU CONCRETE MASONRY UNIT
COL COLUMN
CONC CONCRETE
CONT CONTINUOUS
CONST CONSTRUCTION
CONTR CONTRACTOR
COORD COORDINATE
CT CERAMIC TILE
DEMO DEMOLITION
DET DETAIL
DF DRINKING FOUNTAIN
DIM DIMENSION
DN DOWN
DR DOOR
DS DOWNSPOUT
DWG DRAWING
EA EACH
EC ELECTRICAL CONTRACTOR
EJ EXPANSION JOINT
EL ELEVATION
ELEC ELECTRICAL
ELEV ELEVATOR
ENT ENTRANCE
EQ EQUAL
EQUIP EQUIPMENT
EX EXISTING
EXP EXPOSED
EXT EXTERIOR
EW EACH WAY
FD FLOOR DRAIN
FE FIRE EXTINGUISHER (CABINET)
FFE FINISHED FLOOR ELEVATION
FIN FINISH(ED)
FL FLOOR
FRP FIBERGLASS REINFORCED PANEL
FRT FIRE RETARDANT
FT FOOT or FEET
GA GAUGE
GALV GALVANIZED
GC GENERAL CONTRACTOR
GFCMU GROUND FACE CONCRETE MASONRY UNIT
GL GLASS
GCMU GLAZED CONCRETE MASONRY UNIT
GWB GYPSUM WALL BOARD
GWBAR GYPSUM WALL BOARD ABUSE RESISTANT
GWBMR GYPSUM WALL BOARD MOISTURE RESISTANT
GWBFR GYPSUM WALL BOARD FIRE RATED
HC HANDICAPPED
HDW HARDWARE
HGT HEIGHT
HP HIGH POINT
HM HOLLOW METAL
HORIZ HORIZONTAL
HVAC HEATING, VENTILATION &
AIR CONDITIONING
ID INSIDE DIAMETER
INFO INFORMATION
INSUL INSULATION
INT INTERIOR
INV INVERT
JST JOIST
JT JOINT
KIT KITCHEN(ETTE)
LAM LAMINATE
LAV LAVATORY
LB POUND
LF LINEAL FEET
LLH LONG LEG HORIZONTAL
LLV LONG LEG VERTICAL
LP LOW POINT
MFR MANUFACTURER
MAT MATERIAL
MAX MAXIMUM
MC MECHANICAL CONTRACTOR
MECH MECHANICAL
MEP MECHANICAL, ELECTRICAL, PLUMBING
MIN MINIMUM
MISC MISCELLANEOUS
MO MASONRY OPENING
MTD MOUNTED or MOUNTING
NIC NOT IN CONTRACT
NO NUMBER
NOM NOMINAL
NTS NOT TO SCALE
OC ON CENTER
OD OUTSIDE DIAMETER
OPNG OPENING
OPP OPPOSITE
PTN PARTITION
PC PLUMBING CONTRACTOR
PL PLATE
PLAM PLASTIC LAMINATE
PLWD PLYWOOD
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PTD PAINTED
QT QUARRY TILE
R RISER or RADIUS
RD ROOF DRAIN
REC RECESSED
RECT RECTANGLE
REINF REINFORCED or REINFORCING
REQD REQUIRED
RM ROOM
RO ROUGH OPENING
RWC RAIN WATER CONDUCTOR
SCH SCHEDULE
SECT SECTION
SF SQUARE FEET
SFCMU SPLIT FACE CONCRETE MASONRY UNIT
SFRM SPRAY-APPLIED FIRE RESISTIVE MATERIAL
SH SHEATHING
SIM SIMILAR
SJ SCORE JOINT
SPECS SPECIFICATIONS
SQ SQUARE
SS STAINLESS STEEL
STD STANDARD
STR STRUCTURAL
SYN SYNTHETIC
T TREAD
TG TEMPERED GLASS
THK THICK(NESS)
TOM TOP OF MASONRY
TOP TOP OF PLANK
TOS TOP OF STEEL
TYP TYPICAL
UL UNDERWRITERS LABORATORIES
UNO UNLESS NOTED OTHERWISE
VCT VINYL COMPOSITION TILE
VERT VERTICAL
VIF VERIFY IN FIELD
WP WATERPROOFING
W/ WITH
WD WOOD
WG WIRE GLASS
ARCHITECTURAL ABBREVIATIONS
THIS ABBREVIATION LIST IS A STANDARD AND NOT ALL ABBREVIATIONS
ARE NECESSARILY USED ON THIS PROJECT
ABBREVIATION
SYMBOLS
@ AT
C CENTER LINE
Ø DIAMETER
+/- PLUS OR MINUS
L
UNDISTURBED EARTH
CONTROLLED FILL
CONCRETE
GRANULAR FILL
CONC MASONRY UNIT
WOOD BLOCKING
RIGID INSULATION
MATERIALS SYMBOLS
LEGEND
A
A3.5
A
A3.5
A
A5.1
A
A3.5
I4.6
C
A101
W1
A101
OFFICE
SECTION
SECTION OR DETAIL NO.
SHEET NO.
SECTION INDICATOR
BUILDING SECTION SHEET NO.
DETAIL NO.
DETAIL SHEET NO.
ELEVATION NO.
ELEVATION SHEET NO.
DOOR NUMBER
WINDOW ELEVATION
SECTION OR DETAIL NO.
DETAIL SHEET NO.
ROOM NAME
BLDG. & ROOM NO.
BUILDING SECTION
DETAIL
INTERIOR ELEVATION
DOOR TAG
WINDOW TAG
MILLWORK SECTION
ROOM TAG
NORTH ARROW
File details come from the government source that posted it. Updated .