This document includes a federal solicitation and technical specifications for a construction project. The solicitation is for the construction of a new parking garage to accommodate approximately 435 vehicles on the existing VA campus of the Wilkes-Barre VA Medical Center. The project shall provide all labor, materials, tools, equipment, permits, testing, and reports required according to the drawings and specifications. The magnitude of the VA project is between $10 million and $20 million. The NAICS code is 236220 for commercial and institutional building construction. As a set-aside for verified service-disabled veteran-owned small businesses, the procurement uses a tiered evaluation process down to the large business tier. The technical specifications cover commissioning requirements for the fire suppression system, including pre-functional checklists, contractor tests, and systems functional performance testing to be witnessed by the commissioning agent.

View the file

Other files for this federal contract opportunity

Other files attached to Y1LZ--693-222 | Parking Structure Solicitation Amendment 2, newest first.
File Type Posted
015000TempFacilitiesControls.pdf PDF
084113 Aluminum Storefront Systems.pdf PDF
097753 Living Wall System.pdf PDF
074515 Composite Wall Panel.pdf PDF
VMAC_Sketch_SKE-1.pdf PDF
S02 Solicitation 36C24420R0075 AMD 0001.pdf PDF
P03 JA Tyco SimplexGrinnell.pdf PDF
P03 JA Johnson Controls.pdf PDF
36C24420R0075_4.docx DOCX document
2903 312000 Earthwork 02.pdf PDF
280800.pdf PDF
262726.pdf PDF
230800.pdf PDF
221400.pdf PDF
221300.pdf PDF
220523.pdf PDF
210512.pdf PDF
111200 Parking Control Equipment.pdf PDF
099600 High Performance Coatings.pdf PDF
079020 Garage Waterproofing Systems.tha.pdf PDF
078410 Through Penetration Firestop Systems.pdf PDF
071113 Bituminous Dampproofing.pdf PDF
061000 Rough Carpentry.pdf PDF
055000 Metal Fabrications.pdf PDF
051200 Structural Steel Framing.pdf PDF
034500 Precast Architectural Concrete.pdf PDF
017900 Warranties_Single Prime.pdf PDF
017823 Operation and Maintenance Data_Single Prime.pdf PDF
015000 Temporary Facilities _ Controls_Single Prime.pdf PDF
014535.docx DOCX document
013100 Project Coordination_Single Prime.pdf PDF
012800 Field Engineering_Single Prime.pdf PDF
012600 Modification Procedures_Single Prime.pdf PDF
000000 Table of Contents_Single Prime 02.docx DOCX document
Arch Dwg 11-16.pdf PDF
S02 Dwg C2-E2.pdf PDF
S02 Parking Structure List of Dwgs.pdf PDF
EXHIBIT D - Sample Transmittal Letter for Past Performance Evaluation Questionnaire.docx DOCX document
EXHIBIT A - Past Performance Relevancy Questionnaire.docx DOCX document
329000 Planting.pdf PDF
283100.pdf PDF
280528-33.pdf PDF
262416.pdf PDF
262200.pdf PDF
260573.pdf PDF
238216.pdf PDF
230593.pdf PDF
230541.pdf PDF
230510.pdf PDF
211200.pdf PDF
Show all 50

Y1LZ--693-222 | Parking Structure Solicitation Amendment 2 has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Parking Garage Project Number 693-222 Department of Veterans Affairs Wilkes-Barre, Pennsylvania

210811 - 1

SECTION 21 08 00 - COMMISSIONING OF FIRE SUPPRESSION SYSTEMS

PART 1 - GENERAL

1.1 DESCRIPTION

A. The requirements of this Section apply to all sections of Division 21.

B. This project will have selected building systems commissioned. The complete list of equipment and systems to be commissioned is specified in Section 01 91 00 GENERAL COMMISSIONING REQUIREMENTS. The commissioning process, which the Contractor is responsible to execute, is defined in Section 01 91 00 GENERAL COMMISSIONING REQUIRMENTS. A Commissioning Agent (CxA) appointed by the VA will manage the commissioning process.

1.2 RELATED WORK

A. Section 01 00 00 GENERAL REQUIREMENTS.

B. Section 01 91 00 GENERAL COMMISSIONING REQUIREMENTS.

C. Section 01 33 23 SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES.

1.3 SUMMARY

A. This Section includes requirements for commissioning the Fire Suppression systems, subsystems and equipment. This Section supplements the general requirements specified in Section 01 91 00 GENERAL COMMISSIONING REQUIREMENTS.

B. The commissioning activities have been developed to support the VA requirements to meet guidelines for Federal Leadership in Environmental, Energy, and Economic Performance.

C. Refer to Section 01 91 00 GENERAL COMMISSIONING REQUIREMENTS for more details regarding processes and procedures as well as roles and responsibilities for all Commissioning Team members.

1.4 DEFINITIONS

A. Refer to Section 01 91 00 GENERAL COMMISSIONING REQUIREMENTS for definitions.

1.5 COMMISSIONED SYSTEMS

A. Commissioning of a system or systems specified in this Division is part of the construction process. Documentation and testing of these systems, as well as training of the VA’s Operation and Maintenance personnel, is required in cooperation with the VA and the Commissioning Agent.

Wilkes-Barre, Pennsylvania

210811 - 2

B. The following Fire Suppression systems will be commissioned:

1. Fire Protection System - dry standpipe risers.

1.6 SUBMITTALS

A. The commissioning process requires review of selected Submittals. The Commissioning Agent will provide a list of submittals that will be reviewed by the Commissioning Agent.

This list will be reviewed and approved by the VA prior to forwarding to the Contractor.

Refer to Section 01 33 23 SHOP DRAWINGS, PRODUCT DATA, and SAMPLES for further details.

B. The commissioning process requires Submittal review simultaneously with engineering review. Specific submittal requirements related to the commissioning process are specified in Section 01 91 00 GENERAL COMMISSIONING REQUIREMENTS.

PART 2 - PRODUCTS (NOT USED)

PART 3- EXECUTION

3.1 PRE-FUNCTIONAL CHECKLISTS

A. The Contractor shall complete Pre-Functional Checklists to verify systems, subsystems, and equipment installation is complete and systems are ready for Systems Functional Performance Testing. The Commissioning Agent will prepare Pre-Functional Checklists to be used to document equipment installation. The Contractor shall complete the checklists. Completed checklists shall be submitted to the VA and to the Commissioning Agent for review. The Commissioning Agent may spot check a sample of completed checklists. If the Commissioning Agent determines that the information provided on the checklist is not accurate, the Commissioning Agent will return the marked-up checklist to the Contractor for correction and resubmission. If the Commissioning Agent determines that a significant number of completed checklists for similar equipment are not accurate, the Commissioning Agent will select a broader sample of checklists for review. If the Commissioning Agent determines that a significant number of the broader sample of checklists is also inaccurate, all the checklists for the type of equipment will be returned to the Contractor for correction and resubmission. Refer to SECTION 01 91 00 GENERAL COMMISSIONING REQUIREMENTS for submittal requirements for Pre- Functional Checklists, Equipment Startup Reports, and other commissioning documents.

3.2 CONTRACTORS TESTS

A. Contractor tests as required by other sections of Division 21 shall be scheduled and documented in accordance with Section 01 00 00 GENERAL REQUIREMENTS. The Commissioning Agent will witness selected Contractor tests. Contractor tests shall be completed prior to scheduling Systems Functional Performance Testing.

3.3 SYSTEMS FUNCTIONAL PERFORMANCE TESTING:

A. The Commissioning Process includes Systems Functional Performance Testing that is intended to test systems functional performance under steady state conditions, to test

Wilkes-Barre, Pennsylvania

210811 - 3 system reaction to changes in operating conditions, and system performance under emergency conditions. The Commissioning Agent will prepare detailed Systems Functional Performance Test procedures for review and approval by the Resident Engineer. The Contractor shall review and comment on the tests prior to approval. The Contractor shall provide the required labor, materials, and test equipment identified in the test procedure to perform the tests. The Commissioning Agent will witness and document the testing. The Contractor shall sign the test reports to verify tests were performed. See Section 01 91 00 GENERAL COMMISSIONING REQUIREMENTS, for additional details.

3.4 TRAINING OF VA PERSONNEL

A. Training of the VA operation and maintenance personnel is required in cooperation with the Resident Engineer and Commissioning Agent. Provide competent, factory authorized personnel to provide instruction to operation and maintenance personnel concerning the location, operation, and troubleshooting of the installed systems. The instruction shall be scheduled in coordination with the VA Resident Engineer after submission and approval of formal training plans. Refer to Section 01 91 00 GENERAL COMMISSIONING REQUIREMENTS and Division 21 Sections for additional Contractor training requirements.

----- END -----

File details come from the government source that posted it. Updated .