This is a Cost Workbook template for a request for proposal (RFP) issued by the State of Illinois Environmental Protection Agency (IEPA) for the Environmental Information Management System (EIMS) project, identified as RFP 26-532EPA-FISCP-B-51295. The workbook is designed to standardize cost proposal submissions across all offerors by requiring the use of this template to calculate implementation deliverables, ongoing costs, and vendor role hourly rates. The project encompasses a ten-year contract term with deliverables organized across multiple service domains including Project Management, Requirements Analysis & Validation, Solution Design & Development/Configuration, Data Migration, Testing, User Training, Solution Hosting & Provisioning, Cutover/Deployment/Hypercare, Maintenance & Operations, Knowledge Transfer & Exit Transition, Multi-Vendor Integration, and Organizational Change Management. All functionalities selected in the Traceability Matrix must be included in the cost proposal and reflected in the workbook submission, with costs tied to either one-time deliverables or ongoing services aligned to the proposed work plan.
The Cost Workbook contains six primary worksheets that offerors must complete: the Total Cost Summary, which aggregates costs from all subsequent worksheets over the ten-year term; Deliverable Costs, capturing one-time implementation costs by service domain and contract year; Ongoing Costs, detailing annual expenses for solution services and maintenance operations; the Ad Hoc Rate Card, specifying hourly rates for sixteen vendor roles across three experience levels (senior, intermediate, junior) for five defined contract periods; Cost Assumptions, documenting all assumptions supporting the proposal with specific RFP references and cost impact analysis; and the BidBuy Entry worksheet, which auto-populates all costs and serves as the submission guide for formal entry into the state's procurement system. Offerors are responsible for ensuring formula accuracy prior to submission, and no cost assumptions or exceptions that conflict with the RFP terms and conditions will be subject to future negotiation once the proposal is submitted.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| BEP U-Plan.pdf | ||
| ipg-active-registered-vendor-disclosure-formerly-forms-b-v.23.1~8.docx | DOCX document | |
| information-and-technology-request-for-proposal-offer-to-the-state-of-illinois.pdf | ||
| 260227 EIMS Rebid RFP.docx | DOCX document | |
| 2600415 IEPA EIMS Rebid Q and A.docx | DOCX document | |
| state-of-illinois-standard-it-terms-and-conditions-v26-1.pdf | ||
| c2d-vendor-answer-sheet-v.24.4 ~3.docx | DOCX document | |
| 260225 Revised Attachment A - Traceability Matrix.xlsx | XLSX spreadsheet | |
| Bureau of Air Operating and Construction Permit Fee Tables - Attachment C.docx | DOCX document | |
| EIMS Pre-Submission Conference Sign-In Sheet 1 of 2.pdf | ||
| c2d-vendor-guidance.pdf | ||
| vendor-disclosure-formerly-forms-a-v26-1-6-25-2025~1.docx | DOCX document | |
| 260410 EIMS Rebid RFP~1.docx | DOCX document | |
| EIMS Pre-Submission Conference Sign-In Sheet 2 of 2.pdf |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Introduction
| State of Illinois Environmental Protection Agency |
| Environmental Information Management System (EIMS) |
| 26-532EPA-FISCP-B-51295 |
| Attachment B - Cost Workbook |
| Offeror: | Enter Offeror Name Here |
| Introduction | |
| Information & Instructions | |
| This Cost Workbook contains multiple worksheets designed to provide an understanding of the cost model for this RFP. Offerors are to use this workbook to calculate the values of implementation deliverables, ongoing costs, and vendor role hourly rates which align with its offer. All costs associated with an offer to IEPA must be tied to either a Deliverable (worksheet 2) or Ongoing Cost (worksheet 3). Please refer to the RFP for all necessary details regarding scope, scale and complexity of this solicitation, and establish the cost proposal accordingly. All functionalities for which an Offeror has selected a Solution Method other than “Functionality Not Met” in column F of worksheet 2. Business Functionality and worksheet 3. Technical Functionality of Attachment A, Traceability Matrix, must be included in the offer and reflected in the cost proposal. In addition to these instructions, there are more information and instructions provided within subsequent worksheets of this workbook. Cells requiring Offeror data entry are in light-green highlight as shown for cell B8 above. It is the responsibility of the Offeror to ensure the accuracy of the Cost Workbook formulas prior to submission. |
Note: It is important all Offerors understand that cost proposals must be developed using this workbook. Formal submission of the cost proposal will be entered into BidBuy as instructed in section C.1. and F.6. of the RFP. Utilization of this workbook ensures all Offerors are establishing cost Proposals in the same manner leading to a truer apples-to-apples comparison.
| Worksheet Title | |||
| Hyperlink | Description | Instructions | |
| 1. Total Cost Summary | This worksheet calculates the total cost based on data entered in all subsequent worksheets. | No data entry into this worksheet. | |
| 2. Deliverable Costs | This worksheet captures one-time costs for all anticipated deliverables for this RFP. Each deliverable is tied to a primary service domain. For additional detail on each deliverable, please refer to Attachment A - Traceability Matrix, worksheet 4. Services. | • Enter the fixed one-time cost for each deliverable. |
• Specify which year of the contract term the deliverable is anticipated to be completed and invoiced (as aligned to the proposed workplan).
| 3. Ongoing Costs | This worksheet is designed to elicit itemized, ongoing costs for the solution once in production (e.g., hosting/provisioning, maintenance and operations). The timing of these costs must align with the proposed workplan provided as part of the offer. | • Enter fixed costs for each service requested. |
| 4. Ad Hoc Rate Card | This worksheet is designed to collect the hourly rates for each implementation resource role. | • Enter the hourly rate for each pre-populated resource role and experience level. |
| 5. Cost Assumptions | This worksheet shall be used by the Offeror to itemize all assumptions upon which its cost proposal is being determined/is dependent. | • Provide details pertaining to any and all assumptions, expectations, and/or vendor performance parameters that have been used as the basis for the cost proposal. |
• Each row should be a separate detailed assumption or expectation.
• The specific section, page, and paragraph of the Offer must be provided to support each assumption or expectation.
• If the Offeror's typical cost model does not normally charge for a specific deliverable/service provided within this workbook, please provide a statement in this worksheet regarding the Offeror's methodology (e.g., not applicable, no additional charge).
Note: Assumption that do not impact cost need not be entered here. No cost assumptions or exceptions shall be in conflict with the Terms and Conditions of this solicitation. There will be no future negotiation allowed for assumptions or exceptions not listed within this worksheet upon submission of the offer.
6. BidBuy Entry This worksheet auto-populates all costs as each subsequent worksheet is completed and provides space for capturing cost assumptions. • Verify the accuracy of the costs for each print sequence.
• Document all cost assumptions made relevant to each print sequence.
• Utilize this worksheet as your guide to entering the formal cost proposal into BidBuy.
1. Total Cost Summary
| State of Illinois Environmental Protection Agency |
| Environmental Information Management System (EIMS) |
| 26-532EPA-FISCP-B-51295 |
| Attachment B - Cost Workbook |
| Enter Offeror Name Here |
| Total Cost Summary |
| Total Cost Summary: Ten-Year Contract Term | Total Cost by Contract Year | ||||||||||
| One Time Costs | Total Deliverable Costs | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 |
| Project Management Deliverables | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Requirements Analysis & Validation Deliverables | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Solution Design & Development/Configuration Deliverables | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Data Migration Deliverables | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Testing Deliverables | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| User Training Deliverables | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Solution Hosting & Provisioning Deliverables | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Cutover/Deployment/Hypercare Deliverables | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Maintenance & Operations Deliverables | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Knowledge Transfer & Exit Transition Deliverables | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Multi-Vendor Integration Deliverables | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Organizational Change Management Deliverables | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| TOTAL Deliverable Costs | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Ongoing Costs | Total Ongoing Costs | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 |
| Solution Ongoing Costs | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Maintenance and Operations Services | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| TOTAL Ongoing Costs | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| TOTAL YEARLY COST | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| TOTAL CONTRACT COST | $0.00 |
| S-126 As Needed Enhancement Plan |
| S-131 Exit Transition Plan |
| S-132 Final Acceptance Document |
| S-133 Knowledge Transfer Plan |
| S-139 Multi-Vendor Integration Plan |
| S-140 Organizational Change Management (OCM) Plan |
| S-141 Organizational Change Management Effectiveness Report |
| S-142 Organizational Change Readiness Assessment Report |
X1A0T X1A0T X1A0T X1A0T
2. Deliverable Costs
| State of Illinois Environmental Protection Agency |
| Environmental Information Management System (EIMS) |
| 26-532EPA-FISCP-B-51295 |
| Attachment B - Cost Workbook |
| Enter Offeror Name Here |
| Deliverable Costs |
| Information & Instructions |
| • Column A: Identifies the deliverables required for this RFP and resulting contract, as detailed in Attachment A - Traceability Matrix, worksheet 4. Services. The ID# assigned to each deliverable within Attachment A - Traceability Matrix is identified along with the Deliverable Name for easy cross-referencing. |
• Column B: Offerors should use this column to enter the total one-time cost for each deliverable during the implementation.
• Column C: Offerors should use this column to enter the contract year the deliverable is expected to be completed and submitted for invoicing. The year entered here must align with the proposed work plan provided as part of the offer.
Note: Deliverables are required to be in a finalized state having all IEPA feedback and requested revisions applied and fully approved before an invoice can be raised.
| Project Management Deliverables | ||||||||||||
| Deliverable Name | Total One-time Cost | Contract Year Completion | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 |
| S-6 Project Management Plan | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| S-8 Baseline Project Schedule | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| S-11 Weekly Status Report | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| S-12 Monthly Executive Status Report | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Total Cost for Deliverable Group | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Requirements Analysis & Validation Deliverables | ||||||||||||
| Deliverable Name | Total One-time Cost | Contract Year Completion | ||||||||||
| S-26 Requirements Validation Report | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Total Cost for Deliverable Group | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Solution Design & Development/Configuration Deliverables | ||||||||||||
| Deliverable Name | Total One-time Cost | Contract Year Completion | ||||||||||
| S-34 Configuration Management Plan | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| S-35 Data Entry Protocol | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| S-36 Role Based Access Control (RBAC) | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| S-37 Solution Design Document | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 2-38 System Security Plan | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Total Cost for Deliverable Group | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| Data Migration Deliverables | ||||||||||||
| Deliverable Name | Total One-time Cost | Contract Year Completion | ||||||||||
| S-41 Data Transformation & Mapping Data Dictionary | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| S-42 Data Validation & Reconciliation Plan | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| S-43 Data Migration Plan | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| S-44 Data Migration Strategy | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Total Cost for Deliverable Group | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Testing Deliverables | ||||||||||||
| Deliverable Name | Total One-time Cost | Contract Year Completion | ||||||||||
| S-45 Test Management Strategy | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| S-46 Test Plans | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| S-47 Test Results Reports | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| S-48 Test Scripts, Test Cases, Test Scenarios, and Test Data | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Total Cost for Deliverable Group | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| User Training Deliverables | ||||||||||||
| Deliverable Name | Total One-time Cost | Contract Month Completion | ||||||||||
| S-54 User Training Plan | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| S-55 Training Curriculum & Materials | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| S-56 Training Report | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Total Cost for Deliverable Group | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Solution Hosting & Provisioning Deliverables | ||||||||||||
| Deliverable Name | Total One-time Cost | Contract Year Completion | ||||||||||
| S-64 Downtime Processes & Protocols | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| S-65 Disaster Recovery Plan | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| S-66 Infrastructure & Solution Recovery Plan | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| S-67 Infrastructure Management Plan | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Total Cost for Deliverable Group | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Cutover/Deployment/Hypercare Deliverables | ||||||||||||
| Deliverable Name | Total One-time Cost | Contract Year Completion | ||||||||||
| S-88 Cutover/Deployment Plan | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| S-89 Infrastructure Documentation | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| S-90 Post-Implementation Report | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| S-91 Successful Deployment Report | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Total Cost for Deliverable Group | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Maintenance & Operations Deliverables | ||||||||||||
| Deliverable Name | Total One-time Cost | Contract Year Completion | ||||||||||
| S-96 Monthly Quality Assurance Report | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| S-97 Plan of Action & Milestones (POAM) | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| S-98 Production Support Plan | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| S-99 Release Management Plan | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| S-100 System & User Documentation | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| S-126 As Needed Enhancement Plan | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Total Cost for Deliverable Group | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Knowledge Transfer & Exit Transition Deliverables | ||||||||||||
| Deliverable Name | Total One-time Cost | Contract Year Completion | ||||||||||
| S-131 Exit Transition Plan | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| S-132 Final Acceptance Document | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| S-133 Knowledge Transfer Plan | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Total Cost for Deliverable Group | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Multi-Vendor Integration Deliverables | ||||||||||||
| Deliverable Name | Total One-time Cost | Contract Month Completion | ||||||||||
| S-139 Multi-Vendor Integration Plan | 8 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| Total Cost for Deliverable Group | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Organizational Change Management Deliverables | ||||||||||||
| Deliverable Name | Total One-time Cost | Contract Year Completion | ||||||||||
| S-140 Organizational Change Management (OCM) Plan | 10 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| S-141 Organizational Change Management Effectiveness Report | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| S-142 Organizational Change Readiness Assessment Report | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Total Cost for Deliverable Group | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
X2A0T X1A0T X1A0T X1A0T X1A0T
3. Ongoing Costs
| State of Illinois Environmental Protection Agency | |
| Environmental Information Management System (EIMS) | Senior |
| 26-532EPA-FISCP-B-51295 | |
| Attachment B - Cost Workbook |
| Enter Offeror Name Here |
| Ongoing Costs |
| Information & Instructions |
| This workbook is designed to capture the detailed pricing for Solution Services as well as Maintenance and Operations Services. Please carefully follow the instructions below to ensure accuracy and completeness in your submission. |
• Column A: This column identifies the specific ongoing costs IEPA is requesting the Offeror to provide.
• Column B - K: The Offeror should use these columns to specify the annual cost per contract year as it aligns with the proposed work plan submitted as part of this offer.
Table 1 - Solution Services:
• Solution Hosting: Enter the costs related to hosting or subscription services required for the solution. Ensure these costs reflect the ongoing service fees.
• Solution Licensing: Enter the costs related to solution licensing reflective of initial set-up through full implementation and ongoing years. Ensure these costs reflect the ongoing service fees.
• Data Storage and Backup: Enter the costs related data storage and backup services from start-up through end of contract. Data storage/backup services should be implemented at start of project. Ensure these costs reflect the ongoing service fees.
• Development Environment: Enter the costs related to providing a development environment through-out the necessary project phases. Ensure these costs reflect the ongoing service fees.
• Testing Environment: Enter the costs related to providing a testing environment through-out the necessary project phases. Ensure these costs reflect the ongoing service fees.
• Training Environment: Enter the costs related to providing a training environment from start-up through end of contract. Ensure these costs reflect the ongoing service fees.
• Disaster Recovery Environment: Enter the costs related to maintaining a Disaster Recovery environment through-out the contract term. Ensure these costs reflect the ongoing service fees.
• Sub-Total Solution Costs: Verify that this field accurately sums the total costs from Solution Costs.
Table 2 - Maintenance and Operations Services:
• Maintenance and Operations Services: Provide the monthly cost associated with maintaining and operating the solution. This should include all necessary activities to ensure the solution remains functional and efficient.
• Monthly Status Report: Provide the costs associated with providing a monthly status report on performance and support of the solution.
• Sub-Total Maintenance and Operations Services Costs: Verify that this field accurately sums the total costs from Maintenance and Operations Services Costs.
| Table 1 - Solution Services | ||||||||||
| Service | Annual Cost Year 1 | Annual Cost Year 2 | Annual Cost Year 3 | Annual Cost Year 4 | Annual Cost Year 5 | Annual Cost Year 6 | Annual Cost Year 7 | Annual Cost Year 8 | Annual Cost Year 9 | Annual Cost Year 10 |
| Solution Hosting | ||||||||||
| Solution Licensing | ||||||||||
| Data Storage and Backup | ||||||||||
| Development Environment | ||||||||||
| Testing Environment | ||||||||||
| Training Environment | ||||||||||
| Disaster Recovery Environment | ||||||||||
| Sub-Total Solution Costs | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Table 2 - Maintenance and Operations Services | ||||||||||
| Service | Annual Cost Year 1 | Annual Cost Year 2 | Annual Cost Year 3 | Annual Cost Year 4 | Annual Cost Year 5 | Annual Cost Year 6 | Annual Cost Year 7 | Annual Cost Year 8 | Annual Cost Year 9 | Annual Cost Year 10 |
| Maintenance and Operations Services | ||||||||||
| Monthly Status Report | ||||||||||
| Sub-Total Maintenance and Operations Services Costs | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| S-126 As Needed Enhancement Plan | ||||||||||
| S-131 Exit Transition Plan | ||||||||||
| S-132 Final Acceptance Document | ||||||||||
| S-133 Knowledge Transfer Plan | ||||||||||
| S-139 Multi-Vendor Integration Plan | ||||||||||
| S-140 Organizational Change Management (OCM) Plan | ||||||||||
| S-141 Organizational Change Management Effectiveness Report | ||||||||||
| S-142 Organizational Change Readiness Assessment Report |
X3A0T X1A0T X1A0T X1A0T X1A0T
4. Ad Hoc Rate Card
| State of Illinois Environmental Protection Agency |
| Environmental Information Management System (EIMS) |
| 26-532EPA-FISCP-B-51295 |
| Attachment B - Cost Workbook |
| Enter Offeror Name Here |
| Ad Hoc Rate Card |
| Information & Instructions |
| This worksheet pertains to specific vendor roles IEPA would like the Offeror to provide an hourly rate for. These rates are excluded from all of the services and deliverables listed throughout the other worksheets of this workbook. These rates will be utilized for any potential future enhances IEPA may request during the contract term. The Offeror should complete the below steps for each of the five (5) tables below for the identified contract term years (e.g., Table 1 is Years 1 - 3). |
• Column A: Identifies the Vendor Role that may be requested during the contract term. Vendor Roles identified in section A.2.4. of the RFP have been prepopulated.
• Column B: Should be used by the Offeror to input the hourly rate for a senior level resource. (e.g., A resource who has a Bachelor's Degree with more than 5 years in the role, or more than 8 years in the role without a degree.)
• Column C: Should be used by the Offeror to input the hourly rate for a intermediate level resource. (e.g., A resource who has a Bachelor's Degree with 2-5 years in the role, or more than 5-8 years in the role without a degree.)
• Column D: Should be used by the Offeror to input the hourly rate for a junior level resource. (e.g., A resource who has a Bachelor's Degree with less than 2 years in the role, or more than 5 years in the role without a degree.)
| Table 1 | ||||
| Years 1 - 3 | ||||
| Vendor Role | Senior Level Resource | Intermediate Level Resource | Junior Level Resource | |
| Hourly Rate | Hourly Rate | Hourly Rate | ||
| Account Executive | ||||
| Functional Lead | ||||
| Project Manager | ||||
| Security Engineer | ||||
| Solution Architect | ||||
| Technical Lead | ||||
| Business Analyst | ||||
| Data Architect | ||||
| Database Administrator | ||||
| Developer | ||||
| Help Desk Level 2 | ||||
| Help Desk Level 3 | ||||
| Organizational Change Management (OCM) Lead | added 4 rows to the bottom of each table to hold all vendor roles identified in A.2. These need to be added to the bidbuy worksheet. | |||
| Quality & Testing Lead | ||||
| Release Manager | ||||
| Training Coordinator |
| Table 2 | |||
| Years 4 - 5 | |||
| Vendor Role | Senior Level Resource | Intermediate Level Resource | Junior Level Resource |
| Hourly Rate | Hourly Rate | Hourly Rate | |
| Account Executive | |||
| Functional Lead | |||
| Project Manager | |||
| Security Engineer | |||
| Solution Architect | |||
| Technical Lead | |||
| Business Analyst | |||
| Data Architect | |||
| Database Administrator | |||
| Developer | |||
| Help Desk Level 2 | |||
| Help Desk Level 3 | |||
| Organizational Change Management (OCM) Lead | |||
| Quality & Testing Lead | |||
| Release Manager | |||
| Training Coordinator | |||
| Table 3 | |||
| Years 6 - 7 | |||
| Vendor Role | Senior Level Resource | Intermediate Level Resource | Junior Level Resource |
| Hourly Rate | Hourly Rate | Hourly Rate | |
| Account Executive | |||
| Functional Lead | |||
| Project Manager | |||
| Security Engineer | |||
| Solution Architect | |||
| Technical Lead | |||
| Business Analyst | |||
| Data Architect | |||
| Database Administrator | |||
| Developer | |||
| Help Desk Level 2 | |||
| Help Desk Level 3 | |||
| Organizational Change Management (OCM) Lead | |||
| Quality & Testing Lead | |||
| Release Manager | |||
| Training Coordinator | |||
| Table 4 | |||
| Years 8 - 9 | |||
| Vendor Role | Senior Level Resource | Intermediate Level Resource | Junior Level Resource |
| Hourly Rate | Hourly Rate | Hourly Rate | |
| Account Executive | |||
| Functional Lead | |||
| Project Manager | |||
| Security Engineer | |||
| Solution Architect | |||
| Technical Lead | |||
| Business Analyst | |||
| Data Architect | |||
| Database Administrator | |||
| Developer | |||
| Help Desk Level 2 | |||
| Help Desk Level 3 | |||
| Organizational Change Management (OCM) Lead | |||
| Quality & Testing Lead | |||
| Release Manager | |||
| Training Coordinator | |||
| Table 5 | |||
| S-140 Organizational Change Management (OCM) Plan | |||
| S-141 Organizational Change Management Effectiveness Report | Senior Level Resource | Intermediate Level Resource | Junior Level Resource |
| Hourly Rate | Hourly Rate | Hourly Rate | |
| Account Executive | |||
| Functional Lead | |||
| Project Manager | |||
| Security Engineer | |||
| Solution Architect | |||
| Technical Lead | |||
| Business Analyst | |||
| Data Architect | |||
| Database Administrator | |||
| Developer | |||
| Help Desk Level 2 | |||
| Help Desk Level 3 | |||
| Organizational Change Management (OCM) Lead | |||
| Quality & Testing Lead | |||
| Release Manager | |||
| Training Coordinator |
X4A0T X1A0T X1A0T X1A0T X1A0T
5. Cost Assumptions
| State of Illinois Environmental Protection Agency |
| Environmental Information Management System (EIMS) |
| 26-532EPA-FISCP-B-51295 |
| Attachment B - Cost Workbook |
| Enter Offeror Name Here |
| Cost Assumptions |
| Information & Instructions |
| The table below is designated for the Offeror to document any assumptions considered in the development of their cost proposal. |
• Column A: Assigns a unique item number to each assumption or expectation.
• Column B: Specifies the section, page, and paragraph of the offer that supports each assumption or expectation.
• Column C: Details all assumptions, expectations, and/or Offeror performance parameters that form the basis of the cost proposal.
• Column D: Details the rationale for each separate assumption or expectation.
• Column E: Identifies the impact of the assumption or exception taken turns out to be invalid. If the Offeror's typical pricing model does not normally charge for a specific deliverable/service provided within this workbook, please provide a statement in this worksheet regarding the Offeror's methodology (e.g., not applicable, no additional charge).
Note: Assumptions that do not impact cost need not be entered here. No cost assumptions or exceptions shall be in conflict with the Terms and Conditions of this solicitation. There will be no future negotiation allowed for assumptions or exceptions not listed within this worksheet upon submission of the offer.
| Offeror Assumptions | ||||
| Item # | Offer Section, Page, Paragraph | Description | Rationale | Cost Impact if the Assumption Turns Out Not to be Valid |
| 1 | ||||
| 2 | ||||
| 3 | ||||
| 4 | ||||
| 5 | ||||
| 6 | ||||
| 7 | ||||
| 8 | ||||
| 9 | ||||
| 10 | ||||
| S-126 As Needed Enhancement Plan | ||||
| S-131 Exit Transition Plan | ||||
| S-132 Final Acceptance Document | ||||
| S-133 Knowledge Transfer Plan | ||||
| S-139 Multi-Vendor Integration Plan | ||||
| S-140 Organizational Change Management (OCM) Plan | ||||
| S-141 Organizational Change Management Effectiveness Report | ||||
| S-142 Organizational Change Readiness Assessment Report |
X1A0T X1A0T X1A0T X1A0T
6. BidBuy Entry
| State of Illinois Environmental Protection Agency |
| Environmental Information Management System (EIMS) |
| 26-532EPA-FISCP-B-51295 |
| Attachment B - Cost Workbook |
| Enter Offeror Name Here |
| BidBuy Entry |
| Information & Instructions |
| • Please review the information below for accuracy. |
• Use this information when entering your cost proposal into BidBuy, as noted in section C. of the main RFP document. The values from column F should be entered into the BidBuy as the unit cost in the same order shown below.
• Document any assumptions made when establishing the cost for each associated print sequence. These assumptions should be entered into BidBuy in alignment with each print sequence.
Note: It is important to note that all Offerors will ONLY be evaluated by the cost information on BidBuy and not this workbook.
| Print Sequence | Year | Description | Quantity | UOM | Unit Cost | Assumption |
| 1 | 0 | S-6 Project Management Plan | 1 | Deliverable | $ - 0 | |
| 2 | 0 | S-8 Baseline Project Schedule | 1 | Deliverable | $ - 0 | |
| 3 | 0 | S-11 Weekly Status Report | 1 | Deliverable | $ - 0 | |
| 4 | 0 | S-12 Monthly Executive Status Report | 1 | Deliverable | $ - 0 | |
| 5 | 0 | S-26 Requirements Validation Report | 1 | Deliverable | $ - 0 | |
| 6 | 0 | S-34 Configuration Management Plan | 1 | Deliverable | $ - 0 | |
| 7 | 0 | S-35 Data Entry Protocol | 1 | Deliverable | $ - 0 | |
| 8 | 0 | S-36 Role Based Access Control (RBAC) | 1 | Deliverable | $ - 0 | |
| 9 | 0 | S-37 Solution Design Document | 1 | Deliverable | $ - 0 | |
| 10 | 0 | 2-38 System Security Plan | 1 | Deliverable | $ - 0 | |
| 11 | 0 | S-41 Data Transformation & Mapping Data Dictionary | 1 | Deliverable | $ - 0 | |
| 12 | 0 | S-42 Data Validation & Reconciliation Plan | 1 | Deliverable | $ - 0 | |
| 13 | 0 | S-43 Data Migration Plan | 1 | Deliverable | $ - 0 | |
| 14 | 0 | S-44 Data Migration Strategy | 1 | Deliverable | $ - 0 | |
| 15 | 0 | S-45 Test Management Strategy | 1 | Deliverable | $ - 0 | |
| 16 | 0 | S-46 Test Plans | 1 | Deliverable | $ - 0 | |
| 17 | 0 | S-47 Test Results Reports | 1 | Deliverable | $ - 0 | |
| 18 | 0 | S-48 Test Scripts, Test Cases, Test Scenarios, and Test Data | 1 | Deliverable | $ - 0 | |
| 19 | 0 | S-54 User Training Plan | 1 | Deliverable | $ - 0 | |
| 20 | 0 | S-55 Training Curriculum & Materials | 1 | Deliverable | $ - 0 | |
| 21 | 0 | S-56 Training Report | 1 | Deliverable | $ - 0 | |
| 22 | 0 | S-64 Downtime Processes & Protocols | 1 | Deliverable | $ - 0 | |
| 23 | 0 | S-65 Disaster Recovery Plan | 1 | Deliverable | $ - 0 | |
| 24 | 0 | S-66 Infrastructure & Solution Recovery Plan | 1 | Deliverable | $ - 0 | |
| 25 | 0 | S-67 Infrastructure Management Plan | 1 | Deliverable | $ - 0 | |
| 26 | 0 | S-88 Cutover/Deployment Plan | 1 | Deliverable | $ - 0 | |
| 27 | 0 | S-89 Infrastructure Documentation | 1 | Deliverable | $ - 0 | |
| 28 | 0 | S-90 Post-Implementation Report | 1 | Deliverable | $ - 0 | |
| 29 | 0 | S-91 Successful Deployment Report | 1 | Deliverable | $ - 0 | |
| 30 | 0 | S-96 Monthly Quality Assurance Report | 1 | Deliverable | $ - 0 | |
| 31 | 0 | S-97 Plan of Action & Milestones (POAM) | 1 | Deliverable | $ - 0 | |
| 32 | 0 | S-98 Production Support Plan | 1 | Deliverable | $ - 0 | |
| 33 | 0 | S-99 Release Management Plan | 1 | Deliverable | $ - 0 | |
| 34 | 0 | S-100 System & User Documentation | 1 | Deliverable | $ - 0 | |
| 35 | 0 | S-126 As Needed Enhancement Plan | 1 | Deliverable | $ - 0 | |
| 36 | 0 | S-131 Exit Transition Plan | 1 | Deliverable | $ - 0 | |
| 37 | 0 | S-132 Final Acceptance Document | 1 | Deliverable | $ - 0 | |
| 38 | 0 | S-133 Knowledge Transfer Plan | 1 | Deliverable | $ - 0 | |
| 39 | 8 | S-139 Multi-Vendor Integration Plan | 1 | Deliverable | $ - 0 | |
| 40 | 10 | S-140 Organizational Change Management (OCM) Plan | 1 | Deliverable | $ - 0 | |
| 41 | 0 | S-141 Organizational Change Management Effectiveness Report | 1 | Deliverable | $ - 0 | |
| 42 | 0 | S-142 Organizational Change Readiness Assessment Report | 1 | Deliverable | $ - 0 | |
| 43 | 1 | Solution Hosting Annual Cost Year 1 | 1 | Year | $0.00 | |
| 44 | 1 | Solution Licensing Annual Cost Year 1 | 1 | Year | $0.00 | |
| 45 | 1 | Data Storage and Backup Annual Cost Year 1 | 1 | Year | $0.00 | |
| 46 | 1 | Development Environment Annual Cost Year 1 | 1 | Year | $0.00 | |
| 47 | 1 | Testing Environment Annual Cost Year 1 | 1 | Year | $0.00 | |
| 48 | 1 | Training Environment Annual Cost Year 1 | 1 | Year | $0.00 | |
| 49 | 1 | Disaster Recovery Environment Annual Cost Year 1 | 1 | Year | $0.00 | |
| 50 | 2 | Solution Hosting Annual Cost Year 2 | 1 | Year | $0.00 | |
| 51 | 2 | Solution Licensing Annual Cost Year 2 | 1 | Year | $0.00 | |
| 52 | 2 | Data Storage and Backup Annual Cost Year 2 | 1 | Year | $0.00 | |
| 53 | 2 | Development Environment Annual Cost Year 2 | 1 | Year | $0.00 | |
| 54 | 2 | Testing Environment Annual Cost Year 2 | 1 | Year | $0.00 | |
| 55 | 2 | Training Environment Annual Cost Year 2 | 1 | Year | $0.00 | |
| 56 | 2 | Disaster Recovery Environment Annual Cost Year 2 | 1 | Year | $0.00 | |
| 57 | 3 | Solution Hosting Annual Cost Year 3 | 1 | Year | $0.00 | |
| 58 | 3 | Solution Licensing Annual Cost Year 3 | 1 | Year | $0.00 | |
| 59 | 3 | Data Storage and Backup Annual Cost Year 3 | 1 | Year | $0.00 | |
| 60 | 3 | Development Environment Annual Cost Year 3 | 1 | Year | $0.00 | |
| 61 | 3 | Testing Environment Annual Cost Year 3 | 1 | Year | $0.00 | |
| 62 | 3 | Training Environment Annual Cost Year 3 | 1 | Year | $0.00 | |
| 63 | 3 | Disaster Recovery Environment Annual Cost Year 3 | 1 | Year | $0.00 | |
| 64 | 4 | Solution Hosting Annual Cost Year 4 | 1 | Year | $0.00 | |
| 65 | 4 | Solution Licensing Annual Cost Year 4 | 1 | Year | $0.00 | |
| 66 | 4 | Data Storage and Backup Annual Cost Year 4 | 1 | Year | $0.00 | |
| 67 | 4 | Development Environment Annual Cost Year 4 | 1 | Year | $0.00 | |
| 68 | 4 | Testing Environment Annual Cost Year 4 | 1 | Year | $0.00 | |
| 69 | 4 | Training Environment Annual Cost Year 4 | 1 | Year | $0.00 | |
| 70 | 4 | Disaster Recovery Environment Annual Cost Year 4 | 1 | Year | $0.00 | |
| 71 | 5 | Solution Hosting Annual Cost Year 5 | 1 | Year | $0.00 | |
| 72 | 5 | Solution Licensing Annual Cost Year 5 | 1 | Year | $0.00 | |
| 73 | 5 | Data Storage and Backup Annual Cost Year 5 | 1 | Year | $0.00 | |
| 74 | 5 | Development Environment Annual Cost Year 5 | 1 | Year | $0.00 | |
| 75 | 5 | Testing Environment Annual Cost Year 5 | 1 | Year | $0.00 | |
| 76 | 5 | Training Environment Annual Cost Year 5 | 1 | Year | $0.00 | |
| 77 | 5 | Disaster Recovery Environment Annual Cost Year 5 | 1 | Year | $0.00 | |
| 78 | 6 | Solution Hosting Annual Cost Year 6 | 1 | Year | $0.00 | |
| 79 | 6 | Solution Licensing Annual Cost Year 6 | 1 | Year | $0.00 | |
| 80 | 6 | Data Storage and Backup Annual Cost Year 6 | 1 | Year | $0.00 | |
| 81 | 6 | Development Environment Annual Cost Year 6 | 1 | Year | $0.00 | |
| 82 | 6 | Testing Environment Annual Cost Year 6 | 1 | Year | $0.00 | |
| 83 | 6 | Training Environment Annual Cost Year 6 | 1 | Year | $0.00 | |
| 84 | 6 | Disaster Recovery Environment Annual Cost Year 6 | 1 | Year | $0.00 | |
| 85 | 7 | Solution Hosting Annual Cost Year 7 | 1 | Year | $0.00 | |
| 86 | 7 | Solution Licensing Annual Cost Year 7 | 1 | Year | $0.00 | |
| 87 | 7 | Data Storage and Backup Annual Cost Year 7 | 1 | Year | $0.00 | |
| 88 | 7 | Development Environment Annual Cost Year 7 | 1 | Year | $0.00 | |
| 89 | 7 | Testing Environment Annual Cost Year 7 | 1 | Year | $0.00 | |
| 90 | 7 | Training Environment Annual Cost Year 7 | 1 | Year | $0.00 | |
| 91 | 7 | Disaster Recovery Environment Annual Cost Year 7 | 1 | Year | $0.00 | |
| 92 | 8 | Solution Hosting Annual Cost Year 8 | 1 | Year | $0.00 | |
| 93 | 8 | Solution Licensing Annual Cost Year 8 | 1 | Year | $0.00 | |
| 94 | 8 | Data Storage and Backup Annual Cost Year 8 | 1 | Year | $0.00 | |
| 95 | 8 | Development Environment Annual Cost Year 8 | 1 | Year | $0.00 | |
| 96 | 8 | Testing Environment Annual Cost Year 8 | 1 | Year | $0.00 | |
| 97 | 8 | Training Environment Annual Cost Year 8 | 1 | Year | $0.00 | |
| 98 | 8 | Disaster Recovery Environment Annual Cost Year 8 | 1 | Year | $0.00 | |
| 99 | 9 | Solution Hosting Annual Cost Year 9 | 1 | Year | $0.00 | |
| 100 | 9 | Solution Licensing Annual Cost Year 9 | 1 | Year | $0.00 | |
| 101 | 9 | Data Storage and Backup Annual Cost Year 9 | 1 | Year | $0.00 | |
| 102 | 9 | Development Environment Annual Cost Year 9 | 1 | Year | $0.00 | |
| 103 | 9 | Testing Environment Annual Cost Year 9 | 1 | Year | $0.00 | |
| 104 | 9 | Training Environment Annual Cost Year 9 | 1 | Year | $0.00 | |
| 105 | 9 | Disaster Recovery Environment Annual Cost Year 9 | 1 | Year | $0.00 | |
| 106 | 10 | Solution Hosting Annual Cost Year 10 | 1 | Year | $0.00 | |
| 107 | 10 | Solution Licensing Annual Cost Year 10 | 1 | Year | $0.00 | |
| 108 | 10 | Data Storage and Backup Annual Cost Year 10 | 1 | Year | $0.00 | |
| 109 | 10 | Development Environment Annual Cost Year 10 | 1 | Year | $0.00 | |
| 110 | 10 | Testing Environment Annual Cost Year 10 | 1 | Year | $0.00 | |
| 111 | 10 | Training Environment Annual Cost Year 10 | 1 | Year | $0.00 | |
| 112 | 10 | Disaster Recovery Environment Annual Cost Year 10 | 1 | Year | $0.00 | |
| 113 | 1 | Maintenance and Operations Services Annual Cost Year 1 | 1 | Year | $0.00 | |
| 114 | 1 | Monthly Status Report Annual Cost Year 1 | 1 | Year | $0.00 | |
| 115 | 2 | Maintenance and Operations Services Annual Cost Year 2 | 1 | Year | $0.00 | |
| 116 | 2 | Monthly Status Report Annual Cost Year 2 | 1 | Year | $0.00 | |
| 117 | 3 | Maintenance and Operations Services Annual Cost Year 3 | 1 | Year | $0.00 | |
| 118 | 3 | Monthly Status Report Annual Cost Year 3 | 1 | Year | $0.00 | |
| 119 | 4 | Maintenance and Operations Services Annual Cost Year 4 | 1 | Year | $0.00 | |
| 120 | 4 | Monthly Status Report Annual Cost Year 4 | 1 | Year | $0.00 | |
| 121 | 5 | Maintenance and Operations Services Annual Cost Year 5 | 1 | Year | $0.00 | |
| 122 | 5 | Monthly Status Report Annual Cost Year 5 | 1 | Year | $0.00 | |
| 123 | 6 | Maintenance and Operations Services Annual Cost Year 6 | 1 | Year | $0.00 | |
| 124 | 6 | Monthly Status Report Annual Cost Year 6 | 1 | Year | $0.00 | |
| 125 | 7 | Maintenance and Operations Services Annual Cost Year 7 | 1 | Year | $0.00 | |
| 126 | 7 | Monthly Status Report Annual Cost Year 7 | 1 | Year | $0.00 | |
| 127 | 8 | Maintenance and Operations Services Annual Cost Year 8 | 1 | Year | $0.00 | |
| 128 | 8 | Monthly Status Report Annual Cost Year 8 | 1 | Year | $0.00 | |
| 129 | 9 | Maintenance and Operations Services Annual Cost Year 9 | 1 | Year | $0.00 | |
| 130 | 9 | Monthly Status Report Annual Cost Year 9 | 1 | Year | $0.00 | |
| 131 | 10 | Maintenance and Operations Services Annual Cost Year 10 | 1 | Year | $0.00 | |
| 132 | 10 | Monthly Status Report Annual Cost Year 10 | 1 | Year | $0.00 | |
| 133 | 1-3 | Account Executive Senior Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 134 | 1-3 | Functional Lead Senior Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 135 | 1-3 | Project Manager Senior Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 136 | 1-3 | Security Engineer Senior Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 137 | 1-3 | Solution Architect Senior Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 138 | 1-3 | Technical Lead Senior Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 139 | 1-3 | Business Analyst Senior Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 140 | 1-3 | Data Architect Senior Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 141 | 1-3 | Database Administrator Senior Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 142 | 1-3 | Developer Senior Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 143 | 1-3 | Help Desk Level 2 Senior Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 144 | 1-3 | Help Desk Level 3 Senior Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 145 | 1-3 | Organizational Change Management (OCM) Lead Senior Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 146 | 1-3 | Quality & Testing Lead Senior Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 147 | 1-3 | Release Manager Senior Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 148 | 1-3 | Training Coordinator Senior Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 149 | 1-3 | Account Executive Intermediate Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 150 | 1-3 | Functional Lead Intermediate Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 151 | 1-3 | Project Manager Intermediate Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 152 | 1-3 | Security Engineer Intermediate Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 153 | 1-3 | Solution Architect Intermediate Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 154 | 1-3 | Technical Lead Intermediate Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 155 | 1-3 | Business Analyst Intermediate Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 156 | 1-3 | Data Architect Intermediate Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 157 | 1-3 | Database Administrator Intermediate Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 158 | 1-3 | Developer Intermediate Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 159 | 1-3 | Help Desk Level 2 Intermediate Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 160 | 1-3 | Help Desk Level 3 Intermediate Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 161 | 1-3 | Organizational Change Management (OCM) Lead Intermediate Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 162 | 1-3 | Quality & Testing Lead Intermediate Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 163 | 1-3 | Release Manager Intermediate Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 164 | 1-3 | Training Coordinator Intermediate Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 165 | 1-3 | Account Executive Junior Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 166 | 1-3 | Functional Lead Junior Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 167 | 1-3 | Project Manager Junior Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 168 | 1-3 | Security Engineer Junior Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 169 | 1-3 | Solution Architect Junior Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 170 | 1-3 | Technical Lead Junior Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 171 | 1-3 | Business Analyst Junior Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 172 | 1-3 | Data Architect Junior Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 173 | 1-3 | Database Administrator Junior Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 174 | 1-3 | Developer Junior Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 175 | 1-3 | Help Desk Level 2 Junior Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 176 | 1-3 | Help Desk Level 3 Junior Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 177 | 1-3 | Organizational Change Management (OCM) Lead Junior Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 178 | 1-3 | Quality & Testing Lead Junior Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 179 | 1-3 | Release Manager Junior Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 180 | 1-3 | Training Coordinator Junior Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 181 | 4-5 | Account Executive Senior Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 182 | 4-5 | Functional Lead Senior Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 183 | 4-5 | Project Manager Senior Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 184 | 4-5 | Security Engineer Senior Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 185 | 4-5 | Solution Architect Senior Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 186 | 4-5 | Technical Lead Senior Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 187 | 4-5 | Business Analyst Senior Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 188 | 4-5 | Data Architect Senior Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 189 | 4-5 | Database Administrator Senior Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 190 | 4-5 | Developer Senior Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 191 | 4-5 | Help Desk Level 2 Senior Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 192 | 4-5 | Help Desk Level 3 Senior Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 193 | 4-5 | Organizational Change Management (OCM) Lead Senior Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 194 | 4-5 | Quality & Testing Lead Senior Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 195 | 4-5 | Release Manager Senior Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 196 | 4-5 | Training Coordinator Senior Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 197 | 4-5 | Account Executive Intermediate Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 198 | 4-5 | Functional Lead Intermediate Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 199 | 4-5 | Project Manager Intermediate Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 200 | 4-5 | Security Engineer Intermediate Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 201 | 4-5 | Solution Architect Intermediate Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 202 | 4-5 | Technical Lead Intermediate Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 203 | 4-5 | Business Analyst Intermediate Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 204 | 4-5 | Data Architect Intermediate Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 205 | 4-5 | Database Administrator Intermediate Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 206 | 4-5 | Developer Intermediate Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 207 | 4-5 | Help Desk Level 2 Intermediate Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 208 | 4-5 | Help Desk Level 3 Intermediate Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 209 | 4-5 | Organizational Change Management (OCM) Lead Intermediate Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 210 | 4-5 | Quality & Testing Lead Intermediate Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 211 | 4-5 | Release Manager Intermediate Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 212 | 4-5 | Training Coordinator Intermediate Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 213 | 4-5 | Account Executive Junior Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 214 | 4-5 | Functional Lead Junior Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 215 | 4-5 | Project Manager Junior Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 216 | 4-5 | Security Engineer Junior Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 217 | 4-5 | Solution Architect Junior Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 218 | 4-5 | Technical Lead Junior Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 219 | 4-5 | Business Analyst Junior Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 220 | 4-5 | Data Architect Junior Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 221 | 4-5 | Database Administrator Junior Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 222 | 4-5 | Developer Junior Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 223 | 4-5 | Help Desk Level 2 Junior Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 224 | 4-5 | Help Desk Level 3 Junior Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 225 | 4-5 | Organizational Change Management (OCM) Lead Junior Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 226 | 4-5 | Quality & Testing Lead Junior Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 227 | 4-5 | Release Manager Junior Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 228 | 4-5 | Training Coordinator Junior Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 229 | 6-7 | Account Executive Senior Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 230 | 6-7 | Functional Lead Senior Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 231 | 6-7 | Project Manager Senior Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 232 | 6-7 | Security Engineer Senior Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 233 | 6-7 | Solution Architect Senior Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 234 | 6-7 | Technical Lead Senior Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 235 | 6-7 | Business Analyst Senior Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 236 | 6-7 | Data Architect Senior Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 237 | 6-7 | Database Administrator Senior Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 238 | 6-7 | Developer Senior Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 239 | 6-7 | Help Desk Level 2 Senior Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 240 | 6-7 | Help Desk Level 3 Senior Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 241 | 6-7 | Organizational Change Management (OCM) Lead Senior Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 242 | 6-7 | Quality & Testing Lead Senior Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 243 | 6-7 | Release Manager Senior Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 244 | 6-7 | Training Coordinator Senior Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 245 | 6-7 | Account Executive Intermediate Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 246 | 6-7 | Functional Lead Intermediate Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 247 | 6-7 | Project Manager Intermediate Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 248 | 6-7 | Security Engineer Intermediate Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 249 | 6-7 | Solution Architect Intermediate Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 250 | 6-7 | Technical Lead Intermediate Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 251 | 6-7 | Business Analyst Intermediate Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 252 | 6-7 | Data Architect Intermediate Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 253 | 6-7 | Database Administrator Intermediate Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 254 | 6-7 | Developer Intermediate Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 255 | 6-7 | Help Desk Level 2 Intermediate Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 256 | 6-7 | Help Desk Level 3 Intermediate Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 257 | 6-7 | Organizational Change Management (OCM) Lead Intermediate Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 258 | 6-7 | Quality & Testing Lead Intermediate Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 259 | 6-7 | Release Manager Intermediate Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 260 | 6-7 | Training Coordinator Intermediate Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 261 | 6-7 | Account Executive Junior Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 262 | 6-7 | Functional Lead Junior Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 263 | 6-7 | Project Manager Junior Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 264 | 6-7 | Security Engineer Junior Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 265 | 6-7 | Solution Architect Junior Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 266 | 6-7 | Technical Lead Junior Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 267 | 6-7 | Business Analyst Junior Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 268 | 6-7 | Data Architect Junior Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 269 | 6-7 | Database Administrator Junior Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 270 | 6-7 | Developer Junior Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 271 | 6-7 | Help Desk Level 2 Junior Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 272 | 6-7 | Help Desk Level 3 Junior Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 273 | 6-7 | Organizational Change Management (OCM) Lead Junior Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 274 | 6-7 | Quality & Testing Lead Junior Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 275 | 6-7 | Release Manager Junior Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 276 | 6-7 | Training Coordinator Junior Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 277 | 8-9 | Account Executive Senior Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 278 | 8-9 | Functional Lead Senior Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 279 | 8-9 | Project Manager Senior Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 280 | 8-9 | Security Engineer Senior Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 281 | 8-9 | Solution Architect Senior Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 282 | 8-9 | Technical Lead Senior Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 283 | 8-9 | Business Analyst Senior Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 284 | 8-9 | Data Architect Senior Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 285 | 8-9 | Database Administrator Senior Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 286 | 8-9 | Developer Senior Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 287 | 8-9 | Help Desk Level 2 Senior Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 288 | 8-9 | Help Desk Level 3 Senior Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 289 | 8-9 | Organizational Change Management (OCM) Lead Senior Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 290 | 8-9 | Quality & Testing Lead Senior Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 291 | 8-9 | Release Manager Senior Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 292 | 8-9 | Training Coordinator Senior Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 293 | 8-9 | Account Executive Intermediate Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 294 | 8-9 | Functional Lead Intermediate Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 295 | 8-9 | Project Manager Intermediate Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 296 | 8-9 | Security Engineer Intermediate Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 297 | 8-9 | Solution Architect Intermediate Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 298 | 8-9 | Technical Lead Intermediate Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 299 | 8-9 | Business Analyst Intermediate Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 300 | 8-9 | Data Architect Intermediate Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 301 | 8-9 | Database Administrator Intermediate Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 302 | 8-9 | Developer Intermediate Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 303 | 8-9 | Help Desk Level 2 Intermediate Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 304 | 8-9 | Help Desk Level 3 Intermediate Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 305 | 8-9 | Organizational Change Management (OCM) Lead Intermediate Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 306 | 8-9 | Quality & Testing Lead Intermediate Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 307 | 8-9 | Release Manager Intermediate Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 308 | 8-9 | Training Coordinator Intermediate Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 309 | 8-9 | Account Executive Junior Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 310 | 8-9 | Functional Lead Junior Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 311 | 8-9 | Project Manager Junior Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 312 | 8-9 | Security Engineer Junior Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 313 | 8-9 | Solution Architect Junior Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 314 | 8-9 | Technical Lead Junior Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 315 | 8-9 | Business Analyst Junior Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 316 | 8-9 | Data Architect Junior Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 317 | 8-9 | Database Administrator Junior Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 318 | 8-9 | Developer Junior Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 319 | 8-9 | Help Desk Level 2 Junior Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 320 | 8-9 | Help Desk Level 3 Junior Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 321 | 8-9 | Organizational Change Management (OCM) Lead Junior Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 322 | 8-9 | Quality & Testing Lead Junior Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 323 | 8-9 | Release Manager Junior Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 324 | 8-9 | Training Coordinator Junior Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 325 | 10 | Account Executive Senior Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 326 | 10 | Functional Lead Senior Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 327 | 10 | Project Manager Senior Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 328 | 10 | Security Engineer Senior Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 329 | 10 | Solution Architect Senior Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 330 | 10 | Technical Lead Senior Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 331 | 10 | Business Analyst Senior Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 332 | 10 | Data Architect Senior Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 333 | 10 | Database Administrator Senior Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 334 | 10 | Developer Senior Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 335 | 10 | Help Desk Level 2 Senior Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 336 | 10 | Help Desk Level 3 Senior Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 337 | 10 | Organizational Change Management (OCM) Lead Senior Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 338 | 10 | Quality & Testing Lead Senior Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 339 | 10 | Release Manager Senior Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 340 | 10 | Training Coordinator Senior Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 341 | 10 | Account Executive Intermediate Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 342 | 10 | Functional Lead Intermediate Level Resource Hourly Rate | 1 | Hour | $0.00 | |
| 343 | 10 | Project Manager Intermediate Level Resource Hourly Rate | 1 | Hour | $0.00 |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .