256025 Supplemental Information Letter No. 1~1.pdf
PDF 88 KB Posted
- Attached to
- Bid No. 256025 Asphaltic Concrete Trench Patching, Overlay, Milling / Inlay, Milling and Speed Bumps
- Solicitation number
- S-KS0043-00013386
- Issued by
- Marion County, Oregon
About this file
This Supplemental Information Letter No. 1, issued by the City of Salem's Department of Finance Services Contracts & Procurement, addresses Bid No. 256025 for asphaltic concrete trench patching, overlay, milling/inlay, milling, and speed bump services. The bid closing date is April 22, 2025, at 11:00 AM local time, with the document specifically addressing a clarification question regarding road milling/cold planning work. The supplemental letter confirms that the bid price must include sweeping behind the mill to complete the removal of milled asphalt and prepare the area for paving.
The document is part of an annual requirement contract for roadway and infrastructure maintenance in Marion County, Oregon, with an estimated first-year budget of $260,000. The contract will run from July 1, 2025, to June 30, 2026, with potential renewal for four additional one-year periods. Contractors will be required to provide unit pricing for various work categories, maintain comprehensive liability coverage, and comply with technical specifications including a Traffic Control Plan. The procurement requires contractors to be registered with the Oregon Construction Contractors Board and will involve work potentially occurring during both daytime and nighttime hours, with strict operational requirements for contractor identification and equipment maintenance.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 1 325a325b325c.pdf | ||
| 256025 Notice Intent to Award.pdf | ||
| General Conditions~17.pdf | ||
| Zoom Bid Opening Instructions 4.22.25~1.docx | DOCX document | |
| 256025 Bid Tabulation.pdf | ||
| Attachment 2 Erosian Control.pdf | ||
| 256025 Technical Specifications.docx | DOCX document | |
| SP Notice for Multi-Mission Twin Otter Aircraft.docx | DOCX document | |
| 256025 Bid Manual.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CITY OF SALEM
DEPARTMENT OF FINANCE SERVICES
CONTRACTS & PROCUREMENT
SUPPLEMENTAL INFORMATION LETTER NO. 1
APRIL 22, 2025
BID NO. 256025
FOR: ASPHALTIC CONCRETE TRENCH PATCHING,
OVERLAY, MILLING / INLAY, MILLING AND SPEED
BUMPS
CLOSING DATE: APRIL 22, 2025 AT 11:00 AM (LOCAL TIME)
The following is a question & answer received on the above-mentioned bid.
QUESTION: For the road milling/cold planning only work, dose the bid price need to include sweeping behind the mill?
ANSWER: Yes, it would need to include any work to complete the removal of the milled asphalt, so the area was ready to pave.
Shawna Self, CPPB Purchasing Manager cc: BRANDON KLUKIS, Contract Administrator File