25-8576_Bid_Schedule.xlsx

XLSX spreadsheet 20 KB Posted

Attached to
Barefoot Beach Restoration - Grant Funded
Solicitation number
25-8576
Issued by
Collier County, Florida

About this file

Summary

This is a bid schedule for the Barefoot Beach Restoration project in Florida, a grant-funded initiative to repair and restore park facilities damaged by storms and return the site to safe and functional condition. The project encompasses civil and site improvements, accessibility upgrades, repairs to the chickee hut and concessions structure, beach access improvements, fencing and gates, monument signage and lighting, and related restoration work. The bid schedule itemizes work across multiple divisions including general requirements, existing conditions, concrete, metals, wood and composites, finishes, specialties, plumbing, electrical, and exterior improvements. Civil work items include mobilization, survey stake-out, beach sand fill, site cleanup, grading and clearing operations, asphalt overlays and repairs for roadways and parking lots, line striping, traffic signage, concrete pads for outdoor showers, water service modifications, silt fence installation, and mobi mat pathway installation. Quantities vary widely by line item, ranging from single lump-sum items to 10,354 linear feet for silt fence installation. An alternate bid option for general plumbing work related to the butterfly garden is included.

All unit costs and total costs in the bid schedule are currently listed at $0.00, indicating this is a blank template prepared for vendor completion. The schedule organizes work by construction divisions and civil categories, with pricing structured as either lump-sum amounts or unit costs for measured quantities specified in various units including square feet, linear feet, cubic yards, and individual units. The base bid total and total including the alternate are both shown as $0.00, pending contractor pricing input. No information regarding set-asides, incumbent contractors, funding sources or amounts, response deadlines, or contract term is included in this bid schedule document.

View the file

Other files

Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bid Schedule

Vendor Name:
25-8576 Bid Schedule
Barefoot Beach Restoration
COST CODESDESCRIPTIONTOTAL UNITSUOMUnit CostTOTAL
DIVISION 1 - GENERAL REQUIREMENTS
General Conditions1Lump Sum$0.00
1-4500 Quality Control
1.1Quality Control - Lab Testing (Compaction, Concrete)1Lump Sum$0.00
1.2Surveying1Lump Sum$0.00
Subtotal$0.00
DIVISION 2 - EXISTING CONDITIONS
2.1Demolition1Lump Sum$0.00
Subtotal$0.00
DIVISION 3 - CONCRETE
3.1Concrete Shower Slab200$/SF unit cost$0.00
3.2Cast-In-Place Concrete Piles for Fencing120$/unit cost$0.00
Subtotal$0.00
DIVISION 5 - METALS
5.1Simpson Straps/Hangar Replacement1Lump Sum$0.00
Subtotal$0.00
DIVISION 6 - WOOD, PLASTICS, AND COMPOSITES
6.1Chikee Hut Rails with Posts in Ground120$/LF unit cost$0.00
6.2Chikee Deck Seating150$/SF unit cost$0.00
6.3Concessions Railing and Pickets50$/LF unit cost$0.00
6.4Concessions Ramp with Rails575$/SF unit cost$0.00
Subtotal$0.00
DIVISION 9 - FINISHES
9.1Paint (Chikee Hut Bench and Railing, Concessions Railing, Ramp)366$/LF unit cost$0.00
Subtotal$0.00
DIVISION 10 - SPECIALITES
10.1Mobi Mats395$/LF unit cost$0.00
10.2Chikee Hut Thatch Roof950$/SF unit cost$0.00
10.3Entrance Sign1Lump Sum$0.00
Subtotal$0.00
DIVISION 22- PLUMBING
22.1General Plumbing1Lump Sum$0.00
Subtotal$0.00
DIVISION 26- ELECTRICAL
26.1General - Electrical1Lump Sum$0.00
Subtotal$0.00
DIVISION 32- EXTERIOR IMPROVEMENTS
32.1Chainlink Fencing and Gates352$/LF unit cost$0.00
32.2White Vinyl Split Rail Fencing1025$/LF unit cost$0.00
Subtotal$0.00
Civil
1MOBILIZATION1Lump Sum$0.00
2SURVEY STAKE-OUT1Lump Sum$0.00
3BEACH SAND FILL (SEE NOTE 1)282$/CY unit cost$0.00
3GENERAL SITE CLEAN-UP AND DEBRIS REMOVAL1Lump Sum$0.00
4CLEARING/ROUGH GRADING FOR NEW ENTRANCE SIGN1Lump Sum$0.00
5CLEARING/GRUBBING FOR NEW MAINTENANCE FENCE1Lump Sum$0.00
6CLEARING/GRUBBING FOR PERMANENT RAMP [SEE NOTE 4]1Lump Sum$0.00
7CLEARING/ROUGH GRADING FOR MOBI-MAT PATHWAYS1Lump Sum$0.00
8CLEANING/MAINTENANCE OF BUTTERFLY GARDEN AND POND1Lump Sum$0.00
9DEMOLITION/REMOVAL OF EXIST. FENCING [SEE NOTE 3]1Lump Sum$0.00
10DEMOLITION/REMOVAL OF EXIST. BOARDWALKS0Lump Sum$0.00
11ROADWAY OVERLAY (1.5" TYPE S-III)9342$/SY unit cost$0.00
12PATHWAY OVERLAY (1.5" TYPE S-III) [SEE NOTE 2]552$/SY unit cost$0.00
12aASPHALT PATHWAY (1.5" TYPE S-III)36$/SY unit cost$0.00
12b6" LIMEROCK BASE FOR ASPHALT PATHWAY36$/SY unit cost$0.00
13PARKING LOT OVERLAY (1.5" TYPE S-III)5301$/SY unit cost$0.00
14ROADWAY FULL REPAIR (2" TYPE S-I)434$/SY unit cost$0.00
15ROADWAY FULL REPAIR (1" TYPE S-III)434$/SY unit cost$0.00
16ROADWAY FULL REPAIR (8" LIMEROCK LBR-100)456$/SY unit cost$0.00
17ROADWAY FULL REPAIR (12" SUBGRADE LBR 40)477$/SY unit cost$0.00
18PARKING LOT FULL REPAIR (2" TYPE S-1)170$/SY unit cost$0.00
19PARKING LOT FULL REPAIR (1" TYPE S-III)170$/SY unit cost$0.00
20PARKING LOT FULL REPAIR (6" LIMEROCK LBR-100)179$/SY unit cost$0.00
21PARKING LOT FULL REPAIR (12" SUBGRADE LBR 40)187$/SY unit cost$0.00
226" DOUBLE YELLOW RESTRIPE THERMOPLASTIC3096$/LF unit cost$0.00
236" SINGLE WHITE RESTRIPE THERMOPLASTIC1042$/LF unit cost$0.00
24PARKING LOT RESTRIPE (COMPLETE, THERMO)1Lump Sum$0.00
25ROADWAY TRAFFIC SIGNAGE1Lump Sum$0.00
26PARKING LOT TRAFFIC SIGNAGE1Lump Sum$0.00
274" CONCRETE PAD (OUTDOOR BEACH SHOWERS)200$/SF unit cost$0.00
282" POLYTUBE WATER SERVICE MODIFICATIONS/EXTENSIONS TO NEW OUTDOOR SHOWERS353$/LF unit cost$0.00
29WATER SERVICE MISC. (METER BOX, BRASS FITTINGS, ISOLATION VALVES, TEES, REDUCER, ETC.)1Lump Sum$0.00
30HOSE BIBB REPLACEMENT (MATERIAL AND INSTALLATION)1Lump Sum$0.00
31SILT FENCE (INSTALL & MAINTAIN)10354$/LF unit cost$0.00
32MOBI MAT® [SEE NOTE 5]372$/LF unit cost$0.00
Subtotal$0.00
ALTERNATE
ALTERNATE 1General Plumbing - Butterfly Garden1Lump Sum$0.00
Subtotal$0.00
TOTAL BASE BID:$0.00
TOTAL BASE BID + ALTERNATE 1:$0.00