This is an Asbestos Inspection Report for Building #1860 at MCB Camp Lejeune, dated March 4, 2026. The report documents the identification and management of asbestos-containing materials (ACM) in this Electrical Communications Shop facility, which was built in 1983.

The building has been designated with a Hazard Rank 3/Green status as of April 2022. Non-friable ACM has been identified in multiple locations throughout the building, including: roofing sealants (black tar at flashings measuring 162 SF and gray base/perimeter flashings measuring 36 SF); interior caulking at perimeter entry doors (334 LF); and floor tiles with adhesive in various areas (ranging from 825 SF to 1,500 SF per location depending on tile type and area). The flooring materials consist of 12-inch beige tiles and 12-inch beige with tan tiles in southwest office areas, south/center hallways, and northside offices. No friable ACM was identified in the building. The report notes that intact and undisturbed ACM does not constitute a significant health hazard to occupants. Building occupants are instructed to avoid disturbance or damage to ACM materials and to report any damage, dust, or debris to the Asbestos Program Manager at 910-451-5837. The document includes detailed sampling records from multiple inspection dates (2006-2022) with chrysotile percentage analyses and confirms that previous removals and local area sampling have been conducted, with no additional ACM identified in recent inspections.

View the file

Other files

File Type Posted
Amend 0005.pdf PDF
Amend 0004.pdf PDF
Amend 0003.pdf PDF
Amend 0002.pdf PDF
Amend 0001.pdf PDF
25-0004 Basis of Design.pdf PDF
N4008525B0004 Specs.pdf PDF
25-0004 Asbestos Survey.pdf PDF
250004 RFP.pdf PDF
N4008525B0004 Dwgs Signed.pdf PDF
25-0004 Lead Survey.pdf PDF
25-0004 Appendix D.pdf PDF
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ASBESTOS INSPECTION REPORT of:

Building # 1860

MCB CAMP LEJEUNE

Wednesday, March 4, 2026

Print Date

Wednesday, March 4, 2026 Page 1 of 9Print Date:

INSPECTION SUMMARY

BLDG #:

OCCUPANT:

YEAR BUILT:

BUILDING COMMENTS:

ELECT COMM SHOP

HAZ RANK 3/GREEN [AH APR2022]

ACM CAULK AND SEALANTS

AUG2014

PVS. ACM REMAINS, LOCAL AREA REMOVALS; ADDL SAMPLING, NO ADDL ACM REMAINS

AUG2012

PVS. ACM REMAINS, RANK DOWNGRADE FOR GASKETS

JUN09

ADDL SAMPLING, ACM IDENTIFIED INCLUDES:

INTERIOR CAULKING

INSULATION SEALANT

GASKET MATERIAL

FLOOR TILE ADHESIVE/ MASTIC

ROOFING SEALANT/ TAR

ASBESTOS MANAGER: 910-451-5837

Friable ACM(s) identified

Non-friable ACM(s) identified

NOTICE: The following asbestos-containing materials have been identified in this structure. Refer to survey findings for additional information or contact the Asbestos Program Manager. Please note ACM that is intact and undisturbed is not considered a significant health hazard to building occupants.

DESCRIPTION LOCATION Date Quantity

DESCRIPTION LOCATION Date Quantity

No friable ACM records found in database

NOTIFICATION OF ACM IN BUILDING

ROOFING SEALANT, BLACK 162 SFROOFING SYSTEM TAR AT FLASHINGS

(SEE ALSO HM16)

2/22/2006

ROOFING SEALANT, GRAY 36 SFROOFING SYSTEM BASE AND

PERIMETER FLASHINGS/ PATCHES (SEE

ALSO HM16)

2/22/2006

INTERIOR CAULKING, 334 LFPERIMETER ENTRY DOORS 2/22/2006

12" BEIGE FLOOR TILE AND ADHESIVE 1,125 SFSOUTH AND CENTER HALLWAY;

NORTHSIDE OFFICES/CAGES;

SOUTHEAST SHOP

6/17/2009

12" BEIGE w/TAN FLOOR TILE AND

ADHESIVE

1,500 SFSOUTHWEST OFFICE AREAS 6/17/2009

12" BEIGE w/TAN FLOOR TILE AND

ADHESIVE

1,500 SFSOUTHWEST OFFICE AREAS 8/11/2014

Wednesday, March 4, 2026 Page 2 of 9Print Date:

12" BEIGE FLOOR TILE AND ADHESIVE 825 SFSOUTH AND CENTER HALLWAY;

NORTHSIDE OFFICES/CAGES;

SOUTHEAST SHOP

8/11/2014

INTERIOR CAULKING, 334 LFPERIMETER ENTRY DOORS 4/25/2018

ROOFING SEALANT, GRAY 36 SFROOFING SYSTEM BASE AND

PERIMETER FLASHINGS/ PATCHES (SEE

ALSO HM16)

6/17/2009

ROOFING SEALANT, BLACK 162 SFROOFING SYSTEM TAR AT FLASHINGS

(SEE ALSO HM16)

6/17/2009

ROOFING SEALANT, BLACK 162 SFROOFING SYSTEM TAR AT FLASHINGS

(SEE ALSO HM16)

8/11/2014

ROOFING SEALANT, GRAY 36 SFROOFING SYSTEM BASE AND

PERIMETER FLASHINGS/ PATCHES (SEE

ALSO HM16)

4/24/2018

ROOFING SEALANT, BLACK 162 SFROOFING SYSTEM TAR AT FLASHINGS

(SEE ALSO HM16)

4/24/2018

12" BEIGE w/TAN FLOOR TILE AND

ADHESIVE

1,500 SFSOUTHWEST OFFICE AREAS 4/24/2018

12" BEIGE FLOOR TILE AND ADHESIVE 825 SFSOUTH AND CENTER HALLWAY;

NORTHSIDE OFFICES/CAGES;

SOUTHEAST SHOP

4/25/2018

INTERIOR CAULKING, 334 LFPERIMETER ENTRY DOORS 8/11/2014

ROOFING SEALANT, GRAY 36 SFROOFING SYSTEM BASE AND

PERIMETER FLASHINGS/ PATCHES (SEE

ALSO HM16)

8/11/2014

INTERIOR CAULKING, 334 LFPERIMETER ENTRY DOORS 6/17/2009

INTERIOR CAULKING, 334 LFPERIMETER ENTRY DOORS 8/9/2012

ROOFING SEALANT, GRAY 36 SFROOFING SYSTEM BASE AND

PERIMETER FLASHINGS/ PATCHES (SEE

ALSO HM16)

8/9/2012

ROOFING SEALANT, BLACK 162 SFROOFING SYSTEM TAR AT FLASHINGS

(SEE ALSO HM16)

8/9/2012

12" BEIGE w/TAN FLOOR TILE AND

ADHESIVE

1,500 SFSOUTHWEST OFFICE AREAS 8/9/2012

12" BEIGE FLOOR TILE AND ADHESIVE 1,125 SFSOUTH AND CENTER HALLWAY;

NORTHSIDE OFFICES/CAGES;

SOUTHEAST SHOP

8/9/2012

INTERIOR CAULKING, 334 LFPERIMETER ENTRY DOORS 4/1/2022

ROOFING SEALANT, GRAY 36 SFROOFING SYSTEM BASE AND

PERIMETER FLASHINGS/ PATCHES (SEE

ALSO HM16)

4/1/2022

ROOFING SEALANT, BLACK 162 SFROOFING SYSTEM TAR AT FLASHINGS

(SEE ALSO HM16)

4/1/2022

Wednesday, March 4, 2026 Page 3 of 9Print Date:

Tested Non ACM or REMOVED Materials

DESCRIPTION LOCATION Date

12" BEIGE w/TAN FLOOR TILE AND

ADHESIVE

1,500 SFSOUTHWEST OFFICE AREAS 4/1/2022

12" BEIGE FLOOR TILE AND ADHESIVE 825 SFSOUTH AND CENTER HALLWAY;

NORTHSIDE OFFICES/CAGES;

SOUTHEAST SHOP

4/1/2022

EXTERIOR CAULKING, WINDOWS 2/22/2006

EXTERIOR CAULKING, BRICK WALL JOINTS 2/22/2006

FIBROUS DEBRIS SOUTH CENTER MECHANICAL ROOM 2/22/2006

12" BEIGE FLOOR TILE AND ADHESIVE PATCHES THROUGHOUT 2/22/2006

12" TAN w/BROWN FLOOR TILE AND

ADHESIVE

NORTH AND SOUTH OFFICE AREAS,

CENTRAL HALLWAY

2/22/2006

MUDDED FITTING(S) SOUTH CENTER MECHANICAL ROOM 2/22/2006

GASKET MATERIAL SOUTH CENTER MECHANICAL ROOM 2/22/2006

PIPE INSULATION SEALANT 6" PIPING, SOUTH CENTER

MECHANICAL ROOM

2/22/2006

DRYWALL AND JOINT MATERIAL NORTH AND SOUTH OFFICES, CENTER

HALLWAY

2/22/2006

4" VINYL BASE AND ADHESIVE NORTH AND SOUTH OFFICES w/FLOOR

TILE

2/22/2006

2'x2' CEILING TILE, NORTH AND SOUTH OFFICE AREAS 2/22/2006

TANK INSULATION SOUTH CENTRAL MECHANICAL ROOM 2/22/2006

TAR SEALANT LEFTOVER BUCKET, ROOF PATCHING 6/17/2009

EXTERIOR CAULKING, SOUTHWEST ENTRY "STOREFRONT"

WINDOWS

6/17/2009

PIPE INSULATION SEALANT 2" PIPES THROUGHOUT 2/22/2006

FOIL BACKED TAPE SOUTHEAST GARAGE AREA OVERHEAD 6/17/2009

CAPPING INSULATION ON FIBERGLASS INSULATION MUDDED

ENDS, OVERHEAD THROUGHOUT AND

MECHANICAL ROOM

6/17/2009

CLOTH LAGGING MATERIAL HVAC DUCT SEAMS, OVERHEAD 6/17/2009

ADHESIVE RESIDUAL ON METAL HVAC DUCT 6/17/2009

INSULATION SEALANT SOUTH CENTER MECHANICAL ROOM 2/22/2006

BLACK VINYL BASE AND ADHESIVE, 4" NORTH AND SOUTH OFFICES w/FLOOR

TILE

2/22/2006

PIPE INSULATION SEALANT 4" PIPING THROUGHOUT 2/22/2006

VINYL THRESHOLD MATERIAL NORTH CENTRAL CAGE AREA 6/17/2009

PITCH POCKET TAR ROOFING CABLE PENETRATIONS,

EASTSIDE

6/17/2009

ROOFING MATERIAL, ROOFING WALKWAYS, SOUTH CENTER 6/17/2009

INTERIOR CAULKING, METAL WINDOWS, DOORS 6/17/2009

Wednesday, March 4, 2026 Page 4 of 9Print Date:

ACM only presents a health hazard when asbestos fibers are airborne and inhaled.

Avoid disturbance which will release fibers. The presence of asbestos does not constitute a health hazard.

HEALTH ASPECTS:

Do not disturb or cause damage to ACM. Do not sand, grind or abrade materials or cause damage with any type of equipment.

CONDITIONS TO AVOID:

Report any damage, dust or debris that may come from ACM or suspect ACM, or any change in the condition of materials, or accidental disturbance to the Asbestos

Program Manager.

REPORTS OF DAMAGE:

Corrective action initiated to minimize fiber release and protect personnel. RESPONSE ACTION:

ACM will be inspected periodically to evaluate any changes in condition.INSPECTION:

The Camp Lejeune Asbestos Program Manager maintains a copy of the survey for the building.

RECORDKEEPING:

CAMP LEJEUNE Asbestos Program Manager: Phone: (910) 451-5837

INTERIOR CAULKING, METAL SOUTH "STOREFRONT"

WINDOWS

6/17/2009

GASKET MATERIAL SOUTH CENTER MECHANICAL ROOM 6/17/2009

INSULATION SEALANT SOUTH CENTER MECHANICAL ROOM 8/11/2014

GASKET MATERIAL SOUTH CENTER MECHANICAL ROOM,

ADDITIONAL ONES POSSIBLE AT ANY

FLANGE

8/11/2014

INSULATION SEALANT SOUTH CENTER MECHANICAL ROOM 6/17/2009

INSULATION SEALANT SOUTH CENTER MECHANICAL ROOM 8/9/2012

GASKET MATERIAL SOUTH CENTER MECHANICAL ROOM 8/9/2012

Wednesday, March 4, 2026 Page 5 of 9Print Date:

SAMPLES COLLECTED

Sample Sample

Date

HA Sample Location Chr

Amo

Oth

Description

1860-01-01 2/22/200601 SOUTHWEST ENTRY 0 0 0EXTERIOR CAULKING, BLACK

1860-02-01 2/22/200602 SW FOYER/ HALL 0 0 0DRYWALL AND JOINT

MATERIAL

1860-02-02 2/22/200602 SW OFFICES, WEST HALL 0 0 0DRYWALL AND JOINT

MATERIAL

1860-03-01 2/22/200603 SW OFFICES, SE 0 0 04" VINYL BASE AND

ADHESIVE

BROWN

1860-04-01 2/22/200604 SW OFFICE 2 0 012" BEIGE FLOOR TILE

AND ADHESIVE

w/MULTICOLORED

SPECKS

1860-04-01tem 2/22/200604 SW OFFICE 0 0 012" BEIGE FLOOR TILE

AND ADHESIVE

w/MULTICOLORED

SPECKS

1860-04-02 2/22/200604 WEST WING TRUCK BAY 0 0 012" BEIGE FLOOR TILE

AND ADHESIVE

w/MULTICOLORED

SPECKS

1860-04-03 2/22/200604 NE OFFICE 0 0 012" BEIGE FLOOR TILE

AND ADHESIVE

w/MULTICOLORED

SPECKS

1860-05-01 2/22/200605 SE OFFICES, SE 0 0 012" TAN w/BROWN

FLOOR TILE AND

ADHESIVE

1860-05-01tem 2/22/200605 SW OFFICE, SE 0 0 012" TAN w/BROWN

FLOOR TILE AND

ADHESIVE

1860-05-02 2/22/200605 CNTR HALL, EAST 0 0 012" TAN w/BROWN

FLOOR TILE AND

ADHESIVE

1860-06-01 2/22/200606 SW STORAGE RM 0 0 0PIPE INSULATION

SEALANT

WHITE

1860-06-02 2/22/200606 NE STORAGE RM 0 0 0PIPE INSULATION

SEALANT

WHITE

1860-07-01 2/22/200607 WEST WING, NW 0 0 0PIPE INSULATION

SEALANT

YELLOW

1860-08-00ri08 6/17/200908 N/A 9 9 9INTERIOR CAULKING, BLACK

1860-08-00ri12 8/9/201208 N/A 9 9 9INTERIOR CAULKING, BLACK

1860-08-00ri14 8/11/201408 N/A 9 9 9INTERIOR CAULKING, BLACK

1860-08-00ri17 4/25/201808 N/A 9 9 9INTERIOR CAULKING, BLACK

1860-08-01 2/22/200608 WEST WING, NORTH DOOR 3 0 0INTERIOR CAULKING, BLACK

Wednesday, March 4, 2026 Page 6 of 9Print Date:

HA Sample Location Chr

Amo

Oth

Description

1860-08-02 2/22/200608 CENTER HALL, EAST DOOR 2 0 0INTERIOR CAULKING, BLACK

1860-09-01 2/22/200609 NE OFFICE 0 0 0BLACK VINYL BASE

AND ADHESIVE, 4"

1860-10-01 2/22/200610 SOUTH CNTR MR TANK 0 0 0TANK INSULATION ON FIBERGLASS

1860-11-00ri08 6/17/200911 N/A 9 9 9INSULATION SEALANT GRAY

1860-11-00ri12 8/9/201211 N/A 9 9 9INSULATION SEALANT GRAY

1860-11-00ri14 8/11/201411 N/A 9 9 9INSULATION SEALANT GRAY

1860-11-01 2/22/200611 SOUTH MR 0 0 0INSULATION SEALANT GRAY

1860-11-02 2/22/200611 SOUTH MR 10 0 0INSULATION SEALANT GRAY

1860-12-00ri08 6/17/200912 N/A 9 9 9GASKET MATERIAL LT. GRAY

1860-12-00ri12 8/9/201212 N/A 9 9 9GASKET MATERIAL LT. GRAY

1860-12-00ri14 8/11/201412 N/A 9 9 9GASKET MATERIAL LT. GRAY

1860-12-01 2/22/200612 SOUTH CNTR MR 60 0 0GASKET MATERIAL LT. GRAY

1860-13-01 2/22/200613 SOUTH CNTR MR 0 0 0FIBROUS DEBRIS GROUND

1860-14-01 2/22/200614 SOUTH CNTR MR 0 0 0PIPE INSULATION

SEALANT

WHITE

1860-15-01 2/22/200615 SOUTH CNTR MR, NE 0 0 0MUDDED FITTING(S) GRAY

1860-16-00ri08 6/17/200916 N/A 9 9 9ROOFING SEALANT, GRAY

1860-16-00ri12 8/9/201216 N/A 9 9 9ROOFING SEALANT, GRAY

1860-16-00ri14 8/11/201416 N/A 9 9 9ROOFING SEALANT, GRAY

1860-16-00ri17 4/24/201816 N/A 9 9 9ROOFING SEALANT, GRAY

1860-16-01 2/22/200616 ROOF 10 0 0ROOFING SEALANT,

GRAY

1860-17-00ri08 6/17/200917 N/A 9 9 9ROOFING SEALANT, BLACK

1860-17-00ri12 8/9/201217 N/A 9 9 9ROOFING SEALANT, BLACK

Wednesday, March 4, 2026 Page 7 of 9Print Date:

HA Sample Location Chr

Amo

Oth

Description

1860-17-00ri14 8/11/201417 N/A 9 9 9ROOFING SEALANT, BLACK

1860-17-00ri17 4/24/201817 N/A 9 9 9ROOFING SEALANT, BLACK

1860-17-01 2/22/200617 WEST ROOF VENT 0 0 0ROOFING SEALANT,

BLACK

1860-17-02 2/22/200617 LOWER ROOF FLASHING 2 0 0ROOFING SEALANT,

BLACK

1860-18-01 2/22/200618 NW OFFICE 0 0 02'x2' CEILING TILE, SMALL PINHOLES

1860-18-02 2/22/200618 NW OFFICE 0 0 02'x2' CEILING TILE, SMALL PINHOLES

1860-19-01 2/22/200619 NW WALL EXT. 0 0 0EXTERIOR CAULKING, GRAY

1860-19-02 2/22/200619 SE WALL EXT. 0 0 0EXTERIOR CAULKING, GRAY

1860-20-00ri12 8/9/201220 N/A 9 9 912" BEIGE w/TAN FLOOR

TILE AND ADHESIVE

SPECS

1860-20-00ri14 8/11/201420 N/A 9 9 912" BEIGE w/TAN FLOOR

TILE AND ADHESIVE

SPECS

1860-20-00ri17 4/24/201820 N/A 9 9 912" BEIGE w/TAN FLOOR

TILE AND ADHESIVE

SPECS

1860-20-10 6/17/200920 SW OFFICES, SE 2 0 012" BEIGE w/TAN FLOOR

TILE AND ADHESIVE

SPECS

1860-20-11 6/17/200920 SW OFFICES, SE 2 0 012" BEIGE w/TAN FLOOR

TILE AND ADHESIVE

SPECS

1860-20-12 6/17/200920 SW OFFICES, NW 3 0 012" BEIGE w/TAN FLOOR

TILE AND ADHESIVE

SPECS

1860-21-10 6/17/200921 SW "STOREFRONT" WINDOWS 0 0 0INTERIOR CAULKING, WHITE

1860-22-10 6/17/200922 SW "STOREFRONT" WINDOW 2 0 0INTERIOR CAULKING, GRAY

1860-22-11 6/17/200922 WEST WING, NORTH DOOR 0 0 0INTERIOR CAULKING, GRAY

1860-23-00ri12 8/9/201223 N/A 9 9 912" BEIGE FLOOR TILE

AND ADHESIVE

w/GRAY

1860-23-00ri14 8/11/201423 N/A 9 9 912" BEIGE FLOOR TILE

AND ADHESIVE

w/GRAY

1860-23-00ri17 4/25/201823 N/A 9 9 912" BEIGE FLOOR TILE

AND ADHESIVE

w/GRAY

1860-23-10 6/17/200923 SW HALL 0 0 012" BEIGE FLOOR TILE

AND ADHESIVE

w/GRAY

Wednesday, March 4, 2026 Page 8 of 9Print Date:

HA Sample Location Chr

Amo

Oth

Description

1860-23-11 6/17/200923 CNTR HALL, WEST 0 0 012" BEIGE FLOOR TILE

AND ADHESIVE

w/GRAY

1860-23-12 6/17/200923 NW CAGE 0 0 012" BEIGE FLOOR TILE

AND ADHESIVE

w/GRAY

1860-23-13 6/17/200923 NE CAGE 3 0 012" BEIGE FLOOR TILE

AND ADHESIVE

w/GRAY

1860-23-14 6/17/200923 SE SHOP 0 0 012" BEIGE FLOOR TILE

AND ADHESIVE

w/GRAY

1860-23-20 8/11/201423 CNTR HALL, WEST 0 0 012" BEIGE FLOOR TILE

AND ADHESIVE

w/GRAY

1860-24-10 6/17/200924 NW CAGE AREA 0 0 0VINYL THRESHOLD

MATERIAL

1" BLACK

1860-24-11 6/17/200924 NE CAGE AREA 0 0 0VINYL THRESHOLD

MATERIAL

1" BLACK

1860-25-10 6/17/200925 SE GARAGE 0 0 0FOIL BACKED TAPE

1860-26-10 6/17/200926 SW ENTRY OVHD 0 0 0CAPPING INSULATION

ON

FIBERGLASS

1860-26-11 6/17/200926 NW CAGE/ OFFICE 0 0 0CAPPING INSULATION

ON

FIBERGLASS

1860-26-12 6/17/200926 SOUTH CNTR MR 0 0 0CAPPING INSULATION

ON

FIBERGLASS

1860-27-10 6/17/200927 CNTR HALL, WEST OVHD 0 0 0CLOTH LAGGING

MATERIAL

TAPE

1860-27-11 6/17/200927 SOUTH CNTR MR 0 0 0CLOTH LAGGING

MATERIAL

TAPE

1860-28-10 6/17/200928 SOUTH CNTR MR 0 0 0ADHESIVE YELLOW

1860-29-10 6/17/200929 ROOF, EAST CNTR 0 0 0PITCH POCKET TAR BLACK

1860-30-10 6/17/200930 UPPER ROOF, SOUTH CNTR 0 0 0ROOFING MATERIAL, WALK PADS

1860-31-10 6/17/200931 SOUTH CNTR MR 0 0 0TAR SEALANT BLACK

1860-32-10 6/17/200932 SW WINDOW, WEST 0 0 0EXTERIOR CAULKING, BLACK

1860-32-11 6/17/200932 SW WINDOW, EAST 0 0 0EXTERIOR CAULKING, BLACK

Wednesday, March 4, 2026 Page 9 of 9Print Date: