This is an Asbestos Inspection Report for Building #1860 at MCB Camp Lejeune, dated March 4, 2026. The report documents the identification and management of asbestos-containing materials (ACM) in this Electrical Communications Shop facility, which was built in 1983.
The building has been designated with a Hazard Rank 3/Green status as of April 2022. Non-friable ACM has been identified in multiple locations throughout the building, including: roofing sealants (black tar at flashings measuring 162 SF and gray base/perimeter flashings measuring 36 SF); interior caulking at perimeter entry doors (334 LF); and floor tiles with adhesive in various areas (ranging from 825 SF to 1,500 SF per location depending on tile type and area). The flooring materials consist of 12-inch beige tiles and 12-inch beige with tan tiles in southwest office areas, south/center hallways, and northside offices. No friable ACM was identified in the building. The report notes that intact and undisturbed ACM does not constitute a significant health hazard to occupants. Building occupants are instructed to avoid disturbance or damage to ACM materials and to report any damage, dust, or debris to the Asbestos Program Manager at 910-451-5837. The document includes detailed sampling records from multiple inspection dates (2006-2022) with chrysotile percentage analyses and confirms that previous removals and local area sampling have been conducted, with no additional ACM identified in recent inspections.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amend 0005.pdf | ||
| Amend 0004.pdf | ||
| Amend 0003.pdf | ||
| Amend 0002.pdf | ||
| Amend 0001.pdf | ||
| 25-0004 Basis of Design.pdf | ||
| N4008525B0004 Specs.pdf | ||
| 25-0004 Asbestos Survey.pdf | ||
| 250004 RFP.pdf | ||
| N4008525B0004 Dwgs Signed.pdf | ||
| 25-0004 Lead Survey.pdf | ||
| 25-0004 Appendix D.pdf |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ASBESTOS INSPECTION REPORT of:
Building # 1860
MCB CAMP LEJEUNE
Wednesday, March 4, 2026
Print Date
Wednesday, March 4, 2026 Page 1 of 9Print Date:
INSPECTION SUMMARY
BLDG #:
OCCUPANT:
YEAR BUILT:
BUILDING COMMENTS:
ELECT COMM SHOP
HAZ RANK 3/GREEN [AH APR2022]
ACM CAULK AND SEALANTS
AUG2014
PVS. ACM REMAINS, LOCAL AREA REMOVALS; ADDL SAMPLING, NO ADDL ACM REMAINS
AUG2012
PVS. ACM REMAINS, RANK DOWNGRADE FOR GASKETS
JUN09
ADDL SAMPLING, ACM IDENTIFIED INCLUDES:
INTERIOR CAULKING
INSULATION SEALANT
GASKET MATERIAL
FLOOR TILE ADHESIVE/ MASTIC
ROOFING SEALANT/ TAR
ASBESTOS MANAGER: 910-451-5837
Friable ACM(s) identified
Non-friable ACM(s) identified
NOTICE: The following asbestos-containing materials have been identified in this structure. Refer to survey findings for additional information or contact the Asbestos Program Manager. Please note ACM that is intact and undisturbed is not considered a significant health hazard to building occupants.
DESCRIPTION LOCATION Date Quantity
DESCRIPTION LOCATION Date Quantity
No friable ACM records found in database
NOTIFICATION OF ACM IN BUILDING
ROOFING SEALANT, BLACK 162 SFROOFING SYSTEM TAR AT FLASHINGS
(SEE ALSO HM16)
2/22/2006
ROOFING SEALANT, GRAY 36 SFROOFING SYSTEM BASE AND
PERIMETER FLASHINGS/ PATCHES (SEE
ALSO HM16)
2/22/2006
INTERIOR CAULKING, 334 LFPERIMETER ENTRY DOORS 2/22/2006
12" BEIGE FLOOR TILE AND ADHESIVE 1,125 SFSOUTH AND CENTER HALLWAY;
NORTHSIDE OFFICES/CAGES;
SOUTHEAST SHOP
6/17/2009
12" BEIGE w/TAN FLOOR TILE AND
ADHESIVE
1,500 SFSOUTHWEST OFFICE AREAS 6/17/2009
12" BEIGE w/TAN FLOOR TILE AND
ADHESIVE
1,500 SFSOUTHWEST OFFICE AREAS 8/11/2014
Wednesday, March 4, 2026 Page 2 of 9Print Date:
12" BEIGE FLOOR TILE AND ADHESIVE 825 SFSOUTH AND CENTER HALLWAY;
NORTHSIDE OFFICES/CAGES;
SOUTHEAST SHOP
8/11/2014
INTERIOR CAULKING, 334 LFPERIMETER ENTRY DOORS 4/25/2018
ROOFING SEALANT, GRAY 36 SFROOFING SYSTEM BASE AND
PERIMETER FLASHINGS/ PATCHES (SEE
ALSO HM16)
6/17/2009
ROOFING SEALANT, BLACK 162 SFROOFING SYSTEM TAR AT FLASHINGS
(SEE ALSO HM16)
6/17/2009
ROOFING SEALANT, BLACK 162 SFROOFING SYSTEM TAR AT FLASHINGS
(SEE ALSO HM16)
8/11/2014
ROOFING SEALANT, GRAY 36 SFROOFING SYSTEM BASE AND
PERIMETER FLASHINGS/ PATCHES (SEE
ALSO HM16)
4/24/2018
ROOFING SEALANT, BLACK 162 SFROOFING SYSTEM TAR AT FLASHINGS
(SEE ALSO HM16)
4/24/2018
12" BEIGE w/TAN FLOOR TILE AND
ADHESIVE
1,500 SFSOUTHWEST OFFICE AREAS 4/24/2018
12" BEIGE FLOOR TILE AND ADHESIVE 825 SFSOUTH AND CENTER HALLWAY;
NORTHSIDE OFFICES/CAGES;
SOUTHEAST SHOP
4/25/2018
INTERIOR CAULKING, 334 LFPERIMETER ENTRY DOORS 8/11/2014
ROOFING SEALANT, GRAY 36 SFROOFING SYSTEM BASE AND
PERIMETER FLASHINGS/ PATCHES (SEE
ALSO HM16)
8/11/2014
INTERIOR CAULKING, 334 LFPERIMETER ENTRY DOORS 6/17/2009
INTERIOR CAULKING, 334 LFPERIMETER ENTRY DOORS 8/9/2012
ROOFING SEALANT, GRAY 36 SFROOFING SYSTEM BASE AND
PERIMETER FLASHINGS/ PATCHES (SEE
ALSO HM16)
8/9/2012
ROOFING SEALANT, BLACK 162 SFROOFING SYSTEM TAR AT FLASHINGS
(SEE ALSO HM16)
8/9/2012
12" BEIGE w/TAN FLOOR TILE AND
ADHESIVE
1,500 SFSOUTHWEST OFFICE AREAS 8/9/2012
12" BEIGE FLOOR TILE AND ADHESIVE 1,125 SFSOUTH AND CENTER HALLWAY;
NORTHSIDE OFFICES/CAGES;
SOUTHEAST SHOP
8/9/2012
INTERIOR CAULKING, 334 LFPERIMETER ENTRY DOORS 4/1/2022
ROOFING SEALANT, GRAY 36 SFROOFING SYSTEM BASE AND
PERIMETER FLASHINGS/ PATCHES (SEE
ALSO HM16)
4/1/2022
ROOFING SEALANT, BLACK 162 SFROOFING SYSTEM TAR AT FLASHINGS
(SEE ALSO HM16)
4/1/2022
Wednesday, March 4, 2026 Page 3 of 9Print Date:
Tested Non ACM or REMOVED Materials
DESCRIPTION LOCATION Date
12" BEIGE w/TAN FLOOR TILE AND
ADHESIVE
1,500 SFSOUTHWEST OFFICE AREAS 4/1/2022
12" BEIGE FLOOR TILE AND ADHESIVE 825 SFSOUTH AND CENTER HALLWAY;
NORTHSIDE OFFICES/CAGES;
SOUTHEAST SHOP
4/1/2022
EXTERIOR CAULKING, WINDOWS 2/22/2006
EXTERIOR CAULKING, BRICK WALL JOINTS 2/22/2006
FIBROUS DEBRIS SOUTH CENTER MECHANICAL ROOM 2/22/2006
12" BEIGE FLOOR TILE AND ADHESIVE PATCHES THROUGHOUT 2/22/2006
12" TAN w/BROWN FLOOR TILE AND
ADHESIVE
NORTH AND SOUTH OFFICE AREAS,
CENTRAL HALLWAY
2/22/2006
MUDDED FITTING(S) SOUTH CENTER MECHANICAL ROOM 2/22/2006
GASKET MATERIAL SOUTH CENTER MECHANICAL ROOM 2/22/2006
PIPE INSULATION SEALANT 6" PIPING, SOUTH CENTER
MECHANICAL ROOM
2/22/2006
DRYWALL AND JOINT MATERIAL NORTH AND SOUTH OFFICES, CENTER
HALLWAY
2/22/2006
4" VINYL BASE AND ADHESIVE NORTH AND SOUTH OFFICES w/FLOOR
TILE
2/22/2006
2'x2' CEILING TILE, NORTH AND SOUTH OFFICE AREAS 2/22/2006
TANK INSULATION SOUTH CENTRAL MECHANICAL ROOM 2/22/2006
TAR SEALANT LEFTOVER BUCKET, ROOF PATCHING 6/17/2009
EXTERIOR CAULKING, SOUTHWEST ENTRY "STOREFRONT"
WINDOWS
6/17/2009
PIPE INSULATION SEALANT 2" PIPES THROUGHOUT 2/22/2006
FOIL BACKED TAPE SOUTHEAST GARAGE AREA OVERHEAD 6/17/2009
CAPPING INSULATION ON FIBERGLASS INSULATION MUDDED
ENDS, OVERHEAD THROUGHOUT AND
MECHANICAL ROOM
6/17/2009
CLOTH LAGGING MATERIAL HVAC DUCT SEAMS, OVERHEAD 6/17/2009
ADHESIVE RESIDUAL ON METAL HVAC DUCT 6/17/2009
INSULATION SEALANT SOUTH CENTER MECHANICAL ROOM 2/22/2006
BLACK VINYL BASE AND ADHESIVE, 4" NORTH AND SOUTH OFFICES w/FLOOR
TILE
2/22/2006
PIPE INSULATION SEALANT 4" PIPING THROUGHOUT 2/22/2006
VINYL THRESHOLD MATERIAL NORTH CENTRAL CAGE AREA 6/17/2009
PITCH POCKET TAR ROOFING CABLE PENETRATIONS,
EASTSIDE
6/17/2009
ROOFING MATERIAL, ROOFING WALKWAYS, SOUTH CENTER 6/17/2009
INTERIOR CAULKING, METAL WINDOWS, DOORS 6/17/2009
Wednesday, March 4, 2026 Page 4 of 9Print Date:
ACM only presents a health hazard when asbestos fibers are airborne and inhaled.
Avoid disturbance which will release fibers. The presence of asbestos does not constitute a health hazard.
HEALTH ASPECTS:
Do not disturb or cause damage to ACM. Do not sand, grind or abrade materials or cause damage with any type of equipment.
CONDITIONS TO AVOID:
Report any damage, dust or debris that may come from ACM or suspect ACM, or any change in the condition of materials, or accidental disturbance to the Asbestos
Program Manager.
REPORTS OF DAMAGE:
Corrective action initiated to minimize fiber release and protect personnel. RESPONSE ACTION:
ACM will be inspected periodically to evaluate any changes in condition.INSPECTION:
The Camp Lejeune Asbestos Program Manager maintains a copy of the survey for the building.
RECORDKEEPING:
CAMP LEJEUNE Asbestos Program Manager: Phone: (910) 451-5837
INTERIOR CAULKING, METAL SOUTH "STOREFRONT"
WINDOWS
6/17/2009
GASKET MATERIAL SOUTH CENTER MECHANICAL ROOM 6/17/2009
INSULATION SEALANT SOUTH CENTER MECHANICAL ROOM 8/11/2014
GASKET MATERIAL SOUTH CENTER MECHANICAL ROOM,
ADDITIONAL ONES POSSIBLE AT ANY
FLANGE
8/11/2014
INSULATION SEALANT SOUTH CENTER MECHANICAL ROOM 6/17/2009
INSULATION SEALANT SOUTH CENTER MECHANICAL ROOM 8/9/2012
GASKET MATERIAL SOUTH CENTER MECHANICAL ROOM 8/9/2012
Wednesday, March 4, 2026 Page 5 of 9Print Date:
SAMPLES COLLECTED
Sample Sample
Date
HA Sample Location Chr
Amo
Oth
Description
1860-01-01 2/22/200601 SOUTHWEST ENTRY 0 0 0EXTERIOR CAULKING, BLACK
1860-02-01 2/22/200602 SW FOYER/ HALL 0 0 0DRYWALL AND JOINT
MATERIAL
1860-02-02 2/22/200602 SW OFFICES, WEST HALL 0 0 0DRYWALL AND JOINT
MATERIAL
1860-03-01 2/22/200603 SW OFFICES, SE 0 0 04" VINYL BASE AND
ADHESIVE
BROWN
1860-04-01 2/22/200604 SW OFFICE 2 0 012" BEIGE FLOOR TILE
AND ADHESIVE
w/MULTICOLORED
SPECKS
1860-04-01tem 2/22/200604 SW OFFICE 0 0 012" BEIGE FLOOR TILE
AND ADHESIVE
w/MULTICOLORED
SPECKS
1860-04-02 2/22/200604 WEST WING TRUCK BAY 0 0 012" BEIGE FLOOR TILE
AND ADHESIVE
w/MULTICOLORED
SPECKS
1860-04-03 2/22/200604 NE OFFICE 0 0 012" BEIGE FLOOR TILE
AND ADHESIVE
w/MULTICOLORED
SPECKS
1860-05-01 2/22/200605 SE OFFICES, SE 0 0 012" TAN w/BROWN
FLOOR TILE AND
ADHESIVE
1860-05-01tem 2/22/200605 SW OFFICE, SE 0 0 012" TAN w/BROWN
FLOOR TILE AND
ADHESIVE
1860-05-02 2/22/200605 CNTR HALL, EAST 0 0 012" TAN w/BROWN
FLOOR TILE AND
ADHESIVE
1860-06-01 2/22/200606 SW STORAGE RM 0 0 0PIPE INSULATION
SEALANT
WHITE
1860-06-02 2/22/200606 NE STORAGE RM 0 0 0PIPE INSULATION
SEALANT
WHITE
1860-07-01 2/22/200607 WEST WING, NW 0 0 0PIPE INSULATION
SEALANT
YELLOW
1860-08-00ri08 6/17/200908 N/A 9 9 9INTERIOR CAULKING, BLACK
1860-08-00ri12 8/9/201208 N/A 9 9 9INTERIOR CAULKING, BLACK
1860-08-00ri14 8/11/201408 N/A 9 9 9INTERIOR CAULKING, BLACK
1860-08-00ri17 4/25/201808 N/A 9 9 9INTERIOR CAULKING, BLACK
1860-08-01 2/22/200608 WEST WING, NORTH DOOR 3 0 0INTERIOR CAULKING, BLACK
Wednesday, March 4, 2026 Page 6 of 9Print Date:
HA Sample Location Chr
Amo
Oth
Description
1860-08-02 2/22/200608 CENTER HALL, EAST DOOR 2 0 0INTERIOR CAULKING, BLACK
1860-09-01 2/22/200609 NE OFFICE 0 0 0BLACK VINYL BASE
AND ADHESIVE, 4"
1860-10-01 2/22/200610 SOUTH CNTR MR TANK 0 0 0TANK INSULATION ON FIBERGLASS
1860-11-00ri08 6/17/200911 N/A 9 9 9INSULATION SEALANT GRAY
1860-11-00ri12 8/9/201211 N/A 9 9 9INSULATION SEALANT GRAY
1860-11-00ri14 8/11/201411 N/A 9 9 9INSULATION SEALANT GRAY
1860-11-01 2/22/200611 SOUTH MR 0 0 0INSULATION SEALANT GRAY
1860-11-02 2/22/200611 SOUTH MR 10 0 0INSULATION SEALANT GRAY
1860-12-00ri08 6/17/200912 N/A 9 9 9GASKET MATERIAL LT. GRAY
1860-12-00ri12 8/9/201212 N/A 9 9 9GASKET MATERIAL LT. GRAY
1860-12-00ri14 8/11/201412 N/A 9 9 9GASKET MATERIAL LT. GRAY
1860-12-01 2/22/200612 SOUTH CNTR MR 60 0 0GASKET MATERIAL LT. GRAY
1860-13-01 2/22/200613 SOUTH CNTR MR 0 0 0FIBROUS DEBRIS GROUND
1860-14-01 2/22/200614 SOUTH CNTR MR 0 0 0PIPE INSULATION
SEALANT
WHITE
1860-15-01 2/22/200615 SOUTH CNTR MR, NE 0 0 0MUDDED FITTING(S) GRAY
1860-16-00ri08 6/17/200916 N/A 9 9 9ROOFING SEALANT, GRAY
1860-16-00ri12 8/9/201216 N/A 9 9 9ROOFING SEALANT, GRAY
1860-16-00ri14 8/11/201416 N/A 9 9 9ROOFING SEALANT, GRAY
1860-16-00ri17 4/24/201816 N/A 9 9 9ROOFING SEALANT, GRAY
1860-16-01 2/22/200616 ROOF 10 0 0ROOFING SEALANT,
GRAY
1860-17-00ri08 6/17/200917 N/A 9 9 9ROOFING SEALANT, BLACK
1860-17-00ri12 8/9/201217 N/A 9 9 9ROOFING SEALANT, BLACK
Wednesday, March 4, 2026 Page 7 of 9Print Date:
HA Sample Location Chr
Amo
Oth
Description
1860-17-00ri14 8/11/201417 N/A 9 9 9ROOFING SEALANT, BLACK
1860-17-00ri17 4/24/201817 N/A 9 9 9ROOFING SEALANT, BLACK
1860-17-01 2/22/200617 WEST ROOF VENT 0 0 0ROOFING SEALANT,
BLACK
1860-17-02 2/22/200617 LOWER ROOF FLASHING 2 0 0ROOFING SEALANT,
BLACK
1860-18-01 2/22/200618 NW OFFICE 0 0 02'x2' CEILING TILE, SMALL PINHOLES
1860-18-02 2/22/200618 NW OFFICE 0 0 02'x2' CEILING TILE, SMALL PINHOLES
1860-19-01 2/22/200619 NW WALL EXT. 0 0 0EXTERIOR CAULKING, GRAY
1860-19-02 2/22/200619 SE WALL EXT. 0 0 0EXTERIOR CAULKING, GRAY
1860-20-00ri12 8/9/201220 N/A 9 9 912" BEIGE w/TAN FLOOR
TILE AND ADHESIVE
SPECS
1860-20-00ri14 8/11/201420 N/A 9 9 912" BEIGE w/TAN FLOOR
TILE AND ADHESIVE
SPECS
1860-20-00ri17 4/24/201820 N/A 9 9 912" BEIGE w/TAN FLOOR
TILE AND ADHESIVE
SPECS
1860-20-10 6/17/200920 SW OFFICES, SE 2 0 012" BEIGE w/TAN FLOOR
TILE AND ADHESIVE
SPECS
1860-20-11 6/17/200920 SW OFFICES, SE 2 0 012" BEIGE w/TAN FLOOR
TILE AND ADHESIVE
SPECS
1860-20-12 6/17/200920 SW OFFICES, NW 3 0 012" BEIGE w/TAN FLOOR
TILE AND ADHESIVE
SPECS
1860-21-10 6/17/200921 SW "STOREFRONT" WINDOWS 0 0 0INTERIOR CAULKING, WHITE
1860-22-10 6/17/200922 SW "STOREFRONT" WINDOW 2 0 0INTERIOR CAULKING, GRAY
1860-22-11 6/17/200922 WEST WING, NORTH DOOR 0 0 0INTERIOR CAULKING, GRAY
1860-23-00ri12 8/9/201223 N/A 9 9 912" BEIGE FLOOR TILE
AND ADHESIVE
w/GRAY
1860-23-00ri14 8/11/201423 N/A 9 9 912" BEIGE FLOOR TILE
AND ADHESIVE
w/GRAY
1860-23-00ri17 4/25/201823 N/A 9 9 912" BEIGE FLOOR TILE
AND ADHESIVE
w/GRAY
1860-23-10 6/17/200923 SW HALL 0 0 012" BEIGE FLOOR TILE
AND ADHESIVE
w/GRAY
Wednesday, March 4, 2026 Page 8 of 9Print Date:
HA Sample Location Chr
Amo
Oth
Description
1860-23-11 6/17/200923 CNTR HALL, WEST 0 0 012" BEIGE FLOOR TILE
AND ADHESIVE
w/GRAY
1860-23-12 6/17/200923 NW CAGE 0 0 012" BEIGE FLOOR TILE
AND ADHESIVE
w/GRAY
1860-23-13 6/17/200923 NE CAGE 3 0 012" BEIGE FLOOR TILE
AND ADHESIVE
w/GRAY
1860-23-14 6/17/200923 SE SHOP 0 0 012" BEIGE FLOOR TILE
AND ADHESIVE
w/GRAY
1860-23-20 8/11/201423 CNTR HALL, WEST 0 0 012" BEIGE FLOOR TILE
AND ADHESIVE
w/GRAY
1860-24-10 6/17/200924 NW CAGE AREA 0 0 0VINYL THRESHOLD
MATERIAL
1" BLACK
1860-24-11 6/17/200924 NE CAGE AREA 0 0 0VINYL THRESHOLD
MATERIAL
1" BLACK
1860-25-10 6/17/200925 SE GARAGE 0 0 0FOIL BACKED TAPE
1860-26-10 6/17/200926 SW ENTRY OVHD 0 0 0CAPPING INSULATION
ON
FIBERGLASS
1860-26-11 6/17/200926 NW CAGE/ OFFICE 0 0 0CAPPING INSULATION
ON
FIBERGLASS
1860-26-12 6/17/200926 SOUTH CNTR MR 0 0 0CAPPING INSULATION
ON
FIBERGLASS
1860-27-10 6/17/200927 CNTR HALL, WEST OVHD 0 0 0CLOTH LAGGING
MATERIAL
TAPE
1860-27-11 6/17/200927 SOUTH CNTR MR 0 0 0CLOTH LAGGING
MATERIAL
TAPE
1860-28-10 6/17/200928 SOUTH CNTR MR 0 0 0ADHESIVE YELLOW
1860-29-10 6/17/200929 ROOF, EAST CNTR 0 0 0PITCH POCKET TAR BLACK
1860-30-10 6/17/200930 UPPER ROOF, SOUTH CNTR 0 0 0ROOFING MATERIAL, WALK PADS
1860-31-10 6/17/200931 SOUTH CNTR MR 0 0 0TAR SEALANT BLACK
1860-32-10 6/17/200932 SW WINDOW, WEST 0 0 0EXTERIOR CAULKING, BLACK
1860-32-11 6/17/200932 SW WINDOW, EAST 0 0 0EXTERIOR CAULKING, BLACK
Wednesday, March 4, 2026 Page 9 of 9Print Date:
File details come from the government source that posted it. Updated .