241011 CDC Wireless CD Set - PLB~1.pdf

PDF 3 MB Posted

Attached to
Central Distribution Center Building 3 Bathroom Remodel Rebid
Solicitation number
S-29100-00012927
Issued by
Marion County, Oregon

About this file

This is a set of plumbing engineering drawings for a restroom remodel project at the CDC Wireless Building located at 3601 State Street, Building 3 in Salem, Oregon. The project involves remodeling existing restroom facilities and includes new plumbing fixtures, water heater installation, and associated piping systems. The permit set drawings are dated October 11, 2024 and were prepared by Cole Design Engineering with offices in Bend, Eugene, Medford, Monterey, Napa, and Santa Cruz. The drawings detail plumbing legends, schedules, calculations, floor plans, and installation details for fixtures including lavatories, water closets, urinals, and a mop sink.

The drawings specify requirements for domestic water piping, waste and vent systems, fixture connections, and a new 28-gallon electric water heater. Key technical specifications include pipe sizing requirements, insulation schedules, valve specifications, and seismic bracing details. The plans indicate that asbestos abatement work will be performed by others and requires coordination with the general contractor for wall, floor, and ceiling repairs related to plumbing work. The documents emphasize compliance with Oregon building codes including the Oregon Structural Specialty Code, Mechanical Specialty Code, Plumbing Specialty Code, Energy Efficiency Specialty Code, and Fire Code.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SHEET NUMBER

REVISION SCHEDULE

JOB NUMBER:

TH

E

US

E

OF

T

HE

SE

P

LA

NS

A

ND

SP

EC

IF

IC

AT

IO

NS

SH

AL

L B E

RE

ST

RI

CT

ED

T

O

TH

E

OR

IG

IN

AL

SI

TE

FO

R W

HI

CH

T

HE

Y W

ER

E

PR

EP

AR

ED

A

ND

P

UB

LIC

AT

IO

N

TH

ER

EO

F I

S E

XP

RE

SS

LY

LI

M

IT

ED

T

O

SU

CH

U

SE

. R

E-

US

E, R

EP

RO

DU

CT

IO

N, O R

PU

BL

IC

AT

IO

N

BY

A

NY

M

ET

HO

D, IN

W

HO

LE

O

R

IN

P

AR

T, IS

P

RO

HI

BI

TE

D.

T

IT

LE

T

O

TH

E

PL

AN

S A

ND

SP

EC

IF

IC

AT

IO

NS

R

EM

AI

NS

W

IT

H

TH

E

EN

GI

NE

ER

W

IT

HO

UT

P

RE

JU

DI

CE

. V

IS

UA

L C

ON

TA

CT

W

IT

H

TH

ES

E

PL

AN

S A

ND

SP

EC

IF

IC

AT

IO

NS

SH

AL

L C

ON

ST

IT

UT

E

PR

IM

A

FA

CI

E

EV

ID

EN

CE

O F T

HE

A

CC

EP

TA

NC

E

OF

T

HE

SE

R

ES

TR

IC

TI

ON

S.

C

OL

EB

RE

IT

E

NG

IN

EE

RI

NG

, L

LC

D

BA

A

XI

OM

E

NG

IN

EE

RS

CD

C

W

IR

EL

ES

S B

LD

G

DATE: 10/11/2024

20240427

RE

ST

RO

OM

S R

EM

OD

EL

ST

AT

E

ST

BU

ILD

IN

G

SA

LE

M

OR

PERMIT SET 10/11/2024

BEND | EUGENE | MEDFORD

MONTEREY | NAPA | SANTA CRUZ

E N G I N E E R I N G

PLUMBING

LEGENDS, NOTES AND

ABBREVIATIONS

P001

1. THIS PROJECT IS A REMODEL. THE PLANS AND SPECIFICATIONS INDICATE THE GENERAL EXTENT OF THE WORK BASED ON OWNER PROVIDED RECORD DRAWINGS AND LIMITED FIELD VERIFICATION. CONTRACTOR SHALL VISIT SITE, VERIFY EXISTING CONDITIONS, AND REPORT ANY DISCREPANCIES NOTED TO THE ARCHITECT PRIOR TO SUBMITTING A BID. CONTRACTOR SHALL BE RESPONSIBLE FOR THE DISCONNECTION AND RECONNECTION OF MECHANICAL, PLUMBING, AND ELECTRICAL SYSTEMS

NECESSARY TO ACCOMPLISH THE WORK WHETHER OR NOT SPECIFIED AND/OR INDICATED.

2. ASBESTOS ABATEMENT BY OTHERS ON THIS PROJECT. ANY REQUIRED ASBESTOS ABATEMENT WORK WILL BE PROVIDED BY OTHERS. AREAS SUSPECTED OF ASBESTOS CONTAMINATION WHICH INTERFERE WITH WORK UNDER THIS PROJECT SHALL BE IDENTIFIED DURING THE EARLY PHASES OF CONSTRUCTION IN ORDER TO PROVIDE FOR TIMELY DISPOSITION. NO DELAYS IN

CONSTRUCTION SCHEDULE WILL BE ALLOWED DUE TO IMPROPER COORDINATION.

3. PLUMBING CONTRACTOR SHALL NOTIFY GENERAL CONTRACTOR TO REPAIR WALL, FLOOR, AND CEILING SURFACES AS

REQUIRED DUE TO DEMOLITION OR INSTALLATION WORK.

4. REMOVE ALL ABANDONED PIPING, EQUIPMENT, AND FIXTURES INTERFERING WITH NEW WORK WHETHER NEW WORK IS

ARCHITECTURAL, STRUCTURAL, MECHANICAL, OR ELECTRICAL.

5. ABANDON IN PLACE ALL PIPING NOT INTERFERING WITH NEW WORK UNLESS REQUIRED FOR CONTINUED SERVICE.

6. CONTRACTOR SHALL SAW-CUT SLAB AS REQUIRED FOR INSTALLATION OF WASTE AND VENT PIPING BELOW FLOOR.

7. CUTTING OR CORING OF STRUCTURAL MEMBERS OR FOOTINGS IS PROHIBITED WITHOUT THE PRIOR WRITTEN CONSENT OF THE

STRUCTURAL ENGINEER AND THE ARCHITECT.

8. CONTRACTOR SHALL VERIFY THAT THE ELECTRICAL CONNECTIONS TO THE UNITS, INCLUDING CIRCUIT PROTECTION, CONFORM

TO UNIT LABELS AND MANUFACTURER'S DIRECTIONS. WHERE WIRE SIZES SHOWN ON DRAWING EXCEED MANUFACTURER'S RECOMMENDATIONS, THE DRAWINGS SHALL GOVERN. ALL WIRING SHALL BE PER THE NATIONAL ELECTRICAL CODE.

9. ALL CONTROL WIRING SHALL BE IN CONDUIT. CONDUIT SHALL BE PROVIDED AND INSTALLED BY THE PLUMBING CONTRACTOR.

10. FLASHING AND WEATHERPROOFING AT EXTERIOR PENETRATIONS ARE SHOWN ON THE ARCHITECTURAL DRAWINGS.

11. COORDINATE WITH OWNER ON SPACE REQUIRED AND TIME SCHEDULE FOR DELIVERY OF ALL ITEMS WHICH ARE TO BE GIVEN

TO THE OWNER FOR HIS DISPOSITION.

12. FOR ROOF PENETRATIONS WITHOUT CURBS, PROVIDE WEATHERPROOF FLASHING PER SMACNA ARCHITECTURAL SHEET METAL

MANUAL AND DRAWING NOTES.

13. LABEL ALL PIECES OF EQUIPMENT WITH MARK MATCHING SCHEDULE OR EQUIPMENT LIST WITH ENGRAVED PLASTIC LABELS

WITH MINIMUM 1/4" HIGH LETTERS. LABELS EXPOSED TO WEATHER SHALL BE ENGRAVED BRASS.

14. PRIME AND PAINT ALL EXPOSED PIPING PER ARCHITECTURAL SPECIFICATIONS. PAINT SHALL NOT EXCEED THE FOLLOWING

VOLATILE ORGANIC COMPOUND CONTENT LIMITS: FLATS < 50 GRAMS PER LITER, NON-FLATS < 100 GRAMS PER LITER.

15. COORDINATE WITH ELECTRICAL ON REQUIRED POWER OUTLETS AND LIGHT SWITCHES NEAR PLUMBING EQUIPMENT.

16. BRACE ALL GAS PIPING THAT IS 1" NOMINAL OR LARGER. BRACE ALL PIPING IN MECHANICAL ROOMS THAT IS 1 1/4" NOMINAL

OR LARGER. BRACE ALL PIPING 2 1/2" NOMINAL OR LARGER. PIPING SUSPENDED BY INDIVIDUAL HANGERS 12" OR LESS IN LENGTH, AS MEASURED FROM THE TOP OF THE PIPE TO THE BOTTOM OF THE SUPPORT WHERE THE HANGER IS ATTACHED, NEED NOT BE BRACED.

17. ALL PIPING, VALVES, EQUIPMENT, ETC. SHOWN IS NEW UNLESS OTHERWISE NOTED.

A. ALL SYMBOLS MAY NOT BE USED IN THIS PROJECT.

B. SYMBOLS DO NOT ALWAYS REPRESENT REAL LIFE DIMENSIONS.

C. SEE BOOK SPECIFICATIONS FOR ADDITIONAL INFORMATION.

D. SEE PLANS FOR PIPE SIZES.

LEGEND NOTES

ABBRV. IDENTIFICATION ABBRV. IDENTIFICATION

ABBREVIATIONSPLUMBING SYMBOLS

IDENTIFICATIONSYMBOL

VENT THROUGH ROOFVTR

UNDERWRITER'S LABORATORIESUL

UON UNLESS OTHERWISE NOTED

TOTAL DYNAMIC HEAD

TEMPERATURE

TDH

TEMP

STANDARDSTD

SPEC SPECIFICATION

SHEETMETALSM

RPM REVOLUTIONS PER MINUTE

REQUIREDREQD

OVERFLOW DRAINOD

NORMALLY OPENNO

NOT IN CONTRACTNIC

NORMALLY CLOSEDNC

LOCKED ROTOR AMPSLRA

LEAVINGLVG

LWT LEAVING WATER TEMPERATURE

HZ HERTZ

HOURHR

FFE FINISHED FLOOR ELEVATION

EQUIPMENT

EXTERIOR

EMBEDMENT

EQUIP

EMBT

EXT

ELEV ELEVATION

ELECTRICALELEC

EWT ENTERING WATER TEMPERATURE

CFH CUBIC FEET PER HOUR

CONNECTIONCONN

CIRC CIRCULATING

°F DEGREES FAHRENHEIT

ARCHITECT/ARCHITECTURALARCH

BLDG BUILDING

AGGR AGGREGATE

APPROX APPROXIMATE

BRAKE HORSEPOWERBHP

ACCESS PANELAP

REDUCED PRESSURE ZONE ASSEMBLYRPZA

FLEXIBLE CONNECTIONFC

GRADE CLEANOUTGCO

FLOOR CLEANOUTFCO

CONDENSATECOND

GLOBE VALVEGV

HOT WATER RETURNHWR

HOT WATERHW

WALL CLEANOUTWCO

ROOMRM

PRESSURE REDUCING VALVEPRV

PART NUMBERP/N

MANUFACTURERMFR

INCHESIN

INSIDE DIAMETERID

GAUGEGA

GALVINIZEDGALV

FEET HEADFT HD

FEET PER MINUTEFPM

CONSTRUCTIONCONST

COORDINATECOORD

OCCUPATIONAL SAFETY AND HEALTH

ADMINISTRATIONOSHA

UNIFORM PLUMBING CODEUPC

CONTINUEDCONT

GAS PRESSURE REGULATORGPR

RELOCATE EXISTING(R)

DIAMETERø

EXISTING TO BE REMOVED(X)

WATER COLUMNWC

WITHW/

TYPICALTYP

SQUARESQ

SHUT-OFF VALVESOV

MINIMUMMIN

ON CENTEROC

EXISTING(E)

NOT TO SCALENTS

MAXIMUMMAX

QUANTITYQTY

POUNDS PER SQUARE INCHPSI

POINT OF CONNECTIONPOC

PHASEPH

PRESSURE DROPPD

NEW(N)

MAXIMUM OVERCURRENT PROTECTIONMOCP

MECHANICALMECH

MINIMUM CURRENT AMPACITYMCA

1000 BTU PER HOURMBH

POUNDSLBS

KILOWATTSKW

INVERT ELEVATIONIE

HORSEPOWERHP

GALLONS PER MINUTEGPM

FEETFT

FLOORFLR

FULL-LOAD AMPERESFLA

EFFICIENCYEFF

DRAWINGSDWGS

DOWNDN

AND&

BRITISH THERMAL UNITSBTU

ABOVE FINISH FLOORAFF

ETCETERAETC

OCCUPANCYOCC

STANDARD CUBIC FEET PER MINUTESCFM

RV RELIEF VALVE

CONDENSATE DRAIN

HOT WATER

COLD WATER

STORM DRAIN / OVERFLOW DRAIN PIPE

VENT PIPE

WASTE PIPE / GREASE WASTE PIPE BELOW GRADE

HOT WATER RETURN PIPE

SPECIALTY SYSTEM PIPE

WATER PIPE BELOW GRADE

IW INDUSTRIAL WASTE

GREASE WASTEGW

CD CONDENSATE DRAIN

W WASTE

V VENT

DSP DRY STAND PIPE

SPKR(D) DELUGE SPRINKLER

DSPKR DRY SPRINKLER

SPKR SPRINKLER

TWR

TW

F FIRE WATER

CW COLD WATER

SD STORM DRAIN

TP TRAP PRIMER LINE

TEMPERED WATER

TEMPERED WATER RETURN

IDENTIFICATIONSYMBOL

ELBOW

90° SWEEP

45° WYE FITTING

COMBINATION WYE FITTING

PIPE UP OR DOWN THROUGH LEVEL

TEMPERATURE GAUGE

PRESSURE GAUGE

THERMOMETER

WALL CLEANOUT

GRADE CLEANOUT OR FLOOR CLEANOUT

WATER HAMMER ARRESTOR WITH ACCESS PANEL

PRESSURE/TEMPERATURE PLUG

FLEXIBLE CONNECTION

PIPE TRANSITION

UNION

TEE

PIPE CAP

PIPE DROP AT TEE

PIPE DROP

PIPE UP

PIPE CONTINUED

WATER HAMMER ARRESTOR

IDENTIFICATIONSYMBOL

POINT OF CONNECTION

CONTRACTOR EQUIPMENT TAG

SHEET KEYNOTE TAG

TRAP PRIMER W/ ACCESS PANEL

DOWNSPOUT NOZZLE

PUMP

FLOOR SINK

FLOOR DRAIN

CIRCULATION PUMP

HOSE BIBB

SHUT-OFF VALVE ON RISER

TEMPERATURE MIXING VALVE

WYE STRAINER

CHECK VALVE

PRESSURE REGULATING VALVE

ANGLE VALVE

ANGLE VALVE; VERTICAL ORIENTATION

TEMPERATURE AND PRESSURE RELIEF VALVE

PRESSURE REDUCING VALVE

SOLENOID VALVE

CIRCUIT SETTER

BALANCING VALVE

BUTTERFLY VALVE

GLOBE VALVE

GATE VALVE; VERTICAL ORIENTATION

GATE VALVE

BALL VALVE

SHUT-OFF VALVE

IDENTIFICATIONSYMBOL

PIPING SYSTEM LINE TYPES

VALVE SYMBOLS

SYMBOL

OTHER PLUMBING SYMBOLS

WSP WET STAND PIPE

GASG

CA COMPRESSED AIR

TAG

GENERAL PLUMBING NOTES

REDUCED PRESSURE ZONE ASSEMBLY

DOUBLE CHECK ASSEMBLY

THIS WORK SHALL CONFORM TO ALL CURRENT AND ADOPTED LOCAL CODES

• OREGON STRUCTURAL SPECIALTY CODE (OSSC)

• OREGON MECHANICAL SPECIALTY CODE (OMSC)

• OREGON PLUMBING SPECIALTY CODE (OPSC)

• OREGON ENERGY EFFICIENCY SPECIALTY CODE (OEESC)

• OREGON FIRE CODE (OFC)

(OR) LIST OF GOVERNING CODES

R

EG

ISTERED PROFESSIONA

L

E N

G I N E E

R79874PE

OREGON

L A

U R A J A N E B R E I T

S E P . 0 9 , 2 0 0 8

EXPIRES 12/31/2025

JOB NUMBER:

TH

E

US

E

OF

T

HE

SE

P

LA

NS

A

ND

SP

EC

IF

IC

AT

IO

NS

SH

AL

L B E

RE

ST

RI

CT

ED

T

O

TH

E

OR

IG

IN

AL

SI

TE

FO

R W

HI

CH

T

HE

Y W

ER

E

PR

EP

AR

ED

A

ND

P

UB

LIC

AT

IO

N

TH

ER

EO

F I

S E

XP

RE

SS

LY

LI

M

IT

ED

T

O

SU

CH

U

SE

. R

E-

US

E, R

EP

RO

DU

CT

IO

N, O R

PU

BL

IC

AT

IO

N

BY

A

NY

M

ET

HO

D, IN

W

HO

LE

O

R

IN

P

AR

T, IS

P

RO

HI

BI

TE

D.

T

IT

LE

T

O

TH

E

PL

AN

S A

ND

SP

EC

IF

IC

AT

IO

NS

R

EM

AI

NS

W

IT

H

TH

E

EN

GI

NE

ER

W

IT

HO

UT

P

RE

JU

DI

CE

. V

IS

UA

L C

ON

TA

CT

W

IT

H

TH

ES

E

PL

AN

S A

ND

SP

EC

IF

IC

AT

IO

NS

SH

AL

L C

ON

ST

IT

UT

E

PR

IM

A

FA

CI

E

EV

ID

EN

CE

O F T

HE

A

CC

EP

TA

NC

E

OF

T

HE

SE

R

ES

TR

IC

TI

ON

S.

C

OL

EB

RE

IT

E

NG

IN

EE

RI

NG

, L

LC

D

BA

A

XI

OM

E

NG

IN

EE

RS

CD

C

W

IR

EL

ES

S B

LD

G

DATE: 10/11/2024

20240427

RE

ST

RO

OM

S R

EM

OD

EL

ST

AT

E

ST

BU

ILD

IN

G

SA

LE

M

OR

PERMIT SET 10/11/2024

BEND | EUGENE | MEDFORD

MONTEREY | NAPA | SANTA CRUZ

E N G I N E E R I N G

PLUMBING

SCHEDULES AND

CALCULATIONS

P002

MARK

PLUMBING FIXTURE CONNECTIONS

DESCRIPTION MIN BRANCH SIZE

W V CW HW TRAP REMARKS

L-1 LAVATORY

WC-1 FLOOR MOUNTED

WATER CLOSET INTEGRAL-2"3" 1/2"

INSULATION SCHEDULE

SYSTEM

1. ALL EXPOSED INDOOR PIPING/TUBING AND FITTINGS WITHIN WINE PRODUCTION AND BARREL STORAGE SPACES SHALL BE FITTED WITH PVC FITTING COVERS AND PVC PIPE COVERS. PVC FITTING AND PIPE COVERS SHALL BE 25/50 FLAME AND SMOKE SPREAD RATED. COVERS AND JACKETING COLOR TO BE SELECTED BY ARCHITECT. PROVIDE TEMPLATE OF JACKET COLORS FOR THE ARCHITECT'S

REVIEW.

2. ALL ELBOWS; CONCEALED OR EXPOSED, SHALL BE INSULATED WITH PRE-MOLDED, FACTORY FORMED FIBROUS GLASS WITH 3.5 PCF MINIMUM DENSITY AS MANUFACTURED BY HAMFAB OR APPROVED EQUAL. ALL ELBOWS; CONCEALED OR EXPOSED, SHALL BE COVERED WITH PVC FITTING COVERS. PVC FITTING COVERS SHALL BE 25/50 FLAME AND SMOKE SPREAD RATED. COVER COLOR TO BE SELECTED BY ARCHITECT. PROVIDE TEMPLATE OF JACKET COLORS FOR THE ARCHITECT'S REVIEW.

DOMESTIC HOT WATER

NOMINAL PIPE DIAMETER (IN INCHES)

INSULATION THICKNESS REQUIRED (IN INCHES)

105-140

FLUID TEMPERATURE RANGE,

(°F)

CONDUCTIVITY RANGE

(IN BTU-INCH PER HOUR PER

SQUARE FOOT °F)

INSULATION MEAN

RATING TEMPERATURE

(°F)

<1 1 TO < 1.5 1.5 TO < 4 4 TO < 8

1.5 1.5 1.51.00.22-0.28 100

DOMESTIC COLD WATER 40-60 0.5 0.5 1.0 1.00.21-0.27 75

PRODUCTS INCLUDED IN THIS SECTION SHALL BE "LEAD FREE" IN ACCORDANCE WITH THE REQUIREMENTS OF THE

"REDUCTION OF LEAD IN DRINKING WATER ACT".

VALVE SCHEDULE

DESCRIPTION

DOMESTIC COLD WATER 2" AND SMALLER

SIZE GATE

GVT GLVT

GLOBE CHECK

CVT BVT

BALL

TYPE

PLUG BALAN. CLASS ABB. DESCRIPTION

ABBREVIATIONS

-- -- 125 PSI BVT BALL VALVE THREADED -

2-PIECE, FULL PORT, 400PSI, BRONZE

CBV CALIBRATED BALANCING VALVE, BRONZE

CVT CHECK VALVE THREADED - BRONZE

GVT GATE VALVE THREADED - BRONZE

GLVT GLOBE VALVE THREADED - BRONZE

DOMESTIC HOT WATER 2" AND SMALLER GVT GLVT CVT BVT -- CBV 125 PSI

SOLENOID VALVE: UL LISTED, FM APPROVED FOR GAS SERVICE, EXPLOSION PROOF, TWO-WAY NORMALLY CLOSED. SOLENOID

VALVE: ASCO 8044 SERIES W/ MANUAL RESET. (EMERGENCY GAS SHUT-OFF VALVE ASSEMBLY)

PIPE AND FITTING SCHEDULE - PLUMBING

SOIL, WASTE AND VENT ABOVE GROUND

SOIL, WASTE AND VENT BELOW GROUND

DOMESTIC COLD, HOT, HWR WATER

WITHIN BUILDING

INDIRECT WASTE AND

CONDENSATE PIPING

SIZE

ALL

ALL

ALL

ALL COPPER

COPPER

CI - NH

CI - NH

TYPE

PIPE

SCHED TYPE

FITTING

RATING REMARKS

SV

SV

CI SV

ALT: PVC W/ DWV FITTINGS,

SOLVENT WELDSVCI

HARD TEMPEREDSTDCUSTYPE L

HARD TEMPEREDSTDCUSTYPE L

ABBREV. DESCRIPTION

CI CAST IRON

CUS WROUGHT COPPER SOLDER (95/5)

NO HUB W/HEAVY DUTY 4-BAND HUSKY CLAMPNH

STD STANDARD

SV SERVICE WEIGHT

PVC PVC - SCH 40 ASTM 2665

PVC-DMV DRAIN,WASTE, & VENT FITTINGS, SOLVENT WELD

LOCATIONMARK

EWH-1

ELECTRIC WATER HEATER

SEE PLAN 28

GAL

CAP

ELECT

30 (2) 2000

W

208/1

V/PH

WT

FULL MAKE & MODEL REMARKS

A

SEE DETAIL 2/P600 FOR MOUNTING.

VERIFY LOCATION W/ ARCHITECT

FIRST HOUR

RATING (GALS.)

RECOVERY @

80°F - GPH

BRADFORD WHITE 3

MS-1 MOP SINK

2" 1 1/2" 2"1/2" 1/2"

2" 1 1/2" 2"1/2" 1/2"

U-1 WALL MOUNTED

URINAL INTEGRAL-1-1/2"2" 1/2"

R

EG

ISTERED PROFESSIONA

L

E N

G I N E E

R79874PE

OREGON

L A

U R A J A N E B R E I T

S

(E) CW

(E) WATER

METER

(N) WATER SUPPLY

TO ADJACENT

BUILDING W/ SOV

IN YARD BOX

(N) WATER SUPPLY FOR

ADJACENT BUILDING ROUTED

TO CONNECTION WITH (E)

WATER SUPPLY LINE AT HIGH

SIDEWALL. VERIFY (E) PIPE

SIZES IN FIELD

(E) WATER SUPPLY TO

ADJACENT BUILDING

(E) WATER SUPPLY TO

ADJACENT BUILDING

CONTINUATION

DOWNSTREAM FROM

(N) CONNECT POINT

(N) 1-1/2" WATER SUPPLY AT

CEILING. MATCH (E) SUPPLY AT

CONNECTION DOWNSTREAM.

SUPPORT FROM ROOF STRUCTURE

(E) WATER SUPPLY

BELOW FLOOR SLAB

(E) WATER SUPPLY

BELOW FLOOR SLAB TO

HOSE STATION, TYP.

CAP (E) WATER SUPPLY ABOVE

FLOOR PENETRATION. REMOVE

(E) VERTICAL PIPE. CONNECT (N)

SUPPLY TO (E) LINE AT HIGH

SIDEWALL.

FOR DETAIL IN THIS

AREA, SEE P200

SHEET NUMBER

REVISION SCHEDULE

JOB NUMBER:

TH

E

US

E

OF

T

HE

SE

P

LA

NS

A

ND

SP

EC

IF

IC

AT

IO

NS

SH

AL

L B E

RE

ST

RI

CT

ED

T

O

TH

E

OR

IG

IN

AL

SI

TE

FO

R W

HI

CH

T

HE

Y W

ER

E

PR

EP

AR

ED

A

ND

P

UB

LIC

AT

IO

N

TH

ER

EO

F I

S E

XP

RE

SS

LY

LI

M

IT

ED

T

O

SU

CH

U

SE

. R

E-

US

E, R

EP

RO

DU

CT

IO

N, O R

PU

BL

IC

AT

IO

N

BY

A

NY

M

ET

HO

D, IN

W

HO

LE

O

R

IN

P

AR

T, IS

P

RO

HI

BI

TE

D.

T

IT

LE

T

O

TH

E

PL

AN

S A

ND

SP

EC

IF

IC

AT

IO

NS

R

EM

AI

NS

W

IT

H

TH

E

EN

GI

NE

ER

W

IT

HO

UT

P

RE

JU

DI

CE

. V

IS

UA

L C

ON

TA

CT

W

IT

H

TH

ES

E

PL

AN

S A

ND

SP

EC

IF

IC

AT

IO

NS

SH

AL

L C

ON

ST

IT

UT

E

PR

IM

A

FA

CI

E

EV

ID

EN

CE

O F T

HE

A

CC

EP

TA

NC

E

OF

T

HE

SE

R

ES

TR

IC

TI

ON

S.

C

OL

EB

RE

IT

E

NG

IN

EE

RI

NG

, L

LC

D

BA

A

XI

OM

E

NG

IN

EE

RS

CD

C

W

IR

EL

ES

S B

LD

G

DATE: 10/11/2024

20240427

RE

ST

RO

OM

S R

EM

OD

EL

ST

AT

E

ST

BU

ILD

IN

G

SA

LE

M

OR

PERMIT SET 10/11/2024

BEND | EUGENE | MEDFORD

MONTEREY | NAPA | SANTA CRUZ

E N G I N E E R I N G

PLUMBING

OVERALL FLOOR PLAN

P100

SCALE:

OVERALL FLOOR PLAN - PLUMBING

3/16" = 1'-0"

NORTH

R

EG

ISTERED PROFESSIONA

L

E N

G I N E E

R79874PE

OREGON

L A

U R A J A N E B R E I T

S

WC-1

WC-1

L-1

L-1

U-1

EWH-1

3" WASTE DOWN

2" VENT UP

1/2" CW DOWN NOTE: ALL PIPING

ABOVE CEILING UON

FC-1

FC-2

2" WASTE DOWN

1-1/2" VENT UP

1/2" HW/CW DOWN

2" WASTE DOWN

1-1/2" VENT UP

1/2" HW/CW DOWN

3" WASTE DOWN

3" VENT UP THRU ROOF

1/2" CW DOWN

2" WASTE DOWN

1-1/2" VENT UP

3/4" CW DOWN

MS-1

2" WASTE DOWN, 1-1/2" VENT UP

1/2" HW DOWN, 1/2" CW FROM

3/4" CW SUPPLY AT U-1

3/4" HW/CW CONNECTIONS.

UNIT TO BE MOUNTED AT HIGH

SIDE WALL. SEE DETAIL 2/P600

1/2" HW

3/4"CW

3"

W W

3"

CONNECT (N) WASTE

LINE TO (E) SITE

SERVICE. VERIFY

LOCATION IN FIELD

3"

W

W 2"

CD

3/4"

3/4" CONDENSATE DRAIN DOWN

TO INDIRECT DRAINAGE

CONNECTION AT MOP SINK

3/4" CONDENSATE DRAIN FROM FAN

COIL TYPICAL. CONNECT PER

MANUFACTURER'S INSTALLATION

SPECIFICATION. SEE MECHANICAL

PLANS FOR FAN COIL SPECIFICATIONS

1/2" HW

3/4"CW

FCO

FCO

WASTE PIPING

BELOW SLAB, TYP.

SAWCUT (E) SLAB

AS REQUIRED FOR

(N) PIPE ROUTING

SL

OP

E 2%

D

OW

N

1-1/4"

3/4"

1/2" CW

(E) CW SUPPLY BELOW

SLAB. VERIFY SIZE AND

LOCATION IN FIELD

CD

(X) WC-1

(X) U-1

(X) MS-1

(X) L-1

DEMO (E) PLUMBING

FIXTURES PER

ARCHITECTURAL PLANS

NOTE:

REMOVE OR ABANDON EXISTING PIPING AT

FIXTURES AND WHERE PRACTICAL TO AID IN NEW

CONSTRUCTION PROCESS. SAW CUT EXISTING

CONCRETE FLOOR FOR REMOVAL/ABANDONMENT

OF EXISTING WASTE LINES WHERE APPROPRIATE

AND VERIFY POINT-OF-CONNECTION TO EXISTING

SYSTEM WHERE IT EXITS BUILDING

VALVE AND STUB EXISTING COLD

WATER MAIN SERVING THE

RESTROOM SPACE FOR FUTURE

CONNECTION TO NEW PIPING .

SHEET NUMBER

REVISION SCHEDULE

JOB NUMBER:

TH

E

US

E

OF

T

HE

SE

P

LA

NS

A

ND

SP

EC

IF

IC

AT

IO

NS

SH

AL

L B E

RE

ST

RI

CT

ED

T

O

TH

E

OR

IG

IN

AL

SI

TE

FO

R W

HI

CH

T

HE

Y W

ER

E

PR

EP

AR

ED

A

ND

P

UB

LIC

AT

IO

N

TH

ER

EO

F I

S E

XP

RE

SS

LY

LI

M

IT

ED

T

O

SU

CH

U

SE

. R

E-

US

E, R

EP

RO

DU

CT

IO

N, O R

PU

BL

IC

AT

IO

N

BY

A

NY

M

ET

HO

D, IN

W

HO

LE

O

R

IN

P

AR

T, IS

P

RO

HI

BI

TE

D.

T

IT

LE

T

O

TH

E

PL

AN

S A

ND

SP

EC

IF

IC

AT

IO

NS

R

EM

AI

NS

W

IT

H

TH

E

EN

GI

NE

ER

W

IT

HO

UT

P

RE

JU

DI

CE

. V

IS

UA

L C

ON

TA

CT

W

IT

H

TH

ES

E

PL

AN

S A

ND

SP

EC

IF

IC

AT

IO

NS

SH

AL

L C

ON

ST

IT

UT

E

PR

IM

A

FA

CI

E

EV

ID

EN

CE

O F T

HE

A

CC

EP

TA

NC

E

OF

T

HE

SE

R

ES

TR

IC

TI

ON

S.

C

OL

EB

RE

IT

E

NG

IN

EE

RI

NG

, L

LC

D

BA

A

XI

OM

E

NG

IN

EE

RS

CD

C

W

IR

EL

ES

S B

LD

G

DATE: 10/11/2024

20240427

RE

ST

RO

OM

S R

EM

OD

EL

ST

AT

E

ST

BU

ILD

IN

G

SA

LE

M

OR

PERMIT SET 10/11/2024

BEND | EUGENE | MEDFORD

MONTEREY | NAPA | SANTA CRUZ

E N G I N E E R I N G

PLUMBING

ENLARGED FLOOR PLANS

P200

DEMO FLOOR PLAN - PLUMBING

1/2" = 1'-0"P200

1NEW FLOOR PLAN - PLUMBING

1/2" = 1'-0"P200

R

EG

ISTERED PROFESSIONA

L

E N

G I N E E

R79874PE

OREGON

L A

U R A J A N E B R E I T

S

JOB NUMBER:

TH

E

US

E

OF

T

HE

SE

P

LA

NS

A

ND

SP

EC

IF

IC

AT

IO

NS

SH

AL

L B E

RE

ST

RI

CT

ED

T

O

TH

E

OR

IG

IN

AL

SI

TE

FO

R W

HI

CH

T

HE

Y W

ER

E

PR

EP

AR

ED

A

ND

P

UB

LIC

AT

IO

N

TH

ER

EO

F I

S E

XP

RE

SS

LY

LI

M

IT

ED

T

O

SU

CH

U

SE

. R

E-

US

E, R

EP

RO

DU

CT

IO

N, O R

PU

BL

IC

AT

IO

N

BY

A

NY

M

ET

HO

D, IN

W

HO

LE

O

R

IN

P

AR

T, IS

P

RO

HI

BI

TE

D.

T

IT

LE

T

O

TH

E

PL

AN

S A

ND

SP

EC

IF

IC

AT

IO

NS

R

EM

AI

NS

W

IT

H

TH

E

EN

GI

NE

ER

W

IT

HO

UT

P

RE

JU

DI

CE

. V

IS

UA

L C

ON

TA

CT

W

IT

H

TH

ES

E

PL

AN

S A

ND

SP

EC

IF

IC

AT

IO

NS

SH

AL

L C

ON

ST

IT

UT

E

PR

IM

A

FA

CI

E

EV

ID

EN

CE

O F T

HE

A

CC

EP

TA

NC

E

OF

T

HE

SE

R

ES

TR

IC

TI

ON

S.

C

OL

EB

RE

IT

E

NG

IN

EE

RI

NG

, L

LC

D

BA

A

XI

OM

E

NG

IN

EE

RS

CD

C

W

IR

EL

ES

S B

LD

G

DATE: 10/11/2024

20240427

RE

ST

RO

OM

S R

EM

OD

EL

ST

AT

E

ST

BU

ILD

IN

G

SA

LE

M

OR

PERMIT SET 10/11/2024

BEND | EUGENE | MEDFORD

MONTEREY | NAPA | SANTA CRUZ

E N G I N E E R I N G

PLUMBING

DETAILS

P600

VENT THROUGH ROOF

NO SCALEP600

TERMINATE 10'-0" MIN

FROM AIR INTAKES

HEIGHT PER LOCAL CODE

OR 6" MIN ABOVE ROOF

FLASHING, MASTER

FLASH OR EQUAL, W/

EPDM BOOT, ALUM.

FLANGE.

FORM FLANGE TO FIT ROOF

CONTOURS. CAULK W/ URETHANE

SILICON SEALANT AND FASTEN BASE TO

ROOFING W/ S.S. S.M. SCREWS

ROOFING - SEE ARCH. DWGS

ROOF CONSTRUCTION

VENT, SEE PLAN

ROUTE VENT IN CEILING CAVITY

WHERE REQUIRED

WATER HEATER

NO SCALE

P600

WALL MOUNTED ELECTRIC

4x4 BLOCKING WITH SIMPSON A34 TOP AND BOTTOM

EACH END

SEISMIC STRAPS, 2" WIDE, 16 GAUGE GALVANIZED,

SECURE TO BLOCKING WITH 3/8"Ø x 3" LAG AND

WASHER, LOCATE AT 1/3 AND 2/3 HEIGHT

ELECTRIC WATER HEATER, FOR SPECIFICATIONS AND

LOCATIONS, SEE PLANS

PLAN

ELEVATION

RUN DRAIN AND T & PRV TO MOP SINK

FOR SIZES AND CONTINUATION, SEE PLANS

CHECK VALVE, TYP

BALL VALVE, TYP

TEMPERATURE AND PRESSURE RELIEF VALVE

BRASSCRAFT WB SERIES WATER HEATER

CONNECTORS, TYP

SEISMIC STRAP, TYP

ELECTRIC WATER HEATER

3/8"Ø x 3" LAG, PRE-DRILL HOLE INTO BLOCKING, TYP

OF FOUR (4) PLACES

DRAIN, CONNECT TO PLATFORM WITH FACTORY

DRAIN KIT

HOLDRITE QUICK STAND #40-SWHP-WM WALL

MOUNTED EQUIPMENT PLATFORM

2x8 CHOCK BLOCK CUT TO RADIUS OF WATER HEATER

R

EG

ISTERED PROFESSIONA

L

E N

G I N E E

R79874PE

OREGON

L A

U R A J A N E B R E I T

S

PLB-P001-P01 - LEGEND AND NOTES
PLB-P001-P01 - LEGEND AND NOTES
PLB-P002-P01 - LEGEND AND NOTES
PLB-P002-P01 - LEGEND AND NOTES
PLB-P100-E001 - LEGEND AND NOTES
PLB-P100-E001 - LEGEND AND NOTES
PLB-P200-E001 - LEGEND AND NOTES
PLB-P200-E001 - LEGEND AND NOTES
PLB-P600-P01 - LEGEND AND NOTES
PLB-P600-P01 - LEGEND AND NOTES
2024-10-11T16:48:58-0700
Laura Breit
2024-10-11T16:48:58-0700
Laura Breit
2024-10-11T16:48:58-0700
Laura Breit
2024-10-11T16:48:59-0700
Laura Breit
2024-10-11T16:48:59-0700
Laura Breit

File details come from the government source that posted it. Updated .