This document package includes a technical specification for heating and cooling coils and related commissioning requirements for a parking garage project, as well as a solicitation posting for the project.
The technical specification outlines product and installation requirements for various types of heating and cooling coils to be used in air handling units and duct applications for the parking garage. It includes submittal requirements, applicable industry standards, and commissioning and demonstration obligations. The related solicitation posting provides additional context that the project is to construct a new parking garage to accommodate approximately 435 vehicles on the existing VA medical center campus in Wilkes-Barre, Pennsylvania, with a magnitude between $10-20 million. The solicitation is set aside for verified service-disabled veteran-owned small businesses and will use a tiered evaluation process including large businesses. Pricing shall be in whole dollars only.
View the file
Other files for this federal contract opportunity
Show all 50
Y1LZ--693-222 | Parking Structure Solicitation Amendment 2 has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Parking Garage Project Number 693-222 Department of Veterans Affairs Wilkes-Barre, Pennsylvania
238216 - 1
SECTION 23 82 16 - AIR COILS
PART 1 - GENERAL
1.1 DESCRIPTION
Heating and cooling coils for air handling unit and duct applications
1.2 RELATED WORK
A. Section 23 05 10, COMMON WORK RESULTS FOR BOILER PLANT and STEAM
GENERATION.
B. Section 23 05 11, COMMON WORK RESULTS FOR HVAC.
C. Section 23 31 00, HVAC DUCTS AND CASINGS
D. Section 23 82 00, CONVECTION HEATING AND COOLING UNITS
E. Section 23 08 00, COMMISSIONING OF HVAC SYSTEMS: Requirements for commissioning, systems readiness checklists, and training.
F. Section 01 91 00, GENERAL COMMISSIONING REQUIREMENTS
1.3 QUALITY ASSURANCE
A. Refer to paragraph, QUALITY ASSURANCE, Section 23 05 11, COMMON WORK
RESULTS FOR HVAC.
B. Unless specifically exempted by these specifications, heating and cooling coils shall be tested, rated, and certified in accordance with AHRI Standard 4l0 and shall bear the
AHRI certification label.
1.4 SUBMITTALS
A. Submit in accordance with Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, and SAMPLES.
B. Manufacturer's Literature and Data for Heating and Cooling Coils: Submit type, size, arrangements and performance details. Present application ratings in the form of tables, charts or curves.
C. Provide installation, operating and maintenance instructions.
D. Certification Compliance: Evidence of listing in current ARI Directory of Certified Applied
Air Conditioning Products.
E. Coils may be submitted with Section 23 82 00, CONVECTION HEATING AND
COOLING UNITS.
Wilkes-Barre, Pennsylvania
238216 - 2
F. Completed System Readiness Checklists provided by the Commissioning Agent and completed by the contractor, signed by a qualified technician and dated on the date of completion, in accordance with the requirements of Section 23 08 00 COMMISSIONING
OF HVAC SYSTEMS.
1.5 APPLICABLE PUBLICATIONS
A. The publications listed below form a part of this specification to the extent referenced.
The publications are referenced in the text by the basic designation only.
B. Air Conditioning and Refrigeration Institute (AHRI):
Directory of Certified Applied Air Conditioning Products
AHRI 4l0-01 ..........................Forced-Circulation Air-Cooling and Air-Heating Coils
C. American Society for Testing and Materials (ASTM):
B75/75M-02 ..........................Standard Specifications for Seamless Copper Tube
D. National Fire Protection Association (NFPA):
70-11.....................................National Electric Code
E. National Electric Manufacturers Association (NEMA):
250-11...................................Enclosures for Electrical Equipment (1,000 Volts
Maximum)
F. Underwriters Laboratories, Inc. (UL):
1996-09.................................Electric Duct Heaters
PART 2 - PRODUCTS
2.1 HEATING AND COOLING COILS
A. Conform to ASTM B75 and AHRI 410.
2.2 ELECTRIC HEATING COILS
A. Standards: ARI 4l0 is not applicable. Electric coils shall meet the requirements of the
National Electric Code (NEC) and UL l996.
B. General: Aluminized steel frame, spot welded. Duct mounted units may be flanged or slip-in design with built-in terminal box completely factory wired to terminals. Control panels for coils in air handling units may be built-in or remote in NEMA l enclosure.
C. Coils: Open type, 80 percent nickel, 20 percent chromium resistance wire, insulated by floating ceramic bushings and supported in aluminized steel brackets spaced on 100 mm (4-inch) maximum centers. Coils shall be mechanically crimped in stainless steel terminals which are insulated from the frame with high temperature molded phenolic bushings.
Wilkes-Barre, Pennsylvania
238216 - 3
D. Over Temperature Protection:
l. Primary system: Automatic reset thermal cutout.
2. Secondary system: Load-carrying manual reset thermal cutout factory wired in series with each heater stage.
E. Overcurrent Protection: Comply with UL and NEC.
PART 3 - EXECUTION
3.1 INSTALLATION
A. Follow coil manufacturer's instructions for handling, cleaning, installation and piping connections.
B. Comb fins, if damaged. Eliminate air bypass or leakage at coil sections.
3.2 STARTUP AND TESTING
A. The Commissioning Agent will observe startup and contractor testing of selected equipment. Coordinate the startup and contractor testing schedules with the Resident
Engineer and Commissioning Agent. Provide a minimum of 7 days prior notice.
3.3 COMMISSIONING
A. Provide commissioning documentation in accordance with the requirements of Section
23 08 00 – COMMISSIONING OF HVAC SYSTEMS for all inspection, start up, and contractor testing required above and required by the System Readiness Checklist provided by the Commissioning Agent.
B. Components provided under this section of the specification will be tested as part of a larger system. Refer to Section 23 08 00 – COMMISSIONING OF HVAC SYSTEMS and related sections for contractor responsibilities for system commissioning.
3.4 DEMONSTRATION AND TRAINING
A. Provide services of manufacturer’s technical representative for one hour to instruct VA personnel in operation and maintenance of units.
B. Submit training plans and instructor qualifications in accordance with the requirements of Section 23 08 00 – COMMISSIONING OF HVAC SYSTEMS.
- - - E N D - - -
| 3.2 STARTup and testing |
| 3.3 COmmissioning |
| 3.4 demonstration and training |