About this file

This document includes a federal contract solicitation and related technical specifications for a parking garage construction project. The solicitation seeks offers to construct a new parking garage to accommodate approximately 435 vehicles on the existing VA medical center campus in Wilkes-Barre, Pennsylvania. The magnitude of the project is estimated between $10 million to $20 million. The NAICS code is 236220 for commercial and institutional building construction. This is a set-aside for verified service-disabled veteran-owned small businesses using tiered evaluation procedures, to include large businesses. Offerors must follow all federal, state, and local codes and VA rules and regulations. The technical specifications outline requirements for phasing, piping and insulation, firestopping, valves, identification, testing, and other work. Responses are due by the date specified in the solicitation. The Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 4 is the contracting agency.

View the file

Other files for this federal contract opportunity

Other files attached to Y1LZ--693-222 | Parking Structure Solicitation Amendment 2, newest first.
File Type Posted
150002002 - VAMC Wilkes-Barre Parking Structure FINAL Geotechnical Report 11-30-15.pdf PDF
107300 Exterior Canopy System.pdf PDF
057200 Ornamental Fence and Gates.pdf PDF
024100 Demolition.docx DOCX document
087100 Door Hardware.pdf PDF
022113 Site Surveys.docx DOCX document
017419 Const Waste Mgmt.doc DOC document
015719 Temp Envir Cont.doc DOC document
013526 Safety Requirements.docx DOCX document
010000 General.docx DOCX document
S02 Q_A Parking Structure Solicit.pdf PDF
S02 36C24420R0075 Amend 2.pdf PDF
EXHIBIT E PastPerformanceQuestionnaire.docx DOCX document
334000 Storm Sewer Utilities.pdf PDF
316326 Drilled Caissons.pdf PDF
312319 Dewatering.pdf PDF
280526.pdf PDF
264313.pdf PDF
280500.pdf PDF
260533.pdf PDF
260519.pdf PDF
260511.pdf PDF
230711.pdf PDF
220800.pdf PDF
220512.pdf PDF
220511.pdf PDF
142400 Hydraulic Elevators.pdf PDF
130541 Sesimic requirements.pdf PDF
101400 Signage.pdf PDF
089000 Louvers and Vents.pdf PDF
077200 Roof Accessories.pdf PDF
071110 Composite Sheet Waterproofing.pdf PDF
034133 Precast Structural Pretensioned Concrete.pdf PDF
033000 Cast-in-Place Concrete.pdf PDF
017200 Project Record Documents_Single Prime.pdf PDF
014529.docx DOCX document
014500 02.docx DOCX document
013216-13.docx DOCX document
010000.docx DOCX document
012500 Substitutions_Single Prime.pdf PDF
Pstruct Dwg 3.pdf PDF
Arch Dwg 1-5.pdf PDF
S02 Dwg S6-C1.pdf PDF
S02 Dwg S3-S5.pdf PDF
075323 EPDM Single-Ply Membrane Roofing.pdf PDF
2903 312000 Earthwork 02.pdf PDF
280800.pdf PDF
262726.pdf PDF
230800.pdf PDF
221400.pdf PDF
Show all 50

Y1LZ--693-222 | Parking Structure Solicitation Amendment 2 has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Parking Garage Project Number 693-222 Department of Veterans Affairs Wilkes-Barre, Pennsylvania

230510 - 1

SECTION 23 05 10 - MECHANICAL-GENERAL

PART 1 - GENERAL

1.1 DESCRIPTION

A. The requirements of this Section shall apply to all sections of Division 23. All Division 1 sections shall apply to the Division 23 Plumbing sections as applicable.

1.2 SUBMITTALS

A. Submittals shall be submitted in accordance with Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, and SAMPLES and individual Plumbing sections as required.

B. Contractor shall make all necessary field measurements and investigations to assure that the equipment and assemblies will meet contract requirements.

C. Prior to developing shop drawings and coordination plans, the Contractor shall submit his drawings to all other trades for review.

1.3 REQUIREMENTS

A. All drawings and portions of the drawings, floor plans, risers, details, schematics and specifications indicated shall apply and are part of the plumbing contract. All other trades of work (Architectural, Structural, HVAC, Electrical) shall be used in the coordination and layout of the new plumbing work. The Plumbing Contractor’s failure to properly coordinate his work with the work of the other disciplines shall not be grounds for additional costs.

B. Any discrepancy or conflict noted between or within the above referenced documents shall be brought to the attention of the Engineer, in writing, a minimum of fourteen (14) days prior to submittal of bids. The Engineer shall resolve issues prior to bid submittal.

C. This Contractor shall carefully read the above mentioned documents and study the drawings of all trades. He shall be responsible for neglect to read, or attend to, any paragraph or items contained therein. Failure to bring any conflicts or discrepancies to the attention of the Engineer, in writing, prior to bid submittal shall not constitute grounds for extras and/or change orders. Costs resultant from this failure shall be borne by this Contractor.

D. This section applies to all Division sections and all mechanical, Contract Drawings and Documents.

Parking Garage Project Number 693-222 Department of Veterans Affairs Wilkes-Barre, Pennsylvania

230510 - 2

1.5 WORK INCLUDED

A. These specifications and accompanying drawings are intended to cover the furnishing by the Contractor of all labor, material and all equipment of every kind necessary for the complete installation of the various systems, and such other materials and equipment as hereinafter specified, and shall include, but not be limited to the following:

1. Phasing of Work as required to meet Phasing sequence as indicated on Contract Documents. Contractor shall coordinate phasing and work sequencing as per Architectural plans and VA Hospital requirements.

2. All required pipe and fittings for the various systems.

3. All required piping insulation, hangers and supports for new piping. Piping insulation shall include new piping and those portions of existing piping where asbestos containing materials have been removed.

4. All required firestopping of wall and floor penetrations per the Contract Documents and VA requirements.

5. All necessary valves and shutoffs. Contractor shall provide check valves on all hot water connections to the new fixtures to prevent backfeed.

6. Piping, valve, and equipment identification for all new systems and equipment installed under this project.

7. Flushing, testing and disinfecting of all new water piping.

8. Setting of all sleeves and inserts in place.

9. Testing, adjusting and placing in service all systems and equipment installed.

B. The above list is presented for general guidance only and does not necessarily cover the entire requirement of the project as shown on the drawings and/or as specified hereinafter.

PART 2 – PRODUCTS (NOT USED)

PART 3 – EXECUTION (NOT USED)

- - - END OF SECTION - - -

File details come from the government source that posted it. Updated .