23-4. REQUIRED PRICE SCHEDULE IFB 023-26-RM.xls
XLS spreadsheet 89 KB Posted
- Attached to
- PUMP STATION 43 IMPROVEMENTS
- Solicitation number
- IFB-023-26-RM
- Issued by
- Leon County, Florida
About this file
This is a Required Price Schedule Bid Form for Invitation for Bid (IFB) 023-26-RM issued by the City of Tallahassee, Florida, for Pump Station 43 Improvements. The project encompasses removal of out-of-service forcemain, installation of approximately 675 linear feet of 18-inch DIP force main, placement of currently in-service forcemain out of service, installation of a surge tank and kingpin manhole, bypass pumping components, and relocation of an existing chemical tank. Additional work includes asphalt patching, milling, resurfacing, surface restoration, arboricultural mitigation for impacted trees per an Arborist Report, traffic maintenance, and material disposal. The mandatory pre-bid meeting is scheduled for March 18, 2026, at 2:00 PM (EST) via Microsoft Teams. The bid form itemizes general contract items (mobilization, maintenance of traffic, erosion control, clearing and grubbing, pavement removal, tree removal, bypass pumping, and perimeter fencing), sanitary sewer utility items (manholes, suction assemblies, force main installation in varying sizes and configurations, plug valves, and existing main removal), and surge tank and chemical feed tank foundation and installation items, with quantities ranging from single units to several hundred linear feet.
All bid prices are currently shown as zero dollars, requiring contractors to complete the schedule with unit prices and extended prices for each line item. The project does not utilize federal funding, making Section 1.36 Federal Provisions inapplicable. Contractors must demonstrate capability to perform all services in a timely and workmanlike manner and are required to secure road closure requests following submission of acceptable Temporary Traffic Control Plans. Any items not specifically identified on the bid form are considered incidental, with associated costs to be included in the most appropriate bid item listed, including as-built preparation and coordination with City Electric, Gas, and Growth Management Departments.
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PS-43-Bid Form
| 14-7a. - Schedule of Bid Items | |||||
| Re-Bid Pump Station 43 Improvements | |||||
| 2/18/26 | |||||
| Contractor Name: __________________________________________________ | |||||
| Item No. | Description of Item | QTY | Unit | Unit Prices | Extended Prices |
| General Contract Items | |||||
| Item No. | Description of Item | QTY | Unit | Unit Prices | Extended Prices |
| 101-1 | Mobilization | 1 | LS | $ - 0 | $ - 0 |
| 102-1 | Maintenance of Traffic | 1 | LS | $ - 0 | $ - 0 |
| 104-WS | Temporary Erosion, Sedimentation, and Water Pollution Control | 1 | LS | $ - 0 | $ - 0 |
| 110-1-1 | Selective Clearing & Grubbing | 1 | LS | $ - 0 | $ - 0 |
| 110-4 | Removal of Existing Concrete Pavement | 45 | SY | $ - 0 | $ - 0 |
| 110-4-1 | Removal of Existing Concrete Air Release Vault | 1 | LS | $ - 0 | $ - 0 |
| 110-4-2 | Removal of Existing Concrete Thrust Restraints | 1 | LS | $ - 0 | $ - 0 |
| 110-15 | Tree Protection & Arboricultural Mitigation | 1 | LS | $ - 0 | $ - 0 |
| 110-23 | Tree Removal | 6 | EA | $ - 0 | $ - 0 |
| SBP-10 | Sewer Bypass Pumping 1 | 1 | LS | $ - 0 | $ - 0 |
| PWS-1 | Relocate/Adjust Existing Water Service | 1 | EA | $ - 0 | $ - 0 |
| 550-10-70 | Fence Gate (3') | 1 | EA | $ - 0 | $ - 0 |
| 550-10-80 | Fence Gate (16' Cantilever) | 1 | EA | $ - 0 | $ - 0 |
| 550-10-222 | Perimeter Fence (Vinyl - 6.0') | 405 | LF | $ - 0 | $ - 0 |
| Subtotal - General | $ - 0 | ||||
| Sanitary Sewer Utilities | |||||
| Item No. | Description of Item | QTY | Unit | Unit Prices | Extended Prices |
| MHL-SPEC-0721 | Sanitary Manhole (Sluice Gate Structure) | 1 | LS | $ - 0 | $ - 0 |
| YP-16-SS | 16" Stainless Steel Suction Assembly | 1 | LS | $ - 0 | $ - 0 |
| 522-10 | Concrete Slab (6" - Bypass Suction)2 | 1 | LS | $ - 0 | $ - 0 |
| SFM-01-18-DIP | Sewer Force Main, 18”, DIP (In Pavement/Road) | 47 | LF | $ - 0 | $ - 0 |
| SFM-02-18-DIP | Sewer Force Main, 18”, DIP (Outside Pavement/Road) | 632 | LF | $ - 0 | $ - 0 |
| SPV-18 | Plug Valve w/ Valve Box, 18” | 2 | EA | $ - 0 | $ - 0 |
| YP-18-DIP | Bypass Connection Assembly | 1 | LS | $ - 0 | $ - 0 |
| 522-11 | Concrete Slab (6" - Bypass Connection)2 | 1 | LS | $ - 0 | $ - 0 |
| APS-01 | Place Out of Service Sanitary Sewer Main Grout-Fill | 33 | CY | $ - 0 | $ - 0 |
| APS-05-8 | Remove Sanitary Sewer Main (8") | 11 | LF | $ - 0 | $ - 0 |
| APS-05-16 | Remove Sanitary Sewer Main (16") | 591 | LF | $ - 0 | $ - 0 |
| APS-05-18 | Remove Sanitary Sewer Main (18") | 520 | LF | $ - 0 | $ - 0 |
| Subtotal - Sewer | $ - 0 | ||||
| Surge Tank and Chemical Feed Tank | |||||
| Item No. | Description of Item | QTY | Unit | Unit Prices | Extended Prices |
| 522-12 | Concrete Foundation (Surge Tank)3 | 1 | LS | $ - 0 | $ - 0 |
| 522-13 | Concrete Foundation (Chem Tank)3 | 1 | LS | $ - 0 | $ - 0 |
| Tank-01 | Surge Tank Installation | 1 | LS | $ - 0 | $ - 0 |
| YP-12-DIP | 12" DIP Pipe Connection | 1 | LS | $ - 0 | $ - 0 |
| YP-4-DIP | 4" DIP Pipe Connection | 1 | LS | $ - 0 | $ - 0 |
| Subtotal - Tanks | $ - 0 | ||||
| TOTAL | |||||
| TOTAL | $ - 0 | ||||
| Notes | |||||
| 1) | Lump Sum bid price for bypass pumping must include all costs associated with and incidental to the contractor's bypass operation during construction. | ||||
| 2) | Quantity includes concrete slabs around suction line and connection line for sewer bypass system. | ||||
| 3) | Quantity includes concrete slabs for surge tank and chemical feed tank per foundation design plans. | ||||
| 4) | Any item not specifically identified on the bid form shall be considered incidental and all costs associated with that item shall be included using the most appropriate bid item listed. This could include, but is not limited to: As‐built preparation, and coordination with City Electric/Gas/Growth Management Departments, etc. |
File details come from the government source that posted it. Updated .