This document is an Exhibit detailing a window replacement project for St. Johns County, Florida, funded through the United States Department of Energy's Energy Efficiency and Conservation Block Grant (EECBG) program. The project involves replacing existing single-hung, single-pane, bronze-colored aluminum windows at the W.E. Harris Center located in Hastings, FL with new energy-efficient, aluminum storefront windows in bronze color. The total grant funding for the project is $275,490.00, and the work is to be completed during normal business hours (Monday through Friday, 8:00 AM - 5:00 PM). The contractor will be responsible for complete turnkey window replacement, including permitting, labor, materials, removal and disposal of existing windows, proper sealing, and touch-up painting.
The project is entirely grant-funded, with the county reserving the right to add or delete windows throughout the contract duration using pre-established unit pricing via a Change Order process. The basis of design references the Kawaneer Company, Inc. TriFab 450 Aluminum Store Front & Entry System, though alternative manufacturers may be considered if they meet specified conditions. The contractor must field verify measurements before bidding and will be solely responsible for proper window fitment. The project emphasizes energy efficiency and compliance with all applicable building codes, with the potential for flexibility in window manufacturer selection pending Department of Energy approval.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Window Replacement W.E. Harris Center
Energy Efficiency and Conservation Block Grant (EECBG) Program
St Johns County has been awarded 275,490.00 through the United States Department of Energy (DOE), Energy Efficiency and Conservation Block Grant (EECBG) program. These funds will be used for window replacement at the W.E. Harris Center located in Hasting Fl. The current windows are single hung single pane glass, aluminum frame construction, and color bronze. The new windows must be energy efficient, aluminum storefront, bronze color meeting all applicable building codes.
This is a grant funded project. All the terms and conditions are included in this solicitation.
Location:
• 400 E Harris St, Hastings Fl, 32145
Overall Budget:
• 275,490.00
Terms and Conditions for Grant:
• See Exhibit 2 - U.S. DOE Grant Special Terms & Conditions
Basis of Design:
• Kawaneer Company, Inc TriFab 450 Aluminum Store Front & Entry System (HVHZ) (Non- Impact) Attached.
• This is what was provided to the DOE for approval.
• SJC Would accept other manufacturers providing their products meet all applicable terms and conditions listed above. This may have to be resubmitted to the DOE.
SOW:
• The Contractor shall be responsible for providing all permitting, bonds, labor, materials, scaffolding, machinery, hoists, transportation, employee safety equipment, equipment, and supervision required to complete turnkey window replacement per the terms and conditions included in this bid.
• The Contractor is solely responsible for the proper fitment of the windows into the existing openings. Measurements given are for estimating only. The Contractor is to field verify before bidding. Final measurements will be solely the contractor’s responsibility.
• The Contractor is to remove and properly dispose of the existing windows and all trash generated from this project.
• Contractor is to properly seal (per manufacturer specs) and touch up paint (matching colors) all window jambs on the affected windows.
• Contractor shall clean new glass and work area after installation.
• Work is to be done during normal business hours: Monday through Friday, 8:00 AM – 5:00 PM.
Additions/Deletions:
Upon award and execution of Contract, the County reserves the right to add and/or delete windows to be replaced throughout the duration of the Contract. The windows added to and/or deleted from the contract shall be at the unit prices submitted on Attachment “R”. Any windows added to or removed under this contract shall be done through an authorized Change Order.