21R3100 Attach N Contract Deliverables TAGOS.xlsx
XLSX spreadsheet 35 KB Posted
- Solicitation number
- N32205-21-R-3100
About this file
This document outlines the reporting requirements for the operation and maintenance contract for five T-AGOS ships and two T-AGM ships. The contractor must provide regular reports on activities including maintenance, repairs, budgets, safety incidents, certifications and more. Reports are due on topics such as casualty reports, oil spills, crew lists, contractor training, damage control documentation, and budget status. The reporting requirements specify delivery dates ranging from immediately upon an event to annual reports. The contractor must use the SAMM system and other channels defined in the document for submitting reports to various government stakeholders, including the Contracting Officer, COR, and MSC departments. Adherence to the reporting requirements is necessary to keep the government informed on key activities and ensure contract compliance.
View the file
Other files
Show all 39
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| N32205-21-R-3100 Contract Deliverables | |||||||||||||||||||||||
| Item A | Item B | Item C | Item D | Item E | Item F | Item 1 | Item 2 | Item 3 | Item 4 | Item 5 | Item 6 | Item 7 | Item 8 | Item 9 | Item 10 | Item 11 | Item 12 | Item 13 | Item 14 | Item 15 | Item 16 | Item 17 (To be completed by Contractor) | Item 18 (To be completed by Contractor) |
| To be provided upon award | N/A | Other | T-AGOS/T-AGM Class O&M | To be provided upon award | To be provided upon award | To be provided upon award | Certificates | N/A | N/A | C-1.1.1.b. | PM2 | N/A | N/A | N/A | Based on Certificate Periodicity. | To be provided upon award | To be provided upon award | To be provided upon award | USCG, USN, ABS, ABS Agent, NOAA, USCG Agent, Vessel, FCC, USPHS FDA, Suez Canal, Panama Canal | As Required | N/A | ||
| To be provided upon award | N/A | Other | T-AGOS/T-AGM Class O&M | To be provided upon award | To be provided upon award | To be provided upon award | Operational Control (OPCON) | N/A | N/A | C-1.1.2. | PM2 | N/A | N/A | N/A | Immediately report any delay of any ship and/or diversions from operations. | To be provided upon award | To be provided upon award | To be provided upon award | Operational Commander, COMSC, MSC Area Commander | As Required | N/A | ||
| To be provided upon award | N/A | Other | T-AGOS/T-AGM Class O&M | To be provided upon award | To be provided upon award | To be provided upon award | GENERAL OPERATIONS Master action taken to abort operations temporarily on the basis of clear and present danger to life at sea. | N/A | N/A | C-1.1.3.3. | PM2 | N/A | N/A | N/A | As soon as possible but not later than five working days of the aborted event. | To be provided upon award | To be provided upon award | To be provided upon award | OPCON with an information copy to COMSC and the cognizant MSC Area Commander | As Required | N/A | ||
| To be provided upon award | N/A | Other | T-AGOS/T-AGM Class O&M | To be provided upon award | To be provided upon award | To be provided upon award | Ship's Force Work List | N/A | N/A | C-1.1.3.3.1. | PM2 | N/A | N/A | N/A | No later than five business days prior to the end of the current month | To be provided upon award | To be provided upon award | To be provided upon award | COR | As Required | N/A | ||
| To be provided upon award | N/A | Other | T-AGOS/T-AGM Class O&M | To be provided upon award | To be provided upon award | To be provided upon award | ROS to FOS Transition Plan | N/A | N/A | C-1.1.3.8. | PM2 | N/A | N/A | N/A | For ships in ROS at time of award, submitted to the COR within 30 days of award. Otherwise, within 30 days of notification of the intent to place a ship in FOS | To be provided upon award | To be provided upon award | To be provided upon award | COR | As Required | N/A | ||
| To be provided upon award | N/A | Other | T-AGOS/T-AGM Class O&M | To be provided upon award | To be provided upon award | To be provided upon award | MOVREP | N/A | N/A | C-1.1.4.1. | PM2 | N/A | N/A | N/A | Prior to ship departure from Port | To be provided upon award | To be provided upon award | To be provided upon award | Naval Oceanography Centers | As Required | N/A | ||
| To be provided upon award | N/A | Other | T-AGOS/T-AGM Class O&M | To be provided upon award | To be provided upon award | To be provided upon award | Severe and Destructive Weather Plan | N/A | N/A | C-1.1.4.2. | PM2 | N/A | N/A | N/A | Within one hour of notification of the condition being set | To be provided upon award | To be provided upon award | To be provided upon award | MSC Area Command COMSC | As Required | N/A | ||
| To be provided upon award | N/A | Other | T-AGOS/T-AGM Class O&M | To be provided upon award | To be provided upon award | To be provided upon award | Invoice for each Port Call | N/A | N/A | C-1.1.5. | PM2 | N/A | N/A | N/A | Within 30 days of port call. | To be provided upon award | To be provided upon award | To be provided upon award | KO / COR | As Required | N/A | ||
| To be provided upon award | N/A | Other | T-AGOS/T-AGM Class O&M | To be provided upon award | To be provided upon award | To be provided upon award | Casualties, incidents, deaths, and injuries | N/A | N/A | C-1.1.9. | PM2 | N/A | N/A | N/A | Immediately. | To be provided upon award | To be provided upon award | To be provided upon award | via naval message IAW SOM and the COR | As Required | N/A | ||
| To be provided upon award | N/A | Other | T-AGOS/T-AGM Class O&M | To be provided upon award | To be provided upon award | To be provided upon award | Casualty Report (CASREP) | N/A | N/A | C-1.1.9.1. | PM2 | N/A | N/A | N/A | If a casualty is mission degrading (category C-3 or C-4), the contractor shall report it within 12 hours of occurrence. If a casualty is not mission degrading and cannot be corrected within 48 hours, then contractor shall report it no later than 24 hours after the occurrence. | To be provided upon award | To be provided upon award | To be provided upon award | MSC Area Command COMSC Program Managers | As Required | N/A | ||
| To be provided upon award | N/A | Other | T-AGOS/T-AGM Class O&M | To be provided upon award | To be provided upon award | To be provided upon award | Special Incident Reporting | N/A | N/A | C-1.1.9.2. | PM2 | N/A | N/A | N/A | Immediately. | To be provided upon award | To be provided upon award | To be provided upon award | USCG | As Required | N/A | ||
| To be provided upon award | N/A | Other | T-AGOS/T-AGM Class O&M | To be provided upon award | To be provided upon award | To be provided upon award | Marine Casualty Investigations | N/A | N/A | C-1.1.9.3. | PM2 | N/A | N/A | N/A | No later than two business days from receipt of the investigation report. | To be provided upon award | To be provided upon award | To be provided upon award | Contracting Officer, COR, and ABS | As Required | N/A | ||
| To be provided upon award | N/A | Other | T-AGOS/T-AGM Class O&M | To be provided upon award | To be provided upon award | To be provided upon award | Weekly Ship Status Report | N/A | N/A | C-1.1.9.4. | PM2 | N/A | N/A | N/A | Weekly summary by email. | To be provided upon award | To be provided upon award | To be provided upon award | Program Manager | As Required | N/A | ||
| To be provided upon award | N/A | Other | T-AGOS/T-AGM Class O&M | To be provided upon award | To be provided upon award | To be provided upon award | Design Speed Trials | N/A | N/A | C-1.1.12. | PM2 | N/A | N/A | N/A | Upon completion of all speed trials. | To be provided upon award | To be provided upon award | To be provided upon award | Squadron Commander and MSC PM | As Required | N/A | ||
| To be provided upon award | N/A | Other | T-AGOS/T-AGM Class O&M | To be provided upon award | To be provided upon award | To be provided upon award | Salvage/Rescue Assistance | N/A | N/A | C-1.1.13. | PM2 | N/A | N/A | N/A | Immediately after event | To be provided upon award | To be provided upon award | To be provided upon award | COMSC, the local MSC Area Commander, and COR | As Required | N/A | ||
| To be provided upon award | N/A | Other | T-AGOS/T-AGM Class O&M | To be provided upon award | To be provided upon award | To be provided upon award | Rescue Assistance Report | N/A | N/A | C-1.1.13.1. | PM2 | N/A | N/A | N/A | In event of rescue situation | To be provided upon award | To be provided upon award | To be provided upon award | COMSC, the local MSC Area Commander and COR | As Required | N/A | ||
| To be provided upon award | N/A | Other | T-AGOS/T-AGM Class O&M | To be provided upon award | To be provided upon award | To be provided upon award | Government Stevedore Damage | N/A | N/A | C-1.1.15.2. | PM2 | N/A | N/A | N/A | Due post action/damage occurs | To be provided upon award | To be provided upon award | To be provided upon award | Local MSC Representative on scene, Contracting Officer, COR | As Required | N/A | ||
| To be provided upon award | N/A | Other | T-AGOS/T-AGM Class O&M | To be provided upon award | To be provided upon award | To be provided upon award | Ship Crew List | N/A | N/A | C-1.1.20. | PM2 | N/A | N/A | N/A | Prior to a ship leaving port | To be provided upon award | To be provided upon award | To be provided upon award | COR | As Required | N/A | ||
| To be provided upon award | N/A | Other | T-AGOS/T-AGM Class O&M | To be provided upon award | To be provided upon award | To be provided upon award | Reporting Requirements for USCG Issues | N/A | N/A | C-1.2.1.4. | PM2 | N/A | N/A | N/A | No later than two calendar days after the contractor receives it. | To be provided upon award | To be provided upon award | To be provided upon award | Contracting Officer, COR, MSC Engineering Type Desk, and Program Manager | As Required | N/A | ||
| To be provided upon award | N/A | Other | T-AGOS/T-AGM Class O&M | To be provided upon award | To be provided upon award | To be provided upon award | Report of Regulatory Deficiency | N/A | N/A | C-1.2.1.5. | PM2 | N/A | N/A | N/A | No later than 24 hours after its issuance. | To be provided upon award | To be provided upon award | To be provided upon award | COR, MSC Engineering Type Desk and the Program Manager (PM) | As Required | N/A | ||
| To be provided upon award | N/A | Other | T-AGOS/T-AGM Class O&M | To be provided upon award | To be provided upon award | To be provided upon award | Certificates of Inspection (COI) | N/A | N/A | C-1.2.1.6. | PM2 | N/A | N/A | N/A | No later than two calendar days after completion of each inspection. | To be provided upon award | To be provided upon award | To be provided upon award | Contracting Officer, COR, MSC Engineering Type Desk, and Program Manager | As Required | N/A | ||
| To be provided upon award | N/A | Other | T-AGOS/T-AGM Class O&M | To be provided upon award | To be provided upon award | To be provided upon award | Survey Reports and Certificates | N/A | N/A | C-1.2.1.10. | PM2 | N/A | N/A | N/A | No later than two days after completion of the availability or in port turnaround period during which each survey was accomplished. | To be provided upon award | To be provided upon award | To be provided upon award | Contracting Officer, COR, MSC Engineering Typedesk, and Program Manager | As Required | N/A | ||
| To be provided upon award | N/A | Other | T-AGOS/T-AGM Class O&M | To be provided upon award | To be provided upon award | To be provided upon award | In Port Readiness (FOS) | N/A | N/A | C-1.2.4.1. | PM2 | N/A | N/A | N/A | When anticipated maintenance and repair work precludes, or has the potential to preclude, a ship from getting underway within any 24-hour period while in FOS. | To be provided upon award | To be provided upon award | To be provided upon award | COR, Operational Commander, and MSC Area Commander | As Required | N/A | ||
| To be provided upon award | N/A | Other | T-AGOS/T-AGM Class O&M | To be provided upon award | To be provided upon award | To be provided upon award | In Port Readiness (ROS) | N/A | N/A | C-1.2.4.2. | PM2 | N/A | N/A | N/A | When anticipated maintenance and repair work precludes, or has the potential to preclude, a ship from getting underway within any 24-hour period while in ROS. | To be provided upon award | To be provided upon award | To be provided upon award | COR, Operational Commander, and MSC Area Commander | As Required | N/A | ||
| To be provided upon award | N/A | Other | T-AGOS/T-AGM Class O&M | To be provided upon award | To be provided upon award | To be provided upon award | In Port Maintenance | N/A | N/A | C-1.2.5. | PM2 | N/A | N/A | N/A | In cases where anticipated maintenance, repair, or regulatory body activities will prevent a ship from getting underway and performing the assigned mission within the time allowed for vessel’s status (i.e., FOS or ROS). | To be provided upon award | To be provided upon award | To be provided upon award | Operational Commander, MSC Area Commander, and COR | As Required | N/A | ||
| To be provided upon award | N/A | Other | T-AGOS/T-AGM Class O&M | To be provided upon award | To be provided upon award | To be provided upon award | Costs of Food and Hotel Services | N/A | N/A | C-1.3.2.3. | PM2 | N/A | N/A | N/A | Monthly | To be provided upon award | To be provided upon award | To be provided upon award | COR | As Required | N/A | ||
| To be provided upon award | N/A | Other | T-AGOS/T-AGM Class O&M | To be provided upon award | To be provided upon award | To be provided upon award | Food Operation and Inspection Form | N/A | N/A | C-1.3.5. | PM2 | N/A | N/A | N/A | Weekly. | To be provided upon award | To be provided upon award | To be provided upon award | COR | As Required | N/A | ||
| To be provided upon award | N/A | Other | T-AGOS/T-AGM Class O&M | To be provided upon award | To be provided upon award | To be provided upon award | Sanitation Inspection Report | N/A | N/A | C-1.3.7. | PM2 | N/A | N/A | N/A | No less than monthly. | To be provided upon award | To be provided upon award | To be provided upon award | COR | As Required | N/A | ||
| To be provided upon award | N/A | Other | T-AGOS/T-AGM Class O&M | To be provided upon award | To be provided upon award | To be provided upon award | Control of Medical Items Including Controlled Substances | N/A | N/A | C-1.4.6.2. | PM2 | N/A | N/A | N/A | Following use or discrepancies. | To be provided upon award | To be provided upon award | To be provided upon award | MSCHQ | As Required | N/A | ||
| To be provided upon award | N/A | Other | T-AGOS/T-AGM Class O&M | To be provided upon award | To be provided upon award | To be provided upon award | MSC Cybersecurity Patching Scan | N/A | N/A | C-1.5.2.5. | PM2 | N/A | N/A | N/A | Upon scan completion | To be provided upon award | To be provided upon award | To be provided upon award | MSC_AFLOAT_IA(AT)navy.(smil).mil | As Required | N/A | ||
| To be provided upon award | N/A | Other | T-AGOS/T-AGM Class O&M | To be provided upon award | To be provided upon award | To be provided upon award | Privileged Access Agreement (PAA) form | N/A | N/A | C-1.5.2.9. | PM2 | N/A | N/A | N/A | Each Fiscal Year. | To be provided upon award | To be provided upon award | To be provided upon award | MSCHQ | As Required | N/A | ||
| To be provided upon award | N/A | Other | T-AGOS/T-AGM Class O&M | To be provided upon award | To be provided upon award | To be provided upon award | Incident Reporting (Network issues & Spillage) | N/A | N/A | C-1.5.4. | PM2 | N/A | N/A | N/A | Immediately upon occurance. | To be provided upon award | To be provided upon award | To be provided upon award | MSC Afloat IA, MSC Afloat ISSM Team | As Required | N/A | ||
| To be provided upon award | N/A | Other | T-AGOS/T-AGM Class O&M | To be provided upon award | To be provided upon award | To be provided upon award | Cyber Incident and Compromise Reporting | N/A | N/A | C-1.5.4.1. | PM2 | N/A | N/A | N/A | Immediately. | To be provided upon award | To be provided upon award | To be provided upon award | MSC | As Required | N/A | ||
| To be provided upon award | N/A | Other | T-AGOS/T-AGM Class O&M | To be provided upon award | To be provided upon award | To be provided upon award | Visit Authorization Request | N/A | N/A | C-1.6.2.3. | PM2 | N/A | N/A | N/A | Within seven working days. | To be provided upon award | To be provided upon award | To be provided upon award | MSC Command Security Manager | As Required | N/A | ||
| To be provided upon award | N/A | Other | T-AGOS/T-AGM Class O&M | To be provided upon award | To be provided upon award | To be provided upon award | Contingency Plan | N/A | N/A | C-1.7.2. | PM2 | N/A | N/A | N/A | Quarterly | To be provided upon award | To be provided upon award | To be provided upon award | COR | As Required | N/A | ||
| To be provided upon award | N/A | Other | T-AGOS/T-AGM Class O&M | To be provided upon award | To be provided upon award | To be provided upon award | Right to Select | N/A | N/A | C-1.7.2.1. | PM2 | N/A | N/A | N/A | Upon award and when amended. | To be provided upon award | To be provided upon award | To be provided upon award | Contracting Officer and COR | As Required | N/A | ||
| To be provided upon award | N/A | Other | T-AGOS/T-AGM Class O&M | To be provided upon award | To be provided upon award | To be provided upon award | Continuity Plan | N/A | N/A | C-1.7.2.4. | PM2 | N/A | N/A | N/A | Within 60 days of Contract award. | To be provided upon award | To be provided upon award | To be provided upon award | Contracting Officer and COR | As Required | N/A | ||
| To be provided upon award | N/A | Other | T-AGOS/T-AGM Class O&M | To be provided upon award | To be provided upon award | To be provided upon award | Crew Shortage Report | N/A | N/A | C-1.7.6. | PM2 | N/A | N/A | N/A | Monthly. | To be provided upon award | To be provided upon award | To be provided upon award | COR | As Required | N/A | ||
| To be provided upon award | N/A | Other | T-AGOS/T-AGM Class O&M | To be provided upon award | To be provided upon award | To be provided upon award | Key Billet Requests | N/A | N/A | C-1.7.7. | PM2 | N/A | N/A | N/A | At least 10 working days prior to assignment to a ship. | To be provided upon award | To be provided upon award | To be provided upon award | COR | As Required | N/A | ||
| To be provided upon award | N/A | Other | T-AGOS/T-AGM Class O&M | To be provided upon award | To be provided upon award | To be provided upon award | Merchant Marine Cadet Report | N/A | N/A | C-1.7.8. | PM2 | N/A | N/A | N/A | Quarterly. | To be provided upon award | To be provided upon award | To be provided upon award | COR | As Required | N/A | ||
| To be provided upon award | N/A | Other | T-AGOS/T-AGM Class O&M | To be provided upon award | To be provided upon award | To be provided upon award | Contractor Training Plan | N/A | N/A | C-1.8.4. | PM2 | N/A | N/A | N/A | 60 days after Contract award. | To be provided upon award | To be provided upon award | To be provided upon award | Contracting Officer | As Required | N/A | ||
| To be provided upon award | N/A | Other | T-AGOS/T-AGM Class O&M | To be provided upon award | To be provided upon award | To be provided upon award | Engineering Casualty Control Exercise(ECCE) | N/A | N/A | C.1.8.5.1. | PM2 | N/A | N/A | N/A | Daily. | To be provided upon award | To be provided upon award | To be provided upon award | SAMM system | As Required | N/A | ||
| To be provided upon award | N/A | Other | T-AGOS/T-AGM Class O&M | To be provided upon award | To be provided upon award | To be provided upon award | Training Status Report | N/A | N/A | C-1.8.6. | PM2 | N/A | N/A | N/A | For the previous month by the fifth day of the following month | To be provided upon award | To be provided upon award | To be provided upon award | COR | As Required | N/A | ||
| To be provided upon award | N/A | Other | T-AGOS/T-AGM Class O&M | To be provided upon award | To be provided upon award | To be provided upon award | Damage Control Documentation | N/A | N/A | C-1.9.3. | PM2 | N/A | N/A | N/A | Upon any DC or CBRN modifications made. | To be provided upon award | To be provided upon award | To be provided upon award | N7, Contracting Officer, and COR | As Required | N/A | ||
| To be provided upon award | N/A | Other | T-AGOS/T-AGM Class O&M | To be provided upon award | To be provided upon award | To be provided upon award | Damage Control Book (Binder) | N/A | N/A | C-1.9.5. | PM2 | N/A | N/A | N/A | Upon Update. | To be provided upon award | To be provided upon award | To be provided upon award | Area Commander | As Required | N/A | ||
| To be provided upon award | N/A | Other | T-AGOS/T-AGM Class O&M | To be provided upon award | To be provided upon award | To be provided upon award | Fire Control Plan | N/A | N/A | C-1.9.6. | PM2 | N/A | N/A | N/A | Upon Update. | To be provided upon award | To be provided upon award | To be provided upon award | MSC Technical Library | As Required | N/A | ||
| To be provided upon award | N/A | Other | T-AGOS/T-AGM Class O&M | To be provided upon award | To be provided upon award | To be provided upon award | Damage Control Display Drawings | N/A | N/A | C-1.9.7. | PM2 | N/A | N/A | N/A | Within 10 days of Update. | To be provided upon award | To be provided upon award | To be provided upon award | MSC Technical Library | As Required | N/A | ||
| To be provided upon award | N/A | Other | T-AGOS/T-AGM Class O&M | To be provided upon award | To be provided upon award | To be provided upon award | Inventory and Records of Damage Control and CBR-D Equipment | N/A | N/A | C-1.9.9. | PM2 | N/A | N/A | N/A | Upon Request. | To be provided upon award | To be provided upon award | To be provided upon award | COR | As Required | N/A | ||
| To be provided upon award | N/A | Other | T-AGOS/T-AGM Class O&M | To be provided upon award | To be provided upon award | To be provided upon award | SAMM Reports | N/A | N/A | C-2.2.2.1.2. | PM2 | N/A | N/A | N/A | Within 5 days of submittal. | To be provided upon award | To be provided upon award | To be provided upon award | SAMM system | As Required | N/A | ||
| To be provided upon award | N/A | Other | T-AGOS/T-AGM Class O&M | To be provided upon award | To be provided upon award | To be provided upon award | Ship's Force Work List | N/A | N/A | C-2.2.2.1.3. | PM2 | N/A | N/A | N/A | Within 7 days of service completion | To be provided upon award | To be provided upon award | To be provided upon award | N7 LCE | As Required | N/A | ||
| To be provided upon award | N/A | Other | T-AGOS/T-AGM Class O&M | To be provided upon award | To be provided upon award | To be provided upon award | Completion | N/A | N/A | C-2.2.2.1.3.1 | PM2 | N/A | N/A | N/A | Last day of each month | To be provided upon award | To be provided upon award | To be provided upon award | SAMM system | As Required | N/A | ||
| To be provided upon award | N/A | Other | T-AGOS/T-AGM Class O&M | To be provided upon award | To be provided upon award | To be provided upon award | Ship's Force Requirements for Availability Planning | N/A | N/A | C-2.2.2.1.3.2. | PM2 | N/A | N/A | N/A | Monthly | To be provided upon award | To be provided upon award | To be provided upon award | SAMM system | As Required | N/A | ||
| To be provided upon award | N/A | Other | T-AGOS/T-AGM Class O&M | To be provided upon award | To be provided upon award | To be provided upon award | Annual Review of Open Ships Force Work List Items | N/A | N/A | C-2.2.2.1.3.3. | PM2 | N/A | N/A | N/A | Within 30 days prior to 30 Sep of each calendar year | To be provided upon award | To be provided upon award | To be provided upon award | N7 LCE | As Required | N/A | ||
| To be provided upon award | N/A | Other | T-AGOS/T-AGM Class O&M | To be provided upon award | To be provided upon award | To be provided upon award | Ad Hoc Maintenance | N/A | N/A | C-2.2.2.2.1. | PM2 | N/A | N/A | N/A | Within 5 days of assignment | To be provided upon award | To be provided upon award | To be provided upon award | SAMM system | As Required | N/A | ||
| To be provided upon award | N/A | Other | T-AGOS/T-AGM Class O&M | To be provided upon award | To be provided upon award | To be provided upon award | Workbook | N/A | N/A | C-2.2.2.2.2 | PM2 | N/A | N/A | N/A | Between 1st and 5th of every month | To be provided upon award | To be provided upon award | To be provided upon award | SAMM system | As Required | N/A | ||
| To be provided upon award | N/A | Other | T-AGOS/T-AGM Class O&M | To be provided upon award | To be provided upon award | To be provided upon award | Vibration Analysis | N/A | N/A | C-2.2.2.2.2.1. | PM2 | N/A | N/A | N/A | Upon receipt of a recommendation | To be provided upon award | To be provided upon award | To be provided upon award | MSC Engineering Typedesk | As Required | N/A | ||
| To be provided upon award | N/A | Other | T-AGOS/T-AGM Class O&M | To be provided upon award | To be provided upon award | To be provided upon award | SAMM Feedback | N/A | N/A | C-2.2.2.2.2.5. | PM2 | N/A | N/A | N/A | Within 5 days of identification of the problem. | To be provided upon award | To be provided upon award | To be provided upon award | MSC Global Service Desk | As Required | N/A | ||
| To be provided upon award | N/A | Other | T-AGOS/T-AGM Class O&M | To be provided upon award | To be provided upon award | To be provided upon award | Electronic Logs | N/A | N/A | C-2.2.2.2.3. | PM2 | N/A | N/A | N/A | Daily | To be provided upon award | To be provided upon award | To be provided upon award | SAMM system | As Required | N/A | ||
| To be provided upon award | N/A | Other | T-AGOS/T-AGM Class O&M | To be provided upon award | To be provided upon award | To be provided upon award | Bridge Logs | N/A | N/A | C-2.2.2.2.3.1. | PM2 | N/A | N/A | N/A | Daily | To be provided upon award | To be provided upon award | To be provided upon award | SAMM system | As Required | N/A | ||
| To be provided upon award | N/A | Other | T-AGOS/T-AGM Class O&M | To be provided upon award | To be provided upon award | To be provided upon award | Equipment Status Management | N/A | N/A | C-2.2.2.2.4. | PM2 | N/A | N/A | N/A | Within 1 day of ship changing status | To be provided upon award | To be provided upon award | To be provided upon award | SAMM system | As Required | N/A | ||
| To be provided upon award | N/A | Other | T-AGOS/T-AGM Class O&M | To be provided upon award | To be provided upon award | To be provided upon award | Planned Maintenance Industrial Assistance (PIMA) | N/A | N/A | C-2.2.3.2.1 | PM2 | N/A | N/A | N/A | As events occur/equipment is installed | To be provided upon award | To be provided upon award | To be provided upon award | MSC Engineering Typedesk | As Required | N/A | ||
| To be provided upon award | N/A | Other | T-AGOS/T-AGM Class O&M | To be provided upon award | To be provided upon award | To be provided upon award | Voyage Repair Request | N/A | N/A | C-2.2.3.3.2. | PM2 | N/A | N/A | N/A | Within two days of identification | To be provided upon award | To be provided upon award | To be provided upon award | SAMM system | As Required | N/A | ||
| To be provided upon award | N/A | Other | T-AGOS/T-AGM Class O&M | To be provided upon award | To be provided upon award | To be provided upon award | Planning Scheduling | N/A | N/A | C-2.2.3.3.2.1. | PM2 | N/A | N/A | N/A | Within 14 days of receipt | To be provided upon award | To be provided upon award | To be provided upon award | SAMM system | As Required | N/A | ||
| To be provided upon award | N/A | Other | T-AGOS/T-AGM Class O&M | To be provided upon award | To be provided upon award | To be provided upon award | Completion | N/A | N/A | C-2.2.3.3.2.2. | PM2 | N/A | N/A | N/A | Within 14 days of completion | To be provided upon award | To be provided upon award | To be provided upon award | SAMM system / MSC | As Required | N/A | ||
| To be provided upon award | N/A | Other | T-AGOS/T-AGM Class O&M | To be provided upon award | To be provided upon award | To be provided upon award | Annual Review of VRRs | N/A | N/A | C-2.2.3.3.2.3. | PM2 | N/A | N/A | N/A | Annually | To be provided upon award | To be provided upon award | To be provided upon award | MSC Engineering Typedesk | As Required | N/A | ||
| To be provided upon award | N/A | Other | T-AGOS/T-AGM Class O&M | To be provided upon award | To be provided upon award | To be provided upon award | Issuing and Tracking Deficiency Reports | N/A | N/A | C-2.2.3.5.2.4. | PM2 | N/A | N/A | N/A | Annually | To be provided upon award | To be provided upon award | To be provided upon award | MSC Engineering Typedesk | As Required | N/A | ||
| To be provided upon award | N/A | Other | T-AGOS/T-AGM Class O&M | To be provided upon award | To be provided upon award | To be provided upon award | Progressing Subcontractor Work | N/A | N/A | C-2.2.3.5.2.5. | PM2 | N/A | N/A | N/A | Within 24hrs of meeting | To be provided upon award | To be provided upon award | To be provided upon award | PENG | As Required | N/A | ||
| To be provided upon award | N/A | Other | T-AGOS/T-AGM Class O&M | To be provided upon award | To be provided upon award | To be provided upon award | Situation Reports (SitRep) | N/A | N/A | C-2.2.3.5.2.6. | PM2 | N/A | N/A | N/A | Weekly | To be provided upon award | To be provided upon award | To be provided upon award | PENG | As Required | N/A | ||
| To be provided upon award | N/A | Other | T-AGOS/T-AGM Class O&M | To be provided upon award | To be provided upon award | To be provided upon award | Port Engineers Notebook | N/A | N/A | C-2.2.3.5.2.7. | PM2 | N/A | N/A | N/A | Daily | To be provided upon award | To be provided upon award | To be provided upon award | PENG | As Required | N/A | ||
| To be provided upon award | N/A | Other | T-AGOS/T-AGM Class O&M | To be provided upon award | To be provided upon award | To be provided upon award | Availability Completion Report | N/A | N/A | C-2.2.3.5.3.1. | PM2 | N/A | N/A | N/A | No later than 45 calendar days after completion of any availability | To be provided upon award | To be provided upon award | To be provided upon award | MSC Engineering Typedesk and COR. | As Required | N/A | ||
| To be provided upon award | N/A | Other | T-AGOS/T-AGM Class O&M | To be provided upon award | To be provided upon award | To be provided upon award | Post Availability SAMM Data Quality Review | N/A | N/A | C-2.2.3.5.3.2. | PM2 | N/A | N/A | N/A | Within 14 days of receipt of this review report | To be provided upon award | To be provided upon award | To be provided upon award | MSC Engineering Typedesk | As Required | N/A | ||
| To be provided upon award | N/A | Other | T-AGOS/T-AGM Class O&M | To be provided upon award | To be provided upon award | To be provided upon award | Off-Ship Lube Samplings | N/A | N/A | C-2.2.4.1.3.4. | PM2 | N/A | N/A | N/A | Within 24 hours of alert | To be provided upon award | To be provided upon award | To be provided upon award | Engineering Typedesk and the MSC N7 Lube Oil Expert | As Required | N/A | ||
| To be provided upon award | N/A | Other | T-AGOS/T-AGM Class O&M | To be provided upon award | To be provided upon award | To be provided upon award | Lube Oil Test Logs | N/A | N/A | C-2.2.4.1.3.5. | PM2 | N/A | N/A | N/A | Maintain log data for 1 year per ship) and enter all into SAMM | To be provided upon award | To be provided upon award | To be provided upon award | SAMM system | As Required | N/A | ||
| To be provided upon award | N/A | Other | T-AGOS/T-AGM Class O&M | To be provided upon award | To be provided upon award | To be provided upon award | Fuel Spec Chart | N/A | N/A | C-2.2.4.2.1. | PM2 | N/A | N/A | N/A | Within 24 hours of non-conformity | To be provided upon award | To be provided upon award | To be provided upon award | MSC N7 Bunker Fuel Manager | As Required | N/A | ||
| To be provided upon award | N/A | Other | T-AGOS/T-AGM Class O&M | To be provided upon award | To be provided upon award | To be provided upon award | Bunker reccomendation Feedback | N/A | N/A | C-2.2.4.2.2.1. | PM2 | N/A | N/A | N/A | Within 24 hours of receipt of recommendation | To be provided upon award | To be provided upon award | To be provided upon award | COR and MSC N7 Bunker Fuel Manager | As Required | N/A | ||
| To be provided upon award | N/A | Other | T-AGOS/T-AGM Class O&M | To be provided upon award | To be provided upon award | To be provided upon award | System Treatment Logs | N/A | N/A | C-2.2.4.3.5. | PM2 | N/A | N/A | N/A | Daily and weekly logs | To be provided upon award | To be provided upon award | To be provided upon award | SAMM / SEAS | As Required | N/A | ||
| To be provided upon award | N/A | Other | T-AGOS/T-AGM Class O&M | To be provided upon award | To be provided upon award | To be provided upon award | Field Service Technical Representative | N/A | N/A | C-2.2.4.4.3. | PM2 | N/A | N/A | N/A | Within 1 business day after receiving | To be provided upon award | To be provided upon award | To be provided upon award | PENG | As Required | N/A | ||
| To be provided upon award | N/A | Other | T-AGOS/T-AGM Class O&M | To be provided upon award | To be provided upon award | To be provided upon award | Pre-Availability Coatings Inspection | N/A | N/A | C-2.2.4.4.6.4. | PM2 | N/A | N/A | N/A | Within 24hrs of receipt | To be provided upon award | To be provided upon award | To be provided upon award | SAMM and MSC Engineering Typedesk | As Required | N/A | ||
| To be provided upon award | N/A | Other | T-AGOS/T-AGM Class O&M | To be provided upon award | To be provided upon award | To be provided upon award | Engineering Drawings/TRANSLATS (O2E) | N/A | N/A | C-2.2.4.5.2. | PM2 | N/A | N/A | N/A | 48 hours of approval from ABS. | To be provided upon award | To be provided upon award | To be provided upon award | MSC Technical Library | As Required | N/A | ||
| To be provided upon award | N/A | Other | T-AGOS/T-AGM Class O&M | To be provided upon award | To be provided upon award | To be provided upon award | Government Required TRANSALTs | N/A | N/A | C-2.3.1.2. | PM2 | N/A | N/A | N/A | When directed | To be provided upon award | To be provided upon award | To be provided upon award | SAMM TRANSALT | As Required | N/A | ||
| To be provided upon award | N/A | Other | T-AGOS/T-AGM Class O&M | To be provided upon award | To be provided upon award | To be provided upon award | TRANSALT Development PWS | N/A | N/A | C-2.3.1.3. | PM2 | N/A | N/A | N/A | Prior to issuing a subcontract | To be provided upon award | To be provided upon award | To be provided upon award | MSC Engineering Typedesk | As Required | N/A | ||
| To be provided upon award | N/A | Other | T-AGOS/T-AGM Class O&M | To be provided upon award | To be provided upon award | To be provided upon award | Alteration Completion Documentation | N/A | N/A | C-2.3.1.4.3 | PM2 | N/A | N/A | N/A | within five days of uploading it | To be provided upon award | To be provided upon award | To be provided upon award | MSC Designated Technical Point of Contact (TPOC) | As Required | N/A | ||
| To be provided upon award | N/A | Other | T-AGOS/T-AGM Class O&M | To be provided upon award | To be provided upon award | To be provided upon award | Root Cause Analysis (RCAs) & Failure Analysis (FA) | N/A | N/A | C-2.3.2 | PM2 | N/A | N/A | N/A | As completed | To be provided upon award | To be provided upon award | To be provided upon award | COR, MSC Engineering Typedesk, and MSC Technical Library | As Required | N/A | ||
| To be provided upon award | N/A | Other | T-AGOS/T-AGM Class O&M | To be provided upon award | To be provided upon award | To be provided upon award | Operational Risk Assessment (ORA) | N/A | N/A | C-2.3.3.1 | PM2 | N/A | N/A | N/A | When ORA is required by the contract | To be provided upon award | To be provided upon award | To be provided upon award | MSC Engineering Typedesk and COR | As Required | N/A | ||
| To be provided upon award | N/A | Other | T-AGOS/T-AGM Class O&M | To be provided upon award | To be provided upon award | To be provided upon award | Departure from Specification (DFS) | N/A | N/A | C-2.3.5. | PM2 | N/A | N/A | N/A | As completed | To be provided upon award | To be provided upon award | To be provided upon award | MSC Engineering Typedesk | As Required | N/A | ||
| To be provided upon award | N/A | Other | T-AGOS/T-AGM Class O&M | To be provided upon award | To be provided upon award | To be provided upon award | Master Letter of Concern (MLOC) | N/A | N/A | C-2.4.1 | PM2 | N/A | N/A | N/A | 14 days prior to each SMART | To be provided upon award | To be provided upon award | To be provided upon award | MSC Ship Inspection Branch (email to Ships Master w/in 30 days) | As Required | N/A | ||
| To be provided upon award | N/A | Other | T-AGOS/T-AGM Class O&M | To be provided upon award | To be provided upon award | To be provided upon award | Onboard Condition Inspection-Enhanced (OCI-E) Invoice List | N/A | N/A | C-2.4.1 | PM2 | N/A | N/A | N/A | 14 days prior to each SMART | To be provided upon award | To be provided upon award | To be provided upon award | MSC Ship Inspection Branch | As Required | N/A | ||
| To be provided upon award | N/A | Other | T-AGOS/T-AGM Class O&M | To be provided upon award | To be provided upon award | To be provided upon award | SMART Dock Trial Schedule | N/A | N/A | C-2.4.1.1 | PM2 | N/A | N/A | N/A | Upon arrival of SMART team | To be provided upon award | To be provided upon award | To be provided upon award | MSC Ship Inspection Branch | As Required | N/A | ||
| To be provided upon award | N/A | Other | T-AGOS/T-AGM Class O&M | To be provided upon award | To be provided upon award | To be provided upon award | SMART Sea Trial Schedule | N/A | N/A | C-2.4.1.2 | PM2 | N/A | N/A | N/A | Upon arrival of SMART team | To be provided upon award | To be provided upon award | To be provided upon award | MSC N7 Ship Inspection Branch | As Required | N/A | ||
| To be provided upon award | N/A | Other | T-AGOS/T-AGM Class O&M | To be provided upon award | To be provided upon award | To be provided upon award | SMART Web Tracker Corrective Action Plans | N/A | N/A | C-2.4.1.3. | PM2 | N/A | N/A | N/A | Within 30 days of receipt of the final SMART report | To be provided upon award | To be provided upon award | To be provided upon award | SMART Web Tracker | As Required | N/A | ||
| To be provided upon award | N/A | Other | T-AGOS/T-AGM Class O&M | To be provided upon award | To be provided upon award | To be provided upon award | OCI Web Tracker Update | N/A | N/A | C-2.4.1.4 | PM2 | N/A | N/A | N/A | Monthly, first five days of each calendar month | To be provided upon award | To be provided upon award | To be provided upon award | SMART Web Tracker | As Required | N/A | ||
| To be provided upon award | N/A | Other | T-AGOS/T-AGM Class O&M | To be provided upon award | To be provided upon award | To be provided upon award | Vessel Self-Assessment (VSA) | N/A | N/A | C-2.4.1.5 | PM2 | N/A | N/A | N/A | Annually, within ten working days of completing the VSA | To be provided upon award | To be provided upon award | To be provided upon award | MSC Ship Inspection Branch and Typedesk | As Required | N/A | ||
| To be provided upon award | N/A | Other | T-AGOS/T-AGM Class O&M | To be provided upon award | To be provided upon award | To be provided upon award | Sample Invoice Validation (SIV) | N/A | N/A | C-2.4.1.6. | PM2 | N/A | N/A | N/A | 14 days prior to the SMART | To be provided upon award | To be provided upon award | To be provided upon award | MSC N7 | As Required | N/A | ||
| To be provided upon award | N/A | Other | T-AGOS/T-AGM Class O&M | To be provided upon award | To be provided upon award | To be provided upon award | Port Engineer Vessel Inspection (PEVI) check lists | N/A | N/A | C-2.4.2 | PM2 | N/A | N/A | N/A | Annually, within ten working days of completing the PEVI. | To be provided upon award | To be provided upon award | To be provided upon award | MSC Ship Inspection Branch | As Required | N/A | ||
| To be provided upon award | N/A | Other | T-AGOS/T-AGM Class O&M | To be provided upon award | To be provided upon award | To be provided upon award | SMART Deficiencies | N/A | N/A | C-2.4.4 | PM2 | N/A | N/A | N/A | Prior to the SMART | To be provided upon award | To be provided upon award | To be provided upon award | MSC Engineering Typedesk | As Required | N/A | ||
| To be provided upon award | N/A | Other | T-AGOS/T-AGM Class O&M | To be provided upon award | To be provided upon award | To be provided upon award | SMART Sequence of Events | N/A | N/A | C-2.4.4 | PM2 | N/A | N/A | N/A | 30 days in advance of the SMART | To be provided upon award | To be provided upon award | To be provided upon award | MSC Engineering Typedesk | As Required | N/A | ||
| To be provided upon award | N/A | Other | T-AGOS/T-AGM Class O&M | To be provided upon award | To be provided upon award | To be provided upon award | SMART MLOC | N/A | N/A | C-2.4.4 | PM2 | N/A | N/A | N/A | 30 days prior to the commencement of the SMART | To be provided upon award | To be provided upon award | To be provided upon award | MSC SMART Coordinator | As Required | N/A | ||
| To be provided upon award | N/A | Other | T-AGOS/T-AGM Class O&M | To be provided upon award | To be provided upon award | To be provided upon award | SMART Corrective Action Plans | N/A | N/A | C-2.4.4 | PM2 | N/A | N/A | N/A | Within 14 days of receipt of SMART results | To be provided upon award | To be provided upon award | To be provided upon award | MSC Ship Inspection Branch(N7 | As Required | N/A | ||
| To be provided upon award | N/A | Other | T-AGOS/T-AGM Class O&M | To be provided upon award | To be provided upon award | To be provided upon award | Safety ManagementCertificate | N/A | N/A | C-2.4.5.1 | PM2 | N/A | N/A | N/A | Upon delivery of the first ship. | To be provided upon award | To be provided upon award | To be provided upon award | COR and the MSC Safety Departments | As Required | N/A | ||
| To be provided upon award | N/A | Other | T-AGOS/T-AGM Class O&M | To be provided upon award | To be provided upon award | To be provided upon award | SMS | N/A | N/A | C-2.4.5.1 | PM2 | N/A | N/A | N/A | Upon delivery of the first ship. | To be provided upon award | To be provided upon award | To be provided upon award | COR and the MSC Safety Departments | As Required | N/A | ||
| To be provided upon award | N/A | Other | T-AGOS/T-AGM Class O&M | To be provided upon award | To be provided upon award | To be provided upon award | Document of Compliance | N/A | N/A | C-2.4.5.1 | PM2 | N/A | N/A | N/A | Upon delivery of the first ship. | To be provided upon award | To be provided upon award | To be provided upon award | COR and the MSC Safety Departments | As Required | N/A | ||
| To be provided upon award | N/A | Other | T-AGOS/T-AGM Class O&M | To be provided upon award | To be provided upon award | To be provided upon award | SMS Implementation Plan | N/A | N/A | C-2.4.5.2 | PM2 | N/A | N/A | N/A | Within 60 days of Contract award | To be provided upon award | To be provided upon award | To be provided upon award | COR and the MSC Safety Departments | As Required | N/A | ||
| To be provided upon award | N/A | Other | T-AGOS/T-AGM Class O&M | To be provided upon award | To be provided upon award | To be provided upon award | SMS Documentation | N/A | N/A | C-2.4.5.3 | PM2 | N/A | N/A | N/A | Within ten days of implementation | To be provided upon award | To be provided upon award | To be provided upon award | COR and the MSC Safety Officer | As Required | N/A | ||
| To be provided upon award | N/A | Other | T-AGOS/T-AGM Class O&M | To be provided upon award | To be provided upon award | To be provided upon award | Management Review | N/A | N/A | C-2.4.5.6 | PM1 | N/A | N/A | N/A | at least 14 days prior to any scheduled review | To be provided upon award | To be provided upon award | To be provided upon award | COR | As Required | N/A | ||
| To be provided upon award | N/A | Other | T-AGOS/T-AGM Class O&M | To be provided upon award | To be provided upon award | To be provided upon award | SMS Audits (Internal & External) | N/A | N/A | C-2.4.5.7 | PM2 | N/A | N/A | N/A | Ten days prior to the scheduled Audit | To be provided upon award | To be provided upon award | To be provided upon award | COR | As Required | N/A | ||
| To be provided upon award | N/A | Other | T-AGOS/T-AGM Class O&M | To be provided upon award | To be provided upon award | To be provided upon award | SMS Audit (Internal & External) Reports | N/A | N/A | C-2.4.5.7 | PM2 | N/A | N/A | N/A | Within ten days of the report being delivered. | To be provided upon award | To be provided upon award | To be provided upon award | COR | As Required | N/A | ||
| To be provided upon award | N/A | Other | T-AGOS/T-AGM Class O&M | To be provided upon award | To be provided upon award | To be provided upon award | Notification of Hazardous Situations | N/A | N/A | C-2.4.6.1 | PM2 | N/A | N/A | N/A | 7th of every month | To be provided upon award | To be provided upon award | To be provided upon award | COR | As Required | N/A | ||
| To be provided upon award | N/A | Other | T-AGOS/T-AGM Class O&M | To be provided upon award | To be provided upon award | To be provided upon award | Mishap Reports | N/A | N/A | C-2.4.6.1 | PM2 | N/A | N/A | N/A | Within 24 hours | To be provided upon award | To be provided upon award | To be provided upon award | COR | As Required | N/A | ||
| To be provided upon award | N/A | Other | T-AGOS/T-AGM Class O&M | To be provided upon award | To be provided upon award | To be provided upon award | Non-Severe Marine Casualties | N/A | N/A | C-2.4.6.1 | PM2 | N/A | N/A | N/A | Within five days | To be provided upon award | To be provided upon award | To be provided upon award | COR | As Required | N/A | ||
| To be provided upon award | N/A | Other | T-AGOS/T-AGM Class O&M | To be provided upon award | To be provided upon award | To be provided upon award | Severe Marine Casualties | N/A | N/A | C-2.4.6.1 | PM2 | N/A | N/A | N/A | Within 24 hours of the event | To be provided upon award | To be provided upon award | To be provided upon award | COR | As Required | N/A | ||
| To be provided upon award | N/A | Other | T-AGOS/T-AGM Class O&M | To be provided upon award | To be provided upon award | To be provided upon award | Ship Casualties (not requiring USCG Form 2692) | N/A | N/A | C-2.5.1.1 | PM2 | N/A | N/A | N/A | Within 24 hours of the event | To be provided upon award | To be provided upon award | To be provided upon award | COR | As Required | N/A | ||
| To be provided upon award | N/A | Other | T-AGOS/T-AGM Class O&M | To be provided upon award | To be provided upon award | To be provided upon award | Safety Meeting Minutes | N/A | N/A | C-2.4.6.1 | PM2 | N/A | N/A | N/A | Within ten days of the meeting | To be provided upon award | To be provided upon award | To be provided upon award | COR | As Required | N/A | ||
| To be provided upon award | N/A | Other | T-AGOS/T-AGM Class O&M | To be provided upon award | To be provided upon award | To be provided upon award | Oil Spill Reporting | N/A | N/A | C-2.4.7.1 | PM4 | N/A | N/A | N/A | Immediately upon event | To be provided upon award | To be provided upon award | To be provided upon award | National Response Center, and others per OPNAVINST 5090.1, response plan, and emergency plan | As Required | N/A | ||
| To be provided upon award | N/A | Other | T-AGOS/T-AGM Class O&M | To be provided upon award | To be provided upon award | To be provided upon award | USCG Certification Updates | N/A | N/A | C-2.5.1.2 | PM3 | N/A | N/A | N/A | Once every three calendar months | To be provided upon award | To be provided upon award | To be provided upon award | COR and MSC Engineering Typedesk | As Required | N/A | ||
| To be provided upon award | N/A | Other | T-AGOS/T-AGM Class O&M | To be provided upon award | To be provided upon award | To be provided upon award | ABS Classification Updates | N/A | N/A | C-2.5.1.2 | PM2 | N/A | N/A | N/A | Once every three calendar months | To be provided upon award | To be provided upon award | To be provided upon award | COR and MSC Engineering Typedesk. | As Required | N/A | ||
| To be provided upon award | N/A | Other | T-AGOS/T-AGM Class O&M | To be provided upon award | To be provided upon award | To be provided upon award | Engineering Issues Effecting Class | N/A | N/A | C-2.5.1.2 | PM2 | N/A | N/A | N/A | Immediately | To be provided upon award | To be provided upon award | To be provided upon award | COR and MSC Engineering Typedesk. | As Required | N/A | ||
| To be provided upon award | N/A | Other | T-AGOS/T-AGM Class O&M | To be provided upon award | To be provided upon award | To be provided upon award | Accomplish Voyage Repairs | N/A | N/A | C-2.5.3.1. | PM2 | N/A | N/A | N/A | Upon completion | To be provided upon award | To be provided upon award | To be provided upon award | SAMM system | As Required | N/A | ||
| To be provided upon award | N/A | Other | T-AGOS/T-AGM Class O&M | To be provided upon award | To be provided upon award | To be provided upon award | Emergency Repair Status Reports | N/A | N/A | C-2.5.3.2 | PM2 | N/A | N/A | N/A | Daily during Emergency Repairs | To be provided upon award | To be provided upon award | To be provided upon award | COR and MSC Engineering Typedesk. | As Required | N/A | ||
| To be provided upon award | N/A | Other | T-AGOS/T-AGM Class O&M | To be provided upon award | To be provided upon award | To be provided upon award | Industrial Assistance (IA) Procurement Request | N/A | N/A | C-2.5.4.3 | PM2 | N/A | N/A | N/A | Ten business days prior to the planned start date | To be provided upon award | To be provided upon award | To be provided upon award | COR | As Required | N/A | ||
| To be provided upon award | N/A | Other | T-AGOS/T-AGM Class O&M | To be provided upon award | To be provided upon award | To be provided upon award | Technical Service Reports | N/A | N/A | C-2.5.4.5 | PM2 | N/A | N/A | N/A | Within 7 days of service completion | To be provided upon award | To be provided upon award | To be provided upon award | COR and MSC Engineering Typedesk | As Required | N/A | ||
| To be provided upon award | N/A | Other | T-AGOS/T-AGM Class O&M | To be provided upon award | To be provided upon award | To be provided upon award | Life Cycle Planning | N/A | N/A | C-2.5.6. | PM2 | N/A | N/A | N/A | Every six months | To be provided upon award | To be provided upon award | To be provided upon award | MSC Engineering Typedesk | As Required | N/A | ||
| To be provided upon award | N/A | Other | T-AGOS/T-AGM Class O&M | To be provided upon award | To be provided upon award | To be provided upon award | 5-Year Availability and Inspection Schedule | N/A | N/A | C-2.5.6.1. | PM2 | N/A | N/A | N/A | Within 60 days of Contract award | To be provided upon award | To be provided upon award | To be provided upon award | Contracting Officer and COR | As Required | N/A | ||
| To be provided upon award | N/A | Other | T-AGOS/T-AGM Class O&M | To be provided upon award | To be provided upon award | To be provided upon award | Availability Deferal Risk Assessment | N/A | N/A | C-2.5.7.1.1 | PM2 | N/A | N/A | N/A | Within 5 days of receiving notice of a potential deferal | To be provided upon award | To be provided upon award | To be provided upon award | COR | As Required | N/A | ||
| To be provided upon award | N/A | Other | T-AGOS/T-AGM Class O&M | To be provided upon award | To be provided upon award | To be provided upon award | Dry-docking Blocking Arrangement | N/A | N/A | C-2.5.7.1.3 | PM2 | N/A | N/A | N/A | Immediately after subcontract award | To be provided upon award | To be provided upon award | To be provided upon award | MSC Engineering Typedesk | As Required | N/A | ||
| To be provided upon award | N/A | Other | T-AGOS/T-AGM Class O&M | To be provided upon award | To be provided upon award | To be provided upon award | POAM | N/A | N/A | C-2.5.7.2.1 | PM2 | N/A | N/A | N/A | Specific mileston due/daily | To be provided upon award | To be provided upon award | To be provided upon award | SAMM | As Required | N/A | ||
| To be provided upon award | N/A | Other | T-AGOS/T-AGM Class O&M | To be provided upon award | To be provided upon award | To be provided upon award | Advance Planning Letter | N/A | N/A | C-2.5.7.2.3. | PM2 | N/A | N/A | N/A | IAW the applicable POAM for each availability | To be provided upon award | To be provided upon award | To be provided upon award | COR and MSC Engineering Typedesk | As Required | N/A | ||
| To be provided upon award | N/A | Other | T-AGOS/T-AGM Class O&M | To be provided upon award | To be provided upon award | To be provided upon award | Pre-Availability Inspection Report | N/A | N/A | C-2.5.7.2.5 | PM2 | N/A | N/A | N/A | Within three weeks of the contractor’s Port Engineer returning from the Pre-Availability Inspection | To be provided upon award | To be provided upon award | To be provided upon award | COR and MSC Engineering Typedesk | As Required | N/A | ||
| To be provided upon award | N/A | Other | T-AGOS/T-AGM Class O&M | To be provided upon award | To be provided upon award | To be provided upon award | Release of Work Package | N/A | N/A | C-2.5.7.2.8 | PM2 | N/A | N/A | N/A | IAW PAOM | To be provided upon award | To be provided upon award | To be provided upon award | MSC Engineering Typedesk | As Required | N/A | ||
| To be provided upon award | N/A | Other | T-AGOS/T-AGM Class O&M | To be provided upon award | To be provided upon award | To be provided upon award | Recommendation and Award of Contract | N/A | N/A | C-2.5.7.2.11. | PM2 | N/A | N/A | N/A | Following availability proposal evaluation | To be provided upon award | To be provided upon award | To be provided upon award | Contracting Officer | As Required | N/A | ||
| To be provided upon award | N/A | Other | T-AGOS/T-AGM Class O&M | To be provided upon award | To be provided upon award | To be provided upon award | Availability Situation Reports SITREP | N/A | N/A | C-2.5.7.3.3 | PM2 | N/A | N/A | N/A | Weekly during availability | To be provided upon award | To be provided upon award | To be provided upon award | Contracting Officer | As Required | N/A | ||
| To be provided upon award | N/A | Other | T-AGOS/T-AGM Class O&M | To be provided upon award | To be provided upon award | To be provided upon award | Credits to and Cancelation of CAT-A Work Items | N/A | N/A | C-2.5.7.4.1. | PM2 | N/A | N/A | N/A | Upon occurrence | To be provided upon award | To be provided upon award | To be provided upon award | COR and MSC Engineering Typedesk | As Required | N/A | ||
| To be provided upon award | N/A | Other | T-AGOS/T-AGM Class O&M | To be provided upon award | To be provided upon award | To be provided upon award | Docking Report | N/A | N/A | C-2.5.7.5.5 | PM2 | N/A | N/A | N/A | Prior to redelivery | To be provided upon award | To be provided upon award | To be provided upon award | MSC Engineering Typedesk | As Required | N/A | ||
| To be provided upon award | N/A | Other | T-AGOS/T-AGM Class O&M | To be provided upon award | To be provided upon award | To be provided upon award | Availability Completion Report | N/A | N/A | C-2.5.7.5.6 | PM2 | N/A | N/A | N/A | No later than 30 calendar days after completion of any availability | To be provided upon award | To be provided upon award | To be provided upon award | MSC Engineering Typedesk and Contracting Officer | As Required | N/A | ||
| To be provided upon award | N/A | Other | T-AGOS/T-AGM Class O&M | To be provided upon award | To be provided upon award | To be provided upon award | Post Overhaul Analysis (POA) | N/A | N/A | C-2.5.7.5.7 | PM2 | N/A | N/A | N/A | Within 30 days after the availability is complete | To be provided upon award | To be provided upon award | To be provided upon award | MSC Engineering Typedesk | As Required | N/A | ||
| To be provided upon award | N/A | Other | T-AGOS/T-AGM Class O&M | To be provided upon award | To be provided upon award | To be provided upon award | DFARS Certification Documentation | N/A | N/A | C-3.3.1 | PM2 | N/A | N/A | N/A | One business day after commencement of Contract performance | To be provided upon award | To be provided upon award | To be provided upon award | Contracting Officer | As Required | N/A | ||
| To be provided upon award | N/A | Other | T-AGOS/T-AGM Class O&M | To be provided upon award | To be provided upon award | To be provided upon award | Annual DFARS Recertification Documentation | N/A | N/A | C-3.3.1 | PM2 | N/A | N/A | N/A | 14 days prior to the end of current performance period | To be provided upon award | To be provided upon award | To be provided upon award | Contracting Officer | As Required | N/A | ||
| To be provided upon award | N/A | Other | T-AGOS/T-AGM Class O&M | To be provided upon award | To be provided upon award | To be provided upon award | Adverse Personnel Security Determinations | N/A | N/A | C-3.4 | PM2 | N/A | N/A | N/A | Immediately | To be provided upon award | To be provided upon award | To be provided upon award | Contracting Officer and MSC Industrial Security Office | As Required | N/A |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .