This is a Demolition and Deconstruction Package design drawing set for the Thayer Hall Building 601 Renovation project at the United States Military Academy, West Point, New York. The contract number is W912WJ26CA002, issued by the U.S. Army Corps of Engineers New England District on July 13, 2026, for Project #7800007. The demolition scope encompasses selective demolition of the majority of a 4-story, approximately 321,013 square-foot stone-clad steel-framed academic building, with specific elements to remain including the north and south exterior walls, three large east-side buttresses, the first-floor slab, foundations, under-slab utility tunnel, and an active boiler chimney connected to the adjacent Central Power Plant. The project includes demolition of three pedestrian bridges spanning the western moat, temporary chiller installation to serve Bartlett Hall due to demolition of existing chilled water piping, rock anchoring and rock drape installation on the adjacent northeast cliff, and all associated incidental work.

The drawing set comprises comprehensive hazardous materials abatement plans, civil/site logistics plans, structural demolition and shoring plans, architectural demolition plans with elevations and sections, mechanical/plumbing/electrical demolition plans, and site details for erosion and sediment control. The project requires asbestos abatement work using manual wet methods in negative pressure enclosures with HEPA-filtered exhaust generating at least four air changes per hour, with continuous digital manometer monitoring. Additional hazardous materials include lead-containing painted surfaces, mold, and suspect materials in plumbing systems. The contractor must coordinate with CSX Railroad for track crossing, verify existing utility locations by contacting 811 and West Point DPW at least 30 days prior to excavation, manage an approximate 5.64-acre area of disturbance with erosion and sediment control measures implemented prior to soil-disturbing activities, and maintain a Stormwater Pollution Prevention Plan on-site. Key staging areas include D Lot, River Courts, and a transfer station salvage storage area. An Industry Day event is scheduled for August 6, 2026, to solicit input from general contractors regarding project execution under a Construction Manager at Risk Other Transaction Agreement authority.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

54321

D

C

B

A

US Army Corps of Engineers New England District

IS

S

U E

D A

T E

S O

L

IC

IT

A

T

IO

N N

U M

B E

R

D E

S

IG

N E

D B

Y

D R

A W

N B

Y

S U

B M

IT

T

E D

B Y

SHEET ID

C H

E C

K E

D B

Y

C O

N T

R A

C T

N U

M B

E R

S

IZ

E

P L

O T

S C

A L E

A R

C H

E

54321

C A

D D

C O

D E

W W

J C

A

A S

N O

T E

D

E

F ile

P a th

P lo t D a te

P ro g re s s P ri n t

N o t fo r C o n s tr u c ti o n

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

205 W Welsh Dr Douglassville, PA 19518

610-385-8500

N E

W E

N G

L A

N D

D

IS

T R

IC

T

V

IR

G

IN

IA

R O

A D

C O

N C

O R

D M

A S

S A

C H

U S

E T

T S

S T

V H

D R

U S

M A

J o in t V e n tu re W

W e ls h D r.

D o u g la s s v ill e P

A

-3

-8

W E

S T

P O

IN

T

N

E W

Y O

R K

T H

A Y

E R

H A

L L

B U

IL

D

IN

G

R

E N

O V

A T

IO

N

B601

A u to d e s k D o c s /1

U

S A

C E

T h a y e r_

H a ll_

R e n /W

P T

H R

-A -D

E M

O -C

E N

T R

A L .r v t

/1

/2

:1

:5

P

M

G-001

W M

O S

E R

W M

O S

E R

W M

O S

E R

/1

/2

C O

V E

R S

H E

E T

.0

R

N E

F F

R T

A D

E M

O L

IT

IO

N

P A

C K

A G

E

J

U L Y

WEST POINT, NEW YORK

THAYER HALL BUILDING 601 RENOVATION

DEMOLITION / DECONSTRUCTION PACKAGE

PROJECT # 7800007

NEW ENGLAND DISTRICT

US Army Corps of Engineers ®

SOLICITATION NO.:

CONTRACT NO.: W912WJ26CA002

ISSUE DATE: 07/13/26

VOLUME: 1 OF 1

STRUCTURAL / MEP

STV

205 W WELSH DR.

DOUGLASSVILLE, PA 19518

610-385-8500

ARCHITECTURAL / SITE

HDR

1800 AMERICAN BLVD., SUITE 100

PENNINGTON, NJ 08534

609-844-1212

VICINITY MAP LOCATION MAP

GENERAL

G-001 COVER SHEET

G-002 GENERAL NOTES, ABBREVIATIONS

DRAWING LIST

PROJECT LOCATION

PROJECT LOCATION

HAZARDOUS MATERIALS

HA001 ABATEMENT PLAN BASEMENT

HA002 ABATEMENT PLAN FIRST FLOOR

HA003 ABATEMENT PLAN SECOND FLOOR

HA004 ABATEMENT PLAN THIRD FLOOR

HA005 ABATEMENT PLAN FOURTH FLOOR

HA006 ABATEMENT PLAN ROOF

CIVIL

C-001 GENERAL NOTES, LEGEND, AND ABBREVIATIONS

C-002 SITE LOGISTICS PLAN OVERALL

C-003 SITE LOGISTICS PLAN

C-004 SITE LOGISTICS PLAN

C-005 PHOTOGRAPH LOCATION MAP

C-006 PHOTOGRAPHS

C-007 TRUCK ACCESS PLAN

C-008 CONSTRUCTION PHASING - PHASE 1

C-009 CONSTRUCTION PHASING - PHASE 2

C-010 CONSTRUCTION PHASING - PHASE 3

C-011 CONSTRUCTION PHASING - PHASE 4

V-100 EXISTING CONDITIONS PLAN - OVERALL

V-101 EXISTING CONDITIONS PLAN - CULLUM ROAD

V-102 EXISTING CONDITIONS PLAN - THAYER HALL MOAT

V-103 EXISTING CONDITIONS PLAN - RIVER COURTS

CD100 DEMOLITION PLAN - OVERALL

CD101 DEMOLITION PLAN - CULLUM ROAD

CD102 DEMOLITION PLAN - THAYER HALL MOAT

CD103 DEMOLITION PLAN - RIVER COURTS

CE100 EROSION & SEDIMENT CONTROL PLAN - OVERALL

CE101 EROSION & SEDIMENT CONTROL PLAN - CULLUM ROAD

CE102 EROSION & SEDIMENT CONTROL PLAN - THAYER HALL MOAT

CE103 EROSION & SEDIMENT CONTROL PLAN - RIVER COURTS

CE104 EROSION & SEDIMENT CONTROL PLAN - D LOT

CE105 EROSION & SEDIMENT CONTROL PLAN - TRANSFER STATION

C-501 EROSION & SEDIMENT CONTROL DETAILS

C-502 SITE DETAILS

GENERAL NOTE

1. ARCHITECTURAL BACKGROUNDS SHOWN ARE BASED ON A LEGACY,

OWNER-FURNISHED MODEL ORIGINALLY PREPARED BY OTHERS IN 2018.

THE MODEL IS NON-CURRENT AND IS USED SOLELY AS A VISUAL

REFERENCE TO ILLUSTRATE THE GENERAL DEMOLITION SCOPE. THE

MODEL SHALL NOT BE RELIED UPON FOR ACCURACY, DIMENSIONS,

QUANTITIES, GEOMETRY, OR EXISTING CONDITIONS. NO CONSTRUCTION,

DEMOLITION MEANS, OR QUANTITIES SHALL BE DERIVED FROM THIS

MODEL. AN UPDATED ARCHITECTURAL BACKGROUND WILL BE

INCORPORATED IN FUTURE SUBMISSIONS WHEN AVAILABLE.

N N

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E A

P P

R

STRUCTURAL

SD001 STRUCTURAL GENERAL NOTES

SD002 STRUCTURAL DESIGN CRITERIA

SD003 STRUCTURAL SPECIAL INSPECTION STATEMENT

SD101 PHASE I DEMOLITION - FIRST FLOOR

SD102 PHASE I DEMOLITION - SECOND FLOOR

SD103 PHASE I DEMOLITION - THIRD FLOOR

SD104 PHASE I DEMOLITION - FOURTH FLOOR

SD105 PHASE I DEMOLITION - ROOF

SD110 SHORING CONSTRUCTION - FOUNDATION PLAN

SD111 SHORING CONSTRUCTION - FIRST FLOOR

SD112 SHORING CONSTRUCTION - SECOND FLOOR

SD113 SHORING CONSTRUCTION - THIRD FLOOR

SD114 SHORING CONSTRUCTION - FOURTH FLOOR

SD121 PHASE II DEMOLITION - FIRST FLOOR

SD122 PHASE II DEMOLITION - SECOND FLOOR

SD123 PHASE II DEMOLITION - THIRD FLOOR

SD124 PHASE II DEMOLITION - FOURTH FLOOR

SD125 PHASE II DEMOLITION - ROOF

SD201 SOUTH WALL ELEVATION

SD202 EAST WALL ELEVATION

SD203 NORTH WALL ELEVATION

SD301 SHORING SECTION

SD302 SHORING SECTION

SD501 STRUCTURAL FOUNDATION DETAILS

SD502 STRUCTURAL CONCRETE DETAILS

SD503 STRUCTURAL STEEL DETAILS

SD504 DEMOLITION DETAILS

SD505 MISCELLANEOUS STRUCTURAL DETAILS

ARCHITECTURAL

AD000 ARCHITECTURE DEMOLITION NOTES, ABBREVIATIONS

AD100 TUNNEL FLOOR DEMOLITION PLAN

AD101 FIRST FLOOR DEMOLITION PLAN

AD102 SECOND FLOOR DEMOLITION PLAN

AD103 THIRD FLOOR DEMOLITION PLAN

AD104 FOURTH FLOOR DEMOLITION PLAN

AD105 FIFTH FLOOR DEMOLITION PLAN

AD201 DEMOLITION ELEVATIONS - NORTH AND SOUTH

AD202 DEMOLITION ELEVATIONS - EAST

AD203 DEMOLITION ELEVATIONS - WEST

AD301 DEMOLITION SECTIONS - BUILDING CROSS

AD302 DEMOLITION SECTIONS - BUILING LONGITUDINAL

AD401 SOUTH TOWER DEMOLITION PLANS

AD402 SOUTH TOWER DEMOLITION PLANS

AD403 NORTH TOWER DEMOLITION PLANS

AD404 NORTH TOWER DEMOLITION PLANS

AD405 EAST FACADE DEMOLITION PLANS

AD406 EAST FACADE DEMOLITION PLANS

AD407 EAST FACADE DEMOLITION PLANS

AD410 PEDESTRIAN BRIDGE - JEFFERSON PLACE DEMOLITION

AD411 PEDESTRIAN BRIDGE - CULLUM ROAD DEMOLITION

AD412 PEDESTRIAN BRIDGE - BREWERTON ROAD DEMOLITION

AD500 DEMOLITION DETAILS

AD600 SALVAGE INVENTORY

A-100 TUNNEL FLOOR END STATE PLAN

A-101 FIRST FLOOR END STATE PLAN

A-201 END STATE ELEVATIONS - NORTH AND SOUTH

A-202 END STATE ELEVATIONS - EAST

A-500 END STATE DETAILS

MECHANICAL

M-001 MECHANICAL GENERAL NOTES AND ABBREVIATIONS

MD100 TUNNEL LEVEL DEMOLITION PLAN - SOUTH

MD101 TUNNEL LEVEL DEMOLITION PLAN - NORTH

MD102 COURTYARD POWERPLANT DEMOLITION PLAN

MD103 FIRST FLOOR DEMOLITION PLAN - SOUTH

MD104 FIRST FLOOR DEMOLITION PLAN - NORTH

MD105 SECOND FLOOR DEMOLITION PLAN - SOUTH

MD106 SECOND FLOOR DEMOLITION PLAN - NORTH

MD107 THIRD FLOOR DEMOLITION PLAN - SOUTH

MD108 THIRD FLOOR DEMOLITION PLAN - NORTH

MD109 FOURTH FLOOR DEMOLITION PLAN - SOUTH

MD110 FOURTH FLOOR DEMOLITION PLAN - NORTH

MD111 ROOF DEMOLITION PLAN - SOUTH

MD112 ROOF DEMOLITION PLAN - NORTH

MD113 SITE DEMOLITION PLAN

M-100 TUNNEL LEVEL NEW WORK - SOUTH

M-101 TUNNEL LEVEL NEW WORK - NORTH

M-102 SITE NEW WORK PLAN

ELECTRICAL

E-001 LEGEND AND ABBREVIATIONS

ED110 TUNNEL LEVEL DEMOLITION PLAN - SOUTH

ED111 TUNNEL LEVEL DEMOLITION PLAN - NORTH

ED112 FIRST FLOOR DEMOLITION PLAN - SOUTH

ED113 FIRST FLOOR DEMOLITION PLAN - NORTH

ED114 SECOND FLOOR DEMOLITION PLAN - SOUTH

ED115 SECOND FLOOR DEMOLITION PLAN - NORTH

ED116 THIRD FLOOR DEMOLITION PLAN - SOUTH

ED117 THIRD FLOOR DEMOLITION PLAN - NORTH

ED118 FOURTH FLOOR DEMOLITION PLAN - SOUTH

ED119 FOURTH FLOOR DEMOLITION PLAN - NORTH

ED120 ROOF DEMOLITION PLAN - SOUTH

ED121 ROOF DEMOLITION PLAN - NORTH

ED122 POWER PLANT COURTYARD DEMOLITION PLAN

ED601 DEMOLITION ELECTRICAL SINGLE LINE DIAGRAM

E-110 TUNNEL LEVEL NEW WORK PLAN DURING DEMOLITION - SOUTH

E-111 TUNNEL LEVEL NEW WORK PLAN DURING DEMOLITION - NORTH

E-112 POWER PLANT COURTYARD NEW WORK DURING DEMOLITION

E-113 TEMPORARY CHILLER POWER FEED SITE PLAN

E-114 TEMPORARY CHILLER POWER CONDUIT ROUTING VIEWS

E-115 BARTLETT HALL MAIN ELECTRICAL ROOM AND SINGLE LINE

DIAGRAM

PLUMBING

P-001 PLUMBING GENERAL NOTES AND ABBREVIATIONS

PD100 TUNNEL LEVEL DEMOLITION PLAN - SOUTH

PD101 TUNNEL LEVEL DEMOLITION PLAN - NORTH

PD102 FIRST FLOOR DEMOLITION PLAN - SOUTH

PD103 FIRST FLOOR DEMOLITION PLAN - NORTH

PD104 SECOND FLOOR DEMOLITION PLAN - SOUTH

PD105 SECOND FLOOR DEMOLITION PLAN NORTH

PD106 THIRD FLOOR DEMOLITION PLAN - SOUTH

PD107 THIRD FLOOR DEMOLITION PLAN - NORTH

PD108 FOURTH FLOOR DEMOLITION PLAN - SOUTH

PD109 FOURTH FLOOR DEMOLITION PLAN - NORTH

PD110 ROOF DEMOLITION PLAN - SOUTH

PD111 ROOF DEMOLITION PLAN - NORTH

DRAWING ABBREVIATIONS

INDEX OF DRAWINGS

BUILDING SUMMARY

NUMBERING SYSTEM:

XX100

DISCIPLINE:

G - GENERAL

H - HAZARDOUS MATERIALS

C/V - CIVIL

S - STRUCTURAL

A - ARCHITECTURAL

P - PLUMBING

M - MECHANICAL

E - ELECTRICAL

DISCIPLINE MODIFIER

ANNOTATION CALLOUTS/DRAWING SYMBOLS

GENERAL NOTES

A ---------------------

A LABEL CLASS A DOOR

A/C AIR CONDITION

A/C UNIT AIR CONDITIONING UNIT

A/E ARCHITECT/ENGINEER

AB ANCHOR BOLT

ACC ACCESSIBLE

ACS AUTOMATIC CONTROL SYSTEM

ACS DR ACCESS DOOR

ACS PNL ACCESS PANEL

ACT ACOUSTICAL CEILING TILE

ADA AMERICANS WITH DISABILITIES

ACT

ADMIN ADMINISTRATION

AFC ABOVE FINISHED COUNTER

AFF ABOVE FINISHED FLOOR

AFG ABOVE FINISHED GRADE

AFS ABOVE FINISHED SLAB

AGGR AGGREGATE

AHU AIR HANDLING UNIT

AIB AIR INFILTRATION BARRIER

ALT ALTERNATE

ALUM ALUMINUM

ANOD ANODIZE

APC ACOUSTICAL PANEL CEILING

APPROX APPROXIMATE

AR AS REQUIRED

ARCH ARCHITECT

ASC ABOVE SUSPENDED CEILING

ASSY ASSEMBLY

ATC ACOUSTICAL TILE CEILING

AVG AVERAGE

AW ARCHITECTURAL WOODWORK

AWT ACOUSTICAL WALL TREATMENT

B ---------------------

B LABEL CLASS B DOOR

BALC BALCONY

BB BASEBOARD

BC BOOKCASE

BD BOARD

BDRY BOUNDARY

BFF BELOW FINISH FLOOR

BHMA BUILDER'S HARDWARE

MANUFACTURER'S

ASSOCIATION

BLDG BUILDING

BLKG BLOCKING

BLT IN BUILT-IN

BN BULLNOSE

BOS BOTTOM OF STEEL

BOT BOTTOM

BP BUILDING PAPER

BRKT BRACKET

BSMT BASEMENT

BTWN BETWEEN

BUR BUILT-UP ROOFING

C ---------------------

C CONC CAST CONCRETE

C LABEL CLASS C DOOR

CAB CABINET

CATW CATWALK

CAV CAVITY

CBB CEMENTITIOUS (BACKER)

BOARD

CD CONSTRUCTION DOCUMENTS

CDW CHILLED DRINKING WATER

CEM PLAS CEMENT PLASTER

CER CERAMIC

CF CONTRACTOR FURNISHED

CF/CI CONTRACTOR

FURNISHED/CONTRACTOR

INSTALLED

CFE CONTRACTOR FURNISHED

EQUIPMENT

CFLG COUNTERFLASHING

CFM CUBIC FEET PER MINUTE

CFMF COLD-FORMED METAL

FRAMING

CFS CUBIC FEET PER SECOND

CG CORNER GUARD

CI CAST IRON

CIP CAST-IN-PLACE

CJ CONTROL JOINT

CL CENTER LINE

CLG CEILING

CLG DIFF CEILING DIFFUSER

CLG HT CEILING HEIGHT

CLL COLUMN LINE

CLO CLOSET

CLR COLOR

CLRM CLASSROOM

CMU CONCRETE MASONRY UNIT

CNDS CONDENSATE

CDR CARD READER

CO CLEANOUT

COL COLUMN

COMM COMMUNICATION

CONC CONCRETE

CONC FLR CONCRETE FLOOR

CONF CONFERENCE

CONT CONTINUE

COORD COORDINATE

CORR CORRIDOR

CP CONCRETE PIPE

CPT CARPET

CR CONTROL ROOM

CS CAST STONE

CSWK CASEWORK

CT CERAMIC TILE

CTB CERAMIC TILE BASE

CTF CERAMIC TILE FLOOR

CTR CENTER

CU FT CUBIC FEET

CW CASEMENT WINDOW

D ---------------------

D DEPTH

D LABEL CLASS D DOOR

DBL DOUBLE

DEMO DEMOLITION

DEPT DEPARTMENT

DET DETAIL

DIA DIAMETER

DIR DIRECTION

DIST DISTANCE

DOC DOCUMENT

DR DOOR

DS DOWNSPOUT

E ---------------------

E LABEL CLASS E DOOR

EA EACH

EF EACH FACE

EIFS EXTERIOR INSULATION AND

FINISH SYSTEM

EJ EXPANSION JOINT

ES EACH SIDE

EL ELEVATION

ELEV ELEVATOR

ENTR ENTRANCE

EPS EXPANDED POLYSTYRENE

BOARD (INSULATION)

EQ EQUAL

EWC ELECTRIC WATER COOLER

EXP EXPOSED

EXT EXTERIOR

EXT EXTINGUISHER

EXT GR EXTERIOR GRADE

F ---------------------

FA FIRE ALARM

FAAP FIRE ALARM ANNUNCIATOR

PANEL

FAS BD FASCIA BOARD

FC BRK FACE BRICK

FCO FLOOR CLEANOUT

FD FLOOR DRAIN

FDTN FOUNDATION

FE FIRE EXTINGUISHER

FEC FIRE EXTINGUISHER CABINET

FED FEDERAL

FF FINISH FACE

FF EL FINISH FLOOR ELEVATION

FF INSUL FOIL BACKED INSULATION

FGL FIBERGLASS

FH FIRE HOSE

FHP FULL HEIGHT PARTITION

FIN FINISH

FIN BS FINISH BOTH SIDES

FIN FLR FINISH FLOOR

FIN GR FINISH GRADE

FIXT FIXTURE

FLDG FOLDING

FLEX FLEXIBLE

FLG FLOORING

FLMT FLUSH MOUNT

FLR FLOOR

FM FACTORY MUTUAL

FOC FACE OF CONCRETE

FOM FACE OF MASONRY

FR FIRE RESISTANT

FRG FIBER REINFORCED GYPSUM

FRMG FRAMING

FRP FIBERGLASS REINFORCED

PLASTIC

FRTW FIRE RETARDANT TREATED

WOOD

FS FEDERAL SPECIFICATION

FSTNR FASTENER

FT FEET

FTG FOOTING

FWC FABRIC WALLCOVERING

G ---------------------

G NATURAL GAS

GALV GALVANIZED

GB GRAB BAR

GFCI GOVERNMENT FURNISHED

CONTRACTOR INSTALLED

GFGI GOVERNMENT INSTALLED

GOVERNMENT INSTALLED

GFRG GLASS-FIBER-REINFORCED

GYPSUM

GLZ GLAZING

GR FL GROUND FLOOR

GUT GUTTER

GYP BD GYPSUM BOARD

GYP PLAS GYPSUM PLASTER

H ---------------------

HB HOSE BIBB

HDPE HIGH DENSITY POLYETHYLENE

HDW HARDWARE

HDWD HARDWOOD

HEPA HIGH EFFICIENCY PARTICULATE

AIR (FILTER)

HM HOLLOW METAL

HMD HOLLOW METAL DOOR

HORIZ HORIZONTAL

HT HEIGHT

HYDR HYDRAULIC

I ---------------------

IBC INTERNATIONAL BUILDING

CODE

INSUL INSULATION

INT INTERIOR

ILO IN LIEU OF

J ---------------------

JAN JANITOR

K ---------------------

KPD KEYPAD

KIT KITCHEN

KPL KICKPLATE

L ---------------------

LAM LAMINATE

LAV LAVATORY

LBR LUMBER

LBS POUND

LDG LANDING

LF LINEAR FEET (FOOT)

LIB LIBRARY

LIN LINEAR

LKR LOCKER

LOC LOCATION

LT LIGHT

LVDR LOUVER DOOR

LVR LOUVER

M ---------------------

MACH RM MACHINE ROOM

MATL MATERIAL

MAX MAXIMUM

MC MOISTURE CONTENT

MD METAL DECK

MECH MECHANICAL

MECH RM MECHANICAL ROOM

MEMB MEMBRANE

MF MILL FINISH

MFR MANUFACTURER

MID MIDDLE

MIL STD MILITARY STANDARD

MIN MINIMUM, MINUTE

MIRR MIRROR

MISC MISCELLANEOUS

MLDG MOLDING (MOULDING)

MO MASONRY OPENING

MOD MODIFY

MB MOISTURE BARRIER

MTG MOUNTING

MTL METAL

MVBL MOVABLE

MWP MEMBRANE WATERPROOFING

N ---------------------

N NORTH

NA NOT APPLICABLE

NFPA NATIONAL FIRE PROTECTION

ASSOCIATION

NIC NOT IN CONTRACT

NO NUMBER

NOM NOMINAL

NP NO PAINT

NRC NOISE REDUCTI

O -------------------

OA OVERALL

OC ON CENTER

OD OUTSIDE DIAMETER

OFD OVERFLOW DRAIN

OFF OFFICE

OGL OBSCURE GLASS

OPH OPPOSITE HAND

OPNG OPENING

OPP OPPOSITE

OPQ OPAQUE

OWSJ OPEN WEB STEEL JOIST

OPR OPERABLE

ORD OVERFLOW ROOF DRAIN

ORIG ORIGINAL

P --------------------

PA PUBLIC ADDRESS

PAR PARAPET

PAT PATTERN

PB PULL BOX

PBD PARTICLEBOARD

PCC PRECAST CONCRETE

PCF POUNDS PER CUBIC FOOT

PCT PERCENT

PERF PERFORATED

PERIM PERIMETER

PH PHASE

PIL PILASTER

PL PROPERTY LINE

PL GL PLATE GLASS

PLAM PLASTIC LAMINATE

PLAS PLASTER

PLBG PLUMBING

PLG PILING

PLYWD PLYWOOD

PNL PANEL

PP PL PUSH/PULL PLATE

PR PAIR

PRCST PRECAST

PRKG PARKING

PS CONC PRESTRESSED CONCRETE

PSF POUNDS PER SQUARE FOOT

PSI POUNDS PER SQUARE INCH

PT PRESSURE TREATED

PTD PAPER TOWEL DISPENSER

PTDR PAPER TOWEL DISPENSER AND

RECEPTACLE

PTN PARTITION

PWR POWER

Q --------------------

QT QUARRY TILE

QTY QUANTITY

R --------------------

RB RESILIENT BASE

RBM REINFORCED BRICK MASONR

RBR RUBBER

RC REINFORCED CONCRETE

RCP REFLECTED CEILING PLAN

RD ROOF DRAIN

RDG INS RIGID INSULATION, SOLID

REC RECESSED

REC ROOM RECREATION ROOM

REF REFERENCE

REM REMOVABLE

REP REPAIR

REPL REPLACE

REQ REQUIRE

REQD REQUIRED

RESIL RESILIENT

REST RESTROOM

RF RESILIENT FLOORING

RFG ROOFING

RH ROOF HATCH

RHR RIGHT HAND REVERSE

RL ROOF LEADER

RLG RAILING

RM ROOM

RO ROUGH OPENING

RSD ROLLING STEEL DOOR

RV ROOF VENT

RVL REVEAL

REFER TO A/E/C CAD STANDARD FOR

SHEET NUMBERING STANDARDS

REVISION

TAG

NORTH ARROW w/

TRUE NORTH

INDICATION

ROOM TAG

ELEVATION NUMBER

SECTION

EXTERIOR ELEVATION

ENLARGEMENT,

DETAIL

SPOT ELEVATION

LEVEL NAME

SHEET NUMBER

SHEET NUMBER

SHEET NUMBER

SHEET KEYNOTE

INTERIOR ELEVATION

SHEET NUMBER

S --------------------

SB SPLASH BLOCK

SCHED SCHEDULE

SD SMOKE DETECTOR

SF SQUARE FOOT (FEET)

SFTWD SOFTWOOD

SGL SINGLE

SHT MTL FLASHSHEET METAL (FLASHING)

SHTHG SHEATHING

SHV SHELVING

SIM SIMILAR

SJ SCORED JOINT

SKLT SKYLIGHT

SLNT SEALANT

SMK SMOKE

SMLS SEAMLESS

SP EL SPOT ELEVATION

SPEC SPECIFICATION

SQ SQUARE

SQ IN SQUARE INCH

SQ YD SQUARE YARD

SST STAINLESS STEEL

ST STAIRS

STD STANDARD

STL JST STEEL JOIST

STL RF DK STEEL ROOF DECK

STOR STORAGE

STR STRINGERS

STRB/HRN STROBE/HORN

SUB FL SUBFLOOR

SV SHEET VINYL

SW SIDEWALK

T --------------------

T TREAD

T/S TUB/SHOWER

TC TERRA COTTA

TD TRENCH DRAIN

TEL TELEPHONE

TEMP TEMPORARY

TER TERRAZZO

TFF TOP OF FINISH FLOOR

THK THICKNESS

TK BD TACKBOARD

TMPD GL TEMPERED GLASS

TN TRUE NORTH

TOF TOP OF FOOTING

TOM TOP OF MASONRY

TOP TOP OF PARAPET

TOPO TOPOGRAPHY

TOS TOP OF SLAB

TRANS TRANSOM

TRTD TREATED

TV TELEVISION

SHEET NUMBER WITHIN SERIES

A201

A204

A301

A401

ROOM

100'

LEVEL 01

100'

A

PROJECT NORTH

1. INFORMATION SHOWN ON THESE DRAWINGS IS BASED ON FIELD OBSERVATIONS AND EXISTING

DOCUMENTS. ALL DIMENSIONS ARE APPROXIMATE. THE CONTRACTOR SHALL VERIFY EXISTING

CONDITIONS AND DIMENSIONS PRIOR TO COMMENCING WORK AND SHALL NOTIFY THE

ARCHITECT OF ANY DISCREPANCIES.

2. INCLUDE ALL DEMOLITION WORK REQUIRED TO COMPLETE THE PROJECT, WHETHER OR NOT

SPECIFICALLY INDICATED. REMOVE ALL ITEMS SCHEDULED FOR DEMOLITION IN THEIR

ENTIRETY, INCLUDING ALL FRAMING, FASTENERS, ACCESSORIES, HARDWARE, AND

ASSOCIATED COMPONENTS.

3. PROVIDE CONTINUOUS PROTECTION OF PERSONS AND PROPERTY THROUGHOUT THE WORK

IN ACCORDANCE WITH OSHA REQUIREMENTS. ANY UNSAFE CONDITIONS OR MATERIALS

ENCOUNTERED SHALL BE IMMEDIATELY REPORTED TO THE OWNER’S REPRESENTATIVE AND

PROPERLY SECURED. PROVIDE BARRICADES, SHORING, BRACING, TEMPORARY WALLS, AND

OTHER MEASURES NECESSARY TO PREVENT INJURY OR COLLAPSE.

4. PROVIDE ALL BRACING, SHORING, AND SUPPORT REQUIRED TO MAINTAIN THE STRUCTURAL

INTEGRITY OF THE BUILDING AND AFFECTED STRUCTURES DURING DEMOLITION.

5. PERFORM DEMOLITION IN A MANNER THAT PREVENTS DAMAGE TO MATERIALS, EQUIPMENT,

AND FINISHES TO REMAIN. CONTROL DUST AND DEBRIS. ANY DAMAGE CAUSED BY DEMOLITION

SHALL BE REPAIRED OR REPLACED TO MATCH EXISTING CONDITIONS USING APPROVED

MATERIALS.

6. WHERE DEMOLITION RESULTS IN INTERRUPTION OF UTILITIES OR SERVICES TO REMAINING

AREAS, PROVIDE TEMPORARY OR PERMANENT REROUTING AS REQUIRED TO MAINTAIN

CONTINUOUS OPERATION WITHOUT CONFLICTING WITH NEW WORK.

7. MATERIALS AND EQUIPMENT DESIGNATED AS SALVAGE SHALL BE TURNED OVER TO THE

OWNER AS DIRECTED. ITEMS TO BE RELOCATED SHALL BE CAREFULLY DISMANTLED, STORED

TO PREVENT DAMAGE OR DETERIORATION, CLEANED, AND TESTED PRIOR TO REINSTALLATION.

8. DO NOT ALLOW DEBRIS TO ACCUMULATE ON SITE. REMOVE REGULARLY. MATERIAL NOT

DESIGNATED FOR SALVAGE OR REUSE SHALL BE LEGALLY DISPOSED OF OFF SITE. SALE OR

BURNING OF MATERIALS ON SITE IS PROHIBITED.

9. PATCH ALL SURFACES AND PENETRATIONS RESULTING FROM DEMOLITION TO MATCH

ADJACENT EXISTING OR NEW CONSTRUCTION. CLEAN ALL REMAINING SURFACES OF

ADHESIVES, SEALANTS, DIRT, AND DEBRIS, LEAVING SURFACES READY FOR NEW WORK.

1. THE WORK INCLUDES BUT IS NOT LIMITED TO THE SELECTIVE DEMOLITION OF

THE MAJORITY OF B601 THAYER HALL, WHICH IS A 4-STORY, APPROXIMATELY

321,013SF STONE-CLAD STEEL-FRAMED ACADEMIC BUILDING CONSISTING OF A

ROOFTOP PARKING DECK AND EXTERIOR HISTORIC STONE WALLS. THE

EXISTING NORTH AND SOUTH WALLS AND THREE (3) LARGE BUTTRESSES ON

THE EAST SIDE OF THE BUILDING WILL REMAIN, AS WELL AS THE FIRST-FLOOR

SLAB, FOUNDATIONS, UNDER-SLAB ACTIVE UTILITY TUNNEL, AND ACTIVE

BOILER CHIMNEY IN THE SOUTHEAST TOWER WHICH IS CONNECTED TO THE

ADJACENT BUILDING 604 CENTRAL POWER PLANT. SELECT PORTIONS OF THE

HISTORIC EXTERIOR FAÇADE AND OTHER ELEMENTS WILL BE SALVAGED FOR

STORAGE OR RE-USE. THREE BRIDGES SPANNING OVER THE "MOAT" ON THE

WEST SIDE OF B601 WILL ALSO BE DEMOLISHED AS PART OF THIS

PROJECT. TEMPORARY CHILLERS WILL BE PROVIDED TO SERVE BARTLETT

HALL BECAUSE THE EXISTING CHILLED WATER SUPPLY AND RETURN PIPING

CURRENTLY RUNS THROUGH THAYER HALL AND WILL BE DEMOLISHED AS

PART OF THIS PROJECT. ROCK ANCHORING AND ROCK DRAPES MUST BE

INSTALLED ON THE ADJACENT CLIFF GENERALLY ON THE NORTHEAST SIDE OF

THE PROJECT SITE. ALL INCIDENTAL RELATED WORK ASSOCIATED WITH THE

ABOVE IS ALSO INCLUDED.

54321

D

C

B

A

US Army Corps of Engineers New England District

IS

S

U E

D A

T E

S O

L

IC

IT

A

T

IO

N N

U M

B E

R

D E

S

IG

N E

D B

Y

D R

A W

N B

Y

S U

B M

IT

T

E D

B Y

SHEET ID

C H

E C

K E

D B

Y

C O

N T

R A

C T

N U

M B

E R

S

IZ

E

P L

O T

S C

A L E

A R

C H

E

54321

C A

D D

C O

D E

W W

J C

A

A S

N O

T E

D

E

F ile

P a th

P lo t D a te

P ro g re s s P ri n t

N o t fo r C o n s tr u c ti o n

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

205 W Welsh Dr Douglassville, PA 19518

610-385-8500

N E

W E

N G

L A

N D

D

IS

T R

IC

T

V

IR

G

IN

IA

R O

A D

C O

N C

O R

D M

A S

S A

C H

U S

E T

T S

S T

V H

D R

U S

M A

J o in t V e n tu re W

W e ls h D r.

D o u g la s s v ill e P

A

-3

-8

W E

S T

P O

IN

T

N

E W

Y O

R K

T H

A Y

E R

H A

L L

B U

IL

D

IN

G

R

E N

O V

A T

IO

N

B601

A u to d e s k D o c s /1

U

S A

C E

T h a y e r_

H a ll_

R e n /W

P T

H R

-A -D

E M

O -C

E N

T R

A L .r v t

/1

/2

:1

:5

P

M

G-002

W M

O S

E R

W M

O S

E R

W M

O S

E R

/1

/2

G E

N E

R A

L N

O T

E S

A

B B

R E

V

IA

T

IO

N S

.0

R

N E

F F

R T

A D

E M

O L

IT

IO

N

P A

C K

A G

E

J

U L Y

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E A

P P

R

ABCDEFGHIJKLM

NO

PQR

S

TU

54321

D

C

B

A

US Army Corps of Engineers New England District

IS

SU

E D

AT

E:

SO

LI

C

IT

AT

IO

N N

U M

BE

R

SHEET ID

C O

N

TR

AC

T

N U

M

BE

R

54321

C

AD

D C

O D

E:

W

2W J2

6C A0

E

Pr og re ss

P rin t

No t f or C on st ru ct io n

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

205 W Welsh Dr Douglassville, PA 19518

610-385-8500

N

EW

E N

G

LA

N D

D

IS

TR

IC

T

VI

R G

IN

IA

R O

AD

C

O N

C O

R D

, M

AS

SA

C

H U

SE

TT

S

ST

V

H D

R U

SM

A

Jo in t V en tu re

W W el sh

D r., D ou gl as sv ille

, P A

0-

5-

W

ES

T

PO

IN

T, N

EW

Y O

R K

TH

A

YE

R

H A

LL

B

U

IL

D

IN

G

R

EN

O

VA

TI

O N

R

TA

D

EM

O

LI

TI

O

N P

AC

KA

G E:

JU

LY

B601

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

AP

PR

D

ES

IG

N

ED

B

Y:

D R

AW

N

B Y:

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

SI

ZE

PL

O T

SC

AL

E:

AR

C H

E

AS

N O

TE

D

Fi le

P at h:

Pl ot D at e:

PLAN

NORTH

KEY PLAN

A Joint Venture

SCALE: 1/16" = 1'-0"

ABATEMENT PLAN - BASEMENT - OVERALLB1

/1

3/

M . D

EL

AN

EY

M . W

EY

D

T

D . A

N D

R

EW

S

M . D

EL

AN

EY

A B

A

TE

M

EN

T

PL

A N

B A

SE

M

EN

T

HA001

1. ASBESTOS ABATEMENT WORK MUST BE PERFORMED IN ACCORDANCE

WITH APPLICABLE GOVERNMENT REGULATIONS. THE CONTRACTOR MUST

USE MANUAL WET METHODS TO CONTROL THE RELEASE OF DUST WHEN

PERFORMING THE REMOVAL OF ALL ASBESTOS AND NON-ASBESTOS

MATERIALS FROM THE WORK AREA.

2. INTERIOR ASBESTOS REMOVAL WORK MUST BE CONDUCTED WITHIN A

NEGATIVE PRESSURE ENCLOSURE. A NEGATIVE AIR PRESSURE OF AT

LEAST -0.02 INCHES OF WATER COLUMN, AS MEASURED AT ANY WORK

AREA PERIMETER LOCATION, MUST BE PROVIDED DURING ASBESTOS

REMOVAL. NEGATIVE AIR PRESSURE MUST BE CREATED IN THE WORK

AREA USING HEPA FILTERED EXHAUST AND EXHAUSTED TO THE

OUTDOORS. THESE HEPA FILTERED EXHAUST UNITS WILL BE USED TO

GENERATE AT LEAST FOUR AIR CHANGES PER HOUR INSIDE THE WORK

AREA. NEGATIVE AIR PRESSURE IN THE WORK AREA MUST BE

CONTINUOUSLY MONITORED THROUGH THE USE OF DIGITAL MANOMETERS

POSTED OUTSIDE THE WORK AREA.

3. THE CONTRACTOR MUST REMOVE HAZARDOUS MATERIALS THAT EXIST

WITHIN WORK AREAS PRIOR TO DISTURBANCE. REFER TO PROJECT

ABATEMENT DESIGN DOCUMENTS FOR FURTHER INFORMATION. REFER TO

SPECIFICATIONS, 02.82.00 FOR ASBESTOS, AND 03.83.00 FOR LEAD (Pb)

REMOVAL REQUIREMENTS.

4. VISIBLE MOLD IS PRESENT IN THE BUILDING. REFER TO MABBETT &

ASSOCIATES REGULATED BUILDING MATERIALS SURVEY REPORT DATED

FEBRUARY 2, 2026 FOR ADDITIONAL INFORMATION. REFER TO MOLD

SPECIFICATION 02.85.00 FOR REMOVAL REQUIREMENTS.

5. SYMBOLS SHOWING LOCATIONS OF ASBESTOS CONTAINING MATERIALS

ARE APPROXIMATE AND NOT TO SCALE. THEY ARE FOR REFERENCE ONLY.

GENERAL ABATEMENT NOTES

050505

6. WORK AREAS WERE SURVEYED TO IDENTIFY HAZARDOUS MATERIALS.

REFER TO MABBETT & ASSOCIATES REGULATED BUILDING MATERIALS

SURVEY REPORT DATED FEBRUARY 9, 2026, IN SPECIFICATIONS, 02.82.00

FOR ADDITIONAL INFORMATION. NOT ALL AREAS MAY HAVE BEEN

ACCESSIBLE AND HAZARDOUS MATERIALS MAY EXIST WHICH HAVE NOT

BEEN IDENTIFIED. IF SUSPECT MATERIALS ARE DISCOVERED WHICH

HAVE NOT BEEN PREVIOUSLY IDENTIFIED, THE CONTRACTOR MUST NOT

DISTURB THOSE MATERIALS AND MUST IMMEDIATELY NOTIFY THE

CONTRACTING OFFICER.

7. ELEVATOR BRAKE PADS ARE KNOWN TO CONTAIN ASBESTOS AND ARE

ASSUMED AND WILL REQUIRE ABATEMENT IF DISTURBED.

8. FIRE DOORS ARE KNOWN TO CONTAIN ASBESTOS AND ARE ASSUMED

AND WILL REQUIRE ABATEMENT IF DISTURBED.

9. HIDDEN PLUMBING SYSTEM INSULATION AND MUDDED FITTINGS ARE

CONSIDERED TO BE SUSPECT MATERIALS AND MAY CONTAIN ASBESTOS.

THE ABATEMENT CONTRACTOR MUST REFER TO DEMOLITION PLANS FOR

LOCATION OF PLUMBING FIXTURES AND ASSUME SUSPECT MATERIAL IS

POSITIVE UNTIL LAB RESULTS PROVE OTHERWISE. IF PLUMBING

INSULATION IS DETERMINED TO CONTAIN ASBESTOS THE ABATEMENT

CONTRACTOR MUST REMOVE WALL AND CEILING MATERIAL AS REQUIRED

TO ACCESS CONCEALED PLUMBING THAT MAY BE IMPACTED BY THE

SCOPE OF WORK.

10. OSHA LEAD (Pb) REGULATIONS WILL APPLY TO ANY DEMOLITION

OPERATION (I.E. SANDING, SCRAPING, CUTTING, AND WELDING) THAT

WOULD DISTURB PAINTED SURFACES WHICH CONTAIN LEAD. EXPOSURE

TO LEAD IN THE CONSTRUCTION INDUSTRY IS REGULATED BY OSHA's

LEAD IN CONSTRUCTION REGULATION (29 CFR 1926.62), AS WELL AS

APPLICABLE STATE REGULATIONS. REFER TO SPECIFICATION FOR

FURTHER INFORMATION.

11. LEAD WASTE IS SUBJECT TO THE USEPA RESOURCE CONSERVATION AND

RECOVERY ACT (RCRA) REGULATIONS (40 CFR PART 260 - 273)

HAZARDOUS WASTE. REFER TO SPECIFICATIONS FOR FURTHER

INFORMATION.

ABATEMENT KEYNOTES#

01 THE ABATEMENT CONTRACTOR SHALL REMOVE AND DISPOSE OF

ASBESTOS CONTAINING THERMAL SYSTEM INSULATION (TSI) AND

MUDDED FITTINGS AS ACM. THE CONTRACTOR SHALL REMOVE WALL

AND CEILING MATERIAL AS REQUIRED TO ACCESS ALL CONCEALED

PIPING.

05 THE ABATEMENT CONTRACTOR SHALL REMOVE AND DISPOSE OF BLACK

AND BROWN STICK PIN ADHESIVE AS ACM.

12 THE ABATEMENT CONTRACTOR SHALL REMOVE AND DISPOSE OF METAL

GRATE CAULK AS ACM.

21 NOT IN SCOPE

ABCDEFGHIJKLMNOPQRSTU

54321

D

C

B

A

US Army Corps of Engineers New England District

IS

SU

E D

AT

E:

SO

LI

C

IT

AT

IO

N N

U M

BE

R

SHEET ID

C O

N

TR

AC

T

N U

M

BE

R

54321

C

AD

D C

O D

E:

W

2W J2

6C A0

E

Pr og re ss

P rin t

No t f or C on st ru ct io n

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

205 W Welsh Dr Douglassville, PA 19518

610-385-8500

N

EW

E N

G

LA

N D

D

IS

TR

IC

T

VI

R G

IN

IA

R O

AD

C

O N

C O

R D

, M

AS

SA

C

H U

SE

TT

S

ST

V

H D

R U

SM

A

Jo in t V en tu re

W W el sh

D r., D ou gl as sv ille

, P A

0-

5-

W

ES

T

PO

IN

T, N

EW

Y O

R K

TH

A

YE

R

H A

LL

B

U

IL

D

IN

G

R

EN

O

VA

TI

O N

R

TA

D

EM

O

LI

TI

O

N P

AC

KA

G E:

JU

LY

B601

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

AP

PR

D

ES

IG

N

ED

B

Y:

D R

AW

N

B Y:

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

SI

ZE

PL

O T

SC

AL

E:

AR

C H

E

AS

N O

TE

D

Fi le

P at h:

Pl ot D at e:

PLAN

NORTH

KEY PLAN

A Joint Venture

/1

3/

M . D

EL

AN

EY

M . W

EY

D

T

D . A

N D

R

EW

S

M . D

EL

AN

EY

A B

A

TE

M

EN

T

PL

A N

F

IR

ST

F

LO

O

HA002

SCALE: 1/16" = 1'-0"

ABATEMENT PLAN - FIRST FLOOR - OVERALLB1

1. ASBESTOS ABATEMENT WORK MUST BE PERFORMED IN ACCORDANCE

WITH APPLICABLE GOVERNMENT REGULATIONS. THE CONTRACTOR MUST

USE MANUAL WET METHODS TO CONTROL THE RELEASE OF DUST WHEN

PERFORMING THE REMOVAL OF ALL ASBESTOS AND NON-ASBESTOS

MATERIALS FROM THE WORK AREA.

2. INTERIOR ASBESTOS REMOVAL WORK MUST BE CONDUCTED WITHIN A

NEGATIVE PRESSURE ENCLOSURE. A NEGATIVE AIR PRESSURE OF AT

LEAST -0.02 INCHES OF WATER COLUMN, AS MEASURED AT ANY WORK

AREA PERIMETER LOCATION, MUST BE PROVIDED DURING ASBESTOS

REMOVAL. NEGATIVE AIR PRESSURE MUST BE CREATED IN THE WORK

AREA USING HEPA FILTERED EXHAUST AND EXHAUSTED TO THE

OUTDOORS. THESE HEPA FILTERED EXHAUST UNITS WILL BE USED TO

GENERATE AT LEAST FOUR AIR CHANGES PER HOUR INSIDE THE WORK

AREA. NEGATIVE AIR PRESSURE IN THE WORK AREA MUST BE

CONTINUOUSLY MONITORED THROUGH THE USE OF DIGITAL MANOMETERS

POSTED OUTSIDE THE WORK AREA.

3. THE CONTRACTOR MUST REMOVE HAZARDOUS MATERIALS THAT EXIST

WITHIN WORK AREAS PRIOR TO DISTURBANCE. REFER TO PROJECT

ABATEMENT DESIGN DOCUMENTS FOR FURTHER INFORMATION. REFER TO

SPECIFICATIONS, 02.82.00 FOR ASBESTOS, AND 03.83.00 FOR LEAD (Pb)

REMOVAL REQUIREMENTS.

4. VISIBLE MOLD IS PRESENT IN THE BUILDING. REFER TO MABBETT &

ASSOCIATES REGULATED BUILDING MATERIALS SURVEY REPORT DATED

FEBRUARY 2, 2026 FOR ADDITIONAL INFORMATION. REFER TO MOLD

SPECIFICATION 02.85.00 FOR REMOVAL REQUIREMENTS.

5. SYMBOLS SHOWING LOCATIONS OF ASBESTOS CONTAINING MATERIALS

ARE APPROXIMATE AND NOT TO SCALE. THEY ARE FOR REFERENCE ONLY.

6. WORK AREAS WERE SURVEYED TO IDENTIFY HAZARDOUS MATERIALS.

REFER TO MABBETT & ASSOCIATES REGULATED BUILDING MATERIALS

SURVEY REPORT DATED FEBRUARY 9, 2026, IN SPECIFICATIONS, 02.82.00

FOR ADDITIONAL INFORMATION. NOT ALL AREAS MAY HAVE BEEN

ACCESSIBLE AND HAZARDOUS MATERIALS MAY EXIST WHICH HAVE NOT

BEEN IDENTIFIED. IF SUSPECT MATERIALS ARE DISCOVERED WHICH HAVE

NOT BEEN PREVIOUSLY IDENTIFIED, THE CONTRACTOR MUST NOT DISTURB

THOSE MATERIALS AND MUST IMMEDIATELY NOTIFY THE CONTRACTING

OFFICER.

7. ELEVATOR BRAKE PADS ARE KNOWN TO CONTAIN ASBESTOS AND ARE

ASSUMED AND WILL REQUIRE ABATEMENT IF DISTURBED.

8. FIRE DOORS ARE KNOWN TO CONTAIN ASBESTOS AND ARE ASSUMED AND

WILL REQUIRE ABATEMENT IF DISTURBED.

9. HIDDEN PLUMBING SYSTEM INSULATION AND MUDDED FITTINGS ARE

CONSIDERED TO BE SUSPECT MATERIALS AND MAY CONTAIN ASBESTOS.

THE ABATEMENT CONTRACTOR MUST REFER TO DEMOLITION PLANS FOR

LOCATION OF PLUMBING FIXTURES AND ASSUME SUSPECT MATERIAL IS

POSITIVE UNTIL LAB RESULTS PROVE OTHERWISE. IF PLUMBING

INSULATION IS DETERMINED TO CONTAIN ASBESTOS THE ABATEMENT

CONTRACTOR MUST REMOVE WALL AND CEILING MATERIAL AS REQUIRED

TO ACCESS CONCEALED PLUMBING THAT MAY BE IMPACTED BY THE

SCOPE OF WORK.

10. OSHA LEAD (Pb) REGULATIONS WILL APPLY TO ANY DEMOLITION

OPERATION (I.E. SANDING, SCRAPING, CUTTING, AND WELDING) THAT

WOULD DISTURB PAINTED SURFACES WHICH CONTAIN LEAD. EXPOSURE

TO LEAD IN THE CONSTRUCTION INDUSTRY IS REGULATED BY OSHA's LEAD

IN CONSTRUCTION REGULATION (29 CFR 1926.62), AS WELL AS APPLICABLE

STATE REGULATIONS. REFER TO SPECIFICATION FOR FURTHER

INFORMATION.

11. LEAD WASTE IS SUBJECT TO THE USEPA RESOURCE CONSERVATION AND

RECOVERY ACT (RCRA) REGULATIONS (40 CFR PART 260 - 273) HAZARDOUS

WASTE. REFER TO SPECIFICATIONS FOR FURTHER INFORMATION.

01 THE ABATEMENT CONTRACTOR SHALL REMOVE AND DISPOSE OF

ASBESTOS CONTAINING THERMAL SYSTEM INSULATION (TSI) AND

MUDDED FITTINGS AS ACM. THE CONTRACTOR SHALL REMOVE WALL AND

CEILING MATERIAL AS REQUIRED TO ACCESS ALL CONCEALED PIPING.

02 THE ABATEMENT CONTRACTOR SHALL REMOVE AND DISPOSE OF ALL

LAYERS OF FLOOR TILE AND FLOOR TILE, MASTIC, ADHESIVE AND

LEVELER AS ACM THROUGHOUT THE ENTIRE BUILDING.

03 THE ABATEMENT CONTRACTOR SHALL REMOVE AND DISPOSE OF ALL

LAYERS OF CARPET AND CARPET ADHESIVE AND LEVELER AS ACM.

04 THE ABATEMENT CONTRACTOR SHALL REMOVE AND DISPOSE OF

ASBESTOS CONTAINING RADIATOR BACKING MATERIAL AND THERMAL

SYSTEM INSULATION (TSI) AS ACM. THE CONTRACTOR SHALL REMOVE

RADIATOR AS REQUIRED TO ACCESS BACKING MATERIAL AND

CONCEALED PIPING.

07 THE ABATEMENT CONTRACTOR SHALL REMOVE AND DISPOSE OF BROWN

COMPUTER BOARD STAND MASTIC AS ACM.

08 THE ABATEMENT CONTRACTOR SHALL REMOVE AND DISPOSE OF GRAY

SPRAY-ON FIREPROOFING AS ACM.

11 THE ABATEMENT CONTRACTOR SHALL REMOVE AND DISPOSE OF WHITE

VIBRATION CLOTH AS ACM.

13 THE ABATEMENT CONTRACTOR SHALL REMOVE AND DISPOSE OF

EXTERIOR WHITE AND GRAY WINDOW CAULK AS ACM.

14 THE ABATEMENT CONTRACTOR SHALL REMOVE AND DISPOSE OF

EXTERIOR WHITE AND GRAY WINDOW GLAZE AS ACM.

16 THE ABATEMENT CONTRACTOR SHALL REMOVE AND DISPOSE OF

EXTERIOR GRAY DOOR CAULK AS ACM.

21 NOT IN SCOPE

01 01

01 02 03

13 14

13 14

13 14

13 14 13 14

13 14

16 16

GENERAL ABATEMENT NOTES ABATEMENT KEYNOTES#

DN

DN

DN

ABCDEFGHIJKLM

NO

PQR

S

TU

54321

D

C

B

A

US Army Corps of Engineers New England District

IS

SU

E D

AT

E:

SO

LI

C

IT

AT

IO

N N

U M

BE

R

SHEET ID

C O

N

TR

AC

T

N U

M

BE

R

54321

C

AD

D C

O D

E:

W

2W J2

6C A0

E

Pr og re ss

P rin t

No t f or C on st ru ct io n

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

205 W Welsh Dr Douglassville, PA 19518

610-385-8500

N

EW

E N

G

LA

N D

D

IS

TR

IC

T

VI

R G

IN

IA

R O

AD

C

O N

C O

R D

, M

AS

SA

C

H U

SE

TT

S

ST

V

H D

R U

SM

A

Jo in t V en tu re

W W el sh

D r., D ou gl as sv ille

, P A

0-

5-

W

ES

T

PO

IN

T, N

EW

Y O

R K

TH

A

YE

R

H A

LL

B

U

IL

D

IN

G

R

EN

O

VA

TI

O N

R

TA

D

EM

O

LI

TI

O

N P

AC

KA

G E:

JU

LY

B601

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

AP

PR

D

ES

IG

N

ED

B

Y:

D R

AW

N

B Y:

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

SI

ZE

PL

O T

SC

AL

E:

AR

C H

E

AS

N O

TE

D

Fi le

P at h:

Pl ot D at e:

PLAN

NORTH

KEY PLAN

A Joint Venture

/1

3/

M . D

EL

AN

EY

M . W

EY

D

T

D . A

N D

R

EW

S

M . D

EL

AN

EY

A B

A

TE

M

EN

T

PL

A N

S

EC

O N

D F

LO

HA003

ABATEMENT PLAN - SECOND FLOOR - OVERALLB1

1. ASBESTOS ABATEMENT WORK MUST BE PERFORMED IN ACCORDANCE

WITH APPLICABLE GOVERNMENT REGULATIONS. THE CONTRACTOR MUST

USE MANUAL WET METHODS TO CONTROL THE RELEASE OF DUST WHEN

PERFORMING THE REMOVAL OF ALL ASBESTOS AND NON-ASBESTOS

MATERIALS FROM THE WORK AREA.

2. INTERIOR ASBESTOS REMOVAL WORK MUST BE CONDUCTED WITHIN A

NEGATIVE PRESSURE ENCLOSURE. A NEGATIVE AIR PRESSURE OF AT

LEAST -0.02 INCHES OF WATER COLUMN, AS MEASURED AT ANY WORK

AREA PERIMETER LOCATION, MUST BE PROVIDED DURING ASBESTOS

REMOVAL. NEGATIVE AIR PRESSURE MUST BE CREATED IN THE WORK

AREA USING HEPA FILTERED EXHAUST AND EXHAUSTED TO THE

OUTDOORS. THESE HEPA FILTERED EXHAUST UNITS WILL BE USED TO

GENERATE AT LEAST FOUR AIR CHANGES PER HOUR INSIDE THE WORK

AREA. NEGATIVE AIR PRESSURE IN THE WORK AREA MUST BE

CONTINUOUSLY MONITORED THROUGH THE USE OF DIGITAL MANOMETERS

POSTED OUTSIDE THE WORK AREA.

3. THE CONTRACTOR MUST REMOVE HAZARDOUS MATERIALS THAT EXIST

WITHIN WORK AREAS PRIOR TO DISTURBANCE. REFER TO PROJECT

ABATEMENT DESIGN DOCUMENTS FOR FURTHER INFORMATION. REFER TO

SPECIFICATIONS, 02.82.00 FOR ASBESTOS, AND 03.83.00 FOR LEAD (Pb

REMOVAL REQUIREMENTS.

4. VISIBLE MOLD IS PRESENT IN THE BUILDING. REFER TO MABBETT &

ASSOCIATES REGULATED BUILDING MATERIALS SURVEY REPORT DATED

FEBRUARY 2, 2026 FOR ADDITIONAL INFORMATION. REFER TO MOLD

SPECIFICATION 02.85.00 FOR REMOVAL REQUIREMENTS.

5. SYMBOLS SHOWING LOCATIONS OF ASBESTOS CONTAINING MATERIALS

ARE APPROXIMATE AND NOT TO SCALE. THEY ARE FOR REFERENCE ONLY.

6. WORK AREAS WERE SURVEYED TO IDENTIFY HAZARDOUS MATERIALS.

REFER TO MABBETT & ASSOCIATES REGULATED BUILDING MATERIALS

SURVEY REPORT DATED FEBRUARY 9, 2026, IN SPECIFICATIONS, 02.82.00

FOR ADDITIONAL INFORMATION. NOT ALL AREAS MAY HAVE BEEN

ACCESSIBLE AND HAZARDOUS MATERIALS MAY EXIST WHICH HAVE NOT

BEEN IDENTIFIED. IF SUSPECT MATERIALS ARE DISCOVERED WHICH HAVE

NOT BEEN PREVIOUSLY IDENTIFIED, THE CONTRACTOR MUST NOT

DISTURB THOSE MATERIALS AND MUST IMMEDIATELY NOTIFY THE

CONTRACTING OFFICER.

7. ELEVATOR BRAKE PADS ARE KNOWN TO CONTAIN ASBESTOS AND ARE

ASSUMED AND WILL REQUIRE ABATEMENT IF DISTURBED.

8. FIRE DOORS ARE KNOWN TO CONTAIN ASBESTOS AND ARE ASSUMED AND

WILL REQUIRE ABATEMENT IF DISTURBED.

9. HIDDEN PLUMBING SYSTEM INSULATION AND MUDDED FITTINGS ARE

CONSIDERED TO BE SUSPECT MATERIALS AND MAY CONTAIN ASBESTOS.

THE ABATEMENT CONTRACTOR MUST REFER TO DEMOLITION PLANS FOR

LOCATION OF PLUMBING FIXTURES AND ASSUME SUSPECT MATERIAL IS

POSITIVE UNTIL LAB RESULTS PROVE OTHERWISE. IF PLUMBING

INSULATION IS DETERMINED TO CONTAIN ASBESTOS THE ABATEMENT

CONTRACTOR MUST REMOVE WALL AND CEILING MATERIAL AS REQUIRED

TO ACCESS CONCEALED PLUMBING THAT MAY BE IMPACTED BY THE

SCOPE OF WORK.

10. OSHA LEAD (Pb) REGULATIONS WILL APPLY TO ANY DEMOLITION

OPERATION (I.E. SANDING, SCRAPING, CUTTING, AND WELDING) THAT

WOULD DISTURB PAINTED SURFACES WHICH CONTAIN LEAD. EXPOSURE

TO LEAD IN THE CONSTRUCTION INDUSTRY IS REGULATED BY OSHA's

LEAD IN CONSTRUCTION REGULATION (29 CFR 1926.62), AS WELL AS

APPLICABLE STATE REGULATIONS. REFER TO SPECIFICATION FOR

FURTHER INFORMATION.

11. LEAD WASTE IS SUBJECT TO THE USEPA RESOURCE CONSERVATION AND

RECOVERY ACT (RCRA) REGULATIONS (40 CFR PART 260 - 273)

HAZARDOUS WASTE. REFER TO SPECIFICATIONS FOR FURTHER

INFORMATION.

01 THE ABATEMENT CONTRACTOR SHALL REMOVE AND DISPOSE OF

ASBESTOS CONTAINING THERMAL SYSTEM INSULATION (TSI) AND

MUDDED FITTINGS AS ACM. THE CONTRACTOR SHALL REMOVE

WALL AND CEILING MATERIAL AS REQUIRED TO ACCESS ALL

CONCEALED PIPING.

02 THE ABATEMENT CONTRACTOR SHALL REMOVE AND DISPOSE OF ALL

LAYERS OF FLOOR TILE AND FLOOR TILE, MASTIC, ADHESIVE AND

LEVELER AS ACM THROUGHOUT THE ENTIRE BUILDING.

03 THE ABATEMENT CONTRACTOR SHALL REMOVE AND DISPOSE OF ALL

LAYERS OF CARPET AND CARPET ADHESIVE AND LEVELER AS ACM.

06 THE ABATEMENT CONTRACTOR SHALL REMOVE AND DISPOSE OF GRAY

SINK COAT AS ACM.

08 THE ABATEMENT CONTRACTOR SHALL REMOVE AND DISPOSE OF GRAY

SPRAY-ON FIREPROOFING AS ACM.

09 THE ABATEMENT CONTRACTOR SHALL REMOVE AND DISPOSE OF

ACOUSTICAL INSULATION AS ACM.

10 THE ABATEMENT CONTRACTOR SHALL REMOVE AND DISPOSE OF

AUDITORIUM LOBBY WALL PANE ADHESIVE AS ACM.

11 THE ABATEMENT CONTRACTOR SHALL REMOVE AND DISPOSE OF WHITE

VIBRATION CLOTH AS ACM.

13 THE ABATEMENT CONTRACTOR SHALL REMOVE AND DISPOSE OF

EXTERIOR WHITE AND GRAY WINDOW CAULK AS ACM.

14 THE ABATEMENT CONTRACTOR SHALL REMOVE AND DISPOSE OF

EXTERIOR WHITE AND GRAY WINDOW GLAZE AS ACM.

21 NOT IN SCOPE

01 01

01 01

02 03

10 13

13 14

13 14

13 14

13 14

13 14

ABCDEFGHIJKLMNOPQRSTU

54321

D

C

B

A

US Army Corps of Engineers New England District

IS

SU

E D

AT

E:

SO

LI

C

IT

AT

IO

N N

U M

BE

R

SHEET ID

C O

N

TR

AC

T

N U

M

BE

R

54321

C

AD

D C

O D

E:

W

2W J2

6C A0

E

Pr og re ss

P rin t

No t f or C on st ru ct io n

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

205 W Welsh Dr Douglassville, PA 19518

610-385-8500

N

EW

E N

G

LA

N D

D

IS

TR

IC

T

VI

R G

IN

IA

R O

AD

C

O N

C O

R D

, M

AS

SA

C

H U

SE

TT

S

ST

V

H D

R U

SM

A

Jo in t V en tu re

W W el sh

D r., D ou gl as sv ille

, P A

0-

5-

W

ES

T

PO

IN

T, N

EW

Y O

R K

TH

A

YE

R

H A

LL

B

U

IL

D

IN

G

R

EN

O

VA

TI

O N

R

TA

D

EM

O

LI

TI

O

N P

AC

KA

G E:

JU

LY

B601

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

AP

PR

D

ES

IG

N

ED

B

Y:

D R

AW

N

B Y:

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

SI

ZE

PL

O T

SC

AL

E:

AR

C H

E

AS

N O

TE

D

Fi le

P at h:

Pl ot D at e:

PLAN

NORTH

KEY PLAN

A Joint Venture

/1

3/

M . D

EL

AN

EY

M . W

EY

D

T

D . A

N D

R

EW

S

M . D

EL

AN

EY

A B

A

TE

M

EN

T

PL

A N

T H

IR

D

F

LO

HA004

ABATEMENT PLAN - THIRD FLOOR - OVERALLB1

1. ASBESTOS ABATEMENT WORK MUST BE PERFORMED IN ACCORDANCE

WITH APPLICABLE GOVERNMENT REGULATIONS. THE CONTRACTOR MUST

USE MANUAL WET METHODS TO CONTROL THE RELEASE OF DUST WHEN

PERFORMING THE REMOVAL OF ALL ASBESTOS AND NON-ASBESTOS

MATERIALS FROM THE WORK AREA.

2. INTERIOR ASBESTOS REMOVAL WORK MUST BE CONDUCTED WITHIN A

NEGATIVE PRESSURE ENCLOSURE. A NEGATIVE AIR PRESSURE OF AT

LEAST -0.02 INCHES OF WATER COLUMN, AS MEASURED AT ANY WORK

AREA PERIMETER LOCATION, MUST BE PROVIDED DURING ASBESTOS

REMOVAL. NEGATIVE AIR PRESSURE MUST BE CREATED IN THE WORK

AREA USING HEPA FILTERED EXHAUST AND EXHAUSTED TO THE

OUTDOORS. THESE HEPA FILTERED EXHAUST UNITS WILL BE USED TO

GENERATE AT LEAST FOUR AIR CHANGES PER HOUR INSIDE THE WORK

AREA. NEGATIVE AIR PRESSURE IN THE WORK AREA MUST BE

CONTINUOUSLY MONITORED THROUGH THE USE OF DIGITAL MANOMETERS

POSTED OUTSIDE THE WORK AREA.

3. THE CONTRACTOR MUST REMOVE HAZARDOUS MATERIALS THAT EXIST

WITHIN WORK AREAS PRIOR TO DISTURBANCE. REFER TO PROJECT

ABATEMENT DESIGN DOCUMENTS FOR FURTHER INFORMATION. REFER TO

SPECIFICATIONS, 02.82.00 FOR ASBESTOS, AND 03.83.00 FOR LEAD (Pb)

REMOVAL REQUIREMENTS.

4. VISIBLE MOLD IS PRESENT IN THE BUILDING. REFER TO MABBETT &

ASSOCIATES REGULATED BUILDING MATERIALS SURVEY REPORT DATED

FEBRUARY 2, 2026 FOR ADDITIONAL INFORMATION. REFER TO MOLD

SPECIFICATION 02.85.00 FOR REMOVAL REQUIREMENTS.

5. SYMBOLS SHOWING LOCATIONS OF ASBESTOS CONTAINING MATERIALS

ARE APPROXIMATE AND NOT TO SCALE. THEY ARE FOR REFERENCE ONLY.

6. WORK AREAS WERE SURVEYED TO IDENTIFY HAZARDOUS MATERIALS.

REFER TO MABBETT & ASSOCIATES REGULATED BUILDING MATERIALS

SURVEY REPORT DATED FEBRUARY 9, 2026, IN SPECIFICATIONS, 02.82.00

FOR ADDITIONAL INFORMATION. NOT ALL AREAS MAY HAVE BEEN

ACCESSIBLE AND HAZARDOUS MATERIALS MAY EXIST WHICH HAVE NOT

BEEN IDENTIFIED. IF SUSPECT MATERIALS ARE DISCOVERED WHICH HAVE

NOT BEEN PREVIOUSLY IDENTIFIED, THE CONTRACTOR MUST NOT

DISTURB THOSE MATERIALS AND MUST IMMEDIATELY NOTIFY THE

CONTRACTING OFFICER.

7. ELEVATOR BRAKE PADS ARE KNOWN TO CONTAIN ASBESTOS AND ARE

ASSUMED AND WILL REQUIRE ABATEMENT IF DISTURBED.

8. FIRE DOORS ARE KNOWN TO CONTAIN ASBESTOS AND ARE ASSUMED AND

WILL REQUIRE ABATEMENT IF DISTURBED.

9. HIDDEN PLUMBING SYSTEM INSULATION AND MUDDED FITTINGS ARE

CONSIDERED TO BE SUSPECT MATERIALS AND MAY CONTAIN ASBESTOS.

THE ABATEMENT CONTRACTOR MUST REFER TO DEMOLITION PLANS FOR

LOCATION OF PLUMBING FIXTURES AND ASSUME SUSPECT MATERIAL IS

POSITIVE UNTIL LAB RESULTS PROVE OTHERWISE. IF PLUMBING

INSULATION IS DETERMINED TO CONTAIN ASBESTOS THE ABATEMENT

CONTRACTOR MUST REMOVE WALL AND CEILING MATERIAL AS REQUIRED

TO ACCESS CONCEALED PLUMBING THAT MAY BE IMPACTED BY THE

SCOPE OF WORK.

10. OSHA LEAD (Pb) REGULATIONS WILL APPLY TO ANY DEMOLITION

OPERATION (I.E. SANDING, SCRAPING, CUTTING, AND WELDING) THAT

WOULD DISTURB PAINTED SURFACES WHICH CONTAIN LEAD. EXPOSURE

TO LEAD IN THE CONSTRUCTION INDUSTRY IS REGULATED BY OSHA's

LEAD IN CONSTRUCTION REGULATION (29 CFR 1926.62), AS WELL AS

APPLICABLE STATE REGULATIONS. REFER TO SPECIFICATION FOR

FURTHER INFORMATION.

11. LEAD WASTE IS SUBJECT TO THE USEPA RESOURCE CONSERVATION AND

RECOVERY ACT (RCRA) REGULATIONS (40 CFR PART 260 - 273)

HAZARDOUS WASTE. REFER TO SPECIFICATIONS FOR FURTHER

INFORMATION.

01 THE ABATEMENT CONTRACTOR SHALL REMOVE AND DISPOSE OF

ASBESTOS CONTAINING THERMAL SYSTEM INSULATION (TSI) AND

MUDDED FITTINGS AS ACM. THE CONTRACTOR SHALL REMOVE WALL AND

CEILING MATERIAL AS REQUIRED TO ACCESS ALL CONCEALED PIPING.

02 THE ABATEMENT CONTRACTOR SHALL REMOVE AND DISPOSE OF ALL

LAYERS OF FLOOR TILE AND FLOOR TILE, MASTIC, ADHESIVE AND

LEVELER AS ACM THROUGHOUT THE ENTIRE BUILDING.

03 THE ABATEMENT CONTRACTOR SHALL REMOVE AND DISPOSE OF ALL

LAYERS OF CARPET AND CARPET ADHESIVE AND LEVELER AS ACM.

05 THE ABATEMENT CONTRACTOR SHALL REMOVE AND DISPOSE OF BLACK

AND BROWN STICK PIN ADHESIVE AS ACM.

08 THE ABATEMENT CONTRACTOR SHALL REMOVE AND DISPOSE OF GRAY

SPRAY-ON FIREPROOFING AS ACM.

09 THE ABATEMENT CONTRACTOR SHALL REMOVE AND DISPOSE OF

ACOUSTICAL INSULATION AS ACM.

10 THE ABATEMENT CONTRACTOR SHALL REMOVE AND DISPOSE OF

AUDITORIUM LOBBY WALL PANE ADHESIVE AS ACM.

13 THE ABATEMENT CONTRACTOR SHALL REMOVE AND DISPOSE OF

EXTERIOR WHITE AND GRAY WINDOW CAULK AS ACM.

14 THE ABATEMENT CONTRACTOR SHALL REMOVE AND DISPOSE OF

EXTERIOR WHITE AND GRAY WINDOW GLAZE AS ACM.

15 THE ABATEMENT CONTRACTOR SHALL REMOVE AND DISPOSE OF

INTERIOR WINDOW GLAZING COMPOUND ON OLD WINDOWS AS ACM.

21 NOT IN SCOPE

02 03

13 14

13 14

13 14

13 14

13 14

13 14

PQR

S

TU

54321

D

C

B

A

US Army Corps of Engineers New England District

IS

SU

E D

AT

E:

SO

LI

C

IT

AT

IO

N N

U M

BE

R

SHEET ID

C O

N

TR

AC

T

N U

M

BE

R

54321

C

AD

D C

O D

E:

W

2W J2

6C A0

E

Pr og re ss

P rin t

No t f or C on st ru ct io n

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

205 W Welsh Dr Douglassville, PA 19518

610-385-8500

N

EW

E N

G

LA

N D

D

IS

TR

IC

T

VI

R G

IN

IA

R O

AD

C

O N

C O

R D

, M

AS

SA

C

H U

SE

TT

S

ST

V

H D

R U

SM

A

Jo in t V en tu re

W W el sh

D r., D ou gl as sv ille

, P A

0-

5-

W

ES

T

PO

IN

T, N

EW

Y O

R K

TH

A

YE

R

H A

LL

B

U

IL

D

IN

G

R

EN

O

VA

TI

O N

R

TA

D

EM

O

LI

TI

O

N P

AC

KA

G E:

JU

LY

B601

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

AP

PR

D

ES

IG

N

ED

B

Y:

D R

AW

N

B Y:

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

SI

ZE

PL

O T

SC

AL

E:

AR

C H

E

AS

N O

TE

D

Fi le

P at h:

Pl ot D at e:

PLAN

NORTH

KEY PLAN

A Joint Venture

/1

3/

M . D

EL

AN

EY

M . W

EY

D

T

D . A

N D

R

EW

S

M . D

EL

AN

EY

A B

A

TE

M

EN

T

PL

A N

F O

U R

TH

F

LO

HA005

ABATEMENT PLAN - FOURTH FLOOR - OVERALLB1

1. ASBESTOS ABATEMENT WORK MUST BE PERFORMED IN ACCORDANCE

WITH APPLICABLE GOVERNMENT REGULATIONS. THE CONTRACTOR MUST

USE MANUAL WET METHODS TO CONTROL THE RELEASE OF DUST WHEN

PERFORMING THE REMOVAL OF ALL ASBESTOS AND NON-ASBESTOS

MATERIALS FROM THE WORK AREA.

2. INTERIOR ASBESTOS REMOVAL WORK MUST BE CONDUCTED WITHIN A

NEGATIVE PRESSURE ENCLOSURE. A NEGATIVE AIR PRESSURE OF AT

LEAST -0.02 INCHES OF WATER COLUMN, AS MEASURED AT ANY WORK

AREA PERIMETER LOCATION, MUST BE PROVIDED DURING ASBESTOS

REMOVAL. NEGATIVE AIR PRESSURE MUST BE CREATED IN THE WORK

AREA USING HEPA FILTERED EXHAUST AND EXHAUSTED TO THE

OUTDOORS. THESE HEPA FILTERED EXHAUST UNITS WILL BE USED TO

GENERATE AT LEAST FOUR AIR CHANGES PER HOUR INSIDE THE WORK

AREA. NEGATIVE AIR PRESSURE IN THE WORK AREA MUST BE

CONTINUOUSLY MONITORED THROUGH THE USE OF DIGITAL MANOMETERS

POSTED OUTSIDE THE WORK AREA.

3. THE CONTRACTOR MUST REMOVE HAZARDOUS MATERIALS THAT EXIST

WITHIN WORK AREAS PRIOR TO DISTURBANCE. REFER TO PROJECT

ABATEMENT DESIGN DOCUMENTS FOR FURTHER INFORMATION. REFER TO

SPECIFICATIONS, 02.82.00 FOR ASBESTOS, AND 03.83.00 FOR LEAD (Pb)

REMOVAL REQUIREMENTS.

4. VISIBLE MOLD IS PRESENT IN THE BUILDING. REFER TO MABBETT &

ASSOCIATES REGULATED BUILDING MATERIALS SURVEY REPORT DATED

FEBRUARY 2, 2026 FOR ADDITIONAL INFORMATION. REFER TO MOLD

SPECIFICATION 02.85.00 FOR REMOVAL REQUIREMENTS.

5. SYMBOLS SHOWING LOCATIONS OF ASBESTOS CONTAINING MATERIALS

ARE APPROXIMATE AND NOT TO SCALE. THEY ARE FOR REFERENCE ONLY.

6. WORK AREAS WERE SURVEYED TO IDENTIFY HAZARDOUS MATERIALS.

REFER TO MABBETT & ASSOCIATES REGULATED BUILDING MATERIALS

SURVEY REPORT DATED FEBRUARY 9, 2026, IN SPECIFICATIONS, 02.82.00

FOR ADDITIONAL INFORMATION. NOT ALL AREAS MAY HAVE BEEN

ACCESSIBLE AND HAZARDOUS MATERIALS MAY EXIST WHICH HAVE NOT

BEEN IDENTIFIED. IF SUSPECT MATERIALS ARE DISCOVERED WHICH HAVE

NOT BEEN PREVIOUSLY IDENTIFIED, THE CONTRACTOR MUST NOT DISTURB

THOSE MATERIALS AND MUST IMMEDIATELY NOTIFY THE CONTRACTING

OFFICER.

7. ELEVATOR BRAKE PADS ARE KNOWN TO CONTAIN ASBESTOS AND ARE

ASSUMED AND WILL REQUIRE ABATEMENT IF DISTURBED.

8. FIRE DOORS ARE KNOWN TO CONTAIN ASBESTOS AND ARE ASSUMED AND

WILL REQUIRE ABATEMENT IF DISTURBED.

9. HIDDEN PLUMBING SYSTEM INSULATION AND MUDDED FITTINGS ARE

CONSIDERED TO BE SUSPECT MATERIALS AND MAY CONTAIN ASBESTOS.

THE ABATEMENT CONTRACTOR MUST REFER TO DEMOLITION PLANS FOR

LOCATION OF PLUMBING FIXTURES AND ASSUME SUSPECT MATERIAL IS

POSITIVE UNTIL LAB RESULTS PROVE OTHERWISE. IF PLUMBING

INSULATION IS DETERMINED TO CONTAIN ASBESTOS THE ABATEMENT

CONTRACTOR MUST REMOVE WALL AND CEILING MATERIAL AS REQUIRED

TO ACCESS CONCEALED PLUMBING THAT MAY BE IMPACTED BY THE

SCOPE OF WORK.

10. OSHA LEAD (Pb) REGULATIONS WILL APPLY TO ANY DEMOLITION

OPERATION (I.E. SANDING, SCRAPING, CUTTING, AND WELDING) THAT

WOULD DISTURB PAINTED SURFACES WHICH CONTAIN LEAD. EXPOSURE

TO LEAD IN THE CONSTRUCTION INDUSTRY IS REGULATED BY OSHA's LEAD

IN CONSTRUCTION REGULATION (29 CFR 1926.62), AS WELL AS APPLICABLE

STATE REGULATIONS. REFER TO SPECIFICATION FOR FURTHER

INFORMATION.

11. LEAD WASTE IS SUBJECT TO THE USEPA RESOURCE CONSERVATION AND

RECOVERY ACT (RCRA) REGULATIONS (40 CFR PART 260 - 273) HAZARDOUS

WASTE. REFER TO SPECIFICATIONS FOR FURTHER INFORMATION.

01 THE ABATEMENT CONTRACTOR SHALL REMOVE AND DISPOSE OF

ASBESTOS CONTAINING THERMAL SYSTEM INSULATION (TSI) AND

MUDDED FITTINGS AS ACM. THE CONTRACTOR SHALL REMOVE WALL

AND CEILING MATERIAL AS REQUIRED TO ACCESS ALL CONCEALED

PIPING.

02 THE ABATEMENT CONTRACTOR SHALL REMOVE AND DISPOSE OF ALL

LAYERS OF FLOOR TILE AND FLOOR TILE, MASTIC, ADHESIVE AND

LEVELER AS ACM THROUGHOUT THE ENTIRE BUILDING.

03 THE ABATEMENT CONTRACTOR SHALL REMOVE AND DISPOSE OF ALL

LAYERS OF CARPET AND CARPET ADHESIVE AND LEVELER AS ACM.

05 THE ABATEMENT CONTRACTOR SHALL REMOVE AND DISPOSE OF BLACK

AND BROWN STICK PIN ADHESIVE AS ACM.

08 THE ABATEMENT CONTRACTOR SHALL REMOVE AND DISPOSE OF GRAY

SPRAY-ON FIREPROOFING AS ACM.

09 THE ABATEMENT CONTRACTOR SHALL REMOVE AND DISPOSE OF

ACOUSTICAL INSULATION AS ACM.

10 THE ABATEMENT CONTRACTOR SHALL REMOVE AND DISPOSE OF

AUDITORIUM LOBBY WALL PANE ADHESIVE AS ACM.

13 THE ABATEMENT CONTRACTOR SHALL REMOVE AND DISPOSE OF

EXTERIOR WHITE AND GRAY WINDOW CAULK AS ACM.

14 THE ABATEMENT CONTRACTOR SHALL REMOVE AND DISPOSE OF

EXTERIOR WHITE AND GRAY WINDOW GLAZE AS ACM.

15 THE ABATEMENT CONTRACTOR SHALL REMOVE AND DISPOSE OF

INTERIOR WINDOW GLAZING COMPOUND ON OLD WINDOWS AS ACM.

21 NOT IN SCOPE

02 03

05 05 05 05

05050505

13 14

13 14

13 14

13 1413 1413 14

13 14

PQR

S

TU

54321

D

C

B

A

US Army Corps of Engineers New England District

IS

SU

E D

AT

E:

SO

LI

C

IT

AT

IO

N N

U M

BE

R

SHEET ID

C O

N

TR

AC

T

N U

M

BE

R

54321

C

AD

D C

O D

E:

W

2W J2

6C A0

E

Pr og re ss

P rin t

No t f or C on st ru ct io n

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

205 W Welsh Dr Douglassville, PA 19518

610-385-8500

N

EW

E N

G

LA

N D

D

IS

TR

IC

T

VI

R G

IN

IA

R O

AD

C

O N

C O

R D

, M

AS

SA

C

H U

SE

TT

S

ST

V

H D

R U

SM

A

Jo in t V en tu re

W W el sh

D r., D ou gl as sv ille

, P A

0-

5-

W

ES

T

PO

IN

T, N

EW

Y O

R K

TH

A

YE

R

H A

LL

B

U

IL

D

IN

G

R

EN

O

VA

TI

O N

R

TA

D

EM

O

LI

TI

O

N P

AC

KA

G E:

JU

LY

B601

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

AP

PR

D

ES

IG

N

ED

B

Y:

D R

AW

N

B Y:

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

SI

ZE

PL

O T

SC

AL

E:

AR

C H

E

AS

N O

TE

D

Fi le

P at h:

Pl ot D at e:

PLAN

NORTH

KEY PLAN

A Joint Venture

SCALE: 1/16" = 1'-0"

ABATEMENT PLAN - ROOF - OVERALLB1

/1

3/

M . D

EL

AN

EY

M . W

EY

D

T

D . A

N D

R

EW

S

M . D

EL

AN

EY

A B

A

TE

M

EN

T

PL

A N

R O

O F

HA006

1. ASBESTOS ABATEMENT WORK MUST BE PERFORMED IN ACCORDANCE

WITH APPLICABLE GOVERNMENT REGULATIONS. THE CONTRACTOR MUST

USE MANUAL WET METHODS TO CONTROL THE RELEASE OF DUST WHEN

PERFORMING THE REMOVAL OF ALL ASBESTOS AND NON-ASBESTOS

MATERIALS FROM THE WORK AREA.

2. INTERIOR ASBESTOS REMOVAL WORK MUST BE CONDUCTED WITHIN A

NEGATIVE PRESSURE ENCLOSURE. A NEGATIVE AIR PRESSURE OF AT

LEAST -0.02 INCHES OF WATER COLUMN, AS MEASURED AT ANY WORK

AREA PERIMETER LOCATION, MUST BE PROVIDED DURING ASBESTOS

REMOVAL. NEGATIVE AIR PRESSURE MUST BE CREATED IN THE WORK

AREA USING HEPA FILTERED EXHAUST AND EXHAUSTED TO THE

OUTDOORS. THESE HEPA FILTERED EXHAUST UNITS WILL BE USED TO

GENERATE AT LEAST FOUR AIR CHANGES PER HOUR INSIDE THE WORK

AREA. NEGATIVE AIR PRESSURE IN THE WORK AREA MUST BE

CONTINUOUSLY MONITORED THROUGH THE USE OF DIGITAL MANOMETERS

POSTED OUTSIDE THE WORK AREA.

3. THE CONTRACTOR MUST REMOVE HAZARDOUS MATERIALS THAT EXIST

WITHIN WORK AREAS PRIOR TO DISTURBANCE. REFER TO PROJECT

ABATEMENT DESIGN DOCUMENTS FOR FURTHER INFORMATION. REFER TO

SPECIFICATIONS, 02.82.00 FOR ASBESTOS, AND 03.83.00 FOR LEAD (Pb)

REMOVAL REQUIREMENTS.

4. VISIBLE MOLD IS PRESENT IN THE BUILDING. REFER TO MABBETT &

ASSOCIATES REGULATED BUILDING MATERIALS SURVEY REPORT DATED

FEBRUARY 2, 2026 FOR ADDITIONAL INFORMATION. REFER TO MOLD

SPECIFICATION 02.85.00 FOR REMOVAL REQUIREMENTS.

5. SYMBOLS SHOWING LOCATIONS OF ASBESTOS CONTAINING MATERIALS

ARE APPROXIMATE AND NOT TO SCALE. THEY ARE FOR REFERENCE ONLY.

6. WORK AREAS WERE SURVEYED TO IDENTIFY HAZARDOUS MATERIALS.

REFER TO MABBETT & ASSOCIATES REGULATED BUILDING MATERIALS

SURVEY REPORT DATED FEBRUARY 9, 2026, IN SPECIFICATIONS, 02.82.00

FOR ADDITIONAL INFORMATION. NOT ALL AREAS MAY HAVE BEEN

ACCESSIBLE AND HAZARDOUS MATERIALS MAY EXIST WHICH HAVE NOT

BEEN IDENTIFIED. IF SUSPECT MATERIALS ARE DISCOVERED WHICH HAVE

NOT BEEN PREVIOUSLY IDENTIFIED, THE CONTRACTOR MUST NOT DISTURB

THOSE MATERIALS AND MUST IMMEDIATELY NOTIFY THE CONTRACTING

OFFICER.

7. ELEVATOR BRAKE PADS ARE KNOWN TO CONTAIN ASBESTOS AND ARE

ASSUMED AND WILL REQUIRE ABATEMENT IF DISTURBED.

8. FIRE DOORS ARE KNOWN TO CONTAIN ASBESTOS AND ARE ASSUMED AND

WILL REQUIRE ABATEMENT IF DISTURBED.

9. HIDDEN PLUMBING SYSTEM INSULATION AND MUDDED FITTINGS ARE

CONSIDERED TO BE SUSPECT MATERIALS AND MAY CONTAIN ASBESTOS.

THE ABATEMENT CONTRACTOR MUST REFER TO DEMOLITION PLANS FOR

LOCATION OF PLUMBING FIXTURES AND ASSUME SUSPECT MATERIAL IS

POSITIVE UNTIL LAB RESULTS PROVE OTHERWISE. IF PLUMBING

INSULATION IS DETERMINED TO CONTAIN ASBESTOS THE ABATEMENT

CONTRACTOR MUST REMOVE WALL AND CEILING MATERIAL AS REQUIRED

TO ACCESS CONCEALED PLUMBING THAT MAY BE IMPACTED BY THE

SCOPE OF WORK.

10. OSHA LEAD (Pb) REGULATIONS WILL APPLY TO ANY DEMOLITION

OPERATION (I.E. SANDING, SCRAPING, CUTTING, AND WELDING) THAT

WOULD DISTURB PAINTED SURFACES WHICH CONTAIN LEAD. EXPOSURE

TO LEAD IN THE CONSTRUCTION INDUSTRY IS REGULATED BY OSHA's LEAD

IN CONSTRUCTION REGULATION (29 CFR 1926.62), AS WELL AS APPLICABLE

STATE REGULATIONS. REFER TO SPECIFICATION FOR FURTHER

INFORMATION.

11. LEAD WASTE IS SUBJECT TO THE USEPA RESOURCE CONSERVATION AND

RECOVERY ACT (RCRA) REGULATIONS (40 CFR PART 260 - 273) HAZARDOUS

WASTE. REFER TO SPECIFICATIONS FOR FURTHER INFORMATION.

17 THE ABATEMENT CONTRACTOR SHALL REMOVE AND DISPOSE OF SILVER

PAINT ON ROOF LEVEL STAIRS AS ACM.

18 THE ABATEMENT CONTRACTOR SHALL REMOVE AND DISPOSE OF BLACK

FLASHING MATERIAL ON ROOF AS ACM.

19 THE ABATEMENT CONTRACTOR SHALL REMOVE AND DISPOSE OF LIGHT

GRAY CAULK ON ROOF CAPSTONES AS ACM.

20 THE ABATEMENT CONTRACTOR SHALL REMOVE AND DISPOSE OF BLACK

CAULK ON ROOF LEVEL AS ACM.

21 NOT IN SCOPE

2017201720

54321

D

C

B

A

US Army Corps of Engineers New England District

IS

SU

E D

AT

E:

SO

LI

C

IT

AT

IO

N N

U M

BE

R

SHEET ID

C O

N

TR

AC

T

N U

M

BE

R

54321

C

AD

D C

O D

E:

W

2W J2

6C A0

E

Pr og re ss

P rin t

No t f or C on st ru ct io n

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

205 W Welsh Dr Douglassville, PA 19518

610-385-8500

N

EW

E N

G

LA

N D

D

IS

TR

IC

T

VI

R G

IN

IA

R O

AD

C

O N

C O

R D

, M

AS

SA

C

H U

SE

TT

S

ST

V

H D

R U

SM

A

Jo in t V en tu re

W W el sh

D r., D ou gl as sv ille

, P A

0-

5-

W

ES

T

PO

IN

T, N

EW

Y O

R K

TH

A

YE

R

H A

LL

B

U

IL

D

IN

G

R

EN

O

VA

TI

O N

R

TA

D

EM

O

LI

TI

O

N P

AC

KA

G E:

JU

LY

B601

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

AP

PR

D

ES

IG

N

ED

B

Y:

D R

AW

N

B Y:

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

SI

ZE

PL

O T

SC

AL

E:

AR

C H

E

AS

N O

TE

D

Fi le

P at h:

Pl ot D at e:

A Joint Venture

G

EN

ER

A

L N

O

TE

S, L

EG

EN

D

A N

D A

B B

R

EV

IA

TI

O N

S

1. THESE ABBREVIATIONS APPLY TO THE ENTIRE SET OF

CONTRACT DRAWINGS.

2. LISTING OF ABBREVIATIONS DOES NOT IMPLY THAT ALL

ABBREVIATIONS ARE USED IN THE CONTRACT DRAWINGS.

3. ABBREVIATIONS SHOWN ON THIS SHEET INCLUDE

VARIATIONS OF A WORD. FOR EXAMPLE, "MOD" MAY

MEAN MODIFY OR MODIFICATION; "INC" MAY MEAN

INCLUDED OR INCLUDING AND "REINF" MAY MEAN EITHER

REINFORCE OR REINFORCING.

4. SEE INSTRUMENTATION LEGEND SHEET FOR

PROJECT-SPECIFIC EQUIPMENT SYMBOLS, EQUIPMENT

ABBREVIATIONS, AND PIPING SYSTEM ABBREVIATIONS.

SYS

T&B T&G T

TA

TAN

TBM

TC

TCE

T.D.

TEF

TEMP.

THD

THK

THRESH

TKBD

TOB

TOC

TOD

TOF

TOG

TOL

TOM

TOP

TOPO

TOS

TP

TPD

TPG

TR

TRANS

TRD

TYP.

TW

U

UG

ULT

UNFN

UNO

USAG-WP

UTIL

V

VA

VAC

VAR

VB

VC

VCP

VCT

VEL

VENT

VERT

VERTS

VG

VIF

VIN

VOL

VPC

VPI

VPT

VS

VTR

VWC

W/ W/O W

WB

WC

WD

WF

WG

WH

WI

WL

WLD

WM

WP

WS

WSCT

WT

WTHP

WWF

XP

XS

XSECT

XXS

YH

YS

SYSTE…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .