2026.07.13_Thayer Hall_RTA Demo Drawings.pdf
PDF 43 MB Posted
- Attached to
- Industry Day for the Thayer Hall Demolition and Construction Project at West Point Academy
- Solicitation number
- Not on record
About this file
This is a Demolition and Deconstruction Package design drawing set for the Thayer Hall Building 601 Renovation project at the United States Military Academy, West Point, New York. The contract number is W912WJ26CA002, issued by the U.S. Army Corps of Engineers New England District on July 13, 2026, for Project #7800007. The demolition scope encompasses selective demolition of the majority of a 4-story, approximately 321,013 square-foot stone-clad steel-framed academic building, with specific elements to remain including the north and south exterior walls, three large east-side buttresses, the first-floor slab, foundations, under-slab utility tunnel, and an active boiler chimney connected to the adjacent Central Power Plant. The project includes demolition of three pedestrian bridges spanning the western moat, temporary chiller installation to serve Bartlett Hall due to demolition of existing chilled water piping, rock anchoring and rock drape installation on the adjacent northeast cliff, and all associated incidental work.
The drawing set comprises comprehensive hazardous materials abatement plans, civil/site logistics plans, structural demolition and shoring plans, architectural demolition plans with elevations and sections, mechanical/plumbing/electrical demolition plans, and site details for erosion and sediment control. The project requires asbestos abatement work using manual wet methods in negative pressure enclosures with HEPA-filtered exhaust generating at least four air changes per hour, with continuous digital manometer monitoring. Additional hazardous materials include lead-containing painted surfaces, mold, and suspect materials in plumbing systems. The contractor must coordinate with CSX Railroad for track crossing, verify existing utility locations by contacting 811 and West Point DPW at least 30 days prior to excavation, manage an approximate 5.64-acre area of disturbance with erosion and sediment control measures implemented prior to soil-disturbing activities, and maintain a Stormwater Pollution Prevention Plan on-site. Key staging areas include D Lot, River Courts, and a transfer station salvage storage area. An Industry Day event is scheduled for August 6, 2026, to solicit input from general contractors regarding project execution under a Construction Manager at Risk Other Transaction Agreement authority.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
54321
D
C
B
A
US Army Corps of Engineers New England District
IS
S
U E
D A
T E
S O
L
IC
IT
A
T
IO
N N
U M
B E
R
D E
S
IG
N E
D B
Y
D R
A W
N B
Y
S U
B M
IT
T
E D
B Y
SHEET ID
C H
E C
K E
D B
Y
C O
N T
R A
C T
N U
M B
E R
S
IZ
E
P L
O T
S C
A L E
A R
C H
E
54321
C A
D D
C O
D E
W W
J C
A
A S
N O
T E
D
E
F ile
P a th
P lo t D a te
P ro g re s s P ri n t
N o t fo r C o n s tr u c ti o n
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
205 W Welsh Dr Douglassville, PA 19518
610-385-8500
N E
W E
N G
L A
N D
D
IS
T R
IC
T
V
IR
G
IN
IA
R O
A D
C O
N C
O R
D M
A S
S A
C H
U S
E T
T S
S T
V H
D R
U S
M A
J o in t V e n tu re W
W e ls h D r.
D o u g la s s v ill e P
A
-3
-8
W E
S T
P O
IN
T
N
E W
Y O
R K
T H
A Y
E R
H A
L L
B U
IL
D
IN
G
R
E N
O V
A T
IO
N
B601
A u to d e s k D o c s /1
U
S A
C E
T h a y e r_
H a ll_
R e n /W
P T
H R
-A -D
E M
O -C
E N
T R
A L .r v t
/1
/2
:1
:5
P
M
G-001
W M
O S
E R
W M
O S
E R
W M
O S
E R
/1
/2
C O
V E
R S
H E
E T
.0
R
N E
F F
R T
A D
E M
O L
IT
IO
N
P A
C K
A G
E
J
U L Y
WEST POINT, NEW YORK
THAYER HALL BUILDING 601 RENOVATION
DEMOLITION / DECONSTRUCTION PACKAGE
PROJECT # 7800007
NEW ENGLAND DISTRICT
US Army Corps of Engineers ®
SOLICITATION NO.:
CONTRACT NO.: W912WJ26CA002
ISSUE DATE: 07/13/26
VOLUME: 1 OF 1
STRUCTURAL / MEP
STV
205 W WELSH DR.
DOUGLASSVILLE, PA 19518
610-385-8500
ARCHITECTURAL / SITE
HDR
1800 AMERICAN BLVD., SUITE 100
PENNINGTON, NJ 08534
609-844-1212
VICINITY MAP LOCATION MAP
GENERAL
G-001 COVER SHEET
G-002 GENERAL NOTES, ABBREVIATIONS
DRAWING LIST
PROJECT LOCATION
PROJECT LOCATION
HAZARDOUS MATERIALS
HA001 ABATEMENT PLAN BASEMENT
HA002 ABATEMENT PLAN FIRST FLOOR
HA003 ABATEMENT PLAN SECOND FLOOR
HA004 ABATEMENT PLAN THIRD FLOOR
HA005 ABATEMENT PLAN FOURTH FLOOR
HA006 ABATEMENT PLAN ROOF
CIVIL
C-001 GENERAL NOTES, LEGEND, AND ABBREVIATIONS
C-002 SITE LOGISTICS PLAN OVERALL
C-003 SITE LOGISTICS PLAN
C-004 SITE LOGISTICS PLAN
C-005 PHOTOGRAPH LOCATION MAP
C-006 PHOTOGRAPHS
C-007 TRUCK ACCESS PLAN
C-008 CONSTRUCTION PHASING - PHASE 1
C-009 CONSTRUCTION PHASING - PHASE 2
C-010 CONSTRUCTION PHASING - PHASE 3
C-011 CONSTRUCTION PHASING - PHASE 4
V-100 EXISTING CONDITIONS PLAN - OVERALL
V-101 EXISTING CONDITIONS PLAN - CULLUM ROAD
V-102 EXISTING CONDITIONS PLAN - THAYER HALL MOAT
V-103 EXISTING CONDITIONS PLAN - RIVER COURTS
CD100 DEMOLITION PLAN - OVERALL
CD101 DEMOLITION PLAN - CULLUM ROAD
CD102 DEMOLITION PLAN - THAYER HALL MOAT
CD103 DEMOLITION PLAN - RIVER COURTS
CE100 EROSION & SEDIMENT CONTROL PLAN - OVERALL
CE101 EROSION & SEDIMENT CONTROL PLAN - CULLUM ROAD
CE102 EROSION & SEDIMENT CONTROL PLAN - THAYER HALL MOAT
CE103 EROSION & SEDIMENT CONTROL PLAN - RIVER COURTS
CE104 EROSION & SEDIMENT CONTROL PLAN - D LOT
CE105 EROSION & SEDIMENT CONTROL PLAN - TRANSFER STATION
C-501 EROSION & SEDIMENT CONTROL DETAILS
C-502 SITE DETAILS
GENERAL NOTE
1. ARCHITECTURAL BACKGROUNDS SHOWN ARE BASED ON A LEGACY,
OWNER-FURNISHED MODEL ORIGINALLY PREPARED BY OTHERS IN 2018.
THE MODEL IS NON-CURRENT AND IS USED SOLELY AS A VISUAL
REFERENCE TO ILLUSTRATE THE GENERAL DEMOLITION SCOPE. THE
MODEL SHALL NOT BE RELIED UPON FOR ACCURACY, DIMENSIONS,
QUANTITIES, GEOMETRY, OR EXISTING CONDITIONS. NO CONSTRUCTION,
DEMOLITION MEANS, OR QUANTITIES SHALL BE DERIVED FROM THIS
MODEL. AN UPDATED ARCHITECTURAL BACKGROUND WILL BE
INCORPORATED IN FUTURE SUBMISSIONS WHEN AVAILABLE.
N N
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E A
P P
R
STRUCTURAL
SD001 STRUCTURAL GENERAL NOTES
SD002 STRUCTURAL DESIGN CRITERIA
SD003 STRUCTURAL SPECIAL INSPECTION STATEMENT
SD101 PHASE I DEMOLITION - FIRST FLOOR
SD102 PHASE I DEMOLITION - SECOND FLOOR
SD103 PHASE I DEMOLITION - THIRD FLOOR
SD104 PHASE I DEMOLITION - FOURTH FLOOR
SD105 PHASE I DEMOLITION - ROOF
SD110 SHORING CONSTRUCTION - FOUNDATION PLAN
SD111 SHORING CONSTRUCTION - FIRST FLOOR
SD112 SHORING CONSTRUCTION - SECOND FLOOR
SD113 SHORING CONSTRUCTION - THIRD FLOOR
SD114 SHORING CONSTRUCTION - FOURTH FLOOR
SD121 PHASE II DEMOLITION - FIRST FLOOR
SD122 PHASE II DEMOLITION - SECOND FLOOR
SD123 PHASE II DEMOLITION - THIRD FLOOR
SD124 PHASE II DEMOLITION - FOURTH FLOOR
SD125 PHASE II DEMOLITION - ROOF
SD201 SOUTH WALL ELEVATION
SD202 EAST WALL ELEVATION
SD203 NORTH WALL ELEVATION
SD301 SHORING SECTION
SD302 SHORING SECTION
SD501 STRUCTURAL FOUNDATION DETAILS
SD502 STRUCTURAL CONCRETE DETAILS
SD503 STRUCTURAL STEEL DETAILS
SD504 DEMOLITION DETAILS
SD505 MISCELLANEOUS STRUCTURAL DETAILS
ARCHITECTURAL
AD000 ARCHITECTURE DEMOLITION NOTES, ABBREVIATIONS
AD100 TUNNEL FLOOR DEMOLITION PLAN
AD101 FIRST FLOOR DEMOLITION PLAN
AD102 SECOND FLOOR DEMOLITION PLAN
AD103 THIRD FLOOR DEMOLITION PLAN
AD104 FOURTH FLOOR DEMOLITION PLAN
AD105 FIFTH FLOOR DEMOLITION PLAN
AD201 DEMOLITION ELEVATIONS - NORTH AND SOUTH
AD202 DEMOLITION ELEVATIONS - EAST
AD203 DEMOLITION ELEVATIONS - WEST
AD301 DEMOLITION SECTIONS - BUILDING CROSS
AD302 DEMOLITION SECTIONS - BUILING LONGITUDINAL
AD401 SOUTH TOWER DEMOLITION PLANS
AD402 SOUTH TOWER DEMOLITION PLANS
AD403 NORTH TOWER DEMOLITION PLANS
AD404 NORTH TOWER DEMOLITION PLANS
AD405 EAST FACADE DEMOLITION PLANS
AD406 EAST FACADE DEMOLITION PLANS
AD407 EAST FACADE DEMOLITION PLANS
AD410 PEDESTRIAN BRIDGE - JEFFERSON PLACE DEMOLITION
AD411 PEDESTRIAN BRIDGE - CULLUM ROAD DEMOLITION
AD412 PEDESTRIAN BRIDGE - BREWERTON ROAD DEMOLITION
AD500 DEMOLITION DETAILS
AD600 SALVAGE INVENTORY
A-100 TUNNEL FLOOR END STATE PLAN
A-101 FIRST FLOOR END STATE PLAN
A-201 END STATE ELEVATIONS - NORTH AND SOUTH
A-202 END STATE ELEVATIONS - EAST
A-500 END STATE DETAILS
MECHANICAL
M-001 MECHANICAL GENERAL NOTES AND ABBREVIATIONS
MD100 TUNNEL LEVEL DEMOLITION PLAN - SOUTH
MD101 TUNNEL LEVEL DEMOLITION PLAN - NORTH
MD102 COURTYARD POWERPLANT DEMOLITION PLAN
MD103 FIRST FLOOR DEMOLITION PLAN - SOUTH
MD104 FIRST FLOOR DEMOLITION PLAN - NORTH
MD105 SECOND FLOOR DEMOLITION PLAN - SOUTH
MD106 SECOND FLOOR DEMOLITION PLAN - NORTH
MD107 THIRD FLOOR DEMOLITION PLAN - SOUTH
MD108 THIRD FLOOR DEMOLITION PLAN - NORTH
MD109 FOURTH FLOOR DEMOLITION PLAN - SOUTH
MD110 FOURTH FLOOR DEMOLITION PLAN - NORTH
MD111 ROOF DEMOLITION PLAN - SOUTH
MD112 ROOF DEMOLITION PLAN - NORTH
MD113 SITE DEMOLITION PLAN
M-100 TUNNEL LEVEL NEW WORK - SOUTH
M-101 TUNNEL LEVEL NEW WORK - NORTH
M-102 SITE NEW WORK PLAN
ELECTRICAL
E-001 LEGEND AND ABBREVIATIONS
ED110 TUNNEL LEVEL DEMOLITION PLAN - SOUTH
ED111 TUNNEL LEVEL DEMOLITION PLAN - NORTH
ED112 FIRST FLOOR DEMOLITION PLAN - SOUTH
ED113 FIRST FLOOR DEMOLITION PLAN - NORTH
ED114 SECOND FLOOR DEMOLITION PLAN - SOUTH
ED115 SECOND FLOOR DEMOLITION PLAN - NORTH
ED116 THIRD FLOOR DEMOLITION PLAN - SOUTH
ED117 THIRD FLOOR DEMOLITION PLAN - NORTH
ED118 FOURTH FLOOR DEMOLITION PLAN - SOUTH
ED119 FOURTH FLOOR DEMOLITION PLAN - NORTH
ED120 ROOF DEMOLITION PLAN - SOUTH
ED121 ROOF DEMOLITION PLAN - NORTH
ED122 POWER PLANT COURTYARD DEMOLITION PLAN
ED601 DEMOLITION ELECTRICAL SINGLE LINE DIAGRAM
E-110 TUNNEL LEVEL NEW WORK PLAN DURING DEMOLITION - SOUTH
E-111 TUNNEL LEVEL NEW WORK PLAN DURING DEMOLITION - NORTH
E-112 POWER PLANT COURTYARD NEW WORK DURING DEMOLITION
E-113 TEMPORARY CHILLER POWER FEED SITE PLAN
E-114 TEMPORARY CHILLER POWER CONDUIT ROUTING VIEWS
E-115 BARTLETT HALL MAIN ELECTRICAL ROOM AND SINGLE LINE
DIAGRAM
PLUMBING
P-001 PLUMBING GENERAL NOTES AND ABBREVIATIONS
PD100 TUNNEL LEVEL DEMOLITION PLAN - SOUTH
PD101 TUNNEL LEVEL DEMOLITION PLAN - NORTH
PD102 FIRST FLOOR DEMOLITION PLAN - SOUTH
PD103 FIRST FLOOR DEMOLITION PLAN - NORTH
PD104 SECOND FLOOR DEMOLITION PLAN - SOUTH
PD105 SECOND FLOOR DEMOLITION PLAN NORTH
PD106 THIRD FLOOR DEMOLITION PLAN - SOUTH
PD107 THIRD FLOOR DEMOLITION PLAN - NORTH
PD108 FOURTH FLOOR DEMOLITION PLAN - SOUTH
PD109 FOURTH FLOOR DEMOLITION PLAN - NORTH
PD110 ROOF DEMOLITION PLAN - SOUTH
PD111 ROOF DEMOLITION PLAN - NORTH
DRAWING ABBREVIATIONS
INDEX OF DRAWINGS
BUILDING SUMMARY
NUMBERING SYSTEM:
XX100
DISCIPLINE:
G - GENERAL
H - HAZARDOUS MATERIALS
C/V - CIVIL
S - STRUCTURAL
A - ARCHITECTURAL
P - PLUMBING
M - MECHANICAL
E - ELECTRICAL
DISCIPLINE MODIFIER
ANNOTATION CALLOUTS/DRAWING SYMBOLS
GENERAL NOTES
A ---------------------
A LABEL CLASS A DOOR
A/C AIR CONDITION
A/C UNIT AIR CONDITIONING UNIT
A/E ARCHITECT/ENGINEER
AB ANCHOR BOLT
ACC ACCESSIBLE
ACS AUTOMATIC CONTROL SYSTEM
ACS DR ACCESS DOOR
ACS PNL ACCESS PANEL
ACT ACOUSTICAL CEILING TILE
ADA AMERICANS WITH DISABILITIES
ACT
ADMIN ADMINISTRATION
AFC ABOVE FINISHED COUNTER
AFF ABOVE FINISHED FLOOR
AFG ABOVE FINISHED GRADE
AFS ABOVE FINISHED SLAB
AGGR AGGREGATE
AHU AIR HANDLING UNIT
AIB AIR INFILTRATION BARRIER
ALT ALTERNATE
ALUM ALUMINUM
ANOD ANODIZE
APC ACOUSTICAL PANEL CEILING
APPROX APPROXIMATE
AR AS REQUIRED
ARCH ARCHITECT
ASC ABOVE SUSPENDED CEILING
ASSY ASSEMBLY
ATC ACOUSTICAL TILE CEILING
AVG AVERAGE
AW ARCHITECTURAL WOODWORK
AWT ACOUSTICAL WALL TREATMENT
B ---------------------
B LABEL CLASS B DOOR
BALC BALCONY
BB BASEBOARD
BC BOOKCASE
BD BOARD
BDRY BOUNDARY
BFF BELOW FINISH FLOOR
BHMA BUILDER'S HARDWARE
MANUFACTURER'S
ASSOCIATION
BLDG BUILDING
BLKG BLOCKING
BLT IN BUILT-IN
BN BULLNOSE
BOS BOTTOM OF STEEL
BOT BOTTOM
BP BUILDING PAPER
BRKT BRACKET
BSMT BASEMENT
BTWN BETWEEN
BUR BUILT-UP ROOFING
C ---------------------
C CONC CAST CONCRETE
C LABEL CLASS C DOOR
CAB CABINET
CATW CATWALK
CAV CAVITY
CBB CEMENTITIOUS (BACKER)
BOARD
CD CONSTRUCTION DOCUMENTS
CDW CHILLED DRINKING WATER
CEM PLAS CEMENT PLASTER
CER CERAMIC
CF CONTRACTOR FURNISHED
CF/CI CONTRACTOR
FURNISHED/CONTRACTOR
INSTALLED
CFE CONTRACTOR FURNISHED
EQUIPMENT
CFLG COUNTERFLASHING
CFM CUBIC FEET PER MINUTE
CFMF COLD-FORMED METAL
FRAMING
CFS CUBIC FEET PER SECOND
CG CORNER GUARD
CI CAST IRON
CIP CAST-IN-PLACE
CJ CONTROL JOINT
CL CENTER LINE
CLG CEILING
CLG DIFF CEILING DIFFUSER
CLG HT CEILING HEIGHT
CLL COLUMN LINE
CLO CLOSET
CLR COLOR
CLRM CLASSROOM
CMU CONCRETE MASONRY UNIT
CNDS CONDENSATE
CDR CARD READER
CO CLEANOUT
COL COLUMN
COMM COMMUNICATION
CONC CONCRETE
CONC FLR CONCRETE FLOOR
CONF CONFERENCE
CONT CONTINUE
COORD COORDINATE
CORR CORRIDOR
CP CONCRETE PIPE
CPT CARPET
CR CONTROL ROOM
CS CAST STONE
CSWK CASEWORK
CT CERAMIC TILE
CTB CERAMIC TILE BASE
CTF CERAMIC TILE FLOOR
CTR CENTER
CU FT CUBIC FEET
CW CASEMENT WINDOW
D ---------------------
D DEPTH
D LABEL CLASS D DOOR
DBL DOUBLE
DEMO DEMOLITION
DEPT DEPARTMENT
DET DETAIL
DIA DIAMETER
DIR DIRECTION
DIST DISTANCE
DOC DOCUMENT
DR DOOR
DS DOWNSPOUT
E ---------------------
E LABEL CLASS E DOOR
EA EACH
EF EACH FACE
EIFS EXTERIOR INSULATION AND
FINISH SYSTEM
EJ EXPANSION JOINT
ES EACH SIDE
EL ELEVATION
ELEV ELEVATOR
ENTR ENTRANCE
EPS EXPANDED POLYSTYRENE
BOARD (INSULATION)
EQ EQUAL
EWC ELECTRIC WATER COOLER
EXP EXPOSED
EXT EXTERIOR
EXT EXTINGUISHER
EXT GR EXTERIOR GRADE
F ---------------------
FA FIRE ALARM
FAAP FIRE ALARM ANNUNCIATOR
PANEL
FAS BD FASCIA BOARD
FC BRK FACE BRICK
FCO FLOOR CLEANOUT
FD FLOOR DRAIN
FDTN FOUNDATION
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER CABINET
FED FEDERAL
FF FINISH FACE
FF EL FINISH FLOOR ELEVATION
FF INSUL FOIL BACKED INSULATION
FGL FIBERGLASS
FH FIRE HOSE
FHP FULL HEIGHT PARTITION
FIN FINISH
FIN BS FINISH BOTH SIDES
FIN FLR FINISH FLOOR
FIN GR FINISH GRADE
FIXT FIXTURE
FLDG FOLDING
FLEX FLEXIBLE
FLG FLOORING
FLMT FLUSH MOUNT
FLR FLOOR
FM FACTORY MUTUAL
FOC FACE OF CONCRETE
FOM FACE OF MASONRY
FR FIRE RESISTANT
FRG FIBER REINFORCED GYPSUM
FRMG FRAMING
FRP FIBERGLASS REINFORCED
PLASTIC
FRTW FIRE RETARDANT TREATED
WOOD
FS FEDERAL SPECIFICATION
FSTNR FASTENER
FT FEET
FTG FOOTING
FWC FABRIC WALLCOVERING
G ---------------------
G NATURAL GAS
GALV GALVANIZED
GB GRAB BAR
GFCI GOVERNMENT FURNISHED
CONTRACTOR INSTALLED
GFGI GOVERNMENT INSTALLED
GOVERNMENT INSTALLED
GFRG GLASS-FIBER-REINFORCED
GYPSUM
GLZ GLAZING
GR FL GROUND FLOOR
GUT GUTTER
GYP BD GYPSUM BOARD
GYP PLAS GYPSUM PLASTER
H ---------------------
HB HOSE BIBB
HDPE HIGH DENSITY POLYETHYLENE
HDW HARDWARE
HDWD HARDWOOD
HEPA HIGH EFFICIENCY PARTICULATE
AIR (FILTER)
HM HOLLOW METAL
HMD HOLLOW METAL DOOR
HORIZ HORIZONTAL
HT HEIGHT
HYDR HYDRAULIC
I ---------------------
IBC INTERNATIONAL BUILDING
CODE
INSUL INSULATION
INT INTERIOR
ILO IN LIEU OF
J ---------------------
JAN JANITOR
K ---------------------
KPD KEYPAD
KIT KITCHEN
KPL KICKPLATE
L ---------------------
LAM LAMINATE
LAV LAVATORY
LBR LUMBER
LBS POUND
LDG LANDING
LF LINEAR FEET (FOOT)
LIB LIBRARY
LIN LINEAR
LKR LOCKER
LOC LOCATION
LT LIGHT
LVDR LOUVER DOOR
LVR LOUVER
M ---------------------
MACH RM MACHINE ROOM
MATL MATERIAL
MAX MAXIMUM
MC MOISTURE CONTENT
MD METAL DECK
MECH MECHANICAL
MECH RM MECHANICAL ROOM
MEMB MEMBRANE
MF MILL FINISH
MFR MANUFACTURER
MID MIDDLE
MIL STD MILITARY STANDARD
MIN MINIMUM, MINUTE
MIRR MIRROR
MISC MISCELLANEOUS
MLDG MOLDING (MOULDING)
MO MASONRY OPENING
MOD MODIFY
MB MOISTURE BARRIER
MTG MOUNTING
MTL METAL
MVBL MOVABLE
MWP MEMBRANE WATERPROOFING
N ---------------------
N NORTH
NA NOT APPLICABLE
NFPA NATIONAL FIRE PROTECTION
ASSOCIATION
NIC NOT IN CONTRACT
NO NUMBER
NOM NOMINAL
NP NO PAINT
NRC NOISE REDUCTI
O -------------------
OA OVERALL
OC ON CENTER
OD OUTSIDE DIAMETER
OFD OVERFLOW DRAIN
OFF OFFICE
OGL OBSCURE GLASS
OPH OPPOSITE HAND
OPNG OPENING
OPP OPPOSITE
OPQ OPAQUE
OWSJ OPEN WEB STEEL JOIST
OPR OPERABLE
ORD OVERFLOW ROOF DRAIN
ORIG ORIGINAL
P --------------------
PA PUBLIC ADDRESS
PAR PARAPET
PAT PATTERN
PB PULL BOX
PBD PARTICLEBOARD
PCC PRECAST CONCRETE
PCF POUNDS PER CUBIC FOOT
PCT PERCENT
PERF PERFORATED
PERIM PERIMETER
PH PHASE
PIL PILASTER
PL PROPERTY LINE
PL GL PLATE GLASS
PLAM PLASTIC LAMINATE
PLAS PLASTER
PLBG PLUMBING
PLG PILING
PLYWD PLYWOOD
PNL PANEL
PP PL PUSH/PULL PLATE
PR PAIR
PRCST PRECAST
PRKG PARKING
PS CONC PRESTRESSED CONCRETE
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PT PRESSURE TREATED
PTD PAPER TOWEL DISPENSER
PTDR PAPER TOWEL DISPENSER AND
RECEPTACLE
PTN PARTITION
PWR POWER
Q --------------------
QT QUARRY TILE
QTY QUANTITY
R --------------------
RB RESILIENT BASE
RBM REINFORCED BRICK MASONR
RBR RUBBER
RC REINFORCED CONCRETE
RCP REFLECTED CEILING PLAN
RD ROOF DRAIN
RDG INS RIGID INSULATION, SOLID
REC RECESSED
REC ROOM RECREATION ROOM
REF REFERENCE
REM REMOVABLE
REP REPAIR
REPL REPLACE
REQ REQUIRE
REQD REQUIRED
RESIL RESILIENT
REST RESTROOM
RF RESILIENT FLOORING
RFG ROOFING
RH ROOF HATCH
RHR RIGHT HAND REVERSE
RL ROOF LEADER
RLG RAILING
RM ROOM
RO ROUGH OPENING
RSD ROLLING STEEL DOOR
RV ROOF VENT
RVL REVEAL
REFER TO A/E/C CAD STANDARD FOR
SHEET NUMBERING STANDARDS
REVISION
TAG
NORTH ARROW w/
TRUE NORTH
INDICATION
ROOM TAG
ELEVATION NUMBER
SECTION
EXTERIOR ELEVATION
ENLARGEMENT,
DETAIL
SPOT ELEVATION
LEVEL NAME
SHEET NUMBER
SHEET NUMBER
SHEET NUMBER
SHEET KEYNOTE
INTERIOR ELEVATION
SHEET NUMBER
S --------------------
SB SPLASH BLOCK
SCHED SCHEDULE
SD SMOKE DETECTOR
SF SQUARE FOOT (FEET)
SFTWD SOFTWOOD
SGL SINGLE
SHT MTL FLASHSHEET METAL (FLASHING)
SHTHG SHEATHING
SHV SHELVING
SIM SIMILAR
SJ SCORED JOINT
SKLT SKYLIGHT
SLNT SEALANT
SMK SMOKE
SMLS SEAMLESS
SP EL SPOT ELEVATION
SPEC SPECIFICATION
SQ SQUARE
SQ IN SQUARE INCH
SQ YD SQUARE YARD
SST STAINLESS STEEL
ST STAIRS
STD STANDARD
STL JST STEEL JOIST
STL RF DK STEEL ROOF DECK
STOR STORAGE
STR STRINGERS
STRB/HRN STROBE/HORN
SUB FL SUBFLOOR
SV SHEET VINYL
SW SIDEWALK
T --------------------
T TREAD
T/S TUB/SHOWER
TC TERRA COTTA
TD TRENCH DRAIN
TEL TELEPHONE
TEMP TEMPORARY
TER TERRAZZO
TFF TOP OF FINISH FLOOR
THK THICKNESS
TK BD TACKBOARD
TMPD GL TEMPERED GLASS
TN TRUE NORTH
TOF TOP OF FOOTING
TOM TOP OF MASONRY
TOP TOP OF PARAPET
TOPO TOPOGRAPHY
TOS TOP OF SLAB
TRANS TRANSOM
TRTD TREATED
TV TELEVISION
SHEET NUMBER WITHIN SERIES
A201
A204
A301
A401
ROOM
100'
LEVEL 01
100'
A
PROJECT NORTH
1. INFORMATION SHOWN ON THESE DRAWINGS IS BASED ON FIELD OBSERVATIONS AND EXISTING
DOCUMENTS. ALL DIMENSIONS ARE APPROXIMATE. THE CONTRACTOR SHALL VERIFY EXISTING
CONDITIONS AND DIMENSIONS PRIOR TO COMMENCING WORK AND SHALL NOTIFY THE
ARCHITECT OF ANY DISCREPANCIES.
2. INCLUDE ALL DEMOLITION WORK REQUIRED TO COMPLETE THE PROJECT, WHETHER OR NOT
SPECIFICALLY INDICATED. REMOVE ALL ITEMS SCHEDULED FOR DEMOLITION IN THEIR
ENTIRETY, INCLUDING ALL FRAMING, FASTENERS, ACCESSORIES, HARDWARE, AND
ASSOCIATED COMPONENTS.
3. PROVIDE CONTINUOUS PROTECTION OF PERSONS AND PROPERTY THROUGHOUT THE WORK
IN ACCORDANCE WITH OSHA REQUIREMENTS. ANY UNSAFE CONDITIONS OR MATERIALS
ENCOUNTERED SHALL BE IMMEDIATELY REPORTED TO THE OWNER’S REPRESENTATIVE AND
PROPERLY SECURED. PROVIDE BARRICADES, SHORING, BRACING, TEMPORARY WALLS, AND
OTHER MEASURES NECESSARY TO PREVENT INJURY OR COLLAPSE.
4. PROVIDE ALL BRACING, SHORING, AND SUPPORT REQUIRED TO MAINTAIN THE STRUCTURAL
INTEGRITY OF THE BUILDING AND AFFECTED STRUCTURES DURING DEMOLITION.
5. PERFORM DEMOLITION IN A MANNER THAT PREVENTS DAMAGE TO MATERIALS, EQUIPMENT,
AND FINISHES TO REMAIN. CONTROL DUST AND DEBRIS. ANY DAMAGE CAUSED BY DEMOLITION
SHALL BE REPAIRED OR REPLACED TO MATCH EXISTING CONDITIONS USING APPROVED
MATERIALS.
6. WHERE DEMOLITION RESULTS IN INTERRUPTION OF UTILITIES OR SERVICES TO REMAINING
AREAS, PROVIDE TEMPORARY OR PERMANENT REROUTING AS REQUIRED TO MAINTAIN
CONTINUOUS OPERATION WITHOUT CONFLICTING WITH NEW WORK.
7. MATERIALS AND EQUIPMENT DESIGNATED AS SALVAGE SHALL BE TURNED OVER TO THE
OWNER AS DIRECTED. ITEMS TO BE RELOCATED SHALL BE CAREFULLY DISMANTLED, STORED
TO PREVENT DAMAGE OR DETERIORATION, CLEANED, AND TESTED PRIOR TO REINSTALLATION.
8. DO NOT ALLOW DEBRIS TO ACCUMULATE ON SITE. REMOVE REGULARLY. MATERIAL NOT
DESIGNATED FOR SALVAGE OR REUSE SHALL BE LEGALLY DISPOSED OF OFF SITE. SALE OR
BURNING OF MATERIALS ON SITE IS PROHIBITED.
9. PATCH ALL SURFACES AND PENETRATIONS RESULTING FROM DEMOLITION TO MATCH
ADJACENT EXISTING OR NEW CONSTRUCTION. CLEAN ALL REMAINING SURFACES OF
ADHESIVES, SEALANTS, DIRT, AND DEBRIS, LEAVING SURFACES READY FOR NEW WORK.
1. THE WORK INCLUDES BUT IS NOT LIMITED TO THE SELECTIVE DEMOLITION OF
THE MAJORITY OF B601 THAYER HALL, WHICH IS A 4-STORY, APPROXIMATELY
321,013SF STONE-CLAD STEEL-FRAMED ACADEMIC BUILDING CONSISTING OF A
ROOFTOP PARKING DECK AND EXTERIOR HISTORIC STONE WALLS. THE
EXISTING NORTH AND SOUTH WALLS AND THREE (3) LARGE BUTTRESSES ON
THE EAST SIDE OF THE BUILDING WILL REMAIN, AS WELL AS THE FIRST-FLOOR
SLAB, FOUNDATIONS, UNDER-SLAB ACTIVE UTILITY TUNNEL, AND ACTIVE
BOILER CHIMNEY IN THE SOUTHEAST TOWER WHICH IS CONNECTED TO THE
ADJACENT BUILDING 604 CENTRAL POWER PLANT. SELECT PORTIONS OF THE
HISTORIC EXTERIOR FAÇADE AND OTHER ELEMENTS WILL BE SALVAGED FOR
STORAGE OR RE-USE. THREE BRIDGES SPANNING OVER THE "MOAT" ON THE
WEST SIDE OF B601 WILL ALSO BE DEMOLISHED AS PART OF THIS
PROJECT. TEMPORARY CHILLERS WILL BE PROVIDED TO SERVE BARTLETT
HALL BECAUSE THE EXISTING CHILLED WATER SUPPLY AND RETURN PIPING
CURRENTLY RUNS THROUGH THAYER HALL AND WILL BE DEMOLISHED AS
PART OF THIS PROJECT. ROCK ANCHORING AND ROCK DRAPES MUST BE
INSTALLED ON THE ADJACENT CLIFF GENERALLY ON THE NORTHEAST SIDE OF
THE PROJECT SITE. ALL INCIDENTAL RELATED WORK ASSOCIATED WITH THE
ABOVE IS ALSO INCLUDED.
54321
D
C
B
A
US Army Corps of Engineers New England District
IS
S
U E
D A
T E
S O
L
IC
IT
A
T
IO
N N
U M
B E
R
D E
S
IG
N E
D B
Y
D R
A W
N B
Y
S U
B M
IT
T
E D
B Y
SHEET ID
C H
E C
K E
D B
Y
C O
N T
R A
C T
N U
M B
E R
S
IZ
E
P L
O T
S C
A L E
A R
C H
E
54321
C A
D D
C O
D E
W W
J C
A
A S
N O
T E
D
E
F ile
P a th
P lo t D a te
P ro g re s s P ri n t
N o t fo r C o n s tr u c ti o n
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
205 W Welsh Dr Douglassville, PA 19518
610-385-8500
N E
W E
N G
L A
N D
D
IS
T R
IC
T
V
IR
G
IN
IA
R O
A D
C O
N C
O R
D M
A S
S A
C H
U S
E T
T S
S T
V H
D R
U S
M A
J o in t V e n tu re W
W e ls h D r.
D o u g la s s v ill e P
A
-3
-8
W E
S T
P O
IN
T
N
E W
Y O
R K
T H
A Y
E R
H A
L L
B U
IL
D
IN
G
R
E N
O V
A T
IO
N
B601
A u to d e s k D o c s /1
U
S A
C E
T h a y e r_
H a ll_
R e n /W
P T
H R
-A -D
E M
O -C
E N
T R
A L .r v t
/1
/2
:1
:5
P
M
G-002
W M
O S
E R
W M
O S
E R
W M
O S
E R
/1
/2
G E
N E
R A
L N
O T
E S
A
B B
R E
V
IA
T
IO
N S
.0
R
N E
F F
R T
A D
E M
O L
IT
IO
N
P A
C K
A G
E
J
U L Y
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E A
P P
R
ABCDEFGHIJKLM
NO
PQR
S
TU
54321
D
C
B
A
US Army Corps of Engineers New England District
IS
SU
E D
AT
E:
SO
LI
C
IT
AT
IO
N N
U M
BE
R
SHEET ID
C O
N
TR
AC
T
N U
M
BE
R
54321
C
AD
D C
O D
E:
W
2W J2
6C A0
E
Pr og re ss
P rin t
No t f or C on st ru ct io n
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
205 W Welsh Dr Douglassville, PA 19518
610-385-8500
N
EW
E N
G
LA
N D
D
IS
TR
IC
T
VI
R G
IN
IA
R O
AD
C
O N
C O
R D
, M
AS
SA
C
H U
SE
TT
S
ST
V
H D
R U
SM
A
Jo in t V en tu re
W W el sh
D r., D ou gl as sv ille
, P A
0-
5-
W
ES
T
PO
IN
T, N
EW
Y O
R K
TH
A
YE
R
H A
LL
B
U
IL
D
IN
G
R
EN
O
VA
TI
O N
R
TA
D
EM
O
LI
TI
O
N P
AC
KA
G E:
JU
LY
B601
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
AP
PR
D
ES
IG
N
ED
B
Y:
D R
AW
N
B Y:
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
SI
ZE
PL
O T
SC
AL
E:
AR
C H
E
AS
N O
TE
D
Fi le
P at h:
Pl ot D at e:
PLAN
NORTH
KEY PLAN
A Joint Venture
SCALE: 1/16" = 1'-0"
ABATEMENT PLAN - BASEMENT - OVERALLB1
/1
3/
M . D
EL
AN
EY
M . W
EY
D
T
D . A
N D
R
EW
S
M . D
EL
AN
EY
A B
A
TE
M
EN
T
PL
A N
B A
SE
M
EN
T
HA001
1. ASBESTOS ABATEMENT WORK MUST BE PERFORMED IN ACCORDANCE
WITH APPLICABLE GOVERNMENT REGULATIONS. THE CONTRACTOR MUST
USE MANUAL WET METHODS TO CONTROL THE RELEASE OF DUST WHEN
PERFORMING THE REMOVAL OF ALL ASBESTOS AND NON-ASBESTOS
MATERIALS FROM THE WORK AREA.
2. INTERIOR ASBESTOS REMOVAL WORK MUST BE CONDUCTED WITHIN A
NEGATIVE PRESSURE ENCLOSURE. A NEGATIVE AIR PRESSURE OF AT
LEAST -0.02 INCHES OF WATER COLUMN, AS MEASURED AT ANY WORK
AREA PERIMETER LOCATION, MUST BE PROVIDED DURING ASBESTOS
REMOVAL. NEGATIVE AIR PRESSURE MUST BE CREATED IN THE WORK
AREA USING HEPA FILTERED EXHAUST AND EXHAUSTED TO THE
OUTDOORS. THESE HEPA FILTERED EXHAUST UNITS WILL BE USED TO
GENERATE AT LEAST FOUR AIR CHANGES PER HOUR INSIDE THE WORK
AREA. NEGATIVE AIR PRESSURE IN THE WORK AREA MUST BE
CONTINUOUSLY MONITORED THROUGH THE USE OF DIGITAL MANOMETERS
POSTED OUTSIDE THE WORK AREA.
3. THE CONTRACTOR MUST REMOVE HAZARDOUS MATERIALS THAT EXIST
WITHIN WORK AREAS PRIOR TO DISTURBANCE. REFER TO PROJECT
ABATEMENT DESIGN DOCUMENTS FOR FURTHER INFORMATION. REFER TO
SPECIFICATIONS, 02.82.00 FOR ASBESTOS, AND 03.83.00 FOR LEAD (Pb)
REMOVAL REQUIREMENTS.
4. VISIBLE MOLD IS PRESENT IN THE BUILDING. REFER TO MABBETT &
ASSOCIATES REGULATED BUILDING MATERIALS SURVEY REPORT DATED
FEBRUARY 2, 2026 FOR ADDITIONAL INFORMATION. REFER TO MOLD
SPECIFICATION 02.85.00 FOR REMOVAL REQUIREMENTS.
5. SYMBOLS SHOWING LOCATIONS OF ASBESTOS CONTAINING MATERIALS
ARE APPROXIMATE AND NOT TO SCALE. THEY ARE FOR REFERENCE ONLY.
GENERAL ABATEMENT NOTES
050505
6. WORK AREAS WERE SURVEYED TO IDENTIFY HAZARDOUS MATERIALS.
REFER TO MABBETT & ASSOCIATES REGULATED BUILDING MATERIALS
SURVEY REPORT DATED FEBRUARY 9, 2026, IN SPECIFICATIONS, 02.82.00
FOR ADDITIONAL INFORMATION. NOT ALL AREAS MAY HAVE BEEN
ACCESSIBLE AND HAZARDOUS MATERIALS MAY EXIST WHICH HAVE NOT
BEEN IDENTIFIED. IF SUSPECT MATERIALS ARE DISCOVERED WHICH
HAVE NOT BEEN PREVIOUSLY IDENTIFIED, THE CONTRACTOR MUST NOT
DISTURB THOSE MATERIALS AND MUST IMMEDIATELY NOTIFY THE
CONTRACTING OFFICER.
7. ELEVATOR BRAKE PADS ARE KNOWN TO CONTAIN ASBESTOS AND ARE
ASSUMED AND WILL REQUIRE ABATEMENT IF DISTURBED.
8. FIRE DOORS ARE KNOWN TO CONTAIN ASBESTOS AND ARE ASSUMED
AND WILL REQUIRE ABATEMENT IF DISTURBED.
9. HIDDEN PLUMBING SYSTEM INSULATION AND MUDDED FITTINGS ARE
CONSIDERED TO BE SUSPECT MATERIALS AND MAY CONTAIN ASBESTOS.
THE ABATEMENT CONTRACTOR MUST REFER TO DEMOLITION PLANS FOR
LOCATION OF PLUMBING FIXTURES AND ASSUME SUSPECT MATERIAL IS
POSITIVE UNTIL LAB RESULTS PROVE OTHERWISE. IF PLUMBING
INSULATION IS DETERMINED TO CONTAIN ASBESTOS THE ABATEMENT
CONTRACTOR MUST REMOVE WALL AND CEILING MATERIAL AS REQUIRED
TO ACCESS CONCEALED PLUMBING THAT MAY BE IMPACTED BY THE
SCOPE OF WORK.
10. OSHA LEAD (Pb) REGULATIONS WILL APPLY TO ANY DEMOLITION
OPERATION (I.E. SANDING, SCRAPING, CUTTING, AND WELDING) THAT
WOULD DISTURB PAINTED SURFACES WHICH CONTAIN LEAD. EXPOSURE
TO LEAD IN THE CONSTRUCTION INDUSTRY IS REGULATED BY OSHA's
LEAD IN CONSTRUCTION REGULATION (29 CFR 1926.62), AS WELL AS
APPLICABLE STATE REGULATIONS. REFER TO SPECIFICATION FOR
FURTHER INFORMATION.
11. LEAD WASTE IS SUBJECT TO THE USEPA RESOURCE CONSERVATION AND
RECOVERY ACT (RCRA) REGULATIONS (40 CFR PART 260 - 273)
HAZARDOUS WASTE. REFER TO SPECIFICATIONS FOR FURTHER
INFORMATION.
ABATEMENT KEYNOTES#
01 THE ABATEMENT CONTRACTOR SHALL REMOVE AND DISPOSE OF
ASBESTOS CONTAINING THERMAL SYSTEM INSULATION (TSI) AND
MUDDED FITTINGS AS ACM. THE CONTRACTOR SHALL REMOVE WALL
AND CEILING MATERIAL AS REQUIRED TO ACCESS ALL CONCEALED
PIPING.
05 THE ABATEMENT CONTRACTOR SHALL REMOVE AND DISPOSE OF BLACK
AND BROWN STICK PIN ADHESIVE AS ACM.
12 THE ABATEMENT CONTRACTOR SHALL REMOVE AND DISPOSE OF METAL
GRATE CAULK AS ACM.
21 NOT IN SCOPE
ABCDEFGHIJKLMNOPQRSTU
54321
D
C
B
A
US Army Corps of Engineers New England District
IS
SU
E D
AT
E:
SO
LI
C
IT
AT
IO
N N
U M
BE
R
SHEET ID
C O
N
TR
AC
T
N U
M
BE
R
54321
C
AD
D C
O D
E:
W
2W J2
6C A0
E
Pr og re ss
P rin t
No t f or C on st ru ct io n
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
205 W Welsh Dr Douglassville, PA 19518
610-385-8500
N
EW
E N
G
LA
N D
D
IS
TR
IC
T
VI
R G
IN
IA
R O
AD
C
O N
C O
R D
, M
AS
SA
C
H U
SE
TT
S
ST
V
H D
R U
SM
A
Jo in t V en tu re
W W el sh
D r., D ou gl as sv ille
, P A
0-
5-
W
ES
T
PO
IN
T, N
EW
Y O
R K
TH
A
YE
R
H A
LL
B
U
IL
D
IN
G
R
EN
O
VA
TI
O N
R
TA
D
EM
O
LI
TI
O
N P
AC
KA
G E:
JU
LY
B601
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
AP
PR
D
ES
IG
N
ED
B
Y:
D R
AW
N
B Y:
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
SI
ZE
PL
O T
SC
AL
E:
AR
C H
E
AS
N O
TE
D
Fi le
P at h:
Pl ot D at e:
PLAN
NORTH
KEY PLAN
A Joint Venture
/1
3/
M . D
EL
AN
EY
M . W
EY
D
T
D . A
N D
R
EW
S
M . D
EL
AN
EY
A B
A
TE
M
EN
T
PL
A N
F
IR
ST
F
LO
O
HA002
SCALE: 1/16" = 1'-0"
ABATEMENT PLAN - FIRST FLOOR - OVERALLB1
1. ASBESTOS ABATEMENT WORK MUST BE PERFORMED IN ACCORDANCE
WITH APPLICABLE GOVERNMENT REGULATIONS. THE CONTRACTOR MUST
USE MANUAL WET METHODS TO CONTROL THE RELEASE OF DUST WHEN
PERFORMING THE REMOVAL OF ALL ASBESTOS AND NON-ASBESTOS
MATERIALS FROM THE WORK AREA.
2. INTERIOR ASBESTOS REMOVAL WORK MUST BE CONDUCTED WITHIN A
NEGATIVE PRESSURE ENCLOSURE. A NEGATIVE AIR PRESSURE OF AT
LEAST -0.02 INCHES OF WATER COLUMN, AS MEASURED AT ANY WORK
AREA PERIMETER LOCATION, MUST BE PROVIDED DURING ASBESTOS
REMOVAL. NEGATIVE AIR PRESSURE MUST BE CREATED IN THE WORK
AREA USING HEPA FILTERED EXHAUST AND EXHAUSTED TO THE
OUTDOORS. THESE HEPA FILTERED EXHAUST UNITS WILL BE USED TO
GENERATE AT LEAST FOUR AIR CHANGES PER HOUR INSIDE THE WORK
AREA. NEGATIVE AIR PRESSURE IN THE WORK AREA MUST BE
CONTINUOUSLY MONITORED THROUGH THE USE OF DIGITAL MANOMETERS
POSTED OUTSIDE THE WORK AREA.
3. THE CONTRACTOR MUST REMOVE HAZARDOUS MATERIALS THAT EXIST
WITHIN WORK AREAS PRIOR TO DISTURBANCE. REFER TO PROJECT
ABATEMENT DESIGN DOCUMENTS FOR FURTHER INFORMATION. REFER TO
SPECIFICATIONS, 02.82.00 FOR ASBESTOS, AND 03.83.00 FOR LEAD (Pb)
REMOVAL REQUIREMENTS.
4. VISIBLE MOLD IS PRESENT IN THE BUILDING. REFER TO MABBETT &
ASSOCIATES REGULATED BUILDING MATERIALS SURVEY REPORT DATED
FEBRUARY 2, 2026 FOR ADDITIONAL INFORMATION. REFER TO MOLD
SPECIFICATION 02.85.00 FOR REMOVAL REQUIREMENTS.
5. SYMBOLS SHOWING LOCATIONS OF ASBESTOS CONTAINING MATERIALS
ARE APPROXIMATE AND NOT TO SCALE. THEY ARE FOR REFERENCE ONLY.
6. WORK AREAS WERE SURVEYED TO IDENTIFY HAZARDOUS MATERIALS.
REFER TO MABBETT & ASSOCIATES REGULATED BUILDING MATERIALS
SURVEY REPORT DATED FEBRUARY 9, 2026, IN SPECIFICATIONS, 02.82.00
FOR ADDITIONAL INFORMATION. NOT ALL AREAS MAY HAVE BEEN
ACCESSIBLE AND HAZARDOUS MATERIALS MAY EXIST WHICH HAVE NOT
BEEN IDENTIFIED. IF SUSPECT MATERIALS ARE DISCOVERED WHICH HAVE
NOT BEEN PREVIOUSLY IDENTIFIED, THE CONTRACTOR MUST NOT DISTURB
THOSE MATERIALS AND MUST IMMEDIATELY NOTIFY THE CONTRACTING
OFFICER.
7. ELEVATOR BRAKE PADS ARE KNOWN TO CONTAIN ASBESTOS AND ARE
ASSUMED AND WILL REQUIRE ABATEMENT IF DISTURBED.
8. FIRE DOORS ARE KNOWN TO CONTAIN ASBESTOS AND ARE ASSUMED AND
WILL REQUIRE ABATEMENT IF DISTURBED.
9. HIDDEN PLUMBING SYSTEM INSULATION AND MUDDED FITTINGS ARE
CONSIDERED TO BE SUSPECT MATERIALS AND MAY CONTAIN ASBESTOS.
THE ABATEMENT CONTRACTOR MUST REFER TO DEMOLITION PLANS FOR
LOCATION OF PLUMBING FIXTURES AND ASSUME SUSPECT MATERIAL IS
POSITIVE UNTIL LAB RESULTS PROVE OTHERWISE. IF PLUMBING
INSULATION IS DETERMINED TO CONTAIN ASBESTOS THE ABATEMENT
CONTRACTOR MUST REMOVE WALL AND CEILING MATERIAL AS REQUIRED
TO ACCESS CONCEALED PLUMBING THAT MAY BE IMPACTED BY THE
SCOPE OF WORK.
10. OSHA LEAD (Pb) REGULATIONS WILL APPLY TO ANY DEMOLITION
OPERATION (I.E. SANDING, SCRAPING, CUTTING, AND WELDING) THAT
WOULD DISTURB PAINTED SURFACES WHICH CONTAIN LEAD. EXPOSURE
TO LEAD IN THE CONSTRUCTION INDUSTRY IS REGULATED BY OSHA's LEAD
IN CONSTRUCTION REGULATION (29 CFR 1926.62), AS WELL AS APPLICABLE
STATE REGULATIONS. REFER TO SPECIFICATION FOR FURTHER
INFORMATION.
11. LEAD WASTE IS SUBJECT TO THE USEPA RESOURCE CONSERVATION AND
RECOVERY ACT (RCRA) REGULATIONS (40 CFR PART 260 - 273) HAZARDOUS
WASTE. REFER TO SPECIFICATIONS FOR FURTHER INFORMATION.
01 THE ABATEMENT CONTRACTOR SHALL REMOVE AND DISPOSE OF
ASBESTOS CONTAINING THERMAL SYSTEM INSULATION (TSI) AND
MUDDED FITTINGS AS ACM. THE CONTRACTOR SHALL REMOVE WALL AND
CEILING MATERIAL AS REQUIRED TO ACCESS ALL CONCEALED PIPING.
02 THE ABATEMENT CONTRACTOR SHALL REMOVE AND DISPOSE OF ALL
LAYERS OF FLOOR TILE AND FLOOR TILE, MASTIC, ADHESIVE AND
LEVELER AS ACM THROUGHOUT THE ENTIRE BUILDING.
03 THE ABATEMENT CONTRACTOR SHALL REMOVE AND DISPOSE OF ALL
LAYERS OF CARPET AND CARPET ADHESIVE AND LEVELER AS ACM.
04 THE ABATEMENT CONTRACTOR SHALL REMOVE AND DISPOSE OF
ASBESTOS CONTAINING RADIATOR BACKING MATERIAL AND THERMAL
SYSTEM INSULATION (TSI) AS ACM. THE CONTRACTOR SHALL REMOVE
RADIATOR AS REQUIRED TO ACCESS BACKING MATERIAL AND
CONCEALED PIPING.
07 THE ABATEMENT CONTRACTOR SHALL REMOVE AND DISPOSE OF BROWN
COMPUTER BOARD STAND MASTIC AS ACM.
08 THE ABATEMENT CONTRACTOR SHALL REMOVE AND DISPOSE OF GRAY
SPRAY-ON FIREPROOFING AS ACM.
11 THE ABATEMENT CONTRACTOR SHALL REMOVE AND DISPOSE OF WHITE
VIBRATION CLOTH AS ACM.
13 THE ABATEMENT CONTRACTOR SHALL REMOVE AND DISPOSE OF
EXTERIOR WHITE AND GRAY WINDOW CAULK AS ACM.
14 THE ABATEMENT CONTRACTOR SHALL REMOVE AND DISPOSE OF
EXTERIOR WHITE AND GRAY WINDOW GLAZE AS ACM.
16 THE ABATEMENT CONTRACTOR SHALL REMOVE AND DISPOSE OF
EXTERIOR GRAY DOOR CAULK AS ACM.
21 NOT IN SCOPE
01 01
01 02 03
13 14
13 14
13 14
13 14 13 14
13 14
16 16
GENERAL ABATEMENT NOTES ABATEMENT KEYNOTES#
DN
DN
DN
ABCDEFGHIJKLM
NO
PQR
S
TU
54321
D
C
B
A
US Army Corps of Engineers New England District
IS
SU
E D
AT
E:
SO
LI
C
IT
AT
IO
N N
U M
BE
R
SHEET ID
C O
N
TR
AC
T
N U
M
BE
R
54321
C
AD
D C
O D
E:
W
2W J2
6C A0
E
Pr og re ss
P rin t
No t f or C on st ru ct io n
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
205 W Welsh Dr Douglassville, PA 19518
610-385-8500
N
EW
E N
G
LA
N D
D
IS
TR
IC
T
VI
R G
IN
IA
R O
AD
C
O N
C O
R D
, M
AS
SA
C
H U
SE
TT
S
ST
V
H D
R U
SM
A
Jo in t V en tu re
W W el sh
D r., D ou gl as sv ille
, P A
0-
5-
W
ES
T
PO
IN
T, N
EW
Y O
R K
TH
A
YE
R
H A
LL
B
U
IL
D
IN
G
R
EN
O
VA
TI
O N
R
TA
D
EM
O
LI
TI
O
N P
AC
KA
G E:
JU
LY
B601
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
AP
PR
D
ES
IG
N
ED
B
Y:
D R
AW
N
B Y:
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
SI
ZE
PL
O T
SC
AL
E:
AR
C H
E
AS
N O
TE
D
Fi le
P at h:
Pl ot D at e:
PLAN
NORTH
KEY PLAN
A Joint Venture
/1
3/
M . D
EL
AN
EY
M . W
EY
D
T
D . A
N D
R
EW
S
M . D
EL
AN
EY
A B
A
TE
M
EN
T
PL
A N
S
EC
O N
D F
LO
HA003
ABATEMENT PLAN - SECOND FLOOR - OVERALLB1
1. ASBESTOS ABATEMENT WORK MUST BE PERFORMED IN ACCORDANCE
WITH APPLICABLE GOVERNMENT REGULATIONS. THE CONTRACTOR MUST
USE MANUAL WET METHODS TO CONTROL THE RELEASE OF DUST WHEN
PERFORMING THE REMOVAL OF ALL ASBESTOS AND NON-ASBESTOS
MATERIALS FROM THE WORK AREA.
2. INTERIOR ASBESTOS REMOVAL WORK MUST BE CONDUCTED WITHIN A
NEGATIVE PRESSURE ENCLOSURE. A NEGATIVE AIR PRESSURE OF AT
LEAST -0.02 INCHES OF WATER COLUMN, AS MEASURED AT ANY WORK
AREA PERIMETER LOCATION, MUST BE PROVIDED DURING ASBESTOS
REMOVAL. NEGATIVE AIR PRESSURE MUST BE CREATED IN THE WORK
AREA USING HEPA FILTERED EXHAUST AND EXHAUSTED TO THE
OUTDOORS. THESE HEPA FILTERED EXHAUST UNITS WILL BE USED TO
GENERATE AT LEAST FOUR AIR CHANGES PER HOUR INSIDE THE WORK
AREA. NEGATIVE AIR PRESSURE IN THE WORK AREA MUST BE
CONTINUOUSLY MONITORED THROUGH THE USE OF DIGITAL MANOMETERS
POSTED OUTSIDE THE WORK AREA.
3. THE CONTRACTOR MUST REMOVE HAZARDOUS MATERIALS THAT EXIST
WITHIN WORK AREAS PRIOR TO DISTURBANCE. REFER TO PROJECT
ABATEMENT DESIGN DOCUMENTS FOR FURTHER INFORMATION. REFER TO
SPECIFICATIONS, 02.82.00 FOR ASBESTOS, AND 03.83.00 FOR LEAD (Pb
REMOVAL REQUIREMENTS.
4. VISIBLE MOLD IS PRESENT IN THE BUILDING. REFER TO MABBETT &
ASSOCIATES REGULATED BUILDING MATERIALS SURVEY REPORT DATED
FEBRUARY 2, 2026 FOR ADDITIONAL INFORMATION. REFER TO MOLD
SPECIFICATION 02.85.00 FOR REMOVAL REQUIREMENTS.
5. SYMBOLS SHOWING LOCATIONS OF ASBESTOS CONTAINING MATERIALS
ARE APPROXIMATE AND NOT TO SCALE. THEY ARE FOR REFERENCE ONLY.
6. WORK AREAS WERE SURVEYED TO IDENTIFY HAZARDOUS MATERIALS.
REFER TO MABBETT & ASSOCIATES REGULATED BUILDING MATERIALS
SURVEY REPORT DATED FEBRUARY 9, 2026, IN SPECIFICATIONS, 02.82.00
FOR ADDITIONAL INFORMATION. NOT ALL AREAS MAY HAVE BEEN
ACCESSIBLE AND HAZARDOUS MATERIALS MAY EXIST WHICH HAVE NOT
BEEN IDENTIFIED. IF SUSPECT MATERIALS ARE DISCOVERED WHICH HAVE
NOT BEEN PREVIOUSLY IDENTIFIED, THE CONTRACTOR MUST NOT
DISTURB THOSE MATERIALS AND MUST IMMEDIATELY NOTIFY THE
CONTRACTING OFFICER.
7. ELEVATOR BRAKE PADS ARE KNOWN TO CONTAIN ASBESTOS AND ARE
ASSUMED AND WILL REQUIRE ABATEMENT IF DISTURBED.
8. FIRE DOORS ARE KNOWN TO CONTAIN ASBESTOS AND ARE ASSUMED AND
WILL REQUIRE ABATEMENT IF DISTURBED.
9. HIDDEN PLUMBING SYSTEM INSULATION AND MUDDED FITTINGS ARE
CONSIDERED TO BE SUSPECT MATERIALS AND MAY CONTAIN ASBESTOS.
THE ABATEMENT CONTRACTOR MUST REFER TO DEMOLITION PLANS FOR
LOCATION OF PLUMBING FIXTURES AND ASSUME SUSPECT MATERIAL IS
POSITIVE UNTIL LAB RESULTS PROVE OTHERWISE. IF PLUMBING
INSULATION IS DETERMINED TO CONTAIN ASBESTOS THE ABATEMENT
CONTRACTOR MUST REMOVE WALL AND CEILING MATERIAL AS REQUIRED
TO ACCESS CONCEALED PLUMBING THAT MAY BE IMPACTED BY THE
SCOPE OF WORK.
10. OSHA LEAD (Pb) REGULATIONS WILL APPLY TO ANY DEMOLITION
OPERATION (I.E. SANDING, SCRAPING, CUTTING, AND WELDING) THAT
WOULD DISTURB PAINTED SURFACES WHICH CONTAIN LEAD. EXPOSURE
TO LEAD IN THE CONSTRUCTION INDUSTRY IS REGULATED BY OSHA's
LEAD IN CONSTRUCTION REGULATION (29 CFR 1926.62), AS WELL AS
APPLICABLE STATE REGULATIONS. REFER TO SPECIFICATION FOR
FURTHER INFORMATION.
11. LEAD WASTE IS SUBJECT TO THE USEPA RESOURCE CONSERVATION AND
RECOVERY ACT (RCRA) REGULATIONS (40 CFR PART 260 - 273)
HAZARDOUS WASTE. REFER TO SPECIFICATIONS FOR FURTHER
INFORMATION.
01 THE ABATEMENT CONTRACTOR SHALL REMOVE AND DISPOSE OF
ASBESTOS CONTAINING THERMAL SYSTEM INSULATION (TSI) AND
MUDDED FITTINGS AS ACM. THE CONTRACTOR SHALL REMOVE
WALL AND CEILING MATERIAL AS REQUIRED TO ACCESS ALL
CONCEALED PIPING.
02 THE ABATEMENT CONTRACTOR SHALL REMOVE AND DISPOSE OF ALL
LAYERS OF FLOOR TILE AND FLOOR TILE, MASTIC, ADHESIVE AND
LEVELER AS ACM THROUGHOUT THE ENTIRE BUILDING.
03 THE ABATEMENT CONTRACTOR SHALL REMOVE AND DISPOSE OF ALL
LAYERS OF CARPET AND CARPET ADHESIVE AND LEVELER AS ACM.
06 THE ABATEMENT CONTRACTOR SHALL REMOVE AND DISPOSE OF GRAY
SINK COAT AS ACM.
08 THE ABATEMENT CONTRACTOR SHALL REMOVE AND DISPOSE OF GRAY
SPRAY-ON FIREPROOFING AS ACM.
09 THE ABATEMENT CONTRACTOR SHALL REMOVE AND DISPOSE OF
ACOUSTICAL INSULATION AS ACM.
10 THE ABATEMENT CONTRACTOR SHALL REMOVE AND DISPOSE OF
AUDITORIUM LOBBY WALL PANE ADHESIVE AS ACM.
11 THE ABATEMENT CONTRACTOR SHALL REMOVE AND DISPOSE OF WHITE
VIBRATION CLOTH AS ACM.
13 THE ABATEMENT CONTRACTOR SHALL REMOVE AND DISPOSE OF
EXTERIOR WHITE AND GRAY WINDOW CAULK AS ACM.
14 THE ABATEMENT CONTRACTOR SHALL REMOVE AND DISPOSE OF
EXTERIOR WHITE AND GRAY WINDOW GLAZE AS ACM.
21 NOT IN SCOPE
01 01
01 01
02 03
10 13
13 14
13 14
13 14
13 14
13 14
ABCDEFGHIJKLMNOPQRSTU
54321
D
C
B
A
US Army Corps of Engineers New England District
IS
SU
E D
AT
E:
SO
LI
C
IT
AT
IO
N N
U M
BE
R
SHEET ID
C O
N
TR
AC
T
N U
M
BE
R
54321
C
AD
D C
O D
E:
W
2W J2
6C A0
E
Pr og re ss
P rin t
No t f or C on st ru ct io n
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
205 W Welsh Dr Douglassville, PA 19518
610-385-8500
N
EW
E N
G
LA
N D
D
IS
TR
IC
T
VI
R G
IN
IA
R O
AD
C
O N
C O
R D
, M
AS
SA
C
H U
SE
TT
S
ST
V
H D
R U
SM
A
Jo in t V en tu re
W W el sh
D r., D ou gl as sv ille
, P A
0-
5-
W
ES
T
PO
IN
T, N
EW
Y O
R K
TH
A
YE
R
H A
LL
B
U
IL
D
IN
G
R
EN
O
VA
TI
O N
R
TA
D
EM
O
LI
TI
O
N P
AC
KA
G E:
JU
LY
B601
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
AP
PR
D
ES
IG
N
ED
B
Y:
D R
AW
N
B Y:
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
SI
ZE
PL
O T
SC
AL
E:
AR
C H
E
AS
N O
TE
D
Fi le
P at h:
Pl ot D at e:
PLAN
NORTH
KEY PLAN
A Joint Venture
/1
3/
M . D
EL
AN
EY
M . W
EY
D
T
D . A
N D
R
EW
S
M . D
EL
AN
EY
A B
A
TE
M
EN
T
PL
A N
T H
IR
D
F
LO
HA004
ABATEMENT PLAN - THIRD FLOOR - OVERALLB1
1. ASBESTOS ABATEMENT WORK MUST BE PERFORMED IN ACCORDANCE
WITH APPLICABLE GOVERNMENT REGULATIONS. THE CONTRACTOR MUST
USE MANUAL WET METHODS TO CONTROL THE RELEASE OF DUST WHEN
PERFORMING THE REMOVAL OF ALL ASBESTOS AND NON-ASBESTOS
MATERIALS FROM THE WORK AREA.
2. INTERIOR ASBESTOS REMOVAL WORK MUST BE CONDUCTED WITHIN A
NEGATIVE PRESSURE ENCLOSURE. A NEGATIVE AIR PRESSURE OF AT
LEAST -0.02 INCHES OF WATER COLUMN, AS MEASURED AT ANY WORK
AREA PERIMETER LOCATION, MUST BE PROVIDED DURING ASBESTOS
REMOVAL. NEGATIVE AIR PRESSURE MUST BE CREATED IN THE WORK
AREA USING HEPA FILTERED EXHAUST AND EXHAUSTED TO THE
OUTDOORS. THESE HEPA FILTERED EXHAUST UNITS WILL BE USED TO
GENERATE AT LEAST FOUR AIR CHANGES PER HOUR INSIDE THE WORK
AREA. NEGATIVE AIR PRESSURE IN THE WORK AREA MUST BE
CONTINUOUSLY MONITORED THROUGH THE USE OF DIGITAL MANOMETERS
POSTED OUTSIDE THE WORK AREA.
3. THE CONTRACTOR MUST REMOVE HAZARDOUS MATERIALS THAT EXIST
WITHIN WORK AREAS PRIOR TO DISTURBANCE. REFER TO PROJECT
ABATEMENT DESIGN DOCUMENTS FOR FURTHER INFORMATION. REFER TO
SPECIFICATIONS, 02.82.00 FOR ASBESTOS, AND 03.83.00 FOR LEAD (Pb)
REMOVAL REQUIREMENTS.
4. VISIBLE MOLD IS PRESENT IN THE BUILDING. REFER TO MABBETT &
ASSOCIATES REGULATED BUILDING MATERIALS SURVEY REPORT DATED
FEBRUARY 2, 2026 FOR ADDITIONAL INFORMATION. REFER TO MOLD
SPECIFICATION 02.85.00 FOR REMOVAL REQUIREMENTS.
5. SYMBOLS SHOWING LOCATIONS OF ASBESTOS CONTAINING MATERIALS
ARE APPROXIMATE AND NOT TO SCALE. THEY ARE FOR REFERENCE ONLY.
6. WORK AREAS WERE SURVEYED TO IDENTIFY HAZARDOUS MATERIALS.
REFER TO MABBETT & ASSOCIATES REGULATED BUILDING MATERIALS
SURVEY REPORT DATED FEBRUARY 9, 2026, IN SPECIFICATIONS, 02.82.00
FOR ADDITIONAL INFORMATION. NOT ALL AREAS MAY HAVE BEEN
ACCESSIBLE AND HAZARDOUS MATERIALS MAY EXIST WHICH HAVE NOT
BEEN IDENTIFIED. IF SUSPECT MATERIALS ARE DISCOVERED WHICH HAVE
NOT BEEN PREVIOUSLY IDENTIFIED, THE CONTRACTOR MUST NOT
DISTURB THOSE MATERIALS AND MUST IMMEDIATELY NOTIFY THE
CONTRACTING OFFICER.
7. ELEVATOR BRAKE PADS ARE KNOWN TO CONTAIN ASBESTOS AND ARE
ASSUMED AND WILL REQUIRE ABATEMENT IF DISTURBED.
8. FIRE DOORS ARE KNOWN TO CONTAIN ASBESTOS AND ARE ASSUMED AND
WILL REQUIRE ABATEMENT IF DISTURBED.
9. HIDDEN PLUMBING SYSTEM INSULATION AND MUDDED FITTINGS ARE
CONSIDERED TO BE SUSPECT MATERIALS AND MAY CONTAIN ASBESTOS.
THE ABATEMENT CONTRACTOR MUST REFER TO DEMOLITION PLANS FOR
LOCATION OF PLUMBING FIXTURES AND ASSUME SUSPECT MATERIAL IS
POSITIVE UNTIL LAB RESULTS PROVE OTHERWISE. IF PLUMBING
INSULATION IS DETERMINED TO CONTAIN ASBESTOS THE ABATEMENT
CONTRACTOR MUST REMOVE WALL AND CEILING MATERIAL AS REQUIRED
TO ACCESS CONCEALED PLUMBING THAT MAY BE IMPACTED BY THE
SCOPE OF WORK.
10. OSHA LEAD (Pb) REGULATIONS WILL APPLY TO ANY DEMOLITION
OPERATION (I.E. SANDING, SCRAPING, CUTTING, AND WELDING) THAT
WOULD DISTURB PAINTED SURFACES WHICH CONTAIN LEAD. EXPOSURE
TO LEAD IN THE CONSTRUCTION INDUSTRY IS REGULATED BY OSHA's
LEAD IN CONSTRUCTION REGULATION (29 CFR 1926.62), AS WELL AS
APPLICABLE STATE REGULATIONS. REFER TO SPECIFICATION FOR
FURTHER INFORMATION.
11. LEAD WASTE IS SUBJECT TO THE USEPA RESOURCE CONSERVATION AND
RECOVERY ACT (RCRA) REGULATIONS (40 CFR PART 260 - 273)
HAZARDOUS WASTE. REFER TO SPECIFICATIONS FOR FURTHER
INFORMATION.
01 THE ABATEMENT CONTRACTOR SHALL REMOVE AND DISPOSE OF
ASBESTOS CONTAINING THERMAL SYSTEM INSULATION (TSI) AND
MUDDED FITTINGS AS ACM. THE CONTRACTOR SHALL REMOVE WALL AND
CEILING MATERIAL AS REQUIRED TO ACCESS ALL CONCEALED PIPING.
02 THE ABATEMENT CONTRACTOR SHALL REMOVE AND DISPOSE OF ALL
LAYERS OF FLOOR TILE AND FLOOR TILE, MASTIC, ADHESIVE AND
LEVELER AS ACM THROUGHOUT THE ENTIRE BUILDING.
03 THE ABATEMENT CONTRACTOR SHALL REMOVE AND DISPOSE OF ALL
LAYERS OF CARPET AND CARPET ADHESIVE AND LEVELER AS ACM.
05 THE ABATEMENT CONTRACTOR SHALL REMOVE AND DISPOSE OF BLACK
AND BROWN STICK PIN ADHESIVE AS ACM.
08 THE ABATEMENT CONTRACTOR SHALL REMOVE AND DISPOSE OF GRAY
SPRAY-ON FIREPROOFING AS ACM.
09 THE ABATEMENT CONTRACTOR SHALL REMOVE AND DISPOSE OF
ACOUSTICAL INSULATION AS ACM.
10 THE ABATEMENT CONTRACTOR SHALL REMOVE AND DISPOSE OF
AUDITORIUM LOBBY WALL PANE ADHESIVE AS ACM.
13 THE ABATEMENT CONTRACTOR SHALL REMOVE AND DISPOSE OF
EXTERIOR WHITE AND GRAY WINDOW CAULK AS ACM.
14 THE ABATEMENT CONTRACTOR SHALL REMOVE AND DISPOSE OF
EXTERIOR WHITE AND GRAY WINDOW GLAZE AS ACM.
15 THE ABATEMENT CONTRACTOR SHALL REMOVE AND DISPOSE OF
INTERIOR WINDOW GLAZING COMPOUND ON OLD WINDOWS AS ACM.
21 NOT IN SCOPE
02 03
13 14
13 14
13 14
13 14
13 14
13 14
PQR
S
TU
54321
D
C
B
A
US Army Corps of Engineers New England District
IS
SU
E D
AT
E:
SO
LI
C
IT
AT
IO
N N
U M
BE
R
SHEET ID
C O
N
TR
AC
T
N U
M
BE
R
54321
C
AD
D C
O D
E:
W
2W J2
6C A0
E
Pr og re ss
P rin t
No t f or C on st ru ct io n
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
205 W Welsh Dr Douglassville, PA 19518
610-385-8500
N
EW
E N
G
LA
N D
D
IS
TR
IC
T
VI
R G
IN
IA
R O
AD
C
O N
C O
R D
, M
AS
SA
C
H U
SE
TT
S
ST
V
H D
R U
SM
A
Jo in t V en tu re
W W el sh
D r., D ou gl as sv ille
, P A
0-
5-
W
ES
T
PO
IN
T, N
EW
Y O
R K
TH
A
YE
R
H A
LL
B
U
IL
D
IN
G
R
EN
O
VA
TI
O N
R
TA
D
EM
O
LI
TI
O
N P
AC
KA
G E:
JU
LY
B601
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
AP
PR
D
ES
IG
N
ED
B
Y:
D R
AW
N
B Y:
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
SI
ZE
PL
O T
SC
AL
E:
AR
C H
E
AS
N O
TE
D
Fi le
P at h:
Pl ot D at e:
PLAN
NORTH
KEY PLAN
A Joint Venture
/1
3/
M . D
EL
AN
EY
M . W
EY
D
T
D . A
N D
R
EW
S
M . D
EL
AN
EY
A B
A
TE
M
EN
T
PL
A N
F O
U R
TH
F
LO
HA005
ABATEMENT PLAN - FOURTH FLOOR - OVERALLB1
1. ASBESTOS ABATEMENT WORK MUST BE PERFORMED IN ACCORDANCE
WITH APPLICABLE GOVERNMENT REGULATIONS. THE CONTRACTOR MUST
USE MANUAL WET METHODS TO CONTROL THE RELEASE OF DUST WHEN
PERFORMING THE REMOVAL OF ALL ASBESTOS AND NON-ASBESTOS
MATERIALS FROM THE WORK AREA.
2. INTERIOR ASBESTOS REMOVAL WORK MUST BE CONDUCTED WITHIN A
NEGATIVE PRESSURE ENCLOSURE. A NEGATIVE AIR PRESSURE OF AT
LEAST -0.02 INCHES OF WATER COLUMN, AS MEASURED AT ANY WORK
AREA PERIMETER LOCATION, MUST BE PROVIDED DURING ASBESTOS
REMOVAL. NEGATIVE AIR PRESSURE MUST BE CREATED IN THE WORK
AREA USING HEPA FILTERED EXHAUST AND EXHAUSTED TO THE
OUTDOORS. THESE HEPA FILTERED EXHAUST UNITS WILL BE USED TO
GENERATE AT LEAST FOUR AIR CHANGES PER HOUR INSIDE THE WORK
AREA. NEGATIVE AIR PRESSURE IN THE WORK AREA MUST BE
CONTINUOUSLY MONITORED THROUGH THE USE OF DIGITAL MANOMETERS
POSTED OUTSIDE THE WORK AREA.
3. THE CONTRACTOR MUST REMOVE HAZARDOUS MATERIALS THAT EXIST
WITHIN WORK AREAS PRIOR TO DISTURBANCE. REFER TO PROJECT
ABATEMENT DESIGN DOCUMENTS FOR FURTHER INFORMATION. REFER TO
SPECIFICATIONS, 02.82.00 FOR ASBESTOS, AND 03.83.00 FOR LEAD (Pb)
REMOVAL REQUIREMENTS.
4. VISIBLE MOLD IS PRESENT IN THE BUILDING. REFER TO MABBETT &
ASSOCIATES REGULATED BUILDING MATERIALS SURVEY REPORT DATED
FEBRUARY 2, 2026 FOR ADDITIONAL INFORMATION. REFER TO MOLD
SPECIFICATION 02.85.00 FOR REMOVAL REQUIREMENTS.
5. SYMBOLS SHOWING LOCATIONS OF ASBESTOS CONTAINING MATERIALS
ARE APPROXIMATE AND NOT TO SCALE. THEY ARE FOR REFERENCE ONLY.
6. WORK AREAS WERE SURVEYED TO IDENTIFY HAZARDOUS MATERIALS.
REFER TO MABBETT & ASSOCIATES REGULATED BUILDING MATERIALS
SURVEY REPORT DATED FEBRUARY 9, 2026, IN SPECIFICATIONS, 02.82.00
FOR ADDITIONAL INFORMATION. NOT ALL AREAS MAY HAVE BEEN
ACCESSIBLE AND HAZARDOUS MATERIALS MAY EXIST WHICH HAVE NOT
BEEN IDENTIFIED. IF SUSPECT MATERIALS ARE DISCOVERED WHICH HAVE
NOT BEEN PREVIOUSLY IDENTIFIED, THE CONTRACTOR MUST NOT DISTURB
THOSE MATERIALS AND MUST IMMEDIATELY NOTIFY THE CONTRACTING
OFFICER.
7. ELEVATOR BRAKE PADS ARE KNOWN TO CONTAIN ASBESTOS AND ARE
ASSUMED AND WILL REQUIRE ABATEMENT IF DISTURBED.
8. FIRE DOORS ARE KNOWN TO CONTAIN ASBESTOS AND ARE ASSUMED AND
WILL REQUIRE ABATEMENT IF DISTURBED.
9. HIDDEN PLUMBING SYSTEM INSULATION AND MUDDED FITTINGS ARE
CONSIDERED TO BE SUSPECT MATERIALS AND MAY CONTAIN ASBESTOS.
THE ABATEMENT CONTRACTOR MUST REFER TO DEMOLITION PLANS FOR
LOCATION OF PLUMBING FIXTURES AND ASSUME SUSPECT MATERIAL IS
POSITIVE UNTIL LAB RESULTS PROVE OTHERWISE. IF PLUMBING
INSULATION IS DETERMINED TO CONTAIN ASBESTOS THE ABATEMENT
CONTRACTOR MUST REMOVE WALL AND CEILING MATERIAL AS REQUIRED
TO ACCESS CONCEALED PLUMBING THAT MAY BE IMPACTED BY THE
SCOPE OF WORK.
10. OSHA LEAD (Pb) REGULATIONS WILL APPLY TO ANY DEMOLITION
OPERATION (I.E. SANDING, SCRAPING, CUTTING, AND WELDING) THAT
WOULD DISTURB PAINTED SURFACES WHICH CONTAIN LEAD. EXPOSURE
TO LEAD IN THE CONSTRUCTION INDUSTRY IS REGULATED BY OSHA's LEAD
IN CONSTRUCTION REGULATION (29 CFR 1926.62), AS WELL AS APPLICABLE
STATE REGULATIONS. REFER TO SPECIFICATION FOR FURTHER
INFORMATION.
11. LEAD WASTE IS SUBJECT TO THE USEPA RESOURCE CONSERVATION AND
RECOVERY ACT (RCRA) REGULATIONS (40 CFR PART 260 - 273) HAZARDOUS
WASTE. REFER TO SPECIFICATIONS FOR FURTHER INFORMATION.
01 THE ABATEMENT CONTRACTOR SHALL REMOVE AND DISPOSE OF
ASBESTOS CONTAINING THERMAL SYSTEM INSULATION (TSI) AND
MUDDED FITTINGS AS ACM. THE CONTRACTOR SHALL REMOVE WALL
AND CEILING MATERIAL AS REQUIRED TO ACCESS ALL CONCEALED
PIPING.
02 THE ABATEMENT CONTRACTOR SHALL REMOVE AND DISPOSE OF ALL
LAYERS OF FLOOR TILE AND FLOOR TILE, MASTIC, ADHESIVE AND
LEVELER AS ACM THROUGHOUT THE ENTIRE BUILDING.
03 THE ABATEMENT CONTRACTOR SHALL REMOVE AND DISPOSE OF ALL
LAYERS OF CARPET AND CARPET ADHESIVE AND LEVELER AS ACM.
05 THE ABATEMENT CONTRACTOR SHALL REMOVE AND DISPOSE OF BLACK
AND BROWN STICK PIN ADHESIVE AS ACM.
08 THE ABATEMENT CONTRACTOR SHALL REMOVE AND DISPOSE OF GRAY
SPRAY-ON FIREPROOFING AS ACM.
09 THE ABATEMENT CONTRACTOR SHALL REMOVE AND DISPOSE OF
ACOUSTICAL INSULATION AS ACM.
10 THE ABATEMENT CONTRACTOR SHALL REMOVE AND DISPOSE OF
AUDITORIUM LOBBY WALL PANE ADHESIVE AS ACM.
13 THE ABATEMENT CONTRACTOR SHALL REMOVE AND DISPOSE OF
EXTERIOR WHITE AND GRAY WINDOW CAULK AS ACM.
14 THE ABATEMENT CONTRACTOR SHALL REMOVE AND DISPOSE OF
EXTERIOR WHITE AND GRAY WINDOW GLAZE AS ACM.
15 THE ABATEMENT CONTRACTOR SHALL REMOVE AND DISPOSE OF
INTERIOR WINDOW GLAZING COMPOUND ON OLD WINDOWS AS ACM.
21 NOT IN SCOPE
02 03
05 05 05 05
05050505
13 14
13 14
13 14
13 1413 1413 14
13 14
PQR
S
TU
54321
D
C
B
A
US Army Corps of Engineers New England District
IS
SU
E D
AT
E:
SO
LI
C
IT
AT
IO
N N
U M
BE
R
SHEET ID
C O
N
TR
AC
T
N U
M
BE
R
54321
C
AD
D C
O D
E:
W
2W J2
6C A0
E
Pr og re ss
P rin t
No t f or C on st ru ct io n
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
205 W Welsh Dr Douglassville, PA 19518
610-385-8500
N
EW
E N
G
LA
N D
D
IS
TR
IC
T
VI
R G
IN
IA
R O
AD
C
O N
C O
R D
, M
AS
SA
C
H U
SE
TT
S
ST
V
H D
R U
SM
A
Jo in t V en tu re
W W el sh
D r., D ou gl as sv ille
, P A
0-
5-
W
ES
T
PO
IN
T, N
EW
Y O
R K
TH
A
YE
R
H A
LL
B
U
IL
D
IN
G
R
EN
O
VA
TI
O N
R
TA
D
EM
O
LI
TI
O
N P
AC
KA
G E:
JU
LY
B601
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
AP
PR
D
ES
IG
N
ED
B
Y:
D R
AW
N
B Y:
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
SI
ZE
PL
O T
SC
AL
E:
AR
C H
E
AS
N O
TE
D
Fi le
P at h:
Pl ot D at e:
PLAN
NORTH
KEY PLAN
A Joint Venture
SCALE: 1/16" = 1'-0"
ABATEMENT PLAN - ROOF - OVERALLB1
/1
3/
M . D
EL
AN
EY
M . W
EY
D
T
D . A
N D
R
EW
S
M . D
EL
AN
EY
A B
A
TE
M
EN
T
PL
A N
R O
O F
HA006
1. ASBESTOS ABATEMENT WORK MUST BE PERFORMED IN ACCORDANCE
WITH APPLICABLE GOVERNMENT REGULATIONS. THE CONTRACTOR MUST
USE MANUAL WET METHODS TO CONTROL THE RELEASE OF DUST WHEN
PERFORMING THE REMOVAL OF ALL ASBESTOS AND NON-ASBESTOS
MATERIALS FROM THE WORK AREA.
2. INTERIOR ASBESTOS REMOVAL WORK MUST BE CONDUCTED WITHIN A
NEGATIVE PRESSURE ENCLOSURE. A NEGATIVE AIR PRESSURE OF AT
LEAST -0.02 INCHES OF WATER COLUMN, AS MEASURED AT ANY WORK
AREA PERIMETER LOCATION, MUST BE PROVIDED DURING ASBESTOS
REMOVAL. NEGATIVE AIR PRESSURE MUST BE CREATED IN THE WORK
AREA USING HEPA FILTERED EXHAUST AND EXHAUSTED TO THE
OUTDOORS. THESE HEPA FILTERED EXHAUST UNITS WILL BE USED TO
GENERATE AT LEAST FOUR AIR CHANGES PER HOUR INSIDE THE WORK
AREA. NEGATIVE AIR PRESSURE IN THE WORK AREA MUST BE
CONTINUOUSLY MONITORED THROUGH THE USE OF DIGITAL MANOMETERS
POSTED OUTSIDE THE WORK AREA.
3. THE CONTRACTOR MUST REMOVE HAZARDOUS MATERIALS THAT EXIST
WITHIN WORK AREAS PRIOR TO DISTURBANCE. REFER TO PROJECT
ABATEMENT DESIGN DOCUMENTS FOR FURTHER INFORMATION. REFER TO
SPECIFICATIONS, 02.82.00 FOR ASBESTOS, AND 03.83.00 FOR LEAD (Pb)
REMOVAL REQUIREMENTS.
4. VISIBLE MOLD IS PRESENT IN THE BUILDING. REFER TO MABBETT &
ASSOCIATES REGULATED BUILDING MATERIALS SURVEY REPORT DATED
FEBRUARY 2, 2026 FOR ADDITIONAL INFORMATION. REFER TO MOLD
SPECIFICATION 02.85.00 FOR REMOVAL REQUIREMENTS.
5. SYMBOLS SHOWING LOCATIONS OF ASBESTOS CONTAINING MATERIALS
ARE APPROXIMATE AND NOT TO SCALE. THEY ARE FOR REFERENCE ONLY.
6. WORK AREAS WERE SURVEYED TO IDENTIFY HAZARDOUS MATERIALS.
REFER TO MABBETT & ASSOCIATES REGULATED BUILDING MATERIALS
SURVEY REPORT DATED FEBRUARY 9, 2026, IN SPECIFICATIONS, 02.82.00
FOR ADDITIONAL INFORMATION. NOT ALL AREAS MAY HAVE BEEN
ACCESSIBLE AND HAZARDOUS MATERIALS MAY EXIST WHICH HAVE NOT
BEEN IDENTIFIED. IF SUSPECT MATERIALS ARE DISCOVERED WHICH HAVE
NOT BEEN PREVIOUSLY IDENTIFIED, THE CONTRACTOR MUST NOT DISTURB
THOSE MATERIALS AND MUST IMMEDIATELY NOTIFY THE CONTRACTING
OFFICER.
7. ELEVATOR BRAKE PADS ARE KNOWN TO CONTAIN ASBESTOS AND ARE
ASSUMED AND WILL REQUIRE ABATEMENT IF DISTURBED.
8. FIRE DOORS ARE KNOWN TO CONTAIN ASBESTOS AND ARE ASSUMED AND
WILL REQUIRE ABATEMENT IF DISTURBED.
9. HIDDEN PLUMBING SYSTEM INSULATION AND MUDDED FITTINGS ARE
CONSIDERED TO BE SUSPECT MATERIALS AND MAY CONTAIN ASBESTOS.
THE ABATEMENT CONTRACTOR MUST REFER TO DEMOLITION PLANS FOR
LOCATION OF PLUMBING FIXTURES AND ASSUME SUSPECT MATERIAL IS
POSITIVE UNTIL LAB RESULTS PROVE OTHERWISE. IF PLUMBING
INSULATION IS DETERMINED TO CONTAIN ASBESTOS THE ABATEMENT
CONTRACTOR MUST REMOVE WALL AND CEILING MATERIAL AS REQUIRED
TO ACCESS CONCEALED PLUMBING THAT MAY BE IMPACTED BY THE
SCOPE OF WORK.
10. OSHA LEAD (Pb) REGULATIONS WILL APPLY TO ANY DEMOLITION
OPERATION (I.E. SANDING, SCRAPING, CUTTING, AND WELDING) THAT
WOULD DISTURB PAINTED SURFACES WHICH CONTAIN LEAD. EXPOSURE
TO LEAD IN THE CONSTRUCTION INDUSTRY IS REGULATED BY OSHA's LEAD
IN CONSTRUCTION REGULATION (29 CFR 1926.62), AS WELL AS APPLICABLE
STATE REGULATIONS. REFER TO SPECIFICATION FOR FURTHER
INFORMATION.
11. LEAD WASTE IS SUBJECT TO THE USEPA RESOURCE CONSERVATION AND
RECOVERY ACT (RCRA) REGULATIONS (40 CFR PART 260 - 273) HAZARDOUS
WASTE. REFER TO SPECIFICATIONS FOR FURTHER INFORMATION.
17 THE ABATEMENT CONTRACTOR SHALL REMOVE AND DISPOSE OF SILVER
PAINT ON ROOF LEVEL STAIRS AS ACM.
18 THE ABATEMENT CONTRACTOR SHALL REMOVE AND DISPOSE OF BLACK
FLASHING MATERIAL ON ROOF AS ACM.
19 THE ABATEMENT CONTRACTOR SHALL REMOVE AND DISPOSE OF LIGHT
GRAY CAULK ON ROOF CAPSTONES AS ACM.
20 THE ABATEMENT CONTRACTOR SHALL REMOVE AND DISPOSE OF BLACK
CAULK ON ROOF LEVEL AS ACM.
21 NOT IN SCOPE
2017201720
54321
D
C
B
A
US Army Corps of Engineers New England District
IS
SU
E D
AT
E:
SO
LI
C
IT
AT
IO
N N
U M
BE
R
SHEET ID
C O
N
TR
AC
T
N U
M
BE
R
54321
C
AD
D C
O D
E:
W
2W J2
6C A0
E
Pr og re ss
P rin t
No t f or C on st ru ct io n
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
205 W Welsh Dr Douglassville, PA 19518
610-385-8500
N
EW
E N
G
LA
N D
D
IS
TR
IC
T
VI
R G
IN
IA
R O
AD
C
O N
C O
R D
, M
AS
SA
C
H U
SE
TT
S
ST
V
H D
R U
SM
A
Jo in t V en tu re
W W el sh
D r., D ou gl as sv ille
, P A
0-
5-
W
ES
T
PO
IN
T, N
EW
Y O
R K
TH
A
YE
R
H A
LL
B
U
IL
D
IN
G
R
EN
O
VA
TI
O N
R
TA
D
EM
O
LI
TI
O
N P
AC
KA
G E:
JU
LY
B601
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
AP
PR
D
ES
IG
N
ED
B
Y:
D R
AW
N
B Y:
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
SI
ZE
PL
O T
SC
AL
E:
AR
C H
E
AS
N O
TE
D
Fi le
P at h:
Pl ot D at e:
A Joint Venture
G
EN
ER
A
L N
O
TE
S, L
EG
EN
D
A N
D A
B B
R
EV
IA
TI
O N
S
1. THESE ABBREVIATIONS APPLY TO THE ENTIRE SET OF
CONTRACT DRAWINGS.
2. LISTING OF ABBREVIATIONS DOES NOT IMPLY THAT ALL
ABBREVIATIONS ARE USED IN THE CONTRACT DRAWINGS.
3. ABBREVIATIONS SHOWN ON THIS SHEET INCLUDE
VARIATIONS OF A WORD. FOR EXAMPLE, "MOD" MAY
MEAN MODIFY OR MODIFICATION; "INC" MAY MEAN
INCLUDED OR INCLUDING AND "REINF" MAY MEAN EITHER
REINFORCE OR REINFORCING.
4. SEE INSTRUMENTATION LEGEND SHEET FOR
PROJECT-SPECIFIC EQUIPMENT SYMBOLS, EQUIPMENT
ABBREVIATIONS, AND PIPING SYSTEM ABBREVIATIONS.
SYS
T&B T&G T
TA
TAN
TBM
TC
TCE
T.D.
TEF
TEMP.
THD
THK
THRESH
TKBD
TOB
TOC
TOD
TOF
TOG
TOL
TOM
TOP
TOPO
TOS
TP
TPD
TPG
TR
TRANS
TRD
TYP.
TW
U
UG
ULT
UNFN
UNO
USAG-WP
UTIL
V
VA
VAC
VAR
VB
VC
VCP
VCT
VEL
VENT
VERT
VERTS
VG
VIF
VIN
VOL
VPC
VPI
VPT
VS
VTR
VWC
W/ W/O W
WB
WC
WD
WF
WG
WH
WI
WL
WLD
WM
WP
WS
WSCT
WT
WTHP
WWF
XP
XS
XSECT
XXS
YH
YS
SYSTE…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .