2026-1 Subtrades -Shift-Differential~1.pdf
PDF 2 MB Posted
- Attached to
- 10. 10. 1965 - ARMC Emergency Department & ICU Expansion Feasibility Study and Master Planning
- Solicitation number
- ANE223-ANE2C-6392
- Issued by
- San Bernardino County, Concord City, California
About this file
This is a General Prevailing Wage Determination document issued by the California Director of Industrial Relations pursuant to California Labor Code sections 1770, 1773, and 1773.1, covering multiple counties including Alameda, Alpine, Amador, Butte, Calaveras, and Colusa. The determinations establish prevailing wage rates for commercial building, highway, heavy construction, and dredging projects across various craft classifications and shift differentials. The wage rates are effective from issuance dates in August 2025 and February 2026, with expiration dates ranging from March 2026 through February 2027. The determinations cover numerous skilled trades including bricklayers, electricians, painters, plasterers, sheet metal workers, terrazzo workers, and tile setters, with specific rates established for second shift, third shift, and special shift work. Each classification includes detailed breakdowns of basic hourly rates, health and welfare contributions, pension contributions, vacation and holiday payments, training funds, and other employer payments.
The wage determinations specify straight-time total hourly rates, daily overtime rates, Saturday overtime rates, and Sunday and holiday overtime rates for each craft classification. Rates vary significantly by shift type, with third shift typically commanding higher base wages than second shift work. Health and welfare contributions range from approximately $11 to $23 per hour depending on the craft, while pension contributions vary from $0 to over $34 per hour. The determinations include extensive footnotes clarifying overtime calculation methodologies, premium pay requirements for specific work conditions such as suspended platform work and height-related hazards, and apprenticeable craft designations. All prevailing wage rates must be paid by contractors on public works projects meeting the determination criteria, with fringe benefits and overtime calculations factored according to the specified formulas. Travel and subsistence provisions and recognized holiday lists are available through the California Department of Industrial Relations website.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GENERAL PREVAILING WAGE DETERMINATION - ALA-2026-1
file:///S/Complete%20Set%20of%20General%20Prevailing%20Wage%20Determinations/2026-1/2026-1%20Subtrades%20Determinations%20(ref)/Shift/Shift-ALA.html[3/10/2026 3:20:42 PM]
GENERAL PREVAILING WAGE DETERMINATION MADE BY THE DIRECTOR OF INDUSTRIAL RELATIONS
PURSUANT TO CALIFORNIA LABOR CODE PART 7,
CHAPTER 1, ARTICLE 2, SECTIONS 1770, 1773 AND 1773.1
FOR COMMERCIAL BUILDING, HIGHWAY, HEAVY CONSTRUCTION AND DREDGING PROJECTS
LOCALITY: ALAMEDA COUNTY
DETERMINATION: ALA-2026-1
CRAFT CLASSIFICATION CRAFT
FOOTNOTE
ISSUE
DATE
EXPIRATION
DATE
BASIC
HOURLY
RATE
BASIC
HOURLY
RATE
FOOTNOTE
HEALTH
AND
WELFARE
HEALTH
AND
WELFARE
FOOTNOTE
PENSION PENSION
FOOTNOTE
VACATION/
HOLIDAY
VACATION/
HOLIDAY
FOOTNOTE
TRAINING TRAINING
FOOTNOTE
OTHER
PAYMENTS
OTHER
PAYMENTS
FOOTNOTE
HOURS HOURS
FOOTNOTE
STRAIGHT-
TIME
TOTAL
HOURLY
RATE
DAILY
OVERTIME
HOURLY
RATE
DAILY
OVERTIME
HOURLY
RATE
FOOTNOTE
SATURDAY
OVERTIME
HOURLY
RATE
SATURDAY
OVERTIME
HOURLY
RATE
FOOTNOTE
SUNDAY
AND
HOLIDAY
OVERTIME
HOURLY
RATE
SUNDAY
AND
HOLIDAY
OVERTIME
HOURLY
RATE
FOOTNOTE
#BRICKLAYER,
BLOCKLAYER,
POINTER, CLEANER,
CAULKER,
WATERPROOFER
(2ND SHIFT)
08/22/2025 06/30/2026* $71.200 A $13.100 $15.120 $0.000 B $1.720 $0.430 8.0 C $101.570 $137.170 D $137.170 E $172.770
#BRICKLAYER,
BLOCKLAYER,
POINTER, CLEANER,
CAULKER,
WATERPROOFER
(3RD SHIFT)
08/22/2025 06/30/2026* $74.290 A $13.100 $15.120 $0.000 B $1.720 $0.430 8.0 C $104.660 $141.810 D $141.810 E $178.950
#BRICKLAYER,
BLOCKLAYER:
BRICKLAYER,
BLOCKLAYER,
STONEMASON (2ND
SHIFT)
08/22/2025 04/30/2026** $61.400 A $13.100 $12.770 $3.250 F $0.800 $2.260 G 8.0 C $93.580 $125.910 H $125.910 H $158.230
#BRICKLAYER,
BLOCKLAYER:
BRICKLAYER,
BLOCKLAYER,
STONEMASON (3RD
SHIFT)
08/22/2025 04/30/2026** $64.340 A $13.100 $12.770 $3.250 F $0.800 $2.260 G 8.0 C $96.520 $130.320 H $130.320 H $164.110
#BRICK
TENDER
BRICK TENDER
(SPECIAL SINGLE
SHIFT)
08/22/2025 06/30/2026** $47.090 I $11.100 $14.770 $0.000 B $0.450 $0.550 8.0 $73.960 $97.510 J $97.510 J $121.050
#CARPET,
LINOLEUM,
SOFT FLOOR LAYER
(SPECIAL SHIFT) 02/22/2026 12/31/2026** $75.670 A $12.250 $22.470 $0.000 K $1.100 $0.460 8.0 $111.950 $187.620 $187.620 $187.620
#ELECTRICIAN:
COMM & SYSTEM
INSTALLER,
SECOND SHIFT
02/22/2026 11/30/2026** $68.420 L $17.250 $11.000 M $0.000 $1.000 $0.260 N 8.0 $100.320 $135.720 O $135.720 O $171.140 P
#ELECTRICIAN:
COMM & SYSTEM
INSTALLER, THIRD
SHIFT
02/22/2026 11/30/2026** $76.650 L $17.250 $11.000 M $0.000 $1.000 $0.260 N 8.0 $108.840 $148.500 O $148.500 O $188.170 P
#ELECTRICIAN:
COMM & SYSTEM
TECH., SECOND
SHIFT
02/22/2026 11/30/2026** $78.680 L $17.250 $11.000 M $0.000 $1.000 $0.260 N 8.0 $110.940 $151.650 O $151.650 O $192.370 P
#ELECTRICIAN: COMM & SYSTEM
TECH., THIRD SHIFT 02/22/2026 11/30/2026** $88.140 L $17.250 $11.000 M $0.000 $1.000 $0.260 N 8.0 $120.730 $166.340 O $166.340 O $211.960 P
#ELECTRICIAN: INSIDE WIREMAN,
2ND SHIFT 08/22/2025 05/31/2026** $89.170 $21.820 $25.570 Q $0.000 B $2.620 $1.630 R 7.5 S $143.490 $189.870 $236.270 T $236.270 P
#ELECTRICIAN: INSIDE WIREMAN,
3RD SHIFT 08/22/2025 05/31/2026** $99.890 $23.380 $27.390 Q $0.000 B $2.840 $1.790 R 7.0 U $158.290 $210.260 $262.220 T $262.220 P
#ELECTRICIAN: CABLE SPLICER-
WELDER, 2ND SHIFT 08/22/2025 05/31/2026** $102.550 $21.820 $25.570 Q $0.000 B $2.620 $1.770 R 7.5 S $157.410 $210.760 $264.110 T $264.110 P
#ELECTRICIAN: CABLE SPLICER-
WELDER, 3RD SHIFT 08/22/2025 05/31/2026** $114.870 $23.380 $27.390 Q $0.000 B $2.840 $1.950 R 7.0 U $173.880 $233.640 $293.400 T $293.400 P
#FIELD
SURVEYOR:
CHIEF OF PARTY
(NIGHT SHIFT) V 02/22/2026 02/28/2027** $72.840 $13.880 $16.010 W $4.400 X $1.260 $0.280 8.0 $108.670 $145.090 Y $145.090 Y $181.510
#FIELD
SURVEYOR:
CHAINMAN/RODMAN
(NIGHT SHIFT) V 02/22/2026 02/28/2027** $61.070 $13.880 $16.010 W $4.400 X $1.260 $0.280 8.0 $96.900 $127.440 Y $127.440 Y $157.970
#GLAZIER GLAZIER (SPECIAL
SHIFT) Z 02/22/2026 12/31/2026** $67.910 A $12.250 $22.960 AA $0.000 $1.100 $0.550 AB 7.5 S $104.770 $172.680 $172.680 $172.680
#MARBLE
FINISHER
MARBLE FINISHER
(2ND SHIFT) AC 08/22/2025 07/31/2026** $48.140 AD $13.100 $6.780 $0.000 K $0.450 $0.970 8.0 $69.440 $93.510 AE $117.580 $117.580
#MARBLE
MASON
MARBLE MASON
(2ND SHIFT) AC 08/22/2025 07/31/2026** $70.010 AD $13.100 $16.220 $0.000 K $0.800 $1.330 8.0 $101.460 $136.470 AE $171.470 $171.470
#PAINTER PAINTER (SPECIAL
SHIFT) AF 02/22/2026 06/30/2026* $67.320 I $12.250 $15.120 W $0.000 K $1.100 $0.550 8.0 C $96.340 $130.000 AG $130.000 AG $163.660
#PAINTER
INDUSTRIAL
PAINTER (SPECIAL
SHIFT)
AH 02/22/2026 06/30/2026* $70.620 I $12.250 $15.120 W $0.000 K $1.100 $0.550 8.0 C $99.640 $134.950 AG $134.950 AG $170.260
#PAINTER BRIDGE PAINTER
(SPECIAL SHIFT) AI 02/22/2026 06/30/2026* $73.020 I $12.250 $15.120 W $0.000 K $1.100 $0.550 8.0 C $102.040 $138.550 AG $138.550 AG $175.060
#PAINTER: TAPER (SPECIAL
SHIFT) 02/22/2026 06/30/2026* $80.710 AJ $12.250 $20.790 $0.000 K $1.050 $0.780 8.0 $115.580 $155.940 AK $155.940 AK $196.290 AL
#PLASTERER PLASTERER: 2ND
SHIFT 08/22/2025 06/30/2026** $55.170 AM $16.040 $19.990 $0.000 B $1.450 $1.440 7.0 AN $94.090 $117.780 AO $117.780 AP $141.470
#PLASTERER PLASTERER: 3RD
SHIFT 08/22/2025 06/30/2026** $56.170 AM $16.040 $19.990 $0.000 B $1.450 $1.440 7.0 AN $95.090 $118.780 AO $118.780 AP $142.470
#PLUMBER:
SPRINKLER FITTER
(FIRE PROTECTION
AND FIRE CONTROL
SYSTEMS), 2ND
SHIFT
08/22/2025 08/02/2026** $94.810 A $13.850 $24.400 $0.000 B $1.850 $0.400 8.0 $135.310 $182.720 H $182.720 H $230.120
#PLUMBER:
SPRINKLER FITTER
(FIRE PROTECTION
AND FIRE CONTROL
SYSTEMS), 3RD
SHIFT
08/22/2025 08/02/2026** $94.810 A $13.850 $24.400 $0.000 B $1.850 $0.400 8.0 $135.310 $182.720 H $182.720 H $230.120
#SHEET METAL
WORKER
SHEET METAL
WORKER (SPECIAL
SHIFT)
02/22/2026 06/28/2026** $90.970 I $18.270 AQ $34.920 AR $0.000 B $1.740 $1.110 8.0 $147.010 $197.250 AS $197.250 AS $247.480
#SHEET METAL
WORKER
SHEET METAL
WORKER (2ND
SHIFT)
02/22/2026 06/28/2026** $87.010 I $18.270 AQ $34.920 AR $0.000 B $1.740 $1.110 7.5 AT $143.050 $191.310 AS $191.310 AS $239.560 file:///S/Complete%20Set%20of%20General%20Prevailing%20Wage%20Determinations/2026-1/2026-1%20Subtrades%20Determinations%20(ref)/Shift/Shift-ALA.html[3/10/2026 3:20:42 PM]
#SHEET METAL
WORKER
SHEET METAL
WORKER (3RD
SHIFT)
02/22/2026 06/28/2026** $90.970 I $18.270 AQ $34.920 AR $0.000 B $1.740 $1.110 7.0 AU $147.010 $197.250 AS $197.250 AS $247.480
#SHEET METAL
WORKER
TOTAL SHEET
METAL CONTRACT
OF $200,000 OR
LESS (SPECIAL
SHIFT)
02/22/2026 06/28/2026** $78.050 I $18.070 AQ $32.870 AR $0.000 B $1.740 $1.110 8.0 $131.840 $174.870 AS $174.870 AS $217.890
#SHEET METAL
WORKER
TOTAL SHEET
METAL CONTRACT
OF $200,000 OR
LESS (2ND SHIFT)
02/22/2026 06/28/2026** $74.660 I $18.070 AQ $32.870 AR $0.000 B $1.740 $1.110 7.5 AT $128.450 $169.790 AS $169.790 AS $211.110
#SHEET METAL
WORKER
TOTAL SHEET
METAL CONTRACT
OF $200,000 OR
LESS (3RD SHIFT)
02/22/2026 06/28/2026** $78.050 I $18.070 AQ $32.870 AR $0.000 B $1.740 $1.110 7.0 AU $131.840 $174.870 AS $174.870 AS $217.890
#SHEET METAL
WORKER
SERVICE MECHANIC
(TOTAL SHEET
METAL CONTRACT
OF $200,000 OR
LESS) (SPECIAL
SHIFT)
02/22/2026 06/28/2026** $60.950 I $17.070 AQ $17.840 AR $0.000 B $1.510 $1.110 8.0 $98.480 $130.390 AV $130.390 AV $162.280
#SHEET METAL
WORKER
SERVICE MECHANIC
(TOTAL SHEET
METAL CONTRACT
OF $200,000 OR
LESS) (2ND SHIFT)
02/22/2026 06/28/2026** $58.300 I $17.070 AQ $17.840 AR $0.000 B $1.510 $1.110 7.5 AT $95.830 $126.410 AV $126.410 AV $156.980
#SHEET METAL
WORKER
SERVICE MECHANIC
(TOTAL SHEET
METAL CONTRACT
OF $200,000 OR
LESS) (3RD SHIFT)
02/22/2026 06/28/2026** $60.950 I $17.070 AQ $17.840 AR $0.000 B $1.510 $1.110 7.0 AU $98.480 $130.390 AV $130.390 AV $162.280
#SHEET METAL
WORKER
SERVICE
TECHNICIAN (TOTAL
SHEET METAL
CONTRACT OF
$200,000 OR LESS)
(SPECIAL SHIFT)
02/22/2026 06/28/2026** $55.580 I $17.070 AQ $11.690 AR $0.000 B $1.510 $1.110 8.0 $86.960 $115.740 AV $115.740 AV $144.490
#SHEET METAL
WORKER
SERVICE
TECHNICIAN (TOTAL
SHEET METAL
CONTRACT OF
$200,000 OR LESS)
(2ND SHIFT)
02/22/2026 06/28/2026** $53.160 I $17.070 AQ $11.690 AR $0.000 B $1.510 $1.110 7.5 AT $84.540 $112.110 AV $112.110 AV $139.650
#SHEET METAL
WORKER
SERVICE
TECHNICIAN (TOTAL
SHEET METAL
CONTRACT OF
$200,000 OR LESS)
(3RD SHIFT)
02/22/2026 06/28/2026** $55.580 I $17.070 AQ $11.690 AR $0.000 B $1.510 $1.110 7.0 AU $86.960 $115.740 AV $115.740 AV $144.490
#SHEET METAL
WORKER
AIR CONDITIONING
SPECIALIST (TOTAL
SHEET METAL
CONTRACT OF
$200,000 OR LESS)
(SPECIAL SHIFT)
02/22/2026 06/28/2026** $47.920 I $17.070 AQ $5.770 AR $0.000 B $1.490 $1.110 8.0 $73.360 $98.160 AS $98.160 AS $122.930
#SHEET METAL
WORKER
AIR CONDITIONING
SPECIALIST (TOTAL
SHEET METAL
CONTRACT OF
$200,000 OR LESS)
(2ND SHIFT)
02/22/2026 06/28/2026** $45.840 I $17.070 AQ $5.770 AR $0.000 B $1.490 $1.110 7.5 AT $71.280 $95.040 AS $95.040 AS $118.770
#SHEET METAL
WORKER
AIR CONDITIONING
SPECIALIST (TOTAL
SHEET METAL
CONTRACT OF
$200,000 OR LESS)
(3RD SHIFT)
02/22/2026 06/28/2026** $47.920 I $17.070 AQ $5.770 AR $0.000 B $1.490 $1.110 7.0 AU $73.360 $98.160 AS $98.160 AS $122.930
#SHEET METAL
WORKER
AIR CONDITIONING
PRO (TOTAL SHEET
METAL CONTRACT
OF $200,000 OR
LESS) (SPECIAL
SHIFT)
02/22/2026 06/28/2026** $56.780 I $17.070 AQ $12.170 AR $0.000 B $1.490 $1.110 8.0 $88.620 $117.970 AS $117.970 AS $147.290
#SHEET METAL
WORKER
AIR CONDITIONING
PRO (TOTAL SHEET
METAL CONTRACT
OF $200,000 OR
LESS) (2ND SHIFT)
02/22/2026 06/28/2026** $54.310 I $17.070 AQ $12.170 AR $0.000 B $1.490 $1.110 7.5 AT $86.150 $114.260 AS $114.260 AS $142.350
#SHEET METAL
WORKER
AIR CONDITIONING
PRO (TOTAL SHEET
METAL CONTRACT
OF $200,000 OR
LESS) (3RD SHIFT)
02/22/2026 06/28/2026** $56.780 I $17.070 AQ $12.170 AR $0.000 B $1.490 $1.110 7.0 AU $88.620 $117.970 AS $117.970 AS $147.290
#TERRAZZO
FINISHER
TERRAZZO
FINISHER, 2ND
SHIFT
AW 08/22/2025 06/30/2026** $51.600 AX $13.100 $7.220 $0.000 B $0.800 $1.120 8.0 $73.840 $96.980 AS $96.980 AS $120.110
#TERRAZZO
FINISHER
TERRAZZO
FINISHER, 3RD
SHIFT
AW 08/22/2025 06/30/2026** $51.600 AX $13.100 $7.220 $0.000 B $0.800 $1.120 8.0 $73.840 $96.980 AS $96.980 AS $120.110
#TERRAZZO
WORKER
TERRAZZO
WORKER, 2ND
SHIFT
AW 08/22/2025 06/30/2026** $70.810 AX $13.100 $15.720 $0.000 B $0.800 $1.370 8.0 $101.800 $133.620 AS $133.620 AS $165.440
#TERRAZZO
WORKER
TERRAZZO
WORKER, 3RD
SHIFT
AW 08/22/2025 06/30/2026** $70.810 AX $13.100 $15.720 $0.000 B $0.800 $1.370 8.0 $101.800 $133.620 AS $133.620 AS $165.440
#TILE
FINISHER
TILE FINISHER, 2ND
SHIFT 08/22/2025 03/31/2026* $42.780 AY $12.400 $6.270 $1.250 $0.530 $1.600 8.0 C $64.830 $83.720 $83.720 E $102.610 file:///S/Complete%20Set%20of%20General%20Prevailing%20Wage%20Determinations/2026-1/2026-1%20Subtrades%20Determinations%20(ref)/Shift/Shift-ALA.html[3/10/2026 3:20:42 PM]
A
B
C
D
E
F
G
H
I
J
K
L
M
N
O
P
Q
R
S
T
U
V
W
X
Y
Z
AA
AB
AC
AD
AE
AF
AG
AH
AI
AJ
AK
AL
AM
#TILE
FINISHER
TILE FINISHER - RED
CIRCLED FINISHER,
2ND SHIFT
08/22/2025 03/31/2026* $48.050 AY $12.400 $7.170 $1.750 $0.530 $1.660 8.0 C $71.560 $93.090 $93.090 E $114.610
#TILE SETTER TILE SETTER, 2ND
SHIFT 08/22/2025 03/31/2026** $64.950 AY $12.400 $9.270 $3.000 $0.800 $2.170 8.0 C $92.590 $122.070 $122.070 E $151.540
Go to increase page
FOOTNOTES
EFFECTIVE UNTIL SUPERSEDED BY A NEW DETERMINATION ISSUED BY THE DIRECTOR OF INDUSTRIAL RELATIONS. CONTACT THE OFFICE OF THE DIRECTOR - RESEARCH UNIT AT (415) 703-4774 FOR THE NEW RATES AFTER TEN DAYS AFTER THE EXPIRATION DATE IF NO SUBSEQUENT
DETERMINATION IS ISSUED.
THE RATE TO BE PAID FOR WORK PERFORMED AFTER THIS DATE HAS BEEN DETERMINED. IF WORK WILL EXTEND PAST THIS DATE, THE NEW RATE MUST BE PAID AND SHOULD BE INCORPORATED IN CONTRACTS ENTERED INTO NOW. CONTACT THE OFFICE OF THE DIRECTOR RESEARCH UNIT FOR
SPECIFIC RATES AT (415) 703-4774.
INDICATES AN APPRENTICEABLE CRAFT. THE CURRENT APPRENTICE WAGE RATES ARE AVAILABLE ON THE INTERNET @ HTTP://WWW.DIR.CA.GOV/OPRL/PWAPPWAGE/PWAPPWAGESTART.ASP.
THE BASIC HOURLY RATE AND EMPLOYER PAYMENTS ARE NOT TAKEN FROM A COLLECTIVE BARGAINING AGREEMENT FOR THIS CRAFT OR CLASSIFICATION.
INCLUDES AMOUNT WITHHELD FOR DUES CHECK OFF.
INCLUDED IN STRAIGHT-TIME HOURLY RATE.
SATURDAYS IN THE SAME WORK WEEK MAY BE WORKED AT STRAIGHT-TIME IF JOB IS SHUT DOWN DURING THE NORMAL WORKWEEK DUE TO INCLEMENT WEATHER.
RATE APPLIES TO FIRST 2 OVERTIME HOURS MONDAY THROUGH FRIDAY; ALL OTHER OVERTIME IS PAID AT THE DOUBLE TIME RATE.
RATE APPLIES TO THE FIRST 8 HOURS WORKED ON SATURDAY. ALL OTHER HOURS ARE PAID AT THE SUNDAY/HOLIDAY RATE.
VACATION IS FACTORED AT THE APPLICABLE OVERTIME MULTIPLIER
INCLUDES AMOUNT FOR INDUSTRY PROMOTION FUND, INTERNATIONAL MASONRY INSTITUTE, LABOR MANAGEMENT COOPERATION COMMITTEE, AND VACATION TRUST FUND. EFFECTIVE 5/1/2022, INDUSTRY PROMOTION FUND IS SPLIT INTO THE INDUSTRY FUND AND THE CALIFORNIA MASONRY
COUNCIL.
RATE APPLIES TO THE FIRST 2 DAILY OVERTIME HOURS AND THE FIRST 10 HOURS ON SATURDAY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE.
INCLUDES AMOUNT FOR VAC/HOL AND DUES CHECK OFF.
RATE APPLIES TO FIRST 2 DAILY OVERTIME HOURS AND THE FIRST 10 HOURS WORKED ON SATURDAY. ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE. SATURDAYS IN THE SAME WORK WEEK MAY BE WORKED AT STRAIGHT-TIME IF JOB IS SHUT DOWNDURING THE
NORMAL WORK WEEK DUE TO INCLEMENT WEATHER.
INCLUDED IN BASIC HOURLY RATE.
INCLUDES AN AMOUNT EQUAL TO 6% OF THE HOURLY RATE FOR VACATION/WORKING DUES WHICH IS FACTORED INTO OVERTIME RATES.
IN ADDITION, AN AMOUNT EQUAL TO 3% OF THE BASIC HOURLY RATE IS ADDED TO THE TOTAL HOURLY RATE AND OVERTIME HOURLY RATES FOR THE NATIONAL EMPLOYEES BENEFIT BOARD.
IN ADDITION, AN AMOUNT EQUAL TO 0.5% OF THE BASIC HOURLY RATE, WHICH IS FACTORED AT THE APPLICABLE OVERTIME MULTIPLIER, IS ADDED TO THE TOTAL HOURLY RATE AND OVERTIME HOURLY RATES.
RATE APPLIES TO THE FIRST 2 DAILY OVERTIME HOURS AND THE FIRST 8 HOURS ON SATURDAY ONLY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY NON-SHIFT OVERTIME HOURLY RATE.
DISREGARD THIS RATE. USE THE SUNDAY AND HOLIDAY NON-SHIFT DIFFERENTIAL RATE FOR THIS CLASSIFICATION AS PUBLISHED IN THE DIRECTOR'S GENERAL PREVAILING WAGE DETERMINATIONS.
IN ADDITION, AN AMOUNT EQUAL TO 3% OF THE BASIC HOURLY RATE IS ADDED TO THE TOTAL HOURLY RATE AND OVERTIME HOURLY RATES FOR THE NATIONAL EMPLOYEES BENEFIT BOARD. PURSUANT TO LABOR CODE SECTIONS 1773.1 AND 1773.8, THE AMOUNT PAID FOR THIS EMPLOYER PAYMENT MAY VARY RESULTING IN A LOWER TAXABLE BASIC HOURLY WAGE RATE, BUT THE TOTAL HOURLY RATES FOR STRAIGHT TIME AND OVERTIME MAY NOT BE LESS THAN THE GENERAL PREVAILING RATE OF PER DIEM WAGES.
INCLUDES AN AMOUNT (1.05% OF THE BASIC HOURLY RATE) FOR THE CONTRACT ADMINISTRATION FUND, WHICH IS FACTORED AT THE APPLICABLE OVERTIME MULTIPLIER.
8 HOURS PAY FOR 7.5 HOURS WORKED AT THE STRAIGHT TIME BASIC HOURLY RATE
DISREGARD THIS RATE. USE THE SATURDAY NON-SHIFT DIFFERENTIAL RATE FOR THIS CLASSIFICATION AS PUBLISHED IN THE DIRECTOR'S GENERAL PREVAILING WAGE DETERMINATIONS.
8 HOURS PAY FOR 7 HOURS WORKED AT THE STRAIGHT TIME BASIC HOURLY RATE.
ALL CREWS, WITHOUT CONSIDERATION TO THE NUMBER OF INDIVIDUALS IN THE CREW, SHALL INCLUDE A CHIEF OF PARTY. A CREW CONSISTS OF ONE (1) OR MORE EMPLOYEES PERFORMING FIELD AND CONSTRUCTION SURVEY WORK.
INCLUDES AN AMOUNT PER HOUR WORKED FOR ANNUITY TRUST FUND.
INCLUDES AN AMOUNT PER HOUR WORKED FOR SUPPLEMENTAL DUES.
RATE APPLIES TO DAILY OVERTIME HOURS UP TO AND INCLUDING 12 HOURS WORKED, SUNDAY NIGHT THROUGH THURSDAY NIGHT, OR OTHER OVERTIME HOURS BEYOND 40 HOURS IN A WORKWEEK. ALL OTHER OVERTIME IS PAID AT THE SUNDAY/HOLIDAY SHIFT DIFFERENTIAL RATE. IN THE EVENT THAT THERE ARE LESS THAN 40 HOURS WORKED SUNDAY THROUGH THURSDAY, THEN THE BALANCE OF HOURS WORKED UP TO AND INCLUDING 40 HOURS FOR THE WORKWEEK, OR UP TO 8 HOURS FOR THE WORKDAY, MAY BE WORKED ON SATURDAY AT THE STRAIGHT-TIME SHIFT DIFFERENTIAL
RATE.
CERTIFIED MANIPULATOR WORK SHALL RECEIVE $2.00 PER HOUR ABOVE THE BASIC WAGE RATE
INCLUDES AN AMOUNT PER HOUR WORKED FOR IUPAT, IARP, AND RETIREE PENSION.
INCLUDES AMOUNTS FOR INDUSTRY FUND, WORK PRESERVATION FUND, AND LABOR MANAGEMENT COOPERATION INITIATIVE
EMPLOYEES WORKING ON ANY SUSPENDED PLATFORM/SWING STAGE SHALL BE PAID AN ADDITIONAL $20.00 PER DAY ABOVE THE WAGE RATE.
INCLUDES AN AMOUNT FOR DUES CHECK-OFF AND VACATION/HOLIDAY WHICH ARE FACTORED INTO OVERTIME RATES.
RATE APPLIES TO FIRST 2 OVERTIME HOURS MONDAY THROUGH FRIDAY; ALL OTHER OVERTIME IS PAID AT THE DOUBLE TIME RATE.
EMPLOYEES SHALL RECEIVE PREMIUM PAY FOR THE FOLLOWING WORK: WALLCOVERING ($2.00 PER HOUR), EXOTIC MATERIALS ($1.25 PER HOUR) AND LEAD ABATEMENT/REMOVAL ($1.00 PER HOUR). EMPLOYEES SHALL ALSO BE ENTITLED TO HIGH TIME PREMIUM PAY WHENEVER THE WORK PERFORMED REQUIRES PERSONAL FALL RESTRAINTS TO BE WORN BY THE EMPLOYEE. THE AMOUNT OF THE PREMIUM SHALL BE AS FOLLOWS: AN ADDITIONAL $2.00 PER HOUR ABOVE BASIC HOURLY RATE WHEN WORKING OVER 50 FEET ABOVE GROUND OR WATER LEVEL, $4.00 PER HOUR WHEN WORKING FROM 100 TO 180 FEET AND $6.00 PER HOUR WHEN WORKING OVER 180 FEET. SEE SCOPE PROVISIONS FOR FURTHER DETAILS ON PREMIUMS.
RATE APPLIES TO THE FIRST 4 OVERTIME HOURS MONDAY THROUGH FRIDAY AND THE FIRST 12 HOURS WORKED ON SATURDAYS AND DESIGNATED DAYS OFF. ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME RATE.
EMPLOYEES SHALL RECEIVE PREMIUM PAY FOR THE FOLLOWING WORK: METALIZING AND THERMAL SPRAY ($4.00 PER HOUR). EMPLOYEES SHALL ALSO BE ENTITLED TO HIGH TIME PREMIUM PAY WHENEVER THE WORK PERFORMED REQUIRES PERSONAL FALL RESTRAINTS TO BE WORN BY THE EMPLOYEE. THE AMOUNT OF THE PREMIUM SHALL BE AS FOLLOWS: AN ADDITIONAL $4.00 PER HOUR WHEN WORKING FROM 100 TO 180 FEET ABOVE GROUND OR WATER LEVEL AND $6.00 PER HOUR WHEN WORKING OVER 180 FEET. SEE SCOPE PROVISIONS FOR FURTHER DETAILS ON PREMIUMS.
EMPLOYEES SHALL RECEIVE PREMIUM PAY FOR THE FOLLOWING WORK: METALIZING AND THERMAL SPRAY ($4.00 PER HOUR). SEE SCOPE PROVISIONS FOR FURTHER DETAILS ON PREMIUMS.
INCLUDES AMOUNTS FOR VACATION AND DUES CHECK OFF
RATE APPLIES TO THE FIRST 4 DAILY OVERTIME HOURS AND THE FIRST 12 HOURS WORKED ON SATURDAY. ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME RATE. SATURDAYS IN THE SAME WORK WEEK MAY BE WORKED AT STRAIGHT-TIME IF JOB IS SHUT DOWN DURING THE
NORMAL WORKWEEK DUE TO INCLEMENT WEATHER.
DESIGNATED DAYS OFF SHALL BE PAID AT THE SATURDAY OVERTIME RATE; PLEASE REFER TO THE HOLIDAY PROVISIONS FOR A LIST OF DESIGNATED DAYS OFF.
INCLUDES AMOUNTS WITHHELD FOR DUES CHECK OFF, VACATION, AND SHIFT PREMIUM WHICH ARE NOT FACTORED INTO OVERTIME. EMPLOYEES OPERATING AND WORKING BEHIND PLASTER GUNS SHALL RECEIVE AN ADDITIONAL $5.00 PER DAY ABOVE THE WAGE RATE. EMPLOYEES WORKING ON AN EXTERIOR SUSPENDED SCAFFOLD SHALL BE PAID AN ADDITIONAL $15.00 PER DAY ABOVE THE WAGE RATE.
file:///OPRL/2026-1/PWD/Increases/Subtrades/Shift/Shift-ALA-Pre.html file:///S/Complete%20Set%20of%20General%20Prevailing%20Wage%20Determinations/2026-1/2026-1%20Subtrades%20Determinations%20(ref)/Shift/Shift-ALA.html[3/10/2026 3:20:42 PM]
AN
AO
AP
AQ
AR
AS
AT
AU
AV
AW
AX
AY
8 HOURS PAY FOR 7 HOURS WORKED AT STRAIGHT-TIME BASIC HOURLY RATE.
RATE APPLIES TO THE FIRST 4 OVERTIME HOURS MONDAY THROUGH FRIDAY AND THE FIRST 7 HOURS WORKED ON SATURDAYS AND DESIGNATED DAYS OFF. ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME RATE.
RATE APPLIES TO THE FIRST 4 OVERTIME HOURS MONDAY THROUGH FRIDAY AND THE FIRST 7 HOURS WORKED ON SATURDAYS AND DESIGNATED DAYS OFF. ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME RATE. SATURDAYS IN THE SAME WORK WEEK MAY BE WORKED AT STRAIGHT-TIME IF JOB IS SHUT DOWN DURING THE NORMAL WORKWEEK DUE TO INCLEMENT WEATHER
INCLUDES SMOHIT AND SHC. EFFECTIVE 1/1/2013, PURSUANT TO LABOR CODE SECTIONS 1773.1 AND 1773.8, THE AMOUNT PAID FOR THIS EMPLOYER PAYMENT MAY VARY RESULTING IN A LOWER TAXABLE BASIC HOURLY WAGE RATE, BUT THE TOTAL HOURLY RATES FOR STRAIGHT TIME AND OVERTIME MAY NOT BE LESS THAN THE GENERAL PREVAILING RATE OF PER DIEM WAGES. INCLUDES AN AMOUNT FOR HEALTH & WELFARE WHICH IS FACTORED AT THE APPLICABLE OVERTIME MULTIPLIER.
INCLUDES AN AMOUNT FOR PENSION WHICH IS FACTORED AT THE APPLICABLE OVERTIME MULTIPLIER. PURSUANT TO LABOR CODE SECTIONS 1773.1 AND 1773.8, THE AMOUNT PAID FOR THIS EMPLOYER PAYMENT MAY VARY RESULTING IN A LOWER TAXABLE BASIC HOURLY WAGE RATE, BUT THE TOTAL HOURLY RATES FOR STRAIGHT TIME AND OVERTIME MAY NOT BE LESS THAN THE GENERAL PREVAILING RATE OF PER DIEM WAGES.
RATE APPLIES TO THE FIRST 2 DAILY OVERTIME HOURS AND THE FIRST 8 HOURS ON SATURDAY ONLY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE.
8 HOURS PAY AT THE STRAIGHT TIME TOTAL HOURLY RATE FOR 7.5 HOURS WORKED
8 HOURS PAY AT THE STRAIGHT TIME TOTAL HOURLY RATE FOR 7 HOURS WORKED
RATE APPLIES TO FIRST 4 DAILY OVERTIME HOURS AND THE FIRST 8 HOURS WORKED ON SATURDAY DURING THE EMPLOYEES NORMAL WORKING HOURS. ALL OTHER OVERTIME HOURS SHALL BE PAID AT THE SUNDAY AND HOLIDAY DOUBLE TIME RATE.
THE RATIO OF TERRAZZO FINISHER HOURS TO TERRAZZO WORKER HOURS SHALL NOT EXCEED TWO (2) TO ONE (1).
INCLUDES AN AMOUNT FOR VACATION/DUES CHECK OFF WHICH IS NOT FACTORED IN THE OVERTIME RATES.
INCLUDES AMOUNT WITHHELD FOR DUES CHECK OFF, WHICH IS FACTORED IN THE OVERTIME RATES. INCLUDES AN AMOUNT OF PREMIUM RATE PER HOUR ABOVE THE REGULAR STRAIGHT-TIME RATE, WHICH IS NOT FACTORED IN THE OVERTIME RATES. ANY EMPLOYEE WORKING UNDERGROUND
SHALL RECEIVE $1.00 PER HOUR IN ADDITION TO REGULAR WAGES.
RECOGNIZED HOLIDAYS: HOLIDAYS UPON WHICH THE GENERAL PREVAILING HOURLY WAGE RATE FOR HOLIDAY WORK SHALL BE PAID, SHALL BE ALL HOLIDAYS IN THE COLLECTIVE BARGAINING AGREEMENT, APPLICABLE TO THE PARTICULAR CRAFT, CLASSIFICATION, OR TYPE OF WORKER EMPLOYED ON THE PROJECT, WHICH IS ON FILE WITH THE DIRECTOR OF INDUSTRIAL RELATIONS. IF THE PREVAILING RATE IS NOT BASED ON A COLLECTIVELY BARGAINED RATE, THE HOLIDAYS UPON WHICH THE PREVAILING RATE SHALL BE PAID SHALL BE AS PROVIDED IN SECTION 6700 OF THE GOVERNMENT CODE. YOU MAY OBTAIN THE HOLIDAY PROVISIONS FOR THE CURRENT DETERMINATIONS ON THE INTERNET AT HTTP://WWW.DIR.CA.GOV/OPRL/DPreWageDetermination.htm. HOLIDAY PROVISIONS FOR THE CURRENT OR SUPERSEDED DETERMINATIONS MAY BE OBTAINED BY CONTACTING THE OFFICE OF
THE DIRECTOR - RESEARCH UNIT AT (415) 703-4774.
TRAVEL AND/OR SUBSISTENCE: IN ACCORDANCE WITH LABOR CODE SECTIONS 1773.1 AND 1773.9, CONTRACTORS SHALL MAKE TRAVEL AND/OR SUBSISTENCE PAYMENTS TO EACH WORKER TO EXECUTE THE WORK. YOU MAY OBTAIN THE TRAVEL AND/OR SUBSISTENCE PROVISIONS FOR THE CURRENT DETERMINATIONS ON THE INTERNET AT HTTP://WWW.DIR.CA.GOV/OPRL/DPreWageDetermination.htm. TRAVEL AND/OR SUBSISTENCE REQUIREMENTS FOR CURRENT OR SUPERSEDED DETERMINATIONS MAY BE OBTAINED BY CONTACTING THE OFFICE OF THE DIRECTOR - RESEARCH UNIT AT (415) 703-4774.
Return to main page file:///OPRL/2026-1/PWD/Determinations/Subtrades/Shift/shiftlist.html
GENERAL PREVAILING WAGE DETERMINATION - ALP-2026-1
file:///S/Complete%20Set%20of%20General%20Prevailing%20Wage%20Determinations/2026-1/2026-1%20Subtrades%20Determinations%20(ref)/Shift/Shift-ALP.html[3/10/2026 3:20:43 PM]
GENERAL PREVAILING WAGE DETERMINATION MADE BY THE DIRECTOR OF INDUSTRIAL RELATIONS
PURSUANT TO CALIFORNIA LABOR CODE PART
7, CHAPTER 1, ARTICLE 2, SECTIONS 1770, 1773 AND 1773.1
FOR COMMERCIAL BUILDING, HIGHWAY, HEAVY CONSTRUCTION AND DREDGING
PROJECTS
LOCALITY: ALPINE COUNTY
DETERMINATION: ALP-2026-1
CRAFT CLASSIFICATION CRAFT
FOOTNOTE
ISSUE
DATE
EXPIRATION
DATE
BASIC
HOURLY
RATE
BASIC
HOURLY
RATE
FOOTNOTE
HEALTH
AND
WELFARE
HEALTH
AND
WELFARE
FOOTNOTE
PENSION PENSION
FOOTNOTE
VACATION/
HOLIDAY
VACATION/
HOLIDAY
FOOTNOTE
TRAINING TRAINING
FOOTNOTE
OTHER
PAYMENTS
OTHER
PAYMENTS
FOOTNOTE
HOURS HOURS
FOOTNOTE
STRAIGHT-
TIME
TOTAL
HOURLY
RATE
DAILY
OVERTIME
HOURLY
RATE
DAILY
OVERTIME
HOURLY
RATE
FOOTNOTE
SATURDAY
OVERTIME
HOURLY
RATE
SATURDAY
OVERTIME
HOURLY
RATE
FOOTNOTE
SUNDAY
AND
HOLIDAY
OVERTIME
HOURLY
RATE
SUNDAY
AND
HOLIDAY
OVERTIME
HOURLY
RATE
FOOTNOTE
#BRICKLAYER,
BLOCKLAYER,
POINTER,
CLEANER,
CAULKER,
WATERPROOFER
(2ND SHIFT)
08/22/2025 06/30/2026* $63.970 A $13.100 $13.370 $0.000 B $1.640 $0.430 8.0 C $92.510 $124.500 D $124.500 E $156.480
#BRICKLAYER,
BLOCKLAYER,
POINTER,
CLEANER,
CAULKER,
WATERPROOFER
(3RD SHIFT)
08/22/2025 06/30/2026* $66.760 A $13.100 $13.370 $0.000 B $1.640 $0.430 8.0 C $95.300 $128.680 D $128.680 E $162.060
#BRICKLAYER,
BLOCKLAYER:
BRICKLAYER,
BLOCKLAYER,
STONEMASON
(2ND SHIFT)
08/22/2025 04/30/2026** $57.230 A $13.100 $11.620 $2.750 F $0.800 $2.200 G 8.0 C $87.700 $117.690 H $117.690 H $147.680
#BRICKLAYER,
BLOCKLAYER:
BRICKLAYER,
BLOCKLAYER,
STONEMASON
(3RD SHIFT)
08/22/2025 04/30/2026** $59.960 A $13.100 $11.620 $2.750 F $0.800 $2.200 G 8.0 C $90.430 $121.790 H $121.790 H $153.140
#BRICK
TENDER
BRICK TENDER
(SPECIAL SINGLE
SHIFT)
08/22/2025 06/30/2026** $45.500 I $11.100 $14.350 $0.000 B $0.450 $0.550 8.0 $71.950 $94.700 J $94.700 J $117.450
#CARPET,
LINOLEUM,
RESILIENT TILE
LAYER (2ND
SHIFT)
02/22/2026 12/31/2026** $64.020 A $12.250 $16.650 $0.000 K $0.940 $0.340 8.0 $94.200 $158.220 $158.220 $158.220 L
#ELECTRICIAN:
COMM & SYSTEM
INSTALLER,
SECOND SHIFT
02/22/2026 03/31/2026* $48.090 $16.000 $8.950 M $0.000 $1.000 $1.110 N 8.0 $76.830 $101.710 O $101.710 O $126.610 P
#ELECTRICIAN:
COMM & SYSTEM
INSTALLER,
THIRD SHIFT
02/22/2026 03/31/2026* $53.870 $16.000 $8.950 M $0.000 $1.000 $1.110 N 8.0 $82.820 $110.700 O $110.700 O $138.570 P
#ELECTRICIAN:
COMM & SYSTEM
TECH., SECOND
SHIFT
02/22/2026 03/31/2026* $55.310 $16.000 $8.950 M $0.000 $1.000 $1.110 N 8.0 $84.310 $112.930 O $112.930 O $141.560 P
#ELECTRICIAN:
COMM & SYSTEM
TECH., THIRD
SHIFT
02/22/2026 03/31/2026* $61.960 $16.000 $8.950 M $0.000 $1.000 $1.110 N 8.0 $91.190 $123.250 O $123.250 O $155.320 P
#ELECTRICIAN:
INSIDE
WIREMAN, 2ND
SHIFT
02/22/2026 05/31/2026* $61.820 $14.060 $14.250 M $0.000 B $1.890 $7.900 Q 8.0 $102.760 $135.100 R $135.100 R $167.430 P
#ELECTRICIAN:
INSIDE
WIREMAN, 3RD
SHIFT
02/22/2026 05/31/2026* $69.250 $14.060 $14.250 M $0.000 B $1.890 $7.900 Q 8.0 $110.540 $146.760 R $146.760 R $182.980 P
#ELECTRICIAN: CABLE SPLICER,
2ND SHIFT 02/22/2026 05/31/2026* $68.000 $14.060 $14.250 M $0.000 B $1.890 $7.900 Q 8.0 $109.230 $144.800 R $144.800 R $180.360 P
#ELECTRICIAN: CABLE SPLICER,
3RD SHIFT 02/22/2026 05/31/2026* $76.170 $14.060 $14.250 M $0.000 B $1.890 $7.900 Q 8.0 $117.770 $157.600 R $157.600 R $197.430 P
#GLAZIER GLAZIER
(SPECIAL SHIFT) S 02/22/2026 12/31/2026** $53.650 A $12.250 $24.540 T $0.000 $1.140 $0.550 U 7.5 V $92.130 $145.780 $145.780 $145.780
#MARBLE
FINISHER
MARBLE
FINISHER (2ND
SHIFT)
W 08/22/2025 07/31/2026** $48.140 X $13.100 $6.780 $0.000 K $0.450 $0.970 8.0 $69.440 $93.510 Y $117.580 $117.580
#MARBLE
MASON
MARBLE MASON
(2ND SHIFT) W 08/22/2025 07/31/2026** $70.010 X $13.100 $16.220 $0.000 K $0.800 $1.330 8.0 $101.460 $136.470 Y $171.470 $171.470
#PAINTER PAINTER
(SPECIAL SHIFT) Z 02/22/2026 06/30/2026* $55.020 I $12.250 $9.950 AA $0.000 K $1.100 $0.530 8.0 C $78.850 $106.360 AB $106.360 AB $133.870
#PAINTER
INDUSTRIAL
PAINTER
(SPECIAL SHIFT)
AC 02/22/2026 06/30/2026* $60.720 I $12.250 $9.950 AA $0.000 K $1.100 $0.530 8.0 C $84.550 $114.910 AB $114.910 AB $145.270
#PAINTER BRIDGE PAINTER
(SPECIAL SHIFT) AD 02/22/2026 06/30/2026* $63.120 I $12.250 $9.950 AA $0.000 K $1.100 $0.530 8.0 C $86.950 $118.510 AB $118.510 AB $150.070
#PAINTER: TAPER (SPECIAL
SHIFT) 02/22/2026 06/30/2026* $75.760 AE $12.250 $19.390 $0.000 K $1.050 $0.740 8.0 $109.190 $147.070 AF $147.070 AF $184.950 AG
#PLASTERER PLASTERER: 2ND
SHIFT 08/22/2025 06/30/2026** $53.170 AH $16.040 $19.990 $0.000 B $1.450 $1.440 7.0 AI $92.090 $114.780 AJ $114.780 AK $137.470
#PLASTERER PLASTERER: 3RD
SHIFT 08/22/2025 06/30/2026** $54.170 AH $16.040 $19.990 $0.000 B $1.450 $1.440 7.0 AI $93.090 $115.780 AJ $115.780 AK $138.470
#SHEET METAL
WORKER
SHEET METAL
WORKER (2ND
SHIFT)
08/22/2025 06/30/2026** $56.120 A $18.190 $25.480 AL $0.000 B $1.680 AM $1.000 AN 7.5 V $102.470 $133.030 AO $133.030 AO $163.590
#SHEET METAL
WORKER
SHEET METAL
WORKER (THIRD
SHIFT)
08/22/2025 06/30/2026** $58.670 A $18.190 $25.480 AL $0.000 B $1.680 AM $1.000 AN 7.0 AP $105.020 $136.860 AO $136.860 AO $168.690
#TERRAZZO
FINISHER
TERRAZZO
FINISHER, 2ND
SHIFT
AQ 08/22/2025 06/30/2026** $51.600 AR $13.100 $7.220 $0.000 B $0.800 $1.120 8.0 $73.840 $96.980 AO $96.980 AO $120.110
#TERRAZZO TERRAZZO
file:///S/Complete%20Set%20of%20General%20Prevailing%20Wage%20Determinations/2026-1/2026-1%20Subtrades%20Determinations%20(ref)/Shift/Shift-ALP.html[3/10/2026 3:20:43 PM]
A
B
C
D
E
F
G
H
I
J
K
L
M
N
O
P
Q
R
S
T
U
V
W
X
Y
Z
AA
AB
AC
AD
AE
AF
AG
AH
FINISHER FINISHER, 3RD
SHIFT
AQ 08/22/2025 06/30/2026** $51.600 AR $13.100 $7.220 $0.000 B $0.800 $1.120 8.0 $73.840 $96.980 AO $96.980 AO $120.110
#TERRAZZO
WORKER
TERRAZZO
WORKER, 2ND
SHIFT
AQ 08/22/2025 06/30/2026** $70.810 AR $13.100 $15.720 $0.000 B $0.800 $1.370 8.0 $101.800 $133.620 AO $133.620 AO $165.440
#TERRAZZO
WORKER
TERRAZZO
WORKER, 3RD
SHIFT
AQ 08/22/2025 06/30/2026** $70.810 AR $13.100 $15.720 $0.000 B $0.800 $1.370 8.0 $101.800 $133.620 AO $133.620 AO $165.440
#TILE
FINISHER
TILE FINISHER,
2ND SHIFT 08/22/2025 03/31/2026* $40.190 AS $12.400 $6.210 $1.000 $0.500 $1.570 8.0 C $61.870 $79.470 $79.470 E $97.060
#TILE
FINISHER
TILE FINISHER -
RED CIRCLED
FINISHER, 2ND
SHIFT
08/22/2025 03/31/2026* $44.750 AS $12.400 $7.050 $1.300 $0.500 $1.630 8.0 C $67.630 $87.510 $87.510 E $107.380
#TILE SETTER TILE SETTER,
2ND SHIFT 08/22/2025 03/31/2026** $60.700 AS $12.400 $9.020 $2.750 $0.750 $2.120 8.0 C $87.740 $115.090 $115.090 E $142.440
Go to increase page
FOOTNOTES
EFFECTIVE UNTIL SUPERSEDED BY A NEW DETERMINATION ISSUED BY THE DIRECTOR OF INDUSTRIAL RELATIONS. CONTACT THE OFFICE OF THE DIRECTOR - RESEARCH UNIT AT (415) 703-4774 FOR THE NEW RATES AFTER TEN DAYS AFTER THE EXPIRATION DATE IF NO SUBSEQUENT
DETERMINATION IS ISSUED.
THE RATE TO BE PAID FOR WORK PERFORMED AFTER THIS DATE HAS BEEN DETERMINED. IF WORK WILL EXTEND PAST THIS DATE, THE NEW RATE MUST BE PAID AND SHOULD BE INCORPORATED IN CONTRACTS ENTERED INTO NOW. CONTACT THE OFFICE OF THE DIRECTOR RESEARCH UNIT FOR
SPECIFIC RATES AT (415) 703-4774.
INDICATES AN APPRENTICEABLE CRAFT. THE CURRENT APPRENTICE WAGE RATES ARE AVAILABLE ON THE INTERNET @ HTTP://WWW.DIR.CA.GOV/OPRL/PWAPPWAGE/PWAPPWAGESTART.ASP.
THE BASIC HOURLY RATE AND EMPLOYER PAYMENTS ARE NOT TAKEN FROM A COLLECTIVE BARGAINING AGREEMENT FOR THIS CRAFT OR CLASSIFICATION.
INCLUDES AMOUNT WITHHELD FOR DUES CHECK OFF.
INCLUDED IN STRAIGHT-TIME HOURLY RATE.
SATURDAYS IN THE SAME WORK WEEK MAY BE WORKED AT STRAIGHT-TIME IF JOB IS SHUT DOWN DURING THE NORMAL WORKWEEK DUE TO INCLEMENT WEATHER.
RATE APPLIES TO FIRST 2 OVERTIME HOURS MONDAY THROUGH FRIDAY; ALL OTHER OVERTIME IS PAID AT THE DOUBLE TIME RATE.
RATE APPLIES TO THE FIRST 8 HOURS WORKED ON SATURDAY. ALL OTHER HOURS ARE PAID AT THE SUNDAY/HOLIDAY RATE.
VACATION IS FACTORED AT THE APPLICABLE OVERTIME MULTIPLIER
INCLUDES AMOUNT FOR INDUSTRY PROMOTION FUND, INTERNATIONAL MASONRY INSTITUTE, LABOR MANAGEMENT COOPERATION COMMITTEE, AND VACATION TRUST FUND. EFFECTIVE 5/1/2022, INDUSTRY PROMOTION FUND IS SPLIT INTO THE INDUSTRY FUND AND THE CALIFORNIA MASONRY
COUNCIL.
RATE APPLIES TO THE FIRST 2 DAILY OVERTIME HOURS AND THE FIRST 10 HOURS ON SATURDAY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE.
INCLUDES AMOUNT FOR VAC/HOL AND DUES CHECK OFF.
RATE APPLIES TO FIRST 2 DAILY OVERTIME HOURS AND THE FIRST 10 HOURS WORKED ON SATURDAY. ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE. SATURDAYS IN THE SAME WORK WEEK MAY BE WORKED AT STRAIGHT-TIME IF JOB IS SHUT DOWNDURING THE
NORMAL WORK WEEK DUE TO INCLEMENT WEATHER.
INCLUDED IN BASIC HOURLY RATE.
DESIGNATED DAYS OFF SHALL BE PAID AT TIME AND ONE-HALF (1 1/2X). PLEASE REFER TO THE HOLIDAY PROVISION FOR A LIST OF DESIGNATED DAYS OFF.
IN ADDITION, AN AMOUNT EQUAL TO 3% OF THE BASIC HOURLY RATE IS ADDED TO THE TOTAL HOURLY RATE AND OVERTIME HOURLY RATES FOR THE NATIONAL EMPLOYEES BENEFIT BOARD.
IN ADDITION, AN AMOUNT EQUAL TO 0.5% OF THE BASIC HOURLY RATE, WHICH IS FACTORED AT THE APPLICABLE OVERTIME MULTIPLIER, IS ADDED TO THE TOTAL HOURLY RATE AND OVERTIME HOURLY RATES FOR THE ADMINISTRATIVE MAINTENANCE FUND.
RATE APPLIES TO THE FIRST 2 DAILY OVERTIME HOURS AND THE FIRST 8 HOURS ON SATURDAY ONLY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY NON-SHIFT OVERTIME HOURLY RATE.
DISREGARD THIS RATE. USE THE SUNDAY AND HOLIDAY NON-SHIFT DIFFERENTIAL RATE FOR THIS CLASSIFICATION AS PUBLISHED IN THE DIRECTOR'S GENERAL PREVAILING WAGE DETERMINATIONS.
IN ADDITION, AN AMOUNT EQUAL TO 1.6% OF THE BASIC HOURLY RATE, WHICH IS FACTORED AT THE APPLICABLE OVERTIME MULTIPLIER, IS ADDED TO THE TOTAL HOURLY RATE AND OVERTIME HOURLY RATES FOR THE CONTRACT ADMINISTRATION FUND.
DISREGARD THIS RATE. USE THE DAILY OVERTIME NON-SHIFT DIFFERENTIAL RATE FOR THIS CLASSIFICATION AS PUBLISHED IN THE DIRECTOR'S GENERAL PREVAILING WAGE DETERMINATIONS.
CERTIFIED MANIPULATOR WORK SHALL RECEIVE $2.00 PER HOUR ABOVE THE BASIC WAGE RATE
INCLUDES AN AMOUNT PER HOUR WORKED FOR IUPAT, IARP, AND RETIREE PENSION.
INCLUDES AMOUNTS FOR INDUSTRY FUND, WORK PRESERVATION FUND, AND LABOR MANAGEMENT COOPERATION INITIATIVE
8 HOURS PAY FOR 7.5 HOURS WORKED AT THE STRAIGHT TIME BASIC HOURLY RATE
EMPLOYEES WORKING ON ANY SUSPENDED PLATFORM/SWING STAGE SHALL BE PAID AN ADDITIONAL $20.00 PER DAY ABOVE THE WAGE RATE.
INCLUDES AN AMOUNT FOR DUES CHECK-OFF AND VACATION/HOLIDAY WHICH ARE FACTORED INTO OVERTIME RATES.
RATE APPLIES TO FIRST 2 OVERTIME HOURS MONDAY THROUGH FRIDAY; ALL OTHER OVERTIME IS PAID AT THE DOUBLE TIME RATE.
EMPLOYEES SHALL RECEIVE PREMIUM PAY FOR THE FOLLOWING WORK: EXOTIC MATERIALS ($1.25 PER HOUR) AND LEAD ABATEMENT/REMOVAL ($1.00 PER HOUR). EMPLOYEES WORKING ON COMMERCIAL PROJECTS SHALL ALSO BE ENTITLED TO HIGH TIME PREMIUM WHENEVER THE WORK PERFORMED REQUIRES A SWINGING AND/OR PLATFORM SUSPENSION SYSTEM. THE AMOUNT OF THE PREMIUM SHALL BE AS FOLLOWS: AN ADDITIONAL $4.00 PER HOUR WHEN WORKING FROM 100 TO 180 FEET ABOVE GROUND OR WATER LEVEL AND $6.00 PER HOUR WHEN WORKING OVER 180
FEET. SEE SCOPE PROVISIONS FOR FURTHER DETAILS ON PREMIUMS.
INCLUDES AN AMOUNT PER HOUR WORKED FOR ANNUITY TRUST FUND.
RATE APPLIES TO FIRST 4 OVERTIME HOURS MONDAY THROUGH FRIDAY, FIRST 12 HOURS WORKED ON SATURDAYS AND ALL HOURS WORKED ON DESIGNATED DAYS OFF. ALL OTHER OVERTIME IS PAID AT SUNDAY/HOLIDAY RATE.
EMPLOYEES SHALL RECEIVE PREMIUM PAY FOR THE FOLLOWING WORK: METALIZING AND THERMAL SPRAY ($4.00 PER HOUR). EMPLOYEES SHALL ALSO BE ENTITLED TO HIGH TIME PREMIUM PAY WHENEVER THE WORK PERFORMED REQUIRES PERSONAL FALL RESTRAINTS TO BE WORN BY THE EMPLOYEE. THE AMOUNT OF THE PREMIUM SHALL BE AS FOLLOWS: AN ADDITIONAL $4.00 PER HOUR WHEN WORKING FROM 100 TO 180 FEET ABOVE GROUND OR WATER LEVEL AND $6.00 PER HOUR WHEN WORKING OVER 180 FEET. SEE SCOPE PROVISIONS FOR FURTHER DETAILS ON PREMIUMS.
EMPLOYEES SHALL RECEIVE PREMIUM PAY FOR THE FOLLOWING WORK: METALIZING AND THERMAL SPRAY ($4.00 PER HOUR). SEE SCOPE PROVISIONS FOR FURTHER DETAILS ON PREMIUMS.
INCLUDES AMOUNTS FOR VACATION AND DUES CHECK OFF
RATE APPLIES TO THE FIRST 4 DAILY OVERTIME HOURS AND THE FIRST 12 HOURS WORKED ON SATURDAY. ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME RATE. SATURDAYS IN THE SAME WORK WEEK MAY BE WORKED AT STRAIGHT-TIME IF JOB IS SHUT DOWN DURING THE
NORMAL WORKWEEK DUE TO INCLEMENT WEATHER.
DESIGNATED DAYS OFF SHALL BE PAID AT THE SATURDAY OVERTIME RATE; PLEASE REFER TO THE HOLIDAY PROVISIONS FOR A LIST OF DESIGNATED DAYS OFF.
INCLUDES AMOUNTS WITHHELD FOR DUES CHECK OFF, VACATION, AND SHIFT PREMIUM WHICH ARE NOT FACTORED INTO OVERTIME. EMPLOYEES OPERATING AND WORKING BEHIND PLASTER GUNS SHALL RECEIVE AN ADDITIONAL $5.00 PER DAY ABOVE THE WAGE RATE. EMPLOYEES WORKING file:///OPRL/2026-1/PWD/Increases/Subtrades/Shift/Shift-ALP-Pre.html file:///S/Complete%20Set%20of%20General%20Prevailing%20Wage%20Determinations/2026-1/2026-1%20Subtrades%20Determinations%20(ref)/Shift/Shift-ALP.html[3/10/2026 3:20:43 PM]
AI
AJ
AK
AL
AM
AN
AO
AP
AQ
AR
AS
ON AN EXTERIOR SUSPENDED SCAFFOLD SHALL BE PAID AN ADDITIONAL $15.00 PER DAY ABOVE THE WAGE RATE.
8 HOURS PAY FOR 7 HOURS WORKED AT STRAIGHT-TIME BASIC HOURLY RATE.
RATE APPLIES TO THE FIRST 4 OVERTIME HOURS MONDAY THROUGH FRIDAY AND THE FIRST 7 HOURS WORKED ON SATURDAYS AND DESIGNATED DAYS OFF. ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME RATE.
RATE APPLIES TO THE FIRST 4 OVERTIME HOURS MONDAY THROUGH FRIDAY AND THE FIRST 7 HOURS WORKED ON SATURDAYS AND DESIGNATED DAYS OFF. ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME RATE. SATURDAYS IN THE SAME WORK WEEK MAY BE WORKED AT STRAIGHT-TIME IF JOB IS SHUT DOWN DURING THE NORMAL WORKWEEK DUE TO INCLEMENT WEATHER
INCLUDES AN AMOUNT FOR PENSION WHICH IS FACTORED AT THE APPLICABLE OVERTIME MULTIPLIER. PURSUANT TO LABOR CODE SECTIONS 1773.1 AND 1773.8, THE AMOUNT PAID FOR THIS EMPLOYER PAYMENT MAY VARY RESULTING IN A LOWER TAXABLE BASIC HOURLY WAGE RATE, BUT THE TOTAL HOURLY RATES FOR STRAIGHT TIME AND OVERTIME MAY NOT BE LESS THAN THE GENERAL PREVAILING RATE OF PER DIEM WAGES.
INCLUDES $0.05 FOR SCHOLAR FUND.
INCLUDES AMOUNTS FOR INDUSTRY FUND AND LABOR MANAGEMENT.
RATE APPLIES TO THE FIRST 2 DAILY OVERTIME HOURS AND THE FIRST 8 HOURS ON SATURDAY ONLY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE.
8 HOURS PAY FOR 7 HOURS WORKED AT THE STRAIGHT TIME BASIC HOURLY RATE.
THE RATIO OF TERRAZZO FINISHER HOURS TO TERRAZZO WORKER HOURS SHALL NOT EXCEED TWO (2) TO ONE (1).
INCLUDES AN AMOUNT FOR VACATION/DUES CHECK OFF WHICH IS NOT FACTORED IN THE OVERTIME RATES.
INCLUDES AMOUNT WITHHELD FOR DUES CHECK OFF, WHICH IS FACTORED IN THE OVERTIME RATES. INCLUDES AN AMOUNT OF PREMIUM RATE PER HOUR ABOVE THE REGULAR STRAIGHT-TIME RATE, WHICH IS NOT FACTORED IN THE OVERTIME RATES. ANY EMPLOYEE WORKING
UNDERGROUND SHALL RECEIVE $1.00 PER HOUR IN ADDITION TO REGULAR WAGES.
RECOGNIZED HOLIDAYS: HOLIDAYS UPON WHICH THE GENERAL PREVAILING HOURLY WAGE RATE FOR HOLIDAY WORK SHALL BE PAID, SHALL BE ALL HOLIDAYS IN THE COLLECTIVE BARGAINING AGREEMENT, APPLICABLE TO THE PARTICULAR CRAFT, CLASSIFICATION, OR TYPE OF WORKER EMPLOYED ON THE PROJECT, WHICH IS ON FILE WITH THE DIRECTOR OF INDUSTRIAL RELATIONS. IF THE PREVAILING RATE IS NOT BASED ON A COLLECTIVELY BARGAINED RATE, THE HOLIDAYS UPON WHICH THE PREVAILING RATE SHALL BE PAID SHALL BE AS PROVIDED IN SECTION 6700 OF THE GOVERNMENT CODE. YOU MAY OBTAIN THE HOLIDAY PROVISIONS FOR THE CURRENT DETERMINATIONS ON THE INTERNET AT HTTP://WWW.DIR.CA.GOV/OPRL/DPreWageDetermination.htm. HOLIDAY PROVISIONS FOR THE CURRENT OR SUPERSEDED DETERMINATIONS MAY BE OBTAINED BY CONTACTING THE OFFICE
OF THE DIRECTOR - RESEARCH UNIT AT (415) 703-4774.
TRAVEL AND/OR SUBSISTENCE: IN ACCORDANCE WITH LABOR CODE SECTIONS 1773.1 AND 1773.9, CONTRACTORS SHALL MAKE TRAVEL AND/OR SUBSISTENCE PAYMENTS TO EACH WORKER TO EXECUTE THE WORK. YOU MAY OBTAIN THE TRAVEL AND/OR SUBSISTENCE PROVISIONS FOR THE CURRENT DETERMINATIONS ON THE INTERNET AT HTTP://WWW.DIR.CA.GOV/OPRL/DPreWageDetermination.htm. TRAVEL AND/OR SUBSISTENCE REQUIREMENTS FOR CURRENT OR SUPERSEDED DETERMINATIONS MAY BE OBTAINED BY CONTACTING THE OFFICE OF THE DIRECTOR - RESEARCH UNIT AT
(415) 703-4774.
GENERAL PREVAILING WAGE DETERMINATION - AMA-2026-1
file:///S/Complete%20Set%20of%20General%20Prevailing%20Wage%20Determinations/2026-1/2026-1%20Subtrades%20Determinations%20(ref)/Shift/Shift-AMA.html[3/10/2026 3:20:43 PM]
GENERAL PREVAILING WAGE DETERMINATION MADE BY THE DIRECTOR OF INDUSTRIAL RELATIONS
PURSUANT TO CALIFORNIA LABOR CODE PART
7, CHAPTER 1, ARTICLE 2, SECTIONS 1770, 1773 AND 1773.1
FOR COMMERCIAL BUILDING, HIGHWAY, HEAVY CONSTRUCTION AND DREDGING
PROJECTS
LOCALITY: AMADOR COUNTY
DETERMINATION: AMA-2026-1
CRAFT CLASSIFICATION CRAFT
FOOTNOTE
ISSUE
DATE
EXPIRATION
DATE
BASIC
HOURLY
RATE
BASIC
HOURLY
RATE
FOOTNOTE
HEALTH
AND
WELFARE
HEALTH
AND
WELFARE
FOOTNOTE
PENSION PENSION
FOOTNOTE
VACATION/
HOLIDAY
VACATION/
HOLIDAY
FOOTNOTE
TRAINING TRAINING
FOOTNOTE
OTHER
PAYMENTS
OTHER
PAYMENTS
FOOTNOTE
HOURS HOURS
FOOTNOTE
STRAIGHT-
TIME
TOTAL
HOURLY
RATE
DAILY
OVERTIME
HOURLY
RATE
DAILY
OVERTIME
HOURLY
RATE
FOOTNOTE
SATURDAY
OVERTIME
HOURLY
RATE
SATURDAY
OVERTIME
HOURLY
RATE
FOOTNOTE
SUNDAY
AND
HOLIDAY
OVERTIME
HOURLY
RATE
SUNDAY
AND
HOLIDAY
OVERTIME
HOURLY
RATE
FOOTNOTE
#BRICKLAYER,
BLOCKLAYER,
POINTER,
CLEANER,
CAULKER,
WATERPROOFER
(2ND SHIFT)
08/22/2025 06/30/2026* $63.970 A $13.100 $13.370 $0.000 B $1.640 $0.430 8.0 C $92.510 $124.500 D $124.500 E $156.480
#BRICKLAYER,
BLOCKLAYER,
POINTER,
CLEANER,
CAULKER,
WATERPROOFER
(3RD SHIFT)
08/22/2025 06/30/2026* $66.760 A $13.100 $13.370 $0.000 B $1.640 $0.430 8.0 C $95.300 $128.680 D $128.680 E $162.060
#BRICKLAYER,
BLOCKLAYER:
BRICKLAYER,
BLOCKLAYER,
STONEMASON
(2ND SHIFT)
08/22/2025 04/30/2026** $57.230 A $13.100 $11.620 $2.750 F $0.800 $2.200 G 8.0 C $87.700 $117.690 H $117.690 H $147.680
#BRICKLAYER,
BLOCKLAYER:
BRICKLAYER,
BLOCKLAYER,
STONEMASON
(3RD SHIFT)
08/22/2025 04/30/2026** $59.960 A $13.100 $11.620 $2.750 F $0.800 $2.200 G 8.0 C $90.430 $121.790 H $121.790 H $153.140
#BRICK
TENDER
BRICK TENDER
(SPECIAL SINGLE
SHIFT)
08/22/2025 06/30/2026** $45.500 I $11.100 $14.350 $0.000 B $0.450 $0.550 8.0 $71.950 $94.700 J $94.700 J $117.450
#CARPET,
LINOLEUM,
RESILIENT TILE
LAYER (2ND
SHIFT)
02/22/2026 12/31/2026** $64.020 A $12.250 $16.650 $0.000 K $0.940 $0.340 8.0 $94.200 $158.220 $158.220 $158.220 L
#ELECTRICIAN:
COMM & SYSTEM
INSTALLER,
SECOND SHIFT
02/22/2026 03/31/2026* $48.090 $16.000 $8.950 M $0.000 $1.000 $1.110 N 8.0 $76.830 $101.710 O $101.710 O $126.610 P
#ELECTRICIAN:
COMM & SYSTEM
INSTALLER,
THIRD SHIFT
02/22/2026 03/31/2026* $53.870 $16.000 $8.950 M $0.000 $1.000 $1.110 N 8.0 $82.820 $110.700 O $110.700 O $138.570 P
#ELECTRICIAN:
COMM & SYSTEM
TECH., SECOND
SHIFT
02/22/2026 03/31/2026* $55.310 $16.000 $8.950 M $0.000 $1.000 $1.110 N 8.0 $84.310 $112.930 O $112.930 O $141.560 P
#ELECTRICIAN:
COMM & SYSTEM
TECH., THIRD
SHIFT
02/22/2026 03/31/2026* $61.960 $16.000 $8.950 M $0.000 $1.000 $1.110 N 8.0 $91.190 $123.250 O $123.250 O $155.320 P
#ELECTRICIAN:
INSIDE
WIREMAN, 2ND
SHIFT
02/22/2026 05/31/2026* $61.820 $14.060 $14.250 M $0.000 B $1.890 $7.900 Q 8.0 $102.760 $135.100 R $135.100 R $167.430 P
#ELECTRICIAN:
INSIDE
WIREMAN, 3RD
SHIFT
02/22/2026 05/31/2026* $69.250 $14.060 $14.250 M $0.000 B $1.890 $7.900 Q 8.0 $110.540 $146.760 R $146.760 R $182.980 P
#ELECTRICIAN: CABLE SPLICER,
2ND SHIFT 02/22/2026 05/31/2026* $68.000 $14.060 $14.250 M $0.000 B $1.890 $7.900 Q 8.0 $109.230 $144.800 R $144.800 R $180.360 P
#ELECTRICIAN: CABLE SPLICER,
3RD SHIFT 02/22/2026 05/31/2026* $76.170 $14.060 $14.250 M $0.000 B $1.890 $7.900 Q 8.0 $117.770 $157.600 R $157.600 R $197.430 P
#GLAZIER GLAZIER
(SPECIAL SHIFT) S 02/22/2026 12/31/2026** $53.650 A $12.250 $24.540 T $0.000 $1.140 $0.550 U 7.5 V $92.130 $145.780 $145.780 $145.780
#MARBLE
FINISHER
MARBLE
FINISHER (2ND
SHIFT)
W 08/22/2025 07/31/2026** $48.140 X $13.100 $6.780 $0.000 K $0.450 $0.970 8.0 $69.440 $93.510 Y $117.580 $117.580
#MARBLE
MASON
MARBLE MASON
(2ND SHIFT) W 08/22/2025 07/31/2026** $70.010 X $13.100 $16.220 $0.000 K $0.800 $1.330 8.0 $101.460 $136.470 Y $171.470 $171.470
#PAINTER PAINTER
(SPECIAL SHIFT) Z 02/22/2026 06/30/2026* $55.020 I $12.250 $9.950 AA $0.000 K $1.100 $0.530 8.0 C $78.850 $106.360 AB $106.360 AB $133.870
#PAINTER
INDUSTRIAL
PAINTER
(SPECIAL SHIFT)
AC 02/22/2026 06/30/2026* $60.720 I $12.250 $9.950 AA $0.000 K $1.100 $0.530 8.0 C $84.550 $114.910 AB $114.910 AB $145.270
#PAINTER BRIDGE PAINTER
(SPECIAL SHIFT) AD 02/22/2026 06/30/2026* $63.120 I $12.250 $9.950 AA $0.000 K $1.100 $0.530 8.0 C $86.950 $118.510 AB $118.510 AB $150.070
#PAINTER: TAPER (SPECIAL
SHIFT) 02/22/2026 06/30/2026* $75.760 AE $12.250 $19.390 $0.000 K $1.050 $0.740 8.0 $109.190 $147.070 AF $147.070 AF $184.950 AG
#PLASTERER PLASTERER: 2ND
SHIFT 08/22/2025 06/30/2026** $53.170 AH $16.040 $19.990 $0.000 B $1.450 $1.440 7.0 AI $92.090 $114.780 AJ $114.780 AK $137.470
#PLASTERER PLASTERER: 3RD
SHIFT 08/22/2025 06/30/2026** $54.170 AH $16.040 $19.990 $0.000 B $1.450 $1.440 7.0 AI $93.090 $115.780 AJ $115.780 AK $138.470
#PLUMBER:
PLUMBER,
STEAMFITTER
(2ND AND 3RD
SHIFT)
AL 08/22/2025 06/30/2026** $77.480 A $12.900 $15.400 AM $0.000 B $1.350 $0.700 8.0 $107.830 $146.570 H $146.570 AN $185.300
#PLUMBER:
PLUMBER (FOR
TOTAL
PLUMBING JOBS
$150,000 OR
UNDER) (2ND
AND 3RD SHIFT)
AL 08/22/2025 06/30/2026* $63.920 A $10.770 $11.550 $0.000 B $1.350 $0.700 8.0 $88.290 $120.250 H $120.250 AO $152.210 file:///S/Complete%20Set%20of%20General%20Prevailing%20Wage%20Determinations/2026-1/2026-1%20Subtrades%20Determinations%20(ref)/Shift/Shift-AMA.html[3/10/2026 3:20:43 PM]
A
B
C
D
E
F
G
H
I
J
K
L
M
N
O
P
Q
R
S
T
U
V
W
X
Y
Z
AA
AB
#SHEET METAL
WORKER
SHEET METAL
WORKER (2ND
SHIFT)
08/22/2025 06/30/2026* $60.570 A $17.020 $28.120 AP $0.000 B $1.560 $0.870 7.5 AQ $108.140 $140.760 H $140.760 H $173.360
#SHEET METAL
WORKER
SHEET METAL
WORKER (3RD
SHIFT)
08/22/2025 06/30/2026* $63.320 A $17.020 $28.120 AP $0.000 B $1.560 $0.870 7.0 AR $110.890 $144.880 H $144.880 H $178.860
#SHEET METAL
WORKER
SHEET METAL
WORKER
(SPECIAL SHIFT)
08/22/2025 06/30/2026* $61.670 A $17.020 $28.120 AP $0.000 B $1.560 $0.870 8.0 $109.240 $142.410 H $142.410 H $175.560
#TERRAZZO
FINISHER
TERRAZZO
FINISHER, 2ND
SHIFT
AS 08/22/2025 06/30/2026** $51.600 AT $13.100 $7.220 $0.000 B $0.800 $1.120 8.0 $73.840 $96.980 AU $96.980 AU $120.110
#TERRAZZO
FINISHER
TERRAZZO
FINISHER, 3RD
SHIFT
AS 08/22/2025 06/30/2026** $51.600 AT $13.100 $7.220 $0.000 B $0.800 $1.120 8.0 $73.840 $96.980 AU $96.980 AU $120.110
#TERRAZZO
WORKER
TERRAZZO
WORKER, 2ND
SHIFT
AS 08/22/2025 06/30/2026** $70.810 AT $13.100 $15.720 $0.000 B $0.800 $1.370 8.0 $101.800 $133.620 AU $133.620 AU $165.440
#TERRAZZO
WORKER
TERRAZZO
WORKER, 3RD
SHIFT
AS 08/22/2025 06/30/2026** $70.810 AT $13.100 $15.720 $0.000 B $0.800 $1.370 8.0 $101.800 $133.620 AU $133.620 AU $165.440
#TILE
FINISHER
TILE FINISHER,
2ND SHIFT 08/22/2025 03/31/2026* $40.190 AV $12.400 $6.210 $1.000 $0.500 $1.570 8.0 C $61.870 $79.470 $79.470 E $97.060
#TILE
FINISHER
TILE FINISHER -
RED CIRCLED
FINISHER, 2ND
SHIFT
08/22/2025 03/31/2026* $44.750 AV $12.400 $7.050 $1.300 $0.500 $1.630 8.0 C $67.630 $87.510 $87.510 E $107.380
#TILE SETTER TILE SETTER,
2ND SHIFT 08/22/2025 03/31/2026** $60.700 AV $12.400 $9.020 $2.750 $0.750 $2.120 8.0 C $87.740 $115.090 $115.090 E $142.440
Go to increase page
FOOTNOTES
EFFECTIVE UNTIL SUPERSEDED BY A NEW DETERMINATION ISSUED BY THE DIRECTOR OF INDUSTRIAL RELATIONS. CONTACT THE OFFICE OF THE DIRECTOR - RESEARCH UNIT AT (415) 703-4774 FOR THE NEW RATES AFTER TEN DAYS AFTER THE EXPIRATION DATE IF NO SUBSEQUENT
DETERMINATION IS ISSUED.
THE RATE TO BE PAID FOR WORK PERFORMED AFTER THIS DATE HAS BEEN DETERMINED. IF WORK WILL EXTEND PAST THIS DATE, THE NEW RATE MUST BE PAID AND SHOULD BE INCORPORATED IN CONTRACTS ENTERED INTO NOW. CONTACT THE OFFICE OF THE DIRECTOR RESEARCH UNIT FOR
SPECIFIC RATES AT (415) 703-4774.
INDICATES AN APPRENTICEABLE CRAFT. THE CURRENT APPRENTICE WAGE RATES ARE AVAILABLE ON THE INTERNET @ HTTP://WWW.DIR.CA.GOV/OPRL/PWAPPWAGE/PWAPPWAGESTART.ASP.
THE BASIC HOURLY RATE AND EMPLOYER PAYMENTS ARE NOT TAKEN FROM A COLLECTIVE BARGAINING AGREEMENT FOR THIS CRAFT OR CLASSIFICATION.
INCLUDES AMOUNT WITHHELD FOR DUES CHECK OFF.
INCLUDED IN STRAIGHT-TIME HOURLY RATE.
SATURDAYS IN THE SAME WORK WEEK MAY BE WORKED AT STRAIGHT-TIME IF JOB IS SHUT DOWN DURING THE NORMAL WORKWEEK DUE TO INCLEMENT WEATHER.
RATE APPLIES TO FIRST 2 OVERTIME HOURS MONDAY THROUGH FRIDAY; ALL OTHER OVERTIME IS PAID AT THE DOUBLE TIME RATE.
RATE APPLIES TO THE FIRST 8 HOURS WORKED ON SATURDAY. ALL OTHER HOURS ARE PAID AT THE SUNDAY/HOLIDAY RATE.
VACATION IS FACTORED AT THE APPLICABLE OVERTIME MULTIPLIER
INCLUDES AMOUNT FOR INDUSTRY PROMOTION FUND, INTERNATIONAL MASONRY INSTITUTE, LABOR MANAGEMENT COOPERATION COMMITTEE, AND VACATION TRUST FUND. EFFECTIVE 5/1/2022, INDUSTRY PROMOTION FUND IS SPLIT INTO THE INDUSTRY FUND AND THE CALIFORNIA MASONRY
COUNCIL.
RATE APPLIES TO THE FIRST 2 DAILY OVERTIME HOURS AND THE FIRST 10 HOURS ON SATURDAY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE.
INCLUDES AMOUNT FOR VAC/HOL AND DUES CHECK OFF.
RATE APPLIES TO FIRST 2 DAILY OVERTIME HOURS AND THE FIRST 10 HOURS WORKED ON SATURDAY. ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE. SATURDAYS IN THE SAME WORK WEEK MAY BE WORKED AT STRAIGHT-TIME IF JOB IS SHUT DOWNDURING THE
NORMAL WORK WEEK DUE TO INCLEMENT WEATHER.
INCLUDED IN BASIC HOURLY RATE.
DESIGNATED DAYS OFF SHALL BE PAID AT TIME AND ONE-HALF (1 1/2X). PLEASE REFER TO THE HOLIDAY PROVISION FOR A LIST OF DESIGNATED DAYS OFF.
IN ADDITION, AN AMOUNT EQUAL TO 3% OF THE BASIC HOURLY RATE IS ADDED TO THE TOTAL HOURLY RATE AND OVERTIME HOURLY RATES FOR THE NATIONAL EMPLOYEES BENEFIT BOARD.
IN ADDITION, AN AMOUNT EQUAL TO 0.5% OF THE BASIC HOURLY RATE, WHICH IS FACTORED AT THE APPLICABLE OVERTIME MULTIPLIER, IS ADDED TO THE TOTAL HOURLY RATE AND OVERTIME HOURLY RATES FOR THE ADMINISTRATIVE MAINTENANCE FUND.
RATE APPLIES TO THE FIRST 2 DAILY OVERTIME HOURS AND THE FIRST 8 HOURS ON SATURDAY ONLY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY NON-SHIFT OVERTIME HOURLY RATE.
DISREGARD THIS RATE. USE THE SUNDAY AND HOLIDAY NON-SHIFT DIFFERENTIAL RATE FOR THIS CLASSIFICATION AS PUBLISHED IN THE DIRECTOR'S GENERAL PREVAILING WAGE DETERMINATIONS.
IN ADDITION, AN AMOUNT EQUAL TO 1.6% OF THE BASIC HOURLY RATE, WHICH IS FACTORED AT THE APPLICABLE OVERTIME MULTIPLIER, IS ADDED TO THE TOTAL HOURLY RATE AND OVERTIME HOURLY RATES FOR THE CONTRACT ADMINISTRATION FUND.
DISREGARD THIS RATE. USE THE DAILY OVERTIME NON-SHIFT DIFFERENTIAL RATE FOR THIS CLASSIFICATION AS PUBLISHED IN THE DIRECTOR'S GENERAL PREVAILING WAGE DETERMINATIONS.
CERTIFIED MANIPULATOR WORK SHALL RECEIVE $2.00 PER HOUR ABOVE THE BASIC WAGE RATE
INCLUDES AN AMOUNT PER HOUR WORKED FOR IUPAT, IARP, AND RETIREE PENSION.
INCLUDES AMOUNTS FOR INDUSTRY FUND, WORK PRESERVATION FUND, AND LABOR MANAGEMENT COOPERATION INITIATIVE
8 HOURS PAY FOR 7.5 HOURS WORKED AT THE STRAIGHT TIME BASIC HOURLY RATE
EMPLOYEES WORKING ON ANY SUSPENDED PLATFORM/SWING STAGE SHALL BE PAID AN ADDITIONAL $20.00 PER DAY ABOVE THE WAGE RATE.
INCLUDES AN AMOUNT FOR DUES CHECK-OFF AND VACATION/HOLIDAY WHICH ARE FACTORED INTO OVERTIME RATES.
RATE APPLIES TO FIRST 2 OVERTIME HOURS MONDAY THROUGH FRIDAY; ALL OTHER OVERTIME IS PAID AT THE DOUBLE TIME RATE.
EMPLOYEES SHALL RECEIVE PREMIUM PAY FOR THE FOLLOWING WORK: EXOTIC MATERIALS ($1.25 PER HOUR) AND LEAD ABATEMENT/REMOVAL ($1.00 PER HOUR). EMPLOYEES WORKING ON COMMERCIAL PROJECTS SHALL ALSO BE ENTITLED TO HIGH TIME PREMIUM WHENEVER THE WORK PERFORMED REQUIRES A SWINGING AND/OR PLATFORM SUSPENSION SYSTEM. THE AMOUNT OF THE PREMIUM SHALL BE AS FOLLOWS: AN ADDITIONAL $4.00 PER HOUR WHEN WORKING FROM 100 TO 180 FEET ABOVE GROUND OR WATER LEVEL AND $6.00 PER HOUR WHEN WORKING OVER 180
FEET. SEE SCOPE PROVISIONS FOR FURTHER DETAILS ON PREMIUMS.
INCLUDES AN AMOUNT PER HOUR WORKED FOR ANNUITY TRUST FUND.
RATE APPLIES TO FIRST 4 OVERTIME HOURS MONDAY THROUGH FRIDAY, FIRST 12 HOURS WORKED ON…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .