2026-09-21_CVG_-_Vertical_Transportation_Elevators.pdf
PDF 2 MB Posted
- Attached to
- Conveyance Equipment
- Solicitation number
- 26-047-ITB - Equip AIP
- Issued by
- Kenton County, Kentucky
About this file
This file comprises architectural floor plans and elevator section diagrams for the Kenton County Airport Board's (KCAB) vertical transportation project at CVG Airport Terminal. The project encompasses the installation of conveyance equipment, including new escalators and elevators across multiple terminal levels, as detailed in the technical drawings. The scope includes equipment installations at the Ticketing Level (T-Level 3), Baggage Claim Level (T-Level 1 and 2), and connections through the Passenger Tunnel. A pre-proposal meeting and mandatory site visit will be held on Monday, September 28, 2026 at 1:00 pm at the Elevate CVG PMO Offices in Hebron, Kentucky. Questions from prospective bidders are due by 11:59 pm on Thursday, October 1, 2026, with answers to be posted no later than Thursday, October 8, 2026. Proposals must be received by Thursday, October 15, 2026 at 2:00 pm, with no late submissions accepted unless an addendum is issued extending the deadline.
The architectural drawings provide detailed floor plan layouts and cross-sectional views with specific elevation measurements and specifications for elevator locations designated as E-5A, E-5B, E-6A, E-6B, E-9, and associated equipment areas. The file does not contain information regarding pricing terms, set-asides, incumbent contractors, funding sources, or contract award amounts. Additional contract documentation, including the Scope of Work and bid specifications, would be necessary to obtain comprehensive details regarding budget allocations, project funding mechanisms, and specific technical requirements for the conveyance equipment procurement.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
E-6B E-6AE-5BE-5A
(2) NEW ESCALATORS(2) NEW ESCALATORS
DP-1
DP-2PARKING GARAGE LOBBY
STAIR
PARKING GARAGE LOBBY
MECHANICAL
DATA
ROOM
STOR.
EAST TICKETING HALLWEST TICKETING HALL
VESTIBULEVESTIBULE
LOCKER
ROOM
LOCKER
ROOM
AA
DP-1
DP-2
E-9
NORTH ELEVATOR LOBBY
PARKING GARAGE LOBBY
ELEVATOR
EQUIP.
STAIR
MENS RESTROOM
WOMENS RESTROOM
TRAINING CLASSROOM
BREAKROOM?
CORRIDOR
LOCKER
OFFICE OFFICE OFFICE
OFFICE STAIR
MEP/NO ACCESS
VENDING
CORRIDOR
BAGGAGE RISER
VACANTLOST & FOUND
BREAK ROOM
OFFICE
OFFICE OFFICE OFFICE
BAGGAGE RISER
STORAGE OFFICE ELEC. CVG STORAGE
ADULT CHANGE
RESTROOMCVG STORAGE
UNASSIGNED
UNASSIGNEDUNASSIGNED
UNASSIGNED K9
TREGO DUGAN
ELECTRICAL
WEST COMM.
ROOM
P. CHASE
FAMILY RESTROOM
CORRIDOR
CONCESSION
CORRIDOR
JANITOR'S
CLOSET
LOST & FOUND STORAGE
BREAK ROOM
1" = 20'-0"
PRE-2.1 PRESENTATION PLAN- LEVEL 03 - TICKETING
CVG Airport - Terminal
23.01039.00
MAIN TERMINAL - FLOOR PLAN - L3 TICKETING
PARKING GARAGE LOBBY - FLOOR PLAN - B1
SCALE: 1/16" = 1'-0"
SCALE: 1/16" = 1'-0"
T-LEVEL 01 -
BAGGAGE CLAIM
876' - 9 1/4"
T-LEVEL 2 -
BAGGAGE CLAIM
MECH
889' - 9 1/4"
T-LEVEL 3 - TERM
TICKETING
900' - 9"
T-LEVEL 4 - TERM
TICKETING MEZZ.
914' - 9 1/4"
T-LEVEL 5 - TERM
929' - 7 1/4"
T-AGTS TUNNEL
LEVEL
854' - 0"
T-BHS & UTILITY
LEVEL
835' - 5 1/4"
T-4 T-5 T-6 T-7 T-8 T-9 T-10 T-11 T-12
T-BASEMENT
LEVEL
846' - 10 3/4"
S-NEW CBIS
LEVEL
874' - 6"
S-4 S-4.3 S-4.7T-6.4 T-7.4 T-8.6
TICKETING LEVEL
BAGGAGE CLAIM
PASSENGER TUNNEL
'-1
0"
'-0
/4
'-1
3/
4"
'-0
2' -3
/4
'-6
7' -1
/4
'-5
/2
E-5A E-5B E-6B E-6A
1/8" = 1'-0"
PRE-2.3 PRESENTATION PLAN- ELEVATOR SECTION
CVG Airport - Terminal
23.01039.00
MAIN TERMINAL - PASSENGER TUNNEL - ENLARGED SECTION DIAGRAM A
SCALE: 1/8" = 1'-0"
NOTE: REFERENCE LEVEL ELEVATIONS FOR
APPROXIMATE HEIGHTS FOR THE FOLLOWING:
DP-01, DP-02, E-9
File details come from the government source that posted it. Updated .