2026-09-21_CVG_-_Vertical_Transportation_Elevators.pdf

PDF 2 MB Posted

Attached to
Conveyance Equipment
Solicitation number
26-047-ITB - Equip AIP
Issued by
Kenton County, Kentucky

About this file

This file comprises architectural floor plans and elevator section diagrams for the Kenton County Airport Board's (KCAB) vertical transportation project at CVG Airport Terminal. The project encompasses the installation of conveyance equipment, including new escalators and elevators across multiple terminal levels, as detailed in the technical drawings. The scope includes equipment installations at the Ticketing Level (T-Level 3), Baggage Claim Level (T-Level 1 and 2), and connections through the Passenger Tunnel. A pre-proposal meeting and mandatory site visit will be held on Monday, September 28, 2026 at 1:00 pm at the Elevate CVG PMO Offices in Hebron, Kentucky. Questions from prospective bidders are due by 11:59 pm on Thursday, October 1, 2026, with answers to be posted no later than Thursday, October 8, 2026. Proposals must be received by Thursday, October 15, 2026 at 2:00 pm, with no late submissions accepted unless an addendum is issued extending the deadline.

The architectural drawings provide detailed floor plan layouts and cross-sectional views with specific elevation measurements and specifications for elevator locations designated as E-5A, E-5B, E-6A, E-6B, E-9, and associated equipment areas. The file does not contain information regarding pricing terms, set-asides, incumbent contractors, funding sources, or contract award amounts. Additional contract documentation, including the Scope of Work and bid specifications, would be necessary to obtain comprehensive details regarding budget allocations, project funding mechanisms, and specific technical requirements for the conveyance equipment procurement.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

E-6B E-6AE-5BE-5A

(2) NEW ESCALATORS(2) NEW ESCALATORS

DP-1

DP-2PARKING GARAGE LOBBY

STAIR

PARKING GARAGE LOBBY

MECHANICAL

DATA

ROOM

STOR.

EAST TICKETING HALLWEST TICKETING HALL

VESTIBULEVESTIBULE

LOCKER

ROOM

LOCKER

ROOM

AA

DP-1

DP-2

E-9

NORTH ELEVATOR LOBBY

PARKING GARAGE LOBBY

ELEVATOR

EQUIP.

STAIR

MENS RESTROOM

WOMENS RESTROOM

TRAINING CLASSROOM

BREAKROOM?

CORRIDOR

LOCKER

OFFICE OFFICE OFFICE

OFFICE STAIR

MEP/NO ACCESS

VENDING

CORRIDOR

BAGGAGE RISER

VACANTLOST & FOUND

BREAK ROOM

OFFICE

OFFICE OFFICE OFFICE

BAGGAGE RISER

STORAGE OFFICE ELEC. CVG STORAGE

ADULT CHANGE

RESTROOMCVG STORAGE

UNASSIGNED

UNASSIGNEDUNASSIGNED

UNASSIGNED K9

TREGO DUGAN

ELECTRICAL

WEST COMM.

ROOM

P. CHASE

FAMILY RESTROOM

CORRIDOR

CONCESSION

CORRIDOR

JANITOR'S

CLOSET

LOST & FOUND STORAGE

BREAK ROOM

1" = 20'-0"

PRE-2.1 PRESENTATION PLAN- LEVEL 03 - TICKETING

CVG Airport - Terminal

23.01039.00

MAIN TERMINAL - FLOOR PLAN - L3 TICKETING

PARKING GARAGE LOBBY - FLOOR PLAN - B1

SCALE: 1/16" = 1'-0"

SCALE: 1/16" = 1'-0"

T-LEVEL 01 -

BAGGAGE CLAIM

876' - 9 1/4"

T-LEVEL 2 -

BAGGAGE CLAIM

MECH

889' - 9 1/4"

T-LEVEL 3 - TERM

TICKETING

900' - 9"

T-LEVEL 4 - TERM

TICKETING MEZZ.

914' - 9 1/4"

T-LEVEL 5 - TERM

929' - 7 1/4"

T-AGTS TUNNEL

LEVEL

854' - 0"

T-BHS & UTILITY

LEVEL

835' - 5 1/4"

T-4 T-5 T-6 T-7 T-8 T-9 T-10 T-11 T-12

T-BASEMENT

LEVEL

846' - 10 3/4"

S-NEW CBIS

LEVEL

874' - 6"

S-4 S-4.3 S-4.7T-6.4 T-7.4 T-8.6

TICKETING LEVEL

BAGGAGE CLAIM

PASSENGER TUNNEL

'-1

0"

'-0

/4

'-1

3/

4"

'-0

2' -3

/4

'-6

7' -1

/4

'-5

/2

E-5A E-5B E-6B E-6A

1/8" = 1'-0"

PRE-2.3 PRESENTATION PLAN- ELEVATOR SECTION

CVG Airport - Terminal

23.01039.00

MAIN TERMINAL - PASSENGER TUNNEL - ENLARGED SECTION DIAGRAM A

SCALE: 1/8" = 1'-0"

NOTE: REFERENCE LEVEL ELEVATIONS FOR

APPROXIMATE HEIGHTS FOR THE FOLLOWING:

DP-01, DP-02, E-9

File details come from the government source that posted it. Updated .