This document is a business case for the Cincinnati/Northern Kentucky International Airport (CVG Airport Authority) proposing a $660,000 project to transition Aircraft Rescue and Firefighting (ARFF) facilities from Aqueous Film Forming Foam (AFFF) to Fluorine Free Foam (F3). The project involves reconstructing foam-distribution systems in the South and North ARFF stations, including installing new holding tanks, pumps, valve controls, and associated piping. The project schedule indicates appropriations approval in October 2025, procurement completion in November 2025, and design/construction completion by July 2026.

The project is driven by increasing Environmental Protection Agency (EPA) regulations on Per- and Polyfluoroalkyl Substances (PFAS), with the Department of Defense committed to certifying F3 foam for military specifications. The total project cost is $660,000, broken down as $545,000 for construction/installation, $109,000 for contingency, and $6,000 for force labor. Known risks include potentially reduced fire suppression effectiveness, higher costs, limited availability of F3, required firefighter retraining, and special storage and disposal requirements. The project aligns with the airport's strategic plan, sustainability goals, and operational excellence objectives by managing assets strategically and developing an environmental sustainability program.

View the file

Other files

File Type Posted
25-069-ITB_Pre-Bid_Sign-In_Sheets.pdf PDF
25-069-ITB_Pre-Bid_Meeting_Agenda.pdf PDF
North_&_South_ARFF_Stations_Mechanical,_Electrical_&_Plumbing_(MEP)_Modifications_&_Tank_Installation.pdf PDF
25-069-ITB_N_&_S_ARFF_MEP_&_Tank_Installation_-_Ad.pdf PDF
25-069-ITB_N_&_S_ARFF_MEP_&_Tank_Installation_-_Exhibit_B-Contract_&_Bonds.pdf PDF
25-069-ITB_Bidders_List_2025.xlsx XLSX spreadsheet
25-069-ITB_N_&_S_ARFF_MEP_&_Tank_Installation_-_Exhibit_A-Proposal_Forms.pdf PDF
25-069-ITB_South_ARFF-AFFF_-_Full_Set_Drawings.pdf PDF
25-069-ITB_North_ARFF-AFFF_-_Full_Set_Drawings.pdf PDF
25-069-ITB_N_&_S_ARFF_-_AFFF_-_Technical_Specifications.pdf PDF
5035-05-CVG_-_South_ARFF-AFFF-Full_Set_ITB.pdf PDF
5035-05-CVG_-_North_ARFF-AFFF-Full_Set_ITB.pdf PDF
5035-05-CVG-ARFF-AFFF-ITB_Specifications.pdf PDF
2025.10.16_APPROVED_ADDITION_Q4_2025_-_Business_Case_-_ARFF_AFFF_Transition_-_New_Construction_-_signed.pdf PDF
2025.06.13_Construction_Cost_Estimate.pdf PDF
Buy_American_Certification-Construction_Projects.docx DOCX document
EEO_Certification.docx DOCX document
Affirmative_Action_Certification.docx DOCX document
Non_Debarment_or_Suspension_Certification.docx DOCX document
Buy_American_Certification-Equipment-Building_Projects.docx DOCX document
NonSegregated_Facilities_Certification.docx DOCX document
Certification_of_Offeror-Bidder_Regarding_Tax_Delinquency_and_Felony_Convictions.docx DOCX document
Disclosure_of_Lobbying_Activities_Certification.docx DOCX document
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Master Plan Alignment

Strategic Plan Alignment

Sustainability Benefits

$545,000.00

Construction Admin & Construction Inspection (CA/CI) $0.00

$109,000.00

$6,000.00

$0.00

$660,000.00

Alternatives

1. Reconstruct the foam-distribution systems in the South and North ARFFs as outlined in this business case.

2. Do nothing.

Total Appropriations Request:

Related Projects

Fuel Performance via Operational Excellence: 3. Develop an environmental sustainability program; 4. Manage assets and space strategically

Organizational Impact Justification

Cost

Construction/Installation:

Contingency (min 10%):

Force Labor:

Miscellaneous:

ARFF Aqueous Film Forming Foam Transition - New Construction PMWeb #1210

Current Situation/Background Information

CVGAA ARFF previously maintained an inventory of approximately 7,000 gallons of aqueous film forming foam (AFFF) across multiple supply tanks and trucks.

AFFF contains a group of manufactured chemicals called Per- and Polyfluoroalkyl Substances (PFAS). The Environmental Protection Agency (EPA) has continued to increase regulation of PFAS through multiple regulatory programs. Regulations by the Federal Aviation Administration (FAA) have limited airports capacity to make the transition to date. With the release of the FAA's Aircraft Firefighting Foam Transition Plan and the Department of Defense's (DOD) newly publish replacement specifications, airports now have an opportunity to transition from AFFF to Fluorine Free Foam (F3).

This funding request it to complete the installation of the new F3 foam holding tanks and associated distribution plumbing in both the North and South ARFF stations.

These systems are used to store additional foam to replenish the ARFF vehicle after the foam has been used and will complete the transition from PFAS fire fighting foams to F3 foams.

Project Definition

Project Scope: This project will install new foam storage tank and pipe plumbing distribution for ARFF vehicles in both ARFF facilities.

Business Objectives: Complete funding of the transition of ARFF operations from AFFF previously demolished to F3 being installed as the new foam system for use on the airport for emergencies.

Project Value: Provide aqueous film-forming foam agents to combat fuel fires.

Organizational Impact

Project Approach

DOD has committed to certifying a foam manufactures product for MILSPEC F3 certification. New trucks purchased by ARFF will be able to be filled with the F3 product and avoid the decontamination process with early procurement.

The scope of this project includes the reconstruction of the foam-distribution systems in the South and North ARFFs. At the South ARFF Station (Station 1), installation will include a new holding tank, pump, valve controls, and associated piping, following minimal site-access demolition. At the North ARFF Station (Station

2), the same components are to be installed; however, this effort will require a more extensive enabling-demolition process. In particular, to facilitate placement of the new holding tank on the second floor, a portion of the existing block wall must be removed, and the mechanical, electrical, and plumbing (MEP) systems reconfigured to accommodate a new permanent opening.

Certainty of Cost Estimates

Construction estimate is based on bids previously received from our two on-call General Contractors.

CAPEX

Project Funding

ARFF Human Resources

Business Administration Information Technology

Capital Accounting Innovation

Commercial Management Operations

Customer Experience Planning & Development

Environmental, Social & Governance (ESG) Police Department

Facilities Procurement

Field Safety

Finance Terminal Modernization Program

Fleet Other ________________________________________________

Approvals:

Larry Krauter

Chief Executive Officer

Dil Gruffydd

Chief Financial Officer

Executive Sponsor

Shannon Oldfield

Chief Operations Officer

Concurrence Leader

Steve Listerman

Vice President Public Safety, Security & Compliance

Contract Finalization: Feb 2026

Notice to Proceed: Mar 2026

Known Risks & Limitations

Fluorine Free Foam (F3) is an alternative firefighting foam that does not contain PFAS. The transition from AFFF to F3 has several known risks and limitations, including:

Effectiveness: F3 may not be as effective as AFFF in suppressing fires. AFFF has been extensively tested and proven to be highly effective in extinguishing fires, particularly those involving hydrocarbon fuels such as gasoline and jet fuel. F3 has not yet been widely tested, and its effectiveness in various fire scenarios is not yet fully understood.

Cost: F3 is more expensive than AFFF. This is partly due to the fact that F3 is a relatively new product and is not yet produced in large quantities. As a result, the cost of production is higher.

Availability: F3 may not be readily available in some areas. Since F3 is a relatively new product, it may not be available in all regions or may only be available in limited quantities.

Training: Firefighters may need to be retrained to use F3. F3 may require different application techniques than AFFF, and firefighters will need to be trained on how to use this alternative foam effectively.

Storage and disposal: F3 requires special storage and disposal methods. Storage and disposal: F3 requires special storage and disposal methods.

Timing: Winter-construction poses a threat to scheduling. ARFF Crash Trucks cannot be stored outside when temperatures are below 32 degrees. Chief has proposed moving equipment around to empty bays to allow construction to be completed during the cold months.

Reconstruct the foam-distribution systems in the South and North ARFFs as outlined in this business case.

Recommendation

Design/Construction Completion: Jul 2026

Stakeholders

Project Schedule

Appropriations Approval: Oct 2025

Procurement Completion: Nov 2025

Board Meeting: Jan 2026

Business Unit Leader

Bill Siemer

Vice President Planning & Development

Sponsor/Originator

Brad Quatman

Project Manager

Stephen Listerman (Oct 14, 2025 16:05:41 EDT)

Shannon R. Oldfield (Oct 15, 2025 07:35:25 EDT) Shannon R. Oldfield

Dilwyn Gruffydd (Oct 15, 2025 13:43:38 EDT) https://cvgairport.na2.adobesign.com/verifier?tx=CBJCHBCAABAAMapGnXYddjP8Z0AzQl-wQ1wP0yxTEsCY https://cvgairport.na2.adobesign.com/verifier?tx=CBJCHBCAABAAMapGnXYddjP8Z0AzQl-wQ1wP0yxTEsCY https://cvgairport.na2.adobesign.com/verifier?tx=CBJCHBCAABAAMapGnXYddjP8Z0AzQl-wQ1wP0yxTEsCY https://cvgairport.na2.adobesign.com/verifier?tx=CBJCHBCAABAAMapGnXYddjP8Z0AzQl-wQ1wP0yxTEsCY https://cvgairport.na2.adobesign.com/verifier?tx=CBJCHBCAABAAMapGnXYddjP8Z0AzQl-wQ1wP0yxTEsCY https://cvgairport.na2.adobesign.com/verifier?tx=CBJCHBCAABAAMapGnXYddjP8Z0AzQl-wQ1wP0yxTEsCY