About this file

This document is a Buy American Certification form for the Kenton County Airport Board (KCAB) at the Cincinnati/Northern Kentucky International Airport. The certification relates to a project for North & South ARFF Stations Mechanical, Electrical & Plumbing (MEP) Modifications & Tank Installation, with a pre-bid meeting scheduled for Thursday, November 6, 2025, at 10:00 am at ARFF South Station #1 in Hebron, Kentucky. Bidders are required to submit questions by 11:59 pm on Thursday, November 20, 2025, with answers to be posted by Tuesday, November 25, 2025. The final bid submission deadline is Thursday, December 4, 2025, at 2:00 pm.

The certification mandates compliance with 49 USC 50101, which requires the use of steel and manufactured goods produced in the United States for AIP-funded projects, unless specific waivers are obtained. Bidders must complete and submit a certification statement indicating their approach to compliance, either by using 100% U.S.-produced materials or by qualifying for a waiver (Type 2, 3, or 4). The document outlines detailed documentation requirements for each type of waiver, including content percentage worksheets, market research, and cost comparisons. Bidders must provide evidence of product origin and commit to using U.S. domestic products, with potential prosecution for false statements under federal law.

View the file

Other files

File Type Posted
25-069-ITB_Pre-Bid_Sign-In_Sheets.pdf PDF
25-069-ITB_Pre-Bid_Meeting_Agenda.pdf PDF
North_&_South_ARFF_Stations_Mechanical,_Electrical_&_Plumbing_(MEP)_Modifications_&_Tank_Installation.pdf PDF
25-069-ITB_N_&_S_ARFF_MEP_&_Tank_Installation_-_Ad.pdf PDF
25-069-ITB_N_&_S_ARFF_MEP_&_Tank_Installation_-_Exhibit_B-Contract_&_Bonds.pdf PDF
25-069-ITB_Bidders_List_2025.xlsx XLSX spreadsheet
25-069-ITB_N_&_S_ARFF_MEP_&_Tank_Installation_-_Exhibit_A-Proposal_Forms.pdf PDF
25-069-ITB_South_ARFF-AFFF_-_Full_Set_Drawings.pdf PDF
25-069-ITB_North_ARFF-AFFF_-_Full_Set_Drawings.pdf PDF
25-069-ITB_N_&_S_ARFF_-_AFFF_-_Technical_Specifications.pdf PDF
5035-05-CVG_-_South_ARFF-AFFF-Full_Set_ITB.pdf PDF
5035-05-CVG_-_North_ARFF-AFFF-Full_Set_ITB.pdf PDF
5035-05-CVG-ARFF-AFFF-ITB_Specifications.pdf PDF
2025.10.16_APPROVED_ADDITION_Q4_2025_-_Business_Case_-_ARFF_AFFF_Transition_-_New_Construction_-_signed.pdf PDF
2025.06.13_Construction_Cost_Estimate.pdf PDF
Buy_American_Certification-Construction_Projects.docx DOCX document
EEO_Certification.docx DOCX document
Affirmative_Action_Certification.docx DOCX document
Non_Debarment_or_Suspension_Certification.docx DOCX document
NonSegregated_Facilities_Certification.docx DOCX document
Certification_of_Offeror-Bidder_Regarding_Tax_Delinquency_and_Felony_Convictions.docx DOCX document
Disclosure_of_Lobbying_Activities_Certification.docx DOCX document
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

KENTON COUNTY AIRPORT BOARD CINCINNATI/NORTHERN KY INTERNATIONAL AIRPORT

PROJECT NAME

BUY AMERICAN CERTIFICATION –

EQUIPMENT/BUILDING PROJECTS

The contractor shall comply with 49 USC § 50101, which provides that Federal funds may not be obligated unless all steel and manufactured goods used in AIP-funded projects are produced in the United States, unless the FAA has issued a waiver for the product; the product is listed as an Excepted Article, Material Or Supply in Federal Acquisition Regulation subpart 25.108; or is included in the FAA Nationwide Buy American Waivers Issued list.

As a matter of bid responsiveness, the bidder or offeror must complete, sign, date, and submit this certification statement with their proposal. The bidder or offeror must indicate how they intend to comply with 49 USC § 50101, and other Made in America Laws, U.S. statutes, guidance, and FAA policies by selecting one on the following certification statements. These statements are mutually exclusive. Bidder must select one or the other (not both) by inserting a checkmark () or the letter “X”.

· Bidder or offeror hereby certifies that it will comply with 49 USC § 50101, BABA and other related U.S. statutes, guidance, and policies of the FAA by:

a) Only installing steel and manufactured products produced in the United States;

b) Only installing construction materials defined as: an article, material, or supply – other than an item of primarily iron or steel; a manufactured product; cement and cementitious materials; aggregates such as stone, sand, or gravel; or aggregate binding agents or additives that are or consist primarily of non-ferrous metals; plastic and polymer-based products (including polyvinylchloride, composite building materials, and polymers used in fiber optic cables); glass (including optic glass); lumber or drywall that have been manufactured in the United States.

c) Installing manufactured products for which the Federal Aviation Administration (FAA) has issued a waiver as indicated by inclusion on the current FAA Nationwide Buy American Waivers Issued listing; or

d) Installing products listed as an Excepted Article, Material or Supply in Federal Acquisition Regulation Subpart 25.108.

By selecting this certification statement, the bidder or offeror agrees:

a) To provide to the Airport Sponsor or FAA evidence that documents the source and origin of the steel and manufactured product.

b) To faithfully comply with providing U.S. domestic product.

c) To furnish U.S. domestic product for any waiver request that the FAA rejects.

d) To refrain from seeking a waiver request after establishment of the contract, unless extenuating circumstances emerge that the FAA determines justified.

· The bidder or offeror hereby certifies it cannot comply with the 100 percent Buy American Preferences of 49 USC § 50101(a) but may qualify for a Type 3 waiver under 49 USC § 50101(b). By selecting this certification statement, the apparent bidder or offeror with the apparent low bid agrees:

a) To submit to the Airport Sponsor or FAA within 15 calendar days of being selected as the responsive bidder, a formal waiver request and required documentation that supports the type of waiver being requested.

b) That failure to submit the required documentation within the specified timeframe is cause for a non-responsive determination that may result in rejection of the proposal.

c) To faithfully comply with providing U.S. domestic products at or above the approved U.S. domestic content percentage as approved by the FAA.

d) To refrain from seeking a waiver request after establishment of the contract, unless extenuating circumstances emerge that the FAA determines justified.

Required Documentation Type 2 Waiver (Nonavailability) - The iron, steel, manufactured goods or construction materials are not available in sufficient quantity or quality in the United States. The required documentation for the Nonavailability waiver is:

a) Completed Content Percentage Worksheet and Final Assembly Questionnaire

b) Record of thorough market research, consideration where appropriate of qualifying alternate items, products, or materials including;

c) A description of the market research activities and methods used to identify domestically manufactured items capable of satisfying the requirement, including the timing of the research and conclusions reached on the availability of sources.

Type 3 Waiver – The cost of the item components and subcomponents produced in the United States is more that 60 percent of the cost of all components and subcomponents of the “item”. The required documentation for a Type 3 waiver is:

a) Completed Content Percentage Worksheet and Final Assembly Questionnaire including;

b) Listing of all product components and subcomponents that are not comprised of 100 percent U.S. domestic content (Excludes products listed on the FAA Nationwide Buy American Waivers Issued listing and products excluded by Federal Acquisition Regulation Subpart 25.108 (products of unknown origin must be considered as non-domestic products in their entirety).

c) Cost of non-domestic components and subcomponents, excluding labor costs associated with final assembly at place of manufacture.

d) Percentage of non-domestic component and subcomponent cost as compared to total “item” component and subcomponent costs, excluding labor costs associated with final assembly at place of manufacture.

Type 4 Waiver (Unreasonable Costs) - Applying this provision for iron, steel, manufactured goods or construction materials, would increase the cost of the overall project by more than 25 percent. The required documentation for this waiver is:

a) Completed Content Percentage Worksheet and Final Assembly Questionnaire from

b) At minimum two comparable equal bidders and/or offerors;

c)Receipt or record that demonstrates that supplier scouting called for in Executive Order 14005, indicates that no domestic source exists for the project and/or component;
d)Completed waiver applications for each comparable bid and/or offer.

False Statements: Per 49 USC § 47126, this certification concerns a matter within the jurisdiction of the Federal Aviation Administration and the making of a false, fictitious, or fraudulent certification may render the maker subject to prosecution under Title 18, United States Code.