- Adams County, Asotin County, Benton County, Chelan County, Clallam County, Clark County, Columbia County, Cowlitz County, Douglas County, Ferry County, Franklin County, Garfield County, Grant County, Grays Harbor County, Island County, Jefferson County, King County, Kitsap County, Kittitas County, Klickitat County, Lewis County, Lincoln County, Mason County, Okanogan County, Pacific County, Pend Oreille County, Pierce County, San Juan County, Skagit County, Skamania County, Snohomish County, Spokane County, Stevens County, Thurston County, Wahkiakum County, Walla Walla County, Whatcom County, Whitman County, Yakima County, Asotin City, Clarkston City, Clarkston Heights-Vineland CDP, West Clarkston-Highland CDP, Benton City, Chelan City, Chelan Falls CDP, Clallam Bay CDP, Lewisville CDP, Rock Island City, Pacific Beach CDP, Whidbey Island Station CDP, Mercer Island City, Pacific City, Bainbridge Island City, Kingston CDP, Kitsap Lake CDP, Kittitas City, Klickitat CDP, Okanogan City, Anderson Island CDP, Fort Lewis CDP, Fox Island CDP, Herron Island CDP, Ketron Island CDP, North Fort Lewis CDP, Raft Island CDP, Stevenson City, Hat Island CDP, Lake Stevens City, Snohomish City, Spokane City, Spokane Valley City, Puget Island CDP, Garfield Town, Yakima City, Washington
About this file
This document is a technical design plan sheet (G-06) for the Tolmie State Park Wastewater Lift Station Retrofit project, prepared by the Washington State Parks and Recreation Commission. The sheet provides detailed technical specifications for pipe installation, polypigging testing procedures, shackle (threaded rod) restraints, mechanical notes, and test and inspection requirements for a wastewater lift station infrastructure improvement project. The plan set is marked as a 100% design plan set for review, focusing on specific technical guidelines for pipe installation, testing, and quality control measures.
The document includes comprehensive technical specifications for pipe materials, installation methods, testing protocols, and component requirements. Key technical details cover polypigging procedures, pipe restraint methods, valve testing protocols, and hydrostatic pressure testing guidelines. The specifications emphasize precise installation techniques, material compatibility, corrosion resistance, and stringent quality control measures, with specific instructions for handling different pipe sizes, materials, and installation environments. The technical notes provide detailed guidance for contractors on everything from pipe joining and thrust blocking to valve operation and pressure testing, ensuring a comprehensive and precise approach to the lift station retrofit project.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PIPE NOTES
G-06
NO SCALE
40525-070_G-04_GENERAL NOTES
PARKS FILE#
SCALE
PARKS
STATE
RECREATION
WASHINGTON
COMMISSION
AND
R E V I S I O
N S
CHECKED (HDQTS.)
REGISTERED STAMP
DESIGNED
CHECKED (FIELD)
DRAWN
ACTION BY
DATE
N O
CAD NO.
A P P
I N
T
D A T E
04/21/23JP/CS
04/21/23PCB
TOLMIE
STATE PARK
WASTEWATER
LIFT STATION
RETROFIT
AE 123-168
100% DESIGN PLAN SET (REVIEW ONLY)
SHEET OF 24
PRELIMINARY
POLYPIG TESTING NOTES
1. POLYPIGGING SHALL BE PERFORMED ON ALL PIPING AS SHOWN ON THE PLANS AND SPECIFIED HEREIN:
1.1. POLYPIGGING LOCATIONS:
1.1.1. FORCE MAIN FROM NEW MECHANICAL VAULT TO SEPTIC LEACHFIELD.
2.MATERIALS
2.1. THE PIG SHALL BE OF POLYURETHANE MATERIAL WITHOUT ABRASIVE COATINGS OR STRIPS THAT
MIGHT DAMAGE THE INSIDE LINING OF THE PIPE. THE PIG DIAMETER SELECTED SHALL BE
APPROPRIATE FOR THE INSIDE DIAMETER OF THE PIPE AND SHALL BE OF A MATERIAL, SIZE, AND
CONFIGURATION RECOMMENDED BY THE PIG MANUFACTURER FOR USE IN CLEANING AND
REMOVING ALL LOOSE DEBRIS FROM INSIDE THE PIPE. A DOUBLE DISH SHAPED PIG SHALL BE USED
UNLESS PREVIOUSLY APPROVED IN WRITING BY THE OWNER. THE MATERIAL, DENSITY, AND SIZE OF
THE PIG SHALL BE SUCH THAT IT WILL NOT DAMAGE THE INTERIOR LINING OF THE PIPE. THE EXACT
INSIDE DIAMETER OF THE PROPOSED PIPE SHALL BE MEASURED TO THE NEAREST 0.10 INCH AND
REPORTED TO THE PIG MANUFACTURER FOR MANUFACTURING TO EXACT PIPE TOLERANCES.
2.2. THE PIG MUST BE CAPABLE OF SUCCESSFULLY PASSING THROUGH THE PIPE WITH DEFLECTIONS OF
90 DEGREES OR LESS, TEES AND OPEN VALVES WITHOUT DAMAGE TO THE PIPE OR PIPE LINING.
3. EXECUTION
3.1. RUN THE PIG FROM THE INSERTION POINT TO THE REMOVAL POINT AS RECOMMENDED BY THE PIG
MANUFACTURER. DURING THE PIGGING PROCESS, WATER USAGE, AND PRESSURE FLUCTUATIONS IN
THE SYSTEM SHALL BE MEASURED. AT A MINIMUM, FLOW AND PRESSURE READINGS MUST BE
RECORDED AT 30 SECOND INTERVALS. ALL OTHER PRESSURE FLUCTUATIONS OR JUMPS SHALL BE
RECORDED AND NOTED ON A RECORD SHEET. PRESSURE INCREASES MAY INDICATE THE PRESENCE
OF A BLOCKAGE. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ENSURING PRESSURE SURGES DO
NOT EXCEED THE RATED WORKING PRESSURE OF THE PIPING, FITTINGS, AND APPURTENANCES. ANY
DAMAGES TO THE MAIN FROM PRESSURE SURGES DURING POLYPIGGING SHALL BE PAID FOR AND
REPAIRED BY THE CONTRACTOR.
3.2. THE TIME AND PRESSURE LOG SHALL BE SUBMITTED TO THE OWNER FOLLOWING THE POLYPIGGING
PROCESS FOR THEIR MAINTENANCE RECORDS INCLUDING; 1) THE NUMBER OF PIG PASSES AND
NUMBER OF PIGS USED; 2) OBJECTS FOUND DURING FLUSHING AND THEIR APPROXIMATE
LOCATIONS IN THE WATER MAIN; 3) APPROXIMATE PIG VELOCITY AND LOCATION; 4) PRESSURE
ZONE OF SYSTEM; 5) FLUSHING TIME BEFORE WATER APPEARED CLEAR; AND 6) DATE.
4.CLEANING
4.1. THE PIG SHALL BE INSPECTED UPON REMOVAL TO DETERMINE WHETHER OR NOT IT HAS BEEN
DAMAGED FROM PASSING OVER OR AROUND A LARGE OBJECT THAT IS WEDGED INSIDE THE PIPE.
IF THE PIG IS DAMAGED, THE LOCATION OF THE BLOCKAGE THAT CAUSED THE DAMAGE SHALL BE
IDENTIFIED USING THE PRESSURE LOG. THE BLOCKAGE SHALL THEN BE REMOVED AND THE PIPELINE
INSPECTED AND REPAIRED TO A LIKE NEW CONDITION. AFTER THE BLOCKAGE(S) HAS BEEN
REMOVED AND THE PIPELINE REPAIRED, A SECOND PIG SHALL RUN THROUGH THE LINE USING THE
SAME PROCESS AND PROCEDURES IDENTIFIED IN THE PREVIOUS PARAGRAPHS.
4.2. DO NOT ALLOW THE SWABBED DEBRIS TO REENTER THE PIPE FOLLOWING A POLYPIG PASS. PIPE
ENDS SHALL BE CAPPED OR FITTINGS REPLACED TO PREVENT DEBRIS FROM ENTERING THE CLEANED
PIPE. ANY FITTINGS OR VALVES NOT CAPABLE OF PASSING A POLYPIG SHALL BE FLUSHED OR SWEPT
CLEAN. AFTER THE PIG HAS BEEN REMOVED, WATER SHALL BE FLUSHED THROUGH THE PIPING
SYSTEM UNTIL THE WATER IS CLEAR AND APPROVED IN WRITING BY THE OWNER.
PIPE INSTALL NOTES
1. USE MATERIALS AND INSTALLATION METHODS IN ACCORDANCE WITH THE LATEST EDITION OF THE
UNIFORM PLUMBING CODE AND LOCAL CODES AND REGULATIONS THAT ARE APPLICABLE.
2. INSTALLATION AND CONSTRUCTION
2.1. INSTALL PIPES IN ACCORDANCE WITH THE MANUFACTURER'S RECOMMENDATIONS. USE TYPES AND
SIZES OF PIPES AS SPECIFIED HEREIN AND/OR AS SHOWN ON THE PLANS.
2.2. WHERE SMALL PIPE SIZES ARE OMITTED FROM THE PLANS AND NOT MENTIONED IN THE
SPECIFICATIONS, USE SIZES CORRESPONDING TO CODE REQUIREMENTS AND AS REQUIRED BY
EQUIPMENT AND PLUMBING FIXTURES AND APPURTENANCES.
2.3. PROPERLY SIZE ANY UNDESIGNATED PIPE SIZES FOR THE FUNCTIONS TO BE PERFORMED.
2.4. LAY PIPE AND SUPPORTS AT PROPER LINES AND GRADES. FOLLOW THE PIPING RUNS SHOWN ON THE
PLANS AS CLOSELY AS POSSIBLE, EXCEPT FOR MINOR ADJUSTMENTS TO AVOID ARCHITECTURAL AND
STRUCTURAL FEATURES. MAKE MAJOR RELOCATIONS, IF REQUIRED, IN A MANNER ACCEPTABLE TO THE
OWNER.
2.5. KEEP OPENINGS IN PIPES CLOSED DURING PROGRESS OF WORK.
2.6. FORM THRUST BLOCKING SO THAT BOLTS, JOINTS, GASKETS, AND FLANGES OF ADJACENT JOINTS ARE
CLEAR OF CONCRETE ALLOWING BOLTS AND JOINTS TO BE DISMANTLED WITHOUT REMOVING
CONCRETE. ALL CONCRETE BLOCKING SHALL HAVE A MINIMUM COMPRESSIVE STRENGTH OF 4,000 PSI
UNLESS IDENTIFIED OTHERWISE IN DIVISION 3 OR ON THE PLANS.
2.7. PIPE PASSING THROUGH CONCRETE WALLS OR SLABS SHALL BE MADE WATERTIGHT.
2.8. BEDDING SHALL BE MECHANICALLY COMPACTED IN LIFTS NO GREATER THAN 8-INCHES FROM BASE TO
SPRINGLINE AND FROM SPRINGLINE TO TOP OF PIPE USING A JUMPING JACK OR SHEEPSFOOT.
2.9. HOE-PACKS, SHEEPSFOOTS, AND VIBRATORY ROLLERS SHALL NOT BE USED WITHIN 12-INCHES DIRECTLY
ABOVE THE PIPE. COMPACT TRENCH BACKFILL IN LIFTS NOT EXCEEDING 18-INCHES LOOSE-THICKNESS.
2.10.FLANGED JOINT ASSEMBLY
2.10.1. BOLT HOLES OF FLANGES SHALL STRADDLE THE HORIZONTAL AND VERTICAL CENTERLINES OF THE
PIPE. CLEAN FLANGES BY WIRE BRUSHING BEFORE ASSEMBLING. CLEAN FLANGE BOLTS AND NUTS
BY WIRE BRUSHING; LUBRICATE BOLTS WITH GRAPHITE OR OIL.
2.10.2. INSERT THE NUTS AND BOLTS (OR STUDS), FINGER TIGHTEN, AND PROGRESSIVELY TIGHTEN
DIAMETRICALLY OPPOSITE BOLTS UNIFORMLY AROUND THE FLANGE TO THE PROPER TENSION.
BOLTS SHALL HAVE MINIMUM OF TWO THREADS SHOWING BEYOND THE NUT.
2.10.3. TIGHTEN JOINTS CAREFULLY TO PREVENT STRAIN UPON VALVES, PUMPS, AND OTHER EQUIPMENT.
2.10.4. IF FLANGES LEAK UNDER PRESSURE TESTING, LOOSEN OR REMOVE THE NUTS AND BOLTS, RESET
OR REPLACE THE GASKET, REINSTALL OR RE-TIGHTEN THE BOLTS AND NUTS, AND RETEST THE
JOINTS. REPLACE THE GASKET IF DAMAGED.
2.10.5. VERIFY THE SIZE, MATERIAL, AND LOCATION OF THE EXISTING MAIN AT THE CONNECTION POINT
PRIOR TO INSTALLING THE NEW SEWER FORCE MAIN.
3.PREPARATION
3.1. PROVIDE ALL REQUIRED PERSONNEL AND EQUIPMENT AND COMPLETE ALL TESTS REQUIRED TO
DEMONSTRATE THE INTEGRITY OF THE FINISHED INSTALLATION FOR THE APPROVAL OF THE OWNER
AND ALL AGENCIES HAVING JURISDICTION.
3.2. BACKFILL THE PIPELINE TRENCH SUFFICIENTLY TO PREVENT MOVEMENT OF THE PIPE UNDER PRESSURE.
ALL THRUST BLOCKS SHALL BE IN PLACE AND SUFFICIENTLY CURED TO REACH DESIGN STRENGTH
BEFORE TESTING. FURNISH, INSTALL, AND REMOVE TEMPORARY BLOCKING WHERE PERMANENT
BLOCKING IS NOT REQUIRED AND REMOVE IT AFTER TESTING.
3.3. ALL PUMPS, GAUGES, PLUGS, SADDLES, CORPORATION STOPS, MISCELLANEOUS HOSE AND PIPING, AND
OTHER EQUIPMENT NECESSARY FOR PERFORMING THE TEST SHALL BE FURNISHED AND OPERATED BY
THE CONTRACTOR. GAUGES USED IN THE TEST MAY BE REQUIRED TO BE CERTIFIED FOR ACCURACY AT
A LABORATORY BY THE OWNER. GAUGE RANGE SHALL NOT EXCEED 200-PERCENT OF THE TEST
PRESSURE.
SHACKLE (THREADED ROD) RESTRAINTS
1. DEFINITIONS
1.1. ANCHOR FASTENER: THE ITEM WHICH CONNECTS TO THE FITTING AND WHICH THE
SHACKLE ROD PASSES THROUGH. SUCH AS A 90° EYE BOLT OR SHACKLE PLATE.
1.2. WEATHERING STEEL: STEEL ALLOY DESIGNED TO RESIST CORROSION. OFTEN REFERRED TO
USING THE GENERICIZED TRADE NAME COR-TEN.
2.DESIGN CRITERIA
2.1. UNLESS SHOWN OTHERWISE ON THE PLANS, USE THE FOLLOWING SHACKLE ROD SIZES
FOR 250 PSI TEST PRESSURE. MINIMUM NUMBER (#) AND DIAMETER OF RODS:
UNDOCUMENTED STEEL
OR STAINLESS STEEL SS COLD DRAWNWEATHERING STEEL
PIPE SIZE(30 KSI MIN YIELD) (35 KSI MIN YIELD)(45 KSI MIN YIELD)
4” (2) AT ½” (2) AT ½” (2) AT ½”
6” (2) AT ¾” (2) AT ¾” (2) AT ¾”
8” (3) AT ¾” OR (3) AT ¾” OR (2) AT ¾” OR
(2) AT 1” (2) AT 1” (2) AT 1”
10” (5) AT ¾” OR (4) AT ¾” OR (3) AT ¾” OR
(3) AT 1” (2) AT 1” (2) AT 1”
12” (7) AT ¾” OR (6) AT ¾” OR (4) AT ¾” OR
(4) AT 1” (3) AT 1” (3) AT 1”
CONTACT ENGINEER FOR OTHER SIZES OR PRESSURE.
3. SUBMITTALS
3.1. PROVIDE SUBMITTAL FOR ANCHOR FASTENER WHICH INCLUDES STRENGTH RATING IN
POUNDS. FOR SHACKLE PLATES, INCLUDE DIMENSIONAL DRAWING.
3.2. FOR HIGH STRENGTH RODS (COLD DRAWN OR WEATHERING STEEL), PROVIDE
SUBMITTALS SHOWING ROD MATERIAL AND YIELD STRENGTH.
4.COMPONENTS
4.1. ANCHOR FASTENERS MUST BE A STEEL ALLOY. DUCTILE IRON, CAST IRON, OR ANY
MATERIAL DEEMED BRITTLE IN THE OPINION OF THE OWNER ARE NOT ALLOWED.
SHACKLE (THREADED ROD) RESTRAINTS CONTINUED
4.COMPONENTS (CONTINUED)
4.1. VERIFY ANCHOR FASTENER IS APPROPRIATE FOR ANCHOR LOCATION.
4.2. ALL BURIED SHACKLED THRUST RESTRAINT SYSTEMS SHALL BE STAINLESS STEEL OR WEATHERING STEEL. EXPOSED
SHACKLES, SUCH AS IN A VAULT OR MECHANICAL ROOM, MAY BE NON-WEATHERING STEEL BUT IF SO, MUST BE
COATED WITH EPOXY PAINT SYSTEM. CLEAN RUST PRIOR TO PAINTING.
MATERIAL (* = WEATHERING STEEL)YIELD STRENGTH CORROSION RESISTANT
TYPE 304/316 SS LOW (30 KSI) YES
ASTM A36 LOW (36 KSI) NO
ASTM A588 * MED (45 KSI) YES
ASTM A709 GR 50W * MED (50 KSI) YES
ASTM A242 * MED (50 KSI) YES
ASTM A307 HIGH (60 KSI) NO
ASTM F3125 A325 TYPE 1 HIGH (90 KSI) NO
ASTM F3125 A325 TYPE 3 * HIGH (90 KSI) YES
4.3. ALL COMPONENTS OF ANY STAINLESS STEEL OR WEATHERING STEEL SYSTEM SHALL INCLUDE ONLY STAINLESS STEEL
OR WEATHERING STEEL COMPONENTS. BOLTS, NUTS, WASHERS, RODS, AND OTHER COMPONENTS SHALL BE ONE
MATERIAL AND NOT INTERMIXED.
4.4. SHACKLE SYSTEMS MUST PROVIDE A MECHANISM TO PREVENT UNTHREADING. EXPOSED SHACKLES SHALL USE DOUBLE
NUTS. BURIED SHACKLE SYSTEMS MAY USE DOUBLE NUTS, SINGLE NUT WITH TACK WELD, OR SINGLE NUT WITH
CENTER PUNCH ON OUTSIDE ROD THREAD.
4.5. PROVIDED WASHERS AT ANCHOR FASTENERS. INSTALL ANCHOR FASTENERS ON THE OPPOSITE SIDE OF THE FLANGE OR
MECHANICAL JOINT FROM THE ROD.
5. INSTALLATION
5.1. FOR STANDARD ELONGATION RESTRAINT, SPACE SHACKLES ROUGHLY EQUALLY AROUND THE PIPE.
5.2. WHEN RESTRAINT IS INTENDED TO ALLOW DEFLECTION MOVEMENT WITHOUT EXPANSION, SUCH AS AT A PUMP OR
TANK CONNECTION, CONCENTRATE RODS ALONG THE NEUTRAL AXIS OF DEFLECTION. IN OTHER WORDS, IF VERTICAL
DEFLECTION IS ALLOWED, PLACE RODS ALONG HORIZONTAL AXIS. CONFIRM PROPER ORIENTATION WITH OWNER.
5.3. NUTS SHALL BE FINGER TIGHTENED TO SNUG, THEN TIGHTENED BY WRENCH ONE FULL TURN. DO NOT OVERTIGHTEN.
MECHANICAL NOTES:
1. PROVIDE THE NECESSARY PIPING, PLUMBING, FITTINGS, AND APPURTENANCES TO MAKE ALL PIPING SYSTEMS COMPLETE, TESTED, AND READY FOR OPERATION AS SPECIFIED HEREIN AND AS SHOWN ON THE PLANS.
1.1. SOME FITTINGS THAT ARE NECESSARY FOR THE COMPLETE PIPING SYSTEM INSTALLATION AND OPERATION MAY NOT
HAVE BEEN SHOWN.
1.2. PROVIDE FITTINGS, PIPE, AND APPURTENANCES NECESSARY, WHETHER SHOWN ON THE PLANS OR NOT, TO MAKE ALL
PIPING SYSTEMS COMPLETE, TESTED, AND READY FOR OPERATION.
2. SOME PIPE SUPPORTS, THRUST BLOCKING, AND TIE RODS ARE NOT SHOWN ON THE PLANS.
2.1. PROVIDE PIPE SUPPORTS, THRUST BLOCKING, AND TIE RODS FOR PIPES AS REQUIRED BY ACCEPTED DESIGN CRITERIA
TO SUPPORT AND RESTRAIN THE LOADS ENCOUNTERED.
3.MATERIALS
3.1. ALL VALVES, METERS, HYDRANTS, SPECIALTIES, APPURTENANCES, AND OTHER SUCH MECHANICAL AND PLUMBING
COMPONENTS THAT ARE OF SIMILAR PURPOSE SHALL BE OF A SINGLE MANUFACTURER AND MODEL LINE.
3.2. DO NOT “MIX AND MATCH” UNLESS SPECIFICALLY STATED OTHERWISE OR ALLOWED BY THE ENGINEER.
3.3. THE INTENTION OF THIS REQUIREMENT IS TO MAINTAIN CONSISTENCY ACROSS ALL COMPONENTS INSTALLED ON THE
PROJECT FOR FUNCTION, MAINTENANCE, AESTHETICS, AND DETAILS OF INSTALLATION.
4.COMPONENTS
4.1. UNDER NO CIRCUMSTANCE SHALL THE FASTENERS BE OF LESSER STRENGTH OR HIGHER CORROSIVE POTENTIAL THAN
THE MATERIALS BEING CONNECTED.
4.1.1. IF DISSIMILAR METALS ARE ADJACENT (FOR EXAMPLE: STAINLESS STEEL FLANGE CONNECTING TO DUCTILE IRON
FLANGE) A DIELECTRIC INSULATION KIT SHALL BE USED.
4.2. FASTENERS FOR PIPE AND FITTINGS: PER AWWA STANDARDS UNLESS OTHERWISE SPECIFIED. ALL RELEVANT
SUBSECTIONS OF AWWA C100, C200, AND C500.
4.2.1. ALL BOLTS AND STUDS SHALL BE LONG ENOUGH SO THAT NO LESS THAN TWO THREADS EXTEND BEYOND THE
FACE OF THE NUT.
4.2.2. NON-SUBMERGED FLANGE BOLTS TO BE ASTM A307 GRADE A, ZINC PLATED.
4.3. FOR SUBMERGED CONDITIONS, CONNECTION BOLTS SHALL BE NITRONIC 60 STEEL.
4.3.1. NUTS AND WASHERS SHALL BE STAINLESS STEEL, MINIMUM GRADE 304 IN RAW DOMESTIC OR TREATED
DOMESTIC WATER AND MINIMUM GRADE 316 IN TREATMENT PROCESSES AND SEWAGE APPLICATIONS.
4.3.2. MINIMUM GRADE 317 FOR ACIDIC TRANSPORT.
4.3.3. BOLTS AND NUTS SHALL MEET ASTM F593 AND F594. STAINLESS STEEL SHALL NOT BE USED WHERE IN CONTACT
WITH CHLORINE OR CHLORINE SOLUTIONS.
4.3.4. STAINLESS STEEL BOLTS MAY BE USED IN LIEU OF NITRONIC BUT MUST BE ASSEMBLED USING APPROPRIATE
LUBRICANT OR TAPE.
4.3.5. FOR INSTALLATIONS IN DOMESTIC WATER, LUBRICANT, OR TAPE MUST BE APPROVED FOR DOMESTIC WATER
SERVICE. COBAS STAINLESS STEEL THREAD SEALING TAPE OR APPROVED EQUAL.
5. FINISHES
5.1. FOR CONDITIONS OTHER THAN SUBMERGED, ALL NUTS AND BOLTS SHALL BE ZINC PLATED, AND SUITABLE FOR
ABOVE AND BELOW GRADE LOCATIONS AS REQUIRED.
5.2. WHERE ABOVE GRADE/EXPOSED PIPING IS SPECIALLY COATED, THE CONNECTING NUTS AND BOLTS SHALL BE COATED
USING THE SAME SYSTEM UNLESS DIRECTED OTHERWISE BY THE OWNER.
6. CONSTRUCTION
6.1. ALL PIPING AND RELATED EQUIPMENT TO BE JOINED SHALL BE CONNECTED AS SHOWN ON THE PLANS, SPECIFICATIONS, AS RECOMMENDED BY THE MANUFACTURER OR AS REQUIRED BY STANDARD INDUSTRY PRACTICES IF
NOT OTHERWISE SPECIFIED.
6.2. STEEL AND STAINLESS STEEL THREADS SHALL BE PROTECTED AGAINST GALLING USING STEEL THREAD SEALING TAPE
EQUAL TO COBAS STEEL THREAD SEALING TAPE. TAPE SHALL BE SPECIFIC TO THE STEEL TYPE USED.
7.FIELD QUALITY CONTROL
7.1. PRESSURE GAUGES USED FOR TESTING AND COMMISSIONING SHALL BE IN GOOD WORKING ORDER AND SCALED
APPROPRIATELY FOR THE TEST.
7.2. SCALE RANGE SHALL NOT EXCEED 200% OF THE TEST PRESSURE. FOR EXAMPLE, FOR A 250 PSI TEST, THE GAUGE
SCALE SHALL NOT EXCEED 500 PSI. THE OWNER HAS THE RIGHT TO REJECT ANY GAUGES THAT ARE SUSPECT IN THEIR
ACCURACY.
7.3. IF ANY COMPONENTS THAT HAVE BEEN APPROVED BY THE OWNER ARE NOT RATED FOR THE SPECIFIED SYSTEM TEST
PRESSURE, REMOVE OR ISOLATE THOSE COMPONENTS DURING PRESSURE TESTING IN A METHOD ACCEPTABLE TO THE
OWNER. SAID COMPONENTS MUST STILL BE PRESSURE TESTED IN THEIR PERMANENT CONFIGURATION AT THEIR
INDIVIDUAL TEST PRESSURE RATING.
TEST AND INSPECTION NOTES
1. TESTS AND INSPECTION
1.1. HYDROSTATIC PRESSURE TESTING
1.1.1. COVER ANY EXPOSED PRESSURIZED PVC OR HDPE PIPE TO PROTECT FROM DIRECT SUNLIGHT
IF THE AIR TEMPERATURE IS ABOVE 70°F.
1.1.2. TEST ALL PIPELINES AND APPURTENANCES UNDER A HYDROSTATIC TEST PRESSURE EQUAL
TO THAT SPECIFIED UNDER DIVISION 1.81.40 OF THESE SPECIFICATIONS. IF NOT STATED, THE
HYDROSTATIC TESTING PRESSURE SHALL BE 150 PSI OVER WORKING PRESSURE OR 250 PSI,
WHICHEVER IS GREATER, MEASURED AT THE LOW POINT OF THE TEST SECTION. THE OWNER
HAS THE RIGHT TO REQUIRE MORE STRINGENT TEST CRITERIA THAN STATED IN THIS
SPECIFICATION OR IN THE PRESSURE RATING SECTION IF IT IS DETERMINED THAT FIELD
CONDITIONS WARRANT SUCH MEASURES.
1.2. THE OWNER WILL FURNISH THE WATER NECESSARY TO FILL THE PIPELINES AND FOR TESTING AT
A TIME OF DAY WHEN SUFFICIENT QUANTITIES OF WATER ARE AVAILABLE FOR NORMAL SYSTEM
OPERATION.
1.3. FILL THE PIPELINES WITH WATER AND ALLOW TO STAND UNDER PRESSURE FOR A MINIMUM OF
24 HOURS TO ALLOW AIR TO ESCAPE AND ALLOW THE LINING OF THE PIPE TO ABSORB WATER.
THE CONTRACTOR IS RESPONSIBLE FOR THE PROPER DISPOSAL OF ANY WASTE, INCLUDING
WATER.
1.3.1. FITTINGS AND SECTIONS OF PIPE THAT CANNOT BE PRESSURE TESTED, SUCH AS
CONNECTIONS TO THE EXISTING SYSTEM, SHALL BE LEFT EXPOSED FOR A VISUAL
INSPECTION UNDER SYSTEM PRESSURE. ANY VISIBLE LEAKAGE SHALL BE CORRECTED BY THE
CONTRACTOR TO THE SATISFACTION OF THE OWNER REGARDLESS OF THE ALLOWABLE
LEAKAGE SPECIFIED HEREIN. SHOULD THE TEST SECTION FAIL TO MEET THE SPECIFIED
PRESSURE TEST SUCCESSFULLY, THE CONTRACTOR SHALL LOCATE AND REPAIR THE DEFECTS
AND THEN RETEST THE PIPELINE AT THEIR EXPENSE.
1.3.2. PRIOR TO CALLING OUT THE OWNER TO WITNESS THE PRESSURE TEST, THE EQUIPMENT
SHALL BE COMPLETELY SET UP, READY FOR OPERATION, AND HAVE SUCCESSFULLY
PERFORMED THE TEST TO ASSURE THAT THE PIPE IS IN A SATISFACTORY CONDITION. THE
OWNER SHALL WITNESS THE TEST; IF THE TEST DOES NOT PASS INSPECTION FOR ANY
REASON, ADDITIONAL TRIPS REQUIRED TO WITNESS ANOTHER TEST SHALL BE DONE AT THE
CONTRACTOR'S EXPENSE.
1.3.3. BEFORE APPLYING THE SPECIFIED TEST PRESSURE, AIR SHALL BE EXPELLED COMPLETELY FROM
THE PIPE, VALVES, AND APPURTENANCES.
1.3.4. THE TEST SHALL BE ACCOMPLISHED BY PUMPING THE MAIN UP TO THE REQUIRED
PRESSURE; STOP THE PUMP FOR A MINIMUM OF 15 MINUTES UP TO A MAXIMUM OF 60
MINUTES AS DIRECTED BY THE ENGINEER, AND THEN PUMP THE MAIN UP TO THE TEST
PRESSURE AGAIN. DURING THE TEST, THE SECTION BEING TESTED SHALL BE OBSERVED FOR
VISIBLE LEAKAGE. A CLEAN CONTAINER SHALL BE USED FOR HOLDING WATER FOR PUMPING
PRESSURE ON THE MAIN BEING TESTED. THIS MAKEUP WATER SHALL BE STERILIZED BY THE
ADDITION OF CHLORINE TO A CONCENTRATION OF 50 MG/L (PPM).
1.3.5. SECTIONS TO BE TESTED SHALL NORMALLY BE LIMITED TO 1,500 FEET. THE OWNER MAY
REQUIRE THAT THE FIRST SECTION OF PIPE, NOT LESS THAN 1,000 FEET IN LENGTH,
INSTALLED BY EACH OF THE CONTRACTOR'S CREWS BE TESTED IN ORDER TO QUALIFY THE
CREW AND/OR THE MATERIAL. PIPE LAYING SHALL NOT CONTINUE MORE THAN AN
ADDITIONAL 1,000 FEET UNTIL THE FIRST SECTION HAS BEEN TESTED SUCCESSFULLY.
1.3.6. SECTIONS TO BE TESTED SHALL BE ISOLATED AND PUMPED TO TEST PRESSURE. TEST
PRESSURE SHALL BE SUSTAINED FOR A MINIMUM OF 60 MINUTES WITH LESS THAN
2-PERCENT (5 PSI) LOSS IN PRESSURE THROUGHOUT THE TEST DURATION WITH OWNER
PRESENT AND ON SITE THROUGHOUT TEST DURATION. IF TEST RESULTS DO NOT COMPLY,
CONTRACTOR SHALL REPAIR LEAKS AND RETEST UNTIL TESTING IS PASSED IN PRESENCE OF
OWNER. OWNER MAY BLEED OFF PRESSURE FROM PUMP TO PIPING CONNECTION ONCE
TEST IS PASSED TO VERIFY SYSTEM PIPING WAS TESTED.
2. VALVE TESTING
2.1. ALL VALVES SHALL BE PRESSURE TESTED. DO NOT EXCEED THE RATED WORKING PRESSURE OF
THE VALVE WHEN OPERATING THE VALVE. BLEED OFF TEST PRESSURE PRIOR TO OPERATING.
CHECK ALL VALVE BONNET FASTENERS FOR TIGHTNESS.
2.2. PRE-INSTALLATION
2.2.1. ALL BURIED VALVES SHALL BE PRESSURE TESTED OUTSIDE THE TRENCH. GATE VALVES SHALL
BE TESTED ON ONE SIDE OF THE CLOSED SEAT. BUTTERFLY AND ECCENTRIC VALVES MUST
BE TESTED ON BOTH SIDES OF THE CLOSED SEAT.
2.3. POST-INSTALLATION
2.3.1. TEST ALL VALVES FOR WATER TIGHTNESS UNDER DIFFERENTIAL WORKING PRESSURE. TO
PERFORM THIS TEST, PRESSURIZE PIPE SECTION WITH VALVE IN PLACE, CLOSE VALVE AND
RELIEVE PRESSURE ON SEAT SIDE OF THE VALVE. THE VALVE SHALL NOT PASS WATER
DURING A 5-MINUTE TEST PERIOD.
2.3.2. OPERATE ALL VALVES AT LEAST ONCE FROM CLOSED-TO-OPEN-TO-CLOSED POSITIONS WHILE
VALVE IS UNDER WORKING (NOT TEST) PRESSURE.
| Sheets and Views |
| G-06 PIPE NOTES |
File details come from the government source that posted it. Updated .