2025_55140_Exhibit_A_PlanSet_Part12.pdf
PDF 3 MB Posted
- Attached to
- 2025-55140 Tolmie Lift Station Improvements
- Solicitation number
- 2025-55140
- Issued by
- Adams County, Asotin County, Benton County, Chelan County, Clallam County, Clark County, Columbia County, Cowlitz County, Douglas County, Ferry County, Franklin County, Garfield County, Grant County, Grays Harbor County, Island County, Jefferson County, King County, Kitsap County, Kittitas County, Klickitat County, Lewis County, Lincoln County, Mason County, Okanogan County, Pacific County, Pend Oreille County, Pierce County, San Juan County, Skagit County, Skamania County, Snohomish County, Spokane County, Stevens County, Thurston County, Wahkiakum County, Walla Walla County, Whatcom County, Whitman County, Yakima County, Asotin City, Clarkston City, Clarkston Heights-Vineland CDP, West Clarkston-Highland CDP, Benton City, Chelan City, Chelan Falls CDP, Clallam Bay CDP, Lewisville CDP, Rock Island City, Pacific Beach CDP, Whidbey Island Station CDP, Mercer Island City, Pacific City, Bainbridge Island City, Kingston CDP, Kitsap Lake CDP, Kittitas City, Klickitat CDP, Okanogan City, Anderson Island CDP, Fort Lewis CDP, Fox Island CDP, Herron Island CDP, Ketron Island CDP, North Fort Lewis CDP, Raft Island CDP, Stevenson City, Hat Island CDP, Lake Stevens City, Snohomish City, Spokane City, Spokane Valley City, Puget Island CDP, Garfield Town, Yakima City, Washington
About this file
This is an electrical power riser diagram for the Tolmie State Park Wastewater Lift Station Retrofit project, prepared by Cross Engineers, Inc. for the Washington State Parks and Recreation Commission. The diagram details the existing and new electrical configurations for the beach restroom and dry well power systems, specifically showing the electrical infrastructure modifications for a lift station improvement project. The document is a 100% design plan set marked for review only, located in Thurston County, and provides comprehensive electrical schematic details including power control, relay configurations, grounding, and various electrical connection notes.
The diagram illustrates the technical specifications for relocating electrical components, including power control panels, alarm systems, transformers, and electrical conduits. Key electrical notes specify requirements such as using galvanized, slip-resistant, hinged and locking electrical enclosures, installing ground wires, providing side-wall mounted LED lighting, and ensuring proper grounding and circuit protection. The document is part of a larger project aimed at improving the lift station's infrastructure and eliminating potential confined space entry risks, as indicated in the related contract opportunity description.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
21 24
| Sheets and Views |
| E-11 EXISTING AND NEW POWER RISER DIAGRAM |
File details come from the government source that posted it. Updated .