2025_55140_Exhibit_A_PlanSet_Part1.pdf
PDF 4 MB Posted
- Attached to
- 2025-55140 Tolmie Lift Station Improvements
- Solicitation number
- 2025-55140
- Issued by
- Adams County, Asotin County, Benton County, Chelan County, Clallam County, Clark County, Columbia County, Cowlitz County, Douglas County, Ferry County, Franklin County, Garfield County, Grant County, Grays Harbor County, Island County, Jefferson County, King County, Kitsap County, Kittitas County, Klickitat County, Lewis County, Lincoln County, Mason County, Okanogan County, Pacific County, Pend Oreille County, Pierce County, San Juan County, Skagit County, Skamania County, Snohomish County, Spokane County, Stevens County, Thurston County, Wahkiakum County, Walla Walla County, Whatcom County, Whitman County, Yakima County, Asotin City, Clarkston City, Clarkston Heights-Vineland CDP, West Clarkston-Highland CDP, Benton City, Chelan City, Chelan Falls CDP, Clallam Bay CDP, Lewisville CDP, Rock Island City, Pacific Beach CDP, Whidbey Island Station CDP, Mercer Island City, Pacific City, Bainbridge Island City, Kingston CDP, Kitsap Lake CDP, Kittitas City, Klickitat CDP, Okanogan City, Anderson Island CDP, Fort Lewis CDP, Fox Island CDP, Herron Island CDP, Ketron Island CDP, North Fort Lewis CDP, Raft Island CDP, Stevenson City, Hat Island CDP, Lake Stevens City, Snohomish City, Spokane City, Spokane Valley City, Puget Island CDP, Garfield Town, Yakima City, Washington
About this file
The document is a 100% design plan set for the Tolmie State Park Wastewater Lift Station Retrofit project, prepared by the Washington State Parks and Recreation Commission (WSPRC) in collaboration with PBS Environmental & Engineering and Cross Engineers, Inc. The project involves a comprehensive retrofit of the existing wastewater lift station at Tolmie State Park, located in Thurston County, Washington. The design plans comprehensively detail the demolition and improvement of the existing wet well and dry well structures, including removing and salvaging existing equipment like sewage pumps, valves, and mechanical pipes, and preparing the site for new infrastructure.
The project scope includes several key technical elements: eliminating confined space entry requirements, bringing controls above ground, creating an overflow prevention mechanism to prevent sewage spills, and implementing structural and mechanical improvements. The design plans specify detailed demolition procedures, grouting requirements, anchor installation specifications, and bolt and connector notes. The project is part of the WSPRC's capital improvement program and is designed to enhance the functionality and safety of the wastewater lift station at Tolmie State Park. The park will be closed to the public throughout the project duration, and the plans indicate a comprehensive approach to retrofitting the existing infrastructure with minimal environmental disruption.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
© 2022 Microsoft Corporation © 2022 TomTom
© 2022 Microsoft Corporation © 2022 TomTom
PAGE SHEET DESCRIPTION
1 G-01 COVER SHEET
2 G-02 PROJECT TEAM
3 G-03 GENERAL NOTES
4 G-04 GENERAL NOTES
5 G-05 COATING NOTES
6 G-06 PIPE NOTES
7 G-07 PUMP AND SOLENOID NOTES
8 C-01 EXISTING CONDITIONS - UPPER PARK
9 C-02 EXISTING CONDITIONS - LOWER PARK
10 C-10 SITE PLAN
11 C-11 SOLENOID SITE PLAN
12 C-20 CIVIL DETAILS AND NOTES
13 C-30 KIOSK STRUCTURAL IMPROVEMENTS
14 S-01 WWLS EXISTING CONDITIONS
15 S-10 WWLS STRUCTURAL IMPROVEMENTS
16 M-01 WET WELL MECHANICAL PLAN
17 M-02 NEW VAULT MECHANICAL PLAN
18 M-10 MECHANICAL DETAILS AND NOTES
19 M-11 MECHANICAL DETAILS AND NOTES
20 E-10 ELECTRICAL SITE PLAN
21 E-11 EXISTING AND NEW POWER RISER DIAGRAM
22 E-12 ELECTRICAL DETAILS
23 E-13 ELECTRICAL DETAILS
24 E-14 ELECTRICAL DETAILS
NORTH
PROJECT LOCATION
NORTH
VICINITY MAP
APPROVED FOR CONSTRUCTION
Area Manager: JEFF VASSALLO date date
C A D
V V
S P E C I F I C A T I O
N
N
U M
B E R
W
A S T E W
A T E R
L I F T
R E T R O
F I T
S T A T I O
N
SHEET INDEX:
7730 61ST AVENUE NE OLYMPIA WA 98506
SEC-23 T-19-N R-1-W
THURSTON COUNTY TAX PARCEL NUMBER 11923230000
LATITUDE 47.119°N & LONGITUDE 122.775°W
TOLMIE STATE PARK
WASTEWATER LIFT STATION RETROFIT
MICHAEL LATIMER
MARK O. BROWN, CHAIR
SOPHIA DANENBERG LAURIE CONNELLY
REGION MANAGER
KEN BOUNDS, VICE CHAIR
WASHINGTON STATE PARKS
& RECREATION COMMISSION CAPITAL PROGRAM MANAGER
DIANA DUPUIS, DIRECTOR
STEVE MILNER HOLLY WILLIAMS
PROJECT
LOCATION
NISQUALLY REACH
PROJECT
LOCATION
100% DESIGN PLAN SET
PUBLISHED: 4/21/2023
info@crossengineers.com
Phone: (253) 759-0118923 MLK Jr. Way
Tacoma, WA 98405
CROSS ENGINEERS, INC
PROJECT TEAM
STATE OF WASHINGTON
PARKS AND RECREATION COMMISSION
1111 ISRAEL ROAD SOUTHWEST
POST OFFICE BOX 42650
OLYMPIA, WASHINGTON 98504-2650
WWW.PARKS.WA.GOV
WASHINGTON STATE PARKS AND RECREATION COMMISSION
MILLERSLVANIA STATE PARK
12245 TILLEY ROAD SOUTH
OLYMPIA, WASHINGTON 98512-9167
TODD FELTON
SW REGION MAINTENANCE MANAGER
TELEPHONE: (360) 902-8686
FACSIMILE: (360) 428-1094
TODD.FELTON@PARKS.WA.GOV
OWNER:
OWNER'S REPRESENTATVE:
PROJECT ENGINEERING CONSULTANTS
CIVIL ENGINEER: ELECTRICAL ENGINEER:
PROJECT LEAD:
PAUL C. BESKOW, PE
CIVIL & WATER RESOURCES PROJECT ENGINEER
TELEPHONE: (425) 654-8480
PAUL.BESKOW@PBSUSA.COM
GENE L. WENTWORTH, PE
PRINCIPAL ENGINEER
TELEPHONE: (253) 759-0118
GENEW@CROSSENGINEERS.COM
PBS ENVIRONMENTAL & ENGINEERING
22833 SE BLACK NUGGET ROAD
SUITE 140
ISSAQUAH, WA 98029
WWW.PBSUSA.COM
CROSS ENGINEERS, INC.
923 MARTIN LUTHER KING JR. WAY
TACOMA, WA 98405
CROSSENGINEERS.COM
PAUL C. BESKOW, PE
CIVIL & WATER RESOURCES PROJECT ENGINEER
TELEPHONE: (425) 654-8480
PAUL.BESKOW@PBSUSA.COM
PBS ENVIRONMENTAL & ENGINEERING
22833 SE BLACK NUGGET ROAD
SUITE 140
ISSAQUAH, WA 98029
WWW.PBSUSA.COM
PROJECT TEAM
G-02
NO SCALE
40525-070_G-02_PROJECT TEAM
PARKS FILE#
SCALE
PARKS
STATE
RECREATION
WASHINGTON
COMMISSION
AND
R E V I S I O
N S
CHECKED (HDQTS.)
REGISTERED STAMP
DESIGNED
CHECKED (FIELD)
DRAWN
ACTION BY
DATE
N O
CAD NO.
A P P
I N
T
D A T E
04/21/23JP/CS
04/21/23PCB
TOLMIE
STATE PARK
WASTEWATER
LIFT STATION
RETROFIT
AE 123-168
100% DESIGN PLAN SET (REVIEW ONLY)
SHEET OF 24
PRELIMINARY
GENERAL
NOTES
G-03
NO SCALE
40525-070_G-03_GENERAL NOTES
PARKS FILE#
SCALE
PARKS
STATE
RECREATION
WASHINGTON
COMMISSION
AND
R E V I S I O
N S
CHECKED (HDQTS.)
REGISTERED STAMP
DESIGNED
CHECKED (FIELD)
DRAWN
ACTION BY
DATE
N O
CAD NO.
A P P
I N
T
D A T E
04/21/23JP/CS
04/21/23PCB
TOLMIE
STATE PARK
WASTEWATER
LIFT STATION
RETROFIT
AE 123-168
100% DESIGN PLAN SET (REVIEW ONLY)
SHEET OF 24
PRELIMINARY
GENERAL NOTES:
1. PARK SITE WILL BE CLOSED TO THE PUBLIC THROUGHOUT THE DURATION OF PROJECT.
2. IN THE EVENT OF A CONFLICT BETWEEN THE NOTES ON G-03 THROUGH G-07 (PREAMBLE
NOTES), AND CALLOUTS OR NOTES THROUGHOUT THE REST OF THE PLAN SET, THESE
PREAMBLE NOTES SHALL TAKE PRECEDENCE.
3. DEFINITIONS
3.1. OWNER SHALL REFERENCE WASHINGTON STATE PARKS AND RECREATION COMMISSION
(WSPRC)
3.2. PARK SHALL REFERENCE TOLMIE STATE PARK, AS DESCRIBED ON SHEET G-01 OF THIS PLAN
SET.
3.3. PROJECT SHALL REFERENCE TOLMIE STATE PARK, AS DESCRIBED ON SHEET G-01 OF THIS
PLAN SET.
3.4. HVAC SHALL REFERENCE HEATING, VENTILATION, AND AIR CONDITIONING.
STRUCTURE DEMOLITION NOTES:
1. DEMOLISH AND REMOVE EXISTING CONSTRUCTION ONLY TO THE EXTENT REQUIRED BY
NEW CONSTRUCTION AND AS INDICATED. USE METHODS REQUIRED TO COMPLETE THE
WORK WITHIN LIMITATIONS OF GOVERNING REGULATIONS.
2. EXISTING ITEMS TO REMOVE: DETACH ITEMS FROM EXISTING CONSTRUCTION AND
DISPOSE OF THEM OFF-SITE UNLESS INDICATED TO BE SALVAGED OR REINSTALLED.
3. EXISTING ITEMS TO REMAIN: LEAVE EXISTING ITEMS THAT ARE NOT TO BE REMOVED
AND THAT ARE NOT OTHERWISE INDICATED TO BE SALVAGED OR REINSTALLED.
4.DISMANTLE: TO REMOVE BY DISASSEMBLING OR DETACHING AN ITEM FROM A
SURFACE, USING GENTLE METHODS AND EQUIPMENT TO PREVENT DAMAGE TO THE
ITEM AND SURFACES; DISPOSING OF ITEMS UNLESS INDICATED TO BE SALVAGED OR
REINSTALLED.
5. NEATLY CUT OPENINGS AND HOLES PLUMB, SQUARE, AND TRUE TO DIMENSIONS
REQUIRED. USE CUTTING METHODS LEAST LIKELY TO DAMAGE CONSTRUCTION TO
REMAIN OR ADJOINING CONSTRUCTION. USE HAND TOOLS OR SMALL POWER TOOLS
DESIGNED FOR SAWING OR GRINDING, NOT HAMMERING AND CHOPPING.
TEMPORARILY COVER OPENINGS TO REMAIN.
6. CAREFULLY SALVAGE HISTORIC ITEMS, RELICS, ANTIQUES, AND SIMILAR ITEMS OF
INTEREST OR VALUE TO OWNER THAT MAY BE UNCOVERED DURING DEMOLITION, IN A
MANNER TO PREVENT DAMAGE AND PROMPTLY RETURN TO OWNER.
7.PREDEMOLITION CONFERENCE: CONDUCT CONFERENCE AT PROJECT SITE.
7.1. INSPECT AND DISCUSS CONDITION OF CONSTRUCTION TO BE SELECTIVELY OR
FULLY DEMOLISHED.
7.2. REVIEW STRUCTURAL LOAD LIMITATIONS OF EXISTING STRUCTURE.
7.3. REVIEW AND FINALIZE DEMOLITION SCHEDULE AND VERIFY AVAILABILITY OF
MATERIALS, DEMOLITION PERSONNEL, EQUIPMENT, AND FACILITIES NEEDED TO
MAKE PROGRESS AND AVOID DELAYS.
7.4. REVIEW REQUIREMENTS OF WORK PERFORMED BY OTHER TRADES THAT RELY ON
SUBSTRATES EXPOSED BY SELECTIVE DEMOLITION OPERATIONS.
7.5. REVIEW AREAS WHERE EXISTING CONSTRUCTION IS TO REMAIN AND REQUIRES
PROTECTION.
8. TAKE PREDEMOLITION PHOTOGRAPHS OR VIDEO SHOWING THE EXISTING CONDITIONS
OF ADJOINING CONSTRUCTION, INCLUDING FINISH SURFACES, THAT MIGHT BE
MISCONSTRUED AS DAMAGE CAUSED BY DEMOLITION OPERATIONS.
9.HAZARDOUS MATERIALS: IT IS NOT EXPECTED THAT HAZARDOUS MATERIALS WILL BE
ENCOUNTERED IN THE WORK.
9.1. HAZARDOUS MATERIALS WILL BE REMOVED BEFORE THE START OF THE WORK.
9.2. IF SUSPECTED HAZARDOUS MATERIALS ARE ENCOUNTERED, DO NOT DISTURB;
IMMEDIATELY NOTIFY ENGINEER AND OWNER. HAZARDOUS MATERIALS WILL BE
REMOVED SEPARATELY.
9.2.1. VERIFY THAT HAZARDOUS MATERIALS HAVE BEEN REMEDIATED BEFORE
PROCEEDING WITH BUILDING DEMOLITION OPERATIONS.
10. STANDARDS: COMPLY WITH ANSI/ASSE A10.6 AND NFPA 241.
11. DISCONNECT, DEMOLISH, AND REMOVE PLUMBING, MECHANICAL, ELECTRICAL, AND
HVAC SYSTEMS, EQUIPMENT, AND COMPONENTS INDICATED ON DRAWINGS TO BE
REMOVED.
11.1.PIPING TO BE REMOVED: REMOVE PORTION OF PIPING INDICATED TO BE
REMOVED AND CAP OR PLUG REMAINING PIPING WITH SAME OR COMPATIBLE
PIPING MATERIAL.
11.1.1. CUT PIPE SUCH THAT IT IS FLUSH WITH THE INTERIOR OF THE EXISTING
STRUCTURE.
11.2.PIPING TO BE ABANDONED IN PLACE: DRAIN PIPING AND CAP OR PLUG PIPING
WITH SAME OR COMPATIBLE PIPING MATERIAL AND LEAVE IN PLACE.
11.2.1. PLUG PIPE WITH GROUT SUCH THAT THE PIPE IS PLUGGED AND THE SOLID
SURFACE IS FLUSH WITH THE INTERIOR OF THE EXISTING STRUCTURE TO
REMAIN.
11.3.EQUIPMENT TO BE REMOVED AND SALVAGED: DISCONNECT AND CAP SERVICES
AND REMOVE EQUIPMENT AND DELIVER TO OWNER.
12. VERIFY THAT UTILITIES HAVE BEEN DISCONNECTED AND CAPPED OR PLUGGED BEFORE
STARTING DEMOLITION OPERATIONS.
13. BEFORE DEMOLITION OR REMOVAL OF EXISTING BUILDING ELEMENTS THAT WILL BE
REPRODUCED OR DUPLICATED IN FINAL WORK, MAKE PERMANENT RECORD OF
MEASUREMENTS, MATERIALS, AND CONSTRUCTION DETAILS REQUIRED TO MAKE EXACT
REPRODUCTION.
14. ENGAGE A PROFESSIONAL ENGINEER TO ASSESS CONDITION OF BUILDING AND TO
DETERMINE WHETHER REMOVING ANY ELEMENT MIGHT RESULT IN STRUCTURAL
DEFICIENCY OR UNPLANNED COLLAPSE OF ANY PORTION OF STRUCTURE OR ADJACENT
STRUCTURES DURING BUILDING DEMOLITION OPERATIONS.
STRUCTURE DEMOLITION NOTES (CONTINUED):
15. TEMPORARY PROTECTION: PROVIDE TEMPORARY BARRICADES AND OTHER PROTECTION REQUIRED TO
PREVENT INJURY TO PEOPLE AND DAMAGE TO ADJACENT BUILDINGS AND FACILITIES TO REMAIN.
15.1.PROVIDE PROTECTION TO ENSURE SAFE PASSAGE OF PEOPLE AROUND DEMOLITION AREA AND
TO AND FROM OCCUPIED PORTIONS OF BUILDING.
15.2.PROVIDE TEMPORARY WEATHER PROTECTION, DURING INTERVAL BETWEEN DEMOLITION OF
EXISTING CONSTRUCTION ON EXTERIOR SURFACES AND NEW CONSTRUCTION, TO PREVENT
WATER LEAKAGE AND DAMAGE TO STRUCTURE AND INTERIOR AREAS.
15.3.PROTECT WALLS, CEILINGS, FLOORS, AND OTHER EXISTING FINISH WORK THAT ARE TO REMAIN
OR THAT ARE EXPOSED DURING SELECTIVE DEMOLITION OPERATIONS.
15.4.FOLLOW INDUSTRY-STANDARD REQUIREMENTS FOR TEMPORARY ENCLOSURES, DUST CONTROL, AND HVAC.
16. TEMPORARY SHORING: DESIGN, PROVIDE, AND MAINTAIN SHORING, BRACING, AND STRUCTURAL
SUPPORTS AS REQUIRED TO PRESERVE STABILITY AND PREVENT MOVEMENT, SETTLEMENT, OR
COLLAPSE OF CONSTRUCTION AND FINISHES TO REMAIN, AND TO PREVENT UNEXPECTED OR
UNCONTROLLED MOVEMENT OR COLLAPSE OF CONSTRUCTION BEING DEMOLISHED.
16.1.STRENGTHEN OR ADD NEW SUPPORTS WHEN REQUIRED DURING PROGRESS OF SELECTIVE
DEMOLITION.
17. REMOVE TEMPORARY BARRICADES AND PROTECTIONS WHERE HAZARDS NO LONGER EXIST.
18. DEMOLITION PROCEDURES FOR SPECIFIC MATERIALS
18.1.MINOR CONCRETE: DEMOLISH IN SMALL SECTIONS. USING POWER-DRIVEN SAW, CUT CONCRETE
TO A DEPTH OF AT LEAST 3/4 INCH (19 MM) AT JUNCTURES WITH CONSTRUCTION TO REMAIN.
DISLODGE CONCRETE FROM REINFORCEMENT AT PERIMETER OF AREAS BEING DEMOLISHED, CUT
REINFORCEMENT, AND THEN REMOVE REMAINDER OF CONCRETE. NEATLY TRIM OPENINGS TO
DIMENSIONS INDICATED.
18.2.MAJOR CONCRETE: DEMOLISH IN SECTIONS. CUT CONCRETE FULL DEPTH AT JUNCTURES WITH
CONSTRUCTION TO REMAIN AND AT REGULAR INTERVALS USING POWER-DRIVEN SAW, AND
THEN REMOVE CONCRETE BETWEEN SAW CUTS.
19. REMOVE DEMOLITION WASTE MATERIALS FROM PROJECT SITE AND RECYCLE OR DISPOSE OF THEM
ACCORDING TO FEDERAL, STATE, AND LOCAL JURISDICTIONS.
20. SELECTIVE DEMOLITION SCHEDULE
20.1.REMOVE:
20.1.1. WET WELL CONCRETE ECCENTRIC MANHOLE LID, ACCESS HATCH, AND ALL HARDWARE.
20.1.2. DRY WELL FLAT TOP LID, VERTICAL ACCESS HATCH AND ALL HARDWARE.
20.1.3. SEWER MECHANICAL PIPES, LOCATED IN THE EXISTING DRY WELL.(DISMANTLE)
20.1.4. FORCE MAIN DISCHARGE PIPE TO BE CUT AND PLUGGED, FLUSH WITH INTERIOR WALL.
20.1.5. TWO (2) SUCTION LINES TO BE CUT AND PLUGGED, FLUSH WITH INTERIOR WALL.
20.2.REMOVE AND SALVAGE:
20.2.1. TWO (2) SEWAGE PUMPS, LOCATED IN THE EXISTING DRY WELL.
20.2.2. VALVES AND OTHER FITTINGS, LOCATED IN THE EXISTING DRY WELL. (DISMANTLE)
20.3.EXISTING TO REMAIN:
20.3.1. WET WELL BASE AND BODY BELOW THE ECCENTRIC CONE LID.
20.3.2. DRY WELL BASE AND BODY BELOW THE FLAT TOP LID.
GROUTING NOTES:
1. USE PRECISION NON-SHRINK GROUT FOR GROUTING ALL EQUIPMENT BASE PLATES, PIPE SUPPORTS, AND
BASE PLATES FOR METALWORK. PRECISION NON-SHRINK GROUT MAY ALSO BE USED FOR ALL OTHER
NON-SHRINK GROUTING OPERATIONS.
1.1. PROVIDE A HIGH-PRECISION, FLUID, NON-SHRINK, QUARTZ OR NON-CATALYZED METALLIC
AGGREGATE GROUTING MATERIAL.
1.2. PROVIDE A READY-TO-USE GROUT THAT HARDENS FREE FROM BLEEDING, SETTLEMENT, OR DRYING
SHRINKAGE WHEN MIXED, PLACED AND CURED AT ANY CONSISTENCY - FLUID, FLOWABLE, PLASTIC
OR DAMP-PACK.
1.3. PROVIDE PRECISION, NON-SHRINK NATURAL AGGREGATE GROUT THAT WHEN CURED PRODUCES
THE FOLLOWING PROPERTIES:
1.3.1. COMPRESSIVE STRENGTH AT FLUID CONSISTENCY (ASTM C109-MODIFIED):
1.3.1.1. 3500 PSI (24 MPA) AT 1 DAY, 7500 PSI (52 MPA) AT 28 DAYS.
1.3.2. PASSES ASTM C1107 AS A GRADE B GROUT WHEN TESTED AS TEMPERATURE MINIMUM AND
MAXIMUMS OF 45 DEGREES FAHRENHEIT TO 90 DEGREES FAHRENHEIT (8 DEGREES CELSIUS TO
32 DEGREES CELSIUS) AT A WORKING TIME OF 30 MINUTES.
1.3.3. GROUT MUST BE TESTED AT A FLUID CONSISTENCY PER ASTM C939 AND REMAIN FLUID AT
TEMPERATURE RANGE MINIMUM AND MAXIMUMS FOR THE 30-MINUTE WORKING TIME.
1.3.4. ALL MATERIALS INCLUDING WATER MUST BE MIXED AND TESTED AT TEMPERATURE
MINIMUM/MAXIMUMS.
1.3.5. MODULUS OF ELASTICITY AT 28 DAYS AT FLUID CONSISTENCY (ASTM C469):
1.3.5.1. 3.0 X 106 PSI (20.7 GPA) MINIMUM,
1.3.5.2. 3.9 X 106 (27.0 GPA) MAXIMUM.
1.3.6. COEFFICIENT OF THERMAL EXPANSION FOR FLUID CONSISTENCY (ASTM C531):
1.3.6.1. 7.5 X 10-6/ DEGREES FAHRENHEIT MAXIMUM (13.5 X 10-6/ DEGREES CELSIUS).
1.3.7. FLEXURAL STRENGTH AT 28 DAYS FOR FLUID CONSISTENCY (ASTM C78):
1.3.7.1. 1300 PSI (7.9 MPA).
1.3.8. RESISTANCE TO RAPID FREEZING - THAWING (ASTM C666, PROCEDURE A):
1.3.8.1. 300 CYCLES- MIN RDF 90 PERCENT.
1.3.9. SPLIT TENSILE STRENGTH AT 28 DAYS AT FLUID CONSISTENCY (ASTM C496):
1.3.9.1. 450 PSI (3.1 MPA).
1.3.10. PASS 24-HOUR GROUT TEST UNDER STATED TEMPERATURE, TIME AND FLUIDITY CONSTRAINTS.
1.3.10.1. SEE MBT PROTECTION AND REPAIR 24-HOUR GROUT FORM.
1.4. PRECISION NON-SHRINK GROUT SHALL BE MASTERFLOW 928 OR 885 GROUT OR APPROVED EQUAL.
2. GENERAL PURPOSE NON-SHRINK GROUT MAY BE USED FOR ANY APPLICATIONS OTHER THAN THOSE
NOTED FOR PRECISION NON-SHRINK GROUT. NON-SHRINK GROUT SHALL BE USED TO SEAL ALL NEW
PIPE AND CONDUIT PENETRATIONS (WATERTIGHT) INTO AND OUT OF ALL CONCRETE WALLED
STRUCTURES.
2.1. GENERAL PURPOSE NON-SHRINK GROUT SHALL MEET THE COMPRESSIVE STRENGTH AND
NONSHRINK REQUIREMENTS OF CRD-C 621, GRADES B AND C; CORP OF ENGINEERS SPECIFICATION
FOR NON-SHRINK GROUT; AND ASTM C1107, GRADES B AND C. GENERAL PURPOSE NON-SHRINK
GROUT SHALL BE MASTERFLOW 713, DAYTON SUPERIOR 1107 ADVANTAGE, OR APPROVED EQUAL.
2.2. PROVIDE CURING COMPOUNDS AS RECOMMENDED BY THE GROUT MANUFACTURER.
2.3. WATER TO BE USED IN MIXING THE GROUT SHALL BE POTABLE.
3. COMPLY WITH GROUT MANUFACTURER'S RECOMMENDATIONS FOR MIXING, PREPARATION, AND
INSTALLATION PROCEDURES.
ANCHOR NOTES:
1. INSTALLATION OF ADHESIVE ANCHORS SHALL BE PERFORMED BY PERSONNEL CERTIFIED IN ACCORDANCE WITH THE ACI/CRSI
ADHESIVE ANCHOR INSTALLER CERTIFICATION PROGRAM. IN LIEU OF CERTIFICATION THE INSTALLER SHALL ATTEND ON-SITE
TRAINING HELD BY THE ADHESIVE MANUFACTURER PRIOR TO THE INSTALLATION OF ADHESIVE ANCHORS.
2. PRODUCTS: SUBMERSIBLE PUMP ANCHORS
2.1. BOLTS SHALL BE DECO HEAVY-DUTY ADJUSTABLE STANDARD ANCHORS OR APPROVED EQUAL. PROVIDE REMOVABLE
MOUNTING STUD FOR EASY PUMP INSTALLATION AND REMOVAL. ANCHORS MUST BE ADJUSTABLE TO 75% OF THE BOLT
DIAMETER IN ANY DIRECTION PRIOR TO TIGHTENING BOLT.
2.2. HTTP://WWW.DECOMFG.COM/
2.3. ANCHOR BOLT DIAMETER TO BE 0.5-INCH MINIMUM.
2.4. EMBEDMENT LENGTH TO BE 4.25-INCH MINIMUM.
2.5. DISTANCE TO NEAREST STRUCTURE EDGE TO BE 6.5-INCH MINIMUM.
3. PRODUCTS: OTHER CONCRETE ANCHORS
3.1. CONCRETE ANCHORS SHALL BE HILTI HIT 500-V3, SIMPSON SET-XP, OR POWERS PE1000+ ADHESIVE ANCHORS.
3.2. FOR WALL MOUNTED EQUIPMENT WEIGHING LESS THAN 250 POUNDS, SIMPSON TITEN-HD SCREW ANCHORS MAY BE USED
IN GROUTED OR NON-GROUTED CMU CELLS.
3.3. THREADED ROD SHALL BE STAINLESS STEEL EXCEPT IN DRY LOCATIONS.
4. INSTALLATION
4.1. INSTALL IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS. SPECIAL INSPECTION IN ACCORDANCE WITH IBC, SECTION 17, MUST BE PROVIDED. PROVIDE A MINIMUM OF 48 HOURS' NOTICE TO ENGINEER PRIOR TO STARTING
INSTALLATION. CONCRETE ANCHORS SHALL NOT BE USED TO RESIST TENSION OR FATIGUE LOADING WITHOUT OWNER'S
EVALUATION AND APPROVAL.
4.2. USE THREADED ROD OR REINFORCING BAR AS SHOWN ON THE DRAWING, AND MEETING MANUFACTURER'S
RECOMMENDATIONS. PROVIDE MINIMUM EMBEDMENT AS SHOWN. HOLES SHALL BE DRILLED WITH CARBIDE-TIPPED DRILL
BIT. HOLES SHALL BE CLEANED OF DUST AND DEBRIS. ADHESIVE SHALL BE INSERTED WITH A MIXING NOZZLE.
BOLT AND CONNECTOR NOTES:
1. PRODUCTS: BOLTS AND OTHER CONNECTORS NOT SPECIFICALLY CALLED OUT OTHERWISE SHALL BE IN ACCORDANCE WITH THE
FOLLOWING.
1.1. UNDER NO CIRCUMSTANCES SHALL THE FASTENERS BE OF LESSER STRENGTH OR HIGHER CORROSION POTENTIAL THAN THE
MATERIALS BEING CONNECTED.
1.2. CONNECTION BOLTS, NUTS AND WASHERS FOR ALL MATERIALS IN WET, DAMP OR CORROSIVE LOCATIONS SHALL BE
STAINLESS STEEL, ALLOY 304 IN RAW DOMESTIC OR TREATED DOMESTIC WATER, ALLOY 316 IN TREATMENT PROCESS AND
SEWAGE APPLICATIONS, AND ALLOY 317 FOR ACIDIC TRANSPORT. BOLTS AND NUTS SHALL MEET ASTM F593B (BOLTS
¼-INCH TO 1½-INCH IN DIAMETER WITH 30 KSI YIELD) AND F594B (NUTS). USE NITRONIC 60 BOLTS AND NUTS FOR STRONG
CHLORINE ENVIRONMENTS.
1.3. SEE HTTP://WWW.PORTLANDBOLT.COM/TECHNICALINFORMATION/ASTM/ASTM_F594.HTML FOR OTHER SIZES AND STRENGTHS.
1.4. STEEL AND CAST-IRON FABRICATIONS: CONNECTION BOLTS FOR DRY LOCATIONS SHALL BE ASTM A307 GALVANIZED OR
ZINC PLATED BOLTS.
1.5. STRUCTURAL PLASTIC FABRICATIONS: CONNECTION BOLTS SHALL BE ASTM A307 GALVANIZED IN DRY APPLICATIONS AND
STAINLESS STEEL IN WET, DAMP OR CORROSIVE LOCATIONS.
2.PRODUCTS: BOLTS AND OTHER CONNECTORS NOT SPECIFICALLY CALLED OUT OTHERWISE SHALL BE IN ACCORDANCE WITH THE
FOLLOWING.(CONTINUED) .
2.1. ALUMINUM FABRICATIONS: CONNECTION BOLTS SHALL BE ASTM A307 GALVANIZED. ALUMINUM FASTENERS MAY BE
ALLOWED WHERE HIGH STRENGTH IS NOT NEEDED (E.G. MOUNTING EXPANDED METAL SCREENS, OR LOUVER FINS), CONFIRM
WITH ENGINEER PRIOR TO USE. STEEL SCREWS MUST BE GALVANIZED, OR ZINC PLATED. 300 SERIES STAINLESS STEEL
FASTENERS ALLOWED ONLY WITH THE USE OF ISOLATING WASHERS.
2.2. STAINLESS STEEL FABRICATIONS: FASTENERS TO MATCH SAME STAINLESS SERIES AS STRUCTURE (E.G. 300 SERIES FASTENERS
WITH 300 SERIES STRUCTURE)
2.3. BOLTS INSTALLED INTO HARDENED CONCRETE SHALL BE CONCRETE ANCHORS PER ANCHOR NOTES, THIS SHEET.
2.4. BOLTS AND STUDS SHALL BE LONG ENOUGH THAT AT LEAST TWO THREADS EXTEND BEYOND THE FACE OF THE TIGHTENED
NUT.
2.5. FOR PUMP ANCHOR BOLTS, SEE ANCHOR NOTES, THIS SHEET.
2.6. FOR MECHANICAL PIPE (NON-STRUCTURAL) CONNECTIONS, SEE MECHANICAL NOTES, NEXT SHEET.
3. INSTALLATION
3.1. ALL MATERIALS TO BE JOINED TOGETHER SHALL BE CONNECTED AS SHOWN ON THE PLANS, AS RECOMMENDED BY THE
MANUFACTURER, OR AS REQUIRED BY STANDARD INDUSTRY PRACTICES IF NOT OTHERWISE SPECIFIED.
3.2. DISSIMILAR METALS:
3.2.1. IN DAMP LOCATIONS, ISOLATE DISSIMILAR METALS USING NYLON ISOLATION SLEEVES AND WASHERS, COOPER B-LINE
NYLON HEADED SLEEVE KIT OR EQUAL.
3.2.2. FOR WET LOCATIONS: AVOID DISSIMILAR METALS UNLESS SPECIFICALLY APPROVED OR SHOWN. USE SIMILAR METALS
WITH WELDED CONNECTIONS. IF APPROVED OR SHOWN, USE GALVANIZED MILD STEEL BOLTS INSTALLED INTO PREPPED
AND COATED HOLES WITH ADDITIONAL FIELD COATING OVER THE TOP OF BOLT.
| Sheets and Views |
| G-01 COVER SHEET |
File details come from the government source that posted it. Updated .