About this file
This is a comprehensive construction set of engineering drawings and project specifications for the Portway Parking Lot project located in Hood River, Oregon, prepared by HRK Engineering & Field Services. The project involves constructing a 72-stall parking lot on Tax Lots 112 and 113 in Section 25, Township 3 North, Range 10 East, for the Port of Hood River. The project includes 6 ADA parking stalls, commercial driveways, sidewalks, pedestrian walkways, bike racks, landscaping, utility connections, storm drainage improvements, and associated site work. The project is scheduled for construction in 2025, with the engineering drawings dated April 2024 and marked for bidding purposes.
The project will be constructed under the jurisdiction of the City of Hood River, with multiple utility coordination points including NW Natural for gas, Pacific Power for electrical services, and City of Hood River Public Works for water, sanitary sewer, and storm drainage systems. The total site area is approximately 4.85 acres, with 33,268 square feet of impervious surface and 16,408 square feet of landscape area. The parking lot will include 4 street trees, 25 parking area trees, and a shrub mix featuring native Oregon plant species. The project also includes a Contech Filterra Bioscape Vault for stormwater management and will implement erosion and sediment control measures consistent with local and state regulations.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
/1 0/
A P
R T
PORTWAY PARKING LOT
CONSTRUCTION OF A 72 STALL PARKING LOT.
TAX LOT 112 AND 113
SECTION 25, TOWNSHIP 3 NORTH, RANGE 10 EAST, W.M.,
CITY OF HOOD RIVER, OREGON
PROJECT #: 24-016
CONSTRUCTION SET - 04/11/2025
SITE
HOOD RIVER, OR
489 N 8TH STREET - SUITE 201
HOOD RIVER, OREGON 97031
541-386-6480 - WWW.HRKUS.COM
HRK ENGINEERING
& FIELD SERVICES
N N
PROJECT MANAGER:
CARLOS A. GARRIDO, PRINCIPAL
PH: 541-490-4923
EM:CGARRIDO@HRKUS.COM
ENGINEER OF RECORD:
RANDOLPH TALLMAN, PE-PLS
PH: 503-878-3643
EM:RTALLMAN@HRKUS.COM
PROJECT ENGINEER:
ALEX PEDROZA, EIT
PH: 541-806-3629
EM:APEDROZA@HRKUS.COM
PRE-APPLICATION DRAWINGS
1 COVER SHEET
2 EXISTING CONDITIONS
3 SITE PLAN
4 LANDSCAPING
5 TURNING RADIUS
SHEET NO.
N
TH
S
TR
EE
T
S
U
IT
E
H O
O D
R
IV
ER
O R
EG
O
N
-3
-6
W
W W
.H R
K U
S .C
O M
N o
D A
TE
D R W
N C H
K D
D
ES
C R
IP
TI
O
N
SHEET NAME
DATE
PROJECT NAME
PROJECT NO.
CLIENT
PHASE
REVISION
H
R K E ng in ee ri ng
A ll ri gh ts r es er ve d.
Th es e dr aw in gs a re t he p ro pe rt y of H
R K E ng in ee ri ng
L
LC
a nd a re n ot t o be u se d or r ep ro du ce d in a ny m an ne r, w ith ou t pr io r w ri tt en p er m is si on
H R
K
E N
G
IN
E E
R
IN
G
F
IE
LD
S
E R
V
IC
E S
PORTWAY PARKING LOT
H O
O D
R
IV
ER
O R
COVER SHEET
OF 20
APRIL 2024
24-016
E P
O R T
M A R
IN
A D
R
IV
E
CONSTRUCTION
GAS:
NW NATURAL
1125 BARGEWAY ROAD
THE DALLES, OR 97058
CONTACT: BRIAN KELLY
PH: 541-296-2229 EXT. 8610
EM: BMK@NWNATURAL.COM
CLIENT:
PORT OF HOOD RIVER
1000 E PORT MARINA DRIVE
HOOD RIVER, OR 97031
CONTACT: KEVIN GREENWOOD
PH: 541-386-1138
EM: KGREENWOOD@PORTOFHOODRIVER.COM
SITE ADDRESS:
910 PORTWAY AVENUE
HOOD RIVER, OR 97031
INDEX:
VICINITY MAP
NOT TO SCALEMap data ©2020 Google
SITE MAP
NOT TO SCALE
SURVEYOR:
HRK ENGINEERING & FIELD SERVICES
489 N 8TH STREET - SUITE 201
HOOD RIVER, OR 97031
CONTACT: RANDOLPH TALLMAN
PH: 503-878-3643
EM: RTALLMAN@HRKUS.COM
SANITARY/WATER/STORM:
CITY OF HOOD RIVER PUBLIC WORKS
1200 18TH STREET
HOOD RIVER, OR 97031
CONTACT: JOHN CLARK
PH: 541-387-5220
EM: J.CLARK@CITYOFHOODRIVER.GOV
PERMITTING JURISDICTION:
CITY OF HOOD RIVER BUILDING DEPARTMENT
211 2ND STREET
HOOD RIVER, OR 97031
CONTACT: MARK VANVOAST
PH: 541-386-1306
EM: MARK.VANVOAST@CO.HOOD-RIVER.OR.US
U.S. POST OFFICE:
HOOD RIVER POST OFFICE
3020 LOWER MILL ROAD
HOOD RIVER, OR 97031
CONTACT: DANIEL ROBERTS
PH: 541-354-9951
EM: DANIEL.ROBERTS@USPS.GOV
POWER:
PACIFIC POWER
1290 TUCKER ROAD
HOOD RIVER, OR 97031
CONTACT: ALAN WILM
PH: 541-308-2008
EM: ALAN.WILM@PACIFICORP.COM
COMMUNICATION:
GORGE NETWORKS
P.O. BOX 1107
HOOD RIVER, OR 97031
CONTACT: GAIL EDWARDS
PH: 760-622-0046
EM: GAILE@BLUEMOUNTAINNET.COM
COMMUNICATION:
CHARTER COMMUNICATIONS
409 UNION STREET
THE DALLES, OR 97058
CONTACT: ERNIE GARCIA
PH: 541-288-6492
EM: ERNIE.GARCIA@CHARTER.COM
FIREFIGHTER AGENCY:
HOOD RIVER FIRE DEPARTMENT
1785 MEYER PARKWAY
HOOD RIVER, OR 97031
CONTACT: LEONARD DAMIAN
PH: 541-386-3939
EM: L.DAMIAN@CITYOFHOODRIVER.GOV
FI
R S T
R
EL
EA
S E
SITE
CONSTRUCTION DRAWINGS
1 COVER SHEET
2 GENERAL NOTES
3 TESTING SCHEDULE
4 LEGEND
5 EXISTING CONDITIONS
6 EROSION AND SEDIMENT CONTROL AND DEMOLITION PLAN
7 SITE PLAN
8 STORM PIPE PLAN AND PROFILE
9 PRIVATE UTILITIES
10 LANDSCAPING
11 TURNING RADIUS
12 DETAILS 1
13 DETAILS 2
14 DETAILS 3
15 DETAILS 4
16 DETAILS 5
17 DETAILS 6
18 DETAILS 7
19 DETAILS 8
20 DETAILS 9
NOTES:
I. ALL MATERIALS AND WORKMANSHIP SHALL BE IN ACCORDANCE WITH THE CITY OF HOOD
RIVER ENGINEERING STANDARDS, THE ODOT/APWA OREGON STANDARDS SPECIFICATIONS
FOR CONSTRUCTION, AND THE AMERICAN WATER WORKS ASSOCIATION (AWWA) STANDARD
SPECIFICATIONS. IN CASE OF CONFLICTS, THE CITY`S ENGINEERING STANDARDS SHALL
APPLY UNLESS SPECIFICALLY LISTED AS A DESIGN EXCEPTION ON THIS DRAWINGS.
II. ALL LATE-SEASON AC PAVING (PLACED AFTER OCTOBER 15TH AND BEFORE APRIL 1ST), SHALL
BE HELD TO THE SAME PERFORMANCE CRITERIA AS ALL OTHER PAVING. IF FOR ANY REASON
THERE IS AGGREGATE SEPARATION, A ROUGH FINISHED SURFACE, OR OTHER
NON-ACCEPTABLE FINAL PRODUCT AND THE CITY OF HOOD RIVER'S ENGINEER DETERMINES
THAT IT IS NOT IN THE BEST INTEREST OF THE CITY TO REJECT THE WORK AND HAVE IT
REMOVED AND RECONSTRUCTED, THE CITY OF HOOD RIVER'S ENGINEER MAY REQUIRE AN
ASPHALT SEAL COAT OR OTHER REMEDIATION ON THE ENTIRE SURFACE OR PORTIONS
THEREOF.
III. DESIGN EXCEPTIONS: ALL DESIGN EXCEPTIONS SHALL BE LISTED BELOW THIS NOTE.
1) A DESIGN EXCEPTION AS PER HRES 2.1.C IS REQUESTED TO USE A 1" = 10' HORIZONTAL
SCALE AND 1" = 5' VERTICAL SCALE ON ONE PROFILE ON SHEET 8.
SIGNATURE BLOCK:
KYLE THOMPSON, INTERIM CITY OF HOOD RIVER ENGINEER DATE
ADAM SCHMID, CITY OF HOOD RIVER PUBLIC WORKS DIRECTOR DATE
J A N
REGISTE
RED
PRO
FESS
IONAL
E
N G
I N
E E
R
RA NDOL P
H S
CO
TT
TA
LLMAN
/2 5/
A P
R T
/0
1/
C
IT
Y
C O
M M
EN
TS
/1 1/
A P
R T
/0
9/
C
IT
Y
C O
M M
EN
TS
AutoCAD SHX Text
55479PE OREGON
AutoCAD SHX Text
EXPIRES 06/30/2026
Apedroza Text Box
FOR BIDDING PURPOSES ONLY
SHEET NO.
N
TH
S
TR
EE
T
S
U
IT
E
H O
O D
R
IV
ER
O R
EG
O
N
-3
-6
W
W W
.H R
K U
S .C
O M
N o
D A
TE
D R W
N C H
K D
D
ES
C R
IP
TI
O
N
SHEET NAME
DATE
PROJECT NAME
PROJECT NO.
CLIENT
PHASE
REVISION
H
R K E ng in ee ri ng
A ll ri gh ts r es er ve d.
Th es e dr aw in gs a re t he p ro pe rt y of H
R K E ng in ee ri ng
L
LC
a nd a re n ot t o be u se d or r ep ro du ce d in a ny m an ne r, w ith ou t pr io r w ri tt en p er m is si on
H
G
IN
E E
R
IN
G
F
IE
LD
S
E R
V
IC
E S
PORTWAY PARKING LOT
H O
O D
R
IV
ER
O R
GENERAL NOTES
OF 20
APRIL 2024
24-016
E P
O R T
M A R
IN
A D
R
IV
E
CONSTRUCTION
DRAWINGS, THESE STRUCTURES SHALL BE REMOVED OR ABANDONED AT THE CONTRACTOR'S
EXPENSE. THE CONTRACTOR SHALL NOTIFY THE OWNER IMMEDIATELY UPON DISCOVERY OF
ANY SEPTIC TANKS, WELLS OR FUEL TANKS NOT SHOWN ON THE DRAWINGS, AND OBTAIN
CONCURRENCE FROM THE OWNER PRIOR TO PROCEEDING WITH THE WORK. THE CONTRACTOR
SHALL PROVIDE THE OWNER WITH A DETAILED COST BREAKDOWN OF ALL WORK RELATED TO
REMOVING OR ABANDONING SAID STRUCTURES. THE CONTRACTOR SHALL BE REIMBURSED
ON A TIME AND MATERIALS BASIS OR AT A NEGOTIATED PRICE AS AGREED TO BY THE OWNER.
12. THE CONTRACTOR SHALL BE RESPONSIBLE FOR MANAGING CONSTRUCTION ACTIVITIES TO
ENSURE THAT PUBLIC STREETS AND RIGHT-OF-WAYS ARE KEPT CLEAN OF MUD, DUST, AND
DEBRIS. DUST ABATEMENT SHALL BE MAINTAINED BY ADEQUATE WATERING OF THE SITE BY
THE CONTRACTOR.
TESTING & INSPECTION:
1. THE CONTRACTOR SHALL ENSURE THAT ALL REQUIRED OR NECESSARY INSPECTIONS ARE
COMPLETED BY THE OWNER'S AUTHORIZED REPRESENTATIVE PRIOR TO PROCEEDING WITH
SUBSEQUENT WORK, WHICH COVERS OR THAT IS DEPENDENT ON THE WORK TO BE
INSPECTED. FAILURE TO OBTAIN NECESSARY INSPECTION(S) AND APPROVAL(S) SHALL
RESULT IN THE CONTRACTOR BEING FULLY RESPONSIBLE FOR ALL PROBLEMS ARISING FROM
UNINSPECTED WORK.
2. UNLESS OTHERWISE SPECIFIED, SHEET C3 OUTLINES THE REQUIRED MINIMUM TESTING
SCHEDULE FOR THE PROJECT. THIS TESTING SCHEDULE IS NOT COMPLETE, AND DOES NOT
RELIEVE THE CONTRACTOR OF THE RESPONSIBILITY OF OBTAINING ALL NECESSARY
INSPECTIONS FOR ALL WORK PERFORMED, REGARDLESS OF WHO IS RESPONSIBLE FOR
PAYMENT.
GRADING, PAVING, & DRAINAGE:
1. UNLESS OTHERWISE NOTED, ALL GRADING, ROCKING, AND PAVING SHALL CONFORM TO HRES
STANDARD SPECIFICATIONS, CURRENT EDITION.
2. THE CONTRACTOR SHALL CLEAR AND GRUB WITHIN WORK LIMITS ALL SURFACE VEGETATION, TREES, STUMPS, BRUSH, ETC. STRIP WORK LIMITS, REMOVING ALL ORGANIC MATTER THAT
CANNOT BE COMPACTED INTO A STABLE MASS. DO NOT DAMAGE OR REMOVE TREES EXCEPT
AS APPROVED BY THE ENGINEER SHOWN ON THE DRAWINGS. PROTECT ALL ROOTS 2 INCHES
IN DIAMETER OR LARGER. ALL TREES, BRUSH AND DEBRIS ASSOCIATED WITH CLEARING,
STRIPPING OR GRADING SHALL BE REMOVED AND DISPOSED OF OFF-SITE.
3. IMMEDIATELY FOLLOWING STRIPPING OPERATIONS, THE CONTRACTOR SHALL COMPACT
SUBGRADE TO 95% WITHIN THE PUBLIC RIGHT-OF-WAY (90% IN OTHER AREAS) OF THE
MAXIMUM DRY DENSITY PER AASHTO T-180 TEST METHOD (STANDARD PROCTOR). SUBGRADE
MUST BE INSPECTED AND APPROVED BY AN INDEPENDENT TESTING ORGANIZATION PRIOR TO
PLACING EMBANKMENTS, ENGINEERED FILLS, OR FINE GRADING FOR BASE ROCK.
4. ALL FILLS SHALL BE ENGINEERED EXCEPT FOR FILLS LESS THAN 18 INCHES IN DEPTH WHICH
ARE LOCATED OUTSIDE THE PUBLIC RIGHT-OF-WAY, BUILDING PADS, PARKING LOTS OR
OTHER AREAS TO BE IMPROVED. ENGINEERED FILLS SHALL BE CONSTRUCTED IN 6" LOOSE
LIFTS OVER APPROVED SUBGRADES. EACH LIFT IN THE PUBLIC RIGHT-OF-WAY SHALL BE
COMPACTED TO 95% OF THE MAXIMUM DRY DENSITY PER AASHTO T-180 TEST METHOD
(STANDARD PROCTOR) OR TO 90% OF THE MAXIMUM DRY DENSITY PER AASHTO T-180 FOR
ALL OTHER AREAS.
5. CRUSHED ROCK SHALL CONFORM TO THE REQUIREMENTS SECTION 207 (AGGREGATE BASE)
APWA STANDARD SPECIFICATIONS. COMPACT TO 95% OF THE MAXIMUM DRY DENSITY PER
AASHTO T-180 TEST METHOD (MODIFIED PROCTOR). WRITTEN COMPACTION TEST RESULTS
FROM AN INDEPENDENT TESTING LABORATORY BE RECEIVED BY THE OWNER'S AUTHORIZED
REPRESENTATIVE PRIOR TO PLACING ASPHALT PAVEMENT.
6. ASPHALT PAVEMENT SHALL CONFORM TO SECTION 211 (ASPHALT CONCRETE PAVEMENT)
APWA STANDARD SPECIFICATIONS FOR STANDARD DUTY MIX. ASPHALT PAVEMENT SHALL BE
COMPACTED TO A MINIMUM OF 92% OF MAXIMUM DENSITY AS DETERMINED BY THE RICE
STANDARD METHOD.
7. UNLESS OTHERWISE SHOWN ON THE DRAWINGS, STRAIGHT GRADES SHALL BE RUN BETWEEN
ALL FINISH GRADE ELEVATIONS AND/OR FINISH CONTOUR LINES SHOWN.
8. FINISH PAVEMENT GRADES AT TRANSITION IN EXISTING PAVEMENT SHALL MATCH EXISTING
PAVEMENT GRADES OR BE FEATHERED PAST JOINTS WITH EXISTING PAVEMENT AS REQUIRED
TO PROVIDE A SMOOTH, FREE DRAINING SURFACE.
9. ALL EXISTING OR CONSTRUCTED MANHOLES, CLEANOUTS, MONUMENTS, GAS VALVES, WATER
VALVES AND SIMILAR STRUCTURES SHALL BE ADJUSTED TO MATCH FINISH GRADES OF THE
PAVEMENT, SIDEWALK, LANDSCAPED AREA OR MEDIAN STRIP WHEREIN THEY LIE. VERIFY
THAT ALL VALVE BOXES AND RISERS ARE CLEAN AND CENTERED OVER THE OPERATION NUT.
ADJUSTMENT AFTER PLACEMENT OF FINAL WEARING COURSE WILL NOT BE ALLOWED.
10. UNLESS OTHERWISE SHOWN ON THE DRAWINGS, NO CUT OR FILL SLOPES SHALL BE
CONSTRUCTED STEEPER THAN 2H:1V.
CURBS & SIDEWALK:
1. UNLESS OTHERWISE SHOWN OR INDICATED ON THE DRAWINGS, 6 INCHES NOMINAL CURB
EXPOSURE SHALL BE USED FOR DESIGN OF ALL PARKING LOT AND STREET GRADES.
2. THE CONTRACTOR SHALL CONSTRUCT CURB RAMPS AT ALL INTERSECTIONS IN ACCORDANCE
WITH CURRENT PROWAG ACT STANDARDS.
3. SIDEWALKS SHALL BE A MINIMUM OF 4 INCHES THICK AND STANDARD DRIVEWAYS SHALL BE
A MINIMUM OF 6 INCHES THICK. COMMERCIAL USE DRIVEWAYS AND ALLEY APPROACHES
SHALL BE MINIMUM 8 INCHES THICK. ALL CURBS, SIDEWALKS AND DRIVEWAYS SHALL BE
CONSTRUCTED USING 3000 PSI CONCRETE WITH TYPE 1 OR TYPE 1D CLEAR CURING
COMPOUND.
4. WHEN TRENCH EXCAVATION REQUIRES REMOVAL OF CONCRETE CURBS AND/OR SIDEWALKS,
THE CURBS AND/OR SIDEWALKS SHALL BE SAWCUT AND REMOVED AT A TOOLED JOINT
UNLESS OTHERWISE AUTHORIZED IN WRITING BY THE CITY. THE SAWCUT LINES SHOWN ON
DRAWINGS ARE SCHEMATIC AND NOT INTENTED TO SHOW THE EXACT ALIGNMENT OF SUCH
CUTS.
PIPED UTILITIES:
1. ALL TAPING OF EXISTING MUNICIPAL SANITARY SEWER, STORM DRAINAGE MAINS, AND
MANHOLES MUST BE PERFORMED BY CONTRACTOR FORCES. INSTALLATION AND TESTING
MUST CONFORM TO CITY STANDARDS.
2. UNDER FUTURE STREETS OR SIDEWALKS, USE CLASS "B" (3
4 INCH MINUS AGGREGATE)
BACKFILL FROM 6 INCHES BELOW PIPE TO SUBGRADE WHERE DEPTH OF COVER IS BETWEEN 2
AND 3 FEET AND WELL-GRADED CLASS "A" (NATIVE MATERIAL) ELSEWHERE. ROCKS NOT
EXCEEDING 6 INCHES IN GREATEST DIMENSION, WHICH ORIGINATE FROM THE TRENCH, WILL
BE PERMITTED IN THE BACKFILL FROM 1 FOOT ABOVE THE TOP OF ANY PIPE TO 1 FOOT BELOW
SUBGRADE. WHEN THE TRENCH IS WIDER THAN 3 FEET, ROCKS NOT EXCEEDING 6 INCHES IN
GREATEST DIMENSION, WHICH ORIGINATE FROM THE TRENCH, WILL BE PERMITTED IN THE
BACKFILL FROM 1 FOOT ABOVE THE TOP OF ANY PIPE OR BOX TO 5 FEET BELOW THE FINISHED SURFACE. ROCKS GREATER THAN 2 12 INCHES IN ANY DIMENSION WILL NOT BE PERMITTED IN
BACKFILL PLACED WITH 1 FOOT OF SUBGRADE. WHERE ROCKS ARE INCLUDED IN THE
BACKFILL, THEY SHALL BE MIXED WITH SUITABLE EXCAVATED MATERIALS SO AS TO
ELIMINATE VOIDS. SUBJECTS TO THE PROVISIONS SPECIFIED HEREIN, THE MATERIAL
OBTAINED FROM PROJECT EXCAVATIONS MAY BE USED AS BACKFILL PROVIDED THAT ALL
ORGANIC MATERIAL, RUBBISH, DEBRIS, AND OTHER OBJECTIONABLE MATERIALS ARE FIRST
REMOVED. HOWEVER, BROKEN CONCRETE AND ASPHALT PAVEMENT OBTAINED FROM THE
PROJECT EXCAVATIONS WILL BE PERMITTED IN THE BACKFILL SUBJECT TO THE SAME
LIMITATIONS AS ROCKS.
3. CONTRACTOR SHALL ARRANGE TO ABANDON EXISTING SANITARY SEWER AND WATER
UTILITIES NOT SCHEDULED TO REMAIN IN SERVICE IN ACCORDANCE WITH APPROVING
AGENCY REQUIREMENTS.
GENERAL NOTES:
1. THE CITY OF HOOD RIVER IS REFERRED TO AS THE "CITY" THROUGHOUT THESE DRAWINGS.
2. CONTRACTOR SHALL PROCURE AND CONFORM TO ALL CONSTRUCTION PERMITS REQUIRED BY
THE CITY. OWNER TO PAY ALL PROJECT PERMIT COSTS. CONTRACTOR SHALL PROVIDE OWNER
48 HOURS NOTICE PRIOR TO REQUIRING PAYMENT FOR PERMITS.
3. CONTRACTOR TO PAY ALL PROJECT UTILITY TAPPING, TV, AND CHLORINATION COSTS. COSTS
FOR RETESTING SHALL BE BORNE BY THE CONTRACTOR. CONTRACTOR SHALL COORDINATE
AND PAY ALL COSTS ASSOCIATED WITH CONNECTING TO EXISTING WATER SYSTEM, SANITARY
SEWER SYSTEM, AND STORM DRAINAGE SYSTEM FACILITIES.
4. CONTRACTOR SHALL PROVIDE ALL BONDS AND INSURANCE REQUIRED BY PUBLIC AND/OR
PRIVATE AGENCIES HAVING JURISDICTION.
5. ALL MATERIALS AND WORKMANSHIP FOR FACILITIES IN STREET RIGHT-OF-WAY OR
EASEMENTS SHALL CONFORM TO APPROVING AGENCIES' CONSTRUCTION SPECIFICATIONS
WHEREIN EACH HAS JURISDICTION, INCLUDING BUT NOT LIMITED TO THE CITY, OREGON
PUBLIC HEALTH DIVISION (PHD), AND THE OREGON DEPARTMENT OF ENVIRONMENTAL
QUALITY (DEQ).
6. UNLESS OTHERWISE APPROVED BY THE PUBLIC WORKS DIRECTOR, CONSTRUCTION OF ALL
PUBLIC FACILITIES SHALL BE DONE BETWEEN 7:00 AM. AND 6:00 P.M., MONDAY THROUGH
FRIDAY.
7. THE CONTRACTOR SHALL PERFORM ALL WORK NECESSARY TO COMPLETE THE PROJECT IN
ACCORDANCE WITH THE APPROVED CONSTRUCTION DRAWINGS INCLUDING SUCH
INCIDENTALS AS MAY BE NECESSARY TO MEET APPLICABLE AGENCY REQUIREMENTS AND
PROVIDE A COMPLETED PROJECT.
8. ALL PUBLIC IMPROVEMENTS SHALL BE INSPECTED BY THE RESIDENT ENGINEER (RE), OR A
QUALIFIED INDIVIDUAL UNDER THE SUPERVISION OF THE RE. THE RE SHALL NOT HAVE ANY
PECUNIARY INTEREST IN THE PROJECT OR DEVELOPMENT, OTHER THAN THAT AS A
PROFESSIONAL SERVICE PROVIDER. THE APPLICANT SHALL HAVE THE RE DESIGNATED PRIOR
TO THE PRE-CONSTRUCTION MEETING WHERE THE RE'S ATTENDANCE IS MANDATORY. ALL
COSTS ASSOCIATED WITH THE RE'S WORK AND TESTING SHALL BE PAID BY THE APPLICANT.
THE RE'S MINIMUM RESPONSIBILITIES ARE DEFINED IN HRES 13.1.
9. ANY INSPECTION BY THE CITY OR OTHER AGENCIES SHALL NOT, IN ANY WAY, RELIEVE THE
CONTRACTOR FROM ANY OBLIGATION TO PERFORM THE WORK IN STRICT COMPLIANCE WITH
THE CONTRACT DOCUMENTS, APPLICABLE CODES AND AGENCY REQUIREMENTS.
10. ALL EXCAVATORS SHALL COMPLY WITH ALL PROVISIONS OF ORS 757.542 TO 757.562 AND
757.993 INCLUDING NOTIFICATION OF ALL OWNERS OF UNDERGROUND FACILITIES AT LEAST
48 BUSINESS DAY HOURS, BUT NOT MORE THAN 10 BUSINESS DAYS BEFORE COMMENCING
ANY EXCAVATION. "ONE CALL" LOCATE NUMBER IS (800) 246-2344. NO WORK SHALL
COMMENCE WITHOUT APPROVED TSP.
11. CONTRACTOR SHALL ERECT AND MAINTAIN BARRICADES, WARNING SIGNS, TRAFFIC CONES
PER CITY REQUIREMENTS IN ACCORDANCE WITH THE MUTCD (INCLUDING OREGON AND/OR
WASHINGTON AMENDMENTS). ACCESS TO DRIVEWAYS SHALL BE MAINTAINED AT ALL TIMES.
ALL TRAFFIC CONTROL MEASURES SHALL BE APPROVED AND IN PLACE PRIOR TO ANY
CONSTRUCTION ACTIVITY.
12. THE CONTRACTOR SHALL TAKE NO ADVANTAGE OF ANY ERRORS, OMISSIONS, OR
DISCREPANCIES IN THE PLANS. WHEN ERRORS, OMISSIONS OR DISCREPANCIES ARE FOUND,
THE ENGINEER SHALL BE NOTIFIED. WORK PERFORMED BY THE CONTRACTOR AS A RESULT OF
AN ERROR, OMISSION OR DISCREPANCY IN THE PLANS SHALL BE AT THE CONTRACTOR'S RISK
AND EXPENSE WHEN SUCH ERROR, OMISSION, OR DISCREPANCY HAS NOT BEEN BROUGHT TO
THE ATTENTION OF THE ENGINEER.
EXISTING UTILITIES & FACILITIES:
1. THE CONTRACTOR SHALL MAINTAIN ONE COMPLETE SET OF APPROVED DRAWINGS ON THE
CONSTRUCTION SITE AT ALL TIMES WHEREON HE WILL RECORD ANY APPROVED DEVIATIONS
IN CONSTRUCTION FROM THE APPROVED DRAWINGS, AND THE STATION LOCATIONS AND
DEPTHS OF ALL EXISTING UTILITIES ENCOUNTERED. THESE FIELD RECORD DRAWINGS SHALL
BE KEPT UP TO DATE AT ALL TIMES AND SHALL BE AVAILABLE FOR INSPECTION BY THE CITY
UPON REQUEST. FAILURE TO CONFORM TO THIS REQUIREMENT MAY RESULT IN DELAY OF
PAYMENT AND/OR FINAL ACCEPTANCE OF THE PROJECT.
2. UPON COMPLETION OF CONSTRUCTION OF ALL NEW FACILITIES, CONTRACTOR SHALL SUBMIT
A CLEAN SET OF FIELD RECORD DRAWINGS CONTAINING ALL AS-BUILT DRAWINGS TO THE
ENGINEER FOR USE IN THE PREPARATION OF AS-BUILT DRAWINGS FOR SUBMITTAL TO THE
CITY AND OWNER. ALL INFORMATION SHOWN ON THE CONTRACTOR'S FIELD RECORD
DRAWINGS SHALL BE SUBJECT TO VERIFICATION BY THE ENGINEER. IF SIGNIFICANT ERRORS
OR DEVIATIONS ARE NOTED BY THE ENGINEER, AN AS-BUILT SURVEY PREPARED AND
STAMPED BY A REGISTERED PROFESSIONAL LAND SURVEYOR AND/OR QUALIFIED ENGINEER
SHALL BE COMPLETED AT THE CONTRACTOR'S EXPENSE.
3. THE LOCATION AND DESCRIPTIONS OF EXISTING UTILITIES SHOWN ON THESE DRAWINGS,
ARE COMPILED FROM AVAILABLE RECORDS AND/OR FIELD SURVEYS. THE ENGINEER OR
UTILITY COMPANIES DO NOT GUARANTEE THE ACCURACY OR THE COMPLETENESS OF SUCH
RECORDS. CONTRACTOR SHALL FIELD VERIFY LOCATIONS AND SIZES OF ALL EXISTING
UTILITIES PRIOR TO CONSTRUCTION.
4. THE CONTRACTOR SHALL LOCATE AND MARK ALL EXISTING PROPERTY AND STREET
MONUMENTS PRIOR TO CONSTRUCTION. ANY MONUMENTS DISTURBED DURING
CONSTRUCTION OF THE PROJECT SHALL BE REPLACED BY A REGISTERED LAND SURVEYOR AT
THE CONTRACTOR'S EXPENSE.
5. THE CONTRACTOR SHALL FIELD VERIFY LOCATION AND DEPTH OF ALL EXISTING UTILITIES
WHERE NEW FACILITIES CROSS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR EXPOSING
POTENTIAL UTILITY CONFLICTS FAR ENOUGH AHEAD OF CONSTRUCTION TO MAKE NECESSARY
GRADE MODIFICATIONS WITHOUT DELAYING THE WORK. IF GRADE MODIFICATION IS
NECESSARY, CONTRACTOR SHALL NOTIFY THE DESIGN ENGINEER, AND THE DESIGN ENGINEER
SHALL OBTAIN APPROVAL FROM THE CITY ENGINEER PRIOR TO CONSTRUCTION. ALL UTILITY
CROSSINGS SHALL BE POTHOLED AS NECESSARY PRIOR TO EXCAVATING OR BORING TO
ALLOW THE CONTRACTOR TO PREVENT GRADE OR ALIGNMENT CONFLICTS.
6. ALL FACILITIES SHALL BE MAINTAINED IN-PLACE BY THE CONTRACTOR UNLESS OTHERWISE
SHOWN OR DIRECTED. THE CONTRACTOR SHALL TAKE ALL PRECAUTIONS NECESSARY TO
SUPPORT, MAINTAIN, OR OTHERWISE PROTECT EXISTING UTILITIES AND OTHER FACILITIES
AT ALL TIMES DURING CONSTRUCTION. THE CONTRACTOR SHALL LEAVE EXISTING FACILITIES
IN AN EQUAL OR BETTER-THAN-ORIGINAL CONDITION AND TO THE SATISFACTION OF THE
CITY ENGINEER.
7. UTILITIES OR PORTIONS OF UTILITIES INTERFERING THAT ARE ABANDONED IN PLACE SHALL
BE REMOVED BY THE CONTRACTOR TO THE EXTENT NECESSARY TO ACCOMPLISH THE WORK.
THE CONTRACTOR SHALL PLUG THE REMAINING EXPOSED ENDS OF ABANDONED UTILITIES.
8. CONTRACTOR SHALL REMOVE ALL EXISTING SIGNS, MAILBOXES, FENCES, LANDSCAPING, ETC., AS REQUIRED TO AVOID DAMAGE DURING CONSTRUCTION AND REPLACE THEM TO EQUAL OR
BETTER-THAN-ORIGINAL CONDITION.
9. ANY SEPTIC TANKS ENCOUNTERED DURING CONSTRUCTION SHALL BE PUMPED OUT. THE
CONTRACTOR SHALL BREAK BOTTOM OF TANK OUT AND BACKFILL WITH PEA GRAVEL UNLESS
OTHERWISE REQUIRED BY PUBLIC AGENCIES HAVING JURISDICTION. SEPTIC TANK REMOVAL
TO BE IN ACCORDANCE WITH SANITARIAN REQUIREMENTS.
10. ANY WELLS ENCOUNTERED SHALL BE ABANDONED PER STATE REQUIREMENTS.
11. ANY FUEL TANKS ENCOUNTERED SHALL BE REMOVED AND DISPOSED OF PER STATE
REQUIREMENTS, AND BACKFILLED WITH COMPACTED GRANULAR MATERIAL.
12. THE CONTRACTOR SHALL COORDINATE AND PAY ALL COSTS ASSOCIATED WITH REMOVING OR
ABANDONING ANY SEPTIC TANKS, WELLS (INCLUDING BOREHOLE PIEZOMETERS), AND FUEL
TANKS ENCOUNTERED AS PER REGULATING AGENCY REQUIREMENTS. WHEN SHOWN ON THE
TABLE 2: SPECIFICATIONS FOR
STORM DRAINAGE & SANITARY SEWER PIPING
COVER DEPTH TO PIPE INVERT SPECIFICATIONS FOR PIPING 8 INCHES TO
48 INCHES IN DIAMETER
LESS THAN 2 FEET OF COVER
CLASS 52 DUCTILE IRON PIPE WITH BELL AND
SPIGOT JOINTS AND RUBBER GASKET OR HDPE
(HIGH DENSITY POLYETHYLENE) PIPE
CONFORMING TO AASHTO M 252 (8"-10") OR
AASHTO M-294, TYPE S (12"-48") WITH
PRESSURE TESTABLE FITTINGS AND O-RING
GASKETS CONFORMING TO ASTM F-1336 AND
ASTM F-477 RESPECTIVELY WITH CDF BACKFILL.
2 TO 2.5 FEET OF COVER
PIPE SPECIFIED FOR LESSER COVER DEPTH OR
PVC ASTM D3034 SDR-35 ELASTOMERIC
GASKETS CONFORMING TO ASTM D-3212.
2.5 FEET OR MORE OF COVER
PIPE SPECIFIED FOR LESSER COVER DEPTH OR
PIPE APPROVED BY ENGINEER
NOTE: HDPE (HIGH DENSITY POLYETHYLENE)
PIPE NOT PERMITTED FOR DEPTH TO INVERT
GREATER THAN 20 FEET.
4. ALL PIPED UTILITIES ABANDONED IN PLACE SHALL HAVE ALL OPENINGS CLOSED WITH
CONCRETE PLUGS WITH A MINIMUM LENGTH EQUAL TO 2 TIMES THE DIAMETER OF THE
ABANDONED PIPE.
5. THE END OF ALL UTILITY STUBS SHALL BE MARKED WITH A COLOR-CODED 2X4 AND WIRED TO
PIPE STUB.
6. ALL NON-METALLIC WATER, SANITARY SEWER AND STORM DRAINAGE PIPING SHALL HAVE
12-GAUGE Cu COLOR-CODED STRANDED WIRE.
7. NO TRENCHES IN ROADS OR DRIVEWAYS SHALL BE LEFT IN AN OPEN CONDITION OVERNIGHT.
ALL SUCH TRENCHES SHALL BE CLOSED BEFORE THE END OF EACH WORK DAY AND NORMAL
TRAFFIC FLOWS SHALL BE RESTORED.
8. SANITARY SEWER SERVICE LATERALS SHALL BE RUN TO EDGE OF R.O.W. AT 1
4 INCH PER 12
INCH SLOPE. LATERALS TO BE INSTALLED DOWNSTREAM OF MAINLINE CLEAN OUTS AND/OR
MANHOLES. ALL CATCH BASINS TO HAVE 8 INCH PVC SDR-35 LATERALS. CATCH BASIN
LOCATION MAY BE MODIFIED TO ACCOMMODATE LOW SPOTS CREATED DURING
CONSTRUCTION. ENGINEER AND/OR CITY PROJECT MANAGER MAY REQUIRE ADDITIONAL CATCH
BASINS TO BE PLACED AT LOW SPOTS CREATED DURING CONSTRUCTION.
9. THE CONTRACTOR SHALL MAKE MINOR ADJUSTMENT TO PIPING LOCATIONS WHERE NECESSARY
TO AVOID CONFLICT. MAINTAIN 5 FOOT MINIMUM HORIZONTAL SEPARATION BETWEEN STORM
DRAINAGE PIPING AND SANITARY SEWER PIPING, 10 FOOT MINIMUM HORIZONTAL SEPARATION
BETWEEN SANITARY SEWER PIPING AND WATER PIPING, AND 5 FOOT MINIMUM HORIZONTAL
SEPARATION BETWEEN MANHOLES AND CATCH BASINS. MAINTAIN 1 FOOT MINIMUM VERTICAL
AND 2 FOOT MINIMUM HORIZONTAL SEPARATION BETWEEN CITY AND PRIVATE FRANCHISE
UTILITY SERVICES AND 2 FOOT MINIMUM HORIZONTAL SEPARATION BETWEEN CITY UTILITIES
IN A COMMON TRENCH.
WATER SYSTEM:
1. CITY FORCES SHALL OPERATE ALL WATER SYSTEM VALVES INCLUDING FIRE HYDRANTS ON
EXISTING PUBLIC MAINS.
2. ALL MATERIALS SHALL CONFORM TO CITY STANDARDS. ALL WATER MAINS SHALL BE PVC C-900
DR 14 COLORED BLUE THROUGHOUT THE ENTIRE COMPOSITION OF THE PIPE. ALL FITTINGS
SHALL BE DUCTILE IRON FITTINGS IN CONFORMANCE WITH AWWA C-153 AND NATIONAL
SANITATION FOUNDATION (NSF) STANDARD 61. THE MINIMUM WORKING PRESSURE FOR ALL MJ
CAST IRON OR DUCTILE IRON FITTINGS 4 INCHES THROUGH 24 INCHES IN DIAMETER SHALL BE
350 PSI FOR MJ FITTING AND 250 PSI FOR FLANGED FITTINGS.
3. MATERIALS THAT COME INTO CONTACT WITH POTABLE WATER SHALL MEET NSF STANDARD 61, SECTION 9 REQUIREMENTS.
4. ALL WATER MAINS TO BE INSTALLED WITH A MINIMUM 36 INCHES COVER TO FINISHED GRADE
UNLESS OTHERWISE NOTED OR DIRECTED. SERVICE LINES TO BE INSTALLED WITH A MINIMUM
24 INCHES COVER. ADDITIONAL DEPTHS MAY BE REQUIRED AS SHOWN ON THE DRAWINGS OR
TO AVOID OBSTRUCTIONS.
5. UNLESS OTHERWISE SHOWN OR APPROVED BY THE ENGINEER, ALL VALVES SHALL BE FLANGE
CONNECTED TO ADJACENT TEES OR CROSSES.
6. WATER SERVICE PIPE ON THE PUBLIC SIDE OF THE METER SHALL BE CTS POLY TUBING AS
SHOWN IN THE WATER SERVICE DETAIL.
7. ALL CONNECTIONS INTO EXISTING WATERLINES ARE TO BE PERFORMED BY CITY APPROVED
CONTRACTORS. SUBMIT NAME, QUALIFICATIONS AND MATERIAL SPECIFICATIONS TO CITY FOR
REVIEW AND APPROVAL A MINIMUM OF 1 WEEK IN ADVANCE OF WORK.
8. CONTRACTOR SHALL PROVIDE ALL NECESSARY EQUIPMENT AND MATERIALS (INCLUDING PLUGS, BLOWOFFS, VALVES, SERVICE TAPS, ETC.) REQUIRED TO FLUSH, TEST, AND DISINFECT
WATERLINES PER PUBLIC AGENCY REQUIREMENTS. PRESSURE TESTING SHALL BE PERFORMED
IN ACCORDANCE WITH APWA SECTION 402.3.04.
9. WORK SHALL BE PERFORMED IN A MANNER DESIGNATED TO MAINTAIN WATER SERVICE TO
BUILDINGS SUPPLIED FROM THE EXISTING WATERLINES. IN NO CASE SHALL SERVICE TO ANY
MAIN LINE OR BUILDING BE INTERRUPTED FOR MORE THAN 4 HOURS IN ANY ONE DAY.
CONTRACTOR SHALL NOTIFY THE CITY AND ALL AFFECTED RESIDENTS AND BUSINESSES A
MINIMUM OF 24 BUSINESS HOURS (1 BUSINESS DAY) PRIOR TO ANY INTERRUPTION OF
SERVICE.
10. WHEN SANITARY SEWER PIPE AND WATERLINES MUST CROSS, CROSSING ANGLE SHOULD BE AS CLOSE TO 90 DEGREES AS PRACTICAL WITH WATERLINE ON TOP. WHERE SANITARY SEWER PIPE
MUST CROSS ABOVE A WATERLINE, A MINIMUM OF 18 INCHES VERTICAL SEPARATION MUST BE
MAINTAINED, SEWER MAINS AND/OR LATERALS SHALL BE REPLACED WITH AWWA C-900 PVC
PIPE (DR 18) AT THE CROSSING. CENTER ONE FULL LENGTH OF AWWA C-900 PVC PIPE AT POINT
OF CROSSING. CONNECT TO EXISTING SANITARY SEWER PIPE WITH APPROVED RUBBER
COUPLINGS. BACKFILL WITH CDF AT THE CROSSING.
STORM DRAINAGE SYSTEM:
1. STORM DRAINAGE PIPING MATERIALS SHALL CONFORM TO THE CONSTRUCTION DRAWINGS AND
CITY STANDARDS. UNLESS OTHERWISE NOTED OR SHOWN ON THE DRAWINGS, STORM
DRAINAGE PIPING MATERIALS WITH WATERTIGHT JOINTS SHALL CONFORM TO TABLE 2.
CONTRACTOR SHALL USE UNIFORM PIPE MATERIAL ON EACH PIPE RIM BETWEEN STRUCTURES
UNLESS OTHERWISE DIRECTED OR APPROVED. JOINTED HDPE PIPE SHALL NOT BE USED FOR
SLOPES EXCEEDING 10%.
2. UNLESS OTHERWISE SPECIFIED, STORM DRAINAGE PIPE SHALL BE PVC IN CONFORMANCE WITH ASTM D3034, SDR 35. MINIMUM STIFFNESS SHALL BE 46 PSI PER ASTM D-2412 AND JOINT TYPE
SHALL BE ELASTOMERIC GASKET CONFORMING TO ASTM D-3212. ALL OTHER APPURTENANCES
AND INSTALLATION SHALL CONFORM TO CITY SPECIFICATIONS.
3. CATCH BASINS SHALL BE SET SQUARE WITH BUILDINGS OR WITH THE EDGE OF THE PARKING LOT OR STREET WHERE THEY LIE. STORM DRAINAGE INLET STRUCTURES AND PAVING SHALL BE
ADJUSTED SO WATER FLOWS INTO THE STRUCTURE WITHOUT PONDING.
4. UNLESS OTHERWISE APPROVED BY THE ENGINEER, ALL STORM DRAINAGE CONNECTIONS SHALL
BE MADE BY MANUFACTURED TEES OR SADDLES.
5. SWEEP (DEFLECT) STORM DRAINAGE PIPE INTO CATCH BASINS AND MANHOLES AS REQUIRED.
MAXIMUM JOINT DEFLECTION SHALL NOT EXCEED 5 DEGREES OR MANUFACTURERS'
RECOMMENDATIONS, WHICHEVER IS LESS.
6. UNLESS OTHERWISE SHOWN OR DIRECTED, THE CONTRACTOR SHALL INSTALL STORM
DRAINAGE PIPING IN ACCORDANCE WITH MANUFACTURERS' INSTALLATION
RECOMMENDATIONS.
7. PRIOR TO MANDREL TESTING OR FINAL ACCEPTANCE, FLUSH AND CLEAN ALL STORM DRAINS, AND REMOVE ALL FOREIGN MATERIAL FROM THE MAINLINES, MANHOLES, AND CATCH BASINS.
8. THE CONTRACTOR SHALL CONDUCT DEFLECTION TEST OF FLEXIBLE STORM DRAINAGE PIPES BY
PULLING AN APPROVED MANDREL THROUGH THE COMPLETED PIPE LINE FOLLOWING TRENCH
COMPACTION. THE DIAMETER OF THE MANDREL SHALL BE 95% OF THE ACTUAL INSIDE PIPE
DIAMETER. TEST SHALL BE CONDUCTED NOT MORE THAN 30 DAYS AFTER THE TRENCH
BACKFILLING AND COMPACTION HAS BEEN COMPLETED.
9. A SEPARATE PLUMBING PERMIT IS REQUIRED FOR ALL PRIVATE STORMWATER WORK AS
REQUIRED BY OSPC.
10. ALL STORMWATER WORK MUST COMPLY WITH THE APPROVED STORMWATER MANAGEMENT
PLAN. PROVIDE O&M MANUAL FOR ALL INSTALLED WORK. STORMWATER MANAGEMENT PLAN
SHALL BE UPDATED TO MATCH AS-BUILT CONDITIONS.
SANITARY SEWER SYSTEM:
1. UNLESS OTHERWISE SPECIFIED, SANITARY SEWER PIPING SHALL BE PVC IN CONFORMANCE
WITH ASTM D3034, SDR 35. MINIMUM STIFFNESS SHALL BE 46 PSI PER ASTM D2412 AND JOINT
TYPE SHALL BE ELASTOMERIC GASKET CONFORMING TO ASTM D3212. ALL MATERIALS AND ALL
OTHER APPURTENANCES AND INSTALLATION SHALL CONFORM TO CITY SPECIFICATIONS.
2. ALL PRECAST MANHOLES SHALL BE PROVIDED WITH INTEGRAL RUBBER BOOTS. WHERE
MANHOLES WITH INTEGRAL RUBBER BOOTS ARE NOT USED, A SHEAR JOINT SHALL BE
PROVIDED ON ALL MAINLINES WITHIN 1.5 FEET OF THE OUTSIDE FACE OF THE MANHOLE.
WATERTIGHT LOCKDOWN LIDS REQUIRED ON ALL MANHOLES OUTSIDE OF PUBLIC
RIGHT-OF-WAY. ALL MANHOLES ARE TO HAVE FLOW CHANNELS CAST IN THEM.
3. OPENINGS FOR CONNECTIONS TO EXISTING MANHOLES SHALL BE MADE BY SAWCUTTING OR
CORE-DRILLING EXISTING MANHOLE STRUCTURE. USE OF PNEUMATIC JACKHAMMER SHALL BE
PROHIBITED. CONNECTIONS SHALL BE WATERTIGHT AND SHALL PROVIDE SMOOTH FLOW INTO
AND THROUGH THE MANHOLE. SMALL CHIPPING HAMMERS OR SIMILAR LIGHT TOOLS, WHICH
WILL NOT DAMAGE OR CRACK THE MANHOLE BASE, MAY BE USED TO SHAPE CHANNELS OR
ENLARGE EXISTING OPENINGS IF AUTHORIZED BY THE ENGINEER.
4. PER DEQ REQUIREMENTS, CONTRACTOR SHALL HAVE PUBLIC SANITARY SEWER INSTALLATION
INSPECTED AND TESTED AND CERTIFIED BY A LICENSED ENGINEER. CONTRACTOR TO PROVIDE
ENGINEER WITH 48 HOURS MINIMUM ADVANCE NOTICE FOR INSPECTION.
5. CONTRACTOR SHALL PROVIDE ALL NECESSARY MATERIALS, EQUIPMENT FACILITIES TO TEST
SANITARY SEWER PIPE AND APPURTENANCES FOR LEAKAGE IN ACCORDANCE WITH CITY
CONSTRUCTION STANDARDS. SANITARY SEWER PIPE AND APPURTENANCES SHALL BE TESTED
FOR LEAKAGE. LEAKAGE TESTS SHALL INCLUDE AN AIR TEST OF ALL SEWER MAINS AND
LATERALS AND VACUUM TESTING OF THE MANHOLES. MANHOLE TESTING SHALL BE PERFORMED
AFTER COMPLETION OF ASPHALT PAVEMENT AND FINAL SURFACE RESTORATION.
6. MANHOLES CONSTRUCTED OVER EXISTING SANITARY SEWERS SHALL CONFORM TO THE
REQUIREMENTS OF APWA SECTION 308.03.02 (MANHOLES OVER EXISTING SEWERS). THE
EXISTING PIPE SHALL NOT BE BROKEN OUT UNTIL AFTER THE COMPLETION OF THE MANHOLE
TESTS.
7. PRIOR TO MANDREL TESTING AND/OR TV INSPECTION, ALL SANITARY SEWERS SHALL BE
CLEANED AND FLUSHED, AND ALL FOREIGN MATERIAL TO BE REMOVED FROM THE MAINLINES
AND MANHOLES.
8. CONTRACTOR SHALL CONDUCT DEFLECTION TESTS OF FLEXIBLE SANITARY SEWER PIPES BY
PULLING AN APPROVED MANDREL THROUGH THE COMPLETED PIPE FOLLOWING TRENCH
COMPACTION. THE DIAMETER OF THE MANDREL SHALL BE 95% OF THE ACTUAL INSIDE PIPE
DIAMETER. TEST SHALL BE CONDUCTED NOT MORE THAN 30 DAYS AFTER THE TRENCH
BACKFILLING AND COMPACTION HAS BEEN COMPLETED.
9. UPON COMPLETION OF ALL SEWER CONSTRUCTION, TESTING AND REPAIR, THE CONTRACTOR
SHALL CONDUCT A COLOR TV ACCEPTANCE INSPECTION OF ALL PUBLIC MAINLINES IN
ACCORDANCE WITH APWA 303.3.11. THE TV INSPECTION SHALL BE CONDUCTED BY AN
APPROVED TECHNICAL SERVICE, WHICH IS EQUIPPED TO MAKE AN AUDIO-VISUAL RECORDING
OF THE TV INSPECTION. UNLESS OTHERWISE REQUIRED BY AGENCY WITH JURISDICTION, A
STANDARD 1 INCH DIAMETER BALL SHALL BE SUSPENDED IN FRONT OF THE CAMERA DURING
THE INSPECTION. SUFFICIENT WATER TO REVEAL LOW AREAS OR REVERSE GRADE SHALL BE
DISCHARGED INTO THE PIPE IMMEDIATELY PRIOR TO INITIATION OF THE TV INSPECTION. THE
AUDIO-VISUAL RECORDING OF THE INSPECTION AND WRITTEN REPORT SHALL BE DELIVERED
TO THE CITY.
10. A SEPARATE PLUMBING PERMIT IS REQUIRED FOR ALL PRIVATE SANITARY WORK REQUIRED BY
THE OSPC.
STREET LIGHTS:
1. STREET LIGHTS SHALL BE INSTALLED AFTER ALL OTHER EARTHWORK AND PUBLIC UTILITY
INSTALLATIONS ARE COMPLETED AND AFTER ROUGH GRADING OF THE PROPERTY IS
ACCOMPLISHED TO PREVENT DAMAGE TO THE POLES.
2. STREET LIGHT POLES SHALL BE SET TO A DEPTH AS SPECIFIED BY THE MANUFACTURER, BUT
NOT LESS THAN 5 FEET.
3. STREET LIGHT POLES SHALL BE INSTALLED WITHIN ONE DEGREE OF PLUMB.
4. CONTRACTOR SHALL COORDINATE WITH UTILITY COMPANIES AND PAY ALL COSTS FOR
PROCUREMENT, INSTALLATION, WIRING, AND HOOK UP OF STREET LIGHTS.
PRIVATE UTILITIES:
1. UNLESS OTHERWISE SHOWN ON THE DRAWINGS OR APPROVED BY JURISDICTION HAVING
AUTHORITY, ALL NEW PRIVATE UTILITIES (POWER, CABLE TV, TELEPHONE, AND GAS) SHALL BE
INSTALLED UNDERGROUND. INSTALLATION OF PRIVATE UTILITIES IN A COMMON TRENCH WITH
WATER, SANITARY SEWER, OR STORM DRAINAGE PIPING IS PROHIBITED.
2. CONTRACTOR SHALL COORDINATE WITH POWER, TELEPHONE, AND CABLE TV COMPANIES FOR
LOCATION OF VAULTS, PEDESTALS, ETC. ALL ABOVE GRADE FACILITIES SHALL BE PLACED IN A
LOCATION OUTSIDE THE PROPOSED SIDEWALK LOCATION.
3. POWER, TELEPHONE AND CATV TRENCHING AND CONDUITS SHALL BE INSTALLED PER UTILITY
COMPANY REQUIREMENTS WITH PULL WIRE. CONTRACTOR SHALL VERIFY WITH UTILITY
COMPANY FOR SIZE AND TYPE OF CONDUIT PRIOR TO CONSTRUCTION. ALL CHANGES IN
DIRECTION OF UTILITY CONDUIT RUNS SHALL HAVE LONG RADIUS STEEL BENDS.
4. CONTRACTOR SHALL NOTIFY AND COORDINATE WITH PRIVATE UTILITY FOR RELOCATION OF
POWER POLES, VAULTS, ETC.
5. ALL PRIVATE UTILITY STRUCTURES (VAULTS, PEDESTALS, LIGHT POLES, ETC.) SHALL BE SET A
MINIMUM OF 1 FOOT FROM ANY PROPERTY CORNER OR SURVEY MONUMENT.
A P
R T
FI
R S T
R
EL
EA
S E
J A N
REGISTE
RED
PRO
FESS
IONAL
E
N G
I N
E E
R
RA NDOL P
H S
CO
TT
TA
LLMAN
/1
0/
/2 5/
A P
R T
/0
1/
C
IT
Y
C O
M M
EN
TS
/1 1/
A P
R T
/0
9/
C
IT
Y
C O
M M
EN
TS
AutoCAD SHX Text
55479PE OREGON
AutoCAD SHX Text
EXPIRES 06/30/2026
Apedroza
55479PE OREGON
Apedroza
N
TH
S
TR
EE
T
S
U
IT
E
H O
O D
R
IV
ER
O R
EG
O
N
-3
-6
W
W W
.H R
K U
S .C
O M
N o
D A
TE
D R W
N C H
K D
D
ES
C R
IP
TI
O
N
SHEET NAME
DATE
PROJECT NAME
PROJECT NO.
CLIENT
PHASE
REVISION
H
R K E ng in ee ri ng
A ll ri gh ts r es er ve d.
Th es e dr aw in gs a re t he p ro pe rt y of H
R K E ng in ee ri ng
L
LC
a nd a re n ot t o be u se d or r ep ro du ce d in a ny m an ne r, w ith ou t pr io r w ri tt en p er m is si on
H
G
IN
E E
R
IN
G
F
IE
LD
S
E R
V
IC
E S
PORTWAY PARKING LOT
H O
O D
R
IV
ER
O R
TESTING SCHEDULE
OF 20
APRIL 2024
24-016
E P
O R T
M A R
IN
A D
R
IV
E
CONSTRUCTION
UTILITY BACKFILL COMPACTION
(OUT OF RIGHT OF WAY) (*2)
AASHTO T-99 or
AASHTO T-180
EVERY 200', MIN. 1/LINE;
2 @ 100' FOR FAILED TESTS (*1) PRIOR TO FINAL ACCEPTANCE MINIMUM COMPACTION REQUIRED:
95% WITH T-99 or 90% WITH T-180.
UTILITY BACKFILL COMPACTION
(OVER 3 FT IN DEPTH) (*2) SAME AS ABOVE REQUIREMENTS EVERY 5' OF DEPTH & SAME AS ABOVE
REQUIREMENTS SAME AS ABOVE REQUIREMENTS
CITY OF HOOD RIVER TESTING STANDARDS (2019)
TEST STANDARD FREQUENCY TESTING AGENCY TIMING TEST REQUIREMENTS CITY SIGNOFF & DATE
SUBGRADE CUT SECTION COMPACTION AGENCY/ENGINEER ALL AGENCY (*4) (*5) PRIOR TO BASE ROCK LOADED 10 CY TRUCK-PROOFROLL.
AASHTO T-180 EVERY 2500 CY, MIN. 2 & 1 PER 3' OF DEPTH CERTIFIED LAB FIELD REPORTS REQUIRED PRIOR
TO BASE ROCK 95% MIN. COMPACTION.
SUBGRADE FILL COMPACTION
AGENCY/ENGINEER
UTILITY BACKFILL COMPACTION
(IN RIGHT OF WAY) (*2) AASHTO T-180 EVERY 200', MIN. 1/LINE;
2 @ 100' FOR FAILED TESTS (*1) CERTIFIED LAB REPORTS PRIOR TO BASE ROCK 95% MIN. COMPACTION.
SAME AS ABOVE REQUIREMENTS SAME AS ABOVE REQUIREMENTS.
LOT AREA COMPACTION
(NON-TRAFFIC AREAS)
AASHTO T-99 or AASHTO T-180 MIN. 1 PER EVERY 3' DEPTH, EACH LOT PRIOR TO FINAL ACCEPTANCE MINIMUM COMPACTION REQUIRED:
95% WITH T-99 or 90% WITH T-180.
WATER MAINS DISINFECTION AWWA C651 ALL CONTRACTOR (*5) PRIOR TO BACTERIA SAMPLE AWWA C651 5.2.3.3 METHOD.
2 CONSECUTIVE TEST 24 HR APART PER REQ.
LOCATION MIN 2 LOCATIONS PER MAIN, 1
ADDITIONAL PER BRANCH AND 1 ADDITIONAL
PER 1,000 FT.
ALL AGENCY (*4) (*5) PRIOR TO BASE ROCK LOADED 10 CY TRUCK-PROOFROLL.
CERTIFIED LAB
CERTIFIED LAB
BACTERIA WATER SAMPLE AWWA C651 ADDY LAB or
APPROVED LAB
PRIOR TO CONNECTION TO MAIN
& BASE ROCK E. COLI & COLIFORM ABSENT.
WATER LINE LEAK TEST
AWWA C605
AWWA C600
ASTM F2164
MAIN, SERVICE, F.H., AIR/VAC CONTRACTOR (*5) PRIOR TO BASE ROCK
C605 7.3 SIMULTANEOUS PRESSURE AND
LEAKAGE TEST OR C600 5.2 2HR @ MAX. OF 150%
OF STATIC OR 150 PSI, WHICHEVER IS GREATER.
SEWER PRESSURE MAIN LEAK TEST
AWWA C605
AWWA C600
ASTM F2164
MAIN, SERVICE, AIR/VAC CONTRACTOR (*5) PRIOR TO BASE ROCK
C605 7.3 SIMULTANEOUS PRESSURE AND
LEAKAGE TEST OR C600 5.2 2HR @ MAX. OF 150%
OF STATIC OR 150 PSI, WHICHEVER IS GREATER.
LOW PRESSURE SEWER PRESSURE TEST AGENCY/ENGINEER MAIN, AIR/VAC CONTRACTOR (*5) PRIOR TO BASE ROCK 15 MIN. @ 150 PSI (MIN) OR WORK PRESSURE
(HIGHER OF 2). NOT TO EXCEED 200 PSI.
STEP SEWER SERVICE AGENCY/ENGINEER ALL SERVICES CONTRACTOR PRIOR TO BASE ROCK 100 PSI FOR 30 SECONDS.
STEP / STEF SEWER TONE TEST AGENCY/ENGINEER MAIN, SERVICES AGENCY (*4) (*5) PRIOR TO BASE ROCK CONTINUOUS TONE.
GRAVITY SEWER - AIR TEST ASTM F1417 MAIN, SERVICES CONTRACTOR (*5) PRIOR TO BASE ROCK PER ASTM F1417-92.
STEF MH COATING AGENCY/ENGINEER ALL AFTER VACUUM TEST H2S RESISTANT - CERTIFIED APPLICATOR -
SUBMITTAL REQUIRED.-------
VACUUM TEST - MH ASTM C1244 ALL CONTRACTOR (*5) AFTER PAVEMENT INSTALLED PER ASTM C1244-05A.
HYDROSTATIC TEST - MH ASTM C969 ALL CONTRACTOR (*5) AFTER PAVEMENT INSTALLED 0.019 GPH/FT DIAM/FT OF DEPTH OF MH.
STEF/CONVENTIONAL SEWER - MANDREL TEST ODOT 00445 AT AGENCY REQUEST PRIOR TO BASE ROCK EFF LENGTH > D, MANDREL DIA > 0.95 D.CONTRACTOR (*5)
STEF/CONVENTIONAL SEWER - TV TEST ODOT 00445 MAIN REQUIRED PRIOR TO BASE ROCK INSPECTION REPORT & VIDEO.CONTRACTOR
STORM SEWER MANDREL TEST ODOT 00445 PRIOR TO BASE ROCKAT AGENCY REQUEST CONTRACTOR (*5) EFF LENGTH > D, MANDREL DIA > 0.95 D.
STORM SEWER TV TEST ODOT 00445 PRIOR TO BASE ROCKAT AGENCY REQUEST CONTRACTOR INSPECTION REPORT & VIDEO.
BASE ROCK GRADATION ODOT 00610 PRIOR TO PLACEMENTONE PER SOURCE CERTIFIED LAB COPY TO INSPECTOR.
BASE ROCK COMPACTION AASHTO T-180 EVERY 250'
PRIOR TO TOP ROCK, CURBS,
DRIVEWAYS, APPROACHES AND
SIDEWALKS
95% MIN. COMPACTION.CERTIFIED LAB
TOP ROCK GRADATION ODOT 00610 PRIOR TO PLACEMENTONE PER SOURCE CERTIFIED LAB COPY TO INSPECTOR.
TOP ROCK COMPACTION AGENCY/ENGINEER PRIOR TO PLACEMENTALL LOADED 10 CY TRUCK-PROOFROLL.AGENCY (*4) (*5)
AC GRADE & OIL CONTENT ODOT 00744 PRIOR TO PLACEMENTONE PER SOURCE CERTIFIED LAB COPY TO INSPECTOR.
AC COMPACTION AASHTO T-209 ONE EVERY 1000 TONS (*3) DURING PLACEMENT 1ST LIFT 91% MIN. COMPACTION. SUBSEQUENT
LIFTS 92% MIN. COMPACTION.CERTIFIED LAB
SUBGRADE GRADE CHECK ELEV AGENCY/ENGINEER PRIOR TO BASE ROCKPER STATION (0+25) +0.04' TOLERANCE.AGENCY (*4) (*5)
BASE ROCK GRADE CHECK ELEV AGENCY/ENGINEER PRIOR TO TOP ROCKPER STATION (0+25) MINIMUM SECTION REQUIRED.AGENCY (*4) (*5)
TOP ROCK GRADE CHECK ELEV AGENCY/ENGINEER PRIOR TO PAVEMENTPER STATION (0+25) +0.02' TOLERANCE.AGENCY (*4) (*5)
CONCRETE CURB ACI PRIOR TO TRAFFIC USEPER 100', 1 TEST MIN. 28 DAY STRENGTHCERTIFIED LAB
CONCRETE WALLS, STRUCTURAL ITEMS ACI PRIOR TO LOADINGPER ITEM AND EVERY 16 CYS 28 DAY STRENGTHCERTIFIED LAB
CONCRETE DRIVEWAYS, APRONS, APPROACHES ACI PRIOR TO TRAFFIC USEPER EACH AND EVERY 60 SY 28 DAY STRENGTHCERTIFIED LAB
NOTE: CONTRACTOR SHALL BE RESPONSIBLE FOR ALL COSTS ASSOCIATED WITH TESTING. ALL TESTING COST SHALL BE CONSIDERED INCIDENTAL AND
INCLUDED IN THE APPROPRIATE UNIT BID ITEM.
(*1): NOT LESS THAN ONE TEST BETWEEN UTILITY STRUCTURES (MH, CLEANOUTS, VAULTS, ETC).
(*2): ALL BACKFILL AROUND UTILITY STRUCTURES SHALL BE COMPACTED AND TESTED, ONE TEST PER STRUCTURE.
(*3): ONE TEST SHALL BE CONDUCTED EVERY BLOCK OR 500 LF OF WORK AS DETERMINED BY THE ENGINEER.
(*4): AGENCY SHALL BE OWNER APPROVED, INDEPEDENT, 3RD PARTY LAB OR TESTING AGENCY.
(*5): ENGINEER OR CITY REPRESENTATIVE SHALL BE PRESENT TO OBSERVE FIELD TESTS OR COLLECTION OF SAMPLES.
A P
R T
FI
R S T
R
EL
EA
S E
J A N
REGISTE
RED
PRO
FESS
IONAL
E
N G
I N
E E
R
RA NDOL P
H S
CO
TT
TA
LLMAN
/1
0/
/2 5/
A P
R T
/0
1/
C
IT
Y
C O
M M
EN
TS
/1 1/
A P
R T
/0
9/
C
IT
Y
C O
M M
EN
TS
AutoCAD SHX Text
55479PE OREGON
AutoCAD SHX Text
EXPIRES 06/30/2026
Apedroza
55479PE OREGON
Apedroza
N
TH
S
TR
EE
T
S
U
IT
E
H O
O D
R
IV
ER
O R
EG
O
N
-3
-6
W
W W
.H R
K U
S .C
O M
N o
D A
TE
D R W
N C H
K D
D
ES
C R
IP
TI
O
N
SHEET NAME
DATE
PROJECT NAME
PROJECT NO.
CLIENT
PHASE
REVISION
H
R K E ng in ee ri ng
A ll ri gh ts r es er ve d.
Th es e dr aw in gs a re t he p ro pe rt y of H
R K E ng in ee ri ng
L
LC
a nd a re n ot t o be u se d or r ep ro du ce d in a ny m an ne r, w ith ou t pr io r w ri tt en p er m is si on
H
G
IN
E E
R
IN
G
F
IE
LD
S
E R
V
IC
E S
PORTWAY PARKING LOT
H O
O D
R
IV
ER
O R
LEGEND
OF 20
APRIL 2024
24-016
E P
O R T
M A R
IN
A D
R
IV
E
CONSTRUCTION
EXISTING SANITARY SEWER
PROPOSED SANITARY SEWER
EXISTING STORM SEWER
PROPOSED STORM SEWER
EXISTING CATCH BASIN
PROPOSED CATCH BASIN
EXISTING SANITARY MANHOLE
PROPOSED SANITARY MANHOLE
EXISTING SANITARY CLEANOUT
EXISTING WATER LINE
PROPOSED WATER LINE
EXISTING FIRE HYDRANT
PROPOSED FIRE HYDRANT
EXISTING WATER VALVE
PROPOSED WATER VALVE
EXISTING BLOW-OFF VALVE
PROPOSED BLOW-OFF VALVE
EXISTING WATER METER
PROPOSED WATER METER
EXISTING OVERHEAD POWER LINE
PROPOSED OVERHEAD POWER LINE
EXISTING UNDERGROUND POWER LINE
PROPOSED UNDERGROUND POWER LINE
EXISTING POWER POLE
PROPOSED POWER POLE
EXISTING ELECTRIC METER
PROPOSED ELECTRIC METER
EXISTING NATURAL GAS LINE
E-SD
P-SD
E-GAS
W
E-OHE
P-OHE
P-SAN
E-WTR
P-WTR
LEGEND:
EXISTING STORM MANHOLE
PROPOSED STORM MANHOLE
PROPOSED SANITARY CLEANOUT
EXISTING STORM DRAINAGE
CLEANOUT
PROPOSED STORM DRAINAGE
CLEANOUT
E-UE
P-UE
W
DY
H
PROPOSED LIGHT POLE
E
E
E-SAN
P-GAS PROPOSED NATURAL GAS LINE
EXISTING GAS METER
PROPOSED GAS METER
EXISTING FENCE LINE
PROPOSED FENCE LINE
EXISTING INDEX CONTOUR LINE
EXISTING CONTOUR LINE
PROPOSED CONTOUR LINE - MAJOR
EXISTING PROPERTY LINE
PROPOSED PROPERTY LINEP-PL
G
G
EXISTING FLOWLINE
E-PL
EXISTING PUBLIC UTILITY EASEMENT
PROPOSED PUBLIC UTILITY EASEMENT
EXISTING RIGHT OF WAY
PROPOSED RIGHT OF WAY
P-PUE
PROPOSED CONTOUR LINE - MINOR
EXISTING LIGHT POLE
IRR
IRR
EXISTING GAS VALVE
PROPOSED GAS VALVE
EXISTING IRRIGATION LINE
PROPOSED IRRIGATION LINE
IRR
IRR
EXISTING IRRIGATION VALVE
PROPOSED IRRIGATION VALVE
SS
SS
SD
CO
CO
CO
D
CO
D
SD
DY
H
PROPOSED POWER VAULT
P-PUE
NOTE: ALL OTHERS AS NOTED ON PLAN
LEGEND:
PROPOSED ASPHALT
PROPOSED SIDEWALK
EXISTING SIDEWALK
EXISTING BUILDING
EXISTING GREEN AREA
PROPOSED BUILDING
PROPOSED GREEN AREA
EXISTING ASPHALT
EXISTING SIGN
EXISTING TELEPHONE RISER
EXISTING TREE
A P
R T
FI
R S T
R
EL
EA
S E
BC BOTTOM OF CURB
BOW BOTTOM OF WALL
CCP CONCRETE CYLINDER PIPE
CL/℄ CENTERLINE
CONC CONCRETE
E EAST
EG EXISTING GROUND
EP EDGE OF PAVEMENT
FL FLOW LINE
G GARBAGE BIN
IE INVERT ELEVATION
MH MANHOLE
N NORTH
OFF OFFSET
R RECYCLE BIN
ROW RIGHT-OF-WAY
S SOUTH
STA STATION
TOC TOP OF CURB
TOF TOP OF FLOOR
TOW TOP OF WALL
ABREVIATIONS:
W WEST
BTOC BACK TOP OF CURB
FF FINISH FLOOR
MEX MATCH EXISTING
AC ASPHALT
SW SIDEWALK
J A N
REGISTE
RED
PRO
FESS
IONAL
E
N G
I N
E E
R
RA NDOL P
H S
CO
TT
TA
LLMAN
/1
0/
/2 5/
A P
R T
/0
1/
C
IT
Y
C O
M M
EN
TS
/1 1/
A P
R T
/0
9/
C
IT
Y
C O
M M
EN
TS
AutoCAD SHX Text
55479PE OREGON
AutoCAD SHX Text
EXPIRES 06/30/2026
Apedroza
55479PE OREGON
Apedroza
PORTWAY AVE
O
R
TH
TH
S
TR
EE
T
SD
SD
SD
SD
E- S D
E- S D
E- S D
E- S D
E- S D
E- S D
E- S D
E- S D
E- S D
E- S D
E- S D
E- S D
E- S D
E-SD
E-SD
E-SD
E-SD
E-SD
E-SD
E-SD
E-SD
E-SD
E-SD
E-SD
E-SD
E-SD
E-SD
E- S D
E- S D
E- S D
E- S D
E- S D
E- S D
E- S D
E- S D
E- S D
E- S D
E- S D
E- S D
E- S D
E- S D
E- S D
E- S D
E- S D
E- S D
E- S D
E- S D
E- S D
E- S D
E- S D
E- S D
E- S D
E- S D
E- S D
E- S D
E- S D
E- S D
E- S D
E- S D
E- S D
E- S D
E- S D
E- S D
E- S D
E- S D
E- S D
E- S D
E- S D
E- S D
E- S D
E- S D
E- S D
E- S D
E- S D
E- S D
E- S D
E- S D
E- S D
E- S D
E- S D
E- S D
E-SD
E-SD
E-SD
E-SD
E- S D
E- S D
E- S D
E- S D
E-SDE-SDE-SDE-SDE-SDE-SDE-SDE-SDE-SDE-SDE-SDE-SDE-SDE-SDE-SDE-SDE-SDE-SDE-SDE-SDE-SDE-SDE-SDE-SDE-SDE-SDE-SDE-SDE-SDE-SDE-SDE-SDE-SDE-SDE-SDE-SDE-SDE-SDE-SDE-SDE-SDE-SDE-SDE-SDE-SDE-SDE-SDE-SD
E-
SD
E-
SD
"Ø
C O
N C R
ET
E
36"Ø CONCRETE
18"Ø PVC
18"Ø PVC
"Ø
C O
N C R
ET
E
E
E
E
EX-POWER VAULT
E
EX-BOLLARDS
EX-WATER VAULT
SS
EX-STEPS
EX-BOLLARDS
SANITARY MANHOLE
RIM: 95.04'
12"Ø CONCRETE IE (E): 86.14'
12"Ø CONCRETE IE (S): 85.94'
12"Ø CONCRETE IE (E): 86.14'
E-SAN E-SAN E-SAN E-SAN E-SAN E-SAN E-SAN E-SAN E-SAN
E- S A N
E- S A N
E- S A N
E- S A N
E- S A N
E- S A N
E- S A N
E- S A N
E- S A N
E- S A N
E- S A N
E- S A N
E- S A N
E- S A N
E- S A N
E- S A N
E- S A N
E- S A N
E- S A N
E- S A N
E- S A N
E- S A N
E-SANE-SANE-SANE-SANE-SANE-SANE-SANE-SANE-SANE-SANE-SANE-SANE-SANE-SANE-SANE-SANE-SANE-SANE-SANE-SANE-SANE-SANE-SANE-SANE-SANE-SANE-SANE-SANE-SANE-SANE-SANE-SANE-SANE-SANE-SANE-SANE-SANE-SANE-SANE-SANE-SANE-SANE-SANE-SANE-SANE-SANE-SANE-SANE-SANE-SANE-SANE-SANE-SANE-SANE-SANE-SANE-SANE-SANE-SANE-SANE-SANE-SANE-SANE-SANE-SANE-SANE-SANE-SANE-SANE-SANE-SANE-SANE-SANE-SANE-SANE-SANE-SANE-SANE-SANE-SANE-SANE-SANE-SANE-SANE-SANE-SANE-SANE-SANE-SANE-SAN
12"Ø CONCRETE
12"Ø CONCRETE
"Ø
C O
N C R
ET
E
DRIVEWAY
E-WTR E-WTR E-WTR E-WTR E-WTR E-WTR E-WTR E-WTR E-WTR E-WTR E-WTR
E-WTRE-WTRE-WTRE-WTRE-WTRE-WTRE-WTRE-WTRE-WTRE-WTRE-WTRE-WTRE-WTRE-WTRE-WTRE-WTRE-WTRE-WTRE-WTRE-WTRE-WTRE-WTRE-WTRE-WTRE-WTRE-WTRE-WTRE-WTRE-WTRE-WTRE-WTRE-WTRE-WTRE-WTRE-WTRE-WTRE-WTRE-WTRE-WTRE-WTRE-WTRE-WTRE-WTRE-WTRE-WTRE-WTRE-WTRE-WTRE-WTRE-WTRE-WTRE-WTRE-WTRE-WTRE-WTRE-WTRE-WTRE-WTRE-WTRE-WTRE-WTRE-WTRE-WTRE-WTRE-WTRE-WTRE-WTRE-WTRE-WTRE-WTRE-WTRE-WTRE-WTRE-WTRE-WTRE-WTRE-WTRE-WTRE-WTRE-WTRE-WTRE-WTRE-WTRE-WTRE-WTRE-WTRE-WTRE-WTRE-WTR
E- W
TR
E-
W
TR
E- W
TR
E-
W
TR
E- W
TR
E-
W
TR
E- W
TR
E-
W
TR
E- W
TR
E-
W
TR
E- W
TR
E-
W
TR
E- W
TR
E-
W
TR
E- W
TR
E-
W
TR
E- W
TR
E-
W
TR
E- W
TR
E-
W
TR
E- W
TR
E-
W
TR
E- W
TR
E-
W
TR
8"Ø DUCTILE IRON
8"Ø DUCTILE IRON
8" Ø
D U
C
TI
LE
I
R O
TAX LOT 112
(4 ACRES)
(ZONE:LI)
TAX LOT 113
(0.35 ACRES)
(ZONE:OS/PF) TAX LOT 122
(6.4 ACRES)
(ZONE:OS/PF)
E-
PL
E-
PL
E-
PL
E-
PL
E-
PL
E-
PL
E-
PL
E-
PL
E-
PL
E-
PL
E-
PL
E-
PL
E-
PL
E-
PL
E-
PL
E-
PL
E-
PL
E-
PL
E-
PL
E-
PL
E-PL
E-
PL
E-
PL
E-
PL
E-
PL
E-
PL
E-
PL
E-
PL
E-
PL
E-
PL
E-PL
E-PL
E-PL
E-PL
E-PL
E-PL
E-PL
E-PL
E-PL
E-PL
E-PL
E-PL
E-PL
E-PL
E-PL
E-PL
E-PL
E-PL
E-PL
E-PL
E-PL
E-PL
E-PL
E-PL
E-PL
E-PL
E-PL
E-PL
E-PL
E-PL
E-PL
E-PL
E-PL
E-PL
E-PL
E-PL
E-PL
E-PL
E-PL
E-PL
E-PL
E-PL
ROW
571.28' N 88°20'44" W
50.00' N 88°20'44" W
571.28' N 88°20'44" W
5.
N
1°
'1 6"
E
5.
N
1°
'1 6"
E
50.00' N 88°20'44" W
.1
0'
N
1°
'1 6"
E
428.46' N 88°20'44" W
428.46' N 88°20'44" W
STORM MANHOLE
RIM: 94.41'
36"Ø CONCRETE IE (NW): 83.26'
36"Ø CONCRETE IE (S): 83.66'
STORM MANHOLE
RIM: 94.18'
36"Ø CONCRETE IE (N): 81.43'
36"Ø CONCRETE IE (SE): 83.63'
18"Ø PVC IE (SW): 82.78'
STORM MANHOLE
RIM: 94.37'
10"Ø PVC IE (N): 84.02'
18"Ø PVC IE (NE): 83.87'
18"Ø PVC IE (SW): 83.92'
STORM MANHOLE
RIM: 93.01'
36"Ø CONCRETE IE (N): 81.12'
36"Ø CONCRETE IE (S): 81.26'
STORM OUTFALL
36"Ø CONCRETE IE (N): 80.42'
EX-BUILDING
EX-6 FOOT CHAIN LINK FENCE
EX-6 FOOT FENCE ENCLOSURE
TAX LOT 110
(2.58 ACRES)
(ZONE:OS/PF) TAX LOT 124
(1.29 ACRES)
(ZONE:LI)
182'
94'
91'
DRIVEWAY
75-FOOT ESEE SETBACK
20'
20' PUBLIC PATH AND UTILITY EASEMENT
6,900 SF (0.158 AC.)
E- G
A S
E- G
A S
E-G A S
E-G A S
E-G A S
E-G A S
E-G A S
E-G A S
E-G A S
E-G A S
E-G A S
E-G A S
E-G
AS
E-GAS
E-GASE-GASE-GASE-GASE-GASE-GASE-GASE-GASE-GASE-GASE-GASE-GASE-GASE-GASE-GASE-GASE-GASE-GASE-GASE-GASE-GASE-GASE-GASE-GASE-GASE-GASE-GASE-GASE-GASE-GASE-GASE-GASE-GASE-GASE-GASE-GASE-GASE-GASE-GASE-GASE-GASE-GASE-GASE-GASE-GASE-GASE-GASE-GASE-GASE-GASE-GASE-GASE-GASE-GASE-GASE-GASE-GASE-GASE-GASE-GASE-GASE-GASE-GASE-GASE-GASE-GASE-GASE-GASE-GAS
E-G A S
E-G A S
E-G A S
E-G A S
E-G A S
E-G A S
E-G A S
E- G
A S
E- G
A S
E- G
A S
E- G
A S
E- G
A S
E- G
A S
E- G
A S
E- G
A S
E- G
AS
E- U
E E-
U E
E-U E
E-U E
E-U E
E-U E
E-U E
E-U E
E-U E
E-U E
E-U E
E-U E
E-U E
E-UE
E-UEE-UEE-UEE-UEE-UEE-UEE-UEE-UEE-UEE-UEE-UEE-UEE-UEE-UEE-UEE-UEE-UEE-UEE-UEE-UEE-UEE-UEE-UEE-UEE-UEE-UEE-UEE-UEE-UEE-UEE-UEE-UEE-UEE-UEE-UEE-UEE-UEE-UEE-UEE-UEE-UEE-UEE-UEE-UEE-UEE-UEE-UEE-UEE-UEE-UEE-UEE-UE
E-UE E-UE E-UE E-UE E-UE E-UE E-UE E-UE E-UE E-UE E-UE E-UE E-UE E-UE E-UE E-UE E-UE E-UE E-UE E-UE E-UE E-UE E-UE E-UE E-UE E-UE E-UE E-UE E-UE E-UE E-UE E-UE
E-UE
E-UE
E-UE E-UE E-UE E-UE
E-UE E-UE E-UE E-UE E-UE E-UE
E- U
E E-
U E
E- U
E E-
U E
E- U
E E-
U E
E- U
E E-
U E
E- U
E E-
U E
E- U
E E-
U E
E- U
E E-
U E
E- U
EE-
U
C E-
U C
E- U
C E-
U C
E- U
C E-
U C
E- U
C E-
U C
E-U C
E-U C
E-U C
E-U C
E-U C
E-UCE-UCE-UCE-UCE-UCE-UCE-UCE-UC
E-UC
E-UCE-UCE-UCE-UCE-UCE-UCE-UCE-UCE-UCE-UCE-UCE-UCE-UCE-UCE-UCE-UCE-UCE-UCE-UCE-UC
E-UC
E- U
C E-
U C
E- U
C E-
U C
E- U
C E-
U C
E- U
C E-
U C
E- U
C E-
U C
E- U
C E-
U C
E- U
C
DY
H
E-U E
E-U E
E-U E E-UE E-UE E-UE E-UE E-UE E-UE E-UE E-UE E-UE E-UE E-UE E-UE E-UE E-UE E-UE E-UE E-UE E-UE E-UE E-UE E-UE E-UE E-UE E-UE E-UE E-UE E-UE
DRIVEWAY
W
75-FOOT ESEE SETBACK
E
EX-TRANSFORMER
SD
SS
E-S D
E-S D
E-S D
STORM MANHOLE
RIM: 92.71'
12"Ø PVC IE (N): 87.36'
18"Ø PVC IE (E): 85.31'
12"Ø PVC IE (S): 87.46'
STORM CATCHBASIN
RIM: 92.22'
12"Ø PVC IE (N): 87.72'
STORM CATCHBASIN
RIM: 92.56'
12"Ø PVC IE (S): 89.81'
SANITARY MANHOLE
RIM: 92.88'
12"Ø CONCRETE IE (E): 86.98'
12"Ø CONCRETE IE (W): 86.93'
8"Ø PVC IE (N): 87.18'
E-SAN
E-SAN
E-SAN
E-SAN
E-SAN
E-SAN
E-SAN
E-SAN
E-SAN
E-SAN
E-SAN
E-SAN
E-SAN
E-SAN
E-SAN
E-SAN
E-SAN
E-SAN
E-SAN
G
CO
SHEET NO.
N
TH
S
TR
EE
T
S
U
IT
E
H O
O D
R
IV
ER
O R
EG
O
N
-3
-6
W
W W
.H R
K U
S .C
O M
N o
D A
TE
D R W
N C H
K D
D
ES
C R
IP
TI
O
N
SHEET NAME
DATE
PROJECT NAME
PROJECT NO.
CLIENT
PHASE
REVISION
H
R K E ng in ee ri ng
A ll ri gh ts r es er ve d.
Th es e dr aw in gs a re t he p ro pe rt y of H
R K E ng in ee ri ng
L
LC
a nd a re n ot t o be u se d or r ep ro du ce d in a ny m an ne r, w ith ou t pr io r w ri tt en p er m is si on
H
G
IN
E E
R
IN
G
F
IE
LD
S
E R
V
IC
E S
PORTWAY PARKING LOT
H O
O D
R
IV
ER
O R
EXISTING CONDITIONS
OF 20
APRIL 2024
24-016
E P
O R T
M A R
IN
A D
R
IV
E
CONSTRUCTION
NOTE:
1. TOPOGRAPHIC SURVEY PERFORMED BY HRK ENGINEERING & FIELD SERVICES ON APRIL 19, 2024.
2. BASIS OF BEARING:
- HORIZONTAL DATUM: OREGON STATE PLANE, NORTH ZONE NAD 83/91, INTERNATIONAL FEET
- VERTICAL DATUM: NAVD 1988.
3. CONTOURS SHOWN ARE 1' INTERVALS.
N
0' 50'
1" = 25' (22"x34")
25'
1" = 50' (11"x17")
A P
R T
FI
R S T
R
EL
EA
S E
J A N
REGISTE
RED
PRO
FESS
IONAL
E
N G
I N
E E
R
RA NDOL P
H S
CO
TT
TA
LLMAN
/1
0/
/2 5/
A P
R T
/0
1/
C
IT
Y
C O
M M
EN
TS
/1 1/
A P
R T
/0
9/
C
IT
Y
C O
M M
EN
TS
AutoCAD SHX Text
55479PE OREGON
AutoCAD SHX Text
EXPIRES 06/30/2026
Apedroza
55479PE OREGON
Apedroza
PORTWAY AVE SD
SD
SD
E-SD
E-SD
E-SD
E-SD
E-SD
E-SD
E-SD
E-SD
E-SD
E-SD
E- S D
E- S D
E- S D
E- S D
E- S D
E- S D
E- S D
E- S D
E- S D
E- S D
E- S D
E- S D
E- S D
E- S D
E- S D
E- S D
E- S D
E- S D
E- S D
E- S D
E- S D
E- S D
E- S D
E- S D
E- S D
E- S D
E- S D
E- S D
E- S D
E- S D
E- S D
E- S D
E- S D
E- S D
E- S D
E- S D
E- S D
E- S D
E- S D
E- S D
E- S D
E- S D
E- S D
E- S D
E- S D
E- S D
E- S D
E- S D
E- S D
E- S D
E- S D
E- S D
E- S D
E- S D
E-SD
E-SD
E-SD
E-SD
E- S D
E- S D
E- S D
E- S D
E-SDE-SDE-SDE-SDE-SDE-SDE-SDE-SDE-SDE-SDE-SDE-SDE-SDE-SDE-SDE-SDE-SDE-SDE-SDE-SDE-SDE-SDE-SDE-SDE-SDE-SDE-SDE-SDE-SDE-SD
36"Ø CONCRETE
18"Ø PVC
18"Ø PVC
"Ø
C O
N C R
ET
E
E
E
EX-POWER VAULT
E
EX-BOLLARDS
EX-WATER VAULT
SS
EX-STEPS
EX-BOLLARDS
SANITARY MANHOLE
RIM: 95.04'
12"Ø CONCRETE IE (E): 86.14'
12"Ø CONCRETE IE (S): 85.94'
12"Ø CONCRETE IE (E): 86.14'
E-SAN E-SAN E-SAN E-SAN E-SAN E-SAN E-SAN E-SAN E-SAN
E- S A N
E- S A N
E- S A N
E- S A N
E- S A N
E- S A N
E- S A N
E-SANE-SANE-SANE-SANE-SANE-SANE-SANE-SANE-SANE-SANE-SANE-SANE-SANE-SANE-SANE-SANE-SANE-SANE-SANE-SANE-SANE-SANE-SANE-SANE-SANE-SANE-SANE-SANE-SANE-SANE-SANE-SANE-SANE-SANE-SANE-SANE-SANE-SANE-SANE-SANE-SANE-SANE-SANE-SANE-SANE-SANE-SANE-SANE-SANE-SANE-SANE-SANE-SANE-SAN
12"Ø CONCRETE
12"Ø CONCRETE
"Ø
C O
N C R
ET
E
DRIVEWAY
E-WTR E-WTR E-WTR E-WTR E-WTR E-WTR E-WTR E-WTR E-WTR E-WTR E-WTR
E-WTRE-WTRE-WTRE-WTRE-WTRE-WTRE-WTRE-WTRE-WTRE-WTRE-WTRE-WTRE-WTRE-WTRE-WTRE-WTRE-WTRE-WTRE-WTRE-WTRE-WTRE-WTRE-WTRE-WTRE-WTRE-WTRE-WTRE-WTRE-WTRE-WTRE-WTRE-WTRE-WTRE-WTRE-WTRE-WTRE-WTRE-WTRE-WTRE-WTRE-WTRE-WTRE-WTRE-WTRE-WTRE-WTRE-WTRE-WTRE-WTRE-WTRE-WTRE-WTR
E- W
TR
E-
W
TR
E- W
TR
E-
W
TR
E- W
TR
E-
W
TR
E- W
TR
E-
W
TR
E- W
TR
8"Ø DUCTILE IRON
8"Ø DUCTILE IRON
TAX LOT 112
(4 ACRES)
(ZONE:LI)
TAX LOT 113
(0.35 ACRES)
(ZONE:OS/PF)
TAX LOT 122
(6.4 ACRES)
(ZONE:OS/PF)
E-
PL
E-
PL
E-
PL
E-
PL
E-
PL
E-
PL
E-
PL
E-
PL
E-
PL
E-
PL
E-
PL
E-
PL
E-
PL
E-
PL
E-
PL
E-
PL
E-
PL
E-
PL
E-
PL
E-
PL
E-PL
E-
PL
E-
PL
E-
PL
E-
PL
E-
PL
E-
PL
E-
PL
E-
PL
E-
PL
E-PL
E-PL
E-PL
E-PL
E-PL
E-PL
E-PL
E-PL
E-PL
E-PL
E-PL
E-PL
E-PL
E-PL
E-PL
E-PL
E-PL
E-PL
E-PL
E-PL
E-PL
E-PL
E-PL
E-PL
E-PL
E-PL
E-PL
E-PL
E-PL
E-PL
E-PL
E-PL
E-PL
ROW
571.28' N 88°20'44" W
50.00' N 88°20'44" W
571.28' N 88°20'44" W
5.
N
1°
'1 6"
E
5.
N
1°
'1 6"
E
50.00' N 88°20'44" W
.1
0'
N
1°
'1 6"
E
428.46' N 88°20'44" W
428.46' N 88°20'44" W
STORM MANHOLE
RIM: 93.01'
36"Ø CONCRETE IE (N): 81.12'
36"Ø CONCRETE IE (S): 81.26'
STORM OUTFALL
36"Ø CONCRETE IE (N): 80.42'
EX-BUILDING
EX-6 FOOT CHAIN LINK FENCE
EX-6 FOOT FENCE ENCLOSURE
182'
94'
91'
DRIVEWAY
75-FOOT ESEE SETBACK
20'
20' PUBLIC PATH AND UTILITY EASEMENT
6,900 SF (0.158 AC.)
E-G A S
E-G A S
E-G A S
E-G A S
E-G A S
E-G A S
E-G
AS
E-GAS
E-GASE-GASE-GASE-GASE-GASE-GASE-GASE-GASE-GASE-GASE-GASE-GASE-GASE-GASE-GASE-GASE-GASE-GASE-GASE-GASE-GASE-GASE-GASE-GASE-GASE-GASE-GASE-GASE-GASE-GASE-GASE-GASE-GASE-GASE-GASE-GASE-GASE-GASE-GASE-GASE-GAS
E-U E
E-U E
E-U E
E-U E
E-U E
E-U E
E-U E
E-UEE-UEE-UEE-UEE-UEE-UEE-UEE-UEE-UEE-UEE-UEE-UEE-UEE-UEE-UEE-UEE-UEE-UEE-UEE-UEE-UEE-UEE-UEE-UEE-UEE-UEE-UEE-UEE-UEE-UEE-UEE-UEE-UEE-UEE-UEE-UEE-UEE-UEE-UEE-UEE-UEE-UE
E-UE E-UE E-UE E-UE E-UE E-UE E-UE E-UE E-UE E-UE E-UE E-UE E-UE E-UE E-UE E-UE E-UE E-UE E-UE E-UE E-UE E-UE E-UE E-UE E-UE E-UE E-UE E-UE E-UE E-UE E-UE E-UE E-UE
E-UE
E-UE E-UE E-UE E-UE
E-UE E-UE E-UE E-UE E-UE E-UE
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .