Adams County, Asotin County, Benton County, Chelan County, Clallam County, Clark County, Columbia County, Cowlitz County, Douglas County, Ferry County, Franklin County, Garfield County, Grant County, Grays Harbor County, Island County, Jefferson County, King County, Kitsap County, Kittitas County, Klickitat County, Lewis County, Lincoln County, Mason County, Okanogan County, Pacific County, Pend Oreille County, Pierce County, San Juan County, Skagit County, Skamania County, Snohomish County, Spokane County, Stevens County, Thurston County, Wahkiakum County, Walla Walla County, Whatcom County, Whitman County, Yakima County, Asotin City, Clarkston City, Clarkston Heights-Vineland CDP, West Clarkston-Highland CDP, Benton City, Chelan City, Chelan Falls CDP, Clallam Bay CDP, Lewisville CDP, Rock Island City, Pacific Beach CDP, Whidbey Island Station CDP, Mercer Island City, Pacific City, Bainbridge Island City, Kingston CDP, Kitsap Lake CDP, Kittitas City, Klickitat CDP, Okanogan City, Anderson Island CDP, Fort Lewis CDP, Fox Island CDP, Herron Island CDP, Ketron Island CDP, North Fort Lewis CDP, Raft Island CDP, Stevenson City, Hat Island CDP, Lake Stevens City, Snohomish City, Spokane City, Spokane Valley City, Puget Island CDP, Garfield Town, Yakima City, Washington

About this file

This document is a Q&A response for a competitive solicitation issued by the Washington State Department of Transportation (WSDOT) for a Highway Speed Camera Pilot Program. The purpose of this solicitation is to procure services for the installation and operation of two Average Speed Systems at various locations throughout the state of Washington, including Interstate 82, Interstate 90, and U.S. Route 101. The systems will be temporary installations and will be removed by the vendor at the end of the 3-month trial period. WSDOT will provide the vendor with a list of potential locations, and the final locations will be selected based on anticipated operating costs and the sites most conducive to achieving the program's goals. The contract term is 6 months, with the vendor providing pricing for the initial 3-month period.

Regarding pricing, vendors must provide a lump sum cost for the total project as well as one-time costs associated with the proposed solution. WSDOT will evaluate both non-cost factors (80%) and cost factors (20%) to determine the highest-scoring responsive and responsible bidder. WSDOT will assist the selected vendor with coordination for work within WSDOT right-of-way, but the vendor will be responsible for addressing any deficiencies in meeting security and CJIS requirements.

View the file

Other files

File Type Posted
Exhibit C-CostProposal.docx DOCX document
Exhibit D-Contract.docx DOCX document
2024-0904 - Amendment2.docx DOCX document
REVISED-2-Exhibit B-PerformanceRequirements.docx DOCX document
Exhibit A -1-BiddersCertification.docx DOCX document
Exhibit F-DiverseBusinessInclusionPlan.docx DOCX document
REVISED Exhibit B-PerformanceRequirements.docx DOCX document
Deliverables Table.docx DOCX document
2024-0904 -Highway Speed Camera RFQQ.docx DOCX document
Exhibit A-3-Client Reference Form.docx DOCX document
Exhibit E-ContractIssuesList.docx DOCX document
2024-0904 - Amendment1.docx DOCX document
SLA Table.docx DOCX document
Mailing Process Graphic.pdf PDF
Exhibit A -2-BiddersProfile.docx DOCX document
Exhibit B-PerformanceRequirements.docx DOCX document
2024-0904-Q&A-1.docx DOCX document
Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Question & Answer # 02 Highway Speed Camera Pilot Program – 2024-0904

This document is posted to capture the questions received during the question & answer period for 2024-0904 Highway Speed Camera Pilot Program This document is the official response to the questions received.

Any additional questions regarding this solicitation must be directed to the Procurement Coordinator listed below.

Tariq Ohab 360-705-7547 acoacquisitionsubmittal@wsdot.wa.gov

Question #
Question
Response
Did this change the solicitation?
1.
For out-of-state drivers and rental cars, could the vendor process up to the point of, but excluding Registered Owner acquisition?
Yes
NO
2.
If you require previously deployed solutions even for the pilot stage, we would go with the first option. But if you are willing to consider new solutions given the entire Average Speed System space is relatively a new and efficient technology when compared to traditional speed violation detection technologies, we would prefer to go with second option.

Which one would DOT have preference for?

In reviewing the proposals, both the technical capabilities and cost aspects of the proposal will be considered in proportional consideration as stated in the RFQQ to determine the proposed system for the pilot. At this time, WSDOT is only authorized to complete the pilot program.

NO

3.
Can WSDOT please provide any information on potential locations? Understanding any existing infrastructure that might be available for use in installing the systems is important in estimating construction costs and time required to complete the install.
Highway
County
Mile Posts

Eastern Washington

I-82
Yakima
73 to 75
I-90
Kittitas
122 to 129
I-90
Spokane
292 to 294

Western Washington

I-5
Skagit
233 to 236
I-5
Whatcom
247 to 250
US 101
Thurston
360 to 361

Preferred locations from this list will be discussed with the selected vendor, with selection of the final locations based on anticipated operating costs and the locations most conducive to for the selected solution to achieve the programs goals.

Please note that these locations may be subject to change.

4.
1.5 The Proposer shall define the methodology for their placement, including:

-Distance between detection cameras -Detection Technology -Automated License Plate Reading (ALPR) Methodology and Equipment, including software and hardware capabilities and use of items such as machine learning and artificial intelligence -Resolution/Occlusion Issues in Image Capture Could the authority please advise on the minimum required distance between the two cameras/points?

Could the authority please advise on the required number of systems/points in each enforcement zone?

Minimum distance should be set in accordance with the speed limit of the section, as well as the WSDOT-specified speed threshold.

A minimum of 2 enforcement points (1 at entry, 1 at exit) is required. Additional points may be provided within the enforcement zone if required to provide a functional enforcement system.

5.
All speeding event images shall be in color or as otherwise approved by the State.

Could the authority please advise whether a combination of color and IR images is acceptable?

IR images, if providing adequate resolution for license place recognition and vehicle type confirmation, are permitted.

6.
6.13 indicates that “Registered owner information shall be obtained for In-State violation vehicles only.” However 6.13.2 indicates the ASV will need to identify the renter of a rental vehicle and the RFP indicates that ASV will need “to process each speeding event as If a notice would be sent.”

Question – does the ASV need to identify out of state drivers and renter information for rental vehicles for the pilot?

The ASV will need to process each speeding event to the point where the determination is made that the vehicle is out-of-state or a rental vehicle. If found to be a rental or out-of-state vehicle, a notice will not be sent to the registered owner. However, the ASV must specify the number of speeding events for both out-of-state and rental vehicles in the final report of the trial period.

7.
Has WSDOT identified specific corridors?

Are any of the corridors two-lanes? If not, how many lanes will be required to be covered?

A list of potential locations has been posted for proposer reference.

Yes, a majority of them are two lane corridors in a single direction. For this pilot only, no more than three lanes should suffice.

8.
Has WSDOT identified specific infrastructure within the corridors? If so, can WSDOT provide the As built drawings for the infrastructure?
WSDOT is working to identify power and other utilities in the area. Available information on utilities within the potential project locations will be provided to the selected proposer.

NO

9.
Will WSDOT help with necessary permitting?
WSDOT will assist with coordination for work within WSDOT right-of-way. Any work requiring the approval of a third-party agency or stakeholder will be the responsibility of the vendor.
10
6.10 references an Speeding event Process Flowchart. Is this attached somewhere?
This chart is uploaded in WEBS

NO

11
23.2.3 references a table which defines severity level. Is this attached somewhere?
This table is uploaded in WEBS

NO

12
Will WSDOT please share what the expected threshold above the speed limit at which it will consider a vehicle to be in violation of the speed limit, even though it will be just a warning? Knowing whether that trigger threshold will be 10, 11, 12mph, etc. over the speed limit, will determine processing volume to estimate.
WSDOT will be responsible for determining the threshold and retains the right to establish and/or modify the threshold. For the purposes of this solicitation, all proposers should assume a threshold of 10+ MPH over the speed limit.
13
Can WSDOT please share any data they may have on the 85th percentile speed?
Please refer to the previously posted table of locations and refer to WSDOT’s Online Mapping Center for further information.

NO

14
Can WSDOT share Average Daily Traffic Volume, ideally for the locations they plan to deploy? If not for those specific locations, any highway locations would be helpful.
Please refer to WSDOT’s Online Mapping Center for further information on ADT data.

NO

15
21.5 references an attached deliverables table. Is this attached somewhere?
This table is uploaded in WEBS

NO

16
24.11.1.1.2 references a 1.27 Technical Architecture for Authentication. Is this attached somewhere?
This reference will be removed from Exhibit B, Section 24.11.1.1.2. A REVISED – 2- Exhibit B will be uploaded to include in your Bid Submittal package

YES

17
INTRODUCTION and Section 2.1

The introductory paragraph indicates the purpose of the solicitation is the purchase of a Speed Safety Camera Speed System.

It also indicates the solicitation is for the installation of 2 of 2 Average Speed Systems, but emphasizes that the systems are intended to be temporary installations and will be removed by the vendor at the close of the contract.

Section 2.1 indicates the purpose of the procurement is to procure Speed Safety Camera Average Speed specific goods and/or services.

QUESTION/CLARIFICATION

Please clarify whether the provision of the camera systems and mounting infrastructure is to be provided as goods or as a service.

Upon removal by the vendor at the end of the 3 month trial period, will ownership of the camera systems and mounting infrastructure be retained by the vendor or will WSDOT assume ownership of the removed equipment?

The provision of these items is considered as a service.

At the close of the trial period, ownership will be retained by the vendor

18
4.4 Exhibit C – Bid Price: This exhibit provides the pricing information that bidders will complete as part of their bid and the price evaluation tool that the Procurement Coordinator will use to evaluate and compare bids.

QUESTION/CLARIFICATION

The file name for Exhibit C is listed as Cost Proposal, not Bid Price. Please provide the appropriate file name/document name in the RFQQ to submit with our proposal.

Exhibit C does not provide any information on the price evaluation tool the Coordinator will use to evaluate and compare bids.

Please provide information on the price evaluation tool to be used to evaluate and compare bids.

The referenced Exhibit C – Cost Proposal is the Bid Price document. Please submit Exhibit C – Cost proposal as your Bid Price document.

19
SECTION 2.1 states:

Pursuant to Washington’s Procurement Code for Goods and Services, RCW chap. 39.26, state agency purchases of goods and services must be based on a competitive solicitation process in which the Contract is awarded to the lowest responsive, responsible bidder.

The table in Section 3.1 indicates a scoring formula that includes Non-Cost Factors (80%) as well as Cost Factors (20%)

2Non-Cost Factors Exhibit B – Bidder Qualifications [80%] 3Cost Factors Exhibit C – Bid Price [20%]

SECTION 3.1 states:

CONTRACT NEGOTIATIONS (STEP 5). WSDOT may negotiate with the highest scored responsive, responsible bidder to finalize the Contract and to determine if the bid may be improved. If, after a reasonable period of time, WSDOT, in its sole judgement, cannot reach agreement on acceptable Contract terms with such bidder, WSDOT may suspend negotiations and undertake negotiations with the next highest scored responsive, responsible bidder as determined by the evaluations.

QUESTION/CLARIFICATION

Section 2.1 suggests the award basis will be solely on the lowest (we assume lowest costs) responsive, responsible bidder.

Section 3.1 suggest the basis for award is the highest scored proposal.

Please clarify whether the basis for award will be lowest costs proposal or highest scored proposal including both Non-Cost Factors and Cost Factors.

An official amendment will be issued to address section 2.1 of the RFQQ as “ 2.1 Purpose of the Procurement – Award a Contract. The purpose of this Competitive Solicitation is to receive competitive bids to evaluate and, as appropriate, award a Contract for WSDOT to procure Speed Safety Camera Average Speed specific goods and/or services as set forth herein. State agency purchases of goods and services must be based on a competitive solicitation process in which this Contract will be awarded to the highest scoring responsive, responsible bidder.

20
2.4 CONTRACT TERM. As set forth in the attached Contract for this Competitive Solicitation, the contract term is Six (6) months. Bidders are to specify prices for the first three (3) months of the contract term (such prices then will be adjusted as set forth in the Contract). The Contract is subject to earlier termination.

QUESTION/CLARIFICATION

Please confirm that the bidders’ cost proposal should only provide pricing data for the first three months of the contract term, not pricing for the 6 month contract term.

This is correct. A lump sum cost for total project cost should also be provided for ranking consideration.

21
There is frequent use of the acronyms ASB and ASV. ASB is defined in Section 3.7 as “Apparent Successful Bidder”.

The Acronym ASV is used both in the RFQQ and extensively in the Performance Requirements Exhibit, but is not defined anywhere in the solicitation documents.

QUESTION/CLARIFICATION

Please clarify if the designation of ASV is synonymous with ASB, or if it’s a separate designation.

The award process draws heavily on the ASB designation, including announcements, opportunities to protest, and negotiations.

Please clarify these terms.

Yes, ASV and ASB are synonymous. ASV = Apparent Successful Vendor – ASB= Apparent Successful Bidder.

22
SUBMITTING BIDS. Bidder’s electronic bid must be emailed to the Procurement Coordinator at the following email address: acoacquisitionsubmittal@wsdot.wa.gov. Note: Bidder emails (including attachments) CANNOT exceed 30MB in size (emails that exceed 30 MB in size will not be delivered). Accordingly, Bidders are cautioned to keep email sizes to less than 25MB to ease delivery. Zipped files cannot be accepted. [AGENCY] will send an acknowledgement of bid receipt. Acknowledgement of bid receipt is not a determination on the bid’s responsiveness. If bidder does not receive an acknowledgement within a reasonable time, it is the responsibility of the Bidder to contact {AGENCY} for acknowledgement of bid receipt.

QUESTION/CLARIFICATION

If the email file size for the entire proposal exceeds 30MB including the multiple files to be submitted, will WSDOT permit submitting the proposal in multiple emails each below the 30MB restriction?

Bidder emails (including attachments) CANNOT exceed 30MB in size (emails that exceed 30 MB in size will not be delivered).

23
SECTION 1.1 Provides dates, but no times for the submission deadlines. Should bidders assume the deadlines are at 11:59 PM on the deadline date? Please clarify.
Bids will be accepted up to 11:59 PM the day of the bid due date.
24
24.12.2A full security audit will be conducted on the system. (See the current CJIS Security Policy version for the details. For reference, the current version as of August 28th, 2023 is [5.9.2 12-07-2022].)

Will WSDOT please provide further details regarding this audit, e.g. scope, timing, etc?

WSDOT reserves the right to perform a CJIS audit at any point during the duration of the program. Should WSDOT elect to perform a CJIS audit during program operations, this audit will be scheduled and coordinated with the selected vendor on the nature and depth of the audit.

The selected vendor will be responsible for addressing any deficiencies/gaps in meeting the CJIS requirements.

25
24.15.1Prior to application acceptance and in conjunction with WSDOT, the ASV will be required to complete a Security Design Review with the state Office of Cyber Security (OCS) to ensure that security controls and processes are in compliance with the state’s OCIO Policies | WaTech – Securing Information Technology Assets Standards prior to “go live”.

Will WSDOT please provide further details regarding this Security Design Review, e.g. scope, timing, etc.?

WSDOT reserves the right to perform a Security Design Review at any point prior to beginning program operations. This review will be scheduled and coordinated with the selected vendor on the nature and depth of the review.

The selected vendor will be responsible for addressing any deficiencies/gaps in meeting the WaTech requirements.

26
25A SOC 2 Type 2 Audit applies to the Contract.

Under normal circumstances, a SOC 2 Type 2 audit would be appropriate for this work. However, with a Contract Award date of 12/30/2024, a possible 12 week development schedule, and a contract completion date of 6/30/2025, there does not appear to be enough operational period to actually perform an audit - typically 3 months of operations is the minimum required to begin this type of audit. In this case, the audit would begin at completion of the Contract scope in the best case scenario.

Will WSDOT please remove the SOC 2 Type 2 requirement and consider other options?

NOTE: As an alternative, WSDOT could require an agreed upon procedures (AUP) engagement to be defined with the ASV after award which is a custom assessment that only evaluates security controls that are relevant. Because AUP reports are less time-consuming and more cost-effective (due to their focused nature), sometimes they're requested in place of SOC Report.

WSDOT will request that vendors provide the date of their last Type 2 SOC 2 audit within the last 12-18 months, as well as submission of the final report from that audit.

The vendor will also be required to specify the hosting environment for the relevant data for WSDOT review.

27
19.15Maintain one total program backup for at least 10 years.

After the end of the Pilot (expected in June 2025), is it sufficient to provide all Images captured during the capture period, Speed Event Data with the DMV Info, Speed Enforcement Notices, Incident Data, etc. on removable media (USB Drive) to WSDOT so that the Infrastructure can be decommissioned? Will the State need access to the application after the end of the Pilot so that the data can be viewed through the applications? Please clarify if the storage and applications have to be maintained for WSDOT access beyond the June 30, 2025 date.

Given that the vendor will be expected to have completed their work by June 30th, 2025, it is not anticipated that any applications for the viewing of data be maintained beyond that date.

It is expected that the vendor will keep a copy of all data from the program stored offline for the 10-year data specified.

28
6.13(MS) The ASV shall match the captured image of the vehicle registration plate with the registered vehicle owner. The ASV shall review and extract the vehicle registration plate data and obtain the name and address of registered owner and other relevant vehicle data to verify the speeding event. Registered owner information shall be obtained for In-State violation vehicles only. The ASV shall be able to work directly with DOL for In-State registered owner information subject to the terms of a data sharing agreement. Proposers shall detail their approach to obtaining vehicle records.

Access to WSDOT DOL for access to Registered Owner Information for WA State Plates requires the Contractor to be an Agent for WSDOT. Please confirm that WSDOT will facilitate and help the Contractor set up the connection/account with WSDOT DOL for ROV Lookup for this Pilot Project?

WSDOT will facilitate the appropriate connection and coordination with DOL. ASV will be required to meet all DOL requirements.

29
Exhibit C: Cost Proposal: Instructions: List all one-time costs associated with the proposed solution. You may add rows to this table as needed.

Will WSDOT please describe the process contemplated in this procurement for invoicing of Contractor's cost, i.e. upfront mobilization payment, milestone deliverable payment, monthly recurring administrative and management payment, etc.?

This requirement allows for a full 30 days to provide final reporting as specified within the RFQQ

30
8.1.2The ASC system operators shall attend a WSDOT provided training course approved by the State to obtain knowledge about safely working adjacent to active traffic.

Is there an associated cost to the ASV for this WSDOT provided training?

WSDOT will provide the training at no cost.

31
6.13.2 In the event the vehicle registered owner is a rental company, the ASV shall be responsible for obtaining the name and address of the renter from the company that owns the vehicle.

In consideration of the fact that this is a program

1) that is a pilot with a very short term of service,

2) where fines are not assessed to violators, and

3) where notices are not mailed to violators that are out of state, will WSDOT please consider disregarding rental car vehicles in their entirety for the purpose of this pilot phase of the program?

NOTE: Many car rental customers will be from out of state.

The selected vendor will be expected to track the number of violations committed by rental cars, as this is one of the metrics being tracked by the program

32
6.3The ASV shall provide an ASC that ensures only one “event” is captured and processed for each vehicle exceeding the speed threshold at a given enforcement location.

Will WSDOT please confirm that this means one event per vehicle trip through the capture zone, but that a specific vehicle could have multiple images captured and processed for multiple events?

NOTE: The reason for the question is simply to confirm that WSDOT does not intend to only send one notice per vehicle owner during the trial period.

This is correct, one event per vehicle trip. Multiple violations per vehicle are possible over the trial period.

33
1.6 A list of potential locations for deployment will be provided to the ASV. These locations are based on previous crash analysis performed by WSDOT and their program team.

A minimum understanding of the potential locations will help bidders estimate cost more accurately. It was stated during the prebid meeting that six potential locations would be posted to WEBS.

Will WSDOT please provide the potential locations?

A list of potential locations has been provided.

34
2.3The Operator shall perform a visual inspection of the enforcement equipment prior to initial activation. The Operator will also be responsible for maintenance of the enforcement equipment during the full duration of the field usage during this contract.

Are there any specific WSDOT requirements regarding ASV vehicles that will be used for deployment and/or maintenance of the enforcement equipment, e.g. safety lights, removal of decals/signage, etc?

Amber bar or dome lights as required in WAC 204-21-130 shall be mounted on the top or inside of each vehicle. Installation of the lights shall provide 360-degree visibility. Lights shall be operational during entry and exit from the work zone. Lights shall be operational during deployment.

Each vehicle shall have removable magnetic program markings approved by the State that will only be displayed while the vehicle is deployed. The marking shall be provided at no additional cost to the State.

35
General question:

Will WSDOT please share its long-term goals for this trial program, i.e. goals, future plans, timeframe, etc.?

This trial will last 2-4 months (depending on pace of installation/implementation), with requirements to spend all program funding for the proviso by June 30th, 2025.

36
A list of potential locations for deployment will be provided to the ASV. These locations are based on previous crash analysis performed by WSDOT and their program team. The intent is for the system is to be applied between interchanges along higher type roadways.

Could the authority please advise on the number of potential locations, the selection process for these locations, and the required lane coverage?

It is anticipated there will be 2 sites selected for implementation. A short list of 6 potential locations was shared as a response to a separate question. These locations were selected based on past crash record and geometrics.

It is expected that all lanes in one direction will be covered. The listed locations all have 2-3 lanes in a single direction.

37
General Question: Back Office scope

Could the authority please clarify the type of speeding offense notice that will be sent to the vehicle owner? Additionally, will payment collection, call centre, and court support be required?

Speeding offense notices will be mailed to the vehicle owner. The selected vendor will be responsible for providing a PDF to the third-party mailing vendor for distribution.

38
1.3.5The electrical system shall be capable of supporting all electronic devices, including power demand and compatibility.

Could the authority confirm if mains power can be provided at each deployment?

Power availability is subject to site selection. The vendor may be responsible for providing power, pending the sites selected.

39
17 The ASV shall be required to comply with all applicable laws, regulations, policies, standards and guidelines affecting Information Technology projects, which may be created or changed periodically. Vendor is required to review all applicable links provided below and state compliance in its response.

It is the responsibility of the ASV to ensure adherence and to remain abreast of new or revised laws, regulations, policies, standards and guidelines affecting project execution. These include, but are not limited to:

17.1 The ASV must meet the policies, guidelines, and methodologies governed by the IT Project Management outline by the OCIO.

In column 4, Priority, this item is annotated S. Could the authority please advise if this should be M, MS, or DS?

This is a “M”. This reference will be updated in Exhibit B, Section 17. A REVISED – 2- Exhibit B will be uploaded to include in your Bid Submittal package

40
3.11All speeding event images shall be in color or as otherwise approved by the State.

Could the authority please advise whether a combination of color and IR images is acceptable?

IR images, if providing adequate resolution for license place recognition and vehicle type confirmation, are permitted.

41
1.5 The Proposer shall define the methodology for their placement, including:

-Distance between detection cameras -Detection Technology -Automated License Plate Reading (ALPR) Methodology and Equipment, including software and hardware capabilities and use of items such as machine learning and artificial intelligence -Resolution/Occlusion Issues in Image Capture Could the authority please advise on the minimum required distance between the two cameras/points?

Could the authority please advise on the required number of systems/points in each enforcement zone?

Minimum distance should be set in accordance with the speed limit of the section, as well as the WSDOT-specified speed threshold.

A minimum of 2 enforcement points (1 at entry, 1 at exit) is required. Additional points may be provided within the enforcement zone if required to provide a functional enforcement system.