20191115_AFTC_IFC_Vol.1B.pdf

PDF 45 MB Posted

Attached to
Air Force Targeting Center, Langley AFB - Solicitation Federal contract opportunity
Solicitation number
W9123621R2005
Issued by
Department of the Army Corps of Engineers Engineering District Norfolk

About this file

This solicitation is for the construction of a new Air Force Targeting Center Facility at Langley Air Force Base in Virginia. The Department of the Army Corps of Engineers Engineering District Norfolk will manage the project. The facility will support the new Intelligence, Surveillance, and Reconnaissance Wing providing 24/7 mission capability for Command and Control of Air Force Target and Threat Analysis. It will be designed according to Department of Defense, Air Force, and Langley standards and unified facility criteria. The project scope includes constructing the new building, installing emergency generators, completing site improvements, and developing all necessary supporting facilities. Local materials and standard construction techniques should be utilized where cost effective.

View the file

Other files for this federal contract opportunity

Other files attached to Air Force Targeting Center, Langley AFB - Solicitation, newest first.
File Type Posted
W9123621R2005 Amendment 0008.pdf PDF
Vol.1A_Revised_Sheet CD-102 DEMOLITION PLAN.pdf PDF
Specs_V1_Revised_01 33 00.00 50.pdf PDF
W9123621R2005 0007.pdf PDF
Specs_V1_Revsied_00 00 00_TOC.pdf PDF
Vol.1B_Revised_Sheet A-313 - EXTERIOR WALL SECTIONS.pdf PDF
Specs_V2_Revised_10 22 19.pdf PDF
Specs_V1_Revised_02 60 00.pdf PDF
Specs_V2_Revised_08 71 00.pdf PDF
Vol.1B_Revised_Sheet IN101A - INTERIOR FINISH PLAN - FIRST FLOOR - AREA A.pdf PDF
Vol.1B_Revised_Sheet A-607 - INTERIOR STOREFRONTS - LEVEL 2.pdf PDF
Vol.1B_Revised_Sheet A-521 - DETAILS - INTERIOR - ACOUSTIC & WOOD.pdf PDF
Vol.1A_Revised_Sheet X-002 TRAFFIC DETAILS.pdf PDF
Vol.1A_Revised_Sheet CG-113 EROSION & SEDIMENT CONTORL DETAIL SHEET.pdf PDF
Vol.1A_Revised_Sheet CG-112 EROSION & SEDIMENT CONTORL DETAIL SHEET.pdf PDF
Vol.1B_Revised_Sheet A-602 - DOOR SCHEDULE - LEVEL 2.pdf PDF
Vol.1B_Revised_Sheet A-601 - DOOR SCHEDULE - LEVEL 1.pdf PDF
Specs_V1_Revised_00 00 00_TOC.pdf PDF
Specs_V2_Revised_08 81 00.pdf PDF
Vol.1B_Revised_Sheet IN102C - INTERIOR FINISH PLAN - SECOND FLOOR - AREA C.pdf PDF
Vol.1A_Revised_Sheet CG-111 EROSION & SEDIMENT CONTORL DETAIL SHEET.pdf PDF
Langley Furniture Qty.pdf PDF
W9123621R2005 0005.pdf PDF
FINAL_LAFB_TCF_Norfolk_District_USACE_Geotechnical_Report.pdf PDF
W9123621R2005 0004.pdf PDF
W9123621R20050003.pdf PDF
20201124_RTA_Specs_V4_Div_26-33_Appendix_Consolidated.pdf PDF
2020RTA_AFTC_Vol.1B.pdf PDF
2020RTA_AFTC_Vol.1A.pdf PDF
20201124_RTA_Specs_V1_Div_00-06_Consolidated.pdf PDF
2020RTA_AFTC_Vol.2.pdf PDF
20201124_RTA_Specs_V3_Div_21-25_Consolidated.pdf PDF
W9123621R20050002.pdf PDF
A.02.01 Amendment 0001 Solicitation 21R2005_released.pdf PDF
B.02.09 Att. 3 Past Performance Questionaire.pdf PDF
B.02.09 Att. 5 Letter of Commitment Sample.pdf PDF
B.02.09 Att. 6 Small Business Subcontracting Record.pdf PDF
20191115_AFTC_IFC_Vol.2.pdf PDF
B.02.09 Att. 2 Company Specialized Experience.pdf PDF
B.02.09 Att. 7 Small Business Participation Plan.pdf PDF
20191115_AFTC_IFC_Vol.1A (Full Scale).pdf PDF
20191115_IFC_Specs_V2_Div_07-14.pdf PDF
20191115_IFC_Specs_V4_Div_26-33_Appendix.pdf PDF
20191115_IFC_Specs_V1_Div_00-06.pdf PDF
JBLE-Langley AF TCF - NTCRA ESS Construction Support (20181115) DRAFT.pdf PDF
20190411_Furniture_specification_package_Amendment_2 (1).pdf PDF
A.02.01 Solicitation W9123621R2005_released 11.03.2020.pdf PDF
B.02.09 Att. 1 Proposal Data Sheet.pdf PDF
B.02.09 Att. 4 Telephone Interview Questionnaire (For Government Use Only).pdf PDF
B.02.09 Att. 8 CLIN Schedule.pdf PDF
Show all 50

Air Force Targeting Center, Langley AFB - Solicitation has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

D

6 7 8 9 10

G

C

E

F

W24X55

AESS 3

W24X55

AESS 3

W24X55

AESS 3

W24X55

AESS 3

W24X55

AESS 3

W24X55

AESS 3

W24X55

AESS 3

W

X

A E

S S

W

X

W

X

C E

LL

U

LA

R

B E

A M

W

X

A E

S S

W

X

W

X

C E

LL

U

LA

R

B E

A M

W

X

A E

S S

W

X

W

X

C E

LL

U

LA

R

B E

A M

W24X55

AESS 3

W30X99 W30X99 W30X99

W

X

W

X

W

X

A E

S S

W30X99

W

X

W

X

W

X

A E

S S

B.5

34'-0" 34'-0" 34'-0" 34'-0" 20'-6" 14'-7"

M A

T C

H L

IN

E

S

E : A

1/ S

-1

B

D.3

MATCHLINE

SEE: A1/S-103C

W27X84 W27X84 W27X84 W27X84W21X44

W16X40

W

X

W

X

W

X26

AESS 3

W 16X26

AESS 3

W 16X26

AESS 3 W

X26

AESS 3

W16X26

AESS 3

W16X26

AESS 3

W

X

A E

S S

W

X26 W

16X26

W 16X26 W

X26

W16X26W16X26

W

X

W

X26

AESS 3

W 16X26

AESS 3

W 16X26

AESS 3 W

X26

AESS 3

W16X26

AESS 3

W16X26

AESS 3

W

X

A E

S S

W

X26 W

16X26

W 16X26 W

X26

W16X26W16X26

W

X

W

X26

AESS 3

W 16X26

AESS 3

W 16X26

AESS 3 W

X26

AESS 3

W16X26

AESS 3

W16X26

AESS 3

W

X

A E

S S

W

X26 W

16X26

W 16X26 W

X26

W16X26W16X26

W

X

W

X26

AESS 3

W 16X26

AESS 3

W 16X26

AESS 3 W

X26

AESS 3

W16X26

AESS 3

W16X26

AESS 3

W

X

A E

S S

W

X26 W

16X26

W 16X26

W

X2

W12X16

W

X

W12X16

S-103A5

A4

1'-0" TYP

W

X

W

X26

EXTERIOR CMU WALL,

SEE NOTE 7

A1

S-518

W24X55W24X55W24X55W24X55

A1

S-510

A1

S-510

3' -6

A1

S-518

A1

S-518

A4

S-514

C1

S-513

A4

S-516

A1

S-516

A1

S-516

SIM

S-513

A7TYP

'-0

'-0

8' -4

'-8

'-0

'-0

'-0

'-0

A E

S S

A E

S S

A E

S S

A E

S S

W

X26

W 16X26

W14X22 W14X22 W14X22 W14X22

D7

S-510

S-700

E1

'-6

B A

KEY PLAN

C

A

86531

F

G

C

M A

T C

H L

IN

E

0 4'-0" 8'-0" 16'-0"

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

O F

E N

G

IN

E E

R S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

UNCLASSIFIED\\FOR OFFICIAL USE ONLY

UNCLASSIFIED\\FOR OFFICIAL USE ONLY

PROJECT

NORTH

TRUE

NORTH

W D

R -1

-D

-0

J E

S S

IC

A

A N

D E

R S

O N

L A

N G

L E

Y A

F B

V

IR

G

IN

IA

L A

N G

L E

Y A

IR

F

O R

C E

T A

R G

E T

IN

G

F A

C

IL

IT

Y

H D

R

IN

C

W

A S

H

IN

G T

N

B

L V

D S

U

IT

E

A R

L

IN

G T

O N

V

A

MAIN BLDG.

S-103A

IN

T

E R

S T

I T

IA

L L

E V

E L F

R A

M

IN

G P

L A

N

A R

E A

A

J A

C K

K N

A P

P

R A

N D

Y W

A L K

E R

G O

N Z

A L

O K

O O

S A

U

/1

/1

ISSUE FOR CONSTRUCTION

1/8" = 1'-0" A1

INTERSTITIAL LEVEL FRAMING PLAN - AREA A

PLAN NOTES

1. REFER TO ELEVATION SHEETS FOR TOP OF STEEL ELEVATIONS

AT GRID LINES. ALL STEEL TO BE ±(0'-0") FROM REFERENCED

ELEVATIONS AND SLOPE LINEARLY BETWEEN ELEVATIONS AT

GRID LINES.

2. INDICATES SPAN DIRECTION OF STEEL ROOF DECK.

ROOF DECK SHALL BE 1-1/2" X 20 GA TYPE B GALVANIZED

STEEL ROOF DECK.

3. SEE BELOW FOR STEEL FRAMING SYMBOL LEGEND.

4. ALL SHEAR CONNECTIONS TO BE DESIGNED TO MEET MINIMUM SHEAR

CAPACITIES AS SHOWN ON D1/S-210, UNLESS OTHERWISE NOTED

ON PLAN.

5. ALL MOMENT FRAME CONNECTIONS TO BE DESIGNED TO MEET

MINIMUM SHEAR AND FLEXURAL CAPACITIES AS SHOWN ON D4/S-210,

UNLESS OTHERWISE NOTED ON PLAN.

6. BEAMS MARKED WITH * ARE DESIGNED TO SUPPORT ADDITIONAL

POINT LOAD AT ITS MIDSPAN.

MAXIMUM ALLOWABLE HUNG LOAD = 2000LBS

7. UNLESS NOTED OTHERWISE ON PLAN, EXTERIOR CMU WALL

CONSTRUCTION TO BE FULLY GROUTED 8-INCH CMU BLOCK WITH A

MINIMUM OF #5 VERTICAL REINFORCEMENT AT 24"O.C.

8. REFERENCE DRAWINGS:

SEE SHEET S-001 THRU S-003 FOR GENERAL NOTES.

SEE SHEET S-004 THRU S-005 FOR SPECIAL INSPECTIONS.

SEE SHEET S-006 THRU S-009 FOR LOAD PLAN.

SEE SHEET S-201 THRU S-202 FOR PARTIAL PLANS

SEE SHEET S-203 THRU S-205 FOR ELEVATIONS.

SEE SHEET S-206 THRU S-210 FOR SCHEDULES.

SEE SHEET S-301 THRU S-303 FOR CONCRETE FOUNDATION DETAILS.

SEE SHEET S-304 THRU S-309 FOR CONCRETE FRAMING DETAILS.

SEE SHEET S-401 THRU S-402 FOR MASONRY FRAMING DETAILS.

SEE SHEET S-501 THRU S-520 FOR STEEL FRAMING DETAILS.

INDICATES MOMENT

CONNECTION

STEEL FRAMING SYMBOL LEGEND

INDICATES TYPICAL

FRAMING CONNECTION

W16X26 (24) C=3/4"

(-X'-X")

BEAM SIZE

QUANTITY OF HEADED STUDS

UPWARD CAMBER AT MIDSPAN

INDICATES CHANGE IN BEAM

ELEVATION FROM TYPICAL,

INDICATED ON PLAN

R

BEAM REACTION [KIPS]

IS

S

U E

F O

R C

O N

S T

R U

C T

IO

N

S U

B M

IT

T

A L

/1 /1

KEYNOTES

1 BID ALTERNATE #0001A: REMOVE ELEVATOR #1 AND ALL

COORDINATING COMPONENTS. REFER TO S-700.

2 BID ALTERNATE #0001B: REMOVE THE LIFT AT THE LOADING

DOCK AND CORRESPONDING CONCRETE STRUCTURE.

2 3 4 5 6

G

C

E

F

W24X55

AESS 3

W24X55

AESS 3

W24X55

AESS 3

W24X55

AESS 3

W24X55

AESS 3

W24X55

AESS 3

W24X55

AESS 3

W24X55

AESS 3

W24X55

AESS 3

W24X55

AESS 3

W

X

A E

S S

W

X

W

X

C E

LL

U

LA

R

B E

A M

W

X

A E

S S

W

X

W

X

C E

LL

U

LA

R

B E

A M

W

X

A E

S S

W

X

W

X

C E

LL

U

LA

R

B E

A M

W

X

A E

S S

W

X

W

X

C E

LL

U

LA

R

B E

A M

W30X99

W

X

W

X

W

X

A E

S S

W30X99 W30X99

W

X

W

X

W

X

A E

S S

W30X99 W30X99

34'-0" 34'-0" 34'-0" 34'-0" 34'-0"

'-0

'-0

'-0

'-0

M A

T C

H L

E : A

1/ S

-1

A

MATCHLINE

SEE: A1/S-103C

W27X84 W27X84 W27X84 W27X84

WITH C12X20.7 TOP AND BOTTOMW27X84

W16X40

W

X

W

X26

AESS 3

W 16X26

AESS 3

W 16X26

AESS 3 W

X26

AESS 3

W16X26

AESS 3

W16X26

AESS 3

W

X

A E

S S

W

X26

AESS 3

W 16X26

AESS 3

W 16X26

AESS 3 W

X26

AESS 3

W16X26

AESS 3

W16X26

AESS 3

W

X

A E

S S

W

X26 W

16X26

W 16X26 W

X26

W16X26W16X26

W

X

W

X26

AESS 3

W 16X26

AESS 3

W 16X26

AESS 3 W

X26

AESS 3

W16X26

AESS 3

W16X26

AESS 3

W

X

A E

S S

W

X26 W

16X26

W 16X26 W

X26

W16X26W16X26

W

X

W

X26

AESS 3

W 16X26

AESS 3

W 16X26

AESS 3 W

X26

AESS 3

W16X26

AESS 3

W16X26

AESS 3

W

X

A E

S S

W

X26 W

16X26

W 16X26 W

X26

W16X26W16X26

W

X

W

X26

AESS 3

W 16X26

AESS 3

W 16X26

AESS 3 W

X26

AESS 3

W16X26

AESS 3

W16X26

AESS 3

W

X

A E

S S

W

X26 W

16X26

W 16X26 W

X26

W16X26W16X26

W

X

W 16X26

W

X26

W

X26

W

X

W

X

W 16X26

W12X16

W

X

W 16X

A1

S-518

W24X55W24X55W24X55W24X55W24X55

A1

S-510

A1

S-510

3' -6

A1

S-518

A1

S-518

A1

S-518

A4

S-514

A4

S-514

A4

S-516

A1

S-516

C1

S-513

1'-0" TYP

S-513

A7 TYP

A E

S S

A E

S S

A E

S S

A E

S S

A E

S S

A7

S-516

PROVIDE FULLY GROUTED 8-INCH

CMU BLOCK WITH #6 VERTICAL

BARS AT 16"O.C. BETWEEN GRIDS

1 AND 3 ALONG GRID C ONLY

W 16X26

W

X26

W14X22 W14X22 W14X22 W14X22

D7

S-510

B A

KEY PLAN

C

A

86531

F

G

C

M A

T C

H L

IN

E

0 4'-0" 8'-0" 16'-0"

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R

E N

G

IN

E E

R S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

UNCLASSIFIED\\FOR OFFICIAL USE ONLY

UNCLASSIFIED\\FOR OFFICIAL USE ONLY

PROJECT

NORTH

TRUE

NORTH

W D

R -1

-D

-0

J E

S S

IC

A

A N

D E

R S

O N

L A

N G

L E

Y A

F B

V

IR

G

IN

IA

L A

N G

L E

Y A

IR

F

O R

C E

T A

R G

E T

IN

G

F A

C

IL

IT

Y

H D

R

IN

C

W

A S

H

IN

G T

V

D S

U

IT

E

A R

L

IN

G T

O N

V

A

MAIN BLDG.

S-103B

IN

T

E R

S T

I T

IA

L L

E V

E L F

R A

M

IN

G P

L A

N

A R

E A

B

J A

C K

K N

A P

P

R A

N D

Y W

A L K

E R

G O

N Z

A L

O K

O O

S A

U

/1

/1

ISSUE FOR CONSTRUCTION

1/8" = 1'-0" A1

INTERSTITIAL LEVEL FRAMING PLAN - AREA B

PLAN NOTES

1. REFER TO ELEVATION SHEETS FOR TOP OF STEEL ELEVATIONS

AT GRID LINES. ALL STEEL TO BE ±(0'-0") FROM REFERENCED

ELEVATIONS AND SLOPE LINEARLY BETWEEN ELEVATIONS AT

GRID LINES.

2. INDICATES SPAN DIRECTION OF STEEL ROOF DECK.

ROOF DECK SHALL BE 1-1/2" X 20 GA TYPE B GALVANIZED

STEEL ROOF DECK.

3. SEE BELOW FOR STEEL FRAMING SYMBOL LEGEND.

4. ALL SHEAR CONNECTIONS TO BE DESIGNED TO MEET MINIMUM SHEAR

CAPACITIES AS SHOWN ON D1/S-210, UNLESS OTHERWISE NOTED

ON PLAN.

5. ALL MOMENT FRAME CONNECTIONS TO BE DESIGNED TO MEET

MINIMUM SHEAR AND FLEXURAL CAPACITIES AS SHOWN ON D4/S-210,

UNLESS OTHERWISE NOTED ON PLAN.

6. BEAMS MARKED WITH * ARE DESIGNED TO SUPPORT ADDITIONAL

POINT LOAD AT ITS MIDSPAN.

MAXIMUM ALLOWABLE HUNG LOAD = 2000LBS

7. UNLESS NOTED OTHERWISE ON PLAN, EXTERIOR CMU WALL

CONSTRUCTION TO BE FULLY GROUTED 8-INCH CMU BLOCK WITH A

MINIMUM OF #5 VERTICAL REINFORCEMENT AT 24"O.C.

8. REFERENCE DRAWINGS:

SEE SHEET S-001 THRU S-003 FOR GENERAL NOTES.

SEE SHEET S-004 THRU S-005 FOR SPECIAL INSPECTIONS.

SEE SHEET S-006 THRU S-009 FOR LOAD PLAN.

SEE SHEET S-201 THRU S-202 FOR PARTIAL PLANS

SEE SHEET S-203 THRU S-205 FOR ELEVATIONS.

SEE SHEET S-206 THRU S-210 FOR SCHEDULES.

SEE SHEET S-301 THRU S-303 FOR CONCRETE FOUNDATION DETAILS.

SEE SHEET S-304 THRU S-309 FOR CONCRETE FRAMING DETAILS.

SEE SHEET S-401 THRU S-402 FOR MASONRY FRAMING DETAILS.

SEE SHEET S-501 THRU S-520 FOR STEEL FRAMING DETAILS.

INDICATES MOMENT

CONNECTION

STEEL FRAMING SYMBOL LEGEND

INDICATES TYPICAL

FRAMING CONNECTION

W16X26 (24) C=3/4"

(-X'-X")

BEAM SIZE

QUANTITY OF HEADED STUDS

UPWARD CAMBER AT MIDSPAN

INDICATES CHANGE IN BEAM

ELEVATION FROM TYPICAL,

INDICATED ON PLAN

R

BEAM REACTION [KIPS]

IS

S

U E

F O

R C

O N

S T

R U

C T

IO

N

S U

B M

IT

T

A L

/1 /1

3 4 5 6 7 8

A

C

B

B.5

34'-0" 34'-0" 34'-0" 34'-0" 34'-0"

MATCHLINE

SEE: A1/S-103A

W

X

W

X

W

X

W

X

W

X

W

X

W

X

W

X

W

X

W

X

W

X

W

X

W27X84 W27X84 W27X84 W27X84 W27X84

W21X68 W21X68 W21X68 W21X68

W

X

W

X

W

X

W

X

W

X

W

X

W

X

W

X

W

X

W

X

K

K

K

K

K

W

X

W

X

W

X

W

X

W

X

W

X

W

X

W

X

W

X

W

X

K

K

K

K

K

W

X

W

X

W

X

W

X

W

X

W30X99 W30X99 W30X99 W30X99

SEE

NOTE 2

W30X99

W

X

W

X

W30X99

W

X

W

X

W30X99

W12X35 W12X35

W

X

W

X

W

X

W

X

W

X

W

X

W

X

W

X

W

X

W

X

W

X

W

X

W

X

W

X 45 W12X45W12X45

W12X35 W12X35

W

X

W

X

W

X

W

X

W10X12

W10X12

W10X12

W12X45 W12X45

W10X12

W10X12

W10X12

W10X12

W10X12

W10X12

W10X12

4' -4

W10X12

S-201

A1

5' -5

/8

5'

-5

/8

5' -5

/8

5'

-5

/8

5' -5

/8

2'

-7

/8

W16X36

W16X36

W16X36

W16X36

W16X36

W

X

W

X

W

X

W

X

W

X

W 10X

W 10X

W 10X

W 10X

W 10X

W10X12

W10X12

W10X12

W30X99

W16X36

W16X36

W16X36

W16X36

W16X36

W

X

W

X

W

X

W

X

W

X

W 10X

W 10X

W 10X

W 10X

W 10X

W10X12

W10X12

W10X12

W30X99W30X99W30X99

W16X36

W16X36

W16X36

W16X36

W16X36

W

X

W

X

W

X

W

X

W

X

W 10X

W 10X

W 10X

W 10X

W 10X

W10X12

W10X12

W10X12

S

T E

S

T E

S

T E

A4

S-513

(2)C4X5.4

(TYP)

A4

S-516

A1

S-516

D1

S-512

W10X12

A4

S-516

A1

S-516

D1

S-512

'-0

'-0

'-0

W10X12

W10X12

W10X12

W10X12

W10X12

W10X12

W10X12

W10X12

W10X12

T Y

P

5' -0

T Y

P

5' -0

D1

S-514

D1

S-514

A E

S S

A E

S S

A E

S S

A E

S S

A E

S S

A E

S S

W21X68

B A

KEY PLAN

C

A

86531

F

G

C

M A

T C

H L

IN

E

0 4'-0" 8'-0" 16'-0"

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R

E N

G

IN

E E

R S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

UNCLASSIFIED\\FOR OFFICIAL USE ONLY

UNCLASSIFIED\\FOR OFFICIAL USE ONLY

PROJECT

NORTH

TRUE

NORTH

W D

R -1

-D

-0

J E

S S

IC

A

A N

D E

R S

O N

L A

N G

L E

Y A

F B

V

IR

G

IN

IA

L A

N G

L E

Y A

IR

F

O R

C E

T A

R G

E T

IN

G

F A

C

IL

IT

Y

H D

R

IN

C

W

A S

H

IN

G T

V

D S

U

IT

E

A R

L

IN

G T

O N

V

A

MAIN BLDG.

S-103C

L O

W R

O O

F F

R A

M

IN

G P

L A

N

A R

E A

C

J A

C K

K N

A P

P

R A

N D

Y W

A L K

E R

G O

N Z

A L

O K

O O

S A

U

/1

/1

ISSUE FOR CONSTRUCTION

1/8" = 1'-0" A1

INTERSTITIAL LEVEL FRAMING PLAN - AREA C

PLAN NOTES

1. REFER TO ELEVATION SHEETS FOR TOP OF STEEL ELEVATIONS

AT GRID LINES. ALL STEEL TO BE ±(0'-0") FROM REFERENCED

ELEVATIONS AND SLOPE LINEARLY BETWEEN ELEVATIONS AT

GRID LINES.

2. INDICATES SPAN DIRECTION OF STEEL ROOF DECK.

ROOF DECK SHALL BE 1-1/2" X 20 GA TYPE B GALVANIZED

STEEL ROOF DECK.

3. SEE BELOW FOR STEEL FRAMING SYMBOL LEGEND.

4. ALL SHEAR CONNECTIONS TO BE DESIGNED TO MEET MINIMUM SHEAR

CAPACITIES AS SHOWN ON D1/S-210, UNLESS OTHERWISE NOTED

ON PLAN.

5. ALL MOMENT FRAME CONNECTIONS TO BE DESIGNED TO MEET

MINIMUM SHEAR AND FLEXURAL CAPACITIES AS SHOWN ON D4/S-210,

UNLESS OTHERWISE NOTED ON PLAN.

6. BEAMS MARKED WITH * ARE DESIGNED TO SUPPORT ADDITIONAL

POINT LOAD AT ITS MIDSPAN.

MAXIMUM ALLOWABLE HUNG LOAD = 2000LBS

7. UNLESS NOTED OTHERWISE ON PLAN, EXTERIOR CMU WALL

CONSTRUCTION TO BE FULLY GROUTED 8-INCH CMU BLOCK WITH A

MINIMUM OF #5 VERTICAL REINFORCEMENT AT 24"O.C.

8. REFERENCE DRAWINGS:

SEE SHEET S-001 THRU S-003 FOR GENERAL NOTES.

SEE SHEET S-004 THRU S-005 FOR SPECIAL INSPECTIONS.

SEE SHEET S-006 THRU S-009 FOR LOAD PLAN.

SEE SHEET S-201 THRU S-202 FOR PARTIAL PLANS

SEE SHEET S-203 THRU S-205 FOR ELEVATIONS.

SEE SHEET S-206 THRU S-210 FOR SCHEDULES.

SEE SHEET S-301 THRU S-303 FOR CONCRETE FOUNDATION DETAILS.

SEE SHEET S-304 THRU S-309 FOR CONCRETE FRAMING DETAILS.

SEE SHEET S-401 THRU S-402 FOR MASONRY FRAMING DETAILS.

SEE SHEET S-501 THRU S-520 FOR STEEL FRAMING DETAILS.

INDICATES MOMENT

CONNECTION

STEEL FRAMING SYMBOL LEGEND

INDICATES TYPICAL

FRAMING CONNECTION

W16X26 (24) C=3/4"

(-X'-X")

BEAM SIZE

QUANTITY OF HEADED STUDS

UPWARD CAMBER AT MIDSPAN

INDICATES CHANGE IN BEAM

ELEVATION FROM TYPICAL,

INDICATED ON PLAN

R

BEAM REACTION [KIPS]

IS

S

U E

F O

R C

O N

S T

R U

C T

IO

N

S U

B M

IT

T

A L

/1

6 7 8 9 10

G

C

E

F

W

X

W

X

W

X

W

X

W

X

W

X

W

X

W

X

W21X68 W21X68 W21X68 W21X68

W21X68 W21X68 W21X68 W21X68

W21X68 W21X68 W21X68 W21X68

W30X99 W30X99 W30X99 W30X99

W30X99 W30X99 W30X99

K

K

K

W

X

K

K

K

W

X

K

K

K

K

K

K

K

K

K

K

W

X

K

K

K

W

X

K

K

K

K

K

W

X

K

K

K

W

X

K

K

K

K

K

K

K

K

K

K

W

X

K

K

K

W

X

K

K

34'-0" 34'-0" 34'-0" 34'-0"

'-0

'-0

'-0

'-0

M A

T C

H L

E : A

1/ S

-1

B

D.3

W

X

K

IN

K E

D

W

X

K

IN

K E

D

W

X

K

IN

K E

D

W

X

K

IN

K E

D

W21X44 W21X44 W21X44 W21X44

K

K

K

K

K

W

X

W

X

W

X

W

X

W

X

K

K

K

K

K

W

X

W

X

W

X

W

X

W

X

K

K

K

K

K

W

X

W

X

W

X

W

X

W

X

K

K

K

K

K

W

X

W

X

W

X

W

X

W

X

W

X

S

T E

SEE

NOTE 2

SEE

NOTE 2

W

X

W12X35

W

X

W

X

W

X

W

X

W

X

W12X35

W

X

W

X

W

X

W

X

W

X

W10X12

W12X26

W

X

K

IN

K E

D W

X

W10X12

W10X12

W12X45

W

X

W10X12

W10X12

W12X45

W

X

W

X

W12X45

W12X45

W12X45

W12X26

W

X

W

X

W

X

W

X

W

X

W

X

W12X35 W

X

W

X

W

X

W

X

W

X

W

X

W12X35 W

X

W

X

W

X

W

X

W

X

W12X35 W

X

W

X

W

X

W

X

W

X

W

X

W

X

W

X

W12X35

5' -5

/8

5'

-5

/8

5' -5

/8

5'

-5

/8

5' -5

/8

5'

-8

W

X 99 W

X

W 10X

W 10X

W 10X

W 10X

W 10X

W

X

W

X

W

X

W

X

W16X36

W16X36

W16X36

W16X36

W16X36

W

X

W

X

W

X

W

X

W

X

W

X

W

X

W30X99

W 10X

W 10X

W 10X

W 10X

W 10X

W

X

W

X

W

X

W16X36

W16X36

W16X36

W16X36

W16X36

W

X

W

X

W

X

W

X

W

X

W

X

W

X

S-201

A6

S

T E

W

X

A1

S-513

TYP

A1

S-512

A4

S-512

D1

S-511

A4

S-516 A1

S-516

A5

S-511

A1

S-511

D4

S-512

W10X12

W10X12

5' -1

5'

-1

5' -1

5'

-1

4' -4

4'

-2

4' -2

5'

-2

5' -2

4'

-1 0"

4' -1

0"

W10X12

W10X12

W10X12

W10X12

W10X12

W10X12

W10X12

W10X12

W12X26

W10X12

D1

S-514

W

X

W

X

W

X

W 10X

W

X

OPP

OPP

W

X

W 10X

B A

KEY PLAN

C

A

86531

F

G

C

M A

T C

H L

IN

E

0 4'-0" 8'-0" 16'-0"

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R

E N

G

IN

E E

R S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

UNCLASSIFIED\\FOR OFFICIAL USE ONLY

UNCLASSIFIED\\FOR OFFICIAL USE ONLY

PROJECT

NORTH

TRUE

NORTH

W D

R -1

-D

-0

J E

S S

IC

A

A N

D E

R S

O N

L A

N G

L E

Y A

F B

V

IR

G

IN

IA

L A

N G

L E

Y A

IR

F

O R

C E

T A

R G

E T

IN

G

F A

C

IL

IT

Y

H D

R

IN

C

W

A S

H

IN

G T

V

D S

U

IT

E

A R

L

IN

G T

O N

V

A

MAIN BLDG.

S-104A

R O

O F

F R

A M

IN

G

P L A

N

A R

E A

A

J A

C K

K N

A P

P

R A

N D

Y W

A L K

E R

G O

N Z

A L

O K

O O

S A

U

/1

/1

ISSUE FOR CONSTRUCTION

1/8" = 1'-0" A1

ROOF FRAMING PLAN - AREA A

PLAN NOTES

1. REFER TO ELEVATION SHEETS FOR TOP OF STEEL ELEVATIONS

AT GRID LINES. ALL STEEL TO BE ±(0'-0") FROM REFERENCED

ELEVATIONS AND SLOPE LINEARLY BETWEEN ELEVATIONS AT

GRID LINES.

2. INDICATES SPAN DIRECTION OF STEEL ROOF DECK.

ROOF DECK SHALL BE 1-1/2" X 20 GA TYPE B GALVANIZED

STEEL ROOF DECK.

3. SEE BELOW FOR STEEL FRAMING SYMBOL LEGEND.

4. ALL SHEAR CONNECTIONS TO BE DESIGNED TO MEET MINIMUM SHEAR

CAPACITIES AS SHOWN ON D1/S-210, UNLESS OTHERWISE NOTED

ON PLAN.

5. ALL MOMENT FRAME CONNECTIONS TO BE DESIGNED TO MEET

MINIMUM SHEAR AND FLEXURAL CAPACITIES AS SHOWN ON D4/S-210,

UNLESS OTHERWISE NOTED ON PLAN.

6. BEAMS MARKED WITH * ARE DESIGNED TO SUPPORT ADDITIONAL

POINT LOAD AT ITS MIDSPAN.

MAXIMUM ALLOWABLE HUNG LOAD = 2000LBS

7. ALL ROOF BEAMS PARALLEL TO PROJECT NORTH-SOUTH TO BE DROPPED

-(4-1/2") FROM TOP OF STEEL ELEVATIONS.

8. UNLESS NOTED OTHERWISE ON PLAN, EXTERIOR CMU WALL

CONSTRUCTION TO BE FULLY GROUTED 8-INCH CMU BLOCK WITH A

MINIMUM OF #5 VERTICAL REINFORCEMENT AT 24"O.C.

9. REFERENCE DRAWINGS:

SEE SHEET S-001 THRU S-003 FOR GENERAL NOTES.

SEE SHEET S-004 THRU S-005 FOR SPECIAL INSPECTIONS.

SEE SHEET S-006 THRU S-009 FOR LOAD PLAN.

SEE SHEET S-201 THRU S-202 FOR PARTIAL PLANS

SEE SHEET S-203 THRU S-205 FOR ELEVATIONS.

SEE SHEET S-206 THRU S-210 FOR SCHEDULES.

SEE SHEET S-301 THRU S-303 FOR CONCRETE FOUNDATION DETAILS.

SEE SHEET S-304 THRU S-309 FOR CONCRETE FRAMING DETAILS.

SEE SHEET S-401 THRU S-402 FOR MASONRY FRAMING DETAILS.

SEE SHEET S-501 THRU S-520 FOR STEEL FRAMING DETAILS.

INDICATES MOMENT

CONNECTION

STEEL FRAMING SYMBOL LEGEND

INDICATES TYPICAL

FRAMING CONNECTION

W16X26 (24) C=3/4"

(-X'-X")

BEAM SIZE

QUANTITY OF HEADED STUDS

UPWARD CAMBER AT MIDSPAN

INDICATES CHANGE IN BEAM

ELEVATION FROM TYPICAL,

INDICATED ON PLAN

R

BEAM REACTION [KIPS]

IS

S

U E

F O

R C

O N

S T

R U

C T

IO

N

S U

B M

IT

T

A L

/1

2 3 4 5 6

G

C

E

F

W

X

W

X

W

X

W

X

W

X

W

X

W

X

W

X

W

X

W

X

W

X

K

IN

K E

D W

X

W

X

W21X68

W21X68 W21X68 W21X68 W21X68 W21X68

W21X68 W21X68 W21X68 W21X68

W21X68 W21X68 W21X68 W21X68W21X68

W

X

W

X

W

X

W

X

W

X

W

X

W30X99 W30X99 W30X99 W30X99 W30X99

W30X99 W30X99 W30X99

K

K

K

K

K

K

K

K

W

X

K

K

K

W

X

K

K

K

K

K

W

X

K

K

K

W

X

K

K

K

K

K

K

K

K

K

K

W

X

K

K

K

W

X

K

K

K

K

K

W

X

K

K

K

W

X

K

K

K

K

K

K

K

K

K

K

W

X

K

K

K

W

X

K

K

34'-0" 34'-0" 34'-0" 34'-0" 34'-0"

'-0

'-0

'-0

'-0

M A

T C

H L

E : A

1/ S

-1

A

W

X

K

IN

K E

D

W

X

K

IN

K E

D

W

X

K

IN

K E

D

W

X

K

IN

K E

D

W

X

K

IN

K E

D

W21X44 W21X44 W21X44 W21X44 W21X44

K

K

K

K

K

W

X

W

X

W

X

W

X

W

X

K

K

K

K

K

W

X

W

X

W

X

W

X

W

X

K

K

K

K

K

W

X

W

X

W

X

W

X

W

X

K

K

K

K

K

W

X

W

X

W

X

W

X

W

X

K

K

K

K

K

W

X

W

X

W

X

W

X

W

X

SEE

NOTE 2

SEE

NOTE 2

D1

S-511

W12X35

W

X

W

X

W

X

W

X

W

X

W12X35

W

X

W

X

W

X

W

X

W

X

W12X35

W

X

W

X

W

X

W

X

W

X

W10X12

W10X12

W

X

K

IN

K E

D W

X

W10X12

W10X12

W12X45

W

X

W10X12

W10X12

W12X45

W12X45

W12X45

W12X45

W10X12

W

X

W

X

W

X

W

X

W

X

W

X

W

X

W

X

W

X

W12X35 W

X

W

X

W

X

W

X

W

X

W12X35 W

X

W

X

W

X

W

X

W

X

W12X35 W

X

W

X

W

X

W

X

W

X

W12X35

W

X

W

X

W

X

W

X

W

X

W

X

W12X35

W

X

S-201

A6

W30X99

W 10X

W 10X

W 10X

W 10X

W 10X

W

X

W

X

W

X

W16X36

W16X36

W16X36

W16X36

W16X36

W

X

W

X

W

X

W

X

W

X

W

X

W

X

W30X99

W 10X

W 10X

W 10X

W 10X

W 10X

W

X

W

X

W

X

W16X36

W16X36

W16X36

W16X36

W16X36

W

X

W

X

W

X

W

X

W

X

W

X

W

X

S

T E

S

T E

W

X

W

X

W

X

A1

S-513

TYP

A4

S-512

A1

S-512

A1

S-511

A5

S-511

D4

S-512

W10X12

W10X12

W10X12

W10X12

W10X12

W10X12

4' -2

4'

-2

4' -1

1/

4" 4'

-1

1/ 4"

4' -1

1/

4" 4'

-1

1/ 4"

4' -1

1/

4"

W10X12

W10X12

W10X12

W10X12

W10X12

W10X12

D1

S-514

W

X

W

X

W 10X

W

X

W

X

W

X

W 10X

W

X

W

X

W

X

W 10X

A7

S-516

B A

KEY PLAN

C

A

86531

F

G

C

M A

T C

H L

IN

E

0 4'-0" 8'-0" 16'-0"

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R

E N

G

IN

E E

R S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

UNCLASSIFIED\\FOR OFFICIAL USE ONLY

UNCLASSIFIED\\FOR OFFICIAL USE ONLY

PROJECT

NORTH

TRUE

NORTH

W D

R -1

-D

-0

J E

S S

IC

A

A N

D E

R S

O N

L A

N G

L E

Y A

F B

V

IR

G

IN

IA

L A

N G

L E

Y A

IR

F

O R

C E

T A

R G

E T

IN

G

F A

C

IL

IT

Y

H D

R

IN

C

W

A S

H

IN

G T

V

D S

U

IT

E

A R

L

IN

G T

O N

V

A

MAIN BLDG.

S-104B

R O

O F

F R

A M

IN

G

P L A

N

A R

E A

B

J A

C K

K N

A P

P

R A

N D

Y W

A L K

E R

G O

N Z

A L

O K

O O

S A

U

/1

/1

ISSUE FOR CONSTRUCTION

1/8" = 1'-0" A1

ROOF FRAMING PLAN - AREA B

PLAN NOTES

1. REFER TO ELEVATION SHEETS FOR TOP OF STEEL ELEVATIONS

AT GRID LINES. ALL STEEL TO BE ±(0'-0") FROM REFERENCED

ELEVATIONS AND SLOPE LINEARLY BETWEEN ELEVATIONS AT

GRID LINES.

2. INDICATES SPAN DIRECTION OF STEEL ROOF DECK.

ROOF DECK SHALL BE 1-1/2" X 20 GA TYPE B GALVANIZED

STEEL ROOF DECK.

3. SEE BELOW FOR STEEL FRAMING SYMBOL LEGEND.

4. ALL SHEAR CONNECTIONS TO BE DESIGNED TO MEET MINIMUM SHEAR

CAPACITIES AS SHOWN ON D1/S-210, UNLESS OTHERWISE NOTED

ON PLAN.

5. ALL MOMENT FRAME CONNECTIONS TO BE DESIGNED TO MEET

MINIMUM SHEAR AND FLEXURAL CAPACITIES AS SHOWN ON D4/S-210,

UNLESS OTHERWISE NOTED ON PLAN.

6. BEAMS MARKED WITH * ARE DESIGNED TO SUPPORT ADDITIONAL

POINT LOAD AT ITS MIDSPAN.

MAXIMUM ALLOWABLE HUNG LOAD = 2000LBS

7. ALL ROOF BEAMS PARALLEL TO PROJECT NORTH-SOUTH TO BE DROPPED

-(4-1/2") FROM TOP OF STEEL ELEVATIONS.

8. UNLESS NOTED OTHERWISE ON PLAN, EXTERIOR CMU WALL

CONSTRUCTION TO BE FULLY GROUTED 8-INCH CMU BLOCK WITH A

MINIMUM OF #5 VERTICAL REINFORCEMENT AT 24"O.C.

9. REFERENCE DRAWINGS:

SEE SHEET S-001 THRU S-003 FOR GENERAL NOTES.

SEE SHEET S-004 THRU S-005 FOR SPECIAL INSPECTIONS.

SEE SHEET S-006 THRU S-009 FOR LOAD PLAN.

SEE SHEET S-201 THRU S-202 FOR PARTIAL PLANS

SEE SHEET S-203 THRU S-205 FOR ELEVATIONS.

SEE SHEET S-206 THRU S-210 FOR SCHEDULES.

SEE SHEET S-301 THRU S-303 FOR CONCRETE FOUNDATION DETAILS.

SEE SHEET S-304 THRU S-309 FOR CONCRETE FRAMING DETAILS.

SEE SHEET S-401 THRU S-402 FOR MASONRY FRAMING DETAILS.

SEE SHEET S-501 THRU S-520 FOR STEEL FRAMING DETAILS.

INDICATES MOMENT

CONNECTION

STEEL FRAMING SYMBOL LEGEND

INDICATES TYPICAL

FRAMING CONNECTION

W16X26 (24) C=3/4"

(-X'-X")

BEAM SIZE

QUANTITY OF HEADED STUDS

UPWARD CAMBER AT MIDSPAN

INDICATES CHANGE IN BEAM

ELEVATION FROM TYPICAL,

INDICATED ON PLAN

R

BEAM REACTION [KIPS]

IS

S

U E

F O

R C

O N

S T

R U

C T

IO

N

S U

B M

IT

T

A L

/1

4 5

G

F

17'-0" 17'-0"

34'-0"

W12X35

W12X22

W12X19

W12X16

W12X14

W12X14

W8X15 POST DOWN

W8X15 POST DOWN

W8X15 POST DOWN

/8

/8

/8

/8

/8

A1

S-519

C1

S-519

F1

S-519

TYP

W8X15 POST DOWN

N O

T E

S -1

A

SLOPE DOWN SLOPE DOWN

WP EL = 39'-8 3/8"

WP EL = 39'-8 3/8"

W X

W X

W X

W X

W X

W X

TYP

1'-0"

BENT

BENT

BENT

BENT

BENT

BENT

5 6

A

B

W12X14

W12X16

W12X16

W12X19

W12X22

W12X35

W8X15 POST DOWN

A1

S-519

C1

S-519

W8X15 POST DOWN

W8X15 POST DOWN

W8X15 POST DOWN

F1

S-519

/8

/8

/8

/8

/2

17'-0" 17'-0"

34'-0"

W X

W X

W X

W X

W X

W X

N O

T E

S -1

A

SLOPE DOWN SLOPE DOWN

WP EL = 29'-0 3/4"

WP EL = 29'-0 3/4"TYP

1'-0"

BENT

BENT

BENT

BENT

BENT

BENT

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R

E N

G

IN

E E

R S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

UNCLASSIFIED\\FOR OFFICIAL USE ONLY

UNCLASSIFIED\\FOR OFFICIAL USE ONLY

W D

R -1

-D

-0

J E

S S

IC

A

A N

D E

R S

O N

L A

N G

L E

Y A

F B

V

IR

G

IN

IA

L A

N G

L E

Y A

IR

F

O R

C E

T A

R G

E T

IN

G

F A

C

IL

IT

Y

H D

R

IN

C

W

A S

H

IN

G T

V

D S

U

IT

E

A R

L

IN

G T

O N

V

A

MAIN BLDG.

S-201

P A

R T

IA

L

F R

A M

IN

G

P L A

N S

J A

C K

K N

A P

P

R A

N D

Y W

A L K

E R

G O

N Z

A L

O K

O O

S A

U

/1

/1

ISSUE FOR CONSTRUCTION

1/4" = 1'-0" A6

PARTIAL FRAMING PLAN - HIGH ROOF GABLE

1/4" = 1'-0"

A1

PARTIAL FRAMING PLAN - LOW ROOF GABLE

IS

S

U E

F O

R C

O N

S T

R U

C T

IO

N

S U

B M

IT

T

A L

/1

GENERATOR,

COORDINATE WITH

ELECTRICAL

W16X26

W12X14 W12X14

W

X

W

X

W12X14 W12X14

W16X26

W

X

W

X

W8X31

COOLING TOWER,

COORDINATE WITH MECH

B33

B33

B

B

8" SLAB

SEE NOTE 3

8'-6" 1'-0" 8'-6"

4' -4

/2

9'

-4

4' -4

32'-0" 3'-7"

B

B

B

TOP OF SLAB

+(0'-4")

F8

S-309

TOP OF STEEL

+(5'-0")

ALL DUNNAGE STEEL

TO BE GALVANIZED

PC1

PC1

PC1

PC1

PC1 PC1

PC1PC1

P6 P6

P6P6P6

P6P6

P6

27'-10" 6'-3" 18'-0" 7'

-9

'-0

/2

S-307

C7

TYP AT COOLING

TOWER DUNNAGE

TOP OF SLAB

-0'-0 3/4"

TOP OF SLAB

-1'-0 1/2"

0" 2'-0" 8'-2" 4" 2'-8 1/4"

1 1/2"

1' -0

0" 2'

-0

8' -2

2'

-0

0"

TOP OF SLAB

-0'-0 3/4"

12" SLAB

A1

S-310

8 1/4"

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R

E N

G

IN

E E

R S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

UNCLASSIFIED\\FOR OFFICIAL USE ONLY

UNCLASSIFIED\\FOR OFFICIAL USE ONLY

W D

R -1

-D

-0

J E

S S

IC

A

A N

D E

R S

O N

L A

N G

L E

Y A

F B

V

IR

G

IN

IA

L A

N G

L E

Y A

IR

F

O R

C E

T A

R G

E T

IN

G

F A

C

IL

IT

Y

H D

R

IN

C

W

A S

H

IN

G T

V

D S

U

IT

E

A R

L

IN

G T

O N

V

A

MAIN BLDG.

S-202

P A

R T

IA

L

F R

A M

IN

G

P L A

N S

J A

C K

K N

A P

P

R A

N D

Y W

A L K

E R

G O

N Z

A L

O K

O O

S A

U

/1

/1

ISSUE FOR CONSTRUCTION

1/4" = 1'-0" A1

PARTIAL FRAMING PLAN - DUNNAGE

1/4" = 1'-0" D1

PARTIAL FOUNDATION PLAN - DUNNAGE

PARTIAL PLAN NOTES

1. TOP OF PILE CAP ELEVATION = +/-(0'-0") AS NOTED ON PLAN.

2. FINISHED SLAB ELEVATION FOR GENERATOR SUPPORT SLAB TO BE

AT ELEVATION +(0'-4").

3. FLOOR CONSTRUCTION FOR GENERATOR SUPPORT SLAB SHALL BE

8" THICK, TWO-WAY STRUCTURAL SLAB ON TOP OF A 15MIL VAPOR

BARRIER AND A MINIMUM OF 6" OF GRANULAR FILL. PROVIDE #5@10"O.C.

EACH WAY, TOP AND BOTTOM.

4. TOP OF STEEL FOR COOLING TOWER SUPPORT DUNNAGE TO BE AT

ELEVATION +(5'-0").

5. ALL SHEAR CONNECTIONS TO BE DESIGNED TO MEET MINIMUM SHEAR

CAPACITIES AS SHOWN ON D1/S-210, UNLESS OTHERWISE NOTED

ON PLAN.

6. ALL MOMENT FRAME CONNECTIONS TO BE DESIGNED TO MEET

MINIMUM SHEAR AND FLEXURAL CAPACITIES AS SHOWN ON D4/S-210,

UNLESS OTHERWISE NOTED ON PLAN.

7. ALL COOLING TOWER SUPPORT DUNNAGE TO BE GALVANIZED.

8. REFERENCE DRAWINGS:

SEE SHEET S-001 THRU S-003 FOR GENERAL NOTES.

SEE SHEET S-004 THRU S-005 FOR SPECIAL INSPECTIONS.

SEE SHEET S-006 THRU S-009 FOR LOAD PLAN.

SEE SHEET S-201 THRU S-202 FOR PARTIAL PLANS

SEE SHEET S-203 THRU S-205 FOR ELEVATIONS.

SEE SHEET S-206 THRU S-210 FOR SCHEDULES.

SEE SHEET S-301 THRU S-303 FOR CONCRETE FOUNDATION DETAILS.

SEE SHEET S-304 THRU S-309 FOR CONCRETE FRAMING DETAILS.

SEE SHEET S-401 THRU S-402 FOR MASONRY FRAMING DETAILS.

SEE SHEET S-501 THRU S-520 FOR STEEL FRAMING DETAILS.

3/8" = 1'-0" A7

PARTIAL FRAMING PLAN - SCISSOR LIFT SLAB

IS

S

U E

F O

R C

O N

S T

R U

C T

IO

N

S U

B M

IT

T

A L

/1 /1

KEYNOTES

1 BID ALTERNATE #0001A: REMOVE ELEVATOR #1 AND ALL

COORDINATING COMPONENTS. REFER TO S-700.

2 BID ALTERNATE #0001B: REMOVE THE LIFT AT THE LOADING

DOCK AND CORRESPONDING CONCRETE STRUCTURE.

SECOND FLOOR

18' - 0"

D GA CB E F

FIRST FLOOR

0"

INTERSTITIAL LEVEL

37' - 2 3/4"

HP ROOF

55' - 6 3/4"

TOP OF PILE CAP

-6' - 0"

8'-4"

21'-0 1/4"

22'-1 1/4"

29'-7 1/4"

48'-4 1/8"

53'-4 1/8" 55'-4 5/8"

49'-3 1/8"

41'-0 1/8"

32'-9 1/8"

31'-8 1/8"

SECOND FLOOR

18' - 0"

D GC E F

FIRST FLOOR

0"

INTERSTITIAL LEVEL

37' - 2 3/4"

HP ROOF

55' - 6 3/4"

TOP OF PILE CAP

-6' - 0"

48'-4 1/8"

53'-4 1/8" 55'-4 3/8"

49'-3 1/8"

41'-0 1/8"

32'-9 1/8"

31'-8 1/8"

47'-4 3/4"

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R

E N

G

IN

E E

R S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

UNCLASSIFIED\\FOR OFFICIAL USE ONLY

UNCLASSIFIED\\FOR OFFICIAL USE ONLY

W D

R -1

-D

-0

J E

S S

IC

A

A N

D E

R S

O N

L A

N G

L E

Y A

F B

V

IR

G

IN

IA

L A

N G

L E

Y A

IR

F

O R

C E

T A

R G

E T

IN

G

F A

C

IL

IT

Y

H D

R

IN

C

W

A S

H

IN

G T

V

D S

U

IT

E

A R

L

IN

G T

O N

V

A

MAIN BLDG.

S-203

E L E

V A

T

IO

N S

J A

C K

K N

A P

P

R A

N D

Y W

A L K

E R

G O

N Z

A L

O K

O O

S A

U

/1

/1

ISSUE FOR CONSTRUCTION

1" = 10'-0" A1

ELEVATION AT GRID 5

1" = 10'-0" D1

ELEVATION AT GRID 2

ELEVATION NOTES

1. TOP OF STEEL TO BE ±(0'-0") FROM REFERENCED

ELEVATIONS AND SLOPE LINEARLY BETWEEN ELEVATIONS AT

GRID LINES.

2. ALL ROOF BEAMS PARALLEL TO PROJECT NORTH-SOUTH TO BE DROPPED

-(4-1/2") FROM TOP OF STEEL ELEVATIONS.

3. REFERENCE DRAWINGS:

SEE SHEET S-001 THRU S-003 FOR GENERAL NOTES.

SEE SHEET S-004 THRU S-005 FOR SPECIAL INSPECTIONS.

SEE SHEET S-006 THRU S-009 FOR LOAD PLAN.

SEE SHEET S-201 THRU S-202 FOR PARTIAL PLANS

SEE SHEET S-203 THRU S-205 FOR ELEVATIONS.

SEE SHEET S-206 THRU S-210 FOR SCHEDULES.

SEE SHEET S-301 THRU S-303 FOR CONCRETE FOUNDATION DETAILS.

SEE SHEET S-304 THRU S-309 FOR CONCRETE FRAMING DETAILS.

SEE SHEET S-401 THRU S-402 FOR MASONRY FRAMING DETAILS.

SEE SHEET S-501 THRU S-520 FOR STEEL FRAMING DETAILS.

IS

S

U E

F O

R C

O N

S T

R U

C T

IO

N

S U

B M

IT

T

A L

/1

D GA CB E F

FIRST FLOOR

0"

INTERSTITIAL LEVEL

37' - 2 3/4"

HP ROOF

55' - 6 3/4"

TOP OF PILE CAP

-6' - 0"

B.5 D.3

2' -6

21'-0 1/4"

22'-1 1/4"

29'-7 1/4"

47'-2 1/2"

48'-4 1/8"

53'-4 1/8" 55'-4 3/8"

49'-3 1/8"

41'-0 1/8"

32'-9 1/8"

31'-8 1/8"

SECOND FLOOR

18' - 0"

D GA CB E F

FIRST FLOOR

0"

INTERSTITIAL LEVEL

37' - 2 3/4"

HP ROOF

55' - 6 3/4"

TOP OF PILE CAP

-6' - 0"

B.5 D.3

24'-5 5/8"

25'-6 5/8"

32'-2 5/8"

27'-6 5/8"

26'-5 5/8"

48'-4 1/8"

53'-4 1/8" 55'-5 1/8"

49'-3 1/8"

40'-11 3/4"

32'-9 1/8"29'-9 5/8"

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R

E N

G

IN

E E

R S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

UNCLASSIFIED\\FOR OFFICIAL USE ONLY

UNCLASSIFIED\\FOR OFFICIAL USE ONLY

W D

R -1

-D

-0

J E

S S

IC

A

A N

D E

R S

O N

L A

N G

L E

Y A

F B

V

IR

G

IN

IA

L A

N G

L E

Y A

IR

F

O R

C E

T A

R G

E T

IN

G

F A

C

IL

IT

Y

H D

R

IN

C

W

A S

H

IN

G T

V

D S

U

IT

E

A R

L

IN

G T

O N

V

A

MAIN BLDG.

S-204

E L E

V A

T

IO

N S

J A

C K

K N

A P

P

R A

N D

Y W

A L K

E R

G O

N Z

A L

O K

O O

S A

U

/1

/1

ISSUE FOR CONSTRUCTION

1" = 10'-0" D1

ELEVATION AT GRID 8

1" = 10'-0" A1

ELEVATION AT GRID 10

ELEVATION NOTES

1. TOP OF STEEL TO BE ±(0'-0") FROM REFERENCED

ELEVATIONS AND SLOPE LINEARLY BETWEEN ELEVATIONS AT

GRID LINES.

2. ALL ROOF BEAMS PARALLEL TO PROJECT NORTH-SOUTH TO BE DROPPED

-(4-1/2") FROM TOP OF STEEL ELEVATIONS.

3. REFERENCE DRAWINGS:

SEE SHEET S-001 THRU S-003 FOR GENERAL NOTES.

SEE SHEET S-004 THRU S-005 FOR SPECIAL INSPECTIONS.

SEE SHEET S-006 THRU S-009 FOR LOAD PLAN.

SEE SHEET S-201 THRU S-202 FOR PARTIAL PLANS

SEE SHEET S-203 THRU S-205 FOR ELEVATIONS.

SEE SHEET S-206 THRU S-210 FOR SCHEDULES.

SEE SHEET S-301 THRU S-303 FOR CONCRETE FOUNDATION DETAILS.

SEE SHEET S-304 THRU S-309 FOR CONCRETE FRAMING DETAILS.

SEE SHEET S-401 THRU S-402 FOR MASONRY FRAMING DETAILS.

SEE SHEET S-501 THRU S-520 FOR STEEL FRAMING DETAILS.

IS

S

U E

F O

R C

O N

S T

R U

C T

IO

N

S U

B M

IT

T

A L

/1

DC

FIRST FLOOR

0"

INTERSTITIAL LEVEL

37' - 2 3/4"

TOP OF PILE CAP

-6' - 0"

B.5 D.3

25'-6 5/8"

29'-3 5/8"

32'-2 1/4"

29'-3 5/8"

27'-6 5/8"

S-510

A3

SIM

S-510

D1

HSS12X8X5/8

HSS12X8X5/8 HSS12X8X5/8

26'-5 1/2"

23'-9"

14'-9 1/2"

12'-8"

SECOND FLOOR

18' - 0"

DC

FIRST FLOOR

0"

INTERSTITIAL LEVEL

37' - 2 3/4"

TOP OF PILE CAP

-6' - 0"

B.5 D.3

HSS12X8X5/8

HSS12X8X5/8

HSS12X8X5/8

S-510

A3

S-510

A3

SIM

29'-3 5/8" 32'-2 1/4"

29'-3 5/8"

28'-10 1/8" 28'-10 1/8"

HSS12X8X5/8

HSS12X8X5/8

S-510

D1

26'-5 1/2"

23'-9"

14'-9 1/2"

12'-8"

SECOND FLOOR

18' - 0"

FIRST FLOOR

0"

S-515

F4

S-515

F1

A1

S-515

W x3

W x3

W x3

W x3

W x3

W x3

W x3

W x3

W x3

W x3

W x3

W x3

W x3

W x3

W x3

W x3

W x3

11 EQ SPACES FOR 34'-0"

S-501

A5

TYP

BOX GIRDER B

BOX GIRDER A

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R

E N

G

IN

E E

R S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

UNCLASSIFIED\\FOR OFFICIAL USE ONLY

UNCLASSIFIED\\FOR OFFICIAL USE ONLY

W D

R -1

-D

-0

J E

S S

IC

A

A N

D E

R S

O N

L A

N G

L E

Y A

F B

V

IR

G

IN

IA

L A

N G

L E

Y A

IR

F

O R

C E

T A

R G

E T

IN

G

F A

C

IL

IT

Y

H D

R

IN

C

W

A S

H

IN

G T

V

D S

U

IT

E

A R

L

IN

G T

O N

V

A

MAIN BLDG.

S-205

E L E

V A

T

IO

N S

J A

C K

K N

A P

P

R A

N D

Y W

A L K

E R

G O

N Z

A L

O K

O O

S A

U

/1

/1

ISSUE FOR CONSTRUCTION

1" = 10'-0" D1

ELEVATION AT GRID 11

1" = 10'-0" A1

ELEVATION AT GRID 12

ELEVATION NOTES

1. TOP OF STEEL TO BE ±(0'-0") FROM REFERENCED

ELEVATIONS AND SLOPE LINEARLY BETWEEN ELEVATIONS AT

GRID LINES.

2. ALL ROOF BEAMS PARALLEL TO PROJECT NORTH-SOUTH TO BE DROPPED

-(4-1/2") FROM TOP OF STEEL ELEVATIONS.

3. REFERENCE DRAWINGS:

SEE SHEET S-001 THRU S-003 FOR GENERAL NOTES.

SEE SHEET S-004 THRU S-005 FOR SPECIAL INSPECTIONS.

SEE SHEET S-006 THRU S-009 FOR LOAD PLAN.

SEE SHEET S-201 THRU S-202 FOR PARTIAL PLANS

SEE SHEET S-203 THRU S-205 FOR ELEVATIONS.

SEE SHEET S-206 THRU S-210 FOR SCHEDULES.

SEE SHEET S-301 THRU S-303 FOR CONCRETE FOUNDATION DETAILS.

SEE SHEET S-304 THRU S-309 FOR CONCRETE FRAMING DETAILS.

SEE SHEET S-401 THRU S-402 FOR MASONRY FRAMING DETAILS.

SEE SHEET S-501 THRU S-520 FOR STEEL FRAMING DETAILS.

1/4" = 1'-0" A5

MONUMENTAL STAIR ELEVATION

IS

S

U E

F O

R C

O N

S T

R U

C T

IO

N

S U

B M

IT

T

A L

/1

MARK

LENGTH WIDTH DEPTH

LONG BARS SHORT BARS

REMARKS

DIMENSIONS

PC3

PC4

PC5

PC6

PC7

PC8

PC9

PC10

PC11

PC12

PC17

REINFORCING

LONG BARS SHORT BARS

TOP BOTTOM

PILE CAP SCHEDULE

SEE DETAIL

7'-6"

9'-6"

12'-0"

12'-0"

12'-0"

12'-0"

16'-6"

16'-6"

16'-6"

22'-0"

7'-6"

9'-6"

7'-6"

10'-9 1/2"

12'-0"

14'-0"

19'-6"

SEE D1/S-301

SEE D3/S-301

SEE D5/S-301

SEE D8/S-301

SEE A1/S-301

SEE A3/S-301

SEE A6/S-301

SEE E1/S-302

SEE E5/S-302

SEE A1/S-302

SEE A5/S-302

32 8#8

38 11#8

42 12#8 18#8

PC1

8#8 8#8 8#8

11#8 11#8 11#8

12#8 18#8

SEE DETAIL 30 8#8 8#8

40 16#8 18#8 16#8 18#8

10'-9 1/2" 42 16#8 18#8 16#8 18#8

46 18#8 18#8 18#8 18#8

10'-9 1/2"

10'-9 1/2"

44 22#8 33#8 22#8 33#8

46 22#8 33#8 22#8 33#8

48 28#8 33#8 28#8 33#8

50 40#9 44#9 40#9 44#9

3'-0" 30 6#83'-0" 6#8 6#8 6#8 SEE F1/S-301

CONCRETE PILE CAP NOTES:

1. REFER TO S-301 AND S-302 FOR PILE CAP DETAILS.

2. REFER TO A1/S-303 FOR TYPICAL PILE CAP SECTION.

3. ALL PILE CAPS TO BE CENTERED ON PIERS UNLESS NOTED OTHERWISE.

4. PILES TO BE PRECAST PRESTRESSED SQUARE CONCRETE PILES WITH A

MINIMUM PILE CAP EMBEDMENT OF 6 INCHES. REFER TO GEOTECHNICAL

REPORT FOR ADDITIONAL REQUIREMENTS.

8#8 8#8

MARK

WIDTH [IN] DEPTH [IN]

REMARKS

DIMENSIONS

P1P1

P2

P3

24 24

24 40

40 40

PIER SCHEDULE

LONGITUDINAL SHEAR TIES

REINFORCING

8#8 #4@12"O.C.

12#9 #4@12"O.C.

16#10P4 #4@12"O.C.

CONCRETE PIER NOTES:

1. REFER TO S-307 FOR PIER DETAILS.

2. ALL PIERS TO BE CENTERED ON COLUMN GRIDS UNLESS OTHERWISE NOTED

OR SHOWN.

3. VERTICAL PIER REINFORCING SHALL BE EQUALLY SPACED ON EACH FACE,

EXCEPT WHERE REQUIRED TO BE ADJUSTED SO AS NOT TO INTERFERE WITH

INTERSECTING BEAM REINFORCING. VERTICAL PIER REINFORCING MAY BE

MOVED WITHIN THE SPECIFIED LIMITATIONS OF ACI 315-04 WITH STANDARD

135 DEGREE HOOK.

4. PROVIDE CLASS "B" LAP SPLICE FOR ALL VERTICAL PIER REINFORCING

INCLUDING AT TOP OF FOOTING.

5. ALL PIER TIES SHALL BE AS SHOWN IN DETAILS AND SHALL HAVE STANDARD

135 DEGREE HOOKS.

6. PIER TIES SHALL BE LOCATED VERTICALLY NO MORE THAN 3 INCHES BELOW

HORIZONTAL REINFORCEMENT IN BEAM OR SLAB. WHERE BEAMS FRAME

FROM FOUR DIRECTIONS INTO A PIER, TIES MAY BE TERMINATED NOT MORE

THAT 3 INCHES BELOW LOWEST REINFORCEMENT OF SHALLOWEST BEAM.

7. PROVIDE HORIZONTAL REINFORCEMENT SPACED AT 3 INCHES MAXIMUM FOR

A MINIMUM OF 12 INCHES AT TOP OF PIER.

30 30 8#10 #4@12"O.C.

P5 40 48 16#11 #4@12"O.C.

SEE A1/S-307

SEE A3/S-307

SEE A5/S-307

SEE A7/S-307

SEE A9/S-307

P6 15 15 8#6 #4@12"O.C.

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R

E N

G

IN

E E

R S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

UNCLASSIFIED\\FOR OFFICIAL USE ONLY

UNCLASSIFIED\\FOR OFFICIAL USE ONLY

W D

R -1

-D

-0

J E

S S

IC

A

A N

D E

R S

O N

L A

N G

L E

Y A

F B

V

IR

G

IN

IA

L A

N G

L E

Y A

IR

F

O R

C E

T A

R G

E T

IN

G

F A

C

IL

IT

Y

H D

R

IN

C

W

A S

H

IN

G T

V

D S

U

IT

E

A R

L

IN

G T

O N

V

A

MAIN BLDG.

S-206

S C

H E

D U

L E

S

C O

N C

R E

T E

F O

U N

D A

T

IO

N S

J A

C K

K N

A P

P

R A

N D

Y W

A L K

E R

G O

N Z

A L

O K

O O

S A

U

/1

/1

ISSUE FOR CONSTRUCTION

3" = 1'-0" A1

PILECAP SCHEDULE

3" = 1'-0" D1

PIER SCHEDULE

IS

S

U E

F O

R C

O N

S T

R U

C T

IO

N

S U

B M

IT

T

A L

/1

LAP CLASS

TOP [IN] OTHER [IN]

WALLS AND SLABS

MINIMUM CONCRETE COVER: 3/4"

MINIMUM CLEAR BAR SPACING: 3"

A 12 12

LAP SPLICE SCHEDULE FOR UNCOATED GRADE 60 BARS

LAP SPLICE SCHEDULE NOTES:

1. TABULATED VALUES ARE BASED ON 4000PSI NORMAL WEIGHT CONCRETE.

FOR LIGHTWEIGHT CONCRETE, MULTIPLY THE TABULATED VALUES BY 1.3.

FOR CONCRETE STRENGTHS OTHER THAN f'c = 4000PSI, MULTIPLY VALUES BY

63.25 DIVIDED BY THE SQUARE ROOT f'c.

2. TABULATED VALUES ARE BASED ON SPECIFIED CLEAR COVER TO BAR AND

CLEAR BAR SPACINGS. FOR OTHER CONDITIONS PROVIDE DEVELOPEMENT

LENGTH AND LAP SPLICE IN ACCORDANCE WITH ACI 318.

3. TOP BARS ARE HORIZONTAL BARS WITH MORE THAN 12" OF CONCRETE CAST

BELOW THE BAR.

4. USE CLASS "B" LAP SPLICE UNLESS NOTED OTHERWISE.

5. DEVELOPMENT LENGTH, Ld, IS EQUAL TO THE CLASS "A" LAP DIMENSION.

BAR SIZE

#3

COLUMNS, BEAMS, WALLS, SLABS

MINIMUM CONCRETE COVER: 1-1/2"

MINIMUM CLEAR BAR SPACING: 1"

TOP [IN] OTHER [IN]

16 12

B

A

#4

B

A

#5

B

A

#6

B

A

#7

B

A

#8

B

A

#9

B

A

#10

B

A

#11

B

15 12 20 16

19 15 25 19

25 19 33 25

28 21 36 28

36 28 47 36

37 29 48 37

49 37 62 48

48 37 61 47

63 48 79 61

60 46 74 57

77 60 97 74

72 56 84 65

94 72 109 84

87 67 94 73

113 87 123 94

102 78 105 81

132 102 136 105

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R

E N

G

IN

E E

R S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

UNCLASSIFIED\\FOR OFFICIAL USE ONLY

UNCLASSIFIED\\FOR OFFICIAL USE ONLY

W D

R -1

-D

-0

J E

S S

IC

A

A N

D E

R S

O N

L A

N G

L E

Y A

F B

V

IR

G

IN

IA

L A

N G

L E

Y A

IR

F

O R

C E

T A

R G

E T

IN

G

F A

C

IL

IT

Y

H D

R

IN

C

W

A S

H

IN

G T

V

D S

U

IT

E

A R

L

IN

G T

O N

V

A

MAIN BLDG.

S-207

S C

H E

D U

L E

S

C O

N C

R E

T E

F R

A M

IN

G

J A

C K

K N

A P

P

R A

N D

Y W

A L K

E R

G O

N Z

A L

O K

O O

S A

U

/1

/1

ISSUE FOR CONSTRUCTION

CONCRETE BEAM SCHEDULE

MARK

SIZE BOTTOM BARS TOP LEFT BARS TOP RIGHT BARS STIRRUPS

REMARKS

WIDTH

(in.)

DEPTH

(in.) NO. SIZE NO. SIZE NO. SIZE TYPE SIZE SPACING

B1 40" 30" 6 #9 8 #9 8 #9 B #4 16@9", REST@18"

B2 24" 30" 5 #9 7 #9 7 #9 A #4 18@4", 9@8", REST@18"

B3 24" 42" 8 #9 8 #9 6 #9 A #4 28@3", 8@6", REST@8"

B4 24" 42" 8 #9 6 #9 8 #9 A #4 28@3", 8@6", REST@8"

B6 24" 34" 5 #9 6 #9 6 #9 A #4 18@4", 9@8", REST@18"

B7 24" 64" 7 #9 6 #9 6 #9 A #4 24@6", REST@18" SEE C1/S-309

B8 24" 64" 7 #9 6 #9 6 #9 A #4 24@6", REST@18"

B9 40" 42" 5 #9 7 #9 7 #9 A #4 12@4", 14@6", REST@18" SEE A7/S-308

B10 40" 42" 5 #9 6 #9 7 #9 A #4 12@4", 14@6", REST@18" SEE A7/S-308

B11 40" 30" 5 #9 6 #9 6 #9 B #4 14@9", REST@18"

B12 40" 34" 6 #9 6 #9 6 #9 B #4 12@6", 6@9", REST@12"

B13 40" 34" 5 #9 6 #9 6 #9 B #4 12@9", REST@18"

B14 40" 30" 5 #9 6 #9 6 #9 A #4 22@6", REST@18"

B15 40" 30" 4 #9 6 #9 6 #9 B #4 8@6", 4@12", REST@18"

B16 40" 30" 8 #9 12 #10 12 #10 B #4 22@2", 14@3", 8@6", 6@12", REST@18"

TWO TOP ROWS OF (6) BARS

B17 40" 30" 8 #9 8 #9 12 #10 B #4 16@3", 12@4", 16@6", REST@18"

TWO TOP ROWS OF (6) BARS ON LEFT SIDE

B18 24" 30" 4 #9 4 #9 4 #9 A #4 16@6", REST@18"

B19 24" 30" 5 #9 7 #9 7 #9 A #4 18@4", 9@8", REST@18"

B20 40" 30" 5 #9 8 #9 6 #9 A #4 12@4", 14@6", REST@18" SEE A3/S-308

B21 40" 30" 5 #9 8 #9 8 #9 A #4 18@2", 9@4", 6@6", REST@18"

SEE A3/S-308

B22 24" 30" 6 #9 4 #9 4 #9 A #4 28@6", REST@18"

B23 24" 34" 5 #9 6 #9 6 #9 A #4 22@4", 12@8", REST@18"

B24 24" 30" 4 #9 4 #9 4 #9 A #4 12@12", REST@18"

B25 18" 24" 3 #9 3 #9 3 #9 A #4 4@12", REST@18"

B26 40" 30" 6 #9 6 #9 6 #9 B #4 6@12", REST@18" TWO TOP ROWS OF (6) BARS ON RIGHT SIDE

B27 40" 30" 6 #9 6 #9 6 #9 B #4 REST@6"

B28 40" 30" 6 #9 12 #10 6 #9 B #4 14@3", 8@6", 6@9", REST@18"

TWO TOP ROWS OF (6) BARS ON RIGHT SIDE

B29 40" 30" 6 #9 6 #9 6 #9 B #4 REST@6" SEE C4/S-309

B30 24" 30" 4 #9 4 #9 6 #9 A #4 12@12", REST@18"

B31 24" 30" 4 #9 4 #9 4 #9 A #4 4@12", REST@18"

B32 24" 30" 4 #9 4 #9 4 #9 A #4 8@12", REST@18"

B33 15" 21" 3 #8 3 #8 3 #8 A #4 2@6", REST@12"

B34 12" 18" 3 #5 3 #5 3 #5 A #3 2@6", REST@18"

NOTES:

1. REFER TO S-306 FOR TYPICAL CONCRETE BEAM DETAILS.

2. LEFT AND RIGHT OF A BEAM SHALL BE DETERMINED AS THE BEAM IS BEING

VIEWED TO READ THE MARK NUMBER ON THE FRAMING PLAN.

3. ALL BOTTOM AND TOP BARS SHALL BE PLACED IN ONE LAYER UNLESS TWO

LAYERS ARE REQUIRED TO MEET ACI MINIMUM BAR SPACING REQUIREMENTS.

WHERE TWO LAYERS ARE REQUIRED, PROVIDE 1" CLEAR BETWEEN LAYERS.

4. WHEN THE NUMBER OF SCHEDULED BARS EXCEEDS THE NUMBER ALLOWED

IN ONE LAYER, THE BALANCE OF THE BARS, BUT NOT LESS THAN TWO BARS,

SHALL BE PLACED IN THE SECOND LAYER.

5. WHERE A BEAM IS SUPPORTED BY A COLUMN BUT HAS ANOTHER BEAM

FRAMING PERPENDICULAR TO IT AT THE SAME COLUMN, THE FIRST STIRRUP

SPACING SHALL START FROM THE FACE OF THE COLUMN AND NOT FROM

THE FACE OF THE TRANSVERSE BEAM.

6. FOR BEAM DEPTH EQUAL TO OR GREATER THAN 24", PROVIDE CONTINUOUS

SIDE BARS EACH FACE. ALL SIDE BARS TO BE TENSION LAP SPLICED AT

MIDSPAN AND HOOKED AT DISCONTINUOUS END.

7. WHERE BEAM SCHEDULE INDICATES 2 SETS OF TOP BARS AT SAME LOCATION

(RE OF ONE SPAN AND LE OF ADJACENT SPAN), PROVIDE ONLY THE SET

REQUIRING THE GREATEST CROSS-SECTIONAL AREA.

8. BOTTOM AND TOP BAR PLACEMENT SHALL BE ARRANGED SUCH THAT THE

BEAM BARS WILL NOT INTERFERE WITH COLUMN BARS AT BEAM / COLUMN

INTERSECTIONS. BEAM BARS SHALL BE ARRANGED IN AN EVEN OR ODD

NUMBER OF BARS TO ACCOMMODATE LOCATION OF COLUMN BARS.

WHERE SUCH PLACEMENT REQUIRES, BEAM BARS MAY BE PLACED IN 2 LAYERS.

9. STIRRUP SPACING AS SPECIFIED TO BE INSTALLED WITH CLOSER TIE SPACING BEGINNGING AT 2"

FROM THE FACE OF THE SUPPORT AT EACH END.

3" = 1'-0" D1

REINFORCING BAR DEVELOPMENT LENGTH (Ld) AND LAP SPLICE SCHEDULE

IS

S

U E

F O

R C

O N

S T

R U

C T

IO

N

S U

B M

IT

T

A L

/1

TOP OF PILE

CAP

TOP OF PILE

CAP

-6' - 0" -6' - 0"

FIRST FLOOR FIRST FLOOR

0" 0"

SECOND

FLOOR

SECOND

FLOOR

18' - 0" 18' - 0"

INTERSTITIAL

LEVEL

INTERSTITIAL

LEVEL

37' - 2 3/4" 37' - 2 3/4"

HP ROOF HP ROOF

55' - 6 3/4" 55' - 6 3/4"

Column

Locations A-3 A-4 A-5 A-6 A-7 A-8 B-3 B-4 B-5 B-6 B-7 B-8 B.5-8 B.5-9 B.5-10 B.5-11 C-1 C-2 C-3 C-4 C-5 C-6 C-7 C-8 C-9 C-10 D-1

TOP OF PILE

CAP

TOP OF PILE

CAP

-6' - 0" -6' - 0"

FIRST FLOOR FIRST FLOOR

0" 0"

SECOND

FLOOR

SECOND

FLOOR

18' - 0" 18' - 0"

INTERSTITIAL

LEVEL

INTERSTITIAL

LEVEL

37' - 2 3/4" 37' - 2 3/4"

HP ROOF HP ROOF

55' - 6 3/4" 55' - 6 3/4"

Column

Locations D-2 D-3 D-4 D-5 D-6 D-7 D-8 D-9 D-10 D.3-10 D.3-11 E-1 E-2 E-3 E-4 E-5 E-6 E-7 E-8 E-9 E-10 F-1 F-2 F-3 F-4 F-5 F-6

W X

W X

W X

W X

W X

W X

W X

W X

W X

W X

W X

W X

W X

W X

W X

W X

W X

W X

W X

W X

W X

W X

W X

W X

W X

W X

W X

W X

W X

W X

W X

W X

W X

W X

W X

W X

W X

W X

W X

W X

W X

W X

W X

W X

W X

W X

W X

W X

W X

W X

W X

W X

W X

W X

A E

S S

A E

S S

A E

S S

A E

S S

A E

S S

A E

S S

A E

S S

A E

S S

A E

S S

A E

S S

A E

S S

A E

S S

A E

S S

A E

S S

A E

S S

A E

S S

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R

E N

G

IN

E E

R S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

UNCLASSIFIED\\FOR OFFICIAL USE ONLY

UNCLASSIFIED\\FOR OFFICIAL USE ONLY

W D

R -1

-D

-0

J E

S S

IC

A

A N

D E

R S

O N

L A

N G

L E

Y A

F B

V

IR

G

IN

IA

L A

N G

L E

Y A

IR

F

O R

C E

T A

R G

E T

IN

G

F A

C

IL

IT

Y

H D

R

IN

C

W

A S

H

IN

G T

V

D S

U

IT

E

A R

L

IN

G T

O N

V

A

MAIN BLDG.

S-208

S C

H E

D U

L E

S

S T

E E

L C

O L U

M N

S

J A

C K

K N

A P

P

R A

N D

Y W

A L K

E R

G O

N Z

A L

O K

O O

S A

U

/1

/1

ISSUE FOR CONSTRUCTION

IS

S

U E

F O

R C

O N

S T

R U

C T

IO

N

S U

B M

IT

T

A L

/1

TOP OF PILE

CAP

TOP OF PILE

CAP

-6' - 0" -6' - 0"

FIRST FLOOR FIRST FLOOR

0" 0"

SECOND

FLOOR

SECOND

FLOOR

18' - 0" 18' - 0"

INTERSTITIAL

LEVEL

INTERSTITIAL

LEVEL

37' - 2 3/4" 37' - 2 3/4"

HP ROOF HP ROOF

55' - 6 3/4" 55' - 6 3/4"

Column

Locations F-7 F-8 F-9 F-10 G-1 G-2 G-3 G-4 G-5 G-6 G-7 G-8 G-9 G-10

W X

W X

W X

W X

W X

W X

W X

W X

W X

W X

W X

W X

W X

W X

A E

S S

A E

S S

A E

S S

A E

S S

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R

E N

G

IN

E E

R S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

UNCLASSIFIED\\FOR OFFICIAL USE ONLY

UNCLASSIFIED\\FOR OFFICIAL USE ONLY

W D

R -1

-D

-0

J E

S S

IC

A

A N

D E

R S

O N

L A

N G

L E

Y A

F B

V

IR

G

IN

IA

L A

N G

L E

Y A

IR

F

O R

C E

T A

R G

E T

IN

G

F A

C

IL

IT

Y

H D

R

IN

C

W

A S

H

IN

G T

V

D S

U

IT

E

A R

L

IN

G T

O N

V

A

MAIN BLDG.

S-209

S C

H E

D U

L E

S

S T

E E

L C

O L U

M N

S

J A

C K

K N

A P

P

R A

N D

Y W

A L K

E R

G O

N Z

A L

O K

O O

S A

U

/1

/1

ISSUE FOR CONSTRUCTION

IS

S

U E

F O

R C

O N

S T

R U

C T

IO

N

S U

B M

IT

T

A L

/1

MARK REMARKS

PLATE DIMENSIONS

BP1

BP2

BP3

BP4

ANCHOR ROD DIMENSIONS

COLUMN BASE PLATE SCHEDULE

2 3/4 15

2-1/2

3-1/2

W8

W10

W12

W14

COLUMN SIZE

LENGTH, B

[IN]

WIDTH, N

[IN]

THICKNESS, T

[IN]

3/4

1-1/4

1-1/2

HOLE LOCATIONS

S1

[IN]

S2

[IN]

2-1/2

3-1/2

DIAMETER

[IN]

EMBEDMENT DEPTH

[IN]

3/4 15

3/4 15

3/4 15

COLUMN BASE PLATE SCHEDULE NOTES:

1. REFER TO A1/S-501 FOR TYPICAL BASE PLATE DETAIL.

2. PROVIDE MINIMUM SIZE WELD PER REQUIREMENTS SET

BY AISC SPECIFICATIONS.

3. PROVIDE PL3/8X2X2 WASHER AT ALL ANCHOR RODS.

PROVIDE MINIMUM SIZE WELD PER REQUIREMENTS SET

BY AISC SPECIFICATIONS.

4. LEVELING PLATES MAY BE USED AS CONTRACTOR

OPTION PENDING APPROVAL FROM THE STRUCTURAL

ENGINEER OF RECORD.

NOTES:

1. REFER TO D1/S-501 FOR TYPICAL SHEAR PLATE DETAIL.

2. REFER TO D3/S-501 FOR TYPICAL DOUBLE ANGLE DETAIL.

3. ALL FIELD BOLTED CONNECTIONS SHALL BE MADE WITH 3/4" DIAMETER

BOLTS, UNLESS STATED OTHERWISE.

4. BOLT SIZE AND NUMBER SHALL BE TYPICAL FOR ALL CONDITIONS,

UNLESS DETAILED OTHERWISE. ALL BOLTS SHALL BE ASTM A490 TYPE N.

5. STANDARD BOLT HOLES TO BE USED, UNLESS STATED OTHERWISE.

SCHEDULE B - DOUBLE ANGLES (AISC 360-10 LRFD)

W8 1/4" 3/16" 2

W10 3/16" 2

W12 3

W14

W16

W18

W21

W24

W27

W30

W33

SCHEDULE A - SHEAR PLATES (AISC 360-10 LRFD)

BEAM SIZE PLATE THICKNESS WELD SIZE "A" NUMBER OF BOLTS

W8 5/16" 1/4" 2

W10 5/16" 1/4" 2

W12 5/16" 3

W14

W16

W18

W21

W24

W27

W30

W33

5/16"

5/16"

5/16"

5/16"

5/16"

5/16"

3/8"

3/8"

3/16"

3/16"

3/16"

3/16"

3/16"

3/16"

3/16"

3/16"

3/16"

6. ALL BEAM TO COLUMN, CANTILEVER BEAM AND COLLECTOR BEAM

CONNECTIONS SHALL BE SLIP-CRITICAL (SC) BOLTS.

7. ALL SINGLE SHEAR PLATE AND DOUBLE ANGLES TO BE ASTM A36 UNLESS

STATED OTHERWISE.

8. CONNECTIONS SHOWN IN SCHEDULE A MAY BE REPLACED WITH

CONNECTIONS SHOWN IN SCHEDULE B USING DOUBLE ANGLES.

9. REFER TO GENERAL NOTES FOR OTHER CONNECTION REQUIREMENTS.

MINIMUM REQUIRED

SHEAR CAPACITY OF

CONNECTION [KIPS]

BEAM SIZE PLATE THICKNESS WELD SIZE "B" NUMBER OF BOLTS

MINIMUM REQUIRED

SHEAR CAPACITY OF

CONNECTION [KIPS]

5/16"

5/16"

5/16"

5/16"

5/16"

5/16"

5/16"

5/16"

5/16"

42.5

42.5

77.5

112.5

112.5

137.5

1/4"

1/4"

1/4"

1/4"

1/4"

1/4"

1/4"

1/4"

1/4"

1/4"

42.5

42.5

77.5

112.5

112.5

137.5

SCHEDULE C - MOMENT CONNECTIONS

(AISC 360-10 LRFD)

BEAM SIZE MINIMUM NUMBER

OF BOLTS

W12 3

W24

W30

16 (2 VERT ROWS)

NOTES:

1. REFER TO A1/S-503 AND D1/S-503 FOR BEAM TO COLUMN MOMENT FRAME DETAILS.

2. ALL FIELD BOLTED CONNECTIONS SHALL BE MADE WITH 3/4" DIAMETER BOLTS, UNO.

3. BOLT SIZE AND NUMBER SHALL BE TYPICAL FOR ALL CONDITIONS,

UNLESS DETAILED OTHERWISE. ALL BOLTS SHALL BE ASTM A490 TYPE N.

4. STANDARD BOLT HOLES TO BE USED UNLESS STATED OTHERWISE.

5. ALL BEAM TO COLUMN, CANTILEVER BEAM AND COLLECTOR BEAM CONNECTIONS

SHALL BE SLIP-CRITICAL (SC) BOLTS. SEE STRUCTURAL NOTES.

6. ALL SINGLE SHEAR PLATE AND DOUBLE ANGLES TO BE ASTM A36 UNLESS

STATED OTHERWISE.

7. REFER TO GENERAL NOTES FOR OTHER CONNECTION REQUIREMENTS.

W33 18 (2 VERT ROWS)

MINIMUM REQUIRED

SHEAR CAPACITY OF

CONNECTION [KIPS]

MINIMUM REQUIRED

FLEXURAL CAPACITY OF

CONNECTION [KIP-FT]

112.5

137.5

42.5

MARK REMARKS

PLATE DIMENSIONS

EP1

HEADED STUD DIMENSIONS

COLUMN EMBED PLATE SCHEDULE

4 1 1/2 2HSS2X2

COLUMN SIZE

LENGTH, B

[IN]

WIDTH, N

[IN]

THICKNESS, T

[IN]

4 1/2

HEADED STUD LOCATIONS

S1

[IN]

S2

[IN]

DIAMETER

[IN]

EMBEDMENT DEPTH

[IN]

COLUM EMBED PLATE SCHEDULE NOTES:

1. REFER TO A1/S-501 FOR TYPICAL BASE PLATE DETAIL.

2. PROVIDE MINIMUM SIZE WELD PER REQUIREMENTS SET

BY AISC SPECIFICATIONS.

3. PROVIDE WELD AT HEADED STUDS TO DEVELOP FULL

TENSION CAPACITY OF STUD.

4. ALL STUDS TO BE LOCATED A MINIMUM OF 4" FROM FREE

EDGES OF CONCRETE.

EP2 HSS4X2 6 1.5 1/2 86 1/2 1.5

EP3 HSS8X4 9 2 1/2 89 1/2 2

EP4 HSS6X6 8 2.5 3/4 88 3/4 2.5

EP5 W12X30 16 12 1-1/2" 5 3/4 155 SEE A5/S-501

EP6 BOX GIRDER A 37 16.25 1-1/2" - 3/4 15- SEE D6/S-501

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R

E N

G

IN

E E

R S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

UNCLASSIFIED\\FOR OFFICIAL USE ONLY

UNCLASSIFIED\\FOR OFFICIAL USE ONLY

W D

R -1

-D

-0

J E

S S

IC

A

A N

D E

R S

O N

L A

N G

L E

Y A

F B

V

IR

G

IN

IA

L A

N G

L E

Y A

IR

F

O R

C E

T A

R G

E T

IN

G

F A

C

IL

IT

Y

H D

R

IN

C

W

A S

H

IN

G T

V

D S

U

IT

E

A R

L

IN

G T

O N

V

A

MAIN BLDG.

S-210

S C

H E

D U

L E

S

S T

E E

L F

R A

M

IN

G

J A

C K

K N

A P

P

R A

N D

Y W

A L K

E R

G O

N Z

A L

O K

O O

S A

U

/1

/1

ISSUE FOR CONSTRUCTION

3" = 1'-0" C1

COLUMN BASE PLATE SCHEDULE

12" = 1'-0" D1

STANDARD SHEAR CONNECTION SCHEDULES

12" = 1'-0"

D4

STANDARD MOMENT CONNECTION SCHEDULE

3" = 1'-0" A1

COLUMN EMBED PLATE SCHEDULE

IS

S

U E

F O

R C

O N

S T

R U

C T

IO

N

S U

B M

IT

T

A L

/1

CL

MIN

1'-6" 2'-3" 2'-3"

MIN

1'-6"

/4

/8

/8

7'-6"

/4

2'-3" 1'-6" 1'-6" 2'-3"

CL

CL

M

IN

M

IN

MIN

1'-6" 2'-3" 2'-3"

MIN

1'-6"

7'-6"

CL

CL

MIN

1'-6" 3'-3" 3'-3"

MIN

1'-6"

9'-6"

M

IN

M

IN

CL

CL

MIN

1'-6" 4'-6" 4'-6" 1'-6"

12'-0"

CL

CL

MIN

1'-6" 2'-3" 2'-3" 2'-3" 2'-3"

MIN

1'-6"

12'-0"

/4

/4

/2

CL

CL

MIN

1'-6" 4'-6" 4'-6"

MIN

1'-6"

M

IN

/4

/4

M

IN

/2

12'-0"

CL

CL

MIN

1'-6" 4'-6" 4'-6"

MIN

1'-6"

12'-0"

M

IN

M

IN

CL

CL

M

IN

M

IN

MIN

1'-6"

MIN

1'-6"

3'-0"

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R

E N

G

IN

E E

R S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

UNCLASSIFIED\\FOR OFFICIAL USE ONLY

UNCLASSIFIED\\FOR OFFICIAL USE ONLY

W D

R -1

-D

-0

J E

S S

IC

A

A N

D E

R S

O N

L A

N G

L E

Y A

F B

V

IR

G

IN

IA

L A

N G

L E

Y A

IR

F

O R

C E

T A

R G

E T

IN

G

F A

C

IL

IT

Y

H D

R

IN

C

W

A S

H

IN

G T

V

D S

U

IT

E

A R

L

IN

G T

O N

V

A

MAIN BLDG.

S-301

C O

N C

R E

T E

F

O U

N D

A T

IO

N

D E

T A

IL

S

J A

C K

K N

A P

P

R A

N D

Y W

A L K

E R

G O

N Z

A L

O K

O O

S A

U

/1

/1

ISSUE FOR CONSTRUCTION

1/2" = 1'-0" D1

CONCRETE PILCAP DETAIL - PC3

1/2" = 1'-0"

D3

CONCRETE PILECAP DETAIL - PC4

1/2" = 1'-0" D5

CONCRETE PILECAP DETAIL - PC5

1/2" = 1'-0"

D8

CONCRETE PILECAP DETAIL - PC6

1/2" = 1'-0" A1

CONCRETE PILECAP DETAIL - PC7

1/2" = 1'-0"

A3

CONCRETE PILECAP DETAIL - PC8

1/2" = 1'-0" A6

CONCRETE PILECAP DETAIL - PC9

1/2" = 1'-0" F1

CONCRETE PILECAP DETAIL - PC1

IS

S

U E

F O

R C

O N

S T

R U

C T

IO

N

S U

B M

IT

T

A L

/1

MIN

1'-6"

MIN

1'-6" 2'-3" 2'-3" 2'-3" 2'-3" 2'-3" 2'-3"

16'-6"

M

IN

/4

/4

M

IN

/2

CL

CL

MIN

1'-6" 2'-3" 2'-3" 2'-3" 2'-3" 2'-3" 2'-3"

MIN

1'-6"

16'-6"

M

IN

/4

/4

M

IN

/2

CL

CL

MIN

1'-6" 4'-6" 2'-3" 2'-3" 4'-6"

MIN

1'-6"

16'-6"

M

IN

M

IN

CL

CL

M

IN

22'-0"

1'-6" 3'-3" 1'-6" 4'-9" 4'-9" 1'-6" 3'-3" 1'-6"

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R

E N

G

IN

E E

R S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

UNCLASSIFIED\\FOR OFFICIAL USE ONLY

UNCLASSIFIED\\FOR OFFICIAL USE ONLY

W D

R -1

-D

-0

J E

S S

IC

A

A N

D E

R S

O N

L A

N G

L E

Y A

F B

V

IR

G

IN

IA

L A

N G

L E

Y A

IR

F

O R

C E

T A

R G

E T

IN

G

F A

C

IL

IT

Y

H D

R

IN

C

W

A S

H

IN

G T

V

D S

U

IT

E

A R

L

IN

G T

O N

V

A

MAIN BLDG.

S-302

C O

N C

R E

T E

F

O U

N D

A T

IO

N

D E

T A

IL

S

J A

C K

K N

A P

P

R A

N D

Y W

A L K

E R

G O

N Z

A L

O K

O O

S A

U

/1

/1

ISSUE FOR CONSTRUCTION

1/2" = 1'-0" E1

CONCRETE PILECAP DETAIL - PC10

1/2" = 1'-0"

E5

CONCRETE PILECAP DETAIL - PC11

1/2" = 1'-0" A1

CONCRETE PILECAP DETAIL - PC12

1/2" = 1'-0" A5

CONCRETE PILECAP DETAIL - PC17

IS

S

U E

F O

R C

O N

S T

R U

C T

IO

N

S U

B M

IT

T

A L

/1

SQUARE PRECAST

PRESTRESSED

CONCRETE PILE

PIER,

SEE PLAN

PILE CAP,

SEE SCHEDULE

S P

LI

C

E C

LA

S

S

B

LA

P

T/ PILE CAP

SEE PLAN

T/ PILE

4" M

IN

3"

M

IN

3" M

IN

TOP REINFORCING,

SEE SCHEDULE

S E

E S

C H

E D

U

LE

D E

P T

H

DOWELS WITH 90 DEGREE

STANDARD HOOK,

LAP AND MATCH VERTICAL

REINFORCING OF PIER

BOTTOM REINFORCING,

SEE SCHEDULE

T/ OF SLAB

SEE PLAN

T/ OF PILE CAP

SEE PLAN

CMU WALL,

SEE PLAN

CONCRETE BEAM,

SEE PLAN

TWO-WAY SLAB,

SEE PLAN

10" CONCRETE WALL,

#6@8"O.C. REINFORCING

EACH DIRECTION EACH FACE

PILECAP,

SEE PLAN

2' -0

3'

-0

2' -0

1'

-0

S E

E S

C H

E D

U

LE

D E

P T

H

S P

LI

C

E C

LA

S

S

B

LA

P

BUILT UP SLAB,

SEE PLAN

NORMALWEIGHT CONCRETE FILL,

PROVIDE #4@18"O.C. EACH

DIRECTION

2'-0"

L3X3X1/4 BY 2'-0" WITH (2)-1/2"Ø

BY 4-1/2" EXPANSION BOLT

LAP AND MATCH VERTICAL

REINFORCING OF CONCRETE

WALL

T/ OF SLAB

SEE PLAN

T/ OF PIT

COORD WITH ARCH

WATERSTOP, TYPICAL

S P

LI

C

E C

LA

S

S

B

LA

P

STRUCTURAL FILL

6" MINIMUM OF

GRANULAR FILL

15MIL VAPOR BARRIER

6" TYP

6" T

Y P

1 1/2"

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R

E N

G

IN

E E

R S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

UNCLASSIFIED\\FOR OFFICIAL USE ONLY

UNCLASSIFIED\\FOR OFFICIAL USE ONLY

W D

R -1

-D

-0

J E

S S

IC

A

A N

D E

R S

O N

L A

N G

L E

Y A

F B

V

IR

G

IN

IA

L A

N G

L E

Y A

IR

F

O R

C E

T A

R G

E T

IN

G

F A

C

IL

IT

Y

H D

R

IN

C

W

A S

H

IN

G T

V

D S

U

IT

E

A R

L

IN

G T

O N

V

A

MAIN BLDG.

S-303

C O

N C

R E

T E

F

O U

N D

A T

IO

N

D E

T A

IL

S

J A

C K

K N

A P

P

R A

N D

Y W

A L K

E R

G O

N Z

A L

O K

O O

S A

U

/1

/1

ISSUE FOR CONSTRUCTION

1/2" = 1'-0" A1

TYPICAL PILECAP SECTION

1/2" = 1'-0"

A5

ELEVATOR PIT SECTION

IS

S

U E

F O

R C

O N

S T

R U

C T

IO

N

S U

B M

IT

T

A L

/1

BLOCKING, THICKNESS TO SUIT

COVER ON REINF

REMOVE FOR SECOND POUR

EXPANDED METAL LATHE,

EXTEND THRU REINF

D

B E

A M

D E

P T

H

FIRST POUR SECOND POUR

D

S

LA

B D

E P

T H

#4 x 3'-4" @ 16" O.C. ADDL.

DELETE IS SLAB TOP BARS

OCCUR CONT THRU JOINT

CONTINUOUS KEYWAY

WITH TAPERED SIDES

ALL REINF TO RUN

THRU UNINTERRUPTED

D /3

D /3

D /3

1 1/2"

D

W A

LL

T

H

IC

K N

E S

S

CONTINUOUS KEYWAY

WITH TAPERED SIDES FOR

WALLS 8" OR GREATER IN

THICKNESS

ALL REINF TO RUN

THRU UNINTERRUPTED 1 1/2"

D /3

D /3

D /3

BEAM CONSTRUCTION JOINT

STRUCTURAL SLAB CONSTRUCTION JOINT

WALL CONSTRUCTION JOINT

NOTES

1. PROVIDE CONSTRUCTION JOINT OR CONTROL JOINT AT 25'-0" MAX. SPACING.

2. LOCATE FIRST JOINT NO FURTHER THAN 15'-0" FROM CORNER.

3. JOINT LOCATIONS AND DETAILS TO BE APPROVED BY ARCHITECT AND STRUCTURAL ENGINEER.

4. PRIOR TO SECOND PLACEMENT OF WALL AT CONSTRUCTION JOINTS, ABRASIVE BLAST OR CHIP

FIRST PLACEMENT FACE OF JOINT TO REMOVE LAITANCE HONEYCOMBING, ETC.. CLEAN WITH

WATER AND STIFF BRUSH AND MAKE SECOND PLACEMENT WHAN CONCRETE IS DAMP.

5. DO NOT USE THIS DETAIL FOR SHEAR WALLS OR WALLS DESIGNED TO SPAN HORIZONTALLY.

WALL CONTROL JOINT

1/2 X 1/2 JOINT WITH

SEALANT EACH FACE

EACH LEG

CLASS 'B' LAP SPLICE

EACH LEG

CLASS 'B' LAP SPLICE

EACH LEG

CLASS 'B' LAP SPLICE

E A

C H

L E

G

C

LA

S S

'B ' L

A P

S P

LI

C

E

E A

C H

L E

G

C

LA

S S

'B ' L

A P

S P

LI

C

E

CORNER - OUTSIDE LOADED CORNER - INSIDE LOADED "T" INTERSECTION

"T" INTERSECTION - SINGLE CURTAINCORNER - SINGLE CURTAIN

BACKFILLED

FACE OF WALL

BACKFILLED

FACE OF WALL

STANDARD 90° HOOK,

ALTERNATE DIRECTION

NOTES:

1. WHERE WALLS ARE BACKFILLED ON BOTH SIDES,

PROVIDE DETAIL SUITABLE FOR SIDE WITH GREATEST

HEIGHT OF BACKFILL. WHERE HEIGHT OF BACKFILL IS

THE SAME ON BOTH SIDES OR WALL WITHOUT BACKFILL,

USE OUTSIDE LOADED DETAIL.

2. CORNER BAR SIZE TO MATCH LARGEST BAR SPLICED

AND SPACING TO MATCH CLOSEST SPACING OF BARS.

CORNER BAR

CORNER BAR

CORNER BAR

CORNER BAR

CORNER BAR

1/2 BAR SPACING

BAR SPACING

SEE NOTE 2

SEE NOTE 1

1-#5 x 4'-0" EACH CORNER, TOP AND BOTTOM IN SLABS

OR EACH FACE IN WALLS

NOTES:

1. HOOK ALL TERMINATED BARS AT FACE OF OPENING. IF EDGE OF CONC OCCURS

BEFORE INDICATED BAR EXTENSION PAST OPENING IS OBTAINED, EXTEND BAR FULL

AVAILABLE LENGTH AND HOOK.

2. ADD BARS EQUAL TO ONE-HALF NUMBER OF BARS RUNNING IN THE SAME DIRECTION

THAT ARE TERMINATED BY OPENING. PROVIDE BARS ON EACH SIDE OF OPENING

(TOP AND BOTTOM OF SLABS OR EACH FACE OF WALL), MIN 2-#4 EACH FACE,

OR TOP AND BOTTOM, EACH SIDE. SPACE BARS AT 3".

3. FOR OPENINGS LESS THAN OR EQUAL TO 18" SQUARE OR DIAMETER, OFFSET REINF

TO CLEAR OPENING, NO ADDITIONAL REINF REQUIRED. SCHEDULED BARS SHALL BE

SPREAD (NOT CUT) TO ALLOW OPENING TO BE MADE.

4. OPENINGS SHALL NOT BE PLACED CLOSER THAN 1 WIDTH OR DIAMETER FROM ANY

ADJACENT BEAM NOR CLOSER THAN 2 WIDTHS OR DIAMETERS. WHEN TWO ADJACENT

OPENINGS ARE OF A DIFFERENT SIZE, SPACING SHALL BE BASED UPON THE LARGER SIZE.

WHEN TOTAL WIDTH OF ADJACENT OPENINGS REQUIRED IS 30" OR WHEN REQUIRED

SPACING OF OPENINGS CANNOT BE MET, COMBINED AREA SHALL BE TREATED AS ONE

OPENING AND SUBMITTED FOR REVIEW PRIOR TO INSTALLATION.

5. CONTRACTOR SHALL VERIFY SIZE AND LOCATION OF REQUIRED OPENINGS WITH OTHER

TRADES BEFORE POURING CONRETE SLABS OR WALLS.

6. INDICATES SCHEDULED BARS

T Y

P 2"

TYP

2"

LENGTH, TYP

2 x LAP SPLICE

LE

N

G T

H , T

Y P

X

L A

P S

P

LI

C E

RECTANGULAR

OR ROUND

OPENING

U N

O

4"

LEVEL TOP

SEE PLAN, ARCH. MECH OR ELEC

FOR SIZE AND LOCATION OF PAD

CLR

1 1/2"

C

LR

1/

2"

CLEAN AND ROUGHEN

SURFACE TO AN AMPLITUDE OF

1/4" PRIOR TO POURING PAD

NORMAL WEIGHT CONCRETE PAD

#4 @ 18" O.C. EACH WAY

POST INSTALLED ANCHORS

MECH. EQUIP BASE RAIL

MECH. EQUIP

8" MIN .

#4 @ 12" SET IN

TYPICAL…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .