This is a Bid Tabulation document for Collier County, Florida's procurement of Uninterrupted Power Systems (UPS) maintenance, repairs, replacement, and installation services (Solicitation No. 20-7723). The solicitation was opened on May 13, 2020, with 14,696 notifications sent, 134 downloads, 7 submissions received, and 2 no-bids. The contract covers preventative maintenance inspections and on-call services for UPS systems ranging from 0-20 KVA to systems exceeding 81 KVA across County-owned facilities. Services include visual inspections, electrical checks, battery maintenance, system testing, and new installations. Vendors were required to provide hourly rates for supervisors, licensed journeymen, apprentices, and engineering/design personnel, with separate pricing for standard hours and after-hours/holiday work. The tabulation included weighted evaluation criteria with 38% weighting for preventative maintenance and 62% weighting for on-call services, with typical scope examples ranging from minor repairs under $1,000 to full turnkey system replacements exceeding $50,000.
Seven vendors submitted bids: LBS Power Technologies, Weissco Power, Fakouri, Precision Power, UP, Facility Gateway Corporation, and one additional bidder. Evaluated bids ranged from a low of $48,013 to a high of $632,492.70. All vendors were required to comply with insurance and bonding requirements, provide W9 forms, complete E-Verify verification, submit immigration affidavits, provide references, and execute conflict-of-interest certifications. Material markups were capped at 10% with subcontractor markups limited to 15%. The County historically spends approximately $150,000 annually on UPS services. All service personnel required mandatory background checks valid for five years, and the contract structure allowed for Primary, Secondary, and Tertiary award recipients to ensure service continuity. Vendors offering local preference certification were eligible for consideration if they maintained a physical address in Collier or Lee County.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Manager: Katie Sibert Procurement: Viviana Giarimoustas Witness: Barbara Lance Opened: 5/13/2020
Bid Tabulation # 20-7723 Uniterrupted
Power Systems
Notifications Sent: 14,696 Downloaded: 134
Submissions: 7 No Bids: 2
Position Unit of measure Unit Price After Hours and Holidays Unit Price After Hours and
Holidays Unit Price After Hours and Holidays Unit of measure Unit Price After Hours and
Holidays Unit Price After Hours and Holidays Unit Price After Hours and
Holidays Unit Price After Hours and Holidays
Supervisor per hour $125.00 $185.00 $185.00 $280.00 $100.00 $150.00 per hour $145.00 $218.00 $250.00 $300.00 $100.00 $100.00 $90.00 $125.00 Licensed Journeyman per hour $185.00 $280.00 $140.00 $205.00 per hour $125.00 $182.00 $250.00 $300.00 $100.00 $142.00 $80.00 $105.00 Apprentice per hour $100.00 $125.00 $100.00 $150.00 per hour $75.00 $112.00 $250.00 $300.00 $100.00 $142.00 $65.00 $90.00 Engineering/Design per hour $125.00 $185.00 $185.00 $280.00 $150.00 $250.00 per hour $250.00 $375.00 $250.00 $300.00 $100.00 $100.00 $135.00 $150.00
EOLA
A B A B A B A B A B A B A B Weighted Multiplier Price per Unit Weighted
Multiplier Price per
Unit Weighted Multiplier
Price per Unit
Weighted Multiplier Price per Unit Weighted
Multiplier Price per
Unit Weighted Multiplier
Price per Unit
Weighted Multiplier
Price per Unit
1 0 - 20 KVA 18 $300.00 $5,400.00 18 $250.00 $4,500.00 18 $650.00 $11,700.00 18 $698.00 $12,564.00 18 $300.00 $5,400.00 18 $450.00 $8,100.00 18 $275.00 $4,950.00 2 21 - 40 KVA 41 $400.00 $16,400.00 41 $300.00 $12,300.00 41 $885.00 $36,285.00 41 $898.00 $36,818.00 41 $350.00 $14,350.00 41 $500.00 $20,500.00 41 $305.00 $12,505.00 3 41 - 80 KVA 18 $500.00 $9,000.00 18 $350.00 $6,300.00 18 $1,005.00 $18,090.00 18 $1,098.00 $19,764.00 18 $400.00 $7,200.00 18 $600.00 $10,800.00 18 $345.00 $6,210.00 4 Greater than 81 KVA 13 $650.00 $8,450.00 13 $400.00 $5,200.00 13 $1,785.00 $23,205.00 13 $1,298.00 $16,874.00 13 $400.00 $5,200.00 13 $700.00 $9,100.00 13 $475.00 $6,175.00 5 Off-hours surcharge 10 $185.00 $1,850.00 10 $75.00 $750.00 10 $1,000.00 $10,000.00 10 $0.00 $0.00 10 $200.00 $2,000.00 10 $125.00 $1,250.00 10 $120.00 $1,200.00 6 $41,100.00 $29,050.00 $99,280.00 $86,020.00 $34,150.00 $49,750.00 $31,040.00
EOLA
A B A B A B A B A B A B A B
Weighted Multiplier
Price per Unit
Weighted Multiplier
Price per Unit
Weighted Multiplier
Price per Unit
Weighted Multiplier Price per Unit Weighted
Multiplier Price per
Unit Weighted Multiplier
Price per Unit
Weighted Multiplier
Price per Unit
7 20 $250.00 $5,000.00 20 $300.00 $6,000.00 20 $900.00 $18,000.00 20 $290.00 $5,800.00 20 $200.00 $4,000.00 20 $100.00 $2,000.00 20 $150.00 $3,000.00
8 15 $300.00 $4,500.00 15 $740.00 $11,100.00 15 $1,200.00 $18,000.00 15 $720.00 $10,800.00 15 $1,000.00 $15,000.00 15 $1,000.00 $15,000.00 15 $1,550.00 $23,250.00
9 45 $350.00 $15,750.00 45 $740.00 $33,300.00 45 $2,500.00 $112,500.00 45 $1,498.00 $67,410.00 45 $3,000.00 $135,000.00 45 $3,000.00 $135,000.00 45 $2,775.00 $124,875.00
10 10 $700.00 $7,000.00 10 $1,100.00 $11,000.00 10 $3,500.00 $35,000.00 10 $9,800.00 $98,000.00 10 $20,000.00 $200,000.00 10 $20,000.00 $200,000.00 10 $35,000.00 $350,000.00
11 5 $1,500.00 $7,500.00 5 $4,500.00 $22,500.00 5 $10,000.00 $50,000.00 5 $22,762.00 $113,810.00 5 $40,000.00 $200,000.00 5 $40,000.00 $200,000.00 5 $50,000.00 $250,000.00
12 5 $2,500.00 $12,500.00 5 $5,000.00 $25,000.00 5 $12,000.00 $60,000.00 5 $56,224.00 $281,120.00 5 $50,000.00 $250,000.00 5 $50,000.00 $250,000.00 5 $50,000.00 $250,000.00
13 $52,250.00 $108,900.00 $293,500.00 $576,940.00 $804,000.00 $802,000.00 $1,001,125.00
Weighted Total Weighted Total Weighted Total Weighted Total Weighted Total Weighted Total Weighted Total $41,100.00 38% 15,618.00$ $29,050.00 38% 11,039.00$ $99,280.00 38% 37,726.40$ $86,020.00 38% 32,687.60$ $34,150.00 38% 12,977.00$ $49,750.00 38% 18,905.00$ $31,040.00 38% 11,795.20$ $52,250.00 62% 32,395.00$ $108,900.00 62% 67,518.00$ $293,500.00 62% 181,970.00$ $576,940.00 62% 357,702.80$ $804,000.00 62% 498,480.00$ $802,000.00 62% 497,240.00$ $1,001,125.00 62% 620,697.50$
48,013.00$ 78,557.00$ 219,696.40$ 390,390.40$ 511,457.00$ 516,145.00$ 632,492.70$
YES/NO YES/NO YES/NO YES/NO YES/NO YES/NO YES/NO
YES YES NO* YES YES YES YES
YES YES YES YES YES YES YES
Conflict of Interest YES YES YES Conflict of Interest YES YES YES YES
YES YES YES YES YES YES YES
Local Vendor Preference NA NA NA Local Vendor Preference NA NA NA NA
YES YES YES YES YES YES YES
YES YES YES YES YES YES YES
YES* YES NO* YES YES YES YES
YES YES NO* YES NO* YES YES
VERIFIED YES NO* YES YES NO* YES
*Minor Irregularity
Addendum Insurance and Bonding Requirements W9 E-Verify
LBS Power Technologies UP Weissco Power
Description Vendor Check List
Vendor Declaration Statement
Total
Total
Total
Total (Multiply
Column A by Column B)
Total (Multiply Column A by Column B)
Precision Power Facility Gateway Corporation
Immigration Affidavit Certification
References
Total (Multiply Column A by Column B)
Total
Total (Multiply Column A by Column B)
Total
Total
Total (Multiply Column A by Column B)
Total
Total (Multiply Column A by Column B)
Total
Total
Total (Multiply Column A by Column B)
Total
Total (Multiply Column A by Column B)
Total
Total
Total (Multiply Column A by Column
B)
Total
Total (Multiply Column A by Column B)
Total
Total
Fakouri
Total (Multiply Column A by Column B)
Total (Multiply Column A by Column B)
Total
E-Verify
Description
Immigration Affidavit Certification
Insurance and Bonding Requirements
Vendor Declaration Statement
Total
References Addendum
W9
Preventative Maintenance On-Call Services
Total
EOLA
Vendor Check List
Typical Scope of Work Between $3,000 and $20,000: -Replace worn or damaged controls found during inspection-Replace bad printed circuit board- Replace logic power supplies Typical Scope of Work Between $20,000 – 40,000: -Replace full bank of batteries due to weak batteries or longevity replacement recommendation from UPS manufacturer
Typical Scope of Work Between $40,000 and $50,000:
-Full turnkey UPS System replacement
Typical Scope of Work $50,000 +:
-Full turnkey UPS System replacement
On-Call Services TOTAL
Category
Provide hourly rates for the positions below. Material mark-up shall be strictly 10% and subcontractor mark-up is 15%.
Provide prices for preventative maintenance inspection. To be considered for an award for this category, the contractor must enter a price for items 1 - 5.
Item System Description Total (Multiply Column A by Column B)
EOLA
Preventative Maintenance Inspection TOTAL
Item System Description Total
(Multiply Column A by Column B)
Typical Scope of Work Under $1,000: The following issues have been found for a unit and needs to be addressed-Replace burned battery wiring found on inspection needing replace-Replace loose battery terminal connections found on inspection needing replacement
Typical Scope of Work Between $1,000 and $3,000: -Replace low reading battery found on inspection-Replace bad diodes, capacitors, SCR's or fuses found during inspection
Price for On-call Services: to be considered for an award, the contractor must enter a price for items 7 - 12 below.
Items 7 - 12 below are being used strictly for evaluation purposes, as general examples of work, and are not specific requests for work.
LBS Power Technologies Weissco Power Fakouri Precision Power UP Facility Gateway Corporation
Sheet1
File details come from the government source that posted it. Updated .