About this file

Summary

This is an engineering plan document prepared by Innovate Engineering & Surveying, LLC for the City of Valdosta Emergency Watershed Protection Stream Clearing and Snagging project in Lowndes County, Georgia. The project comprises stream debris removal and vegetation management across three sites: Sugar Creek (2,157 linear feet of stream clearing and snagging covering 217,177 square feet), Twomile Branch (4,338 linear feet across two segments covering 433,700 square feet), and Threemile Branch (7,184 linear feet across three segments covering 718,097 square feet). All work must be conducted in accordance with Natural Resources Conservation Service (NRCS) Conservation Practice Standards 326 (Clearing and Snagging), 484 (Mulching), and 342 (Critical Area Planting). Construction methods include sawing, cabling, winching, and dragging using hydraulic excavators, loaders, and winches operating from beyond stream banks. The scope includes removal of storm-damaged downed and snagged trees, fallen and leaning vegetation at angles of 30 degrees or less, debris disposal, erosion control matting, seeding stabilization, and restoration of disturbed areas. Operations are confined to a 50-foot offset from creek centerline on each side, with no equipment permitted within the stream channel or within 20 feet of stream banks except at designated access points.

The project requires the contractor to obtain temporary easements from affected property owners and right-of-entry documents as applicable. Stone construction entrances and exits must be installed at public road intersections prior to debris removal operations, which shall proceed in phased upstream-to-downstream sequence with completed portions seeded and mulched within 10 days. Debris removal must be disposed of outside wetlands and the 100-year floodplain, with options for burning (with appropriate permits), mulching on-site, or off-site disposal. All disturbed areas above water levels shall be stabilized with erosion control matting and seeded per specifications, with matting not necessary in flat areas. The contractor is responsible for a Quality Assurance Plan and Operation & Maintenance documentation. Permits anticipated from GDOT or USACE will be obtained by the City of Valdosta. Cultural resource protection protocols require immediate work stoppage and notification of the NRCS Georgia State Archaeologist if any cultural materials are encountered during construction.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

© 2025 Microsoft Corporation © 2025 TomTom

I:\ Pr oj ec ts \1

5-

V al do st a

EW

P G ra nt

P ro je ct

\C iv il\

C

A

.d w g

- C

O V

ER

9/

/2

4:

P

M

C

O

PY

R

IG

H T

TH

IS

D R

A W

IN

G

IS

T

H E

PR

O

PE

R

TY

O

F

IN

N O

V A

TE

E

N G

IN

EE

R

IN

G

S U

R V

EY

IN

G

LL

C

. A N

D M

A Y

N O

T

BE

R

EP

R O

D U

C

ED

W

IT

H O

U T

W R

IT

TE

N P

ER

M

IS

SI

O N

D

O C

U M

EN

TS

O F

PU

BL

IC

R

EC

O

R D

M A

Y

BE

C O

PI

ED

B U

T N

O T

A

LT

ER

ED

PROJECT NUMBER

Engineering & Surveying

I !NNOVATE

PHONE: 229-249-9113 - www.innovatees.com 2214 N. Patterson Street, Valdosta, GA 31602

PREPARED BY:

EMERGENCY WATERSHED PROTECTION

STREAM CLEARING AND SNAGGING

CITY OF VALDOSTA, LOWNDES COUNTY, GA

ALL CONSTRUCTION & MATERIALS SHALL BE

IN ACCORDANCE WITH CITY OF VALDOSTA &

NRCS STANDARDS AND SPECIFICATIONS.

NOTE: NO UNDERGROUND UTILITIES WERE VERIFIED OR FIELD

LOCATED ON THE PROPERTY SHOWN HERON

INNOVATE ENGINEERING & SURVEYING, LLC. DOES NOT

GUARANTEE THAT ALL EASMENTS WHICH MAY AFFECT THE

PROPERTY ARE SHOWN HERON AND ASSUMES NO LIABILITY FOR

FAILURE TO CONFIRM UTILITY LOCATIONS PRIOR TO ANY

DIGGING OR CONSTRUCTION.

CITY OF VALDOSTA

LOCATION MAP

N.T.S.

Sheet List Table Sheet Number Sheet Title

-- COVER

1 GENERAL NOTES

2 SITE 1 - SUGARCREEK

3 SITE 1 INDEX

4 SITE 2 - TWOMILE BRANCH

5 SITE 2 INDEX

6 SITE 3 - THREEMILE BRANCH

7 SITE 3 INDEX

8 MISC DETAILS

9 ES&PC DETAILS 1

10 ES&PC DETAILS 2

11 ES&PC DETAILS 3

DATED: 09/30/2025

NO OPEN PITS SHALL BE LEFT OPEN

OVERNIGHT OR LEFT UNATTENDED.

SNIKNEJ

NOSR

EIF

DNOMHCIR

NLO

NEVERCS

EKRUB

AIBMULOC

LEUNAME

HSOTNICM

GNILPPA

ENYAW

YREM

ECREIP

GNOL

YTREBIL

ER

LLANTTAT

SBMOOT

HCOLLUB

MAHTAHC

NOC

NOTLRAHC

NNYLG

SNAVE

YELTNARB

MAHGNIFFE

NAYRB

NEDMAC

RELDNAC

EENOCO

RAMAL

SENOJ

EKIP

NOSNIKLIW

ELADKCOR

NOTWEN

REPSAJ

YARRUM

NOSNHOJ

FFEJ

SNERUAL

EEGOCSUM

UDCM

NUBAR

NIKPMUL

MANTUP

NAGROM

REHTEWIREM

NOTSUOH

NOTGNIHSAW

KLOP

HCAEP

EORNOM

NOSPU

REKLAW

GNIDLUAP

PUORT

EEKOREHCWOTRAB

EDAD

BLAKED

AGOOTTAHC SNEKCIP

NOSKCAJ

NIL

NOSIDAM

EPROHTELGO

SEKLIW

DLEIFTIHW

SGGIWT

ETIHW

NOINU

NERRAW

ROLYAT

ORREFAILAT

SNWOT

NOTLAW

GNIDLAPS

STTUB

SALGUOD

EKRALCWORRAB

NOSWAD

DROFWARC

SKNAB

ASOOTAC

NOSLARAH

LLORRAC

DYOLF

DRAEH

NODROG

BBOC

NOTYALC

NIWDLAB

ATEWOC

TRAH

SIRRAH

ENEERG

KCOCNAH

NILKNARF

NINNAF

LLAH

ETTEYAF YRNEH

TTENNIWG

HTYSROF

REMLIG

MAHSREBAH

KCOCSALG

NOTLUF

TREBLE

YELKCELB

BBIB

TOBLAT

SNEHPETS

HPLODNAR

REINAL

NOIRAM

NAMTIUQ

IKSALUP

RELLIM

YELHCS

NOCAM

SEDNWOL

GTNOM

SIVADFFEJ

RENRUT

LLIHNEB

YTREHGUODNUOHLAC

PSIRC

NIWRI

LLEHCTIM

RIAFLETXOCLIW

RELEEHW

SAMOHT

LLERRET

W

RETMUS

ELONIMES

EEL

YLOOD EGDOD

RUTACED

EEHCOOHATTAHC

YALC

NEIRREB

REKAB

B

NOSNIKTA

KOOC

YDARG

HTROW

TTIUQLOC

SKOORB

EEFFOC

HCNILC

SLOHCE

YLRAE

RETSBEW

TFIT

TRAWETS

LTUERT

E

F

O

C

A

NE

A

LOCATION MAP

STATE OF GEORGIA

SITE 1 - SUGAR CREEK

SITE 2 - TWOMILE BRANCH

SITE 3 - THREEMILE BRANCH

CULTURAL RESOURCES PROTECTION NOTES

1. In the event that any type of cultural material is encountered during the normal course of NRCS (GA) approved implementation, work will immediately pause within a 100-meter buffer and NRCS GA State Archaeologist will be called to report the situation. The NRCS GA post-review discovery/ inadvertent discovery process will be followed.

2. Utilize adequate protective measures to ensure historic properties and features, including archaeological resources, within or adjacent to debris removal sites, and are not damaged by project activities. This includes but is not limited to minimalizing potential ground disturbance in accordance with the Georgia Forestry Commission's established practices as documented in Georgia's Best Management Practices for Forestry.

3. In the event that project activities result in unanticipated effects to known historic resources, including but not limited to previously identified archaeological sites, project activities should cease immediately, and NRCS GA State Archaeologist will be called to report the unanticipated effects. Work cannot resume until approval to proceed is given.

4. All work done along the waterway’s locations associated with cultural resources (if identified) is to be conducted in extreme caution and measures taken to minimize ground disturbance.

PRE-CONSTRUCTION CERTIFICATION:

THE VALDOSTA STORM DEBRIS REMOVAL PROJECT WILL

BE CONSTRUCTED IN ACCORDANCE WITH THE FOLLOWING

DRAWINGS AND PRACTICE CODES 326, 484 AND 342. ALL

ADDITIONS OR CHANGES HAVE BEEN CONCURRED BY

NRCS.

CITY OF VALDOSTA

SIGNATURE DATE

NRCS REPRESENTATIVE

SIGNATURE DATE

AS-BUILT CERTIFICATION:

THE VALDOSTA STORM DEBRIS REMOVAL PROJECT HAS

BEEN CONSTRUCTED IN ACCORDANCE WITH THESE PLANS

AND MEETS NRCS STANDARDS AND SPECIFICATIONS.

CITY OF VALDOSTA

SIGNATURE DATE

NRCS REPRESENTATIVE

SIGNATURE DATE

COVER NOTES:

1. ALL WORK MUST BE CONDUCTED IN ACCORDANCE WITH NRCS

CONSERVATION PRACTICE STANDARDS 326 CLEARING AND SNAGGING,

484 MULCHING AND 342 CRITICAL AREA PLANTING.

2. METHODS TO REMOVE FLOW OBSTRUCTION INCLUDE SAWING, CABLING,

WINCHING, LIFTING, OR DRAGGING. EQUIPMENT USED WILL GENERALLY

INCLUDE HYDRAULIC EXCAVATORS EQUIPPED WITH MECHANICAL THUMB

OR GRAPPLE ATTACHMENT, LOADERS, WINCHES MOUNTED ON TRACKED

OR RUBBER-TIRED EQUIPMENT, PORTABLE WINCHES, AND CHAIN SAWS.

NO EQUIPMENT WILL BE PERMITTED WITHIN THE STREAM. ALL

EQUIPMENT WILL OPERATE FROM BEYOND THE TOP OF THE STREAM

BANKS.HEAVY EQUIPMENT WORKING IN WETLANDS MUST BE PLACED ON

MATS OR OTHER MEASURES MUST BE TAKEN TO MINIMIZE SOIL

DISTURBANCE. MECHANIZED LAND CLEARING WILL NOT OCCUR WITHIN

WETLANDS AT ANY TIME.

3. DO NOT REMOVE TREES FROM THE STREAM CHANNEL THAT WERE

DEPOSITED PRIOR TO THE STORM EVENT AND ARE IN AN ADVANCE

STAGE OF DECAY. ONLY TREE STUMPS COMPLETELY UPROOTED BY THE

STORM EVENT ARE TO BE REMOVED. SNAGS ARE TO BE CUT OFF AT

STUMP LEVEL AND REMOVED. STUMPS FROM SNAGS WILL REMAIN IN

PLACE.

4. DEBRIS FROM PROJECT AREAS SHALL BE DISPOSED BY CONTRACTOR.

5. DAMAGE TO ADJACENT STREAM AREAS SHALL BE KEPT TO A MINIMUM

DURING CLEARING AND SNAGGING OPERATIONS. ALL DAMAGED AREAS

SHALL BE STABILIZED CONCURRENT WITH LAND DISTURBING ACTIVITIES.

6. BEST MANAGEMENT PRACTICES SHALL BE EMPLOYED DURING THE

OPERATION TO AVOID STREAM BANK EROSION AND SEDIMENTATION RUN

OFF INTO THE STREAM.

7. THE CLEARING AND SNAGGING OPERATIONS SHALL BE CONFINED TO 25

FEET FROM THE TOP OF BANK ON EACH SIDE OF THE STREAM (DISTANCE

VARIES).

Pr oj ec ts \1

5-

V al do st a

EW

P G ra nt

P ro je ct

\C iv il\

C

A

.d w g

- 1

G

EN

ER

A

L N

O

TE

S

- 9

/3 0/

:4

PM

En gi ne er in g

S ur ve yi ng

I

N N

O V

A

TE

DATE:

DRAWN BY:

CHECKED BY:

B. KENT

R

EV

IS

IO

N S

D A

TE

D

ES

C R

IP

TI

O N

PH

O

N E:

9-

9-w w w

.in no va te es .co m

N

. P at te rs on S tr ee t, V al do st a, G A

SHEET

PROJECT NUMBER

09/30/2025

M. WILSON

C

O

PY

R

IG

H T

TH

IS

D R

A W

IN

G

IS

T

H E

PR

O

PE

R

TY

O

F

IN

N O

V A

TE

E

N G

IN

EE

R

IN

G

S U

R V

EY

IN

G

LL

C

. A N

D M

A Y

N O

T

BE

R

EP

R O

D U

C

ED

W

IT

H O

U T

W R

IT

TE

N P

ER

M

IS

SI

O N

D

O C

U M

EN

TS

O F

PU

BL

IC

R

EC

O

R D

M A

Y

BE

C O

PI

ED

B U

T N

O T

A

LT

ER

ED

GEO R G IA

W

IL L I A M D. KENT

REG I S T ERED

E N G I N E E R

No. 22564

PROFESSIONAL

GENERAL NOTES

CI

TY

O F

VA

LD

O

ST

A

EM

ER

G

EN

CY

W

AT

ER

SH

ED

P

RO

TE

CT

IO

N

ST

RE

AM

C

LE

AR

IN

G A

N D

SN

AG

G

IN

G

CI

TY

O

F

VA

LD

O

ST

A, L O

W N

DE

S

CO

U

N

TY

, G A

LEVEL II CERT. 8141

OWNER:

CITY OF VALDOSTA

216 E CENTRAL AVENUE

VALDOSTA, GA 31601

PH: (229) 242-2600

ENGINEER:

INNOVATE ENGINEERING & SURVEYING, LLC.

2214 N. PATTERSON STREET

VALDOSTA, GA 31604

PH: (229) 249-9113

24 HOUR CONTACT:

CHARLIE CLARK

ENGINEERING DEPARTMENT

CITY HALL ANNEX

300 N LEE STREET

VALDOSTA, GA 31601

PH: (229) 259-3530

UTILITY CONTRACTOR:

TBD

CONSTRUCTION NOTES:

1. REMOVE DOWNED AND SNAGGED MATERIAL FROM THE STREAM CHANNEL PLUS 25'

ADJACENT TO THE TOP OF BOTH STREAM BANKS. ONLY STORM DEBRIS IN THE

ADJACENT FLOOD PLAIN AREA (WITHIN 25 FEET) THAT COULD EASILY MIGRATE TO THE

STREAM CHANNEL SHALL BE REMOVED.

2. REMOVE FALLEN TREES AND LEANING TREES THAT ARE AT AN ANGLE OF 30° OR LESS

WITH THE GROUND. UNDERMINED OR STORM DAMAGED TREES WITHIN OR OUTSIDE THE

BANKS WHICH ARE STILL STANDING BUT LIKELY TO FALL INTO THE STREAM SHOULD BE

REMOVED. ROOT WADS ATTACHED TO THE BANK SHOULD BE LEFT IN PLACE WITH THE

TREE SAWN OFF.

3. TREES AND DEBRIS LESS THAN 8” IN DIAMETER ARE NOT REQUIRED TO BE REMOVED.

HOWEVER, IF IT CAN BLOCK THE DOWNSTREAM CULVERT OR BRIDGE DURING A

FLOODING EVENT AND EASILY MIGRATE INTO THE STREAM CHANNEL, IT SHOULD BE

REMOVED. ALL STORM EVENT RELATED FOREIGN DEBRIS, DOWN TREES (EXCEPT FOR

INTACT STUMPS/ROOT WADS), BRUSH, LIMBS, TOPS, VINES, AND OTHER WASHED-IN

WOODY VEGETATIVE MATERIALS LYING COMPLETELY OR PARTIALLY WITHIN THE

STREAM BANKS SHOULD BE REMOVED. UNDER NO CIRCUMSTANCE SHALL OLD

(PRE-STORM EVENT) DEBRIS BE REMOVED. ONLY STORM DEBRIS IN THE ADJACENT

FLOOD PLAIN AREA (WITHIN 25 FEET) THAT COULD EASILY MIGRATE TO THE STREAM

CHANNEL SHALL BE REMOVED.

4. MINIMIZE DISTURBANCE OF WETLANDS, RIPARIAN AREAS, AND FISH AND WILDLIFE

HABITAT, AND AVOID DISTURBANCE WHERE POSSIBLE.

5. RETAIN HABITAT-FORMING ELEMENTS THAT PROVIDE COVER, FOOD, POOLS, AND

WATER TURBULENCE, TO THE EXTENT POSSIBLE.

6. CONTRACTOR SHALL NOT REMOVE THE ROOTS, ROOT BALLS, OR STUMP OF ANY TREES

OR VEGETATION.

7. CONTRACTOR SHALL REMOVE THE TREE FROM THE ROOT BALL OR STUMP USING SAWS

OR OTHER HAND EQUIPMENT.

8. CONTRACTOR SHALL ENTER THE STREAM BUFFER AT RIGHT ANGLES TO THE STREAM.

9. CONTRACTOR SHALL NOT TURN ANY VEHICLE INSIDE THE 25' WIDE STREAM BUFFER.

10. DEBRIS MAY BE BURNED IF APPROPRIATE PERMITS ARE OBTAINED. ALSO, DEBRIS MAY

BE MULCHED AND SPREAD ON SITE. DO NOT PLACE DEBRIS IN TRIBUTARIES, SIDE

DITCHES, NOR OTHER DEFINED WATER ENTRANCES TO THE WATERCOURSE BEING

CLEANED. NO DEBRIS WILL BE DISPOSED IN A WETLAND OR WITHIN THE 100-YEAR

FLOODPLAIN.

11. ALL DISTURBED AREA ABOVE WATER LEVELS SHALL BE STABILIZED WITH EROSION

CONTROL MATTING IF THE STUMP CANNOT BE REPLACED. MATTING IS NOT NECESSARY

IN FLAT AREAS.

12. PERMITS THAT MAY BE REQUIRED FROM GDOT, EPD, OR USACE WILL BE OBTAINED BY

THE SPONSOR.

13. THE CONTRACTOR WILL OBTAIN TEMPORARY EASEMENTS FROM AFFECTED PROPERTY

OWNERS.

14. ALL CONSTRUCTION MUST MEET NRCS STANDARDS.

15. THE CONTRACTOR TO INCLUDE O&M.

16. THE CONTRACTOR TO INCLUDE QUALITY ASSURANCE PLAN (QAP).

GENERAL NOTES:

1. THE CONTRACTOR IS RESPONSIBLE FOR THE REMOVAL AND COMPLIANT

DISPOSAL/RECYCLING OF ALL VEGETATIVE DEBRIS REMOVED AS PART OF THIS

PROJECT.

2. DAMAGE OF ADJACENT STREAM AREAS SHALL BE KEPT TO A MINIMUM DURING

CLEARING AND SNAGGING OPERATION. ALL DAMAGED AREAS SHALL BE

STABILIZED CONCURRENT WITH LAND DISTURBING ACTIVITIES.

3. BEST MANAGEMENT PRACTICES SHALL EMPLOYED DURING THE ENTIRE

OPERATION TO AVOID STREAM BANK EROSION AND SEDIMENTATION RUN OFF

INTO THE STREAM.

4. THE CLEARING AND SNAGGING OPERATION SHALL BE CONFINED TO 50 FEET

EACH SIDE OF CENTER OF THE STREAM (100 FEET TOTAL).

Natural Resources Conservation Service

CONSERVATION PRACTICE STANDARD

MULCHING

Code 484 (Ac)

DEFINITION

Applying plant residues or other suitable materials to the land surface.

PURPOSE

This practice is applied to achieve the following purpose(s):

· Improve the efficiency of moisture management

· Reduce irrigation energy used in farming/ranching practices and field operations

· Improve the efficient use of irrigation water

· Prevent excessive bank erosion from water conveyance channels

· Reduce concentrated flow erosion

· Reduce sheet, rill, & wind erosion

· Improve plant productivity and health

· Maintain or increase organic matter content

· Reduce emissions of particulate matter

CONDITIONS WHERE PRACTICE APPLIES

This practice applies to all lands where mulches are needed.

CRITERIA

General Criteria Applicable to All Purposes The selection of mulching materials will depend primarily on the purpose(s) for the mulch application, site conditions, and the material’s availability. The mulch materials may consist of natural or artificial materials of sufficient dimension (depth or thickness) and durability to achieve the intended purpose for the required time period.

Prepare the soil surface to achieve its desired purpose prior to mulching.

Apply the mulch material evenly. Use tackifiers, emulsions, pinning, netting, crimping or other methods of anchoring, if needed, to hold the mulch in place for specified periods.

In cases where furrow erosion may occur due to concentrated flows from mulches (e.g., plastic mulches on beds), take appropriate measures to protect the furrows and the furrow outlets.

Apply manufactured mulches according to the manufacturer’s specifications.

Remove synthetic mulches from the field prior to the next crop. Do not incorporate (e.g., disk) synthetic mulches into the soil.

When mulching with wood products such as wood chips, bark, or shavings or other wood materials, apply a minimum 2-inch thickness of particles that will remain in place during heavy rainfall or strong wind events, or both if applicable.

The minimum size of mulching material consisting of gravel or other inorganic mulching is 0.75 inches and applied to a minimum depth of 2 inches.

When mulching with cereal grain straw or grass hay, apply at a rate to achieve a minimum 70-percent ground cover. Determine the mulch rate using the current erosion prediction technology for the intended purpose.

Do not apply plant-based mulch materials with a carbon (C) to nitrogen (N) ratio less than 20:1 to watercourses.

Additional Criteria to Improve the Efficiency of Moisture Management, to Reduce Irrigation Energy Used in Farming/Ranching Practices and Field Operations or to Improve the Efficient Use of Irrigation Water Apply mulch materials to cover at least 90 percent of the soil surface to reduce potential evaporation.

Fine-textured mulches (e.g., rice hulls) that allow less oxygen penetration than coarser materials should not be thicker than 2 inches.

Additional Criteria to Improve Plant Productivity and Health When establishing vegetative cover, apply mulch at a rate that achieves a minimum of 70-percent ground cover to provide protection from erosion and runoff and yet allow adequate light and air penetration to the seedbed to ensure proper germination and emergence.

Additional Criteria to Maintain or Increase Organic Matter Content Use plant-based mulching materials of suitable quantity and quality to add organic matter, provide food and shelter for soil biota, and protect the soil surface from raindrop impact and crusting, while allowing for adequate soil aeration.

An evaluation of the system using the current approved soil conditioning index (SCI) procedure results in zero or higher.

CONSIDERATIONS

Evaluate the effects of mulching on evaporation, infiltration, and runoff. Mulch material may affect microbial activity in the soil surface, increase infiltration, and decrease runoff, erosion, and evaporation. The temperature of the surface runoff may also be lowered.

Mulch materials with low permeability may adversely affect the water needs of plants.

Avoid excessively thick or tightly packed mulches that can result in soggy, anaerobic conditions at the soil surface during wet weather; or prevent rainfall or overhead irrigation from reaching the soil during times of moisture deficit.

Organic materials with C:N ratios of less than 20:1 will release nitrate-nitrogen that could cause water quality impairments.

Finely divided plant residues (e.g., sawdust) and those rich in soluble carbohydrates (e.g., fresh green- chopped sorghum-sudangrass, corn, or other grasses) that have a C:N ratio greater than 30 can tie up soil N and necessitate supplemental N applications on crops. Coarser materials such as grain straw and chipped brush usually do not reduce crop-available soil N levels unless and until they are incorporated into the soil by tillage or cultivation.

Mulching may also provide habitat for beneficial organisms and provide pest suppression.

In attempting to provide habitat for ground beetles, spiders, and other predators of weed seeds and crop pests, use mulch of sufficient ground cover and suitable thickness and texture for the target species.

Avoid excessively thick or tightly packed mulches, which can interfere with the movement of ground beetles and other beneficial organisms, and may increase the incidence of crop pests and diseases. Consider mulching crops only if the selected mulching materials, and rates of application do not contribute to pest problems.

During the period when weed seed predation is desired and predators are most active, avoid pesticide applications or pesticide exposures that could adversely affect weed seed consumers.

Low permeability mulches (e.g., plastic) may increase concentrated flow and erosion on the nonmulched areas.

Light-reflecting mulches such as white or aluminized plastic film or bright straw can repel some pests.

Consider potential beneficial or detrimental effects of mulching materials on the biotic community surrounding the crop, including beneficial soil micro- and macro-organisms, as well as plant pathogens and plant pests. These effects are specific to site, mulch, and crop, and may include enhanced soil microbial activity, increased or reduced levels of crop diseases, and toxic (allelopathic) activity against the crop, weeds, or other beneficial or pest organisms.

Keep mulch 3 to 6 inches away from plant stems and crowns to prevent disease and pest problems. Additional weed control may be needed around the plant base area.

Deep mulch provides nesting habitat for ground-burrowing rodents that can chew extensively on tree trunks and tree roots. Light mulch applied after the first cold weather may prevent rodents from nesting.

Some mulch material may adversely affect aquatic environments through changes in water chemistry or as waterborne debris.

Consider placing mulch in locations that minimize these risks.

Consider potential effects of soil physical, chemical, and biological properties. Refer to soil survey data as a preliminary planning tool for assessment of areas. Consult a resource soil scientist or the Web Soil Survey at:

http://websoilsurvey.nrcs.usda.gov/app/ to obtain soil properties and qualities information.

For all organic or transitioning to organic operations, follow all National Organic Program rules.

PLANS AND SPECIFICATIONS

Prepare specifications for each site and purpose on the implementation requirements document. Documentation must include—

· Purpose of the mulch.

· Type of mulch material used.

· Percent cover or thickness of mulch material, as applicable.

· Timing of application.

· Site preparation.

· Listing of netting, tackifiers, or method of anchoring.

· Operation and maintenance.

OPERATION AND MAINTENANCE

Periodically inspect the mulched areas and reinstall mulch or repair as needed to accomplish the intended purpose.

Evaluate the effectiveness of the mulch (application, amount of cover provided, durability, etc.) and adjust the management or type of mulch to better meet the intended purpose(s).

Remove or incorporate mulch materials to be consistent with the intended purpose and site conditions.

Do not operate equipment near the mulched site that would compromise the intended purpose of the mulch.

Prevent or repair any fire damage to the mulch material.

Properly collect and dispose of synthetic mulch material after intended use.

Monitor and control undesirable weeds in mulched areas.

Natural Resources Conservation Service

CONSERVATION PRACTICE STANDARD

Critical Area Planting Code 342 (Ac)

DEFINITION

Establishing permanent vegetation on sites that have, or are expected to have, high erosion rates, and on sites that have physical, chemical, or biological conditions that prevent the establishment of vegetation with normal seeding/planting methods.

PURPOSE

· Stabilize areas with existing or expected high rates of soil erosion by wind or water.

· Stabilize stream and channel banks, pond and other shorelines, earthen features of structural conservation practices.

· Stabilize areas such as sand dunes and riparian areas.

CONDITIONS WHERE PRACTICE APPLIES

This practice applies to highly disturbed areas such as—

· Active or abandoned mined lands.

· Urban restoration sites.

· Construction areas.

· Conservation practice construction sites.

· Areas needing stabilization before or after natural disasters such as floods, hurricanes, tornados, and wildfires.

· Eroded banks of natural channels, banks of newly constructed channels, and lake shorelines.

· Other areas degraded by human activities or natural events.

CRITERIA

General Criteria Applicable to All Purposes Site preparation. Conduct a site investigation to identify any physical, chemical, or biological conditions that could affect the successful establishment of vegetation.

Clear areas to be planted of unwanted materials and smooth or shape, if needed, to meet planting purpose(s).

Prepare a suitable seedbed for all seeded species. Rip compacted layers and re-firm the soil prior to seedbed preparation, as needed.

As site conditions dictate, when grading slopes, stockpile topsoil to be redistributed over area to be planted.

Species selection. Select species for seeding or planting that are suited to local site conditions and intended uses, and common to the site or location.

Selected species will have the capacity to achieve adequate density and vigor to stabilize the site within an appropriate period.

Establishment of vegetation. Plant seeds using the method or methods best suited to site and soil conditions.

Limit sod placement to areas that can naturally supply needed moisture or sites that can be irrigated during the establishment period. Place and anchor sod using techniques to ensure that it remains in place until established.

Specify species, rates of seeding or planting, legume inoculation, minimum quality of planting stock (e.g., pure live seed (PLS) or stem caliper), method of seedbed preparation, and method of establishment before application. Use only viable, high-quality seed or planting stock.

Seed or plant at a time and in a manner that best ensures establishment and growth of the selected species.

Plant during approved times for the species to be used.

Apply soil amendments (e.g., lime, fertilizer, compost) according to the requirements in the local Field Office Technical Guide.

Mulch or otherwise stabilize (e.g., polyacrylamide (PAM)) plantings as necessary to ensure successful establishment.

Additional Criteria to Stabilize Stream and Channel Banks, Pond and Other Shorelines, Earthen Features of Structural Conservation Practices Bank and channel slopes. Shape channel side slopes so that they are stable and allow establishment and maintenance of desired vegetation.

A combination of vegetative and structural measures may be necessary on slopes steeper than 3:1 to ensure adequate stability.

Species selection. Plant material used for this purpose must—

· Be adapted to the hydrologic zone into which they will be planted.

· Be adapted and proven in the regions in which they will be used.

· Be compatible with existing vegetation in the area.

· Protect the channel banks but not restrict channel capacity.

Establishment of vegetation. Specify species, planting rates, spacing, methods and dates of planting based on local planting guides or technical notes.

Identify and protect desirable existing vegetation during practice installation.

Use a combination of vegetative and structural practices with living and inert material when flow velocities, soils, and bank stability preclude stabilization by vegetative establishment alone. Use Conservation Practice Standard (CPS) Streambank Stabilization (Code 580) for the structural measures.

Control existing vegetation on a site that will compete with species to be established vegetatively (e.g.. bare-root, containerized, ball-and-burlap, potted) to ensure successful establishment of the planted species.

Plant streambank stabilization vegetation in accordance with the NRCS Engineering Field Handbook Part 650, Chapter 16, “Streambank and Shoreline Protection,” and Chapter 18, “Soil Bioengineering for Upland Slope Protection & Erosion Reduction.”

Site protection and access control. Restrict access to planted areas until fully established.

Additional Criteria to Stabilize Areas Such As Sand Dunes and Riparian Areas Plants for sand dunes and coastal sites must be able to survive being buried by blowing sand, sand blasting, salt spray, salt water flooding, drought, heat, and low nutrient supply.

Include sand trapping devices such as sand fences or brush matting in the revegetation/stabilization plans where applicable.

CONSIDERATIONS

Species or diverse mixes that are adapted to the site and have multiple benefits should be considered. Native species may be used when appropriate for the site.

To benefit pollinators and other wildlife, flowering shrubs and wildflowers with resilient root systems and good soil-holding capacity also should be considered for incorporation as a small percentage of a larger grass-dominated planting. Where appropriate consider a diverse mixture of forbs to support pollinator habitat.

Planning and installation of other CPSs such as Diversion (Code 362), Obstruction Removal (Code 500), Subsurface Drain (Code 606), Underground Outlet (Code 620), or Anionic Polyacrylamide Application (Code 450) may be necessary to prepare the area or ensure vegetative establishment.

Areas of vegetation established with this practice can create habitat for various type of wildlife. Maintenance activities, such as mowing or spraying, can have detrimental effects on certain species. Perform management activities at the times and in a manner that causes the least disruption to wildlife.

PLANS AND SPECIFICATIONS

Prepare plans and specifications for each field or management unit according to the criteria and operation and maintenance sections of this standard. Record practice specifications using approved Implementation Requirements document.

Address the following elements in the plan, as applicable, to meet the intended purpose(s):

· Practice purpose(s)

· Site preparation

· Topsoil requirements

· Fertilizer application

· Seedbed/planting area preparation

· Timing and method of seeding/planting

· Selection of species

· Seed/plant source

· Seed analysis/pure live seed (PLS)

· Seeding rate/plant spacing

· Mulching, PAM, or other stabilizing materials

· Supplemental water needed for establishment

· Protection of plantings

· Describe successful establishment (e.g., minimum percent ground/canopy cover, percent survival, stand density)

OPERATION AND MAINTENANCE

· Control access to the area to ensure the site remains stable.

· Protect plantings shall be protected from pests (e.g., weeds, insects, diseases, livestock, or wildlife) as necessary to ensure long-term survival.

· Inspections, reseeding or replanting, and fertilization may be needed to ensure that this practice functions as intended throughout its expected life.

· Observe establishment progress and success at regular intervals until the practice has met the criteria for successful establishment and implementation.

· Description of successful establishment (e.g., minimum percent ground/canopy cover, percent survival, stand density).

Natural Resources Conservation Service

CONSERVATION PRACTICE STANDARD

CLEARING AND SNAGGING

CODE 326

(ft)

DEFINITION

Removal of specified vegetation along the bank (clearing) and selective removal of snags, drifts, or other obstructions (snagging) from natural or improved streams (includes channels).

PURPOSE

This practice is used to accomplish one or more of the following purposes:

· Restore flow capacity and direction to prevent and/or reduce ponding and flooding

· Prevent and or reduce excessive bank erosion

· Prevent and/or reduce sediment transported to surface water

· Prevent or reduce debris impacts to infrastructure

CONDITIONS WHERE PRACTICE APPLIES

Any natural or improved stream where the removal of vegetation, trees, brush, and other obstructions is needed to accomplish one or more of the listed purposes.

CRITERIA

General Criteria Applicable to All Purposes Notify landowner and/or contractor of responsibility to locate all buried utilities in the project area, including drainage tile and other structural measures. The landowner is also required to obtain all necessary permits for project installation prior to construction.

The design must address all modified flow conditions caused by clearing and snagging.

Location Include the work limits and flow area of the stream in the area to be cleared and snagged. Trees on the bank that are leaning over or other objects that may fall into the stream may be included.

Clearing and snagging may also be used for other areas, such as temporary disposal areas or travelways, required for implementation of this practice.

Capacity Determine the capacity of the stream, both before and after modification as needed, using NRCS National Engineering Handbook (NEH) (Title 210), Part 654, Chapter 6, “Stream Hydraulics.” Select a value of Manning’s “n” roughness coefficient to determine stream capacity after modification that reflects the degree of natural changes and maintenance expected to occur in future years. Other capacity analysis may be performed at the discretion of the design engineer, area engineer, or state engineer.

Stability Clearing and snagging activities may affect stream stability. The effect on downstream and upstream reaches due to the removal of obstructions must be analyzed using appropriate stream geomorphologic procedures. Avoid or mitigate activities that negatively affect stability.

Debris disposal Remove cleared and snagged material from the floodplain or deposit in areas or in a manner that will not significantly affect the flow capacity of the floodplain. Designate proper locations to dispose of all debris including invasive species and where the debris will not remobilize during future flood events.

Hazardous materials Hazardous materials such as propane tanks and car bodies may be part of the debris that is to be removed. The contractor will investigate the debris in the work limit area prior to and during removal to ensure that all work is performed in a safe manner and hazardous debris is properly disposed of.

Vegetation Restore all areas denuded and/or disturbed during clearing and snag removal by planting vegetation, unless the disturbance is minimal and conditions are highly conducive for natural regeneration of vegetation. Use native vegetation where practical.

Vegetation established as part of this practice should include ecologically suitable species obtained from local sources wherever practical. Take precautions to prevent introduction of invasive species.

Minimize disturbance of wetlands, riparian areas, and fish and wildlife habitat sites, and avoid disturbance where possible.

The establishment of vegetation on cleared and snagged areas will be in accordance with the criteria contained within NRCS Conservation Practice Standard (CPS) Critical Area Planting (Code 342).

CONSIDERATIONS

Debris in stream systems affects the physical characteristics of the stream as well as the diversity and abundance of its aquatic organisms. Fisheries and/or aquatic biologists can assist in evaluating and incorporating measures to improve aquatic and riparian-wetland habitat.

Incorporate enhancements for fish and wildlife values as needed and practical. Special attention should be given to landscape aesthetics and to protecting and maintaining key shade, food, and den trees. Use NRCS CPS Stream Habitat Improvement and Management (Code 395).

In addition to NRCS CPS Critical Area Planting (Code 342), for areas where it is difficult to establish vegetation consider NRCS CPSs Riparian Herbaceous Cover (Code 390), Riparian Forest Buffer (Code 391), Access Control (Code 472), Mulching (Code 484), Streambank and Shoreline Protection (Code 580), and Tree/Shrub Establishment (Code 612).

Retain habitat-forming elements that provide cover, food, pools, and water turbulence, to the extent possible.

Root balls of fallen trees that are securely anchored in the stream or naturally formed logjams may provide fish habitat and/or stability. The effects of these items should be included in the stream capacity hydraulic analysis. Existing root structure and stumps firmly within the soil should remain to help stabilize the soil and facilitate resprouting of woody vegetation.

Erosion rates decline as a percentage of vegetative roots in a streambank increases. Selection of appropriate riparian vegetation will increase the streambank’s ability to resist future erosion.

Clearing and snagging activity may resuspend sediments in the flow. Consider techniques that promote beneficial sediment deposition and the filtering of sediment.

During construction, woody materials may float downstream and cause additional snags and drifts. Incorporate measures as needed and practical to address this concern.

Schedule in-stream work to avoid environmentally sensitive periods such as spawning and migration to the fullest extent possible.

Incorporate measures and practices, as needed and practical, to address modified flow conditions that adversely affect resources such as—

· A lowered hydraulic gradient that may drain adjacent flood plains more quickly.

· Decreased ground water recharge in water-losing streams resulting from reduced residence time in the stream and adjacent floodplains.

Ground-disturbing activities associated with this practice have the potential to adversely affect protected plant species and may encourage the establishment of invasive plant species. Quickly revegetating disturbed areas can minimize the introduction of nonnative species.

Temporary erosion and sediment best management practices can be used to minimize the delivery of fine sediment to adjacent and downstream reaches.

Incorporate construction methods that enhance fish and wildlife values as needed and practical to include—

· Use of hand-operated equipment, water-based equipment, or small equipment to minimize soil, water, and other resource disturbances.

· Operation of heavy machinery from atop adjacent streambanks to the fullest extent possible.

· After the material has been removed from streambank locations, limiting machinery access to riparian areas to minimize damage to stream habitat.

· No special considerations have been identified for this practice.

PLANS AND SPECIFICATIONS

Prepare plans and specifications for clearing and snagging that describe the requirements for applying the practice to achieve its intended purpose(s).

As a minimum, include, as applicable, the following items in the plans and specifications:

· Map of overall area including work limits and limits of clearing and snagging required.

· Location of ingress and egress to the site.

· Description of works of improvement, extent of removal, and manner of disposal.

· Location of disposal areas or location of areas off limits for disposal of debris.

· Requirements for stabilization and vegetation in disturbed areas.

· Location and description of trees or vegetation to be left undisturbed.

· Manner and sequence of construction operations so that impacts on the environment will be minimized.

· Hazardous material identification procedure.

· Erosion control measures, as applicable.

Carry out all operations in a safe and skillful manner. Observe all safety and health regulations and use appropriate safety measures.

OPERATION AND MAINTENANCE

Provide an operation and maintenance plan to the landowner/user to maintain stream capacity and vegetative cover. Items to include are—

· Assessing the area after each major storm event for downed trees and debris accumulation. Remove or relocate and anchor downed trees and debris accumulations that are causing bank erosion problems as soon as possible.

· Periodically inspecting the area for signs of streambank undermining or instability. Remove any debris accumulations that may contribute to the instability and closely monitor the area.

· Clearing any vegetation and/or debris that blocks side drainage structures and streams.

· Promptly repair eroded areas.

· Maintain companion conservation practices to NRCS specifications.

N SAINT AUGUSTINE RD ROUSE RD

LYNN TERRACE

PARKER MATHIS DR

W

ILK

ES C

IR

HA

RM

ON

D

R

HI

CK

OR

Y

RD

SU

GA

R

CR

EE

K

SCALE 1"=100'

HALF SCALE 1"=200'

200100 0 10050

VERTICAL SCALE 1"=10'

I:\ Pr oj ec ts \1

5-

V al do st a

EW

P G ra nt

P ro je ct

\C iv il\

C

A

.d w g

- 2

S

IT

E

- S U

G A

R C

R

EE

K

9/

/2

4:

P

M

En gi ne er in g

S ur ve yi ng

I

N N

O V

A

TE

DATE:

DRAWN BY:

CHECKED BY:

B. KENT

R

EV

IS

IO

N S

D A

TE

D

ES

C R

IP

TI

O N

PH

O

N E:

9-

9-w w w

.in no va te es .co m

N

. P at te rs on S tr ee t, V al do st a, G A

M. WILSON

C

O

PY

R

IG

H T

TH

IS

D R

A W

IN

G

IS

T

H E

PR

O

PE

R

TY

O

F

IN

N O

V A

TE

E

N G

IN

EE

R

IN

G

S U

R V

EY

IN

G

LL

C

. A N

D M

A Y

N O

T

BE

R

EP

R O

D U

C

ED

W

IT

H O

U T

W R

IT

TE

N P

ER

M

IS

SI

O N

D

O C

U M

EN

TS

O F

PU

BL

IC

R

EC

O

R D

M A

Y

BE

C O

PI

ED

B U

T N

O T

A

LT

ER

ED

LEVEL II CERT. 8141

±2157 L.F. OF STREAM

CLEARING & SNAGGING

(217,177 S.F.)

50' OFFSET FROM CREEK

CENTERLINE (TYP.)

30.836960° N 83.315603° W

Co

NOTES:

1. SEDIMENT REMOVAL FROM STREAM AREA SHALL BE SPREAD OUT ON

ADJACENT UPLAND AREA TO BE DESIGNATED DURING A

PRE-CONSTRUCTION CONFERENCE WITH THE CITY OF VALDOSTA.

SEDIMENT SHALL BE SPREAD, LEVELED AND GRASSED. DEBRIS SHALL BE

PLACED AT LEAST 10 FEET A WAY FROM TOP OF STREAM BANK ON SIDE OF

STREAM WHERE IT WAS REMOVED FROM.

2. ALL DISTURBED AREA ABOVE WATER LEVELS SHALL BE STABILIZED WITH

EROSION CONTROL MATTING AND BE SEEDED PER THE PROVIDED SEEDING

SCHEDULE.

3. PERMITS THAT MAYBE REQUIRED FROM GDOT AND USACE WILL BE

OBTAINED BY THE CITY OF VALDOSTA. NEITHER GDOT NOR USACE PERMITS

ARE ANTICIPATED AT THIS TIME.

4. THE CONTRACTOR SHALL OBTAIN RIGHT-OF-ENTRY DOCUMENTS FROM

AFFECTED PROPERTY OWNERS.

LEGEND

CENTERLINE OF CREEK:

100' LIMITS OF OPERATION:

STREAM BUFFER:

CONSTRUCTION EXIT:

SHEET

PROJECT NUMBER

09/30/2025

GEO R G IA

W

IL L I A M D. KENT

REG I S T ERED

E N G I N E E R

No. 22564

PROFESSIONAL

SITE 1 - SUGAR CREEK

CI

TY

O F

VA

LD

O

ST

A

EM

ER

G

EN

CY

W

AT

ER

SH

ED

P

RO

TE

CT

IO

N

ST

RE

AM

C

LE

AR

IN

G A

N D

SN

AG

G

IN

G

CI

TY

O

F

VA

LD

O

ST

A, L O

W N

DE

S

CO

U

N

TY

, G A

STREAM BUFFER

330.841742° N 83.312397° W

Co oj ec ts \1

5-

V al do st a

EW

P G ra nt

P ro je ct

\C iv il\

C

A

.d w g

- 3

S

IT

E

IN

D

EX

9/

/2

4:

P

M

En gi ne er in g

S ur ve yi ng

I

N N

O V

A

TE

DATE:

DRAWN BY:

CHECKED BY:

B. KENT

R

EV

IS

IO

N S

D A

TE

D

ES

C R

IP

TI

O N

PH

O

N E:

9-

9-w w w

.in no va te es .co m

N

. P at te rs on S tr ee t, V al do st a, G A

SHEET

PROJECT NUMBER

09/30/2025

M. WILSON

C

O

PY

R

IG

H T

TH

IS

D R

A W

IN

G

IS

T

H E

PR

O

PE

R

TY

O

F

IN

N O

V A

TE

E

N G

IN

EE

R

IN

G

S U

R V

EY

IN

G

LL

C

. A N

D M

A Y

N O

T

BE

R

EP

R O

D U

C

ED

W

IT

H O

U T

W R

IT

TE

N P

ER

M

IS

SI

O N

D

O C

U M

EN

TS

O F

PU

BL

IC

R

EC

O

R D

M A

Y

BE

C O

PI

ED

B U

T N

O T

A

LT

ER

ED

GEO R G IA

W

IL L I A M D. KENT

REG I S T ERED

E N G I N E E R

No. 22564

PROFESSIONAL

SITE 1 INDEX

LEVEL II CERT. 8141

CI

TY

O F

VA

LD

O

ST

A

EM

ER

G

EN

CY

W

AT

ER

SH

ED

P

RO

TE

CT

IO

N

ST

RE

AM

C

LE

AR

IN

G A

N D

SN

AG

G

IN

G

CI

TY

O

F

VA

LD

O

ST

A, L O

W N

DE

S

CO

U

N

TY

, G A

3 4

11 12

13 14 15

B

ER

K

LEY D

R

CANNA DR

GONWOOD CIR

MILLPOND RD

HOWELL BROOK DR

MACK DR

N O

A K

S T

VICTORY DR

ROOSEVELT DR

N

PA

TTER

SO

N

ST

BURTON ST

TWOMILE BRANCH

TWOMILE BRANCH

SCALE 1"=150'

HALF SCALE 1"=300'

300150 0 15075

VERTICAL SCALE 1"=15'

I:\ Pr oj ec ts \1

5-

V al do st a

EW

P G ra nt

P ro je ct

\C iv il\

C

A

.d w g

- 4

S

IT

E

- T W

O M

IL

E

BR

A

N C

H

9/

/2

4:

P

M

En gi ne er in g

S ur ve yi ng

I

N N

O V

A

TE

DATE:

DRAWN BY:

CHECKED BY:

B. KENT

R

EV

IS

IO

N S

D A

TE

D

ES

C R

IP

TI

O N

PH

O

N E:

9-

9-w w w

.in no va te es .co m

N

. P at te rs on S tr ee t, V al do st a, G A

M. WILSON

C

O

PY

R

IG

H T

TH

IS

D R

A W

IN

G

IS

T

H E

PR

O

PE

R

TY

O

F

IN

N O

V A

TE

E

N G

IN

EE

R

IN

G

S U

R V

EY

IN

G

LL

C

. A N

D M

A Y

N O

T

BE

R

EP

R O

D U

C

ED

W

IT

H O

U T

W R

IT

TE

N P

ER

M

IS

SI

O N

D

O C

U M

EN

TS

O F

PU

BL

IC

R

EC

O

R D

M A

Y

BE

C O

PI

ED

B U

T N

O T

A

LT

ER

ED

LEVEL II CERT. 8141

50' OFFSET FROM CREEK

CENTERLINE (TYP.)

±3332 L.F. OF STREAM

CLEARING & SNAGGING

(333,155 S.F.)

50' OFFSET FROM CREEK

CENTERLINE (TYP.)

±1006 L.F. OF STREAM

CLEARING & SNAGGING

(100,545 S.F.)

30.863564° N 83.301903° W

Co

30.863488° N 83.292363° W

Co 30.864238° N 83.289110° W

Co

SHEET

PROJECT NUMBER

09/30/2025

GEO R G IA

W

IL L I A M D. KENT

REG I S T ERED

E N G I N E E R

No. 22564

PROFESSIONAL

SITE 2 - TWOMILE BRANCH

CI

TY

O F

VA

LD

O

ST

A

EM

ER

G

EN

CY

W

AT

ER

SH

ED

P

RO

TE

CT

IO

N

ST

RE

AM

C

LE

AR

IN

G A

N D

SN

AG

G

IN

G

CI

TY

O

F

VA

LD

O

ST

A, L O

W N

DE

S

CO

U

N

TY

, G A

STREAM BUFFER

STREAM BUFFER

LEGEND

CENTERLINE OF CREEK:

100' LIMITS OF OPERATION:

STREAM BUFFER:

CONSTRUCTION EXIT: Co

NOTES:

1. SEDIMENT REMOVAL FROM STREAM AREA SHALL BE SPREAD OUT ON

ADJACENT UPLAND AREA TO BE DESIGNATED DURING A

PRE-CONSTRUCTION CONFERENCE WITH THE CITY OF VALDOSTA.

SEDIMENT SHALL BE SPREAD, LEVELED AND GRASSED. DEBRIS SHALL BE

PLACED AT LEAST 10 FEET A WAY FROM TOP OF STREAM BANK ON SIDE OF

STREAM WHERE IT WAS REMOVED FROM.

2. ALL DISTURBED AREA ABOVE WATER LEVELS SHALL BE STABILIZED WITH

EROSION CONTROL MATTING AND BE SEEDED PER THE PROVIDED SEEDING

SCHEDULE.

3. PERMITS THAT MAYBE REQUIRED FROM GDOT AND USACE WILL BE

OBTAINED BY THE CITY OF VALDOSTA. NEITHER GDOT NOR USACE PERMITS

ARE ANTICIPATED AT THIS TIME.

4. THE CONTRACTOR SHALL OBTAIN RIGHT-OF-ENTRY DOCUMENTS FROM

AFFECTED PROPERTY OWNERS.

oj ec ts \1

5-

V al do st a

EW

P G ra nt

P ro je ct

\C iv il\

C

A

.d w g

- 5

S

IT

E

IN

D

EX

9/

/2

4:

P

M

En gi ne er in g

S ur ve yi ng

I

N N

O V

A

TE

DATE:

DRAWN BY:

CHECKED BY:

B. KENT

R

EV

IS

IO

N S

D A

TE

D

ES

C R

IP

TI

O N

PH

O

N E:

9-

9-w w w

.in no va te es .co m

N

. P at te rs on S tr ee t, V al do st a, G A

SHEET

PROJECT NUMBER

09/30/2025

M. WILSON

C

O

PY

R

IG

H T

TH

IS

D R

A W

IN

G

IS

T

H E

PR

O

PE

R

TY

O

F

IN

N O

V A

TE

E

N G

IN

EE

R

IN

G

S U

R V

EY

IN

G

LL

C

. A N

D M

A Y

N O

T

BE

R

EP

R O

D U

C

ED

W

IT

H O

U T

W R

IT

TE

N P

ER

M

IS

SI

O N

D

O C

U M

EN

TS

O F

PU

BL

IC

R

EC

O

R D

M A

Y

BE

C O

PI

ED

B U

T N

O T

A

LT

ER

ED

GEO R G IA

W

IL L I A M D. KENT

REG I S T ERED

E N G I N E E R

No. 22564

PROFESSIONAL

SITE 2 INDEX

LEVEL II CERT. 8141

CI

TY

O F

VA

LD

O

ST

A

EM

ER

G

EN

CY

W

AT

ER

SH

ED

P

RO

TE

CT

IO

N

ST

RE

AM

C

LE

AR

IN

G A

N D

SN

AG

G

IN

G

CI

TY

O

F

VA

LD

O

ST

A, L O

W N

DE

S

CO

U

N

TY

8 9

PEBBLEWOOD DR

M

OSS

TRAIL

CIR

C O

U N

TR

Y

C

LU

B D

R

WILLIAMSBURG DR

THORNBROOKE CT

NORTHWOOD PARK PL

PINE POINT CIR

PINE POINT CIR

BRIG

G

S ST

RAMBLEWOOD CIR

KN

OB

H

IL

L

RD

MOSS WAY

N VALDOSTA RD

PINE POINT CIR

WILLIAMSBURG DR

THREEMILE BR

THREEMILE BR

CA

ST

LE

C

RE

EK

P L

SCALE 1"=200'

HALF SCALE 1"=400'

400200 0 200100

VERTICAL SCALE 1"=20'

I:\ Pr oj ec ts \1

5-

V al do st a

EW

P G ra nt

P ro je ct

\C iv il\

C

A

.d w g

- 6

S

IT

E

- T H

R

EE

M

IL

E

BR

A N

C H

9/

/2

4:

P M

En gi ne er in g

S ur ve yi ng

I

N N

O V

A

TE

DATE:

DRAWN BY:

CHECKED BY:

B. KENT

R

EV

IS

IO

N S

D A

TE

D

ES

C R

IP

TI

O N

PH

O

N E:

9-

9-w w w

.in no va te es .co m

N

. P at te rs on S tr ee t, V al do st a, G A

M. WILSON

C

O

PY

R

IG

H T

TH

IS

D R

A W

IN

G

IS

T

H E

PR

O

PE

R

TY

O

F

IN

N O

V A

TE

E

N G

IN

EE

R

IN

G

S U

R V

EY

IN

G

LL

C

. A N

D M

A Y

N O

T

BE

R

EP

R O

D U

C

ED

W

IT

H O

U T

W R

IT

TE

N P

ER

M

IS

SI

O N

D

O C

U M

EN

TS

O F

PU

BL

IC

R

EC

O

R D

M A

Y

BE

C O

PI

ED

B U

T N

O T

A

LT

ER

ED

LEVEL II CERT. 8141

50' OFFSET FROM CREEK

CENTERLINE (TYP.)

±3328 L.F. OF STREAM

CLEARING & SNAGGING

(332,529 S.F.)

±3198 L.F. OF STREAM

CLEARING & SNAGGING

(319,804 S.F.)

50' OFFSET FROM CREEK

CENTERLINE (TYP.)

30.877056° N 83.305340° W

Co

30.875852° N 83.294475° W

Co

Co

30.877112° N 83.296128° W

±658 L.F. OF STREAM

CLEARING & SNAGGING

(65,764 S.F.)

SHEET

PROJECT NUMBER

09/30/2025

GEO R G IA

W

IL L I A M D. KENT

REG I S T ERED

E N G I N E E R

No. 22564

PROFESSIONAL

SITE 3 - THREEMILE BRANCH

CI

TY

O F

VA

LD

O

ST

A

EM

ER

G

EN

CY

W

AT

ER

SH

ED

P

RO

TE

CT

IO

N

ST

RE

AM

C

LE

AR

IN

G A

N D

SN

AG

G

IN

G

CI

TY

O

F

VA

LD

O

ST

A, L O

W N

DE

S

CO

U

N

TY

, G A

STREAM BUFFER

STREAM BUFFER

30.876005° N 83.314599° W

LEGEND

CENTERLINE OF CREEK:

100' LIMITS OF OPERATION:

STREAM BUFFER:

CONSTRUCTION EXIT: Co

NOTES:

1. SEDIMENT REMOVAL FROM STREAM AREA SHALL BE SPREAD OUT ON

ADJACENT UPLAND AREA TO BE DESIGNATED DURING A

PRE-CONSTRUCTION CONFERENCE WITH THE CITY OF VALDOSTA.

SEDIMENT SHALL BE SPREAD, LEVELED AND GRASSED. DEBRIS SHALL BE

PLACED AT LEAST 10 FEET A WAY FROM TOP OF STREAM BANK ON SIDE OF

STREAM WHERE IT WAS REMOVED FROM.

2. ALL DISTURBED AREA ABOVE WATER LEVELS SHALL BE STABILIZED WITH

EROSION CONTROL MATTING AND BE SEEDED PER THE PROVIDED SEEDING

SCHEDULE.

3. PERMITS THAT MAYBE REQUIRED FROM GDOT AND USACE WILL BE

OBTAINED BY THE CITY OF VALDOSTA. NEITHER GDOT NOR USACE PERMITS

ARE ANTICIPATED AT THIS TIME.

4. THE CONTRACTOR SHALL OBTAIN RIGHT-OF-ENTRY DOCUMENTS FROM

AFFECTED PROPERTY OWNERS.

oj ec ts \1

5-

V al do st a

EW

P G ra nt

P ro je ct

\C iv il\

C

A

.d w g

- 7

S

IT

E

IN

D

EX

9/

/2

4:

P

M

En gi ne er in g

S ur ve yi ng

I

N N

O V

A

TE

DATE:

DRAWN BY:

CHECKED BY:

B. KENT

R

EV

IS

IO

N S

D A

TE

D

ES

C R

IP

TI

O N

PH

O

N E:

9-

9-w w w

.in no va te es .co m

N

. P at te rs on S tr ee t, V al do st a, G A

SHEET

PROJECT NUMBER

09/30/2025

M. WILSON

C

O

PY

R

IG

H T

TH

IS

D R

A W

IN

G

IS

T

H E

PR

O

PE

R

TY

O

F

IN

N O

V A

TE

E

N G

IN

EE

R

IN

G

S U

R V

EY

IN

G

LL

C

. A N

D M

A Y

N O

T

BE

R

EP

R O

D U

C

ED

W

IT

H O

U T

W R

IT

TE

N P

ER

M

IS

SI

O N

D

O C

U M

EN

TS

O F

PU

BL

IC

R

EC

O

R D

M A

Y

BE

C O

PI

ED

B U

T N

O T

A

LT

ER

ED

GEO R G IA

W

IL L I A M D. KENT

REG I S T ERED

E N G I N E E R

No. 22564

PROFESSIONAL

SITE 3 INDEX

LEVEL II CERT. 8141

CI

TY

O F

VA

LD

O

ST

A

EM

ER

G

EN

CY

W

AT

ER

SH

ED

P

RO

TE

CT

IO

N

ST

RE

AM

C

LE

AR

IN

G A

N D

SN

AG

G

IN

G

CI

TY

O

F

VA

LD

O

ST

A, L O

W N

DE

S

CO

U

N

TY

oj ec ts \1

5-

V al do st a

EW

P G ra nt

P ro je ct

\C iv il\

C

A

.d w g

- 8

M

IS

C D

ET

A

IL

S

- 9 /3

0/

:4

PM

En gi ne er in g

S ur ve yi ng

I

N N

O V

A

TE

DATE:

DRAWN BY:

CHECKED BY:

B. KENT

R

EV

IS

IO

N S

D A

TE

D

ES

C R

IP

TI

O N

PH

O

N E:

9-

9-w w w

.in no va te es .co m

N

. P at te rs on S tr ee t, V al do st a, G A

SHEET

PROJECT NUMBER

09/30/2025

M. WILSON

C

O

PY

R

IG

H T

TH

IS

D R

A W

IN

G

IS

T

H E

PR

O

PE

R

TY

O

F

IN

N O

V A

TE

E

N G

IN

EE

R

IN

G

S U

R V

EY

IN

G

LL

C

. A N

D M

A Y

N O

T

BE

R

EP

R O

D U

C

ED

W

IT

H O

U T

W R

IT

TE

N P

ER

M

IS

SI

O N

D

O C

U M

EN

TS

O F

PU

BL

IC

R

EC

O

R D

M A

Y

BE

C O

PI

ED

B U

T N

O T

A

LT

ER

ED

GEO R G IA

W

IL L I A M D. KENT

REG I S T ERED

E N G I N E E R

No. 22564

PROFESSIONAL

MISC DETAILS

LEVEL II CERT. 8141

EXIT DIAGRAM

NOTES:

1. AVOID LOCATING ON STEEP SLOPES OR AT CURVES ON PUBLIC ROADS.

2. REMOVE ALL VEGETATION AND OTHER UNSUITABLE MATERIAL FROM THE FOUNDATION AREA, GRADE, AND

CROWN FOR POSITIVE DRAINAGE.

3. AGGREGATE SIZE SHALL BE IN ACCORDANCE WITH NATIONAL STONE ASSOCIATION R-2 (1.5"-3.5" STONE).

4. GRAVEL PAD SHALL HAVE A MINIMUM THICKNESS OF 6".

5. PAD WIDTH SHALL BE EQUAL FULL WIDTH AT ALL POINTS OF VEHICULAR EGRESS, BUT NO LESS THAN 20'.

6. A DIVERSION RIDGE SHOULD BE CONSTRUCTED WHEN GRADE TOWARD PAVED AREA IS GREATER THAN

2%..

7. INSTALL PIPE UNDER THE ENTRANCE IF NEEDED TO MAINTAIN DRAINAGE DITCHES.

8. WHEN WASHING IS REQUIRED, IT SHOULD BE DONE ON AN AREA STABILIZED WITH CRUSHED STONE THAT

DRAINS INTO AN APPROVED SEDIMENT TRAP OR SEDIMENT BASIN (DIVERT ALL SURFACE RUNOFF AND

DRAINAGE FROM THE ENTRANCE TO A SEDIMENT CONTROL DEVICE).

9. WASHRACKS AND/OR TIRE WASHERS MAY BE REQUIRED DEPENDING ON SCALE AND CIRCUMSTANCE. IF NECESSARY, WASHRACK DESIGN MAY CONSIST OF ANY MATERIAL SUITABLE FOR TRUCK TRAFFIC THAT

REMOVE MUD AND DIRT.

10.MAINTAIN AREA IN A WAY THAT PREVENTS TRACKING AND/OR FLOW OF MUD ONTO PUBLIC

RIGHTS-OF-WAYS. THIS MAY REQUIRE TOP DRESSING, REPAIR AND/OR CLEANOUT OF ANY MEASURES

USED TO TRAP SEDIMENT.

6" MIN.

6" MIN.

50' MIN.

20' MIN.

FLOW

FLOW

ENTRANCE ELEVATION

N.T.S.

CRUSHED STONE CONSTRUCTION EXITCo

CULVERT UNDER

ENTRANCE (IF NEEDED)

DIVERSION RIDGE

(SEE NOTE 6)

N.S.A. R-2 (1.5"-3.5")

COARSE AGGREGATE

GEOTEXTILE UNDERLINER

TIRE WASHRACK AREA/

TIRE WASHERS

SUPPLY WATER TO WASH

WHEELS IF NECESSARY

SEDIMENT TRAP

(SEE NOTE 6)

HARD SURFACE PUBLIC ROAD

GEOTEXTILE

UNDERLINER

N.S.A. R-2 (1.5"-3.5")

COARSE AGGREGATE

ORIGINAL

GRADE

THE DEBRIS REMOVAL OPERATIONS FROM THE STREAM CHANNEL AND ADJACENT

AREAS MUST START AT THE UPSTREAM LIMIT OF THE PROJECT AREA. THE

CONTRACTOR SHALL CONSTRUCT ACCESS ROAD ONLY WHERE REQUIRED TO ACCESS THE

ELIGIBLE STORM DEBRIS. A STONE CONSTRUCTION ENTRANCE AND EXIT DRIVEWAY AS

PER THE DETAIL IS REQUIRED WHERE THE ACCESS LOCATION INTERSECTS THE PUBLIC

RIGHT-OF-WAY TO PREVENT TRACKING ONTO THE ROADWAY. THE CONSTRUCTION

DRIVEWAY SHALL BE INSTALLED PRIOR TO STARTING DEBRIS REMOVAL OPERATIONS. THE

DEBRIS OPERATIONS SHALL BE PHASED AS TO ONLY WORK FROM THE UPSTREAM

DIRECTION TOWARD THE DOWNSTREAM DIRECTION AND THE COMPLETED PORTIONS

SHALL BE SEEDED AND MULCHED PER THE CONSTRUCTION PLANS AND

SPECIFICATIONS WITHIN 10 DAYS OR AT THE DIRECTION OF THE ENGINEER. UNDER

NO CIRCUMSTANCES CAN EQUIPMENT ENTER THE STREAM CHANNEL OR COME

WITHIN TWENTY FEET OF THE STREAM BANK EXCEPT AT SPECIFIC LOCATIONS

DETERMINED BY THE ENGINEER FOR THE PURPOSE OF GATHERING CHANNEL DEBRIS.

THE PREFERRED METHOD IS TO ONLY HAVE EQUIPMENT ON ONE SIDE OF THE

STREAM CHANNEL. IF PLACING EQUIPMENT ON BOTH SIDES OF THE STREAM

CHANNEL IS NECESSARY TO COMPLETE THE SCOPE OF WORK THE STREAM CHANNEL

AND TWENTY FOOT ADJACENT AREAS SHALL NOT BE ACCESSED BY THE EQUIPMENT

AS SHOWN ON THE CROSS-SECTION DRAWINGS. WETLANDS MUST BE AVOIDED AT

ALL TIMES AND NO DEBRIS REMOVED SHALL BE DISPOSED OF WITHIN A WETLAND

OR THE 100-YEAR FLOODPLAIN.

CI

TY

O F

VA

LD

O

ST

A

EM

ER

G

EN

CY

W

AT

ER

SH

ED

P

RO

TE

CT

IO

N

ST

RE

AM

C

LE

AR

IN

G A

N D

SN

AG

G

IN

G

CI

TY

O

F

VA

LD

O

ST

A, L O

W N

DE

S

CO

U

N

TY

, G A

GROUND

LEANING TREE

ST

R

AI

G

H T

TR

EE

NOTE:

ANY TREES LEANING 30° OR LESS WITH THE GROUND

SHALL BE CLEAN CUT WITH STUMP REMAINING ANY TREE

LEANING GREATER THAN 30° SHALL BE KEPT INTACT.

30°

DELINEATING LEANING TREES

TO BE REMOVED

oj ec ts \1

5-

V al do st a

EW

P G ra nt

P ro je ct

\C iv il\

C

A

.d w g

- 9

E S&

PC

D

ET

A

IL

S

- 9

/3 0/

:4

PM

En gi ne er in g

S ur ve yi ng

I

N N

O V

A

TE

DATE:

DRAWN BY:

CHECKED BY:

B. KENT

R

EV

IS

IO

N S

D A

TE

D

ES

C R

IP

TI

O N

PH

O

N E:

9-

9-w w w

.in no va te es .co m

N

. P at te rs on S tr ee t, V al do st a, G A

SHEET

PROJECT NUMBER

09/30/2025

M. WILSON

C

O

PY

R

IG

H T

TH

IS

D R

A W

IN

G

IS

T

H E

PR

O

PE

R

TY

O

F

IN

N O

V A

TE

E

N G

IN

EE

R

IN

G

S U

R V

EY

IN

G

LL

C

. A N

D M

A Y

N O

T

BE

R

EP

R O

D U

C

ED

W

IT

H O

U T

W R

IT

TE

N P

ER

M

IS

SI

O N

D

O C

U M

EN

TS

O F

PU

BL

IC

R

EC

O

R D

M A

Y

BE

C O

PI

ED

B U

T N

O T

A

LT

ER

ED

GEO R G IA

W

IL L I A M D. KENT

REG I S T ERED

E N G I N E E R

No. 22564

PROFESSIONAL

ES&PC DETAILS 1

LEVEL II CERT. 8141

CI

TY

O F

VA

LD

O

ST

A

EM

ER

G

EN

CY

W

AT

ER

SH

ED

P

RO

TE

CT

IO

N

ST

RE

AM

C

LE

AR

IN

G A

N D

SN

AG

G

IN

G

CI

TY

O

F

VA

LD

O

ST

A, L O

W N

DE

S

CO

U

N

TY

oj ec ts \1

5-

V al do st a

EW

P G ra nt

P ro je ct

\C iv il\

C

A

.d w g

- 1

ES

PC

D

ET

A

IL

S

- 9 /3

0/

:4

PM

En gi ne er in g

S ur ve yi ng

I

N N

O V

A

TE

DATE:

DRAWN BY:

CHECKED BY:

B. KENT

R

EV

IS

IO

N S

D A

TE

D

ES

C R

IP

TI

O N

PH

O

N E:

9-

9-w w w

.in no va te es .co m

N

. P at te rs on S tr ee t, V al do st a, G A

SHEET

PROJECT NUMBER

09/30/2025

M. WILSON

C

O

PY

R

IG

H T

TH

IS

D R

A W

IN

G

IS

T

H E

PR

O

PE

R

TY

O

F

IN

N O

V A

TE

E

N G

IN

EE

R

IN

G

S U

R V

EY

IN

G

LL

C

. A N

D M

A Y

N O

T

BE

R

EP

R O

D U

C

ED

W

IT

H O

U T

W R

IT

TE

N P

ER

M

IS

SI

O N

D

O C

U M

EN

TS

O F

PU

BL

IC

R

EC

O

R D

M A

Y

BE

C O

PI

ED

B U

T N

O T

A

LT

ER

ED

GEO R G IA

W

IL L I A M D. KENT

REG I S T ERED

E N G I N E E R

No. 22564

PROFESSIONAL

ES&PC DETAILS 2

LEVEL II CERT. 8141

CI

TY

O F

VA

LD

O

ST

A

EM

ER

G

EN

CY

W

AT

ER

SH

ED

P

RO

TE

CT

IO

N

ST

RE

AM

C

LE

AR

IN

G A

N D

SN

AG

G

IN

G

CI

TY

O

F

VA

LD

O

ST

A, L O

W N

DE

S

CO

U

N

TY

oj ec ts \1

5-

V al do st a

EW

P G ra nt

P ro je ct

\C iv il\

C

A

.d w g

- 1

ES

PC

D

ET

A

IL

S

- 9 /3

0/

:4

PM

En gi ne er in g

S ur ve yi ng

I

N N

O V

A

TE

DATE:

DRAWN BY:

CHECKED BY:

B. KENT

R

EV

IS

IO

N S

D A

TE

D

ES

C R

IP

TI

O N

PH

O

N E:

9-

9-w w w

.in no va te es .co m

N

. P at te rs on S tr ee t, V al do st a, G A

SHEET

PROJECT NUMBER

09/30/2025

M. WILSON

C

O

PY

R

IG

H T

TH

IS

D R

A W

IN

G

IS

T

H E

PR

O

PE

R

TY

O

F

IN

N O

V A

TE

E

N G

IN

EE

R

IN

G

S U

R V

EY

IN

G

LL

C

. A N

D M

A Y

N O

T

BE

R

EP

R O

D U

C

ED

W

IT

H O

U T

W R

IT

TE

N P

ER

M

IS

SI

O N

D

O C

U M

EN

TS

O F

PU

BL

IC

R

EC

O

R D

M A

Y

BE

C O

PI

ED

B U

T N

O T

A

LT

ER

ED

GEO R G IA

W

IL L I A M D. KENT

REG I S T ERED

E N G I N E E R

No. 22564

PROFESSIONAL

ES&PC DETAILS 3

LEVEL II CERT. 8141

CI

TY

O F

VA

LD

O

ST

A

EM

ER

G

EN

CY

W

AT

ER

SH

ED

P

RO

TE

CT

IO

N

ST

RE

AM

C

LE

AR

IN

G A

N D

SN

AG

G

IN

G

CI

TY

O

F

VA

LD

O

ST

A, L O

W N

DE

S

CO

U

N

TY

Sheets and Views
COVER
1 GENERAL NOTES
2 SITE 1 - SUGAR CREEK
3 SITE 1 INDEX
4 SITE 2 - TWOMILE BRANCH
5 SITE 2 INDEX
6 SITE 3 - THREEMILE BRANCH
7 SITE 3 INDEX
8 MISC DETAILS
9 ES&PC DETAILS 1
10 ES&PC DETAILS 2
11 ES&PC DETAILS 3