About this file

This is a Statement of Work (SOW) for demolition and construction work at the T82 Remote Communications Air/Ground (RCAG) site in Fredericksburg, Texas. The contractor must demolish all existing towers including foundations and guided cable anchors, then install a new 30-foot antenna tower with foundations and cabling to the building. The work includes installing a lightning protection system for both towers and building according to FAA specifications.

The contractor must provide all labor, equipment, materials, and transportation, with work to be completed within 6 months. Work hours are 7:00 AM to 5:30 PM Monday through Friday, with weekend work allowed only for schedule recovery. Key requirements include FAA pre-approval of materials, minimizing outage time, coordinating shutdowns 30 days in advance, maintaining liability insurance, and submitting a safety/security plan. The contractor's superintendent must be on-site during all work and maintain communication with FAA. The work must comply with multiple FAA standards and specifications including FAA-STD-019F, FAA-C-1217G, and NFPA 70. All work will be inspected and approved by an FAA Resident Engineer.

View the file

Other files

Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SCOPE OF WORK

Fredericksburg, Texas (T82) Remote Communications Air/Ground (RCAG) site.

01/30/2024

1) TABLE OF CONTENTS

a) BACKGROUND

b) SCOPE OF WORK

c) SPECIFICATIONS

d) GENERAL REQUIREMENTS

e) LOCATION

f) CONTACTS

2) BACKGROUND

T82 RCAG (30° 23' 11.004"N, 98° 51' 47.016"W) Contractor must demolish all old towers, including foundations and old guided cable anchors. Additionally, contractor shall install a new 30’ antenna tower and the respective foundations will be constructed in this site as well as the cabling from the towers to the building. The contractor will install lightning protection system for the towers and the building as per FAA specifications. These specifications, along with the accompanying drawings, describe the requirements for the re-cabling of an existing Federal Aviation Administration (FAA) Remote Communications Air/Ground

(RCAG) in Fredericksburg, Texas. Contractor will comply with all procedures, and regulations of the city.

3) SPECIFICATIONS

Contractor shall furnish all plant, labor, equipment material, supplies and transportation required to perform the work, including erection or installation of items, all in strict accordance with the drawings and specifications. (NOT LIMITED TO THIS VERSION, MOST UPDATED VERSION WILL HAVE TO

BE USED)

a) INSTALLATION OF ROOFING MEMBRANE ON OMN VOR ROOF

b) FAA-STD-019F

c) FAA-C-1217G

d) FAA-C-1391D

e) FAA-G-2100G

f) FAA Order 6950.19A

g) FAA-E-2013E

h) NFPA 70

i) ANSI A250.6, A250.8

j) SDI 100

k) ANSI/BHMA A156.1 through A156.21

l) ASTM D118, ASTM C136

4) GENERAL REQUIREMENTS

a) The FAA, before installation, must approve all materials used.

b) Contractor will stage work in a manner that minimizes outage time.

c) All shutdowns and cutovers shall be coordinated with and scheduled by local FAA Air Traffic

Management with 30 days of anticipation.

d) Contractor shall repair any damage done by him to any entity, at his cost. Contractor shall be covered by minimum locally required liability.

e) Contractor must provide FAA with a safety and security plan before work begins. (1) Due to the remote location of this facility, extra precautions shall be established. Plan will include procedures for accident prevention, emergency procedures, phone number & map to nearest emergency medical facility.

f) Contractor's Superintendent shall be present at the work site during all times work is performed. Superintendent shall carry a cell phone and be prepared to make and receive calls to

& from the FAA at all times while on work site.

5) WORK HOURS AND CONDITIONS

Contractor will be subject to all laws and regulations that apply to persons on State of Texas property and landowner regulations.

a) RTR installation work must be complete within (6 months) calendar days.

b) Work will be done between 7:00AM to 5:30PM. Monday through Friday. Unless otherwise noted.

c) Saturday, Sunday, & Overtime work will only be allowed to expedite work in case of schedule setbacks.

d) Contractor will report & coordinate each day’s work in advance with the onsite FAA COR.

e) All work will be inspected and approved by an FAA Resident Engineer.

6) LOCATION

Fredericksburg, Texas

30° 23' 11.004"N

98° 51' 47.016"W

T82 RCAG is a remote site to the north of Fredericksburg, Texas.

7) CONTACTS

Travis Hundl

Austin Enroute SSC travis.s.hundl@faa.gov

(512) 569-2261

Elias Castillo

CSA Engineering Services elias.a.castillo@faa.gov

(817) 889-0605

Devkota Saurav

CSA Engineering Services

Saurav.devkota@faa.gov

(817) 201-7124

***END***

mailto:travis.s.hundl@faa.gov mailto:elias.a.castillo@faa.gov mailto:Saurav.devkota@faa.gov

File details come from the government source that posted it. Updated .