This is an AIA Document B101-2017 Standard Form of Agreement Between Owner and Architect, executed by Waukesha County for professional architectural and engineering services related to a comprehensive study of the Waukesha County Administration Center. The agreement establishes the scope of services to be performed by the selected architect/engineering firm, including schematic design, design development, construction documents, procurement phase services, and construction phase administration. The project timeline requires completion of the study by October 1, 2026, with the selection of the firm anticipated for April 2026. The Waukesha County Department of Public Works will manage the process, and the study may be accomplished through the use of sub-consultants or joint ventures, provided eligibility requirements are satisfied. The agreement incorporates the Owner's Request for Proposal and the Architect's response as binding exhibits, and references AIA Document A201-2017 General Conditions of the Contract for Construction as the basis for construction phase services.
The agreement provides for compensation based on methods to be determined from the architect's proposal, with additional services and supplemental services compensated separately upon written authorization by Waukesha County prior to commencement of work. All additional work beyond the scope of basic services must be authorized in writing with fees determined before work begins and calculated using hourly rates submitted in the pricing document. The architect is required to maintain comprehensive insurance coverage including $1,000,000 Commercial General Liability, $1,000,000 Automobile Liability, and $1,000,000 Professional Liability per claim. The agreement is governed by Wisconsin law with exclusive venue in Waukesha County Circuit Court, and the architect must comply with all federal, state, and local nondiscrimination laws. Reimbursable expenses beyond standard allowances require advance authorization from Waukesha County, and five percent of total compensation will be retained until final completion of the construction phase.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Document B101® – 2017 Standard Form of Agreement Between Owner and Architect
AIA Document B101 – 2017. Copyright © 1974, 1978, 1987, 1997, 2007 and 2017. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This document was produced at 09:38:25 CDT on 07/24/2025 under Subscription No.20250136525 which expires on 06/26/2026, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com.
User Notes: (6882451e2a61ed3bf4e9564c)
ADDITIONS AND DELETIONS:
The author of this document may have revised the text of the original AIA standard form. An Additions and Deletions Report that notes revisions to the standard form text is available from the author and should be reviewed. A vertical line in the left margin of this document indicates where the author has added to or deleted from the original AIA text.
This document has important legal consequences. Consultation with an attorney is encouraged with respect to its completion or modification.
AS MODIFIED BY OWNER
AGREEMENT made as of the Twenty-fourth day of July in the year Two Thousand Twenty-Five (In words, indicate day, month and year.)
BETWEEN the Architect’s client identified as the Owner:
(Name and address) and the Architect:
(Name and address) for the following Project:
The Owner and Architect agree as follows:
AIA Document B101 – 2017. Copyright © 1974, 1978, 1987, 1997, 2007 and 2017. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This document was produced at 09:38:25 CDT on 07/24/2025 under Subscription No.20250136525 which expires on 06/26/2026, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com.
User Notes: (6882451e2a61ed3bf4e9564c)
TABLE OF ARTICLES
1 INITIAL INFORMATION
2 ARCHITECT’S RESPONSIBILITIES
3 SCOPE OF ARCHITECT’S BASIC SERVICES
4 ARCHITECT'S BASIC SERVICES, CONTINUED
5 OWNER’S RESPONSIBILITIES
6 COST OF THE WORK
7 COPYRIGHTS AND LICENSES
8 CLAIMS AND DISPUTES
9 TERMINATION OR SUSPENSION
10 MISCELLANEOUS PROVISIONS
11 COMPENSATION
12 SPECIAL TERMS AND CONDITIONS
13 SCOPE OF THE AGREEMENT
ARTICLE 1 INITIAL INFORMATION
§ 1.1 This Agreement is based on the Initial Information, if any, set forth in this Section 1.1.
(For each item in this section, insert the information or a statement such as “not applicable” or “unknown at time of execution.”)
§ 1.1.1 The Owner’s program for the Project:
(Insert the Owner’s program, identify documentation that establishes the Owner’s program, or state the manner in which the program will be developed.)
§ 1.1.2 The Project’s physical characteristics:
(Identify or describe pertinent information about the Project’s physical characteristics, such as size; location;
dimensions; geotechnical reports; site boundaries; topographic surveys; traffic and utility studies; availability of public and private utilities and services; legal description of the site, etc.)
Reminder: insert plans & specs date + project. Incorporate RFP + attachments into contract.
§ 1.1.3
Owner's RFP No. _______ (add amendments, if any) herein attached and incorporated by reference as Exhibit A and Architect's response dated ______, (add clarifications, if any) herein attached and incorporated by reference as Exhibit B.
§ 1.1.4 The Owner’s anticipated design and construction milestone dates:
.1 Design phase milestone dates, if any:
AIA Document B101 – 2017. Copyright © 1974, 1978, 1987, 1997, 2007 and 2017. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This document was produced at 09:38:25 CDT on 07/24/2025 under Subscription No.20250136525 which expires on 06/26/2026, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com.
User Notes: (6882451e2a61ed3bf4e9564c)
.2 Construction commencement date:
.3 Substantial Completion date or dates:
.4 Final Completion
§ 1.1.5 The Owner intends the following procurement and delivery method for the Project: Public Bid
§ 1.1.6 The Owner’s anticipated Sustainable Objective for the Project:
(Identify and describe the Owner’s Sustainable Objective for the Project, if any.)
See Exhibit ________, RFP No. _____
§ 1.1.6.1
§ 1.1.7 The Owner identifies the following representative in accordance with Section 5.3:
(List name, address, and other contact information.)
§ 1.1.8
§ 1.1.9
.1
.2
.3
§ 1.1.10 The Architect identifies the following representative in accordance with Section 2.3:
(List name, address, and other contact information.)
§ 1.1.11 The Architect shall retain the consultants identified in Sections 1.1.11.1 and 1.1.11.2:
(List name, legal status, address, and other contact information.)
§ 1.1.11.1 Consultants retained under Basic Services:
.1 Structural Engineer:
.2 Mechanical Engineer:
AIA Document B101 – 2017. Copyright © 1974, 1978, 1987, 1997, 2007 and 2017. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This document was produced at 09:38:25 CDT on 07/24/2025 under Subscription No.20250136525 which expires on 06/26/2026, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com.
User Notes: (6882451e2a61ed3bf4e9564c)
.3 Electrical Engineer:
.4 Geotechnical Engineer: .5 Civil Engineer: .6 Surveyors: .7 Other, if any:
§ 1.1.11.2
§ 1.1.12 Other Initial Information on which the Agreement is based:
§ 1.2
§ 1.3 The parties shall agree upon protocols governing the transmission and use of Instruments of Service or any other information or documentation in digital form.
§ 1.3.1
ARTICLE 2 ARCHITECT’S RESPONSIBILITIES
§ 2.1 The Architect shall provide the professional services set forth in this Agreement and in AIA Document A201-2017, as modified, a copy of AIA Document A201-2017, as modified, being attached hereto as Exhibit C and by reference made a part hereof. The Architect represents that it is properly licensed in the jurisdiction where the Project is located to provide the services required by this Agreement, or shall cause such services to be performed by appropriately licensed design professionals.
§ 2.2 The Architect shall perform its services consistent with the professional skill and care ordinarily provided by architects practicing in the same or similar locality under the same or similar circumstances, and shall be responsible for its acts and omissions. The Architect shall perform its services as expeditiously as is consistent with such professional skill and care and the orderly progress of the Project.
§ 2.3 The Architect shall identify a representative authorized to act on behalf of the Architect with respect to the Project.
§ 2.4 Except with the Owner’s knowledge and consent, the Architect shall not engage in any activity, or accept any employment, interest or contribution that would reasonably appear to compromise the Architect’s professional judgment with respect to this Project.
§ 2.5 The Architect shall maintain the following insurance until termination of this Agreement. Architect agrees that it will, at all times during the term of this Agreement, to keep in force and effect insurance policies as outlined below, issued by a company or companies authorized to do business in the State of Wisconsin and satisfactory to the Owner.
Such insurance shall be primary.
§ 2.5.1 Commercial General Liability with policy limits of not less than ($ 1,000,000 ) for each occurrence and ($ 1,000,000 ) in the aggregate for bodily injury and property damage. Policy shall be written to provide coverage for, but not limited to, premises and operations, personal injury, blanket contractual, independent contractor.
§ 2.5.2 Automobile Liability covering vehicles owned, and non-owned vehicles used, by the Architect with policy limits of not less than ($ 1,000,000 ) per accident for bodily injury, death of any person, and property damage arising out of the ownership, maintenance and use of those motor vehicles, along with any other statutorily required automobile coverage.
§ 2.5.3 The Architect may achieve the required limits and coverage for Commercial General Liability and Automobile Liability through a combination of primary and excess or umbrella liability insurance, provided such primary and excess or umbrella liability insurance policies result in the same or greater coverage as the coverages required under Sections 2.5.1 and 2.5.2, and in no event shall any excess or umbrella liability insurance provide narrower coverage than the primary policy. The excess policy shall not require the exhaustion of the underlying limits only through the
AIA Document B101 – 2017. Copyright © 1974, 1978, 1987, 1997, 2007 and 2017. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This document was produced at 09:38:25 CDT on 07/24/2025 under Subscription No.20250136525 which expires on 06/26/2026, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com.
User Notes: (6882451e2a61ed3bf4e9564c) actual payment by the underlying insurers.
§ 2.5.4 Workers’ Compensation at statutory limits.
§ 2.5.5 Employers’ Liability with policy limits not less than ($ 500,000 ) each accident, ($ 500,000 ) each employee, and ($ 500,000 ) policy limit.
§ 2.5.6 Professional Liability covering negligent acts, errors and omissions in the performance of professional services with policy limits of not less than ($ 1,000,000 ) per claim and ($ 1,000,000 ) in the aggregate.
§ 2.5.6.1 For claims made coverage, the retroactive date for policies in force during this Agreement shall be no later than the inception date of this Agreement unless policy in force at the inception date is extended indefinitely to cover all acts.
Coverage shall be extended beyond this Agreement either by a supplemental extended reporting period for at least two
(2) years after work has been completed or by providing a retroactive date no later than the inception date of this Agreement for any policy issued within two (2) years after work has been completed or accepted. The retroactive date shall be stated on the Certificate of Insurance.
§ 2.5.6.2 Any insurance policy deductibles or self-insured retentions (SIRS) must be declared to and approved of by the Owner. Deductibles and SIRS shall be stated on the Certificate of Insurance.
§ 2.5.7 Additional Insured Obligations. To the fullest extent permitted by law, the Architect shall cause the primary and excess or umbrella polices for Commercial General Liability and Automobile Liability to include the Owner as an additional insured for claims caused in whole or in part by the Architect’s negligent acts or omissions. The additional insured coverage shall be primary and non-contributory to any of the Owner’s insurance policies and shall apply to both ongoing and completed operations.
§ 2.5.8 Prior to execution of this agreement, the Architect shall provide certificates of insurance to the Owner and upon request, certified copies of the required insurance policies, that evidence compliance with the requirements in this Section 2.5. The Owner shall be given thirty (30) days’ advance notice of cancellation, nonrenewal, or material reduction of coverages, scope or limits during the term of this Agreement.
ARTICLE 3 SCOPE OF ARCHITECT’S BASIC SERVICES
§ 3.1 The Architect’s Basic Services consist of those described in this Article 3 or elsewhere specifically described in this document or reasonably inferable therefrom, and include usual and customary structural, mechanical, electrical, geotechnical, and civil engineering, surveying and other services.
§ 3.1.1 The Architect shall manage the Architect’s services, research applicable design criteria, attend Project meetings, communicate with Project participants, and report progress to the Owner.
§ 3.1.2 The Architect shall coordinate its services with those services provided by the Owner and the Owner’s consultants, if any. The Architect shall be entitled to rely on, the accuracy, completeness, and timeliness of, services and information furnished by the Owner and the Owner’s consultants. The Architect shall provide prompt written notice to the Owner if the Architect becomes aware of any error, omission, or inconsistency in such services or information.
§ 3.1.3 As soon as practicable after the date of this Agreement, the Architect shall submit for the Owner’s approval a schedule for the performance of the Architect’s services. The schedule initially shall include anticipated dates for the commencement of construction and for Substantial Completion of the Work as set forth in the Initial Information. The schedule shall include allowances for periods of time required for the Owner’s review, for the performance of the Owner’s consultants, if any, and for approval of submissions by authorities having jurisdiction over the Project. Once approved by the Owner, time limits established by the schedule shall not, except for reasonable cause, be exceeded by the Architect or Owner. With the Owner’s approval, the Architect shall adjust the schedule, if necessary, as the Project proceeds until the commencement of construction.
§ 3.1.4 The Architect shall not be responsible for an Owner’s directive or substitution, or for the Owner’s acceptance of non-conforming Work, made or given without the Architect’s written approval.
AIA Document B101 – 2017. Copyright © 1974, 1978, 1987, 1997, 2007 and 2017. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This document was produced at 09:38:25 CDT on 07/24/2025 under Subscription No.20250136525 which expires on 06/26/2026, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com.
User Notes: (6882451e2a61ed3bf4e9564c)
§ 3.1.5 The Architect shall contact governmental authorities required to approve the Construction Documents and entities providing utility services to the Project. The Architect shall respond to applicable design requirements imposed by those authorities and entities.
§ 3.1.6 The Architect shall assist the Owner in connection with the Owner’s responsibility for filing documents required for the approval of governmental authorities having jurisdiction over the Project.
§ 3.2 Schematic Design Phase Services § 3.2.1 The Architect shall review the program and other information furnished by the Owner, and shall review laws, codes, and regulations applicable to the Architect’s services. The Architect shall provide analysis of the Owner's needs and program to ascertain the requirements of the Project.
§ 3.2.2 The Architect shall prepare a written preliminary evaluation of the Owner’s program, schedule, budget for the Cost of the Work, Project site, the proposed procurement and delivery method, and other Initial Information, each in terms of the other, to ascertain the requirements of the Project. The Architect shall notify the Owner in writing of (1) any inconsistencies discovered in the information, and (2) other information or consulting services that may be reasonably needed for the Project.
§ 3.2.3 The Architect shall present its preliminary evaluation to the Owner and shall discuss with the Owner alternative approaches to design and construction of the Project. The Architect shall reach an understanding with the Owner regarding the requirements of the Project.
§ 3.2.4 Based on the Project requirements agreed upon with the Owner, the Architect shall prepare and present, for the Owner’s review (multiple if necessary) , a preliminary design illustrating the scale and relationship of the Project components.
§ 3.2.5 Based on the Owner’s approval of the preliminary design, the Architect shall prepare Schematic Design Documents for the Owner’s approval. The Schematic Design Documents shall consist of drawings and other documents including a site plan, if appropriate, and preliminary building plans, sections and elevations; and may include some combination of study models, perspective sketches, or digital representations. Preliminary selections of major building systems and construction materials shall be noted on the drawings or described in writing.
§ 3.2.5.1 The Architect shall consider sustainable design alternatives, such as material choices and building orientation, together with other considerations based on program and aesthetics, in developing a design that is consistent with the Owner’s program, schedule and budget for the Cost of the Work. The Owner may obtain more advanced sustainable design services as a Supplemental Service under Section 4.1.1.
§ 3.2.5.2 The Architect shall consider the value of alternative materials, building systems and equipment, together with other considerations based on program and aesthetics, in developing a design for the Project that is consistent with the Owner’s program, schedule, and budget for the Cost of the Work.
§ 3.2.6 The Architect shall submit to the Owner an estimate of the Cost of the Work prepared in accordance with Section 6.3.
§ 3.2.7 The Architect shall submit the Schematic Design Documents to the Owner, and request the Owner’s approval.
§ 3.3 Design Development Phase Services § 3.3.1 Based on the Owner’s approval of the Schematic Design Documents, and on the Owner’s authorization of any adjustments in the Project requirements and the budget for the Cost of the Work, the Architect shall prepare Design Development Documents for the Owner’s approval. The Design Development Documents shall illustrate and describe the development of the approved Schematic Design Documents and shall consist of drawings and other documents including plans, sections, elevations, typical construction details, and diagrammatic layouts of building systems to fix and describe the size and character of the Project as to architectural, structural, mechanical and electrical systems, and other appropriate elements. The Design Development Documents shall also include outline specifications that identify major materials and systems and establish, in general, their quality levels.
§ 3.3.2 The Architect shall update the estimate of the Cost of the Work prepared in accordance with Section 6.3.
AIA Document B101 – 2017. Copyright © 1974, 1978, 1987, 1997, 2007 and 2017. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This document was produced at 09:38:25 CDT on 07/24/2025 under Subscription No.20250136525 which expires on 06/26/2026, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com.
User Notes: (6882451e2a61ed3bf4e9564c)
§ 3.3.3 The Architect shall submit the Design Development Documents to the Owner, advise the Owner of any adjustments to the estimate of the Cost of the Work, and request the Owner’s approval.
§ 3.3.4 The Architect shall provide services to verify the accuracy of drawings or other information furnished by the Owner.
§ 3.3.5 The Architect shall provide interior design and other similar services required for or in connection with the selection, procurement or installation of furniture, furnishings and related equipment.
§ 3.3.6 The Architect shall change and edit previously prepared documents necessitated by the enactment or revision of codes, laws or regulations of official interpretations;
§ 3.3.7 The Architect shall prepare digital data for transmission to the Owner’s consultants and contractors, or to other Owner authorized recipients;
§ 3.3.8 The Architect shall prepare design and documentation for alternate bid or proposal requests proposed by the Owner;
§ 3.3.9 The Architect shall prepare for, and attend public presentations, meetings or hearings.
§ 3.3.10 The Architect shall evaluate substitutions proposed by the Owner and making subsequent revisions to drawings, specifications or other documents resulting therefrom.
§ 3.4 Construction Documents Phase Services § 3.4.1 Based on the Owner’s approval of the Design Development Documents, and on the Owner’s authorization of any adjustments in the Project requirements and the budget for the Cost of the Work, the Architect shall prepare Construction Documents for the Owner’s review. The Owner's review of the Architect's design documents shall not be for the purpose of determining the accuracy, adequacy or completeness of such documents and shall not alter the Architect's responsibilities with respect to such documents.The Construction Documents shall illustrate and describe the further development of the reviewed Design Development Documents and shall consist of Drawings and Specifications setting forth in detail the quality levels and performance criteria of materials and systems and other requirements for the construction of the Work. The Owner and Architect acknowledge that, in order to perform the Work, the Contractor will provide additional information, including Shop Drawings, Product Data, Samples and other similar submittals, which the Architect shall review in accordance with Section 3.6.4.
§ 3.4.2 The Architect shall incorporate the design requirements of governmental authorities having jurisdiction over the Project into the Construction Documents and shall assist the Owner in connection with the Owner's responsibility for filing documents required for the approval of governmental authorities having jurisdiction over the Project by preparing and submitting such documents.
§ 3.4.3 During the development of the Construction Documents, the Architect shall assist the Owner in the development and preparation of (1) procurement information that describes the time, place, and conditions of bidding, including bidding or proposal forms; (2) the form of agreement between the Owner and Contractor; and (3) the Conditions of the Contract for Construction (General, Supplementary and other Conditions). The Architect shall also compile a project manual that includes the Conditions of the Contract for Construction and Specifications, and may include bidding requirements and sample forms.
§ 3.4.4 The Architect shall update the estimate for the Cost of the Work prepared in accordance with Section 6.3.
§ 3.4.5 The Architect shall submit the Construction Documents to the Owner, advise the Owner of any adjustments to the estimate of the Cost of the Work, take any action required under Section 6.5, and request the Owner’s review.
§ 3.5 Procurement Phase Services § 3.5.1 General The Architect shall assist the Owner in establishing a list of prospective contractors. The Architect shall assist the Owner in (1) obtaining either competitive bids or negotiated proposals; (2) evaluating the qualifications of bidders or proposers and confirming responsiveness of bids or proposals; (3) determining the successful bid or proposal, if any;
AIA Document B101 – 2017. Copyright © 1974, 1978, 1987, 1997, 2007 and 2017. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This document was produced at 09:38:25 CDT on 07/24/2025 under Subscription No.20250136525 which expires on 06/26/2026, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com.
User Notes: (6882451e2a61ed3bf4e9564c) and, (4) awarding and preparing contracts for construction.
§ 3.5.2 Competitive Bidding § 3.5.2.1 Bidding Documents shall consist of bidding requirements and proposed Contract Documents.
§ 3.5.2.2 The Architect shall assist the Owner in bidding the Project by:
.1 facilitating the distribution of Bidding Documents to prospective bidders;
.2 organizing and conducting a pre-bid conference for prospective bidders;
.3 preparing responses to questions from prospective bidders and providing clarifications and interpretations of the Bidding Documents to the prospective bidders in the form of addenda; and, .4 organizing and conducting the opening of the bids, and subsequently documenting and distributing the bidding results, as directed by the Owner.
§ 3.5.2.3 If the Bidding Documents permit substitutions, upon the Owner’s written authorization, the Architect shall consider requests for substitutions and prepare and distribute addenda identifying approved substitutions to all prospective bidders.
§ 3.5.3 Negotiated Proposals § 3.5.3.1 Proposal Documents shall consist of proposal requirements and proposed Contract Documents.
§ 3.5.3.2 The Architect shall assist the Owner in obtaining proposals by:
.1 facilitating the distribution of Proposal Documents for distribution to prospective contractors and requesting their return upon completion of the negotiation process;
.2 organizing and participating in selection interviews with prospective contractors;
.3 preparing responses to questions from prospective contractors and providing clarifications and interpretations of the Proposal Documents to the prospective contractors in the form of addenda; and, .4 participating in negotiations with prospective contractors, and subsequently preparing a summary report of the negotiation results, as directed by the Owner.
§ 3.5.3.3 If the Proposal Documents permit substitutions, upon the Owner’s written authorization, the Architect shall consider requests for substitutions and prepare and distribute addenda identifying approved substitutions to all prospective contractors.
§ 3.6 Construction Phase Services § 3.6.1 General § 3.6.1.1 The Architect shall provide administration of the Contract between the Owner and the Contractor as set forth below and in AIA Document A201™–2017, General Conditions of the Contract for Construction as modified by Owner.
§ 3.6.1.2 The Architect shall advise and consult with the Owner during the Construction Phase Services. The Architect shall be a representative of the Owner during construction until the date the Architect issues the final Certificate for Payment and, with the Owner's concurrence, during the one-year period for correction of Work. The Architect shall have authority to act on behalf of the Owner only to the extent provided in this Agreement. The Architect shall not have control over, charge of, or responsibility for the construction means, methods, techniques, sequences or procedures, or for safety precautions and programs in connection with the Work, nor shall the Architect be responsible for the Contractor’s failure to perform the Work in accordance with the requirements of the Contract Documents. The Architect shall be responsible for the Architect’s negligent acts or omissions, but shall not have control over or charge of, and shall not be responsible for, acts or omissions of the Contractor or of any other persons or entities performing portions of the Work.
§ 3.6.1.3 The Architect’s responsibility to provide Construction Phase Services commences with the award of the Contract for Construction and terminates on the date the Architect issues the final Certificate for Payment.
§ 3.6.2 Evaluations of the Work § 3.6.2.1 The Architect shall visit the site at intervals appropriate to the stage of construction, or as otherwise agreed by the Owner and Architect in Article 12, to become familiar with the progress and quality of the portion of the Work completed, to guard the Owner against defects and deficiencies in the Work and to determine if the Work is being performed. in accordance with the Contract Documents. However, the Architect shall not be required to make
AIA Document B101 – 2017. Copyright © 1974, 1978, 1987, 1997, 2007 and 2017. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This document was produced at 09:38:25 CDT on 07/24/2025 under Subscription No.20250136525 which expires on 06/26/2026, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com.
User Notes: (6882451e2a61ed3bf4e9564c) exhaustive or continuous on-site inspections to check the quality or quantity of the Work. On the basis of the site visits, the Architect shall keep the Owner reasonably informed about the progress and quality of the portion of the Work completed, and promptly report to the Owner (1) known deviations from the Contract Documents, (2) known deviations from the most recent construction schedule submitted by the Contractor, and (3) defects and deficiencies observed in the Work.
§ 3.6.2.2 The Architect shall reject Work that does not conform to the Contract Documents. Whenever the Architect considers it necessary or advisable, the Architect shall have the authority to require inspection or testing of the Work in accordance with the provisions of the Contract Documents, whether or not the Work is fabricated, installed or completed. However, neither this authority of the Architect nor a decision made in good faith either to exercise or not to exercise such authority shall give rise to a duty or responsibility of the Architect or the Owner to the Contractor, Subcontractors, suppliers, their agents or employees, or other persons or entities performing portions of the Work.
§ 3.6.2.3 The Architect shall interpret and decide matters concerning performance under, and requirements of, the Contract Documents on written request of either the Owner or Contractor. The Architect’s response to such requests shall be made in writing within any time limits agreed upon or otherwise with reasonable promptness.
§ 3.6.2.4 Interpretations and decisions of the Architect shall be consistent with the intent of, and reasonably inferable from, the Contract Documents and shall be in writing or in the form of drawings. When making such interpretations and decisions, the Architect shall endeavor to secure faithful performance by both Owner and Contractor, shall not show partiality to either.
§ 3.6.2.5 The Architect shall render recommendations on claims between the Owner and the Contractor as provided in the Contract Documents.
§ 3.6.3 Certificates for Payment to Contractor § 3.6.3.1 The Architect shall review and certify the amounts due the Contractor and shall issue certificates in such amounts. The Architect’s certification for payment shall constitute a representation to the Owner, based on the Architect’s evaluation of the Work as provided in Section 3.6.2 and on the data comprising the Contractor’s Application for Payment, that, to the best of the Architect’s knowledge, information and belief, the Work has progressed to the point indicated, the quality of the Work is in accordance with the Contract Documents, and that the Contractor is entitled to payment in the amount certified. The foregoing representations are subject to (1) an evaluation of the Work for conformance with the Contract Documents upon Substantial Completion, (2) results of subsequent tests and inspections,
(3) correction of minor deviations from the Contract Documents prior to completion, and (4) specific qualifications expressed by the Architect.
§ 3.6.3.2 The issuance of a Certificate for Payment shall not be a representation that the Architect has (1) made exhaustive or continuous on-site inspections to check the quality or quantity of the Work, (2) reviewed construction means, methods, techniques, sequences or procedures, (3) reviewed copies of requisitions received from Subcontractors and suppliers and other data requested by the Owner to substantiate the Contractor’s right to payment, or (4) ascertained how or for what purpose the Contractor has used money previously paid on account of the Contract Sum.
§ 3.6.3.3 The Architect shall maintain a record of the Applications and Certificates for Payment.
§ 3.6.4 Submittals § 3.6.4.1 The Architect shall review the Contractor’s submittal schedule and shall not unreasonably delay or withhold approval of the schedule. The Architect’s action in reviewing submittals shall be taken in accordance with the approved submittal schedule or, in the absence of an approved submittal schedule, with such reasonable promptness as to cause no delay in the Work while allowing sufficient time, in the Architect’s professional judgment, to permit adequate review.
§ 3.6.4.2 The Architect shall review and approve, or take other appropriate action upon, the Contractor’s submittals such as Shop Drawings, Product Data and Samples, but only for the limited purpose of checking for conformance with information given and the design concept expressed in the Contract Documents. Review of such submittals is not for the purpose of determining the accuracy and completeness of other information such as dimensions, quantities, and installation or performance of equipment or systems, which are the Contractor’s responsibility. The Architect’s review shall not constitute approval of safety precautions or construction means, methods, techniques, sequences or procedures.
The Architect’s approval of a specific item shall not indicate approval of an assembly of which the item is a component.
AIA Document B101 – 2017. Copyright © 1974, 1978, 1987, 1997, 2007 and 2017. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This document was produced at 09:38:25 CDT on 07/24/2025 under Subscription No.20250136525 which expires on 06/26/2026, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com.
User Notes: (6882451e2a61ed3bf4e9564c)
§ 3.6.4.3 If the Contract Documents specifically require the Contractor to provide professional design services or certifications by a design professional related to systems, materials, or equipment, the Architect shall specify the appropriate performance and design criteria that such services must satisfy. The Architect shall review and take appropriate action on Shop Drawings and other submittals related to the Work designed or certified by the Contractor’s design professional, provided the submittals bear such professional’s seal and signature when submitted to the Architect. The Architect’s review shall be for the limited purpose of checking for conformance with information given and the design concept expressed in the Contract Documents. The Architect shall be entitled to rely upon, and shall not be responsible for, the adequacy and accuracy of the services, certifications, and approvals performed or provided by such design professionals.
§ 3.6.4.4 The Architect shall review and respond to requests for information about the Contract Documents.The Architect’s response to such requests shall be made in writing within any time limits agreed upon, or otherwise with reasonable promptness. If appropriate, the Architect shall prepare and issue supplemental Drawings and Specifications in response to the requests for information.
§ 3.6.4.5 The Architect shall maintain a record of submittals and copies of submittals supplied by the Contractor in accordance with the requirements of the Contract Documents.
§ 3.6.5 Changes in the Work § 3.6.5.1 The Architect may order minor changes in the Work that are consistent with the intent of the Contract Documents and do not involve an adjustment in the Contract Sum or an extension of the Contract Time. The Architect shall prepare Change Orders and Construction Change Directives for the Owner’s approval and execution in accordance with the Contract Documents.
§ 3.6.5.2 The Architect shall maintain records relative to changes in the Work.
§ 3.6.6 Project Completion § 3.6.6.1 The Architect shall:
.1 conduct inspections to determine the date or dates of Substantial Completion and the date of final completion;
.2 issue Certificates of Substantial Completion;
.3 forward to the Owner, for the Owner’s review and records, written warranties and related documents required by the Contract Documents and received from the Contractor; and, .4 issue a final Certificate for Payment based upon a final inspection indicating that, to the best of the Architect’s knowledge, information, and belief, the Work complies with the requirements of the Contract Documents.
§ 3.6.6.2 The Architect’s inspections shall be conducted with the Owner to check conformance of the Work with the requirements of the Contract Documents and to verify the accuracy and completeness of the list submitted by the Contractor of Work to be completed or corrected.
§ 3.6.6.3 When Substantial Completion has been achieved, the Architect shall inform the Owner about the balance of the Contract Sum remaining to be paid the Contractor, including the amount to be retained from the Contract Sum, if any, for final completion or correction of the Work.
§ 3.6.6.4 The Architect shall forward to the Owner the following information received from the Contractor: (1) consent of surety or sureties, if any, to reduction in or partial release of retainage or the making of final payment; (2) affidavits, receipts, releases and waivers of liens, or bonds indemnifying the Owner against liens; and (3) any other documentation required of the Contractor under the Contract Documents.
§ 3.6.6.5 Upon request of the Owner, and prior to the expiration of one year from the date of Substantial Completion, the Architect shall, without additional compensation, conduct a meeting with the Owner to review the facility operations and performance and shall make appropriate recommendations to the Owner.
§ 3.6.6.6 The Architect shall prepare a final set of record drawings in digital format showing significant changes in the Work made during construction based on mark-up prints, drawings and other data furnished by the Contractor to the Architect.
AIA Document B101 – 2017. Copyright © 1974, 1978, 1987, 1997, 2007 and 2017. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This document was produced at 09:38:25 CDT on 07/24/2025 under Subscription No.20250136525 which expires on 06/26/2026, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com.
User Notes: (6882451e2a61ed3bf4e9564c)
ARTICLE 4 ARCHITECT'S BASIC SERVICES, CONTINUED
§ 4.1 Basic Services § 4.1.1 The table set forth below summarizes services that the Architect is obligated to provide. Some of the services are described in more detail in previous sections of this Agreement, which sections are referred to in the right-hand column.
Some of the services have not been previously described, and these services will be described in more detail in Section
4.2 below. All of the services that are summarized in the table and described in further detail elsewhere shall be provided with no further compensation to the Architect than what is set forth in Section 11.1
Basic Services, Continued Responsibility (Architect, Owner, or not provided)
§ 4.1.1.1 Programming
§ 4.1.1.2 Multiple preliminary designs Secs. 3.2.4 & 3.2.5
§ 4.1.1.3 Measured drawings
§ 4.1.1.4 Existing facilities surveys Sec. 3.3.4
§ 4.1.1.5 Site evaluation and planning Sec. 3.2.5
§ 4.1.1.6 Building Information Model management responsibilities
§ 4.1.1.7 Development of Building Information Models for post construction use
§ 4.1.1.8 Civil engineering § 4.1.1.8.1 Structural engineering § 4.1.1.8.2 Mechanical engineering § 4.1.1.8.3 Electrical engineering § 4.1.1.8.4 Geotechnical engineering § 4.1.1.8.5 Surveyors § 4.1.1.8.6 Other, if any
Sec. 1.1.11, 3.1 & 3.3.1 Sec. 1.1.11, 3.1 & 3.3.1 Sec. 1.1.11, 3.1 & 3.3.1 Sec. 1.1.11, 3.1 & 3.3.1 Sec. 1.1.11, 3.1 & 3.3.1 Sec. 1.1.11, 3.1 & 3.3.1 Sec. 1.1.11, 3.1 & 3.3.1
§ 4.1.1.9 Landscape design
§ 4.1.1.10 Architectural interior design Sec. 3.3.5
§ 4.1.1.11 Value analysis
§ 4.1.1.12 Detailed cost estimating beyond that required in Section 6.3
Sec. 3.2.6
§ 4.1.1.13 On-site project representation
§ 4.1.1.14 Conformed documents for construction
§ 4.1.1.15 As-designed record drawings Sec. 3.6.6.6
§ 4.1.1.16 As-constructed record drawings Sec. 3.6.6.6
§ 4.1.1.17 Post-occupancy evaluation
§ 4.1.1.18 Facility support services
§ 4.1.1.19 Tenant-related services
§ 4.1.1.20 Architect’s coordination of the Owner’s consultants
AIA Document B101 – 2017. Copyright © 1974, 1978, 1987, 1997, 2007 and 2017. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This document was produced at 09:38:25 CDT on 07/24/2025 under Subscription No.20250136525 which expires on 06/26/2026, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com.
User Notes: (6882451e2a61ed3bf4e9564c)
§ 4.1.1.21 Telecommunications/data design Sec. 3.1 & 3.3.1
§ 4.1.1.22 Security evaluation and planning
§ 4.1.1.23 Commissioning
§ 4.1.1.24 Sustainable Project Services pursuant to Section 4.1.3
§ 4.1.1.25 Fast-track design services
§ 4.1.1.26 Multiple bid packages
§ 4.1.1.27 Historic preservation
§ 4.1.1.28 Furniture, furnishings, and equipment design Sec. 3.3.5
§ 4.1.1.29 Other services provided by specialty Consultants
§ 4.1.1.30 Other Supplemental Services
§ 4.1.2 Description of Basic Services § 4.1.2.1 A detailed description of each Basic Service identified in Section 4.1.1 as the Architect’s responsibility is provided below if not further described in an exhibit attached to this document or in a section referred to in the right-hand column of the table.
(Describe in detail the Architect’s Basic Services identified in Section 4.1.1 or, if set forth in an exhibit, identify the exhibit. The AIA publishes a number of Standard Form of Architect’s Services documents that can be included as an exhibit to describe the Architect’s Basic Services.)
§ 4.1.2.2 A description of each Basic Service identified in Section 4.1.1 as the Owner’s responsibility is provided below.
(Describe in detail the Owner’s Basic Services identified in Section 4.1.1 or, if set forth in an exhibit, identify the exhibit.)
§ 4.1.3
§ 4.2 Architect’s Additional Services The Architect may provide Additional Services after execution of this Agreement without invalidating the Agreement.
Except for services required due to the fault of the Architect, which shall be provided at the Architect's own cost, any Other Services provided in accordance with this Section 4.2 Shall subject the Architect's compensation to equitable adjustment pursuant to Section 11.3 and, if appropriate, an adjustment in the Architect’s schedule.
§ 4.2.1 Upon recognizing the need to perform the following Additional Services, the Architect shall notify the Owner with reasonable promptness and explain the facts and circumstances giving rise to the need. The Architect shall not proceed to provide the following Additional Services until the Architect receives the Owner’s written authorization:
.1 Services necessitated by a change in the Initial Information, if any, previous instructions or approvals given by the Owner, or a material change in the Project including size, quality, complexity, the Owner’s schedule or budget for Cost of the Work, or procurement or delivery method;
or
AIA Document B101 – 2017. Copyright © 1974, 1978, 1987, 1997, 2007 and 2017. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This document was produced at 09:38:25 CDT on 07/24/2025 under Subscription No.20250136525 which expires on 06/26/2026, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com.
User Notes: (6882451e2a61ed3bf4e9564c)
.10 Consultation concerning replacement of Work resulting from fire or other cause during construction.
§ 4.2.2
§ 4.2.3
§ 4.2.4
§ 4.2.5 If the services covered by this Agreement have not been completed within ( ) months of the date of this Agreement, through no fault of the Architect, extension of the Architect’s services beyond that time shall be compensated as Additional Services.
ARTICLE 5 OWNER’S RESPONSIBILITIES
§ 5.1 The Owner shall provide such timely information as may be reasonably necessary for the Architect to perform the Architect's services.
§ 5.2 The Owner shall establish the Owner’s budget for the Project, including (1) the budget for the Cost of the Work as defined in Section 6.1; (2) the Owner’s other costs; and, (3) reasonable contingencies related to all of these costs. The Owner shall update the Owner’s budget for the Project as necessary throughout the duration of the Project until final completion. If the Owner significantly increases or decreases the Owner’s budget for the Cost of the Work, the Owner shall notify the Architect.
AIA Document B101 – 2017. Copyright © 1974, 1978, 1987, 1997, 2007 and 2017. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This document was produced at 09:38:25 CDT on 07/24/2025 under Subscription No.20250136525 which expires on 06/26/2026, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com.
User Notes: (6882451e2a61ed3bf4e9564c)
§ 5.3 The Owner shall identify a representative authorized to represent the Owner with respect to the Project. The Owner shall render decisions in a timely manner in order to avoid unreasonable delay in the orderly and sequential progress of the Architect’s services.
§ 5.4 The Owner shall furnish surveys to describe physical characteristics, legal limitations and utility locations for the site of the Project, and a written legal description of the site. The surveys and legal information shall include, as applicable, grades and lines of streets, alleys, pavements and adjoining property and structures; designated wetlands;
adjacent drainage; rights-of-way, restrictions, easements, encroachments, zoning, deed restrictions, boundaries and contours of the site; locations, dimensions, and other necessary data with respect to existing buildings, other improvements and trees; and information concerning available utility services and lines, both public and private, above and below grade, including inverts and depths. All the information on the survey shall be referenced to a Project benchmark.
§ 5.5 If necessary, the Owner shall furnish evaluations of hazardous materials,with written reports and appropriate recommendations.
§ 5.6
§ 5.7
§ 5.8 The Owner shall coordinate the services of its other consultants, if any, with those services provided by the Architect. Upon the Architect’s request, the Owner shall furnish copies of the scope of services in the contracts between the Owner and the Owner’s consultants, if any. The Owner shall furnish the services of consultants other than those designated as the responsibility of the Architect in this Agreement, or authorize the Architect to furnish them as an Additional Service, when the Architect requests such services and demonstrates that they are reasonably required by the scope of the Project and the services are approved by Owner. The Owner shall require that its consultants and contractors maintain insurance, including professional liability insurance, as appropriate to the services or work provided.
§ 5.9 The Owner shall furnish tests, inspections and reports required by law or the Contract Documents, such as structural, mechanical, and chemical tests, tests for air and water pollution, and tests for hazardous materials.
§ 5.10
§ 5.11 While the Owner has no affirmative duty to become aware of same, the Owner shall provide prompt written or verbal notice to the Architect if the Owner becomes aware of any fault or defect in the Project, including any errors, omissions or…