14-C1 EXISTING CONDITIONS Rev.3.pdf
PDF 2 MB Posted
- Solicitation number
- 2026010
- Issued by
- Waukesha County, Wisconsin
About this file
This document is an Existing Conditions survey map prepared by TerraTec Engineering, LLC for the Waukesha County Courthouse in Waukesha, Wisconsin, in support of a Professional Services contract for an Administration Center Study being managed by the Waukesha County Department of Public Works. The survey was conducted from January 18-20, 2022, and documents the existing site infrastructure including building edges, pavement, storm and sanitary sewer systems, water lines, gas lines, electric utilities, and fiber optic lines. The map identifies 21 catch basins, inlets, and storm/sanitary manholes with specific elevation and invert elevation data, along with soil boring locations and survey control points. The survey references the North American Datum of 1983/2011 for horizontal coordinates and NAVD 88 for elevations, with baseline data established from NGS Point DF9884. A gas line runs under the curb along Moreland Boulevard, and multiple utility types are documented across the site including a buried fiber optic line and various water valves and hydrants.
The civil work scope outlined in the General Notes includes installation and maintenance of erosion controls, clearing and grubbing, topsoil stripping, grading and paving, signage installation, striping, topsoil placement, seeding, fertilizing, and mulching. All work must comply with Wisconsin DOT Standard Specifications, Wisconsin Standard Specifications for Sewer & Water Construction, the Wisconsin Construction Site Best Management Practice Handbook, and local municipality technical standards. The contractor is responsible for obtaining all permits and inspections, including traffic control, demolition, disposal, and utility removal or relocation. The contractor must call Diggers Hotline a minimum of three days prior to construction start and notify utility companies of any existing service line destruction. The document explicitly states that all utility locations are for informational purposes only and are not guaranteed to be accurate, requiring contractors to verify existing conditions and proceed with caution. Any damage to utilities or adjacent properties during construction must be repaired at the contractor's expense.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
E
FO
CB
CB
CB
CB
20"
18"
18"
15" 15"
15"
15"
15"
901.56
E18" 18"
8"
891.66
891.69
E
CB
PO
ST
PO
ST
CB
CB
ST
10"
VE
NT
10"
891.73
POST
891.71
891.69
891.72
ST
FO
FO
CB
E
C/ O
ST
BORE
12"
15"
BO
RE
891.69
9"
8"
8"
6"
BORE
FL
AG
15"
8"
9"
9"
8"
8"
8"
905.09
901.44
8"
WV
8"
FLAG
VENT
MH
MH
BO
RE
891.70
891.71
891.74TILE
SA
CB
891.71
E
E
E
W
W
W
W
E
E
G
G
G
G
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
E
E
E
E S
T
E
E
S
T
E
S
T
S
T
S
T
W
W
W
W
W
W
E
E
18"
S
T
S
A
N
S
A
N
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
ST
ST
ST
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S T
S T
S T
S
T
S
T
BENCHMARK
WEST FLANGE BOLT
ON HYDRANT
EL=899.37
W. MORELAND BOULEVARD
CONCRETE WINDOW
WELL (TYP.)
INLET #2558
EL = 894.75
12" (N,SW) IE = 891.25
RI
V
ER
V
IE
W A
V
EN
U E
INLET #2155
EL = 895.48
12" (SW,NE) IE = 891.68
INLET #2208
EL = 896.60
UNDER PARKED CAR
AT TIME OF SURVEY
CATCH BASIN #1211
EL = 896.35
12" (NW) IE = 893.25
CATCH BASIN #1235
EL = 895.94
12" (NW,SE) IE = 892.34
CATCH BASIN #1353
EL = 894.25
12" (N,SE) IE = 890.64
CATCH BASIN #1406
EL = 894.40
12" (N,S) IE = 890.20
INLET #1608
EL = 889.30
15" (E) IE = 885.30
15" (SW) IE = 885.30
8" (NE) IE = 886.30
CATCH BASIN #1607
EL = 889.12
15" (E) IE = 884.62
15" (SW) IE = 884.32
CATCH BASIN #1625
EL = 889.55
12" (NW,SE) IE = 884.95
STORM MH #1627
EL = 889.58
10" (NE) IE = 886.78
10" (SE) IE = 886.58
12" (NW) IE = 886.58
4" (S) IE = 886.58
STORM MH #1773
EL = 890.55
10" (NE) IE = 887.70
6" (NW) IE = 887.70
10" (SW) IE = 887.70
CATCH BASIN #1841
EL = 889.76
12" (NW) IE = 885.31
6" (SE) IE = 885.31
INLET #1844
EL = 889.40
6" (NW) IE = 885.48
STORM MH #1922
LOCATION ONLY, BURIED
UNDER FROZEN GROUND
SMALL FLOOR DRAIN #2510
EL = 891.18
6" (SW,NE) IE = 890.33
SANITARY MH #2511
EL = 891.58
8" (NE,SW) IE = 885.28
8" (SE) IE = 885.18
CATCH BASIN #2512
EL = 890.99
12" (SW) IE = 887.79
6" (NE) IE = 887.79
MONUMENT SIGN
A/C
A/C
ST
STORM MH
UNDER PARKED CAR
AT TIME OF SURVEY
BUS SHELTER
BUS SHELTER
S
T
S
T
S
T
S
T
S
T
S
T
S
T
RAISED ENCLOSED
WALKWAY BETWEEN
BUILDINGS
COLUMN (TYP.)
STEPS TO SECOND
FLOOR ENTRANCE
G
RA
SS
G
RA
SS
GRASS
GRASS
GRASS
CONCRETE WINDOW
WELL (TYP.)
6" GAS LINE RUNNING UNDER CURB
ALONG MORELAND BLVD.
CP 107
SET CROSS
NOTCH
CP 106
SET CROSS
NOTCH
CP 101
SET CROSS
NOTCH
CP 102
SET CROSS
NOTCH
CP 103
SET CROSS
NOTCH
CP 104
SET CROSS
NOTCH
AWNING
SOIL
BORING #1
SOIL
BORING #3
SOIL BORING
#4A
SOIL BORING #4
CATCH BASIN #1621
EL = 889.35
12" (SE) IE = 884.75
15" (W) IE = 884.75
INLET #2557
(IN RIVERVIEW AVENUE)
EL = 889.49
15" (NE,NW) IE = 883.79
TO INLET ACROSS
RIVERVIEW AVENUE
STEPS
STEPS
S
T
S
T
S
T
S
T
E
E
E
G
G
SA
CB
CB
POST4"
5"
3" 3"
6" 3"
4"
12"
CB 5" 6"
6"
3" 7"
5"
CB
S T
S T
S T
S
T
S
T
S
T
S
T
S
A
N
S
A
N
S
A
N
S
A
N
W
CATCH BASIN #3164
EL = 890.56
12" (N) IE = 887.31
12" (SE) IE = 885.86
SANITARY MH #3007
EL = 891.62
8" (NE,SE) IE = 884.57
CATCH BASIN #3046
EL = 891.07
8" (NE) IE = 889.77
CATCH BASIN #3037
EL = 891.16
12" (S,NE) IE = 887.44
8" (SW,SE) IE = 887.76
CATCH BASIN #3113
EL = 891.11
8" (NE) IE = 889.81
CONCRETE GRATED
VENTS
X
X
GENERAL NOTES
1. FIELD SURVEY PERFORMED FROM JANUARY 18TH TO THE 20TH, 2022 BY TERRATEC ENGINEERING, LLC.
2. HORIZONTAL COORDINATES REFERENCED TO THE NORTH AMERICAN DATUM OF 1983/2011, WISCONSIN STATE PLANE, SOUTH ZONE.
3. ELEVATIONS REFERENCED TO NAVD 88(12). NGS POINT DF9884, BEING 819.02'.
4. THE LOCATIONS OF UNDERGROUND UTILITIES AS SHOWN ON THIS MAP ARE BASED ON AVAILABLE DOCUMENTATION AND MARKS PLACED ON THE GROUND BY OTHERS. THESE LOCATIONS MAY OR MAY NOT REFLECT THE ACTUAL LOCATION OF THESE UTILITIES. DIGGERS HOTLINE SHOULD BE NOTIFIED BEFORE ANY SUBSURFACE WORK IS CONDUCTED. SURVEYED UTILITIES BASED ON DIGGERS HOTLINE NOS.
20220203882.
WV
BUILDING
EDGE OF PAVEMENT
STORM SEWER
ST
BURIED GAS
CONCRETE SURFACE
BURIED ELECTRIC
E
LIGHT POLE
UTILITY PEDESTAL
GAS METER
DECIDUOUS TREE
MH UNIDENTIFIED MANHOLESANITARY SEWER
SAN
HYDRANT
INLET
WATER VALVE
WV
EXISTING LEGEND
GROUND CONTOUR751
WATER LINE
W
SIGNGRASS LINE
ICE/SNOW PILE AT TIME OF SURVEY
SURVEY CONTROL POINT
VENT VENT PIPE
C/O CLEANOUT
"The information shown on this drawing concerning type and location of underground utilities is not guaranteed to be accurate or all inclusive. The contractor is responsible for making his own determinations as to the type and location of underground utilities as may be necessary to avoid damage thereto."
Milwaukee Area (414) 259-1181
Hearing Impaired TDD (800)
542-2289
SCALE IN FEET
030' 30'
LOCATION MAP
NOT TO SCALE
BURIED FIBER OPTIC LINE
ELECTRIC MANHOLE
FIBER OPTIC MANHOLE
SANITARY MANHOLE
STORM MANHOLE
CATCH BASIN (OPEN LID)
W V
E
FO
SA
ST
CB
THRESHOLD ELEVATION
POST
FLAGPOLE
PO
ST
FLAG
RAISED ENCLOSED WALKWAY
SOIL BORING LOCATION
COLUMN
BORE
TERRATEC PROJECT NO.
© 2022 TERRATEC ENGINEERING, LLC.
CEDARBURG, WI 53012
Tel.: 262.377.9905 - Fax: 262.375.1958
W67 N222 EVERGREEN BLVD., STE. 205
TERRATECENGINEERING,LLC.
BYNO.
REVISION
SHEET No.
DATEREVISIONS
APPROVED BYDESIGNED BY DATE
OF
C1
WAUKESHA, WISCONSIN
KUENY ARCHITECTS, LLC.
WAUKESHA COUNTY COURTHOUSE
EXISTING CONDITIONS
SHEET INDEX
C1 EXISTING CONDITIONS
C2 SITE PREP & EROSION CONTROL PLAN
C3 GRADING/PAVING PLAN
C4 DETAIL
GENERAL NOTES FOR TERRATEC'S CIVIL PLANS (C1 - C4)
1. SUMMARY OF WORK: PROJECT WORK SHALL INCLUDE INSTALLATION/MAINTAINENECE/REMOVAL OF EROSION CONTROLS, CLEARING/GRUBBING, TOPSOIL STRIPPING, GRADING/PAVING, SIGNAGE, STRIPING, TOPSOIL PLACEMENT, AND SEEDING/FERTLIZING/MULCHING. PAVEMENT (WITH ASSOCIATED PAVEMENT STRIPING) AS SHOWN ON PROJECT DRAWINGS.
CONSTRUCTION DETAILS ARE INCLUDED IN THE PLAN SET.
2. ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH ALL FEDERAL, STATE AND LOCAL CODES/ORDINANCES/LAWS/REQUIREMENTS.
3. THE PROPOSED IMPROVEMENTS SHALL BE CONSTRUCTED IN ACCORDANCE TO THE LATEST EDITIONS OF: WISCONSIN DOT STANDARD SPECIFICATIONS FOR HIGHWAY AND STRUCTURE CONSTRUCTION (WISDOT SPECIFICATIONS); STANDARD SPECIFICATIONS FOR SEWER & WATER CONSTRUCTION IN WISCONSIN; THE WISCONSIN CONSTRUCTION SITE BEST MANAGEMENT PRACTICE HANDBOOK; THE LOCAL MUNICIPALITY'S TECHNICAL STANDARDS; (MUNCIPALITY STANDARDS); AND THE SITE GEOTECHNICAL REPORT (SITE GEOECHNICAL
REPORT) THAT WAS PREPARED BY OTHERS, IF AVAILABLE.
4. ALL WORK SHALL BE CONSTRUCTED TO THE SATISFACTION OF REGULATORY AGENCIES, OWNER AND ARCHITECT.
5. THE CONTRACTOR SHALL INDEMNIFY THE OWNER, TERRATEC ENGINEERING, ARCHITECT, AND THEIR AGENTS FROM ALL LIABILITY INVOLVED WITH THE CONSTRUCTION, INSTALLATION AND TESTING OF THE CIVIL WORK INCLUDED ON THESE CIVIL PLANS.
6. TERRATEC ENGINEERING ASSUMES NO RESPONSIBILITY FOR DAMAGES, LIABILITY OR COSTS RESULTING FROM CHANGES OR ALTERATIONS MADE TO THESE PLANS WITHOUT THE EXPRESSED WRITTEN CONSENT OF TERRATEC ENGINEERING.
7. CONTRACTOR SHALL OBTAIN AND PAY FOR ALL NECESSARY WORK, PERMITS AND INSPECTIONS FOR THE CONSTRUCTION OF THESE CIVIL PLANS INCLUDING, BUT NOT LIMITED TO, TRAFFIC CONTROL, DEMOLITION, DISPOSAL, UTILITY REMOVAL/RELOCATION/CONSTRUCTION, GRADING/PAVING, ETC.
8. CONTRACTOR SHALL REFER TO ARCHITECT'S PLANS AND OTHER DISCIPLINE'S PLANS FOR ADDITIONAL DESIGN INFORMATION.
CONTRACTOR SHALL EXAMINE ALL APPROPRIATE PLANS/REPORTS AND NOTIFY ARCHITECT IMMEDIATELY OF ANY DISCREPANCIES PRIOR TO CONSTRUCTION COMMENCEMENT SO THAT PROPER MODIFICATIONS CAN BE MADE. IF CONTRACTOR (OR ITS' SUBCONTRACTORS) COMMENCES WORK (I.E., EQUIPMENT MOBILIZATION TO SITE), CONTRACTOR ACCEPTS RESPONSIBILITY/EXPENSES FOR ANY CHANGES TO BE PERFORMED AS A RESULT OF DISCREPANCIES AT NO ADDITIONAL COST TO THE OWNER/ARCHITECT/ENGINEER.
9. CIVIL PROJECT DRAWING VERIFICATION: CONTRACTOR SHALL REVIEW SITE PLANS PRIOR TO CONSTRUCTION. ANY DISCREPANCIES NOTED BETWEEN EXISTING SITE CONDITIONS AND PROJECT DRAWINGS, AND BETWEEN PROJECT DRAWINGS (FOR UTILITY CONFLICTS, DRAINAGE/GRADING CONFLICTS, ETC.) SHALL BE NOTED TO THE ARCHITECT IN WRITING PRIOR TO CONSTRUCTION COMMENCEMENT.
CHANGES IN WORK SCOPE SHALL BE MADE ACCORDINGLY. IF CONTRACTOR (OR ITS' SUBCONTRACTORS) COMMENCES WORK (I.E., EQUIPMENT MOBILIZATION TO SITE), CONTRACTOR ACCEPTS RESPONSIBILITY/EXPENSES FOR ANY CHANGES TO BE PERFORMED AS A RESULT OF PROJECT DRAWING INCONSISTENCIES AT NO ADDITIONAL COST TO THE OWNER/ARCHITECT/ENGINEER.
10.UNDERGROUND UTILITIES ARE SHOWN FOR INFORMATIONAL PURPOSES ONLY, AND ARE NOT GUARANTEED TO BE ACCURATE OR ALL INCLUSIVE. THE CONTRACTOR IS RESPONSIBLE FOR MAKING HIS OWN DETERMINATION AS TO THE TYPE AND LOCATION OF UNDERGROUND UTILITIES AS MAY BE NECESSARY TO AVOID DAMAGE THERETO. CONTRACTOR SHALL CALL DIGGER'S HOTLINE A MINIMUM OF THREE DAYS PRIOR TO THE START OF ANY CONSTRUCTION ACTIVITIES. IN ADDITION, CONTRACTOR SHALL NOTIFY UTILITY COMPANIES FOR ONSITE LOCATIONS OF EXISTING UTILITY PRIOR TO CONSTRUCTION COMMENCEMENT.
11. ALL EXISTING UTILITIES SHOWN ARE NOT TO BE INTERPRETED AS THE EXACT LOCATION OR AS THE ONLY OBSTACLES THAT MAY OCCUR ON THE SITE. CONTRACTOR SHALL VERIFY EXISTING CONDITIONS AND PROCEED WITH CAUTION AROUND ALL FEATURES. GIVE NOTICE TO UTILITY COMPANIES REGARDING DESTRUCTION AND REMOVAL OF THEIR SERVICE LINES AND CAP ALL LINES BEFORE PROCEEDING WITH WORK. DAMAGE TO UTILITIES THAT ARE TO REMAIN SHALL BE REPAIRED AT CONTRACTOR'S COST AT NO ADDITIONAL COST TO THE
OWNER/ARCHITECT/ENGINEER.
12.PRIOR TO ANY CONSTRUCTION ACTIVITIES, CONTRACTOR SHALL REFER TO, AND ADHERE TO THE RECOMMENDATIONS OF THE SITE GEOTECHNICAL REPORT AND ANY RELEVANT ENVIRONMENTAL ASSESSMENT REPORTS. IF PREVIOUSLY UNIDENTIFIED HAZARDOUS, CONTAMINATED MATERIALS, ENVIRONMENAL-RELATED CONDITIONS, OR UNEXPECTED SUBGRADE CONDITIONS ARE DISCOVERED, STOP WORK IMMEDIATELY AND NOTIFY THE OWNER/ARCHITECT FOR ACTION TO BE TAKEN. DO NOT RESUME WORK UNTIL SPECIFICALLY AUTHORIZED BY
THE OWNER/ARCHITECT.
13. THE CONTRACTOR IS RESPONSIBLE FOR VERIFYING SOIL CONDITIONS PRIOR TO COMMENCEMENT OF CONSTRUCTION. CHECK WITH ARCHITECT AND OWNER IF A SITE GEOTECHNICAL REPORT IS AVAILABLE. IF AVAILABLE, CONTRACTOR SHALL PERFORM ALL EXCAVATIONS, DEWATERING, BACKFILLING (MATERIALS AND PLACEMENT/COMPACTION), SUBGRADE CONSTRUCTION, ETC. IN ACCORDANCE WITH THE SITE GEOTECHNICAL
REPORT.
14.CONTRACTOR SHALL REFER TO ARCHITECTURAL PLANS FOR EXACT LOCATION AND DIMENSION OF BUILDINGS, ENTRANCES, VESTIBULES, STAIRS, RETAINING WALLS, RAMPS, PRECISE BUILDING DIMENSIONS AND EXACT BUILDING UTILITY ENTRANCE LOCATIONS.
15.CONTRACTOR IS RESPONSIBLE FOR SITE SECURITY AND SAFETY. OWNER, ARCHITECT AND ENGINEER ASSUMES NO RESPONSIBILITY FOR EITHER
SITE SECURITY OR SAFETY.
16. THE MUNICIPALITY, OWNER, AND ARCHITECT SHALL HAVE THE RIGHT TO INSPECT, APPROVE, AND REJECT THE CONSTRUCTION OF THE IMPROVEMENTS DETAILED IN THESE CIVIL PLANS. CONTRACTOR TO PAY/COORDINATE ALL INSPECTIONS. REJECTED CONSTRUCTION SHALL BE RECONSTRUCTED AT CONTRACTOR'S EXPENSE AT NO ADDITIONAL COST TO THE OWNER/ARCHITECT/ENGINEER.
17. ANY ADJACENT PROPERTIES, UTILITIES, OR ROAD RIGHT-OF-WAYS WHICH ARE DAMAGED DURING CONSTRUCTION MUST BE RESTORED BY THE CONTRACTOR AT THE CONTRACTOR'S EXPENSES TO THE SATISFACTION TO THE MUNICIPALITY/OWNER/ARCHITECT AT NO ADDITIONAL COST
TO THE OWNER/ARCHITECT/ENGINEER.
18.EXISTING ITEMS TO REMAIN SHALL BE CAREFULLY PROTECTED DURING CONSTRUCTION. ANY DAMAGE TO THESE ITEMS WILL BE REPAIRED OR REPLACED AT CONTRACTOR'S EXPENSE AT NO ADDITIONAL COST TO THE OWNER/ARCHITECT/ENGINEER.
19. ALL WORK IN THE RIGHT-OF-WAY SHALL BE PERFORMED IN ACCORDANCE WITH THE MUNICIPALITY'S TECHNICAL STANDARDS, COUNTY
STANDARDS OR STATE STANDARDS, WHICHEVER IS MORE RESTRICTIVE.
20.FIELD TILE CONNECTION - TILE LINES CROSSED BY A TRENCH/EXCAVATION SHALL BE REROUTED AND REPLACED WITH THE SAME MATERIAL AS
THE STORM SEWER TO MAINTAIN FIELD TILE DRAINAGE.
21.ALL UTILITY DEMOLITION WILL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY AND TO BE PERFORMED IN ACCORDANCE WITH UTILITY REQUIREMENTS. IF LINES ARE LEFT IN PLACE, THEY NEED TO BE FILLED WITH FLOWABLE GROUT; IF A NEW UTILITY CROSSES AN EXISTING LINE, THE EXISTING LINE NEEDS TO BE REMOVED 5'-0" CLEAR IN BOTH DIRECTIONS AND STILL GROUTED TIGHT.
AutoCAD SHX Text Toll Free (800) 242-8511 www.DiggersHotline.com
AutoCAD SHX Text N
AutoCAD SHX Text 211001
AutoCAD SHX Text
JPF
AutoCAD SHX Text
LKJ
AutoCAD SHX Text 04/25/2023
File details come from the government source that posted it. Updated .