2--3- 1.4 Section 2 Document 3.0 Schedule of Values.xlsx

XLSX spreadsheet 13 KB Posted

Attached to
SLCo LIB133030 Magna Library Rooftop Equip Replacement - CONST
Solicitation number
SLCo LIB133030 Magna Library Rooftop Equip Replacement - CONST
Issued by
Utah

About this file

This is a Schedule of Values document for the State of Utah's procurement of rooftop equipment replacement services at the Magna Library facility (Project ID: LIB133030). The project scope involves the replacement of the Magna Library's rooftop thermal units (RTUs) and photovoltaic (PV) systems. The Schedule of Values form is structured to allow bidders to itemize costs across multiple work divisions, including Payment and Performance Bonds, Insurance and Builder's Risk, and Division 01 General Conditions, with provisions for a base bid and three alternate bids (Alternate 1, Alternate B, and Alternate C).

The document requires that all cost entries be submitted through the Online Solicitation System (OSS), with the base bid total and each alternate bid total matching the amounts entered in that system. The form includes line items for various divisions of work, though the specific details of individual line items are not populated in this version of the document. Bidders must enter their company name on the form and ensure that totals for the base bid and all alternates correspond precisely to amounts submitted through the OSS to maintain bid validity. The document does not specify pricing terms, award dates, or contract duration within the Schedule of Values itself, as these details would be contained in the broader bid solicitation documents.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Section 2 - Document 3.0
Schedule Of Values
Project: LIB133030 Magna Library Rooftop Equip Replacement
Divisions of WorkBase BidAlternate 1Alternate 2Alternate 3
(Specify entire work scope; examples are listed below)Alternate 1Alternate BAlternate CTotal
Payment & Performance Bond$ - 0$ - 0$ - 0$ - 0$ - 0
Insurance & Builder's Risk$ - 0$ - 0$ - 0$ - 0$ - 0
Division 01-General Conditions$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0
Totals (Enter in OSS)$ - 0$ - 0$ - 0$ - 0$ - 0
The total for the base bid must be the same total that was entered into the Online Solicitation System (OSS).
The total for each alternate must be the same total that was entered into the Online Solicitation System (OSS)
Name of Company Bidding ________________________________

Sheet2

Sheet3