This Amendment Number 1 clarifies the scope and specifications for Salt Lake County's Request for Bids (RFB) for the Magna Library Rooftop Equipment Replacement project (LIB133030). The project involves the replacement of rooftop units (RTUs) and photovoltaic (PV) systems at the Magna Library. Key clarifications include requirements that the contractor coordinate a four-week library closure with major construction activities such as ceiling opening for steel framing, ductwork replacement, RTU installation via crane, and roof drain replacement. The amendment specifies that all items installed below the roof deck and above the suspended ceiling must be painted to match existing finishes, and that all Alerton controls throughout the building must be replaced with current-generation Alerton equipment, with the option to reuse the existing cabinet shell. The bid closing date is September 23, 2026, at 1:00 p.m., and the estimated bonding range is $800,000 to $900,000.
The amendment clarifies that the reroofing work will be performed under a separate county contract to be bid in November, with the RTU contractor responsible for coordinating with but not supervising the roofing contractor. Approved RTU manufacturers include Daiken in addition to original specifications. The RTU contractor is responsible for lifting rooftop equipment and providing a construction schedule to the roofing contractor, while the reroofing contractor handles lifting roofing materials and maintaining roof warranty. The county will reserve parking spaces for storage of PV panels during construction. Regarding controls, only Alerton-approved control manufacturers and installers listed on page 252 of the specifications are acceptable; alternatives such as Siemens and Halverson are not approved.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Date: September 17, 2026
Amendment Number 1
Project: General Contractors Request for Bids Issued by Salt Lake County
Project: LIB133030 Magna Library Rooftop Equip Replacement Project #: LIB133030 Closing date: September 23, 2026, at 1:00 pm This amendment represents clarifications and additions to the Request for Bids (RFB) and any of its respective parts. These changes are to be considered part of said documents as though they were included in the original documents. Any terms or conditions of said documents not modified by Amendment No. 1 shall remain unchanged.
1. Change to Documents:
Item 1.1 Questions during Pre-Bid Meeting:
a. Magna Library will be closed 4 weeks during construction. Library closure time will be coordinated with contractor’s heavy major construction activities (i.e. opening ceilings to install steel framing supports for the RTUs, removing and replacing ductwork, crane to lift up RTUs and replace RTUs, removing & replacing roof drains; prep for electrical work…etc). Contractor shall utilize 4-week Library closure duration to get major work done and functioned (i.e. RTU and roof drains are in place and functioned) to avoid any interruption to Library normal hour operations.
Item 1.2 Sheet A1.4N Reflected Ceiling Plan - New:
a. Add General Note 3 to read: All items added below roof deck and above suspended ceiling shall be pained to match existing paint (i.e. supply air diffusers & return air grilles that are not installed in the suspended ceiling grids & tiles, ductwork, pipes, roof drains, wires, cables, conduits, screws, steel bolts, steel plates, steel angles, pipe hangers, pipe racks…etc.)
Item 1.3 Sheet MH1.0 – HVAC Controls:
a. Change note 3 on MH1.0 to read, “Contractor shall replace all Alerton controls with the new current generation of Alerton controls throughout the building including the head end controls in this cabinet. The existing cabinet shell may be reused, if desired. Add cabinets as needed.)
2. Questions and Answers from Contractors in Bonfire:
Q: Will you accept Siemens Controls as an alternate?
A: No, Siemens controls are not approved for this project, only Alerton.
Q: Can the solar be stored in the parking lot while the roof is getting replaced?
A: Yes. Library will reserve parking spots to store the PV Panels.
Q: What is the model number and type of refrigerant in the splits?
A: The nameplates on the outdoor split system units is worn and not legible. The original plans call out R-410A.
Q: Section 01 1100 and the drawing notes require coordination between the rooftop equipment replacement and a simultaneous reroofing project, but the division of contractual responsibility and scope is unclear. Can you please clarify A: See following 4 questions/answers
Q: Is this solicitation for a general contractor to perform the rooftop equipment replacement and associated trades, with the reroof performed under a separate County contract, or must the successful bidder include and subcontract the reroofing work?
A: Roofing will be under separate contract.
Q: Which contract is responsible for equipment curb raising, roof insulation, membrane and penetration flashing, temporary dry-in, and maintaining the roof warranty?
A: Since procuring RTU equipment will be longer lead time than the Roofing project.
Thus, Roofing project will be bid in November in order to perform the work in the same time frame as RTU Replacement schedule.
Q: Is the successful bidder responsible only for coordinating with the roofing contractor, or also for supervising and managing that contractor’s work?
A: RTU contractor is responsible for coordination with the roofing contractor. Roofing contractor is responsible for supervising and managing roofing work.
Q: During the job walk, Halverson was mentioned for controls. In the specs, pg. 252, it mentions Alliance, ATC, ACES & D&L. Would any of these be ok, or just Halverson?
A: The approved control manufacturer is Alerton, not Halverson. The controls installers on page 252 of the specifications are accurate.
Q: Can we Get Daiken RTUs approved?
A: The County will accept Daiken as an approved manufacturer. The criteria of the other specifications must be met and match up with the Daiken equipment.
Q: Can you please provide an estimated budget for this project for bid bond purposes?
A: The bonding range is $800,000 to $900,000.
Q: It's mentioned that the roof will be done in stages am trying to figure out the mobilization for the crane i need to know how many stages?
A: The Reroofing contractor is responsible for lifting roofing materials. The RTU contractor is responsible for lifting roof top equipment. The RTU contractor is to provide their construction schedule to the roofing contractor for roofing work coordination.
End of Amendment Number 1