1b 721511 OH Final Plans KN 21883.pdf
PDF 22 MB Posted
- Solicitation number
- S-KS0043-00015152
- Issued by
- Multnomah County, Oregon
About this file
The document is a comprehensive engineering design plan set for the Orchard Heights Road NW project in Salem, Oregon, prepared by the City of Salem's Department of Public Works. The project covers a 0.2-mile roadway improvement segment from Snowbird to Westhaven, with three primary locations: Reservoir, Glen Creek Village, and Parkway. The project includes roadway reconstruction, sidewalk improvements, swale construction, landscaping, irrigation systems, traffic signal upgrades, and ADA ramp installations. The project is identified with City of Salem Project Number 721511, ODOT Key Number 21883, and Federal Aid Number 6490(133).
The project's design documents include detailed civil engineering drawings, cross-sections, landscape plans, traffic control strategies, erosion prevention plans, and utility coordination. The design incorporates multiple technical elements such as 4-inch and 6-inch concrete sidewalks, Level 3 HMAC pavement, aggregate base layers, swale construction with specific plant species, irrigation systems, traffic signals with rectangular rapid flashing beacons (RRFB), and comprehensive drainage infrastructure. The project appears to be funded through a combination of city and federal sources, with a focus on improving road safety, accessibility, and environmental management along the Orchard Heights corridor.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 721511 Addendum 1 executed.pdf | ||
| 000015153_Mini-RFP~1.docx | DOCX document | |
| 721511 Bid Tab.pdf | ||
| 721511 Intent to Award Letter.pdf | ||
| 721511 - Bid Register.pdf | ||
| 721511 Addendum 2_executed.pdf | ||
| 1d 721511 Project Manual KN 21883.pdf | ||
| 721511 Bid Tabulation.pdf | ||
| Zoom-Teams Bid Opening Link~1.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
G-01
TITLE SHEET
PN:721511
NAD 83-SPCS
NGVD 1929(47)
AS SHOWN
AS SHOWN
ECT
J.KUENZI
7654321
F
E
D
C
B
A
7654321
SHEET OF
SHEET TITLE
HORIZ DATUM:
VERT DATUM:
HORIZ SCALE:
VERT SCALE:
DESIGN:
DRAWN:
CHECKED:
APPROVED:
NO. DATE BYDESCRIPTION
REVISIONS
S
A
L
E
M
P
U
B
L
IC
WORK
S
D
E
P
A
R
T
M
E
N
T
N
O I
S I
V I
D
GNI
R
E
E
N
N I
G
E
ORCHARD HEIGHTS
RD NW: SNOWBIRD
TO WESTHAVEN
(SALEM)
8 9
8 97
A
M
G G r o u p
E n g i n e e r i n g P r o j e c t s C
I P
O r c h a r d
H e i g h t s
S n o w b i t o
W s t h a v e n
C
A D
S h e e t
S e t
G
T
C d w g
G t a b
EXPIRES: 06-30-2026
R
E
G
I
S
T
E
R
E
D
PR
O
F
E
S
S
I
O
N
A
L
E
L
I
Z
A
B
E
T
H C
T
O
R
L
E
Y
J
U
L
Y
E
N
G
I N
E
E
R
099675PE
OREGON
CITY OF SALEM - DEPARTMENT OF PUBLIC WORKS
555 LIBERTY STREET SE - SALEM, OREGON 97301
VICINITY MAP
CITY OF SALEM PN: 721511
ODOT KN: 21883
FEDERAL AID NO: 6490(133)
LENGTH: 0.2 MILES
Call before you dig.
Know what's below.
ATTENTION:
O R
C H
AR
D
H
EIG
H
TS R
D N
W
O
R
C
H
A
R
D
E
I
G
H
S
N
W
A
L
L
A
GLEN CREEK RD NW
CHAPMAN HILL DR NW
L
I N
W
O
O
M O
U S
E B
I R
D
A
V
N
W
S N
O W
B I R
D
S
T
N
W
W E
S T
H A
V E
N
A
V
N
W
K E
N A
N
W
W E
N
W
P
A
R
K
W
A
K A
R E
N
W
Y
N
W
PROJECT AREA
PROJECT AREA
ORCHARD HEIGHTS RD NW:
SNOWBIRD TO
WESTHAVEN (SALEM)
O
R
C
H
A
R
D
H
E
I
G
H
T
S
P
A
R
K
LOCATION #1
L
O
C
A
T
I
L
O
C
A
T
I
UTILITY CONTACTS
G-02
SHEET INDEX
PN:721511
NAD 83-SPCS
NGVD 1929(47)
AS SHOWN
AS SHOWN
ECT
J.KUENZI
7654321
F
E
D
C
B
A
7654321
SHEET OF
SHEET TITLE
HORIZ DATUM:
VERT DATUM:
HORIZ SCALE:
VERT SCALE:
DESIGN:
DRAWN:
CHECKED:
APPROVED:
NO. DATE BYDESCRIPTION
REVISIONS
S
A
L
E
M
P
U
B
L
IC
WORK
S
D
E
P
A
R
T
M
E
N
T
N
O I
S I
V I
D
GNI
R
E
E
N
N I
G
E
ORCHARD HEIGHTS
RD NW: SNOWBIRD
TO WESTHAVEN
(SALEM)
8 9
8 97
A
M
G G r o u p
E n g i n e e r i n g P r o j e c t s C
I P
O r c h a i g h t s
S n o w b i s t h a v e n
C
A D
S h e e t
S e t
G
T
C d t a b
EXPIRES: 06-30-2026
R
E
G
I
S
T
E
R
E
D
PR
O
F
E
S
S
I
O
N
A
L
E
L
I
Z
A
B
E
T
H
O
R
L
E
Y
J
U
E
N
G
I N
E
E
R
099675PE
OREGON
SHEET INDEX
NO. ID. DESCRIPTION
GENERAL
1 G-01 TITLE SHEET
2 G-02 SHEET INDEX
3 G-03 GENERAL CONSTRUCTION NOTES & LEGEND
4 G-04 PAGE LAYOUT SHEET
5 G-05 SURVEY CONTROL SHEET
EPSC
6 EC-01 EPSC NOTES
7 EC-02
ORCHARD HEIGHTS RD NW
EPSC EXISTING CONDITIONS PLAN
LOCATION #1 - RESERVOIR
8 EC-03
ORCHARD HEIGHTS RD NW
EPSC EXISTING CONDITIONS PLAN
LOCATION #2 - GLEN CREEK VILLAGE
9 EC-04
ORCHARD HEIGHTS RD NW
EPSC EXISTING CONDITIONS PLAN
LOCATION #3 - PARKWAY
10 EC-05
ORCHARD HEIGHTS RD NW
EPSC NEW IMPROVEMENTS PLAN
LOCATION #1 - RESERVOIR
11 EC-06
ORCHARD HEIGHTS RD NW
EPSC NEW IMPROVEMENTS PLAN
LOCATION #2 - GLEN CREEK VILLAGE
12 EC-07
ORCHARD HEIGHTS RD NW
EPSC NEW IMPROVEMENTS PLAN
LOCATION #3 - PARKWAY
TEMPORARY TRAFFIC CONTROL
13 TC-01
TEMPORARY TRAFFIC CONTROL
NOTES & SIGNS
14 TC-02
ADVANCED SIGNING
ORCHARD HEIGHTS RD NW
TEMPORARY TRAFFIC CONTROL
LOCATION #1 - RESERVOIR
15 TC-03
TPAR
ORCHARD HEIGHTS RD NW
TEMPORARY TRAFFIC CONTROL
LOCATION #1 - RESERVOIR
16 TC-04
TPAR
ORCHARD HEIGHTS RD NW
TEMPORARY TRAFFIC CONTROL
LOCATION #1 - RESERVOIR
17 TC-05
ADVANCED SIGNING
ORCHARD HEIGHTS RD NW
TEMPORARY TRAFFIC CONTROL
LOCATION #2 - GLEN CREEK VILLAGE
18 TC-06
WEST SIDE TPAR
ORCHARD HEIGHTS RD NW
TEMPORARY TRAFFIC CONTROL
LOCATION #2 - GLEN CREEK VILLAGE
19 TC-07
EAST SIDE TPAR
ORCHARD HEIGHTS RD NW
TEMPORARY TRAFFIC CONTROL
LOCATION #2 - GLEN CREEK VILLAGE
20 TC-08
NORTH SIDE TPAR
ORCHARD HEIGHTS RD NW
TEMPORARY TRAFFIC CONTROL
LOCATION #3 - PARKWAY
21 TC-09
SOUTH SIDE TPAR
ORCHARD HEIGHTS RD NW
TEMPORARY TRAFFIC CONTROL
LOCATION #3 - PARKWAY
STREET SHEETS
22 ST-01
ORCHARD HEIGHTS RD NW
OVERALL SITE PLAN
LOCATION #1 - RESERVOIR
23 ST-02
LOCATION #2 - GLEN CREEK VILLAGE
ORCHARD HEIGHTS RD NW
OVERALL SITE PLAN
LOCATION #3 - PARKWAY
24 ST-03
ORCHARD HEIGHTS RD NW
SIDEWALK PLAN & PROFILE
LOCATION #1 - RESERVOIR
25 ST-04
ORCHARD HEIGHTS RD NW
SIDEWALK PLAN & PROFILE
LOCATION #1 - RESERVOIR
26 ST-05
ORCHARD HEIGHTS RD NW
SIDEWALK PLAN & PROFILE
LOCATION #1 - GLEN CREEK VILLAGE
27 ST-06
ORCHARD HEIGHTS RD NW
OVERALL SITE DETAILS
LOCATION #3 - PARKWAY
28 ST-07
SOUTH SIDE
ORCHARD HEIGHTS RD NW
SIDEWALK PLAN
LOCATION #3 - PARKWAY
SWALE DETAILS
29 SW-01
ORCHARD HEIGHTS RD NW
SWALE #1 PLAN & PROFILE
LOCATION #1 - RESERVOIR
30 SW-02
ORCHARD HEIGHTS RD NW
SWALE #2 PLAN & PROFILE
LOCATION #1 - RESERVOIR
31 D-01
TYPICAL SECTIONS 1-3
ORCHARD HEIGHTS RD NW
CIVIL DETAILS
LOCATION #1- SWALE
32 D-02
TYPICAL SECTIONS 4-6
ORCHARD HEIGHTS RD NW
CIVIL DETAILS
LOCATION #1- SWALE
33 D-03
BEEHIVE
ORCHARD HEIGHTS RD NW
CIVIL DETAILS
LOCATION #1- SWALE
34 D-04
TYPE 3 CB, FENCE, & LANDSCAPE CURB
ORCHARD HEIGHTS RD NW
CIVIL DETAILS
LOCATION #1- SWALE
ADA RAMP DETAILS
35 ADA-01
WEST CORNER
ORCHARD HEIGHTS RD NW
ADA RAMP DETAILS
LOCATION #2 - GLEN CREEK VILLAGE
36 ADA-02
EAST CORNER
ORCHARD HEIGHTS RD NW
ADA RAMP DETAILS
LOCATION #2 - GLEN CREEK VILLAGE
37 ADA-03
NORTH SIDE
ORCHARD HEIGHTS RD NW
ADA RAMP DETAILS
LOCATION #3 - PARKWAY
38 ADA-04
STA H41+22
ORCHARD HEIGHTS RD NW
TIE-IN DETAILS
LOCATION #2 - GLEN CREEK VILLAGE
DRIVEWAYS
39 DW-01
MT. VIEW RESERVOIR
ORCHARD HEIGHTS RD NW
DRIVEWAY DETAILS
STA H19+20 RT
TRAFFIC SIGNAL
40 TS-01
R.R.F.B.
ORCHARD HEIGHTS RD NW
TRAFFIC SIGNAL PLAN
LOCATION #3 - PARKWAY
41 TS-02
R.R.F.B.
ORCHARD HEIGHTS RD NW
TRAFFIC SIGNAL DETAILS
LOCATION #3 - PARKWAY
42 TS-03
R.R.F.B.
ORCHARD HEIGHTS RD NW
TRAFFIC SIGNAL DETAILS
LOCATION #3 - PARKWAY
STRIPING AND SIGNING
43 S-01
NOTES & LEGEND
ORCHARD HEIGHTS RD NW
STRIPING & SIGNING
SIGN KEY & TABLE
44 S-02
ORCHARD HEIGHTS RD NW
STRIPING & SIGNING PLAN
LOCATION #1 - RESERVOIR
45 S-03
ORCHARD HEIGHTS RD NW
STRIPING & SIGNING PLAN
LOCATION #2 - GLEN CREEK VILLAGE
46 S-04
ORCHARD HEIGHTS RD NW
STRIPING & SIGNING PLAN
LOCATION #3 - PARKWAY
LANDSCAPING
47 LA-01
LANDSCAPING
SCHEDULE & NOTES
48 LA-02
ORCHARD HEIGHTS RD NW
LANDSCAPING PLAN
LOCATION #1 - RESERVOIR
49 LA-03
ORCHARD HEIGHTS RD NW
LANDSCAPING PLAN
LOCATION #1 - SWALE
50 LA-04
ORCHARD HEIGHTS RD NW
LANDSCAPING PLAN
LOCATION #1 - SWALE
51 LA-05
ORCHARD HEIGHTS RD NW
LANDSCAPING PLAN
LOCATION #2 - GLEN CREEK VILLAGE
52 LA-06
ORCHARD HEIGHTS RD NW
LANDSCAPING PLAN
LOCATION #3 - PARKWAY
IRRIGATION
53 IR-01
IRRIGATION
NOTES & PLAN
54 IR-02
IRRIGATION
DETAILS
CROSS SECTIONS
55 X-01
STA H14+95 TO H15+42
ORCHARD HEIGHTS RD NW
CROSS SECTIONS
LOCATION #1 - RESERVOIR
56 X-02
STA H15+57 TO H16+00
ORCHARD HEIGHTS RD NW
CROSS SECTIONS
LOCATION #1 - RESERVOIR
57 X-03
STA H16+34 TO H16+41
ORCHARD HEIGHTS RD NW
CROSS SECTIONS
LOCATION #1 - RESERVOIR
58 X-04
STA H16+61 TO H16+73.30
ORCHARD HEIGHTS RD NW
CROSS SECTIONS
LOCATION #1 - RESERVOIR
59 X-05
STA H17+00 TO H17+25
ORCHARD HEIGHTS RD NW
CROSS SECTIONS
LOCATION #1 - RESERVOIR
60 X-06
STA H17+67 TO H18+00
ORCHARD HEIGHTS RD NW
CROSS SECTIONS
LOCATION #1 - RESERVOIR
61 X-07
STA H18+35 TO H18+65
ORCHARD HEIGHTS RD NW
CROSS SECTIONS
LOCATION #1 - RESERVOIR
62 X-08
STA H19+20 TO H19+40
ORCHARD HEIGHTS RD NW
CROSS SECTIONS
LOCATION #1 - RESERVOIR
63 X-09
STA H39+83.23 TO H41+00
ORCHARD HEIGHTS RD NW
CROSS SECTIONS
LOCATION #2 - GLEN CREEK VILLAGE
64 X-10
STA H41+21.70 TO H42+95
ORCHARD HEIGHTS RD NW
CROSS SECTIONS
LOCATION #2 - GLEN CREEK VILLAGE
JB-2 JB-3 HD
HOLE
SPL
VLT
CNTRL
CAB
SRV
CAB
SIGNAL EQUIPMENT
LIGHTING
JB-2 JB-3 HD
HOLE
SPL
VLT
CNTRL
CAB
SRV
CAB
RRFB
E
RIGHT OF WAY
FIRE HYDRANT
SANITARY SEWER
STORM DRAIN
WATER
TELEVISION
CURB &
ELECTRICITY
UNDERGROUND
WITH DRIVEWAY
SIDEWALK
10" ST. PIPE
UTILITIES AND TOPOGRAPHIC FEATURES
EXISTING
WATER METER
WATER VALVE
RIGHT OF WAY
FIRE HYDRANT
SANITARY SEWER
STORM DRAIN
WATER
N.W. NATURAL
TELEPHONE
TELEVISION
CURB &
ELECTRICITY
UNDERGROUND
WITH DRIVEWAY
SIDEWALK
PROPERTY LINE
EDGE OF
PAVEMENT
TO BE INSTALLED
CALLOUTS
8" SS PIPE
6" D.I. W
SAWCUT
SIG
SIGNAL WIRE
WOOD FENCE
CYCLONE FENCE
TEMPORARY
CONSTRUCTION
EASEMENT
TRAFFIC SIGNAL
EASEMENT
SIDEWALK EASEMENT
DAYLIGHT
LANDSCAPING
WORK DONE BY OTHERS
WORK DONE BY CONTRACTOR
WORK DONE BY CITY FORCES
DECIDUOUS
EVERGREEN
DECIDUOUS
EVERGREEN
G-03
GENERAL
CONSTRUCTION
NOTES & LEGEND
PN:721511
NAD 83-SPCS
NGVD 1929(47)
AS SHOWN
AS SHOWN
ECT
J.KUENZI
7654321
F
E
D
C
B
A
7654321
SHEET OF
SHEET TITLE
HORIZ DATUM:
VERT DATUM:
HORIZ SCALE:
VERT SCALE:
DESIGN:
DRAWN:
CHECKED:
APPROVED:
NO. DATE BYDESCRIPTION
REVISIONS
S
A
L
E
M
P
U
B
L
IC
WORK
S
D
E
P
A
R
T
M
E
N
T
N
O I
S I
V I
D
GNI
R
E
E
N
N I
G
E
ORCHARD HEIGHTS
RD NW: SNOWBIRD
TO WESTHAVEN
(SALEM)
8 9
8 97
A
M
G G r o u p
E n g i n e e r i n g P r o j e c t s C
I P
O r c h a i g h t s
S n o w b i s t h a v e n
C
A D
S h e e t
S e t
G
T
C d t a b
EXPIRES: 06-30-2026
R
E
G
I
S
T
E
R
E
D
PR
O
F
E
S
S
I
O
N
A
L
E
L
I
Z
A
B
E
T
H
O
R
L
E
Y
J
U
E
N
G
I N
E
E
R
099675PE
OREGON
GENERAL LEGEND
GENERAL CONSTRUCTION NOTES
1. ALL CONSTRUCTION AND MATERIALS SHALL CONFORM TO THESE PLANS, THE CITY OF SALEM "PUBLIC WORKS
DESIGN STANDARDS," OREGON STANDARD SPECIFICATIONS FOR CONSTRUCTION CURRENT EDITION, AND
SPECIAL PROVISIONS DEVELOPED FOR THE PROJECT.
2. CONTRACTOR SHALL TAKE ALL PRECAUTIONS NECESSARY TO SUPPORT, MAINTAIN, OR OTHERWISE
PROTECT EXISTING UTILITIES AT ALL TIMES DURING CONSTRUCTION.
3. CONTRACTOR SHALL PROVIDE TRAFFIC CONTROL AT ALL TIMES DURING CONSTRUCTION. ALL TRAFFIC
CONTROL MEASURES SHALL BE APPROVED AND IN PLACE PRIOR TO ANY CONSTRUCTION ACTIVITY.
4. UPON COMPLETION AT THE END OF THE WORK DAY, THE CONTRACTOR SHALL LEAVE THE PROJECT AREA FREE
OF DEBRIS AND UNUSED MATERIALS.
5. UTILITY COORDINATION:
A. THE LOCATION AND DESCRIPTION OF EXISTING UTILITIES SHOWN ARE COMPILED FROM AVAILABLE
RECORDS AND/OR FIELD SURVEYS. THE CITY OR UTILITY COMPANIES DO NOT GUARANTEE THE ACCURACY
NOR THE COMPLETENESS OF SUCH RECORDS.
B. ATTENTION: OREGON LAW REQUIRES YOU TO FOLLOW RULES ADOPTED BY THE OREGON UTILITY
NOTIFICATION CENTER. THOSE RULES ARE SET FORTH IN OAR 952-001-0010THROUGH OAR 952-001-0090. YOU
MAY OBTAIN COPIES OF THE RULES BY CALLING THE CENTER. (NOTE: THE TELEPHONE NUMBER FOR THE
OREGON UTILITY NOTIFICATION CENTER IS (503)-232-1987).
C. PROVISIONS SHALL BE MADE BY THE CONTRACTOR TO KEEP ALL EXISTING UTILITIES IN SERVICE
AND PROTECT THEM DURING CONSTRUCTION.
D. UTILITIES, OR INTERFERING PORTIONS OF UTILITIES, THAT ARE ABANDONED IN PLACE SHALL BE
REMOVED BY THE CONTRACTOR TO THE EXTENT NECESSARY TO ACCOMPLISH THE WORK.
THE CONTRACTOR SHALL PLUG THE REMAINING EXPOSED ENDS OF ABANDONED UTILITIES.
6. THE CONTRACTOR SHALL BE EXPECTED TO VISIT THE SITE AND MAKE THEIR OWN DETERMINATION OF
TOPOGRAPHIC FEATURES REQUIRING RESTORATION.
7. DO NOT REMOVE TREES EXCEPT AS APPROVED BY THE ENGINEER. PROTECT ALL ROOTS TWO
INCHES AND LARGER IN DIAMETER. TRIM TREES, SHRUBS AND HEDGES ONLY AS DIRECTED BY THE ENGINEER.
8. ALL DAMAGE CAUSED BY CONTRACTOR SHALL BE RESTORED TO AN 'AS GOOD OR BETTER' CONDITION.
9. ALL LANDSCAPING AND/OR SOD SHALL BE RESTORED TO AN 'AS GOOD OR BETTER' CONDITION.
ED
W
IN
G C
T N W
S
N
O
W
B
I
S N
O W
B I R
D
S
T
N
W
BAR
LO
W
AV N
W
S C
H O
O L H
O U
N
W
L
I N
W
O
P
A
R
K
W
W E
W E
S T
H A
V E
N
A
V
N
W
K E
N A
N
W
K A
R E
N
W
O V
E R
L O
K
V
N
W
C
H
A
P
M
I
O
R
C
H
A
I
G
H
G-04
PAGE LAYOUT
SHEET
PN:721511
NAD 83-SPCS
NGVD 1929(47)
AS SHOWN
AS SHOWN
ECT
J.KUENZI
7654321
F
E
D
C
B
A
7654321
SHEET OF
SHEET TITLE
HORIZ DATUM:
VERT DATUM:
HORIZ SCALE:
VERT SCALE:
DESIGN:
DRAWN:
CHECKED:
APPROVED:
NO. DATE BYDESCRIPTION
REVISIONS
S
A
L
E
M
P
U
B
L
IC
WORK
S
D
E
P
A
R
T
M
E
N
T
N
O I
S I
V I
D
GNI
R
E
E
N
N I
G
E
ORCHARD HEIGHTS
RD NW: SNOWBIRD
TO WESTHAVEN
(SALEM)
8 9
8 97
A
M
G G r o u p
E n g i n e e r i n g P r o j e c t s C
I P
O r c h a i g h t s
S n o w b i s t h a v e n
C
A D
S h e e t
S e t
G
T
C d t a b
EXPIRES: 06-30-2026
R
E
G
I
S
T
E
R
E
D
PR
O
F
E
S
S
I
O
N
A
L
E
L
I
Z
A
B
E
T
H
O
R
L
E
Y
J
U
E
N
G
I N
E
E
R
099675PE
OREGON
ST-03
ST-04
ST-05
ST-06
O
RCHARD HEIG
HTS RD NW
LOCATION #2-
GLEN CREEK VILLAGE
LOCATION #1-
RESERVOIR
LOCATION #3-
PARKWAY
COMPLETE WORK
AT LOCATION #3
PRIOR TO STARTING
WORK AT OTHER
LOCATIONS
W
IN
G C
T N W
S
N
O
W
B
I
S N
O W
B I R
D
S
T
N
W
B A
R
LO
W A
V N
W
S C
H O
O L H
O U
N
W
L
I N
W
O
P
A
R
K
W
W E
W E
S T
H A
V E
N
A
V
N
W
K E
N A
N
W
K A
R E
N
W
B
E
A
U
M
O
U
V A
L L E
Y
V
I E
W
A
V
N
W
V A
L L E
Y
V
I E
W
A
V
N
W
O V
E R
L O
N
W
O
R
C
H
A
I
G
H
C
H
A
P
M
O
R
C
H
A
I
G
H
G-05
SURVEY
CONTROL SHEET
PN:721511
NAD 83-SPCS
NGVD 1929(47)
AS SHOWN
AS SHOWN
ECT
J.KUENZI
7654321
F
E
D
C
B
A
7654321
SHEET OF
SHEET TITLE
HORIZ DATUM:
VERT DATUM:
HORIZ SCALE:
VERT SCALE:
DESIGN:
DRAWN:
CHECKED:
APPROVED:
NO. DATE BYDESCRIPTION
REVISIONS
S
A
L
E
M
P
U
B
L
IC
WORK
S
D
E
P
A
R
T
M
E
N
T
N
O I
S I
V I
D
GNI
R
E
E
N
N I
G
E
ORCHARD HEIGHTS
RD NW: SNOWBIRD
TO WESTHAVEN
(SALEM)
8 9
8 97
A
M
G G r o u p
E n g i n e e r i n g P r o j e c t s C
I P
O r c h a i g h t s
S n o w b i s t h a v e n
C
A D
S h e e t
S e t
G
T
C d t a b
EXPIRES: 06-30-2026
R
E
G
I
S
T
E
R
E
D
PR
O
F
E
S
S
I
O
N
A
L
E
L
I
Z
A
B
E
T
H
O
R
L
E
Y
J
U
E
N
G
I N
E
E
R
099675PE
OREGON
SURVEY CONTROL POINTS
TEMPORARY SURVEY CONTROL POINTS
PT# NORTHING EASTING ELEVATION DESCRIPTION
1 482159.403 7536969.835 282.47 PK SET
2 482209.919 7537261.394 280.49 PK SET
3 480982.794 7538695.472 182.05 PK SET
4 480585.776 7539348.522 194.99 PK SET
5 480215.220 7540028.079 253.34 PK FD
6 479859.410 7540707.152 244.42 PK FD
LEGEND
TEMPORARY SURVEY CONTROL POINT
FOUND MONUMENT
AC ALUMINUM CAP
IP IRON PIPE
PK SURVEYOR'S NAIL
YPC YELLOW PLASTIC CAP
HORIZONTAL DATUM:
OREGON STATE PLANE COORDINATE SYSTEM ('83) NORTH
ZONE, EPOCH (CURRENT VERSION)
VERTICAL DATUM:
NATIONAL GEODETIC VERTICAL DATUM OF 1929 ('47)
SURVEY MONUMENT PRESERVATION:
1. THE SHOWN SURVEY CONTROL IS NOT ALL INCLUSIVE OF
ALL SURVEY MONUMENTS WITHIN THE WORK AREA. THE
CONTRACTOR IS REQUIRED BY ORS 209.150 TO REPLACE ALL
SURVEY MONUMENTS DISTURBED OR DESTROYED BY
CONSTRUCTION ACTIVITIES.
2. THE CONTRACTOR SHALL NOTIFY THE CITY INSPECTOR OR
PROJECT ENGINEER WITHIN 24 HOURS OF ANY SURVEY
MONUMENT DISTURBED/DESTROYED BY CONSTRUCTION
ACTIVITIES.
EC-01
ORCHARD HEIGHTS RD NW
EPSC NOTES
PN:721511
NAD 83-SPCS
NGVD 1929(47)
AS SHOWN
AS SHOWN
ECT
J.KUENZI
7654321
F
E
D
C
B
A
7654321
SHEET OF
SHEET TITLE
HORIZ DATUM:
VERT DATUM:
HORIZ SCALE:
VERT SCALE:
DESIGN:
DRAWN:
CHECKED:
APPROVED:
NO. DATE BYDESCRIPTION
REVISIONS
S
A
L
E
M
P
U
B
L
IC
WORK
S
D
E
P
A
R
T
M
E
N
T
N
O I
S I
V I
D
GNI
R
E
E
N
N I
G
E
ORCHARD HEIGHTS
RD NW: SNOWBIRD
TO WESTHAVEN
(SALEM)
8 9
8 97
A
M
G G r o u p
E n g i n e e r i n g P r o j e c t s C
I P
O r c h a i g h t s
S n o w b i s t h a v e n
C
A D
S h e e t
S e t
E
C S
T R
I P
E d
C t a b
EXPIRES: 06-30-2026
R
E
G
I
S
T
E
R
E
D
PR
O
F
E
S
S
I
O
N
A
L
E
L
I
Z
A
B
E
T
H
O
R
L
E
Y
J
U
E
N
G
I N
E
E
R
099675PE
OREGON
EROSION PREVENTION AND SEDIMENT CONTROL (EPSC) NOTES
1. THE CONTRACTOR SHALL PROVIDE DAILY MEASURES TO ENSURE
SEDIMENT CONTROL DURING NON-WORK HOURS.
2. THE CONTRACTOR SHALL PROVIDE PROTECTION AS REQUIRED ON
PRIVATE INLETS TO ENSURE SEDIMENT CONTROL WITHIN THE WORK AREA.
3. THE PROJECT SITE SHALL HAVE A CONCRETE WASHOUT BASIN AVAILABLE
PER STD. PLAN 917 OR APPROVED EQUAL.
4. ALL TEMPORARY STOCKPILES AND CONCRETE MANAGEMENT FACILITIES
SHALL BE LOCATED A MINIMUM OF 50 FEET FROM ANY DRAINAGE INLET OR
WATERCOURSE.
5. THIS EROSION CONTROL PLAN REPRESENTS MINIMUM EROSION CONTROL
MEASURES. ADDITIONAL COORDINATION AND WORK WITH THE CITY OF SALEM
MAY BE REQUIRED.
GENERAL EPSC NOTES
(a) Pre-Construction
(1) Prior to any land disturbing activities, the boundaries of the clearing and grading limits, vegetated buffers, and any sensitive areas shown on this plan shall be clearly delineated in the field. Unless otherwise approved, no disturbance is permitted beyond the clearing limits. The contractor must maintain the delineation for the duration of the project. Note: vegetated corridors to be delineated with orange construction fence or approved equal.
(2) BMPS that must be installed prior to land disturbing activities are construction entrance, perimeter sediment control, and inlet protection.
(3) Hold a preconstruction conference to review the EPSC and with the city’s project manager and inspector.
(b) Construction
(1) All sediment is required to stay on site. Sediment amounts greater than ½ cubic foot which leave the site must be cleaned up within 24 hours and placed back on the site and stabilized or properly disposed. Vacuuming or dry sweeping must be used to clean up released sediment and it must not be swept or washed into storm sewers, drainage ways, or water bodies. The cause of the sediment release must be found and prevented from causing a recurrence of the discharge within the same 24 hours. Any in-stream clean up of sediment shall be performed according to the DSL required time frame.
(2) Construction, maintenance, replacement, and upgrading of erosion prevention and sediment control facilities is the sole responsibility of the contractor until all construction is completed, approved, and permanent erosion control
(i.e., vegetation/landscaping) is established on all disturbed areas.
(3) All recommended erosion prevention and sediment control procedures are dependent on construction methods, staging, site conditions, weather, and scheduling.
During the construction period, erosion control facilities shall be revised, upgraded, replaced, or added, to comply with SRC and State and Federal regulatory requirements.
(4) The contractor is solely responsible for protection of all adjacent property and downstream facilities from erosion and siltation during project construction. Any damage resulting from such erosion and siltation shall be corrected at the sole expense of the contractor.
(5) When saturated soil is present, water-tight trucks must be used to transport saturated soils from the construction site. Soil may be drained on site at a designated location, using appropriate BMPs. Soil must be drained sufficiently to drip less than one gallon per hour prior to leaving the site.
(6) All materials spilled, dropped, or washed into storm drains must be removed immediately, and the contractor shall provide protection of downstream inlets and catch basins to ensure sediment-laden water does not enter the storm drain system.
(7) All discharge of sediment-laden water must be treated with an appropriate bmp to remove sediment from discharge waters and to comply with SRC and State and
Federal regulatory permits.
(8) In areas subject to wind erosion, appropriate BMPs must be used which may include the application of fine water spraying, plastic sheeting, mulching, or other approved measures.
(9) The EPSC measures and BMPs shown on this plan are the minimum requirements for anticipated site conditions. During the construction period, these measures shall be upgraded as needed to maintain compliance with all regulations.
(10) The contractor shall provide onsite water or other appropriate BMPs to prevent dust and wind erosion of fine grain soils.
(11) Disturbed areas must be stabilized after 14 days of inactivity, or immediately if rain is forecasted. See subsection 7A.1(d)-Wet Weather Period.
(12) During the wet weather work period or when rain is forecasted, all active and inactive soil stock piles must be covered with appropriate plastic sheeting. Plastic sheeting must cover the entire stock pile and be sufficiently anchored.
(c) Pollutants, Solid Waste and Hazardous Materials Management
(1) Any use of toxic or other hazardous materials must include proper storage, application, and disposal.
(2) The contractor is solely responsible to properly manage pollutants, hazardous wastes, used oils, contaminated soils, concrete waste, sanitary waste, liquid waste, or other toxic substances discovered or generated during construction to prevent leakage, spills or release of pollutants to the environment and surface waters.
(3) Contractor shall develop a project specific written spill prevention and response procedures that includes employee training on spill prevention and proper disposal procedures; regular maintenance schedule for vehicles and machinery; and material delivery and storage controls, signage, material use, and use of covered storage areas for waste and supplies. The plan shall comply with SRC and Federal and
State requirements, and shall be available on site at all times.
(d) Wet Weather Period (October 15 through April 30)
(1) Construction activities must avoid or minimize the duration of disturbed areas.
(2) Temporary stabilization of the site including covering of bare soils with approved BMPs, must be installed at the end of the shift before a holiday or weekend, or at the end of each workday if rainfall is forecast in the next 24 hours.
(3) Temporary stabilization or covering of soil stockpiles and protection of stockpiles located away from construction activity must occur at the end of each workday.
(e) Maintenance
(1) Erosion control measures shall be maintained in such a manner as to ensure that erosion is prevented and sediment-laden water does not enter a drainage system, roadway, or violate applicable water quality standards.
(2) Sediment shall not be washed or swept into storm sewers, drainage ways, or water bodies.
(3) Sediment must be removed from behind all sediment control measures when it has reached a height of 1/3 the barrier height, and prior to the control measures removal.
(4) Removal of trapped sediment in a sediment basin or sediment trap or catch basins must occur when the sediment retention capacity has been reduced by 50 percent; is not functioning properly and/or at the completion of project.
(5) Cleaning of all structures, inlet protection BMPs, and sump pumps must be completed regularly and as required to ensure structures and inlets function properly and flow freely.
(6) Construction site exits shall be maintained in a condition that will prevent tracking or flow of mud onto the row or approved access point. The entrance may require periodic top dressing as conditions demand, and repair and/or cleanout of any structures used to trap sediment. Wheel washing shall be required to prevent sediment and material tracking on road surfaces if passive BMPs are not effective.
(f) Inspection
(1) The EPSC must be kept onsite at all times. All measures shown on the plan must be installed properly to ensure compliance with SRC and State and Regulatory permits, and that sediment does not enter a surface water system, roadway, or other properties.
(2) Written EPSC inspection logs shall be maintained onsite and available to city inspectors upon request.
(3) All BMPs shall be inspected at least every week. When a rainfall event exceeds ½" in a 24-hour period, daily inspection of the erosion controls, sediment controls, and discharge outfalls must be conducted and documented. Inspections shall be done by a representative of the permit registrant who is knowledgeable and experienced in the principles, practices, installation, and maintenance of erosion and sediment controls.
(g) Inactive Construction Periods and Post-Construction
(1) Should work cease in any area for 14 days, the inactive area must be stabilized with appropriate soil stabilization BMPs. If all construction activity ceases the entire site must be temporarily stabilized using vegetation, heavy mulch layer, temporary seeding, or other method.
(2) All temporary erosion prevention and sediment control facilities shall be removed by the contractor within 30 days after permanent landscaping/vegetation is established and the threat of erosion and sediment transport has been mitigated.
(3) Temporary grass cover measures must be fully established by October 15 or other cover measures (i.e., erosion control blankets with anchors, one-inch of straw mulch, six mil HDPE plastic sheet, etc.) shall be in place over all disturbed soil areas until April 30. To establish an adequate grass stand for controlling erosion by October
15, it is recommended that seeding and mulching occur by September 1.
(4) Permanent erosion control vegetation on all embankments and disturbed areas shall be re-established as soon as construction is completed.
(h) Specifications
(1) Soil preparation. Topsoil should be prepared according to the landscape plans, if available, or recommendations of the grass seed supplier. Slopes shall be textured before seeding by rack walking (i.e., driving a crawling tractor up and down the slopes to leave a pattern of cleat imprints parallel to slope contours) or other method to provide stable areas for seeds to rest.
(2) Seeding. Erosion control grass seed mix shall be as follows: Dwarf grass mix
(low height, low maintenance) consisting of dwarf perennial ryegrass (80 percent by weight), creeping red fescue (20 percent by weight). Application rate shall be 100 pounds per acre minimum.
(3) Grass seed shall be fertilized at a rate of ten pounds per 1,000 square feet with 16-16-16 slow release type fertilizer. Disturbed areas within 50 feet of water bodies and wetlands must use a non-phosphorous fertilizer.
(4) The application rate of fertilizers used to reestablish vegetation shall follow manufacturer's recommendations. Nutrient releases from fertilizers to surface waters shall be minimized. Time release fertilizers shall be used. Care shall be made in the application of fertilizers within any waterway riparian zone to prevent leaching into the waterway.
(5) When used, hydromulch shall be applied with grass seed at a rate of 2,000 pounds per acre between April 30 and June 10, or between September 1 and October
1. On slopes steeper than ten percent, hydroseed and mulch shall be applied with a bonding agent (tackifier). Application rate and methodology shall be in accordance with seed supplier recommendations.
(6) When used in lieu of hydromulch, dry, loose, weed-free straw used as mulch shall be applied at a rate of 4,000 pounds per acre (double the hydromulch application requirement). Anchor straw by working in by hand or with equipment (rollers, cleat trackers, etc.). Mulch shall be spread uniformly immediately following seeding.
(7) When conditions are not favorable to germination and establishment of the grass seed, the Contractor shall irrigate the seeded and mulched areas as required to establish the grass cover.
(8) Sediment fences shall be constructed of continuous filter fabric to avoid use of joints. When joints are necessary, filter cloth shall be spliced together only at a support post, with a minimum six-inch overlap, and both ends securely fastened to a post.
(9) The standard strength filter fabric shall be fastened securely to stitched loops installed on the upslope side of the posts, and six inches of the fabric shall be extended into the trench. The fabric shall not extend more than 30 inches above the original ground surface. Filter fabric shall not be stapled to existing trees.
(10) Bio-filter bags shall be clean 100 percent wood product waste. Bags shall be 18-inch x 18-inch x 30-inch, weigh approximately 45 pounds, and be contained in a bag made of ½ inch plastic mesh.
(11) Minimum wet weather slope protection. For 3H:1V or steeper slopes use
Bon Terra Type C2 or North American Green Type C125 erosion control blankets. Use a minimum of two inches straw mulch or North American Green Type S150 for slopes flatter than 3H:1V and greater than 6H:1V. Slopes flatter than 6H:1V use one inch straw mulch, hydroseed with hydromulch and tackifier. Slope protection shall be placed on all disturbed areas immediately after completion of each section of construction activity, until the erosion control seeding has been established. As an option during temporary or seasonal work stoppages, a six-mil HDPE plastic sheet may be placed on exposed slopes. The plastic sheet shall be provided with an anchor trench at the top and bottom of the slope, and shall be sandbagged on the slopes as required to prevent damage or displacement by wind.
DESIGN STANDARDS NOTES
EC-02
ORCHARD HEIGHTS RD NW
EPSC EXISTING
CONDITIONS PLAN
LOCATION #1 - RESERVOIR
PN:721511
NAD 83-SPCS
NGVD 1929(47)
AS SHOWN
AS SHOWN
ECT
J.KUENZI
7654321
F
E
D
C
B
A
7654321
SHEET OF
SHEET TITLE
HORIZ DATUM:
VERT DATUM:
HORIZ SCALE:
VERT SCALE:
DESIGN:
DRAWN:
CHECKED:
APPROVED:
NO. DATE BYDESCRIPTION
REVISIONS
S
A
L
E
M
P
U
B
L
IC
WORK
S
D
E
P
A
R
T
M
E
N
T
N
O I
S I
V I
D
GNI
R
E
E
N
N I
G
E
SHEET KEYNOTES
A
M
G G r o u p
E n g i n e e r i n g P r o j e c t s C
I P
O r c h a i g h t s
S n o w b i s t h a v e n
C
A D
S h e e t
S e t
E
C S
T R
I P
E d
C t a b
ORCHARD HEIGHTS
RD NW: SNOWBIRD
TO WESTHAVEN
(SALEM)
EXPIRES: 06-30-2026
R
E
G
I
S
T
E
R
E
D
PR
O
F
E
S
S
I
O
N
A
L
E
L
I
Z
A
B
E
T
H
O
R
L
E
Y
J
U
E
N
G
I N
E
E
R
099675PE
OREGON
M A
T C
H L
I N
E
S
S E
E
B
E L
O W
S E
E
A
B O
M
T
C H
L I N
E
S
ORCHARD HEIGHTS RD NW
ORCHARD HEIGHTS RD NW
MT. VIEW RESERVOIR
CITY PROPERTY
MT. VIEW RESERVOIR
CITY PROPERTY
S N
O W
B I R
D
S C
H O
O L
H O
U S
E
LOCATION #1 - RESERVOIR
EROSION CONTROL WORK LIMITS
WL
INSTALL SEDIMENT FENCE
PER STD. PLAN 902.
INSTALL WATTLES OVERLAND FLOW
PER STD. PLAN 903
OR BIOFILTER BAG OVERLAND FLOW
PER STD. PLAN 904.
FLOW ARROW
(EXISTING CONDITIONS PRIOR TO
CONSTRUCTION)
NOTE: THIS IS REQUIRED ON ALL
INLETS RECEIVING FLOW FROM THE
PROJECT, INCLUDING EXISTING
INLETS TO BE REMOVED AND NEW
INLETS ONCE INSTALLED.
INSTALL INLET PROTECTION SILT SACK
PER STD. PLAN 913.
EXISTING NEW
INSTALL BIOFILTER BAG CHECK DAM
PER STD. PLAN 914 OR 916
WHICHEVER IS SHOWN.
OR
INSTALL WORK ZONE FENCING FOR
TREE PROTECTION PER STD. PLAN 820.
INSTALL CONSTRUCTION ENTRANCE
PER STD. PLAN 901.
CONTOURS ARE FROM TOPOGRAPHIC
SURVEY ON DECEMBER 2022 AND MAY NOT
REPRESENT EXACT TOPOGRAPHICAL
CONDITIONS PRIOR TO CONSTRUCTION.
THIS EROSION CONTROL PLAN PROVIDES
GUIDANCE FOR PLACEMENT OF
RECOMMENDED MEASURES, CERTAIN
CONSTRUCTION ACTIVITIES MAY REQUIRE
ADDITIONAL EROSION CONTROL MEASURES.
EC-03
ORCHARD HEIGHTS RD NW
EPSC EXISTING
CONDITIONS PLAN
LOCATION #2 - G.C.V.
PN:721511
NAD 83-SPCS
NGVD 1929(47)
AS SHOWN
AS SHOWN
ECT
J.KUENZI
7654321
F
E
D
C
B
A
7654321
SHEET OF
SHEET TITLE
HORIZ DATUM:
VERT DATUM:
HORIZ SCALE:
VERT SCALE:
DESIGN:
DRAWN:
CHECKED:
APPROVED:
NO. DATE BYDESCRIPTION
REVISIONS
S
A
L
E
M
P
U
B
L
IC
WORK
S
D
E
P
A
R
T
M
E
N
T
N
O I
S I
V I
D
GNI
R
E
E
N
N I
G
E
SHEET KEYNOTES
A
M
G G r o u p
E n g i n e e r i n g P r o j e c t s C
I P
O r c h a i g h t s
S n o w b i s t h a v e n
C
A D
S h e e t
S e t
E
C S
T R
I P
E d
C t a b
ORCHARD HEIGHTS
RD NW: SNOWBIRD
TO WESTHAVEN
(SALEM)
EXPIRES: 06-30-2026
R
E
G
I
S
T
E
R
E
D
PR
O
F
E
S
S
I
O
N
A
L
E
L
I
Z
A
B
E
T
H
O
R
L
E
Y
J
U
E
N
G
I N
E
E
R
099675PE
OREGON
EROSION CONTROL WORK LIMITS
WL
INSTALL SEDIMENT FENCE
PER STD. PLAN 902.
INSTALL WATTLES OVERLAND FLOW
PER STD. PLAN 903.
FLOW ARROW
(EXISTING CONDITIONS PRIOR TO
CONSTRUCTION)
NOTE: THIS IS REQUIRED ON ALL
INLETS RECEIVING FLOW FROM THE
PROJECT, INCLUDING EXISTING
INLETS TO BE REMOVED AND NEW
INLETS ONCE INSTALLED.
INSTALL INLET PROTECTION SILT SACK
PER STD. PLAN 913.
EXISTING NEW
INSTALL BIOFILTER BAG CHECK DAM
PER STD. PLAN 914 OR 916
WHICHEVER IS SHOWN.
OR
INSTALL WORK ZONE FENCING FOR
TREE PROTECTION PER STD. PLAN 820.
O R
C H
A R
D H
E
IG
H T
S R
D N
W
M A
T C
H L
I N
E
S
S E
E
B
E L
O W
S E
E
A
B O
T
C H
L I N
E
S
ORCHARD HEIGHTS RD NW
1260-1320
EX. BRIDGE
M A
T C
H L
I N
E
S
S E
E
S
H E
LOCATION #2 - GLEN CREEK VILLAGE
CONTOURS ARE FROM TOPOGRAPHIC
SURVEY ON DECEMBER 2022 AND MAY NOT
REPRESENT EXACT TOPOGRAPHICAL
CONDITIONS PRIOR TO CONSTRUCTION.
THIS EROSION CONTROL PLAN PROVIDES
GUIDANCE FOR PLACEMENT OF
RECOMMENDED MEASURES, CERTAIN
EC-04
LOCATION #2 - G.C.V.
ORCHARD HEIGHTS RD NW
EPSC EXISTING
CONDITIONS PLAN
LOCATION #3 - PARKWAY
PN:721511
NAD 83-SPCS
NGVD 1929(47)
AS SHOWN
AS SHOWN
ECT
J.KUENZI
7654321
F
E
D
C
B
A
7654321
SHEET OF
SHEET TITLE
HORIZ DATUM:
VERT DATUM:
HORIZ SCALE:
VERT SCALE:
DESIGN:
DRAWN:
CHECKED:
APPROVED:
NO. DATE BYDESCRIPTION
REVISIONS
S
A
L
E
M
P
U
B
L
IC
WORK
S
D
E
P
A
R
T
M
E
N
T
N
O I
S I
V I
D
GNI
R
E
E
N
N I
G
E
SHEET KEYNOTES
A
M
G G r o u p
E n g i n e e r i n g P r o j e c t s C
I P
O r c h a i g h t s
S n o w b i s t h a v e n
C
A D
S h e e t
S e t
E
C S
T R
I P
E d
C t a b
ORCHARD HEIGHTS
RD NW: SNOWBIRD
TO WESTHAVEN
(SALEM)
EXPIRES: 06-30-2026
R
E
G
I
S
T
E
R
E
D
PR
O
F
E
S
S
I
O
N
A
L
E
L
I
Z
A
B
E
T
H
O
R
L
E
Y
J
U
E
N
G
I N
E
E
R
099675PE
OREGON
EROSION CONTROL WORK LIMITS
WL
INSTALL SEDIMENT FENCE
PER STD. PLAN 902.
INSTALL WATTLES OVERLAND FLOW
PER STD. PLAN 903.
FLOW ARROW
(EXISTING CONDITIONS PRIOR TO
CONSTRUCTION)
NOTE: THIS IS REQUIRED ON ALL
INLETS RECEIVING FLOW FROM THE
PROJECT, INCLUDING EXISTING
INLETS TO BE REMOVED AND NEW
INLETS ONCE INSTALLED.
INSTALL INLET PROTECTION SILT SACK
PER STD. PLAN 913.
EXISTING NEW
INSTALL BIOFILTER BAG CHECK DAM
PER STD. PLAN 914 OR 916
WHICHEVER IS SHOWN.
OR
INSTALL WORK ZONE FENCING FOR
TREE PROTECTION PER STD. PLAN 820.
ORCHARD HEIGHTS RD NW
ORCHARD HEIGHTS RD NW
P A
R K
W A
Y
ORCHARD HEIGHTS PARK
CITY PROPERTY
ORCHARD HEIGHTS PARK
CITY PROPERTY
S E
E
S
H E
M A
T C
H L
I N
E
S
M A
T C
H L
I N
E
S
S E
E
B
E L
O W
S E
E
A
B O
V E
M A
T C
H L
I N
E
S
LOCATION #2 - GLEN CREEK VILLAGE
LOCATION #3 - PARKWAY
CONTOURS ARE FROM TOPOGRAPHIC
SURVEY ON DECEMBER 2022 AND MAY NOT
REPRESENT EXACT TOPOGRAPHICAL
CONDITIONS PRIOR TO CONSTRUCTION.
THIS EROSION CONTROL PLAN PROVIDES
GUIDANCE FOR PLACEMENT OF
RECOMMENDED MEASURES, CERTAIN
EC-05
ORCHARD HEIGHTS RD NW
EPSC NEW
IMPROVEMENTS PLAN
LOCATION #1 - RESERVOIR
PN:721511
NAD 83-SPCS
NGVD 1929(47)
AS SHOWN
AS SHOWN
ECT
J.KUENZI
7654321
F
E
D
C
B
A
7654321
SHEET OF
SHEET TITLE
HORIZ DATUM:
VERT DATUM:
HORIZ SCALE:
VERT SCALE:
DESIGN:
DRAWN:
CHECKED:
APPROVED:
NO. DATE BYDESCRIPTION
REVISIONS
S
A
L
E
M
P
U
B
L
IC
WORK
S
D
E
P
A
R
T
M
E
N
T
N
O I
S I
V I
D
GNI
R
E
E
N
N I
G
E
SHEET KEYNOTES
A
M
G G r o u p
E n g i n e e r i n g P r o j e c t s C
I P
O r c h a i g h t s
S n o w b i s t h a v e n
C
A D
S h e e t
S e t
E
C S
T R
I P
E d
C t a b
ORCHARD HEIGHTS
RD NW: SNOWBIRD
TO WESTHAVEN
(SALEM)
EXPIRES: 06-30-2026
R
E
G
I
S
T
E
R
E
D
PR
O
F
E
S
S
I
O
N
A
L
E
L
I
Z
A
B
E
T
H
O
R
L
E
Y
J
U
E
N
G
I N
E
E
R
099675PE
OREGON
M A
T C
H L
I N
E
S
S E
E
B
E L
O W
S E
E
A
B O
T
C H
L I N
E
S
ORCHARD HEIGHTS RD NW
ORCHARD HEIGHTS RD NW
MT. VIEW RESERVOIR
CITY PROPERTY
MT. VIEW RESERVOIR
CITY PROPERTY
S N
O W
B I R
D
S C
H O
O L
H O
U S
E
LOCATION #1 - RESERVOIR
EROSION CONTROL WORK LIMITS
WL
INSTALL SEDIMENT FENCE
PER STD. PLAN 902.
INSTALL WATTLES OVERLAND FLOW
PER STD. PLAN 903
OR BIOFILTER BAG OVERLAND FLOW
PER STD. PLAN 904.
FLOW ARROW
(EXISTING CONDITIONS PRIOR TO
CONSTRUCTION)
NOTE: THIS IS REQUIRED ON ALL
INLETS RECEIVING FLOW FROM THE
PROJECT, INCLUDING EXISTING
INLETS TO BE REMOVED AND NEW
INLETS ONCE INSTALLED.
INSTALL INLET PROTECTION SILT SACK
PER STD. PLAN 913.
EXISTING NEW
INSTALL BIOFILTER BAG CHECK DAM
PER STD. PLAN 914 OR 916
WHICHEVER IS SHOWN.
OR
INSTALL WORK ZONE FENCING FOR
TREE PROTECTION PER STD. PLAN 820.
INSTALL CONSTRUCTION ENTRANCE
PER STD. PLAN 901.
INSTALL EROSION MATTING TYPE 'C'
ALONG SLOPE PER STD. PLAN 906.
SEE LANDSCAPE PLANS FOR
PLANTING INFORMATION.
LP
LP
LP
CONTOURS ARE FROM TOPOGRAPHIC
SURVEY ON DECEMBER 2022 AND MAY NOT
REPRESENT EXACT TOPOGRAPHICAL
CONDITIONS PRIOR TO CONSTRUCTION.
THIS EROSION CONTROL PLAN PROVIDES
GUIDANCE FOR PLACEMENT OF
RECOMMENDED MEASURES, CERTAIN
EC-06
ORCHARD HEIGHTS RD NW
EPSC NEW
IMPROVEMENTS PLAN
LOCATION #2 - G.C.V.
PN:721511
NAD 83-SPCS
NGVD 1929(47)
AS SHOWN
AS SHOWN
ECT
J.KUENZI
7654321
F
E
D
C
B
A
7654321
SHEET OF
SHEET TITLE
HORIZ DATUM:
VERT DATUM:
HORIZ SCALE:
VERT SCALE:
DESIGN:
DRAWN:
CHECKED:
APPROVED:
NO. DATE BYDESCRIPTION
REVISIONS
S
A
L
E
M
P
U
B
L
IC
WORK
S
D
E
P
A
R
T
M
E
N
T
N
O I
S I
V I
D
GNI
R
E
E
N
N I
G
E
SHEET KEYNOTES
A
M
G G r o u p
E n g i n e e r i n g P r o j e c t s C
I P
O r c h a i g h t s
S n o w b i s t h a v e n
C
A D
S h e e t
S e t
E
C S
T R
I P
E d
C t a b
ORCHARD HEIGHTS
RD NW: SNOWBIRD
TO WESTHAVEN
(SALEM)
EXPIRES: 06-30-2026
R
E
G
I
S
T
E
R
E
D
PR
O
F
E
S
S
I
O
N
A
L
E
L
I
Z
A
B
E
T
H
O
R
L
E
Y
J
U
E
N
G
I N
E
E
R
099675PE
OREGON
EROSION CONTROL WORK LIMITS
WL
INSTALL SEDIMENT FENCE
PER STD. PLAN 902.
INSTALL WATTLES OVERLAND FLOW
PER STD. PLAN 903.
FLOW ARROW
(EXISTING CONDITIONS PRIOR TO
CONSTRUCTION)
NOTE: THIS IS REQUIRED ON ALL
INLETS RECEIVING FLOW FROM THE
PROJECT, INCLUDING EXISTING
INLETS TO BE REMOVED AND NEW
INLETS ONCE INSTALLED.
INSTALL INLET PROTECTION SILT SACK
PER STD. PLAN 913.
EXISTING NEW
INSTALL BIOFILTER BAG CHECK DAM
PER STD. PLAN 914 OR 916
WHICHEVER IS SHOWN.
OR
INSTALL WORK ZONE FENCING FOR
TREE PROTECTION PER STD. PLAN 820.
O R
C H
A R
D H
E
IG
H T
S R
D N
W
M A
T C
H L
I N
E
S
S E
E
B
E L
O W
S E
E
A
B O
T
C H
L I N
E
S
ORCHARD HEIGHTS RD NW
1260-1320
EX. BRIDGE
M A
T C
H L
I N
E
S
S E
E
S
H E
LOCATION #2 - GLEN CREEK VILLAGE
CONTOURS ARE FROM TOPOGRAPHIC
SURVEY ON DECEMBER 2022 AND MAY NOT
REPRESENT EXACT TOPOGRAPHICAL
CONDITIONS PRIOR TO CONSTRUCTION.
THIS EROSION CONTROL PLAN PROVIDES
GUIDANCE FOR PLACEMENT OF
RECOMMENDED MEASURES, CERTAIN
EC-07
LOCATION #2 - G.C.V.
ORCHARD HEIGHTS RD NW
EPSC NEW
IMPROVEMENTS PLAN
LOCATION #3 - PARKWAY
PN:721511
NAD 83-SPCS
NGVD 1929(47)
AS SHOWN
AS SHOWN
ECT
J.KUENZI
7654321
F
E
D
C
B
A
7654321
SHEET OF
SHEET TITLE
HORIZ DATUM:
VERT DATUM:
HORIZ SCALE:
VERT SCALE:
DESIGN:
DRAWN:
CHECKED:
APPROVED:
NO. DATE BYDESCRIPTION
REVISIONS
S
A
L
E
M
P
U
B
L
IC
WORK
S
D
E
P
A
R
T
M
E
N
T
N
O I
S I
V I
D
GNI
R
E
E
N
N I
G
E
SHEET KEYNOTES
A
M
G G r o u p
E n g i n e e r i n g P r o j e c t s C
I P
O r c h a i g h t s
S n o w b i s t h a v e n
C
A D
S h e e t
S e t
E
C S
T R
I P
E d
C t a b
ORCHARD HEIGHTS
RD NW: SNOWBIRD
TO WESTHAVEN
(SALEM)
EXPIRES: 06-30-2026
R
E
G
I
S
T
E
R
E
D
PR
O
F
E
S
S
I
O
N
A
L
E
L
I
Z
A
B
E
T
H
O
R
L
E
Y
J
U
E
N
G
I N
E
E
R
099675PE
OREGON
EROSION CONTROL WORK LIMITS
WL
INSTALL SEDIMENT FENCE
PER STD. PLAN 902.
INSTALL WATTLES OVERLAND FLOW
PER STD. PLAN 903.
FLOW ARROW
(EXISTING CONDITIONS PRIOR TO
CONSTRUCTION)
NOTE: THIS IS REQUIRED ON ALL
INLETS RECEIVING FLOW FROM THE
PROJECT, INCLUDING EXISTING
INLETS TO BE REMOVED AND NEW
INLETS ONCE INSTALLED.
INSTALL INLET PROTECTION SILT SACK
PER STD. PLAN 913.
EXISTING NEW
INSTALL BIOFILTER BAG CHECK DAM
PER STD. PLAN 914 OR 916
WHICHEVER IS SHOWN.
OR
INSTALL WORK ZONE FENCING FOR
TREE PROTECTION PER STD. PLAN 820.
ORCHARD HEIGHTS RD NW
ORCHARD HEIGHTS RD NW
P A
R K
W A
Y
ORCHARD HEIGHTS PARK
CITY PROPERTY
ORCHARD HEIGHTS PARK
CITY PROPERTY
S E
E
S
H E
M A
T C
H L
I N
E
S
M A
T C
H L
I N
E
S
S E
E
B
E L
O W
S E
E
A
B O
V E
M A
T C
H L
I N
E
S
LOCATION #2 - GLEN CREEK VILLAGE
LOCATION #3 - PARKWAY
CONTOURS ARE FROM TOPOGRAPHIC
SURVEY ON DECEMBER 2022 AND MAY NOT
REPRESENT EXACT TOPOGRAPHICAL
CONDITIONS PRIOR TO CONSTRUCTION.
THIS EROSION CONTROL PLAN PROVIDES
GUIDANCE FOR PLACEMENT OF
RECOMMENDED MEASURES, CERTAIN
TC-01
TEMPORARY
TRAFFIC CONTROL
NOTES & SIGNS
PN:721511
NAD 83-SPCS
NGVD 1929(47)
AS SHOWN
AS SHOWN
ECT
J.KUENZI
7654321
F
E
D
C
B
A
7654321
SHEET OF
SHEET TITLE
HORIZ DATUM:
VERT DATUM:
HORIZ SCALE:
VERT SCALE:
DESIGN:
DRAWN:
CHECKED:
APPROVED:
NO. DATE BYDESCRIPTION
REVISIONS
S
A
L
E
M
P
U
B
L
IC
WORK
S
D
E
P
A
R
T
M
E
N
T
N
O I
S I
V I
D
GNI
R
E
E
N
N I
G
E
ORCHARD HEIGHTS
RD NW: SNOWBIRD
TO WESTHAVEN
(SALEM)
8 9
8 97
A
M
G G r o u p
E n g i n e e r i n g P r o j e c t s C
I P
O r c h a i g h t s
S n o w b i s t h a v e n
C
A D
S h e e t
S e t
G
T
C d
C t a b
EXPIRES: 06-30-2026
R
E
G
I
S
T
E
R
E
D
PR
O
F
E
S
S
I
O
N
A
L
E
L
I
Z
A
B
E
T
H
O
R
L
E
Y
J
U
E
N
G
I N
E
E
R
099675PE
OREGON
TRAFFIC CONTROL NOTES:
9.) ALL FLEXIBLE SIGNS AND PORTABLE SIGN SUPPORTS SHALL BE CRASHWORTHY.
8.) SIGNS PLACED CONTINUOUSLY FOR LONGER THAN THREE DAYS SHALL BE
POST-MOUNTED.
10.) RIGID SIGNS MAY BE USED ON BARRICADES WHEN APPROPRIATELY CRASH TESTED.
7.) SIGN LOCATIONS SHOWN ARE APPROXIMATE AND SHOULD BE ADJUSTED IN THE FIELD FOR
CONFLICTS SUCH AS SIGHT DISTANCE, DRIVEWAYS, LANDSCAPING, UTILITIES, ETC.
6.) CONTRACTOR SHALL PROTECT TRAFFIC AND SHALL PROVIDE TRAFFIC CONTROL
AT ALL TIMES DURING CONSTRUCTION.
5.) MAINTAIN LOCAL ACCESS AT ALL TIMES.
4.) SEE SPECIAL PROVISIONS FOR WORK HOURS AND SPECIAL RESTRICTIONS.
3.) USE FLAGGERS AND TEMPORARY TRAFFIC CONTROL AS REQUIRED WITH APPROVED PERMIT.
REFER TO THE MUTCD AND THE OTTCH.
2.) REFER TO THE MUTCD AND THE OREGON TEMPORARY TRAFFIC CONTROL
HANDBOOK (OTTCH) FOR DISTANCES BETWEEN SIGNS AND CONES,
UNLESS OTHERWISE NOTED.
1.) CONTRACTOR TO COMPLY WITH ALL FEDERAL, STATE AND LOCAL GUIDELINES FOR
TRAFFIC CONTROL.
60" x 24"
G20-2
END
CONSTRUCTION
TEMPORARY TRAFFIC CONTROL SIGNS
11.) TEMPORARY SIGNS SHALL NOT BE MOUNTED ON THE SIDEWALK AT ANY LOCATION.
PEDESTRIAN NOTES:
1.) CONTRACTOR TO PROVIDE PROPER SIGNAGE AND MAINTAIN ONE SAFE ACCESSIBLE
ROUTE FOR PEDESTRIAN TRAFFIC AT ALL TIMES DURING CONSTRUCTION.
AT INTERSECTIONS, EACH DIRECTION SHALL HAVE A ROUTE.
2.) CONTRACTOR TO PROVIDE SAFE ACCESSIBLE ROUTES TO THE PEDESTRIAN
PUSHBUTTONS AT ALL TIMES DURING CONSTRUCTION.
3.) A SIDEWALK CLOSURE REQUIRES ADVANCE SIGNING.
4.) AN ADA DETECTABLE SIDEWALK BARRIER SHALL BE PLACED ACROSS THE FULL WIDTH
OF A CLOSED SIDEWALK.
R9-11
24" x 12"
R9-11
24" x 12"
R9-9
24" x 12"
SIDEWALK
CLOSED
18C 18D18A
SIDEWALK CLOSED
CROSS HERE
AHEAD
SIDEWALK CLOSED
CROSS HERE
AHEAD
18E
SIDEWALK
CLOSED AHEAD
24" x 12"
23 ON
ROADWAY
36" x 36"
CW11-1
W20-5
36" x 36"
W4-2
36" x 36"
W20-5
36" x 36"
W4-2
36" x 36"
2R 2L 3R
3L 16R
15R
W20-1
36" x 36"
R3-5
30" x 36"
R4-7A
24" x 30"
CUSTOM
15L
R4-7A
24" x 30"
M4-9B
30" x 24"
M4-9B
30" x 24"
41R 41L q q
17L
TYPE W1
36" x 36"
FINES
DOUBLE
W1-4
30" x 30"
18F
OR22-7
24" x 12"
CROSSWALK
CLOSED
36"x36" W11-2
FLUORESCENT
YELLOW-GREEN
W
IN
G C
T N W
S
N
O
W
B
I
S N
O W
B I R
D
S
T
N
W
BAR
LO
W
AV N
W
CHUKAR CT NW
S C
H O
O L H
O U
N
W
L
I N
W
O
O
R
C
H
A
I
G
H
TC-02
ADVANCED SIGNING
ORCHARD HEIGHTS RD NW
TEMPORARY
TRAFFIC CONTROL
LOCATION #1 - RESERVOIR
PN:721511
NAD 83-SPCS
NGVD 1929(47)
AS SHOWN
AS SHOWN
ECT
J.KUENZI
7654321
F
E
D
C
B
A
7654321
SHEET OF
SHEET TITLE
HORIZ DATUM:
VERT DATUM:
HORIZ SCALE:
VERT SCALE:
DESIGN:
DRAWN:
CHECKED:
APPROVED:
NO. DATE BYDESCRIPTION
REVISIONS
S
A
L
E
M
P
U
B
L
IC
WORK
S
D
E
P
A
R
T
M
E
N
T
N
O I
S I
V I
D
GNI
R
E
E
N
N I
G
E
GENERAL NOTES
A
M
G G r o u p
E n g i n e e r i n g P r o j e c t s C
I P
O r c h a i g h t s
S n o w b i s t h a v e n
C
A D
S h e e t
S e t
G
T
C d
C t a b
ORCHARD HEIGHTS
RD NW: SNOWBIRD
TO WESTHAVEN
(SALEM)
EXPIRES: 06-30-2026
R
E
G
I
S
T
E
R
E
D
PR
O
F
E
S
S
I
O
N
A
L
E
L
I
Z
A
B
E
T
H
O
R
L
E
Y
J
U
E
N
G
I N
E
E
R
099675PE
OREGON
1. STAGES MUST BE COMPLETED
SEPARATELY AS TO NOT CLOSE BOTH
LANES OF TRAVEL IN ANY DIRECTION
OR CLOSE BOTH SIDEWALKS
SIMULTANEOUSLY.
2. DO NOT OBSTRUCT TRAFFIC VISIBILITY.
SIGN REFERENCE NUMBER
(SEE SHEET TC-01)
PEDESTRIAN CHANNELIZING DEVICE
TYPE II BARRICADE MEETING ADA
ACCESSIBILITY STANDARDS
(MIN. 24" WIDE - REFER TO
THE OTTCH, PAGE 36)
28" TUBULAR MARKERS
(SPACING = AS SHOWN)
q q
TEMPORARY PEDESTRIAN
ACCESSIBLE ROUTE (TPAR)
TEMPORARY AC RAMP WITH
DETECTABLE WARNING SURFACE.
PROVIDE MIN. 5'x5' ADA TURNING
SPACE
PORTABLE (ROLLUP) SIGN
POST MOUNTED SIGN
TEMPORARY REFLECTORIZED
PEDESTRIAN BARRIER MEETING ADA
ACCESSIBILITY STANDARDS
· INSTALL TEMPORARY TRAFFIC
CONTROL MEASURES
· EXCAVATE AND CONSTRUCT
IMPROVEMENTS PER PLANS AND
TYPICAL SECTIONS.
NEW IMPROVEMENTS WORK ZONE
SHEET KEYNOTES
D
DRIVEWAY ACCESS MUST REMAIN
OPEN AT ALL TIMES TO ENSURE
ACCESS TO PUMP STATION AND
RESERVOIR.
FLAGGER
SPOTTER
CHERRIOTS BUS STOPBUS
TYPE III BARRICADE
(MIN. 8' WIDE - REFER TO
THE OTTCH, PAGE 36)
N
LOCATION #1 - RESERVOIR
MT. VIEW RESERVOIR
CITY PROPERTY
ORCHARD HEIGHTS RD NW
TC-03
TPAR
ORCHARD HEIGHTS RD NW
TEMPORARY
TRAFFIC CONTROL
LOCATION #1 - RESERVOIR
PN:721511
NAD 83-SPCS
NGVD 1929(47)
AS SHOWN
AS SHOWN
ECT
J.KUENZI
7654321
F
E
D
C
B
A
7654321
SHEET OF
SHEET TITLE
HORIZ DATUM:
VERT DATUM:
HORIZ SCALE:
VERT SCALE:
DESIGN:
DRAWN:
CHECKED:
APPROVED:
NO. DATE BYDESCRIPTION
REVISIONS
S
A
L
E
M
P
U
B
L
IC
WORK
S
D
E
P
A
R
T
M
E
N
T
N
O I
S I
V I
D
GNI
R
E
E
N
N I
G
E
GENERAL NOTES
A
M
G G r o u p
E n g i n e e r i n g P r o j e c t s C
I P
O r c h a i g h t s
S n o w b i s t h a v e n
C
A D
S h e e t
S e t
G
T
C d
C t a b
ORCHARD HEIGHTS
RD NW: SNOWBIRD
TO WESTHAVEN
(SALEM)
EXPIRES: 06-30-2026
R
E
G
I
S
T
E
R
E
D
PR
O
F
E
S
S
I
O
N
A
L
E
L
I
Z
A
B
E
T
H
O
R
L
E
Y
J
U
E
N
G
I N
E
E
R
099675PE
OREGON
1. STAGES MUST BE COMPLETED
SEPARATELY AS TO NOT CLOSE BOTH
LANES OF TRAVEL IN ANY DIRECTION
OR CLOSE BOTH SIDEWALKS
SIMULTANEOUSLY.
2. DO NOT OBSTRUCT TRAFFIC VISIBILITY.
SIGN REFERENCE NUMBER
(SEE SHEET TC-01)
PEDESTRIAN CHANNELIZING DEVICE
TYPE II BARRICADE MEETING ADA
ACCESSIBILITY STANDARDS
(MIN. 24" WIDE - REFER TO
THE OTTCH, PAGE 36)
28" TUBULAR MARKERS
(SPACING = AS SHOWN)
q q
TEMPORARY PEDESTRIAN
ACCESSIBLE ROUTE (TPAR)
TEMPORARY AC RAMP WITH
DETECTABLE WARNING SURFACE.
PROVIDE MIN. 5'x5' ADA TURNING
SPACE
PORTABLE (ROLLUP) SIGN
POST MOUNTED SIGN
TEMPORARY REFLECTORIZED
PEDESTRIAN BARRIER MEETING ADA
ACCESSIBILITY STANDARDS
· INSTALL TEMPORARY TRAFFIC
CONTROL MEASURES
· EXCAVATE AND CONSTRUCT
IMPROVEMENTS PER PLANS AND
TYPICAL SECTIONS.
NEW IMPROVEMENTS WORK ZONE
SHEET KEYNOTES
D
DRIVEWAY ACCESS MUST REMAIN
OPEN AT ALL TIMES TO ENSURE
ACCESS TO PUMP STATION AND
RESERVOIR.
FLAGGER
SPOTTER
CHERRIOTS BUS STOPBUS
TYPE III BARRICADE
(MIN. 8' WIDE - REFER TO
THE OTTCH, PAGE 36)
N
PEDESTRIAN "ACTIVE"
PEDESTRIAN/STREET ''END OF SHIFT''
LOCATION #1 - RESERVOIR
MT. VIEW RESERVOIR
CITY PROPERTY
MT. VIEW RESERVOIR
CITY PROPERTY
ORCHARD HEIGHTS RD NW
S
N
O
W
B
I
S N
O W
B I R
D
D
R
N
W
41L18E
18A
18A
41R
18E q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q qqq
41L
S C
H O
O L H
O U
N
W
D
D
D
D
ORCHARD HEIGHTS RD NW
q q q q q q q q q q q q q q q q q q q q q q q q q q q
TC-04
TPAR
ORCHARD HEIGHTS RD NW
TEMPORARY
TRAFFIC CONTROL
LOCATION #1 - RESERVOIR
PN:721511
NAD 83-SPCS
NGVD 1929(47)
AS SHOWN
AS SHOWN
ECT
J.KUENZI
7654321
F
E
D
C
B
A
7654321
SHEET OF
SHEET TITLE
HORIZ DATUM:
VERT DATUM:
HORIZ SCALE:
VERT SCALE:
DESIGN:
DRAWN:
CHECKED:
APPROVED:
NO. DATE BYDESCRIPTION
REVISIONS
S
A
L
E
M
P
U
B
L
IC
WORK
S
D
E
P
A
R
T
M
E
N
T
N
O I
S I
V I
D
GNI
R
E
E
N
N I
G
E
GENERAL NOTES
A
M
G G r o u p
E n g i n e e r i n g P r o j e c t s C
I P
O r c h a i g h t s
S n o w b i s t h a v e n
C
A D
S h e e t
S e t
G
T
C d
C t a b
ORCHARD HEIGHTS
RD NW: SNOWBIRD
TO WESTHAVEN
(SALEM)
EXPIRES: 06-30-2026
R
E
G
I
S
T
E
R
E
D
PR
O
F
E
S
S
I
O
N
A
L
E
L
I
Z
A
B
E
T
H
O
R
L
E
Y
J
U
E
N
G
I N
E
E
R
099675PE
OREGON
1. STAGES MUST BE COMPLETED
SEPARATELY AS TO NOT CLOSE BOTH
LANES OF TRAVEL IN ANY DIRECTION
OR CLOSE BOTH SIDEWALKS
SIMULTANEOUSLY.
2. DO NOT OBSTRUCT TRAFFIC VISIBILITY.
SIGN REFERENCE NUMBER
(SEE SHEET TC-01)
PEDESTRIAN CHANNELIZING DEVICE
TYPE II BARRICADE MEETING ADA
ACCESSIBILITY STANDARDS
(MIN. 24" WIDE - REFER TO
THE OTTCH, PAGE 36)
28" TUBULAR MARKERS
(SPACING = AS SHOWN)
q q
TEMPORARY PEDESTRIAN
ACCESSIBLE ROUTE (TPAR)
TEMPORARY AC RAMP WITH
DETECTABLE WARNING SURFACE.
PROVIDE MIN. 5'x5' ADA TURNING
SPACE
PORTABLE (ROLLUP) SIGN
POST MOUNTED SIGN
TEMPORARY REFLECTORIZED
PEDESTRIAN BARRIER MEETING ADA
ACCESSIBILITY STANDARDS
· INSTALL TEMPORARY TRAFFIC
CONTROL MEASURES
· EXCAVATE AND CONSTRUCT
IMPROVEMENTS PER PLANS AND
TYPICAL SECTIONS.
NEW IMPROVEMENTS WORK ZONE
SHEET KEYNOTES
D
DRIVEWAY ACCESS MUST REMAIN
OPEN AT ALL TIMES TO ENSURE
ACCESS TO PUMP STATION AND
RESERVOIR.
FLAGGER
SPOTTER
CHERRIOTS BUS STOPBUS
TYPE III BARRICADE
(MIN. 8' WIDE - REFER TO
THE OTTCH, PAGE 36)
N
STREET- ''ACTIVE WORK''
LOCATION #1 - RESERVOIR
MT. VIEW RESERVOIR
CITY PROPERTY
O R
C H
A R
D H
E
IG
H T
S R
D N
W
S N
O W
B I R
D
D
R
N
W
S C
H O
O L H
O U
N
W
17L
D
D D
D
15L
B
BELOW
A
BELOW
ORCHARD HEIGHTS NW - SECTION A-A
28" TUBULAR MARKERPEDESTRIAN CHANNELIZING DEVICE 28" TUBULAR MARKER
NEW CURB & GUTTER
NEW PAVEMENT
ORCHARD HEIGHTS NW - SECTION B-B
NEW CURB & GUTTER
NEW PAVEMENT
28" TUBULAR MARKER28" TUBULAR MARKER
B
U
S
TC-05
ADVANCED SIGNING
ORCHARD HEIGHTS RD NW
TEMPORARY
TRAFFIC CONTROL
LOCATION #2 - G.C.V.
PN:721511
NAD 83-SPCS
NGVD 1929(47)
AS SHOWN
AS SHOWN
ECT
J.KUENZI
7654321
F
E
D
C
B
A
7654321
SHEET OF
SHEET TITLE
HORIZ DATUM:
VERT DATUM:
HORIZ SCALE:
VERT SCALE:
DESIGN:
DRAWN:
CHECKED:
APPROVED:
NO. DATE BYDESCRIPTION
REVISIONS
S
A
L
E
M
P
U
B
L
IC
WORK
S
D
E
P
A
R
T
M
E
N
T
N
O I
S I
V I
D
GNI
R
E
E
N
N I
G
E
GENERAL NOTES
A
M
G G r o u p
E n g i n e e r i n g P r o j e c t s C
I P
O r c h a i g h t s
S n o w b i s t h a v e n
C
A D
S h e e t
S e t
G
T
C d
C t a b
ORCHARD HEIGHTS
RD NW: SNOWBIRD
TO WESTHAVEN
(SALEM)
EXPIRES: 06-30-2026
R
E
G
I
S
T
E
R
E
D
PR
O
F
E
S
S
I
O
N
A
L
E
L
I
Z
A
B
E
T
H
O
R
L
E
Y
J
U
E
N
G
I N
E
E
R
099675PE
OREGON
W
E
1. STAGES MUST BE COMPLETED
SEPARATELY AS TO NOT CLOSE BOTH
LANES OF TRAVEL IN ANY DIRECTION
OR CLOSE BOTH SIDEWALKS
SIMULTANEOUSLY.
2. DO NOT OBSTRUCT TRAFFIC VISIBILITY.
SIGN REFERENCE NUMBER
(SEE SHEET TC-01)
PEDESTRIAN CHANNELIZING DEVICE
TYPE II BARRICADE MEETING ADA
ACCESSIBILITY STANDARDS
(MIN. 24" WIDE - REFER TO
THE OTTCH, PAGE 36)
28" TUBULAR MARKERS
(SPACING = AS SHOWN)
q q
TEMPORARY PEDESTRIAN
ACCESSIBLE ROUTE (TPAR)
TEMPORARY AC RAMP WITH
DETECTABLE WARNING SURFACE.
PROVIDE MIN. 5'x5' ADA TURNING
SPACE
PORTABLE (ROLLUP) SIGN
POST MOUNTED SIGN
TEMPORARY REFLECTORIZED
PEDESTRIAN BARRIER MEETING ADA
ACCESSIBILITY STANDARDS
· INSTALL TEMPORARY TRAFFIC
CONTROL MEASURES
· EXCAVATE AND CONSTRUCT
IMPROVEMENTS PER PLANS AND
TYPICAL SECTIONS.
NEW IMPROVEMENTS WORK ZONE
SHEET KEYNOTES
D
DRIVEWAY ACCESS MUST REMAIN
OPEN AT ALL TIMES TO ENSURE
ACCESS TO PUMP STATION AND
RESERVOIR.
FLAGGER
SPOTTER
CHERRIOTS BUS STOPBUS
TYPE III BARRICADE
(MIN. 8' WIDE - REFER TO
THE OTTCH, PAGE 36)
N
LOCATION #2 - GLEN CREEK VILLAGE
ORCHARD HEIGHTS RD NW
C
H
A
P
M
P A
R K
W A
Y
D
R
N
W
TI
1260-1320
ORCHARD HEIGHTS PARK
CITY PROPERTY
S q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q
BUS
TC-06
WEST SIDE TPAR
ORCHARD HEIGHTS RD NW
TEMPORARY
TRAFFIC CONTROL
LOCATION #2 - G.C.V.
PN:721511
NAD 83-SPCS
NGVD 1929(47)
AS SHOWN
AS SHOWN
ECT
J.KUENZI
7654321
F
E
D
C
B
A
7654321
SHEET OF
SHEET TITLE
HORIZ DATUM:
VERT DATUM:
HORIZ SCALE:
VERT SCALE:
DESIGN:
DRAWN:
CHECKED:
APPROVED:
NO. DATE BYDESCRIPTION
REVISIONS
S
A
L
E
M
P
U
B
L
IC
WORK
S
D
E
P
A
R
T
M
E
N
T
N
O I
S I
V I
D
GNI
R
E
E
N
N I
G
E
GENERAL NOTES
A
M
G G r o u p
E n g i n e e r i n g P r o j e c t s C
I P
O r c h a i g h t s
S n o w b i s t h a v e n
C
A D
S h e e t
S e t
G
T
C d
C t a b
ORCHARD HEIGHTS
RD NW: SNOWBIRD
TO WESTHAVEN
(SALEM)
EXPIRES: 06-30-2026
R
E
G
I
S
T
E
R
E
D
PR
O
F
E
S
S
I
O
N
A
L
E
L
I
Z
A
B
E
T
H
O
R
L
E
Y
J
U
E
N
G
I N
E
E
R
099675PE
OREGON
1. STAGES MUST BE COMPLETED
SEPARATELY AS TO NOT CLOSE BOTH
LANES OF TRAVEL IN ANY DIRECTION
OR CLOSE BOTH SIDEWALKS
SIMULTANEOUSLY.
2. DO NOT OBSTRUCT TRAFFIC VISIBILITY.
SIGN REFERENCE NUMBER
(SEE SHEET TC-01)
PEDESTRIAN CHANNELIZING DEVICE
TYPE II BARRICADE MEETING ADA
ACCESSIBILITY STANDARDS
(MIN. 24" WIDE - REFER TO
THE OTTCH, PAGE 36)
28" TUBULAR MARKERS
(SPACING = AS SHOWN)
q q
TEMPORARY PEDESTRIAN
ACCESSIBLE ROUTE (TPAR)
TEMPORARY AC RAMP WITH
DETECTABLE WARNING SURFACE.
PROVIDE MIN. 5'x5' ADA TURNING
SPACE
PORTABLE (ROLLUP) SIGN
POST MOUNTED SIGN
TEMPORARY REFLECTORIZED
PEDESTRIAN BARRIER MEETING ADA
ACCESSIBILITY STANDARDS
· INSTALL TEMPORARY TRAFFIC
CONTROL MEASURES
· EXCAVATE AND CONSTRUCT
IMPROVEMENTS PER PLANS AND
TYPICAL SECTIONS.
NEW IMPROVEMENTS WORK ZONE
SHEET KEYNOTES
D
DRIVEWAY ACCESS MUST REMAIN
OPEN AT ALL TIMES TO ENSURE
ACCESS TO PUMP STATION AND
RESERVOIR.
FLAGGER
SPOTTER
CHERRIOTS BUS STOPBUS
TYPE III BARRICADE
(MIN. 8' WIDE - REFER TO
THE OTTCH, PAGE 36)
N
PEDESTRIAN
LOCATION #2 - GLEN CREEK VILLAGE -
WEST SIDE
ORCHARD HEIGHTS RD NW
C
H
A
P
M
L
L
STREET
18A
18A
18E
41L
W
W
18E
41R
1260-1320
ORCHARD HEIGHTS PARK
CITY PROPERTY
1260-1320
N
41L
O
R
C
H
A
I
G
H
S q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q
BUS
TC-07
EAST SIDE TPAR
ORCHARD HEIGHTS RD NW
TEMPORARY
TRAFFIC CONTROL
LOCATION #2 - G.C.V.
PN:721511
NAD 83-SPCS
NGVD 1929(47)
AS SHOWN
AS SHOWN
ECT
J.KUENZI
7654321
F
E
D
C
B
A
7654321
SHEET OF
SHEET TITLE
HORIZ DATUM:
VERT DATUM:
HORIZ SCALE:
VERT SCALE:
DESIGN:
DRAWN:
CHECKED:
APPROVED:
NO. DATE BYDESCRIPTION
REVISIONS
S
A
L
E
M
P
U
B
L
IC
WORK
S
D
E
P
A
R
T
M
E
N
T
N
O I
S I
V I
D
GNI
R
E
E
N
N I
G
E
GENERAL NOTES
A
M
G G r o u p
E n g i n e e r i n g P r o j e c t s C
I P
O r c h a i g h t s
S n o w b i s t h a v e n
C
A D
S h e e t
S e t
G
T
C d
C t a b
ORCHARD HEIGHTS
RD NW: SNOWBIRD
TO WESTHAVEN
(SALEM)
EXPIRES: 06-30-2026
R
E
G
I
S
T
E
R
E
D
PR
O
F
E
S
S
I
O
N
A
L
E
L
I
Z
A
B
E
T
H
O
R
L
E
Y
J
U
E
N
G
I N
E
E
R
099675PE
OREGON
1. STAGES MUST BE COMPLETED
SEPARATELY AS TO NOT CLOSE BOTH
LANES OF TRAVEL IN ANY DIRECTION
OR CLOSE BOTH SIDEWALKS
SIMULTANEOUSLY.
2. DO NOT OBSTRUCT TRAFFIC VISIBILITY.
SIGN REFERENCE NUMBER
(SEE SHEET TC-01)
PEDESTRIAN CHANNELIZING DEVICE
TYPE II BARRICADE MEETING ADA
ACCESSIBILITY STANDARDS
(MIN. 24" WIDE - REFER TO
THE OTTCH, PAGE 36)
28" TUBULAR MARKERS
(SPACING = AS SHOWN)
q q
TEMPORARY PEDESTRIAN
ACCESSIBLE ROUTE (TPAR)
TEMPORARY AC RAMP WITH
DETECTABLE WARNING SURFACE.
PROVIDE MIN. 5'x5' ADA TURNING
SPACE
PORTABLE (ROLLUP) SIGN
POST MOUNTED SIGN
TEMPORARY REFLECTORIZED
PEDESTRIAN BARRIER MEETING ADA
ACCESSIBILITY STANDARDS
· INSTALL TEMPORARY TRAFFIC
CONTROL MEASURES
· EXCAVATE AND CONSTRUCT
IMPROVEMENTS PER PLANS AND
TYPICAL SECTIONS.
NEW IMPROVEMENTS WORK ZONE
SHEET KEYNOTES
D
DRIVEWAY ACCESS MUST REMAIN
OPEN AT ALL TIMES TO ENSURE
ACCESS TO PUMP STATION AND
RESERVOIR.
FLAGGER
SPOTTER
CHERRIOTS BUS STOPBUS
TYPE III BARRICADE
(MIN. 8' WIDE - REFER TO
THE OTTCH, PAGE 36)
N
PEDESTRIAN
LOCATION #2 - GLEN CREEK VILLAGE -
EAST SIDE
ORCHARD HEIGHTS RD NW
C
H
A
P
M
L
L
18A
18E
41L
E
TI
STREET
E
18A
18A
18E
41R
1260-1320
ORCHARD HEIGHTS PARK
CITY PROPERTY
1260-1320
N
41L
O
R
C
H
A
I
G
H
S
TC-08
NORTH SIDE TPAR
ORCHARD HEIGHTS RD NW
TEMPORARY
TRAFFIC CONTROL
LOCATION #3 - PARKWAY
PN:721511
NAD 83-SPCS
NGVD 1929(47)
AS SHOWN
AS SHOWN
ECT
J.KUENZI
7654321
F
E
D
C
B
A
7654321
SHEET OF
SHEET TITLE
HORIZ DATUM:
VERT DATUM:
HORIZ SCALE:
VERT SCALE:
DESIGN:
DRAWN:
CHECKED:
APPROVED:
NO. DATE BYDESCRIPTION
REVISIONS
S
A
L
E
M
P
U
B
L
IC
WORK
S
D
E
P
A
R
T
M
E
N
T
N
O I
S I
V I
D
GNI
R
E
E
N
N I
G
E
GENERAL NOTES
A
M
G G r o u p
E n g i n e e r i n g P r o j e c t s C
I P
O r c h a i g h t s
S n o w b i s t h a v e n
C
A D
S h e e t
S e t
G
T
C d
C t a b
ORCHARD HEIGHTS
RD NW: SNOWBIRD
TO WESTHAVEN
(SALEM)
EXPIRES: 06-30-2026
R
E
G
I
S
T
E
R
E
D
PR
O
F
E
S
S
I
O
N
A
L
E
L
I
Z
A
B
E
T
H
O
R
L
E
Y
J
U
E
N
G
I N
E
E
R
099675PE
OREGON
N
1. STAGES MUST BE COMPLETED
SEPARATELY AS TO NOT CLOSE BOTH
LANES OF TRAVEL IN ANY DIRECTION
OR CLOSE BOTH SIDEWALKS
SIMULTANEOUSLY.
2. DO NOT OBSTRUCT TRAFFIC VISIBILITY.
SIGN REFERENCE NUMBER
(SEE SHEET TC-01)
P…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .