- ULTRAVIOLET BALLAST WATER TREATMENT SYSTEM FOR SURFACE VESSELS Federal contract opportunity
- Solicitation number
- 19-SBO-002
About this file
This statement of work outlines requirements for the engineering design, manufacturing, delivery, testing and evaluation of compact and standard ultraviolet ballast water treatment systems for Navy surface vessels. The contractor shall complete three phases over five years to design, manufacture and support testing of the systems. Phase 1 requires detailed design analysis and development of technical data packages for the compact and standard systems. Phase 2 involves manufacturing one compact and one standard system, along with factory acceptance testing. Phase 3 supports operational testing at a government facility and environmental testing, including shock, vibration and EMI tests. The contractor must also provide technical manuals, spare parts, consumables and tools. The Navy will issue task orders specifying work to be performed. Deliverables include progress reports, master schedules, meeting materials, requests for variance, design documents, test plans and reports, and updated technical data packages.
View the file
Other files for this federal contract opportunity
Show all 21
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
| 1 | SCOPE |
| 1.1 | Scope |
This Statement of Work (SOW) establishes the requirements for the engineering design, manufacturing, delivery, testing and evaluation of a Compact and a Standard Ultraviolet (UV) Ballast Water Treatment System (BWTS) for Navy surface vessels. The Compact BWTS shall be able to treat ballast water at a flow rate of 200-300 cubic meters per hour (m3/hr). The Standard BWTS shall be able to treat ballast water at a flow rate of 800-1,000 m3/hr.
1.2 Introduction
Naval Surface Warfare Center, Carderock Division (NSWCCD), in support of the Naval Sea Systems Command (SEA 05P), is tasked to procure and demonstrate BWTSs for potential use on Navy surface vessels. The design of the BWTS shall be based on existing design(s) of a US Coast Guard (USCG) Type Approved BWTS. The project shall be accomplished over a period of five years, through three phases as described in Section 3 of this Statement of Work (SOW). The Government shall issue Task Orders (TOs) detailing all required work. The Government’s intent is to order work in accordance with the following schedule. In the first 12-month period, the Contractor shall complete Phase 1, performing a detailed design analysis and developing detailed designs of a Compact BWTS and a Standard BWTS. In the second 12-month period, the Contractor shall complete Phase 2, the manufacture of the Compact BWTS. In the third 12-month period, the Contractor shall complete Phase 3, supporting NSWCCD in testing/evaluation of the Compact BWTS. In the fourth 12-month period, the Contractor shall complete Phase 2 for the Standard BWTS. In the fifth 12-month period, the Contractor shall perform Phase 3 for the Standard BWTS.
1.3 Objectives
The objectives are for the Contractor to design, manufacture, deliver, and support the testing of Compact and Standard BWTSs, and provide Technical Data Packages (TDPs) as defined in individual TOs. The BWTSs shall be manufactured in accordance with the Government-developed Baseline Design Requirements Document, enclosure (1), with any Government approved changes.
2 ENCLOSURES AND RELEVANT GOVERNMENT DOCUMENTS
The following enclosures are attached to this document as these documents provide minimum performance requirements for this SOW.
| ENCLOSURE |
| DOCUMENT NO. |
| TITLE |
| 1 |
| 633/19-155 |
| Baseline Design Requirements Document: Ultraviolet Ballast Water Treatment System for Surface Vessels |
| 2 |
| 633/19-156 |
| Navy BWTS Conformance Checklist |
| 3 |
| T9070-AL-DPC-020/077-2 |
| NAVSEA Hazardous Material Avoidance Process, Design Practices and Criteria Manual |
The following government documents are relevant to this SOW. Copies of all military handbooks, standards, manuals, and Data Item Descriptions (DIDs) are available online at https://quicksearch.dla.mil/qsSearch.aspx.
Document EPA/600/R-10/146 is available at https://cfpub.epa.gov/si/si_public_record_report.cfm?Lab=NRMRL&dirEntryId=230926.
| DOCUMENT NO. |
| TITLE |
| MIL-HDBK-61A(SE) |
| Military Handbook Configuration Management |
Guidance
| MIL-PRF-32216A |
| Evaluation of Commercial Off-the-Shelf |
(COTS) Manuals and Preparation of Supplemental Data
| MIL-STD-31000B |
| Standard Practice Technical Data Packages |
| EPA/600/R-10/146 |
| Generic Protocol for the Verification of Ballast Water Treatment Technology |
Note: Contract Data Requirements Lists (CDRLs) and related DIDs to be executed as part of the base contract are listed in Section 4.1.
Additional GFI may be provided in the individual TOs.
3 REQUIREMENTS
3.1 General
The Government will issue TOs to initiate and specify tasking, and will indicate Applicable Documents and Government Furnished Information (GFI) as they become available. Deliverables will consist of products and data deliverables in accordance with the TO and the applicable CDRL(s) of the base contract.
| 3.1.1 | Contractor’s Progress, Status and Management Report. The Contractor shall submit monthly status reports in accordance with CDRL A001. |
| 3.1.2 | Master Schedule. The Contractor shall prepare and maintain a Master Schedule. The Master Schedule shall be updated as needed and submitted for Government review in accordance with CDRL A002. |
| 3.1.3 | Meetings and Technical Reviews. The Contractor shall host kickoff meetings, monthly progress meetings, and technical reviews as requested by the Government throughout the Contract. Meetings shall be in-person at the Contractor facility and/or by teleconference. The Contractor shall prepare meeting materials for all meetings and reviews held with the Government. Meeting materials include briefs, agenda, and meeting reports in accordance with CDRL A003. |
| a. | Kick-off Meeting. The Contractor shall brief the Government two weeks after award of each TO to review the planned engineering approach and Master Schedule for each deliverable. The Contractor shall submit meeting materials in accordance with CDRL A003. |
| b. | Preliminary Review. The Contractor shall brief the Government on the interim product(s) at the time specified in the Master Schedule. The Contractor shall submit meeting materials in accordance with CDRL A003. |
| c. | Critical Review. The Contractor shall brief the Government on the deliverable(s) at the time specified in the Master Schedule. The Contractor shall submit meeting materials in accordance with CDRL A003. |
| 3.1.4 | Configuration Management (CM). The Contractor shall establish and maintain throughout the performance period a CM program that implements the guidance contained in MIL-HDBK-61A(SE) . The Contractor shall maintain configuration management and update all technical data to reflect the approved design changes. |
| a. | Baseline Design Requirements. “Baseline design requirements,” for the purposes of this document, means a design meeting the minimum requirements of enclosure (1). |
b. Deviations. The Contractor shall submit a Request for Variance (RFV) if there is need to deviate from the baseline design requirements. The explanation of need for deviation shall provide detailed justification and consequences of approval, to include technical details explaining the degree of non-compliance or effect on ship equipment or system operation constraints in accordance with CDRL A004, “RFV.”
c. Modifications. The Contractor shall brief the Government on modifications if there is a need to change the design after a TDP has been accepted by the Government. The brief shall summarize changes in sufficient detail to enable Government review and evaluation of the merits of the proposed change, including technical, cost, and scheduling impacts, and consequences if disapproved. All existing drawings and technical manuals impacted by the change shall be listed along with a brief narrative explaining the changes. The Contractor shall submit the design modification review meeting materials in accordance with CDRL A003.
| 3.1.5 | Shipping. The Contractor shall be responsible for packaging and shipping all BWTSs and all ancillary equipment and hardware (including, but not limited to, spare parts, consumables, special tools, manuals, cables, connectors and other hardware) as required for operational and environmental testing. |
| 3.1.6 | Travel Requirements. The Contractor shall make visits during the execution of tasks under this contract. Such visits will be to Naval activities, the operational testing site(s), and the environmental testing site(s). Travel requirements will be identified in individual TOs. The Government will provide the location of the testing site(s) at least 30 days prior to the commencement of the testing, or as far in advance of testing as possible. |
| 3.2 | Phase 1 – Design |
The Contractor shall design one Compact and one Standard BWTS to meet the baseline design requirements with any Government-approved changes.
3.2.1 Detailed Design Analysis Report for Compact and Standard BWTSs. The Contractor shall perform a detailed design analysis for the Compact and Standard BWTSs. The kick-off meeting and the results of the completion of enclosure (2) shall form the basis for developing the BWTS detailed design analysis. The report shall document the analysis results and compare the detailed design with all Government requirements in accordance with CDRL E001.
The Technical report shall include all details of the material and technical solutions needed to demonstrate that the proposed design satisfies all baseline design requirements including, but not limited to:
a. Models and engineering drawings of the system layouts and design of components as needed to demonstrate the proposed design satisfies the baseline design requirements.
b. Supporting data in the form of test data, engineering calculations, and analyses that provide the supporting rationale necessary to demonstrate the proposed design satisfies the baseline design requirements.
c. Fabrication, operation and maintenance cost estimates for the proposed design.
d. Details on ship interfaces and support equipment needed to install and maintain the proposed design.
e. Optional - Proposed design enhancements that have the potential to add value (e.g. increasing any of the following: performance, reliability, manufacturability, maintainability; or decreasing any of the following: maintenance, initial manufacturing cost, total ownership cost) while still satisfying baseline design requirements. The Contractor shall distinguish value-added changes from design changes/solutions that are necessary to meet the baseline design requirements.
3.2.2 Developmental Technical Data Package (TDP) Post-Detailed Design. The Contractor shall submit a TDP with sufficient data to enable Government evaluation of the specific design approach, system performance in relation to enclosure (1), and the manufacturing of Compact and Standard BWTSs. The Contractor shall include the following documents in the Developmental TDP Post-Detailed Design in accordance with CDRL E002.
a. Developmental Design Drawings/Models and Associated Lists. The Contractor shall generate drawings and associated lists including parts lists and maintenance tools lists to document the detailed design.
b. Piping and Instrumentation Diagrams. The Contractor shall develop Piping and Instrumentation Diagrams to depict all components that contribute to the functionality of the BWTS. This includes piping systems, valves, components, mechanical and electrical systems, and their functional interconnections.
c. Electrical Diagrams. The Contractor shall develop Electrical Diagrams to depict switches, fuses, and other discrete components. Cable types, gauges, circuit protection, and component ratings shall be designated on the diagram.
d. Software and Firmware Documentation. The Contractor shall document the functional and detailed design of software, firmware, and Human Machine Interface (HMI) components. The documents shall define key design attributes and implementation standards to enable the evaluation of software and HMI components. The Contractor shall furnish all applicable software applications and documentation with the Developmental TDP Post-Detailed Design, including but not limited to models, engineering design data, drawings, associated lists, specifications, standards, quality assurance provisions, performance and operational requirements, software documentation, and packaging details, in accordance with CDRL E002.
e. Contractor Furnished Data. The Contractor shall provide documentation as Objective Quality Evidence (OQE) that each BWTS conforms to enclosure (1). Suitable OQE documentation includes, but is not limited to, test results, engineering calculations and analyses. The contractor is not required to provide OQE to demonstrate conformance with enclosure (1) for shock, vibration and Electromagnetic Interference (EMI) as these environmental requirements will be tested and reported in Phase 3.
3.3 Phase 2 – Manufacturing
The Contractor shall manufacture, perform Factory Acceptance Testing (FAT), and deliver BWTS in accordance with the TDP approved by the Government.
| 3.3.1 | Factory Visits and Manufacturing Inspections. During the fabrication of each Compact and Standard BWTS unit, the Contractor shall host a Government visit to the manufacturing facility after each milestone identified in the Master Schedule. The Contractor shall submit a post-visit report documenting any decision(s) and/or directive(s) on the fabrication of the BWTS units in accordance with CDRL A003. |
| 3.3.2 | Factory Acceptance Test (FAT). The Contractor shall conduct a FAT of each BWTS unit. The Government will witness the FAT. The Contractor shall submit the following FAT documentation: |
| a. | Test Procedure. The Contractor shall develop and submit FAT procedures and obtain Government approval in accordance with CDRL T001. |
| b. | Test Report. The Contractor shall submit a test report in accordance with CDRL T002 after the completion of the FAT. The report shall include test data and results, any problems/issues encountered during testing, and any modifications to the BWTS units during and after testing in accordance with CDRL T002. |
| 3.3.3 | BWTS, Spare Parts, Consumables, Tools. The Contractor shall provide the BWTS and associated spare parts, consumables, and tools in support of operational and environmental testing. The Contractor shall provide all ancillary equipment, cables, connectors, attachments, mounting devices, and other interfaces to connect all the various subsystems, components and devices within the BWTS and to external systems required for operational testing. The Contractor shall also provide the mounting configuration(s) applicable to environmental testing. |
| 3.3.4 | Developmental Technical Data Package (TDP) Post-Manufacture. The Contractor shall update the Developmental TDP Post-Detailed Design provided in 3.2.2 to create the Developmental TDP Post-Manufacture. The Contractor shall also include the following documents in the Developmental TDP Post-Manufacture in accordance with CDRL E003. |
| a. | Safety Data Sheets (SDS). The Contractor shall provide a Safety Data Sheet (SDS) for each hazardous material proposed for use in the BWTS. The Contractor shall prepare and submit SDS(s) for each BWTS. |
| b. | Spare Parts and Consumables List. The Contractor shall prepare a Contractor-recommended list of spare parts and consumables required for 30-year service life. |
| c. | Tool List. The Contractor shall provide a list of all tools necessary to perform BWTS maintenance and troubleshooting during operation for 30-year service life. |
| d. | Maintenance Requirement List (MRL). The Contractor shall develop a MRL that identifies all equipment and components requiring maintenance for 30-year service life. The Contractor shall include equipment and components either built by the Contractor or purchased through third-party vendors. |
| e. | Software and Firmware Requirements. The Contractor shall create and modify software, firmware, and computer code to execute the required functionality of all BWTS components. The Contractor shall develop documentation to describe a software design for the Developmental TDP Post-Manufacture. |
| 3.3.5 | Technical Manual – The Contractor shall submit a technical manual that updates and supplements the Commercial Off-the-Shelf (COTS) manual. The technical manual shall provide the necessary information and instructions to install, operate and maintain the equipment in accordance with CDRL E004. |
3.4 Phase 3 – Testing
The Contractor shall support operational and environmental testing of each BWTS. The Contractor shall also update the Developmental TDP Post-Manufacture provided in 3.3.4 for each BWTS as a Product TDP Post-Testing in accordance with section 3.4.4. The Government will operate the BWTS and conduct the operational testing. Government-contracted environmental labs will conduct the environmental testing.
| 3.4.1 | Operational Testing. The Contractor shall support operational testing of each BWTS to verify performance at a Government-selected East Coast testing facility. The duration of the operational test will be up to 700 hours. The Contractor shall provide the following technical support: |
| a. | Planning for Operational Testing. The Contractor shall review the test procedure(s) and installation drawing(s), drafted by the Government and to be provided as GFI in the applicable TO, and brief the Government on necessary revisions to comply with manufacturer’s component and equipment installation practices, operating procedures, and warranty. The Contractor shall submit meeting materials in accordance with CDRL A003. |
| b. | Commissioning. The Government will install the BWTS. The Contractor shall commission each BWTS at the testing facility in accordance with the Environmental Technology Verification (ETV) Protocol (EPA/600/R-10/146) and verify the BWTS is installed in accordance with the Government-developed installation drawings. The Contractor shall provide and operate instrumentation and equipment required for commissioning each unit. The Contractor shall submit a commissioning checklist in accordance with CDRL T001. All commissioning activities shall be completed no more than five days after the commencement of commissioning. |
| c. | Training. The Contractor shall provide BWTS training following the commissioning of each BWTS. The training shall include an overview of the BWTS followed by operational training of the BWTS. The training shall be based on the skill and knowledge levels required for new operators to achieve competency in routine operation, maintenance, and troubleshooting during commissioning. All required training shall be completed no more than three days after the completion of commissioning. |
| d. | Decommissioning. The Government will uninstall the BWTS. The Contractor shall decommission each BWTS upon the completion of operational testing. Instrumentation and equipment required for decommissioning shall be provided and operated by the Contractor. The Contractor shall submit a decommissioning checklist in accordance with CRDL T001. All decommissioning activities shall be completed no more than five days after the commencement of decommissioning. |
| 3.4.2 | Environmental Testing. The Contractor shall support environmental testing to verify that each BWTS conforms to environmental testing requirements. Environmental testing includes shock, vibration, and EMI tests, as specified in enclosure (1). The Government will select and separately contract with environmental test facilities to conduct this testing. The Contractor shall provide the following technical support: |
| a. | Planning for Environmental Testing. The Contractor shall submit test documentation to include test plans and acceptance criteria in accordance with CDRL T001. |
| b. | Test Observation. The Contractor shall travel to the test facility and witness all environmental tests. |
| c. | Test Report. The Contractor shall submit a test report after the completion of each test in accordance with CDRL T002, “Test/Inspection Report." |
| d. | Modeling and Analysis. As required by the Government, the Contractor shall perform mathematical or computer-based modeling to verify that the BWTS meet environmental testing standards and requirements. The Government will use the modeling and analysis results as alternatives to testing or to supplement testing. The Contractor shall document the results in a technical report to verify that the BWTS meets Government requirements in accordance with CDRL E005. |
3.4.3 General Support for Testing. The Contractor shall provide the following general support:
| a. | Repair. The Contractor shall conduct Intermediate Level (local shop) and Depot Level (overhaul facility) repair of the BWTS or any component of the BWTS damaged during or after any testing. The repair shall be completed on site at the appropriate test sites or at the Contractor’s facility. Time requirements and test sites shall be in accordance with the TO(s) issued. |
| b. | Correction for Failed Testing. The Contractor shall brief the Government on the root cause, problems encountered, and recommended course of action to correct failed test(s). The Contractor shall submit meeting materials in accordance with CDRL A003. Upon obtaining Government approval, the Contractor shall implement the corrective measure(s) on site at the appropriate test sites or at the Contractor’s facility in order to prepare the BWTS for retesting. Time requirements and test sites shall be in accordance with the TO(s) issued. |
| 3.4.4 | Product Technical Data Package (TDP) Post-Testing. Upon Government acceptance of each BWTS, the Contractor will revise the Developmental TDP Post-Manufacture described in 3.3.4 to create the Product TDP Post-Testing. The Contractor shall prepare the Product TDP Post-Testing to provide the design, engineering, and manufacturing information necessary to enable manufacture of the final approved design by the Government or its contractors other than the signatory to this contract. In addition to the TDP documents specified in 3.3.4, the Contractor shall submit the following Product TDP Post-Testing documents in accordance with CDRL E006. |
| a. | Product drawings/models and associated lists. The Contractor shall prepare product drawings/models and associated lists to include in the Product TDP Post-Testing. |
| b. | Software and Firmware Requirements. The Contractor shall create and modify software, firmware, and computer code to execute required functionality of all BWTS components. The Contractor shall develop documentation that describes a software design for the Product TDP Post-Testing. |
| 3.4.5 | Technical Manual – The Contractor shall submit a technical manual that updates the technical manual developed in 3.3.5 to include in the Product TDP Post-Testing. The technical manual shall provide the necessary information and instructions to install, operate, and maintain the equipment in accordance with CDRL E004. |
| 4 | DATA RIGHTS |
At a minimum, the Government shall have Government Purpose Rights, as that term is defined at DFARS 252.227-7013 and -7014, in all deliverables under this contract.
5 Electronic Cost Reporting and Financial Tracking (eCRAFT) system
(a) The Contractor agrees to upload the Contractor's Funds and Man-hour Expenditure Reports in the Electronic Cost Reporting and Financial Tracking (eCRAFT) System and submit the Contract Status Report on the day and for the same timeframe the contractor submits an invoice into the Invoicing, Receipt, Acceptance, and Property Transfer (iRAPT) system. Compliance with this requirement is a material requirement of this contract. Failure to comply with this requirement may result in contract termination.
(b) The Contract Status Report indicates the progress of work and the status of the program and of all assigned tasks. It informs the Government of existing or potential problem areas.
(c) The Contractor's Funds and Man-hour Expenditure Report reports contractor expenditures for labor, materials, travel, subcontractor usage, and other contract charges.
(1) Access:
eCRAFT: Reports are uploaded through the eCRAFT System Periodic Report Utility (EPRU). The EPRU spreadsheet and user manual can be obtained at: http://www.navsea.navy.mil/Home/Warfare-Centers/NUWCNewport/Partnerships/Commercial-Contracts/Information-eCraft-/ under eCRAFT information. The eCRAFT e-mail address for report submission is: Ecraft.nuwc.npt.fct@navy.mil.
If you have problems uploading reports, please see the Frequently Asked Questions at the site address above.
(2) Submission and Acceptance/Rejection:
The contractor shall submit their reports on the same day and for the same timeframe the contractor submits an invoice in iRAPT. The amounts shall be the same. eCRAFT acceptance/rejection will be indicated by e-mail notification from eCRAFT.
Exhibit A: CONTRACT DATA REQUIREMENT LIST (CDRL) The following table contains the CDRLs to be executed as part of the Statement of Work.
| CDRL # |
| DID # |
| Data Item Title |
| Description |
| A001 |
| DI-MGMT-81864A |
| Contracting Officer’s Management Report |
| Monthly Status Report |
| A002 |
| DI-MGMT-81650 |
| Integrated Master Schedule (IMS) |
| Master Schedule |
| A003 |
| DI-ADMN-81505 |
| Report, Record of Meeting/Minutes |
| Kick-off Meeting, Preliminary Review, Critical Review, Design Modifications Review, Factory Visit and Manufacturing Inspection Report, Operation Test Procedure Review |
| A004 |
| DI-SESS-80640D |
| Request for Variance (RFV) |
| Request for Variance for Configuration Management |
| E001 |
| DI-MISC-80508B |
| Technical Report – Study/Services |
| Detailed Design Analysis Report |
| E002 |
| DI-SESS-80776A |
| Technical Data Package |
| Developmental TDP Post-Detailed Design |
| E003 |
| DI-SESS-80776A |
| Technical Data Package |
| Developmental TDP Post-Manufacture |
| E004 |
| DI-TMSS-80527C |
| Commercial Off-the-Shelf (COTS) Manuals and Associated |
Supplemental Data Technical Manual
| E005 |
| DI-MISC-80508B |
| Technical Report – Study/Services |
| Modeling and Analysis for Environmental Testing |
| E006 |
| DI-SESS-80776A |
| Technical Data Package |
| Product TDP Post-Testing |
| T001 |
| DI-SESS-81704 |
| Test Plans/Test Procedures |
| Factory Acceptance Test (FAT) Procedure, Commissioning Checklist, Decommissioning Checklist, Environmental Test Procedures |
| T002 |
| DI-NDTI-80809B |
| Test/Inspection Report |
| FAT Report, Environmental Test Reports |
File details come from the government source that posted it. Updated .