BWTS_IndustryDay_briefs_4-3-2019_FBO.pdf
PDF 4 MB Posted
- Attached to
- ULTRAVIOLET BALLAST WATER TREATMENT SYSTEM FOR SURFACE VESSELS Federal contract opportunity
- Solicitation number
- 19-SBO-002
About this file
This document summarizes a federal government industry day briefing and related federal contract opportunity for the development of ballast water treatment systems for U.S. Navy surface vessels. The industry day briefing provided an overview of the Navy's ballast water management program and technical needs, as well as the contract approach for a multiple award IDIQ contract with a period of performance of five years and estimated value of $5-6 million. The contract will have firm fixed price and cost plus fixed fee CLINs and is anticipated to have 3-5 awardees. The related federal contract opportunity involves a pre-solicitation for ultraviolet ballast water treatment systems and includes a market research questionnaire, draft specifications, hazard avoidance criteria, and conformance checklist for industry response by December 3, 2018.
Industry Day Presentation
View the file
Other files for this federal contract opportunity
Show all 21
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CAPT Mark Vandroff Commanding Officer, NSWCCD
Lawrence Tarasek, SES Technical Director, NSWCCD
Ballast Water Treatment Systems (BWTS) Industry Day
BWTS Manufacturers and Engineering Services Firms
15 March 2019
Distribution Statement A: approved for public release; distribution is unlimited 1
AMERICA’S FLEET STARTS HERE
0900 – 0915 Registration 0915 – 0930 Welcome and Opening Remarks
Dr. John Barkyoumb, NSWCCD Code 00T, Director of Strategic Relations 0930 – 0945 Overview of Navy’s Wastewater Management Program
Steve Verosto, NSWCCD Code 633 Wastewater Management Branch Head 0945 – 1000 Overview and Strategic Needs to Develop the Navy BWTS
Holly Nestle, NAVSEA 05P5 Wet Systems and Discharges Technical Warrant Holder 1000 – 1030 Technical Needs to Develop the Navy BWTS
Rita Schuh, NSWCCD Code 633 Ballast Water Management Technical Area Leader 1030 – 1045 Contract Approach to Develop the Navy BWTS
Shelby O’Neill, NSWCCD Code 02 Contracting Specialist 1045 – 1115 Questions and Answers 1115 – 1130 Closing Remarks
Patrick Long, NAVSEA 05P5 Ballast Water Management Engineering Manager 1130 – 1200 Networking Session
BWTS Industry Day Agenda
Distribution Statement A: approved for public release; distribution is unlimited 2
• All attendees must sign in and sign out
• No photos or recording allowed
• Visitor badges/access control
• Information briefing only
• Question submission
– Submit questions in writing on cards and provide them to the support team representatives
– Only a portion of the questions will be answered today, however all questions will be answered. All questions and answers will be posted on www.fbo.gov at a later date
• POCs are:
– Contract: Shelby O’Neill, Shelby.O’Neill@navy.mil
– Contract: Zelda Rappuhn, Zelda.Rappuhn@navy.mil
– Technical: Cindy Chen, Cindy.Chen@navy.mil
• Emergency exits
Logistics & Ground Rules
Distribution Statement A: approved for public release; distribution is unlimited 3 mailto:Shelby.Rappuhn@navy.mil mailto:Zelda.Rappuhn@navy.mil mailto:Cindy.Chen@navy.mil
Dr. John Barkyoumb Director of Strategic Relations
Code 00T
NSWCCD
Command Overview
Distribution Statement A: approved for public release; distribution is unlimited 4
Carderock
NAVSEA Warfare Centers:
10 Divisions – 1 Team
NSWC Carderock Division West Bethesda, Md.
NSWC Indian Head Explosive Ordnance Disposal
Technology Division Indian Head, Md.
NSWC Corona Division Corona, Calif.
NSWC Port Hueneme Division Port Hueneme, Calif.
NSWC Panama City Division Panama City, Fla.
NSWC Dahlgren Division Dahlgren, Va.
NSWC Crane Division Crane, Ind.
NSWC Philadelphia Division Philadelphia, Penn.
NUWC Keyport Division Keyport, Wash.
NUWC Newport Division Newport, R.I.
N A V S E A W A R F A R E C E N T E R S
N A V S E A W A R F A R E C E N T E R S
Carderock: 16 Technical Capabilities
• Ship and submarine design and integration
• Ship and submarine acquisition engineering
• Ship and submarine systems concepts, technologies and processes
• Combatant craft and expeditionary vehicles
• Unmanned vehicles naval architecture and marine engineering
• Hull forms and fluid dynamics
• Propulsors
• Surface, undersea and weapon vehicle materials and manufacturing technology
• Surface and undersea vehicle structures
• Alternative energy and power sources research and development
• Liquid waste management, science and systems
• Solid waste and hazardous material management; science and systems; and ships and submarines systems safety
• Surface, undersea and expeditionary vehicle vulnerability reduction and protection
• Surface and undersea vehicle underwater signature, silencing systems and susceptibility
• Surface and undersea vehicle non-acoustic topside signature, silencing systems and susceptibility
• Radiation detection technology research and management
Distribution Statement A: approved for public release; distribution is unlimited 6
Strategic Alignment
FOUNDATIONAL PILLARS
Workforce
Innovation
Business Processes
Cybersecurity
STRATEGIC PILLARS
Ship and Submarine Design
Platform Integrity and Performance
Digital Strategy
Signature Management
Unmanned Systems
NDS STRATEGIC APPROACH
Build a More Lethal Force
Strengthen Alliances & Attract New Partners
Reform the Department for Greater Performance & Affordability
One Team – Expanding the Advantage through Collaboration
FOUR LINES OF EFFORT
Strengthen Naval Power
Achieve High-Velocity Learning
Strengthen our Navy Team
Expand, Strengthen our Network of Partners
FORCE BEHIND THE FLEET
On-time delivery of ships & submarines
Improve Warfighting Capability of Ships & Submarines
Cybersecurity
Affordability
People
High-Velocity Learning
Distribution Statement A: approved for public release; distribution is unlimited 7
MISSION
Provide full-spectrum research and development, test and evaluation, analyses, acquisition and Fleet support for the Navy’s ships, ship systems and associated Navy logistics systems.
About Carderock
• Provide technical capabilities for surface / undersea vehicles and associated systems
• Develop and apply S&T
• Support the maritime industry
Distribution Statement A: Approved for Public Release; distribution unlimited. 8AMERICA’S FLEET STARTS HERE
CORE EQUITIES
Full-spectrum, life-cycle naval architecture and marine engineering for ship, submarines, boats, craft and unmanned vehicles
• Ship Design & Integration
• Hull Forms and Propulsion Systems
• Structures and Material Systems
• Environmental Quality Systems
• Vulnerability and Survivability Systems
• Signatures and Silencing Systems
VISION
Excellence in Ship Design
HISTORY
2008 – Twisted Bicone Arrays installed at STAFAC, SEAFAC
1967 – Combatant Craft Det established (Little Creek, Va)
2013 – Modeling and Seakeeping (MASK) basin renovated (West Bethesda)
1896 – Experimental model basin established
1937 – Carderock site approved
1967 – First large-scale model submarine test vehicle delivered to Acoustic
Research Detachment (ARD) Lake Pend Orielle, Idaho
Distribution Statement A: approved for public release; distribution is unlimited 8
Carderock by the Numbers
Workforce 2,298 Civil Service
1 Military
1,490 Scientists & Engineers
Education
– 171 PhDs
– 644 Masters
– 1,062 Bachelors
97 Student Interns
10 Visiting Professors
Departments 3 technical departments 3 business departments
Top 5 Sponsors PEO Submarines
SEA 07
PEO Ships Office of Naval Research
PEO USC
Top Engineering Fields Mechanical Engineer Naval Architect Chemical, Computer, Environmental Engineer Materials Engineer Electrical Engineer
14 yrs. average service
44 yrs. average age
Resources (FY18) Navy Working Capital
Fund Organization $693M Total Obligation
Authority $245.5M Contract Obligations
– 41% Small Business
Facilities 7 detachments each with unique mission Hydro, structural & acoustic laboratories at WB site
Distribution Statement A: approved for public release; distribution is unlimited 9
33 27
22 19
2 17
Doctorate
Masters
Bachelors
Carderock Workforce
TOTAL
EMPLOYEES
SCIENTISTS &
ENGINEERS
ADMINISTRATIVE TECHNICIAN & WAGE-
GRADE
EDUCATION
2,298 1,490 588 220 Bachelors Masters Doctorate
1,062 644 171 Non-Degree 421
As of 15 March 2019
General, Chemical, Aerospace, Industrial, Computer, Environmental, Civil Engineering and Scientists
Naval Architecture
Electronics Engineering
Electrical Engineering
Materials Engineering
Mechanical Engineering
Administrative Technicians/ Wage Grade
Distribution Statement A: approved for public release; distribution is unlimited 10
Carderock: What We Do Science & Technology Research & Development Advanced Concepts & Designs
Acquisition & Construction Test & Evaluation Modernization & In-Service Engineering
Distribution Statement A: approved for public release; distribution is unlimited 11
Puget Sound Detachment at Naval Submarine Base Bangor
BANGOR, WA
Acoustic Research Detachment
BAYVIEW, ID
Carderock Division HEADQUARTERS
WEST BETHESDA, MD
Norfolk Detachment Combatant Craft Division
NORFOLK, VA
South Florida Ocean Measurement Facility
DANIA, FL
Acoustic Trials Detachment
TITUSVILLE, FL
Memphis Detachment Dr. William B. Morgan Large Cavitation Channel
MEMPHIS, TN
Southeast Alaska Acoustic Measurement Facility
KETCHIKAN, AK
Carderock: Where We Work
AMERICA’S FLEET STARTS HERE Distribution Statement A: approved for public release; distribution is unlimited 12
Center for Innovation in Ship Design (CISD)
Subsonic Wind Tunnel
Model Fabrication Facility
Curator of Ship Models
David Taylor Model Basin
Structural Mechanics Lab
Explosives Test Pond
Deep Submergence Pressure Tanks
36” Water Tunnel
Maneuvering & Seakeeping (MASK)
Basin
186.8 acres in Montgomery
County
The U.S. Navy’s Ship & Ship Systems RDT&E Laboratory
Unique Facilities (West Bethesda site)
AMERICA’S FLEET STARTS HERE Distribution Statement A: approved for public release; distribution is unlimited 13
TASKING
Major Customers and FY18 Budget
Business Cost reimbursable and direct cite:
$693 Million
REIMBURSABLE DIRECT CITE
FY18 Actual $536 Million $157 Million
FY17 $661M Actual / FY18 $693M Actual / FY19 $727M Projection
PEO USC
Distribution Statement A: approved for public release; distribution is unlimited 14
• DDG 1000 / DDG 51
• Littoral Combat Ship (both variants)
• Stiletto (technology demonstrations)
• Unmanned Systems
• Columbia-class
• Virginia-class
• Seawolf-class
• Los Angeles-class
Major Programs Supported
AMERICA’S FLEET STARTS HERE Distribution Statement A: approved for public release; distribution is unlimited 15
Naval Architecture & Engineering Department
Signatures Department
Platform Integrity Department
Technical Departments
Distribution Statement A: approved for public release; distribution is unlimited 16
Platform Integrity Department (Code 60)
FY18: 440 FTEs
PROGRAMS / PROJECTS
CVN 78 FSST, TSST
COLUMBIA and
VIRGINIA (VPM)
Confirmation Models
Lithium Battery Technology (Blue Wolf/ Snakehead / Orca)
System, Engineering, Acquisition, Logistics
(SEAL)
Patrol Coastal (PC) Hull Monitoring System
▼ DIVISIONS
Provide technologies for enhanced ship integrity & performance. Conduct RDT&E in areas of:
Materials & Manufacturing Environmental & Energy Structures & Composites Survivability & Weapons Effects
MAJOR SPONSORS
PEO Subs
ONR
SEA 05
PEO USC
AMERICA’S FLEET STARTS HERE
PEO Carriers PEO Ships
PMS 501
DARPA
Distribution Statement A: approved for public release; distribution is unlimited 17
Signatures Department (Code 70) On-time Delivery of Signature Reduction Technologies to the FLEET
- Ensuring the Stealth Advantage via:
Full Scale Signatures Measurement & Analysis Acoustic Signatures Technology Signatures Measurement & Management Systems Electromagnetic Signatures Technology
AMERICA’S FLEET STARTS HERE
Modeling & Simulation
TBCAFLEET Signature Measurement
FY18: 578 FTEs
PROGRAMS / PROJECTS
COLUMBIA Class
Design VIRGINIA Class
Design and Construction
Fleet Signature Trials & Engineering Support
Submarine Trainers and Simulators
Advanced Signature Materials
Predictive Tools Propulsor
Development Sensors & Actuators Signature Self
Assessment TUBA Program Navy Digital Twin
MAJOR SPONSORS
PEO Subs
SEA 07
Navy Other
ONR
SEA 21
Fleet
PEO IWS
PEO Ships
Distribution Statement A: approved for public release; distribution is unlimited 18
Naval Architecture & Engineering Dept. (Code 80)
▼ DIVISIONS
Provide naval architect, engineering and hydromechanics expertise. Conduct RDT&E in:
Ship & Sub Acquisition Engineering Future Concepts & Design Integration Combatant Craft Naval Architecture & Engineering Surface Ship Hydromechanics Submarine Maneuvering & Control Computational Fluid Dynamics & Propulsors Marine, Aviation, & Unmanned Systems Facilities Engineering & Operations
MAJOR SPONSORS
PMS 397
PMS 450
ONR
PMS 392
PMS 322
AMERICA’S FLEET STARTS HERE
FY18: 750 FTEs
PROGRAMS / PROJECTS
Submarine Fly-by-Wire Ship
Control System Submarine Ship Control
Operator Trainers (SCOT) Propulsor / Propeller Design, Development, Evaluation, and Manufacturing Future Surface Combatant Pre-
AoA Concept Development Ship and Submarine Design
Tool Suite Center for Innovation in Ship
Design (CISD) Full Life-Cycle support to
Combatant Craft Ship Design and Engineering
Management Computational Fluid Dynamics
M&S Unmanned Surface and
Underwater Vehicles
Distribution Statement A: approved for public release; distribution is unlimited 19
Summary
Dedicated, talented workforce
World-class facilities
Active collaborations with Government, industry, academia
Providing critical support to today’s Navy and tomorrow’s fleet
We do things for the warfighter that industry can’t, won’t or shouldn’t do
Science & Technology
Research & Development Prototyping
In-Service Fleet Support
Distribution Statement A: approved for public release; distribution is unlimited 20
Mr. Steve Verosto Branch Head
Code 633 Wastewater Management
NSWCCD
NSWCCD – Wastewater Management
Distribution Statement A: approved for public release; distribution is unlimited 21
Program Profile – Technical Areas
• Ballast Water Management
• Uniform National Discharge Standards (UNDS)
39 Liquid Waste Discharges
• Oil Pollution Abatement (OPA)
• Non-Oily Waste (NOW)
Who Are We?
• Engineers (Chemical, Mechanical, Environmental, Systems)
• Scientists (Chemists, Biologists, Postdoctoral Fellows)
• Visiting Faculty
• Technicians (Mechanical, Electrical)
• Unique Testing Facility
Wastewater Management Program
Distribution Statement A: approved for public release; distribution is unlimited 22
Mission
• We are the Navy’s source of knowledge and provider of environmental solutions for liquid waste treatment and management in marine applications.
• We execute this role for the Navy and other maritime organizations by providing science and engineering expertise, including basic and applied research; specification development and acquisition support; design guidance; technology assessments; hands-on testing, evaluation, analysis, development, demonstration, validation, and verification of marine systems and technologies; installation and integration guidance development;
training; and support to life cycle management of fielded systems and management processes.
Distribution Statement A: approved for public release; distribution is unlimited 23
Mission
• We provide the expertise and unique facilities necessary to carry out this role with excellence and passion.
• Our capabilities extend from surface ships and submarines to associated ship-to-shore activities, and encompass strong partnerships and a solid network with the Navy Fleet, waterfront activities, other U.S. military services, U.S. regulatory agencies, technical communities from foreign and domestic governments and militaries, industry, professional societies, and academia.
• We are recognized as the technical leaders of shipboard liquid waste science and engineering.
Distribution Statement A: approved for public release; distribution is unlimited 24
Vision Execute Code 633’s mission as part of the larger Shipboard Environmental Quality Program and Warfare Center enterprise through
• application of our expert technical capabilities;
• management of historic and current knowledge;
• resolution of challenging science and engineering problems;
• insight to anticipate ship impacts from emerging regulations;
• delivery of high quality, innovative, value-added products; and
• respect for and an understanding of our Customers’ and Fleet needs.
Distribution Statement A: approved for public release; distribution is unlimited 25
Why Are We Here?
• Communicate the Navy’s requirements to industry
• Solicit industry questions and feedback
• Improve understanding of industry capabilities
• Provide networking opportunities for industry
– Drive collaboration among BWTS manufacturers and engineering service firms
• Enhance the Navy’s ability to obtain quality supplies and services
Purpose of the Industry Day
Navy
ManufacturerEngineering Services Firm
Distribution Statement A: approved for public release; distribution is unlimited 26
Ms. Holly Nestle Technical Warrant Holder
Wet Environmental Systems and Discharges
NAVSEA 05P5
Navy BWTS – Overview & Strategic Needs
Distribution Statement A: approved for public release; distribution is unlimited 27
Regulations and Drivers Goal and Objectives Needs and Considerations
Key Topics
Distribution Statement A: approved for public release; distribution is unlimited 28
• DoD Manual 4715.06, Volume 3 - Updated regulations for DoD Vessels and ballast water issued in 2017
– A ship (not submersible) with a keel laid date on or after October 1, 2020 will need to manage ballast water
– Manage = Ballast water exchange replaced by treatment or other methods that prevent discharge of untreated ballast water (potable water or offload to shore)
• DoD Manual leverages U.S. Coast Guard requirements for discharge standards but BWTS certification authority resides at NAVSEA
• Kill (USCG) vs non-viable (IMO)
• NAVSEA certifies the system and installation of BWTS on Navy ships
Navy BWTS – Regulations and Drivers
Distribution Statement A: approved for public release; distribution is unlimited 29
Goal:
• Develop certifiable BWTS for Navy surface vessels
Objectives:
• Use proven commercial technologies
– Leverage USCG Type Approval for efficacy
• Incorporate Navy requirements for militarized environment
– Documented in the Navy BWTS Performance Specification
• Rapid development to support short timeline
• Sustain procurement of certifiable system
Navy BWTS – Goal and Objectives
Distribution Statement A: approved for public release; distribution is unlimited 30
Military vs. Commercial:
• Militarized environment vs. commercial environment
– Shock, vibration, electromagnetic interference, cybersecurity
– Integration with ship systems to meet operational mission needs
• Worldwide operations vs. predictable/fixed routes
– Influent conditions are expected to vary significantly
• Intended service life (30 years vs. 20 years)
– Navy vessels can range from 20 years to over 50 years of service life
– Material considerations for a robust and durable design
• Limited operator experience/training vs. maritime expert
– Ease of operation and maintenance
– Automation to support reduced manning
• Standardization of equipment vs. individualized systems
– In-service support best served with common systems
Navy BWTS – Needs and Considerations
Distribution Statement A: approved for public release; distribution is unlimited 31
Ms. Rita Schuh Technical Area Lead
Code 633 Ballast Water Management
NSWCCD
Navy BWTS – Technical Needs
Distribution Statement A: approved for public release; distribution is unlimited 32
Scope of Work and Deliverables Description of Phases and Planned Activities Notional Timeline
Key Topics
Distribution Statement A: approved for public release; distribution is unlimited 33
Upcoming RFP - Scope of Work
• Phase I – Detail Design of Compact and Standard BWTS
• Phase II – Manufacture of Compact BWTS
• Phase III – Testing of Compact BWTS
• Phase IV – Manufacture of Standard BWTS
• Phase V – Testing of Standard BWTS
Compact BWTS: 200-300 m3/hr Standard BWTS: 800-1,000 m3/hr
Navy BWTS RFP
Distribution Statement A: approved for public release; distribution is unlimited 34
Detail Design
Manufacture
Test
Key Data Deliverables
• Developmental Technical Data Package (TDP)
– Provides sufficient data to allow analytical evaluation of the design approach
– Enables the development of prototype Navy BWTS
– Describes physical and functional characteristics
• Product TDP
– Provides sufficient data to allow the procurement or manufacture of the Navy
BWTS
– Enables a competent manufacturer to produce the Navy BWTS that duplicates the physical and performance characteristics of the original design
– Includes design, engineering, manufacturing, inspection, packaging, and quality assurance provisions
Navy BWTS RFP
Distribution Statement A: approved for public release; distribution is unlimited 35
Developmental TDP Product TDP
Phase I – Detail Design of Compact and Standard BWTS
Navy BWTS Acquisition – Phase I
Distribution Statement A: approved for public release; distribution is unlimited 36
Basic Design
Modifications
Developmental
TDP
Basic Design must complete USCG TA land-based and/or shipboard testing
Specification driven modifications/upgrades – not limited by USCG TA
INPUT PLANNED ACTIVITIES OUTPUT
- Contractor Basic Design
- BWTS Perf Spec
(GFI)
- System Conformance Review
- Design Change Proposals
- Preliminary Design Reviews
Developmental Technical Data Package
Navy BWTS Acquisition – Phase I
Distribution Statement A: approved for public release; distribution is unlimited 37
Phase I – Detail Design of Compact and Standard BWTS
• Formal assessment of the Contractor Basic Design to verify conformance with the BWTS Perf Spec
• Identify differences & deficiencies
• Submit request for deviations from the BWTS Perf Spec
System Conformance Review (SCR)
•Recommend changes to address SCR findings •Recommend value added changes •Assess the impacts of design changes
Design Change Proposals (DCPs)
•Gov. meets with the Contractor to review SCR results •Gov. meets with the Contractor to review DCPs
Preliminary Design Reviews (PDRs)
•Drawings and associated lists
• Schematic and electrical diagrams
• Software documentation
Developmental Technical Data Package
(TDP)
What is a Basic Design?
Basic Design is a contractor developed, proven commercial BWTS that serves as the foundation for the design of the Navy certifiable BWTS.
Phase II – Manufacture of Compact BWTS
Navy BWTS Acquisition – Phase II
Distribution Statement A: approved for public release; distribution is unlimited 38
Detail Design
Modifications
Prototype
BWTS
To be considered for Phase II, the Basic Design must obtain USCG TA
Manufacturing and FAT driven modifications/upgrades – not limited by USCG TA
INPUT PLANNED ACTIVITIES OUTPUT
Detail Design (Phase I) - Manufacture
- Gov. Inspections
- Design Change
Proposals
- Factory Acceptance Test
Update Developmental Technical Data Package
Navy BWTS Acquisition – Phase II
Distribution Statement A: approved for public release; distribution is unlimited 39
Phase II – Manufacture of Compact BWTS
• Up to two Compact units from each awarded Contractor
• 12-month warranty
• Spare parts, consumables, and special tools
Manufacture and Delivery
• Host factory visits to review progress
• Propose modifications to address findings and deficiencies
Manufacturing Inspections
• Evaluate recommended changes
• Submit request for deviations from the BWTS Perf Spec
Design Change Proposals (DCPs)
• Develop FAT procedures and obtain Gov. approval
• Conduct FAT
• Resolve problems prior to delivery of BWTS
Factory Acceptance Test
(FAT)
• Update Phase I TDP (Compact BWTS)
• Technical manuals and publications (e.g., safety data sheets, spare parts and consumable lists, maintenance requirement lists, software documentation)
Data Package (TDP)
Phase III – Testing of Compact BWTS
Navy BWTS Acquisition – Phase III
Distribution Statement A: approved for public release; distribution is unlimited 40
Test and Evaluation
Modifications
Product
TDP
Tests will be conducted at a ballast water management ready facility:
• BWTS pump(s) and piping ready
• BWTS space available onboard
• Power available onboard
Test driven modifications/upgrades
– not limited by USCG TA
INPUT PLANNED ACTIVITIES OUTPUT
Compact BWTS (Phase II) - Tests (Gov. Led)
- Critical Design
Reviews and Design Change Proposals
- Contractor Furnished Test Data & Analyses
Product Technical Data Package
Navy BWTS Acquisition – Phase III
Distribution Statement A: approved for public release; distribution is unlimited 41
Phase III – Testing of Compact BWTS
• Not to exceed 700 hours
• Gov. led and Contractor supported
• Contractor support includes commissioning, training, repair, decommissioning
Operational Test
• Shock (Gov. led and Contractor supported)
• Vibration (Gov. led and Contractor supported)
• EMI (Gov. led and Contractor supported)
Environmental Tests
• Review operational test results
• Review environmental test results
• Propose system modifications to pass tests
Critical Design Reviews (CDRs) and Design
Change Proposals (DCPs)
• Provide previous test data and analyses related to the Basic Design
Contractor Furnished Test Data
• Update Phase II TDP (Compact BWTS)
• Provide as-built drawings and documentations
Package (TDP)
Phase IV – Manufacture of Standard BWTS
Navy BWTS Acquisition – Phase IV
Distribution Statement A: approved for public release; distribution is unlimited 42
Detail Design
Modifications
Prototype
BWTS
To be considered for Phase IV award, the Basic Design must obtain USCG TA
Manufacturing and FAT driven modifications/upgrades – not limited by USCG TA
INPUT PLANNED ACTIVITIES OUTPUT
Detail Design (Phase I) - Manufacture
- Gov. Inspections
- Design Change
Proposals
- Factory Acceptance Test
Update Developmental Technical Data Package
Navy BWTS Acquisition – Phase IV
Distribution Statement A: approved for public release; distribution is unlimited 43
Phase IV – Manufacture of Standard BWTS
• Up to two Standard units
• Warranty
• Spare parts and consumables
• Special tools
Manufacture and Delivery
• Host factory visits to review progress
• Propose modifications to address findings and deficiencies
Manufacturing Inspections
• Evaluate recommended changes
• Submit request for deviations from the BWTS Perf Spec
Design Change Proposals (DCPs)
• Develop FAT procedures and obtain Gov. approval
• Conduct FAT
• Resolve problems prior to delivery of BWTS
Factory Acceptance Test
(FAT)
• Update Phase I TDP (Standard BWTS)
• Technical manuals and publications (e.g., safety data sheets, spare parts and consumable lists, maintenance requirement lists, software documentation)
Data Package (TDP)
Phase V – Testing of Standard BWTS
Navy BWTS Acquisition – Phase V
Distribution Statement A: approved for public release; distribution is unlimited 44
Test & Evaluation
Modifications
Product
TDP
Tests will be conducted at a ballast water management ready facility:
• BWTS pump(s) and piping ready
• BWTS space available onboard
• Power available onboard
Test driven modifications/upgrades
– not limited by USCG TA
INPUT PLANNED ACTIVITIES OUTPUT
Standard BWTS (Phase
IV)
- Tests (Gov. Led)
- Critical Design Reviews and Design Change Proposals
- Contractor Furnished Test Data & Analyses
Package
Navy BWTS Acquisition – Phase V
Distribution Statement A: approved for public release; distribution is unlimited 45
Phase V – Testing of Standard BWTS
• Not to exceed 700 hours
• Gov. led and Contractor supported
• Contractor support includes commissioning, training, repair, decommissioning
Operational Test
• Shock, vibration, EMI (Gov. led and Contractor supported)
• Conduct analyses in lieu of testing to demonstrate equal or greater performance Environmental Tests
• Review operational test results
• Review environmental test results
• Propose system modifications to pass test
Critical Design Reviews (CDRs) and Design
Change Proposals (DCPs)
• Provide previous test data and analyses related to the Basic design
Contractor Furnished Test Data
• Update Phase VI TDP (Standard BWTS)
• Provide as-built drawings and documentations
Package (TDP)
Navy BWTS – Notional Timeline
Distribution Statement A: approved for public release; distribution is unlimited 46
Ms. Shelby O’Neill Contracting Specialist
Code 02 Contracts Division
NSWCCD
Navy BWTS – Technical Needs
Distribution Statement A: approved for public release; distribution is unlimited 47
Contract Type
• Multiple Award Indefinite-Delivery-Indefinite-Quantity (IDIQ) contract with Firm Fixed Price (FFP) and Cost-Plus-Fixed-Fee
(CPFF) CLINS
• Source Selection: Trade-Off IAW FAR 15
Period of Performance
• Five year ordering period
Estimated Value of Multiple-award Contract
• $5-$6 million
Anticipated Number of Awardees
• 3-5 NAICS Code
• 541330- Engineering Services
• Size Standard- 38.5 million
Estimated Dates
• RFP Release: Early-Mid May 2019 on Federal Business Opportunities (FBO), posted for 45-60 days
• Award : January 2020
Contract Approach
Distribution Statement A: approved for public release; distribution is unlimited 48
Security Requirements
• Anticipate requirement to be unclassified
Competition
• No small business set-aside decision has been made to date
• POC: Suanne Coonrad, NSWC CD Small Business Deputy
– Suanne.Coonrad@navy.mil
– 301-227-5499
Technical Data Rights
• Unlimited Rights or Government Purpose rights
• Unlimited Rights- means rights to use, modify, reproduce, perform, display, release, or disclose technical data in whole or in part, in any manner, and for any purpose whatsoever, and to have or authorize others to do so\
• Government Purpose Rights (GPR)- use, modify, release, reproduce, perform, display or disclose the data pertaining to such items, components, or processes within the Government without restriction but may release or disclose the data outside the Government only for government purposes
Industry Day Questions and Answers
• Forward all additional questions to Shelby O’Neill via email at shelby.o’neill@navy.mil, Subj: 19-SBO-002BWTS_IndustryDayQuestions
• Must be received by 12:00 PM EST, Friday, 22 March 2019
• All Q&A’s will be posted on FBO NLT than 29 March 2019 as an amendment to the original posting (19-SBO-002)
Contract Approach
Distribution Statement A: approved for public release; distribution is unlimited 49 mailto:Suanne.Coonrad@navy.mil
Q & A
Navy BWTS Industry Day
Distribution Statement A: approved for public release; distribution is unlimited 50
| Ballast Water Treatment Systems (BWTS) Industry Day |
| BWTS Industry Day Agenda |
| Logistics & Ground Rules |
| Command Overview |
| NAVSEA Warfare Centers:�10 Divisions – 1 Team |
| Carderock: 16 Technical Capabilities |
| Slide Number 7 |
| Slide Number 8 |
| Carderock by the Numbers |
| Carderock Workforce |
| Slide Number 11 |
| Slide Number 12 |
| Slide Number 13 |
| Slide Number 14 |
| Slide Number 15 |
| Slide Number 16 |
| Platform Integrity Department (Code 60) |
| Signatures Department (Code 70) |
| Naval Architecture & Engineering Dept. (Code 80) |
| Slide Number 20 |
| NSWCCD – Wastewater Management |
| Wastewater Management Program |
| Wastewater Management Program |
| Wastewater Management Program |
| Wastewater Management Program |
| Purpose of the Industry Day |
| Navy BWTS – Overview & Strategic Needs |
| Key Topics |
| Navy BWTS – Regulations and Drivers |
| Navy BWTS – Goal and Objectives |
| Navy BWTS – Needs and Considerations |
| Navy BWTS – Technical Needs |
| Key Topics |
| Navy BWTS RFP |
| Navy BWTS RFP |
| Navy BWTS Acquisition – Phase I |
| Navy BWTS Acquisition – Phase I |
| Navy BWTS Acquisition – Phase II |
| Navy BWTS Acquisition – Phase II |
| Navy BWTS Acquisition – Phase III |
| Navy BWTS Acquisition – Phase III |
| Navy BWTS Acquisition – Phase IV |
| Navy BWTS Acquisition – Phase IV |
| Navy BWTS Acquisition – Phase V |
| Navy BWTS Acquisition – Phase V |
| Navy BWTS – Notional Timeline |
| Navy BWTS – Technical Needs |
| Contract Approach |
| Contract Approach |
| Navy BWTS Industry Day |
File details come from the government source that posted it. Updated .