QandA 1.docx
DOCX document 20 KB Posted
- Solicitation number
- 19AQMM26Q0429_FRC_Training_Skills_Class_Reno
About this file
This is a Questions and Answers (Q&A) document related to the Florida Regional Center (FRC) Training Skills Class Renovation solicitation. The document provides responses to contractor inquiries submitted during the proposal development phase for this Request for Proposal (RFP) issued by the Department of State Office of Acquisition Management. The solicitation pertains to a training skills class renovation project located in Oakland Park, Florida, with a site visit scheduled for September 3, 2026 at 10:00 AM ET, questions due by September 10, 2026, and proposals due September 23, 2026 by 3:00 PM ET. Amendment 04 of the solicitation specifically incorporated this Q&A document to provide clarification on contractor questions and address potential ambiguities in the procurement documents, helping bidders better understand requirements before final proposal submission.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 26Q0429 0004.pdf | ||
| 26Q0429 0003.pdf | ||
| 26Q0429 0002.pdf | ||
| Attch 7 - FRC Demo Draft.pdf | ||
| 26Q0429 0001.pdf | ||
| Attch 6 - FRC Propsoed Draft.pdf | ||
| Attch 4 - Bidders DD-254.pdf | ||
| Attch 2 - FRC 133 FL1 Proposed Layout.pdf | ||
| Attch 5 - Past Performance Questionnaire.docx | DOCX document | |
| 19AQMM26Q0429.pdf | ||
| Attch 3 - DBA WD FL20260197 Mod 1.pdf | ||
| Attch 1 - Statement of Work.docx | DOCX document |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. Carpet specifications Please provide the carpet manufacturer, product, color, and applicable installation specifications.
DOS Response: Carpet Tile– Manufacturer is Robert Shaw. The existing color has been discontinued. Respectfully request color and texture be matched as closely as practicable to the existing.
2. Paint specifications (Next week) Please provide the required paint manufacturer, product line, sheen/finish, and colors.
DOS Response: Respectfully request matching existing yellow paint used throughout the rest of the building - Sherwin Williams B20W12651.
3. Baseboard specifications (Next week) Please provide the baseboard manufacturer, material/type, size, profile, and color.
DOS Response: Baseboard information is unknown. Respectfully request matching existing baseboard as closely as practicable. Rubber wall base, roll goods. Straight base on carpet, Coved base on tile flooring.
4. Flooring area (Next week) Please confirm whether the total flooring area for this project is approximately 1,770 SF.
DOS Response: Total area of those spaces is 1810 Gross Square Feet according to Archibus.
5. Ceiling at removed walls Please confirm whether the existing soffit can remain and be finished where walls are removed, with no modifications or repairs required to the existing ceiling grid and tiles. If ceiling work is required, please clarify the extent.
DOS Response: Confirmed.
6. Data cabling Please confirm the distance from the designated IT room/data rack to the work area, along with the maximum allowable cable-run distance to the telecommunications outlets. Please also provide the required cable type/category, approved manufacturer if applicable, and requirements for pathways, patch panels, termination hardware, and testing, including the applicable project specifications or standards.
DOS Response: No new ports are being added. Drops will only be relocated, using existing ports, and to the extent of cable length already in place. Locations shown on drawings are for general and approximate placement.
7. Electrical circuits and panel capacity Please confirm whether the existing circuit can accommodate the proposed new outlet layout and additional load. If a new dedicated circuit is required, please provide the circuiting requirements and confirm whether the existing panel has sufficient capacity and available breaker space. If capacity or space is insufficient, please clarify the required modifications.
DOS Response: No new outlets are being added, therefore no additional load. Outlets are only being relocated from the demolished wall to an approximate location shown on drawings, dictated by the length of existing cable.
8. Occupancy sensors Please confirm whether occupancy sensors are required for this project.
DOS Response: Not required
9. Are we permitted to reuse the existing doors?
DOS Response: Yes, reusing existing doors is acceptable.
10. Are we permitted to reuse the existing receptacles?
DOS Response: Yes, reusing existing receptacles is acceptable.
11. Could you please confirm whether attendance at the scheduled pre-proposal site visit is a mandatory requirement for proposal eligibility? If a contractor was unable to attend the original site visit, please advise whether an alternate site visit can be arranged or whether the contractor may still submit a responsive proposal.
DOS Response: Please see Request for Quote L-003, para 2. If a contractor was unable to attend, they will not be considered for an award.
12. Please confirm whether an asbestos, lead, or other hazardous-material survey is available for the demolition areas.
DOS Response: No, there is no asbestos, lead or other hazardous-material survey available. No asbestos, lead or other hazardous material is known to be present.
13. Will the facility remain occupied during construction? Please confirm permitted working hours, and any night/weekend restrictions for noisy or dusty work.
DOS Response: Yes, the facility will remain occupied/operational during construction. Training classes will not be scheduled between Thanksgiving and the first week of January. This is the timeframe in which the work must be completed. Working outside normal working hours may be permissible on a case-by-case basis. Requests for work outside normal working hours shall be submitted 5 working days in advance.
14. Please confirm whether contractor-generated drawings must be prepared or sealed by a Florida-licensed architect/engineer.
DOS Response: No contractor drawings are required.