This document is a Questions and Answers (Q&A) file for the Department of State's Charleston Regional Center Building D Passport Office Construction Renovation project. The solicitation (19AQMM25R0163) is a total small business set-aside, with site visits scheduled for June 25th and June 30th as the only available dates for contractors to inspect the occupied space. The Department of State has extended the proposal due date to July 24, 2025, by 4:00 PM ET to provide sufficient time for offerors to prepare and submit proposals following the site visits. Access to specific attachments (3 and 4) requires a request through SAM.gov, and only prime small business contractors will be granted access to these documents. Questions from potential offerors are due by June 23, 2025, at 12:00 PM ET.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 19AQMM25R0163 M005.pdf | ||
| QA 4.docx | DOCX document | |
| Attch 11 - 10 14 23 - Room Identification Panel Signage.pdf | ||
| Attch 12 - Building D Sprinkler As-Built Drawings.pdf | ||
| CRC Bldg D Pictures.zip | ZIP file | |
| Attch 9 - Site Visit 1 Sign In Sheet.pdf | ||
| 19AQMM25R0163 M004.pdf | ||
| Attch 8 - Campus Site Overall - Laydown Areas.pdf | ||
| QA 3.docx | DOCX document | |
| Attch 10 - Site Visit 2 Sign In Sheet.pdf | ||
| QA 2.docx | DOCX document | |
| 19AQMM25R0163 M003.pdf | ||
| 19AQMM25R0163 M002.pdf | ||
| Attch 4 - Infrastructure TSS Documents 6.24.25.pdf | ||
| 19AQMM25R0163 M001.pdf | ||
| Attch 5 - DBA Wage Determination SC20250023.pdf | ||
| Attch 2 - Final Design Specifications.pdf | ||
| Attch 7 - Past Performance Questionnaire.docx | DOCX document | |
| Attch 1 - Statement of Work.docx | DOCX document | |
| Attch 6 - Public Release of Information 20250219.pdf | ||
| 19AQMM25R0163.pdf |
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. Will this be a group site visit with other contractors or are you doing single site visits for contractors?
DOS Response: The revisions to the terms and conditions of the solicitation removed FAR 52.236-27 and replaced it with FAR 52.236-27 Alt I. The site visits scheduled are for June 25th and June 30th, which are the only two dates the DoS will offer for site visits. This is an occupied space and unfortunately we cannot accommodate more than the two site visits as it will disrupt the DoS mission.
Additionally, the proposal due date has been extended to July 24, 2025 by 4:00 PM ET to allow sufficient time for offerors to submit proposals from the date of the second site visit.