Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or
(c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION
NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.
IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable
2. AMENDMENT/MODIFICATION NO.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Subject: 2018 Billings and Portland Construction MATOC
This amendment revises an RFI response from Amendment 0004. See page 2.
Indian Health Service - DES 701 5th Avenue, Suite 1650 Seattle, WA 98104
See item 7
18-102-SOL-00015
3. EFFECTIVE DATE
11/13/2018
09/28/2018 x
18-102-SOL-00015
2018 Billings/ Portland MATOC Amendment 0005
1. This amendment revises a response to a RFI that was provided in amendment 0004.
RFI 0057
2. No Window schedule – are there dimensions?
Revised Response Please see revised sheets A-1 and A-6 for window schedule.
2. All other terms and conditions remain unchanged. The proposal due date remains November 20, 2018 at 2pm local time. Offerors are reminded to acknowledge receipt of all amendments when submitting proposals in accordance with the RFP requirements.
ASU
S
EC
I V R E S
N A
M U H
HTLAEH
F O
T N E
M T R A
P
ED
ASU
S
EC
I V R E S
N A
M U H
HTLAEH
F
O T
N E
M T R A
P
ED
O R E G O N
I D A H O
W A S H I N G T O N
C A N A D A
M O
N T
A N
A
C A L I F O R N I A N E V A D A U T A H
P
A
C
I F
I
O
E
A
N
W Y
O M
I N G
COOS BAY BOISE
POCATELLO
PENDLETON
WALLA WALLA
EUGENE BEND
PORTLAND THE DALLES
MADRAS
SALEM
ASTORIA
YAKAMA
BELLINGHAM
PSSU
OLYMPIA
TACOMA
EVERETT
SEATTLE
WELLPINIT SU
NWWSUVANCOUVERISLAND
NBSU
COLVILLE SU
COEUR D'ALENE
RESERVATION
YAKAMA SU
WMSPR SU
YELLOWHAWK SU
FTHALL SU
NoIDSU
KAMIAHLAPWAI
TAHOLAH SU
INCHELIUM
SPOKANE
NESPELEM
YAKAMA HEALTH
CENTER
M A
IN
T
E N
A N
C E
B L
D G
A D
M
IN
B L
D G
PROJECT
LOCATION
FORT ROAD
E N
T E
R T
A
IN
M E
N T
R O
A D
JAIL ROAD
N 88° 56" 00" W
S 88° 56" 00" E
N
E
YAKAMA
NATION
ASU
S
EC
I V R E S
N A
M U H
HTLAEH
F
O T
N E
M T R A
P
ED
K F DAVIS ENGINEERING, INC
530 LA GONDA WAY, SUITE E,
DANVILLE, CA 94526
WWW.KFDE.COM
(925) 743-8884
REV. DATE ACTION DESCRIPTION BY APVD.
AFM BRANCH CHIEF
APPROVED: DATE:
CHECKED: DRAWN:
DATE: PROJECT NUMBER:
PUBLIC HEALTH SERVICES
DEPARTMENT OF HEALTH & HUMAN SERVICES
YAKAMA HEALTH CENTER COMPLEX
401 BUSTER ROAD TOPPENISH, WA 98948
SH. __ OF 35
DWG NO:
12/15/2017
ARCHITECT/ENGINEERS:CONSULTANTS: A B
C
D E F
G
H I
KEY PLAN
COVER SHEET
A-1
D.DIMATULACJ. ROBERTS
PO6YA657C9
IPC DEMONSTRATION SPACE
INDIAN HEALTH SERVICE
YAKAMA HEALTH CENTER
IPC DEMONSTRATION SPACE
PROJECT # PO6YA657C9
YAKAMA HEALTH CENTER COMPLEX
401 BUSTER ROAD, TOPPENISH, WA 98948
COVER SHEET
1" = 100'-0"A-1
1 YAKAMA HEALTH CENTER COMPLEX
NOT TO SCALEA-1
2 PORTLAND AREA IHS REGION A-1
3 ISOMETRIC OVERVIEW
DRAWING INDEX
DRAWING
NUMBER
SHEET
NUMBER SHEET TITLES
1 A-1 COVER SHEET
2 A-1.1 GENERAL PROJECT NOTES
3 A-1.2 CODE DATA AND ADDITIONAL NOTES
4 A-2 ARCHITECTURAL SYMBOLS,
ABBREVIATION AND GENERAL NOTES
5 A-3 ARCHITECTURAL SITE PLAN
6 A-4 ARCHITECTURAL DEMOLITION PLAN
7 A-5 ARCHITECTURAL FLOOR PLAN
8 A-5.1 FINISH FLOOR PLAN
9 A-6 ARCHITECTURAL EXISTING AND NEW
ELEVATIONS
10 A-7 ARCHITECTURAL REFLECTED CEILING
PLAN
11 A-8 ARCHITECTURAL ENLARGED EXAM ROOM
& ISOMETRIC VIEW
12 A-9 ARCHITECTURAL DETAILS
13 A-10 ARCHITECTURAL DETAILS
14 A-11 ARCHITECTURAL INTERIOR FINISH AND
DOOR SCHEDULE
15 P-1 GENERAL NOTES, LEGEND,
ABBREVIATIONS, SCHEDULE AND FIRE
PROTECTION
16 P-2 PLUMBING DEMOLITION PLAN
17 P-3 PLUMBING FLOOR PLAN
18 P-4 PLUMBING WATER AND DWV PIPING
DIAGRAMS
19 M-1 MECHANICAL GENERAL NOTES, LEGEND
AND ABBREVIATIONS
20 M-2 MECHANICAL SCHEDULES
21 M-3 MECHANICAL DEMOLITION PLAN
22 M-4 MECHANICAL FLOOR PLAN
23 M-5 MECHANICAL ATTIC PLAN
24 E-1 ELECTRICAL GENERAL NOTES, LEGEND
AND ABBREVIATIONS
25 E-2 ELECTRICAL POWER DEMOLITION PLAN
26 E-3 ELECTRICAL LIGHTING DEMOLITION PLAN
27 E-4 ELECTRICAL POWER AND TELECOM PLAN
28 E-5 ELECTRICAL LIGHTING PLAN
29 E-6 ELECTRICAL MECHANICAL PLAN
30 E-7 ELECTRICAL ACCESS CONTROL, PUBLIC
ADDRESS AND WI-FI PLAN
31 E-8 ELECTRICAL FIRE ALARM PLAN
32 E-9 ELECTRICAL PANEL SCHEDULES FOR
DEMOLITION
33 E-10 ELECTRICAL PANEL SCHEDULES NEW
WORK
34 E-11 ELECTRICAL LIGHTING FIXTURE
SCHEDULE
35 E-12 ELECTRICAL DETAILS
TRUE
NORTH
PROJECT
NORTH
PROJECT
NORTH
FINAL STAMPED SUBMITTAL
DISCLAIMER
1 11/09/18 CLARIFY WINDOW & DOOR DIMS JR
FLOOR LINE
0"
B.O.ROOF
OVERHANG
8' - 0"
WINDOW SILLS TO
REMAIN TYP. U.O.N.
ALUM. FRAME WINDOWS
TO BE REMOVED
STONE VENEER
TO REMAIN U.O.N.
REMOVE LAVA ROCK
VENEER AND SILL PROVIDE
CLEAN SAW-CUT EDGE
REMOVE WALL
BELOW WINDOW
FLOOR LINE
0"
B.O.ROOF
OVERHANG
8' - 0"
NEW ALUM FRAME
WINDOW INSERT.
ALIGN ALUM FRAME
PANEL WITH INTERIOR
WALL, SEE DET 1/A6
NEW DOOR AND FRAME AT EXISTING DOOR LOCATION,
SEE DETAIL SHEET A-10
NOTE: WINDOW AND DOOR GLAZING SHALL BE
ONE WAY REFLECTIVE TO THE EXTERIOR.
ALIGN
MATCH EXISTING
LARGE WINDOW SIZE
DEPTH
2' - 5" 5' - 7"
2' - 1"1' - 9"3' - 0"4' - 4"
7' - 3" 9"2' - 1"1' - 11"
1 1
VARIES
OF WALL OR CABINET
.1 1/2" MIN FROM FACE
NEW PARTITION
ALUMINUM FRAME PANEL
(THE ALUMINUM FRAME PANEL
SHALL BE CONSTRUCTED
AS AN INTEGRAL PART OF
THE ALUMINUM WINDOW
FRAME.)
EXTERIOR WALL/WINDOW
ACCOUSTICAL SEALANT
BOTH SIDE OF WALL
FILL VOID WITH BATT
INSUL
ALIGN ALUM FRAME
PANEL WITH FACE
OF GYP BD FINISH
ASU
S
EC
I V R E S
N A
M U H
HTLAEH
F
O T
N E
M T R A
P
ED
K F DAVIS ENGINEERING, INC
530 LA GONDA WAY, SUITE E,
DANVILLE, CA 94526
WWW.KFDE.COM
(925) 743-8884
REV. DATE ACTION DESCRIPTION BY APVD.
AFM BRANCH CHIEF
APPROVED: DATE:
CHECKED: DRAWN:
DATE: PROJECT NUMBER:
PUBLIC HEALTH SERVICES
DEPARTMENT OF HEALTH & HUMAN SERVICES
YAKAMA HEALTH CENTER COMPLEX
401 BUSTER ROAD TOPPENISH, WA 98948
SH. __ OF 35
DWG NO:
12/15/2017
ARCHITECT/ENGINEERS:CONSULTANTS: A B
C
D E F
G
H I
KEY PLAN
ARCHITECTURAL EXISTING
AND NEW ELEVATIONS A-6
D. DIMATULACJ. ROBERTS
PO6YA657C9
IPC DEMONSTRATION SPACE
1/4" = 1'-0"A-6
1 EXISTING ELEVATION
1/4" = 1'-0"A-6
2 NEW ELEVATION
REMOVE EXISTING DOOR
AND FRAME
CUT BACK WINDOW SILL AS
NECESSARY FOR INSTALLATION
OF NEW WINDOW UNIT
1" = 1'-0"A-6
3 ALUMINUM FRAME PANEL
DISCLAIMERA-6
4 3D VIEW
ARTIST RENDERING - THIS IS NOT AN ACTUAL
REPRESENTATION OF THE FINAL BUILDING
1 11/09/18 CLARIFY WINDOW & DOOR DIMS JR
| Amendment 0005 |
| Amendment 0003 |
| Page 2 |
| REV 1 IPC DEMONSTRATION SPACE SHTS A-1 AND A-6 |
| Sheets |
| A-1 - COVER SHEET |
| A-6 - ARCHITECTURAL EXISTING AND NEW ELEVATIONS |
File details come from the government source that posted it.