1701-09 TJ - Hot Work Operations (public).pdf

PDF 225 KB Posted

Attached to
Drawings/References for the THOMAS JEFFERSON Dockside Repairs FY23
Solicitation number
1305M222QNMAN0068
Issued by

View the file

Other files

File Type Posted
SNAME Technical and Research Bulletin 4-16_Calculations for Merchant Ship HVAC Design (2015).pdf PDF
NOAA Thomas Jefferson Ships Registry TTS.pdf PDF
NOAA Thomas Jefferson Procedure 1701-09 TJ - Hot Work Operations.pdf PDF
TJ_FY23_DS_Gauge Meter Inventory (Updated 20220601).pdf PDF
MOC-573-2 Overhaul Repair of Hydraulic Cylinders.pdf PDF
Register of Lifting Appliances_fillable.pdf PDF
NAVSEA Standard Item 009-32_Cleaning and Painting Requirements.pdf PDF
Calculations for Merchant Ship HVAC Design (2015).pdf PDF
320-6634679_E Cableway Arrangement and Details - AS BUILT(1).pdf PDF
Document locations.pdf PDF
TJ-152-002B Deck Extension Structure _ Grating Replacement_131148294.pdf PDF
301-001_C_Electrical One Line Dia - AS BUILT.pdf PDF
ABS Marine Vessel Rules.pdf PDF
Appendix I to Part 1918_ Title 29 (up to date as of 6-21-2022).pdf PDF
TJ_FY23_DS_MCT P2 Repairs.xlsx XLSX spreadsheet
512-6634850F HVAC Arrangement and Details Engine Room_130758174.pdf PDF
NOAA Form 57-17-09 - Hot Work Permit.pdf PDF
Weight Reporting Spreadsheet.docx DOCX document
NOAA Standard Specifications MOC-300-3_General Requirements for Electrical_Electronic Items.pdf PDF
624-6634931 Joiner Door Schedule.pdf PDF
512-3275003-8 HVAC MODS MN DECK REV B.pdf PDF
TJ-233-03 EMD Engine_Maintenance Instruction_1722 Rev I.pdf PDF
085-6980295E TJ Tank Capacities _ Soundings.pdf PDF
TJ-233-01 Detroit Diesel 6V92.pdf PDF
321-3274004-3A HVAC Elec Control Mods Incdt HVAC Mods.pdf PDF
505-6634825 Standard Piping Details.pdf PDF
321-3274004-2A HVAC Electrical Pwr Mods Incdt HVAC Mods.pdf PDF
NOAA StandardSpecification AMC-505-2_Hydrostatic Pressure Tests.pdf PDF
NOAA Standard Specification AMC-300-1 Overhaul of Electrical Rotating Machinery.pdf PDF
514-3275003-12 Rev A AC PP INSTALL FCSLE DK _ ABV.pdf PDF
514-3275003-6 REV A AC PIPING INSTL 2ND DK _ BLW.pdf PDF
TJ-241-01 Reduction Gear Main Propulstion RS2719S.pdf PDF
512-004_-_HVAC Makeup Air Modifications.pdf PDF
TJ-436-01A - Consilium Salwico CS4000 Operations Manual.pdf PDF
TJ-233-03 EMD Engine 12-645F7B.pdf PDF
985-6634639 REV N Fire Control Plan Final_123787221_123332124.pdf PDF
085-002H Booklet of General Plans.pdf PDF
Mathers Control Drawings.pdf PDF
514-003_-_Refrigerant System and Condensate Piping Modifications.pdf PDF
NOAA Standard Specification AMC-635-2 Thermal Insulation for Compartments.pdf PDF
NF 57-17-09 - Hot Work Permit.pdf PDF
NOAA Standard Specification 000-1H General Requirements for Ship Repair Contract Work.pdf PDF
501-6634837C Reach Rod ARR _ Details.pdf PDF
101-6634906 Structural standards.pdf PDF
NOAA Standard Specification MOC-635-1 Thermal Insulation for Piping.pdf PDF
320-6634679_E Cableway Arrangement and Details - AS BUILT.pdf PDF
514-3275003-11 REV A AC PIPING INSTL MN DK.pdf PDF
803-3275003-10 TJ HVAC Upgrade Engineering Data Package.pdf PDF
NOAA General Technical Requirements (GTR) Rev -.pdf PDF
525-6634754F Fill Vents and Sounds Arrangement _ Details.pdf PDF
Show 40 more

Latest 50 of 73 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NOAA SHIP THOMAS JEFFERSON

PROCEDURE

1701-09 TJ

VERSION

4.0

EFFECTIVE DATE

October 23, 2019

AUTHORIZED BY:

/s/ CDR Briana W. Hillstrom, NOAA

CDR Briana W. Hillstrom, NOAA Commanding Officer

REVIEW DATE

October 23, 2022

RESPONSIBLE POSITION

Commanding Officer

HOT WORK OPERATIONS

1. PURPOSE

1.1 This procedure provides the minimum requirements for performing hot work aboard a National Oceanic and Atmospheric Administration (NOAA) Ship Thomas Jefferson.

1.2 This version:

1.2.1 Satisfied the triennial review with the following changes:

1.2.2 Adds Responsible Positions section;

1.2.3 Changes “Qualified person” to “Competent Person”;

1.2.4 Adds “designated hot work areas” and the requirements for establishing and maintaining these spaces;

1.2.5 Corrects reference to NF 57-17-07 Emergency Escape Breathing Device Training Record to NF 57- 07-10 Confined Space “Safe for Workers” Checklist and Permit.

1.2.6 Corrects DMS web address in the reference section.

1.2.7 Changes definition of hot work to allow for grinding, chipping, and needle gunning on weather decks where the presence of gases below the lower explosive level are not present, and no combustible materials are within the area.

2. SCOPE

2.1 This procedure applies to NOAA Ship Thomas Jefferson

2.2 This procedure applies to contractors, industry representatives, shipyard workers, and other individuals that may work aboard NOAA Ship Thomas Jefferson.

Page 2 of 6 Procedure 1701-09

3. RESPONSIBLE POSITIONS

3.1 The following positions or groups have action item responsibilities within this procedure:

• Ship Commanding Offier

• Chief Marine Engineer

• Officer of the Deck

• Competent Person

• Marine Chemist

4. RESPONSIBILITIES AND PROCEDURES

4.1 Background

The high temperatures, molten metal, and sparks produced in hot work operations have been the cause of disastrous fires, both ashore and at sea.

4.2 Responsibilities

4.2.1 The Commanding Officer (CO) ensures all hot work operations are conducted per this procedure.

4.2.2 A Ship Specific Instruction (SSI) is required to list designated hotwork areas and qualified individuals.

4.2.3 The competent person prepares required permits and completes the hot work operation prerequisites.

4.2.4 The hot work operator conducts all hot work operations safely.

4.2.5 Fire watch personnel ensure fires do not start as a result of hot work operations, and in the event that a fire does start, fire watch personnel sound the fire alarm and begin extinguishing the fire.

4.3 Hot Work Procedures

4.3.1 Hot work operations conducted by ship’s force are only performed by a trained and qualified hot work operator as designated by the Chief Marine Engineer (CME) or Competent Person and approved by the CO. A list of the designated hot work operators is maintained aboard the ship (posted where other qualification lists are maintained). In addition to the hot work operator, all hot work operations must have at least one person on fire watch at the hot work location.

4.3.2 The hot work operator uses required personal protective equipment (PPE), as indicated in the OMAO Procedure 1701-06 – Personal Protective Equipment, including:

• Eye and face protection;

• Electrical safety gloves when removing or replacing electrodes;

Hot work must not be performed:

• During fueling or oil transfers;

• If it is likely to cause a fire or explosion;

• On surfaces that will emit toxic fumes when heated;

• In confined spaces without marine chemist

“Safe for Hot Work” certificate; or

• In spaces or adjacent spaces that contain concentrations of flammable vapors greater than

10 percent of the lower explosive limit (LEL), except in designated hot work spaces (see below).

Page 3 of 6 Procedure 1701-09

• Respiratory protection, type determined by task and location, see OMAO Procedure 1701-07 – Respiratory Protection Program; and

• Leather gloves, aprons, and jackets as appropriate.

4.3.3 Hot work operations may only be conducted if all fire systems are as fully operational as possible and a fire watch is assigned. During periods when fire system components are disabled due to repair or removed from the ship, an equally effective means of fire detection or suppression must be used.

4.3.4 Hot work operations in confined spaces may only be performed if:

• The ship is in port;

• Safe for Hot Work Certificate is issued by Marine Chemist;

• All Confined Space Entry requirements indicated in OMAO Procedure 1701-10 – Confined Space

Entry Program are met; and

• Gas cylinders, manifolds, and other cutting equipment remain outside of the confined space.

4.3.5 During welding operations:

• When practical, shielding should be provided and/or restrict access to protect others from viewing the arc;

• Gas supplies must be secured at the cylinder or manifold when equipment will not be used for periods greater than 30 minutes or will be left unattended for periods greater than 15 minutes;

and

• Torches and electrodes must be disconnected from the hoses/supply cables when not in use for periods greater than 30 minutes or left unattended for periods greater than 15 minutes.

4.3.6 Designated Hot Work Areas:

• Whenever possible, a space such as a workshop should be designated for hot work to be performed and should be the first place considered for performing hot work operations.

• Designated hot work areas must be prepared and maintained per section 4.4.1 of this instruction.

• The precautions section of NOAA Form (NF) 57-17-09 - Hot Work Permit must be completed by the CME or their designee (no signatures necessary). The EOW shall serve as the CME designee for completion of the precautions required by this section for hot work conducted in the designated hot work area.

• The OOD is notified when hot work will be performed and when completed within a designated area.

• Any hot work performed on a bulkhead within a designated area will still require the completion of a hot work permit.

• A list of the designated hot work areas must be maintained in the SSI. The Thomas Jefferson maintains the Machine Shop, space 2-75-0, as the only designated hot work area.

4.4 Hot Work Prerequisites

4.4.1 Before hot work operations may commence, the following preparations of the hot work area must be completed:

• The subject space and adjacent spaces are inspected to determine potential fire hazards;

• Combustible materials inside the subject space, within 35 feet of the hot work area, are moved to another space, covered with a fire proof cloth, or shielded with a metal guard;

• Combustible materials inside adjacent spaces are removed from the opposite side of the subject space bulkhead, overhead, or deck below.

• Machinery and equipment that cannot be moved in the subject space is covered by a fire proof cloth, or shielded with a metal guard;

• The edges of the fire proof cloth are tightened or secured so to provide significant overlap and protection to keep sparks from getting under the cloth.

• Lockout / tagout requirements in OMAO Procedure 1701-05 – Lockout/Tagout are complied with, if applicable;]

• Ducts that could carry sparks are blanked off;

Page 4 of 6 Procedure 1701-09

• Sufficient ventilation (fixed or portable) is provided to remove smoke and keep flammable vapor concentrations within safe limits.

4.4.2 Before hot work operations may commence outside of a designated hot work area, the following administrative requirements must be in place:

• The CME/Competent Person certifies the area or space “Safe for Hot Work”;

• The CO or designated representative approves the hot work and document approval in the ship’s deck log;

• A Hot Work Permit (NF 57-17-09) is completed, including precautions and all signatures (ship specific requirements can be added to the permit).

o Onboard Thomas Jefferson, the Competent Person will route the Hot Work

Permit for signature through (in order):

1. Chief Marine Engineer

2. Commanding Officer

3. Officer of the Deck o Original copies of the signed form will be posted in the workspace.

o A scanned copy of the signed form is to be archived in the <N:\Public\Digital

Binders\Hot Work Operations\Chits> folder on the ship’s network \\OMAO-

TJ-FS2.

• The NF 57-17-09 is posted in the adjacent space on the bulkhead next to the entrance of the hot work space.

4.4.3 Before hot work operations may commence, the following support personnel must be in place or notified:

• A trained and competent fire watch, per section 4.4.5 of this procedure, is posted in each space where a fire may occur as a result of the hot work operations;

• Radio communications is established between each member of the fire watch, the hot work operator and the Officer of the Deck (OOD);

• The OOD makes an announcement on the ship’s public address system notifying all shipboard personnel of the ensuing hot work operations; and

• The fire watch notifies the OOD when hot work commences.

4.4.4 A certified Marine Chemist must issue a “Safe for Hot Work” certificate before hot work operations are conducted in any of the following locations:

• Within a confined space;

• Within or on the boundaries of tanks that have been used to carry combustible liquid chemicals or petroleum products;

• Upon any pipeline, heating coil, pump, fitting, or other appurtenance connected to such tanks.

Additionally, for contractors working aboard:

• Within any space adjacent to tanks that have been used to carry liquid chemicals or petroleum products, unless distance between such tank and hot work is greater than 25 feet.

4.4.5 A fire watch is required in each space where sparks or heat transfer may ignite combustibles.

Multiple fire watch personnel may be required. The fire watch:

• Has the authority to stop any hot work operation, for any reason;

• Has no other assigned duties while maintaining a fire watch;

• Reviews all posted permits and certificates;

• Is knowledgeable in sounding the fire alarm;

• Is properly trained in the use of firefighting equipment;

• Is equipped with appropriate firefighting equipment;

• Is equipped with appropriate PPE, as required for the operation; and

• Is maintained without interruption, including meals and other breaks.

4.5 Procedures Following Completion of Hot Work

4.5.1 The hot work operator:

file://OMAO-TJ-FS2 file://OMAO-TJ-FS2

Page 5 of 6 Procedure 1701-09

• Notifies the OOD and CME.

4.5.2 The fire watch:

• Remains on fire watch for 30 minutes after completion of hot work operations or longer until the affected metal surface areas are cool to the touch;

• Inspects the work area and all adjacent spaces for hot spots and smoldering embers before securing the fire watch; and

• Informs the OOD of fire watch termination.

4.5.3 The OOD:

• Makes an announcement on the ship’s public address system notifying all shipboard personnel of the completion of hot work operations;

• Returns to service any disabled fire system or part thereof;

• Thoroughly inspects the hot work area and all adjacent spaces at the end of their watch;

• Directs subsequent security watches to conduct heightened inspections for fire or smoke for at least eight (8) hours following the completion of the hot work; and

• Ensures all appropriate entries are made in the ship’s deck log.

5. RECORDS AND REPORTS

• NF 57-11-13B - Deck Log

• NF 57-17-10 - Confined Space Entry Permit

• NF 57-17-09 - Hot Work Permit

• Marine Chemist “Safe for Hot Work” certificate

6. REFERENCES

29 CFR, Part 1910, Subpart Q – Welding, Cutting, and Brazing. Occupational Safety and Health Administration.

29 CFR, Part 1915, Subpart B – Confined and Enclosed Spaces and Other Dangerous Atmospheres in Shipyard Employment. Occupational Safety and Health Administration.

U.S. Department of Commerce Occupational Safety and Health Manual http://hr.commerce.gov/s/groups/public/@doc/@cfoasa/@ohrm/documents/content/dev01_006463.pdf

Document Management System http://nor-is-waypoint.corpsrv.noaa.local/WebDesktop/Binders.aspx

• OMAO Procedure 1701-05 – Lockout/Tagout

• OMAO Procedure 1701-10 – Confined Space Entry

• OMAO Procedure 1701-06 – Personal Protection Equipment

• OMAO Procedure 1701-07 – Respiratory Protection Program

7. DEFINITIONS

Adjacent Space A space that borders the subject space in all directions, including points of contact, corners, diagonals, decks, tank tops, and bulkheads.

Fire System Any system used to detect, suppress or extinguish a fire.

Hot Work Riveting, welding, burning, the use of powder-actuated tools or similar fire-producing operations; any operation that raises the temperature of the work piece equal to or greater than 204°C (400°F); or grinding, http://hr.commerce.gov/s/groups/public/@doc/@cfoasa/@ohrm/documents/content/dev01_006463.pdf http://nor-is-waypoint.corpsrv.noaa.local/WebDesktop/Binders.aspx

Page 6 of 6 Procedure 1701-09 drilling, abrasive blasting, or similar operations in the presence of or against the accumulations of readily combustible materials or flammable or combustible liquids or vapors when the atmosphere exceeds 10 percent of the LEL.

Marine Chemist An individual recognized by the National Fire Protection Agency as qualified to test confined spaces and determine their condition with respect to oxygen sufficiency, explosive vapors, or toxic gases.

Competent Person An individual trained and authorized to conduct testing of oxygen and explosive gas levels. He/she evaluates the space, develops ways to control hazards, and signs hot work permit (must have completed Shipyard Competent Person, or NAVY Gas Free Engineer training and been designated by Command).

8. NOTES

Effect on other documents: Supersedes all previous versions of OMAO Procedure 1701-09 – Hot Work Operations

DOCUMENT HISTORY

Version Description of Change Effective Date

4.0 Reviewed and reissued 10/23/19

3.0

Triennial review; Adds Responsible Positions section; Changes “Qualified person” to “Competent Person”; Adds “designated hot work areas” and the requirements for establishing and maintaining these spaces. Corrects reference to NF 57-17-07 Emergency Escape Breathing Device Training Record to NF 57-07-10 Confined Space “Safe for Workers” Checklist and Permit. Corrects DMS web address in reference section. Changes definition of hot work.

1/26/2017

2.0

Reformats Version 1.0; Section 3.2 adds on the responsibilities for qualified person, hot work operator, and fire watch; Section 3.3.3 adds to the information on fire system operability; Section 3.4.1 Clarifies 35 foot requirement for removal of combustible materials.

6/20/2012

1.0 Initial Document. 2/22/2011