NOAA Standard Specification AMC-635-2 Thermal Insulation for Compartments.pdf

PDF 117 KB Posted

Attached to
Drawings/References for the THOMAS JEFFERSON Dockside Repairs FY23
Solicitation number
1305M222QNMAN0068
Issued by

View the file

Other files

File Type Posted
SNAME Technical and Research Bulletin 4-16_Calculations for Merchant Ship HVAC Design (2015).pdf PDF
NOAA Thomas Jefferson Ships Registry TTS.pdf PDF
NOAA Thomas Jefferson Procedure 1701-09 TJ - Hot Work Operations.pdf PDF
TJ_FY23_DS_Gauge Meter Inventory (Updated 20220601).pdf PDF
MOC-573-2 Overhaul Repair of Hydraulic Cylinders.pdf PDF
Register of Lifting Appliances_fillable.pdf PDF
NAVSEA Standard Item 009-32_Cleaning and Painting Requirements.pdf PDF
Calculations for Merchant Ship HVAC Design (2015).pdf PDF
320-6634679_E Cableway Arrangement and Details - AS BUILT(1).pdf PDF
Document locations.pdf PDF
TJ-152-002B Deck Extension Structure _ Grating Replacement_131148294.pdf PDF
301-001_C_Electrical One Line Dia - AS BUILT.pdf PDF
ABS Marine Vessel Rules.pdf PDF
Appendix I to Part 1918_ Title 29 (up to date as of 6-21-2022).pdf PDF
TJ_FY23_DS_MCT P2 Repairs.xlsx XLSX spreadsheet
512-6634850F HVAC Arrangement and Details Engine Room_130758174.pdf PDF
NOAA Form 57-17-09 - Hot Work Permit.pdf PDF
Weight Reporting Spreadsheet.docx DOCX document
NOAA Standard Specifications MOC-300-3_General Requirements for Electrical_Electronic Items.pdf PDF
624-6634931 Joiner Door Schedule.pdf PDF
512-3275003-8 HVAC MODS MN DECK REV B.pdf PDF
TJ-233-03 EMD Engine_Maintenance Instruction_1722 Rev I.pdf PDF
085-6980295E TJ Tank Capacities _ Soundings.pdf PDF
TJ-233-01 Detroit Diesel 6V92.pdf PDF
321-3274004-3A HVAC Elec Control Mods Incdt HVAC Mods.pdf PDF
505-6634825 Standard Piping Details.pdf PDF
321-3274004-2A HVAC Electrical Pwr Mods Incdt HVAC Mods.pdf PDF
NOAA StandardSpecification AMC-505-2_Hydrostatic Pressure Tests.pdf PDF
NOAA Standard Specification AMC-300-1 Overhaul of Electrical Rotating Machinery.pdf PDF
514-3275003-12 Rev A AC PP INSTALL FCSLE DK _ ABV.pdf PDF
514-3275003-6 REV A AC PIPING INSTL 2ND DK _ BLW.pdf PDF
TJ-241-01 Reduction Gear Main Propulstion RS2719S.pdf PDF
512-004_-_HVAC Makeup Air Modifications.pdf PDF
TJ-436-01A - Consilium Salwico CS4000 Operations Manual.pdf PDF
TJ-233-03 EMD Engine 12-645F7B.pdf PDF
985-6634639 REV N Fire Control Plan Final_123787221_123332124.pdf PDF
085-002H Booklet of General Plans.pdf PDF
Mathers Control Drawings.pdf PDF
514-003_-_Refrigerant System and Condensate Piping Modifications.pdf PDF
NF 57-17-09 - Hot Work Permit.pdf PDF
NOAA Standard Specification 000-1H General Requirements for Ship Repair Contract Work.pdf PDF
501-6634837C Reach Rod ARR _ Details.pdf PDF
101-6634906 Structural standards.pdf PDF
NOAA Standard Specification MOC-635-1 Thermal Insulation for Piping.pdf PDF
320-6634679_E Cableway Arrangement and Details - AS BUILT.pdf PDF
514-3275003-11 REV A AC PIPING INSTL MN DK.pdf PDF
803-3275003-10 TJ HVAC Upgrade Engineering Data Package.pdf PDF
NOAA General Technical Requirements (GTR) Rev -.pdf PDF
525-6634754F Fill Vents and Sounds Arrangement _ Details.pdf PDF
TJ-651-02 Grease interceptor Gaylord Hood.pdf PDF
Show 40 more

Latest 50 of 73 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMC-635-2

OCTOBER 1989

NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION (NOAA)

ATLANTIC MARINE CENTER

STANDARD SPECIFICATION AMC-635-2

THERMAL INSULATION FOR COMPARTMENTS

1. SCOPE. This specification contains the general requirements for renewing and installing thermal insulation on shell plating, bulkheads, overheads, and other structure in compartments of NOAA ships.

2. REFERENCES.

a. NOAA Standard Specification AMC-000-1 (latest revision), General Requirements for Ship Repair Contract Work on NOAA Ships"

3. REQUIREMENTS.

3.1 Whenever removal or renewal of existing insulation is

necessary to accomplish the required work, the contractor shall remove and properly dispose of all existing insulation. If the existing insulation contains asbestos materials, comply with Section 4.11.7 of reference 2.a. All suspect materials shall be considered to contain asbestos unless proven to be otherwise.

The contractor may have samples analyzed by a qualified laboratory to prove or disprove the presence of asbestos.

3.2 Materials.

3.2.1 Fibrous glass faced thermal insulation board, complying with MIL-I-742, Type I, shall be used.

3.2.2 Fibrous glass tape shall comply with MIL-C-20079, Type II, Class 1.

3.2.3 Fibrous glass insulation felt shall comply with MIL-I-

22023, Type I, Class 6.

3.2.4 Epoxy adhesive shall comply with MIL-A-24456.

3.2.5 Latex adhesive shall comply with MIL-A-3316, Class 1, Grade A.

3.2.6 Vapor barrier coating compound shall comply with MIL-C- 19993.

3.3 Installation.

3.3.1 Secure insulation board to the specified surfaces using 3/16-inch diameter studs and press-fit metal caps. Aluminum studs shall be used if the specified surface is aluminum and cadmium-plated steel studs shall be used on steel surfaces.

3.3.2 In areas accessible for a stud gun, weld studs shall be used. In areas that are inaccessible for a stud gun, studs welded to a perforated pad may be bonded to ship's structure using epoxy adhesive. A maximum of 25-percent of the total number of studs required to secure insulation on each plane area bounded by stiffeners or bulkheads may be attached using adhesive.

3.3.3 Studs shall be spaced approximately 12 inches (maximum of 14 inches) apart on centers. Studs at the edges of each piece of insulation board shall be placed not more than 4 inches from the edge at maximum intervals of 12 inches. Sufficient studs must be used to hold the insulation board firmly and evenly against the surface.

3.3.4 Insulation on vertical surfaces shall extend from 6 inches above the deck to the overhead. Do not apply insulation to the vertical surface within 6 inchess of the deck. Along the lower edge of the insulation, install a metal buffer plate tack-welded to the surface and extending out from surface a distance equal to the insulation thickness.

3.3.5 Insulation board shall be cut and neatly fitted around

surface protrusions.

3.3.6 Install insulation on beams, frames, and stiffeners as

shown on attached Appendix A.

3.3.7 Cover all seams, joints, and edges of thermal insulation with fibrous glass tape using latex adhesive.

3.3.8 To all insulation installed in laundries, sculleries, galleys, drying rooms, and to all insulation installed on the warm side of refrigerated stores spaces, apply a vapor barrier consisting of three alternate brush coatings of white, orange, and white vapor barrier coating compound.

APPENDIX A

INSULATION INSTALLATION ON BEAMS, FRAMES AND STIFFENERS

END OF SPECIFICATION