NOAA Standard Specifications MOC-300-3_General Requirements for Electrical_Electronic Items.pdf

PDF 22 KB Posted

Attached to
Drawings/References for the THOMAS JEFFERSON Dockside Repairs FY23
Solicitation number
1305M222QNMAN0068
Issued by

View the file

Other files

File Type Posted
SNAME Technical and Research Bulletin 4-16_Calculations for Merchant Ship HVAC Design (2015).pdf PDF
NOAA Thomas Jefferson Ships Registry TTS.pdf PDF
NOAA Thomas Jefferson Procedure 1701-09 TJ - Hot Work Operations.pdf PDF
TJ_FY23_DS_Gauge Meter Inventory (Updated 20220601).pdf PDF
MOC-573-2 Overhaul Repair of Hydraulic Cylinders.pdf PDF
Register of Lifting Appliances_fillable.pdf PDF
NAVSEA Standard Item 009-32_Cleaning and Painting Requirements.pdf PDF
Calculations for Merchant Ship HVAC Design (2015).pdf PDF
320-6634679_E Cableway Arrangement and Details - AS BUILT(1).pdf PDF
Document locations.pdf PDF
TJ-152-002B Deck Extension Structure _ Grating Replacement_131148294.pdf PDF
301-001_C_Electrical One Line Dia - AS BUILT.pdf PDF
ABS Marine Vessel Rules.pdf PDF
Appendix I to Part 1918_ Title 29 (up to date as of 6-21-2022).pdf PDF
TJ_FY23_DS_MCT P2 Repairs.xlsx XLSX spreadsheet
512-6634850F HVAC Arrangement and Details Engine Room_130758174.pdf PDF
NOAA Form 57-17-09 - Hot Work Permit.pdf PDF
Weight Reporting Spreadsheet.docx DOCX document
624-6634931 Joiner Door Schedule.pdf PDF
512-3275003-8 HVAC MODS MN DECK REV B.pdf PDF
TJ-233-03 EMD Engine_Maintenance Instruction_1722 Rev I.pdf PDF
085-6980295E TJ Tank Capacities _ Soundings.pdf PDF
TJ-233-01 Detroit Diesel 6V92.pdf PDF
321-3274004-3A HVAC Elec Control Mods Incdt HVAC Mods.pdf PDF
505-6634825 Standard Piping Details.pdf PDF
321-3274004-2A HVAC Electrical Pwr Mods Incdt HVAC Mods.pdf PDF
NOAA StandardSpecification AMC-505-2_Hydrostatic Pressure Tests.pdf PDF
NOAA Standard Specification AMC-300-1 Overhaul of Electrical Rotating Machinery.pdf PDF
514-3275003-12 Rev A AC PP INSTALL FCSLE DK _ ABV.pdf PDF
514-3275003-6 REV A AC PIPING INSTL 2ND DK _ BLW.pdf PDF
TJ-241-01 Reduction Gear Main Propulstion RS2719S.pdf PDF
512-004_-_HVAC Makeup Air Modifications.pdf PDF
TJ-436-01A - Consilium Salwico CS4000 Operations Manual.pdf PDF
TJ-233-03 EMD Engine 12-645F7B.pdf PDF
985-6634639 REV N Fire Control Plan Final_123787221_123332124.pdf PDF
085-002H Booklet of General Plans.pdf PDF
Mathers Control Drawings.pdf PDF
514-003_-_Refrigerant System and Condensate Piping Modifications.pdf PDF
NOAA Standard Specification AMC-635-2 Thermal Insulation for Compartments.pdf PDF
NF 57-17-09 - Hot Work Permit.pdf PDF
NOAA Standard Specification 000-1H General Requirements for Ship Repair Contract Work.pdf PDF
501-6634837C Reach Rod ARR _ Details.pdf PDF
101-6634906 Structural standards.pdf PDF
NOAA Standard Specification MOC-635-1 Thermal Insulation for Piping.pdf PDF
320-6634679_E Cableway Arrangement and Details - AS BUILT.pdf PDF
514-3275003-11 REV A AC PIPING INSTL MN DK.pdf PDF
803-3275003-10 TJ HVAC Upgrade Engineering Data Package.pdf PDF
NOAA General Technical Requirements (GTR) Rev -.pdf PDF
525-6634754F Fill Vents and Sounds Arrangement _ Details.pdf PDF
TJ-651-02 Grease interceptor Gaylord Hood.pdf PDF
Show 40 more

Latest 50 of 73 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MOC-300-3

September 2000

NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION (NOAA)

MARINE OPERATIONS CENTER

STANDARD SPECIFICATION MOC-300-3

GENERAL REQUIREMENTS FOR ELECTRICAL/ELECTRONIC ITEMS

1. SCOPE. This specification provides general requirements for work performed on electrical and electronic systems.

2. REFERENCES.

2.1 IEEE STD 45-1988, Recommended Practice for Electric

Installations on Shipboard (series)

2.2 U. S. Coast Guard 46 CFR 110 through 113, “Subchapter J - Electrical Engineering”

3. REQUIREMENTS.

3.1 The contractor shall accomplish all work in these

specifications in accordance with the requirements of References

2.1 and 2.2, and using the best marine and shipbuilding practices.

3.2 The quality of all materials provided by the contractor

shall be in accordance with References 2.1 and 2.2, suitable for marine service, and have the same shape, color, and finish as the existing or damaged materials when they were new.

3.3 All new cabling shall be low smoke and sized for the cable’s intended use.

3.4 All machinery, piping, cabling, ducts, insulation, paint

work, deck tile, or any other article removed, disturbed, or damaged in the process of accomplishing the work required by these specifications shall be replaced, renewed, or repaired.

All paneling removed shall be replaced, including any required alterations. Paneling damaged by the contractor shall be renewed equal to the original when new. All flanges and joints broken or loosened shall be properly remade using new gaskets of the proper size and material.

3.5 All electronic racks installed shall be securely fastened to overhead and deck structural or steel members to prevent movement.

3.6 Any disturbed painted or varnished surfaces shall be

cleaned, painted, and/or varnished with original type and color of paint or varnish.

MOC-300-3

September 2000

3.7 Any extension of electrical cabling shall be through a

junction box. Any removal of electrical cabling shall be to the nearest junction box.

3.8 All electrical junction boxes, receptacles, hangers, and

miscellaneous electrical fittings shall be in accordance with References 2.1 and 2.2.

3.9 All electrical cabling installed by the contractor shall be run behind paneling in existing cableways and shall be securely banded to the hangers. If existing cableways are not available, new cableways shall be established.

3.10 All electrical cabling installed by the contractor shall be identified at each end with embossed metal tags. Where cables are marked within a junction or terminal box, nonconductive labels shall be used. The contractor shall number cabling with a marking system similar to that used on the ship.

3.11 All manufacturer's or supplier's standard warranties on

equipment installed on the ship shall be assigned in writing by the contractor to the Government.

3.12 Three copies all manufacturer's technical manuals, prints, and drawings shall be delivered to the COTR. Spare parts and surplus installation materials shall be delivered to the COTR.

4. QUALITY ASSURANCE.

4.1 All items disturbed and all devices used, repaired, altered, furnished, or installed by the contractor shall be demonstrated to be fully operational upon completion of work.

END OF SPECIFICATION

Page 1
Page 2

File details come from the government source that posted it. Updated .