MOC-573-2 Overhaul Repair of Hydraulic Cylinders.pdf

PDF 23 KB Posted

Attached to
Drawings/References for the THOMAS JEFFERSON Dockside Repairs FY23
Solicitation number
1305M222QNMAN0068
Issued by

View the file

Other files

File Type Posted
SNAME Technical and Research Bulletin 4-16_Calculations for Merchant Ship HVAC Design (2015).pdf PDF
NOAA Thomas Jefferson Ships Registry TTS.pdf PDF
NOAA Thomas Jefferson Procedure 1701-09 TJ - Hot Work Operations.pdf PDF
TJ_FY23_DS_Gauge Meter Inventory (Updated 20220601).pdf PDF
Register of Lifting Appliances_fillable.pdf PDF
NAVSEA Standard Item 009-32_Cleaning and Painting Requirements.pdf PDF
Calculations for Merchant Ship HVAC Design (2015).pdf PDF
320-6634679_E Cableway Arrangement and Details - AS BUILT(1).pdf PDF
Document locations.pdf PDF
TJ-152-002B Deck Extension Structure _ Grating Replacement_131148294.pdf PDF
301-001_C_Electrical One Line Dia - AS BUILT.pdf PDF
ABS Marine Vessel Rules.pdf PDF
Appendix I to Part 1918_ Title 29 (up to date as of 6-21-2022).pdf PDF
TJ_FY23_DS_MCT P2 Repairs.xlsx XLSX spreadsheet
512-6634850F HVAC Arrangement and Details Engine Room_130758174.pdf PDF
NOAA Form 57-17-09 - Hot Work Permit.pdf PDF
Weight Reporting Spreadsheet.docx DOCX document
NOAA Standard Specifications MOC-300-3_General Requirements for Electrical_Electronic Items.pdf PDF
624-6634931 Joiner Door Schedule.pdf PDF
512-3275003-8 HVAC MODS MN DECK REV B.pdf PDF
TJ-233-03 EMD Engine_Maintenance Instruction_1722 Rev I.pdf PDF
085-6980295E TJ Tank Capacities _ Soundings.pdf PDF
TJ-233-01 Detroit Diesel 6V92.pdf PDF
321-3274004-3A HVAC Elec Control Mods Incdt HVAC Mods.pdf PDF
505-6634825 Standard Piping Details.pdf PDF
321-3274004-2A HVAC Electrical Pwr Mods Incdt HVAC Mods.pdf PDF
NOAA StandardSpecification AMC-505-2_Hydrostatic Pressure Tests.pdf PDF
NOAA Standard Specification AMC-300-1 Overhaul of Electrical Rotating Machinery.pdf PDF
514-3275003-12 Rev A AC PP INSTALL FCSLE DK _ ABV.pdf PDF
514-3275003-6 REV A AC PIPING INSTL 2ND DK _ BLW.pdf PDF
TJ-241-01 Reduction Gear Main Propulstion RS2719S.pdf PDF
512-004_-_HVAC Makeup Air Modifications.pdf PDF
TJ-436-01A - Consilium Salwico CS4000 Operations Manual.pdf PDF
TJ-233-03 EMD Engine 12-645F7B.pdf PDF
985-6634639 REV N Fire Control Plan Final_123787221_123332124.pdf PDF
085-002H Booklet of General Plans.pdf PDF
Mathers Control Drawings.pdf PDF
514-003_-_Refrigerant System and Condensate Piping Modifications.pdf PDF
NOAA Standard Specification AMC-635-2 Thermal Insulation for Compartments.pdf PDF
NF 57-17-09 - Hot Work Permit.pdf PDF
NOAA Standard Specification 000-1H General Requirements for Ship Repair Contract Work.pdf PDF
501-6634837C Reach Rod ARR _ Details.pdf PDF
101-6634906 Structural standards.pdf PDF
NOAA Standard Specification MOC-635-1 Thermal Insulation for Piping.pdf PDF
320-6634679_E Cableway Arrangement and Details - AS BUILT.pdf PDF
514-3275003-11 REV A AC PIPING INSTL MN DK.pdf PDF
803-3275003-10 TJ HVAC Upgrade Engineering Data Package.pdf PDF
NOAA General Technical Requirements (GTR) Rev -.pdf PDF
525-6634754F Fill Vents and Sounds Arrangement _ Details.pdf PDF
TJ-651-02 Grease interceptor Gaylord Hood.pdf PDF
Show 40 more

Latest 50 of 73 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MOC-573-2

September 2000

National Oceanic and Atmospheric Administration Marine Operation Center

Standard Specification MOC-573-2

OVERHAUL/REPAIR OF HYDRAULIC CYLINDERS

1. SCOPE: This specification provides the minimum requirements for the overhaul and/or repair of hydraulic cylinders.

2. REFERENCES

None

3. REQUIREMENTS

3.1 Tag out system controllers and actuators to preclude

inadvertent operation and secure the movable member to prevent movement while cylinder is removed.

3.1.1 Disconnect and cap hydraulic lines from the cylinder.

Ensure containment is provided to prevent spillage of oil.

Hydraulic lines and inlet/outlet ports shall be capped or plugged with threaded fittings to prevent leakage or contamination of the system.

3.1.2 Remove the cylinder from the ship and transport to

repair facility.

3.2 Perform the following work on the removed cylinder:

3.2.1 Completely disassemble the cylinder and clean all

parts.

3.2.2 Prepare and preserve the external painted surfaces in

accordance with the identified painting specification or as original.

3.2.3 Reassemble the cylinder under clean conditions using

new "O" rings, seals, gaskets, packing, and piston rings.

Materials used shall meet or exceed original manufacturers specifications. During reassembly lubricate the above with a product equal to Hilton's Hyper-Lube, that is compatible with the system fluid.

3.2.4 Provide and install new nuts, washers, bolts, studs and inlet and outlet fittings.

3.3 Reinstall the cylinder in its original location.

MOC-573-2

September 2000

3.4 Top off hydraulic reservoir to full mark and purge all air from the system taking care to contain any fluid bled off.

3.5 Remove tag outs.

4. QUALITY ASSURANCE

4.1 After disassembly, inspect all components for trueness of bore and rod, wear, damage, corrosion or pitting. Provide a Condition Report detailing the inspection results, contractor's corrective action recommendations, and list of additional parts, material and labor not covered by this specification, required to restore the cylinder to the manufacturers specifications.

4.2 After reassembly, bench test the assembly at system working pressure to prove smoothness of operation and tightness of sealing surfaces.

4.3 Cycle the cylinder through a minimum of four evolutions to demonstrate operation and tightness of all disturbed fittings and connections. Upon satisfactory demonstration of operation and tightness apply "Denso tape" to all connections.

END OF SPECIFICATION