17-2- St George Cemetery Plaza BID TERMS.pdf

PDF 90 KB Posted

Attached to
IFB - ST GEORGE CEMETERY PLAZA
Solicitation number
26-298
Issued by
Washington County, Utah

About this file

This document is the Bid Terms for the St George Cemetery Plaza construction project, issued by the City of St. George, Utah, under Reference No. 26-298. The project involves the construction of a plaza at the St George Cemetery located at 100 S and 700 E. Bidders must submit complete proposals in strict accordance with all contract documents, drawings, and specifications, and are responsible for familiarizing themselves with existing site conditions. All work shall be performed subject to the City's approval, with the City maintaining sole authority over decisions regarding material quality, suitability, acceptability, drawing interpretation, and contract fulfillment. Each bidder must certify that their bid was prepared independently without consultation or agreement with competitors.

The contract requires a bid bond equal to 5% of the bid amount, issued by a surety company licensed in Utah, with the City named as obligee. Upon award, 100% payment and performance bonds will be required. Liquidated damages are assessed at $250.00 per calendar day for failure to complete work within the specified contract time, and an additional $250.00 per day for failure to repair deficiencies within ten days of notification. The City reserves the right to reject any or all proposals and to waive any formality or technicality in the interest of the municipality. No specific contract completion date, project budget, or award date is identified in this bid terms document.

View the file

Other files

Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BID TERMS

Project Name: St George Cemetery Plaza

Reference No: 26-298

Proposal of (“BIDDER"), organized and existing under the laws of the State of doing business as a corporation, partnership, or an individual (circle applicable status), to the City of St. George ("CITY"). Pursuant to and in compliance with the Public Notice, BIDDER hereby proposes to perform all Work for the above named Project in strict accordance with the Contract Documents, BIDDER'S Instructions, Drawings, Specifications, and other documents related thereto, the undersigned, having familiarized themselves with the existing conditions on the site and the conditions under which the work on the Drawings and in the Specifications is to be done, hereby proposes to furnish all labor, materials, equipment, incidental items, permits, fees, and services to perform all specified work on the above named project.

By submission of this BID, each BIDDER certifies, and in the case of a joint BID each party thereto certifies as to his own organization, that this BID has been arrived at independently, without consultation, communication, or agreement as to any matter relating to this BID with any other BIDDER or with any competitor.

All Work shall be in strict accordance with the Contract Documents and documents issued thereto and shall be installed at the price/prices set forth in the Contract Documents.

Bidder acknowledges that all Work shall be done subject to CITY’S approval. Decisions and questions as to the quality, suitability, and acceptability of the materials, interpretation of drawings and specifications, and acceptable fulfillment of the Contract by the BIDDER shall be made by CITY.

Of particular importance to be considered in the BID are the following:

CONTRACT TIME AND LIQUIDATED DAMAGES

The WORK is to be performed within the specified CONTRACT TIME. If the CONTRACTOR shall fail to complete the WORK within the CONTRACT TIME, or extension of time granted by the CITY, then the CONTRACTOR will pay the CITY LIQUIDATED DAMAGES assessed at the rates established as follows:

a. $250.00 (dollars) per day for each calendar day that the CONTRACTOR shall be in default after the CONTRACT TIME.

b. $250.00 (dollars) per day for failure to make repairs to deficiencies in the work within 10 days of notification to repair.

The rates specified in ‘b.’ above are cumulative and are in addition to LIQUIDATED DAMAGES assessed in association with the overall Contract Time as listed in ‘a.’ above.

Additional information on LIQUIDATED DAMAGES is provided in the GENERAL

CONDITIONS.