About this file
This file consists of 100% construction drawings for the Downtown Cemetery Columbarium Plaza project in St. George, Utah, prepared by Civil Science, Inc. and dated July 2026. The project involves the construction of a columbarium plaza at the St. George Cemetery located at 700 East and 100 South. The scope of work includes demolition of existing improvements, site preparation and grading, installation of concrete flatwork and brick pavers, landscape planting with trees and shrubs, irrigation system installation, and electrical infrastructure. The drawings comprise 19 sheets covering survey control, demolition plans, site plans, grading plans, construction details, landscape plans, irrigation plans, and electrical specifications and diagrams. The project requires coordination with multiple utility providers including St. George City Water Department, St. George Energy Services, Enbridge Gas, TDS Telecom, Lumen Communications, and Utah Tech University. Construction activities are limited to 7 AM to 7 PM on weekdays only, with no work permitted on weekends or holidays without owner approval.
The drawings establish comprehensive construction standards and specifications requiring contractor compliance with St. George City Standards, the International Plumbing Code, the Uniform Building Code, and OSHA and EPA requirements. All waterline work must be performed by contractors pre-qualified by the City of St. George Water Department, and all primary underground power work must be completed by contractors pre-qualified by St. George Energy Services. The contractor is responsible for utility locating, potholing, and protection of all existing utilities, with sole liability for any damages resulting from construction operations. A performance and payment bond requirement is established at 100%, with a bid bond of 5% required at the time of bid submission. The project contemplates careful coordination with cemetery operations, including sensitivity to burial plot locations, protection of existing monuments and headstones, and compliance with cemetery event scheduling. As-built drawings documenting exact locations of all utilities, valve boxes, and control devices must be provided upon project completion.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
X
X X
X
IRR
IRR
IRR
IRR
IRR
E
TABERNACLE ST.
1OO SOUTH
EA
ST
EA
ST
PROJECT LOCATION
VICINITY MAP
PROJECT MAP
(N.T.S.)
(N.T.S.)
DOWNTOWN CEMETERY COLUMBARIUM PLAZA
CONSTRUCTION DRAWINGS
ST. GEORGE, UT
JULY, 2026
OF
D O
W N
TO
W
N C
EM
ET
ER
Y
C O
LU
M
BA
R
IU
M
P
LA
ZA
ST
. G
EO
R
G E, U T
25539.00
JULY, 2026
CC, JG
JH, JG
G-001
COVER SHEET
1 12
M
AR
K D
AT
E
D
ES
C R
IP
TI
O N
R
EV
IS
IO
N S
R
EU
SE
O
F D
R A
W
IN
G S
TH
IS
D O
C U
M
EN
T
AN
D T
H E
ID
EA
S H
ER
EI
N A
R E
TH
E
PR
O
PE
R
TY
O
F C
IV
IL
S C
IE
N
C E, IN
C
. A N
D
IS
N O
T
TO
B E
R
EP
R O
D U
C
ED
, M O
D
IF
IE
D
O R
U
SE
D
IN
W H
O
LE
O R
IN
PA
R T, F O
R A
N Y
O
TH
ER
P
R O
JE
C
T O
R E
XT
EN
SI
O
N O
F
TH
IS
P
R O
JE
C
T
EX
C
EP
T
BY
W R
IT
TE
N A
U
TH
O R
IZ
AT
IO
N
O F
C
IV
IL
S
C
IE
N C
E, IN
C
PROJECT NO:
DATE:
DESIGN BY:
CHECKED BY:
FI
LE
N
AM
E:
L:
\U ta h\ Pr oj ec ts \A ct iv e
\IF
9.
St
. G eo rg e
C ity
D ow nt ow n C em et er y
C ol um ba riu m
P la za \8
C
AD
\8
Sh ee ts
\2
-G
-0
.d w g
- P
LO
TT
ED
:J
G O
FF
D
AT
E:
7/
/2
1:
P M
SHEET TITLE
S.
D ixi e D riv e, St e.
St . G eo rg e, UT
5.9
.0
1453 S DIXIE DRIVE, STE 150
ST. GEORGE, UT 84770
435.986.0100
175 EAST 200 NORTH
ST. GEORGE, UT 84770
435.627.4000
OWNERPREPARED BY
PROJECT ENGINEER
JACOB HOWELL, P.E.
DATE
LANDSCAPE ARCHITECT
JORDAN GOFF, PLA, ASLA
DATE
LANDSCAPE ARCHITECT, ST. GEORGE CITY
PAUL STEAD, PLA, ASLA
DATE
SHEET INDEX
SHEET
NO
SHEET
ID SHEET TITLE
1 G-001 COVER SHEET
2 G-002 GENERAL NOTES
3 G-003 LEGEND & ABBREVIATIONS
4 V-101 SURVEY CONTROL
5 C-101 DEMOLITION PLAN
6 C-201 SITE PLAN
7 C-301 GRADING PLAN
8 C-401 DETAILS
9 L-1 LANDSCAPE PLAN
10 LD-1 LANDSCAPE DETAILS
11 I-1 & 2 IRRIGATION PLAN
12 ID-1 & 2 IRRIGATION DETAILS
13 SE001 SYMBOLS & NOTES
14 SE002 ELECTRICAL SCHEDULES
15 SE003 ELECTRICAL SPECIFICATIONS
16 SE101 ELECTRICAL DEMOLITION PLAN
17 SE102 ELECTRICAL SITE PLAN
18 SE301 ONE-LINE DIAGRAM
19 SE401 ELECTRICAL DIAGRAMS
I-15
ST. GEORGE
CITY
ST. GEORGE BLVD
R
IV
ER
R
D
BL
U
FF
S
T
PROJECT
LOCATION
7/20/26
7/20/26
OF
D O
W N
TO
W
N C
EM
ET
ER
Y
C O
LU
M
BA
R
IU
M
P
LA
ZA
ST
. G
EO
R
G E, U T
25539.00
JULY, 2026
CC, JG
JH, JG
G-002
GENERAL
NOTES
2 12
M
AR
K D
AT
E
D
ES
C R
IP
TI
O N
R
EV
IS
IO
N S
R
EU
SE
O
F D
R A
W
IN
G S
TH
IS
D O
C U
M
EN
T
AN
D T
H E
ID
EA
S H
ER
EI
N A
R E
TH
E
PR
O
PE
R
TY
O
F C
IV
IL
S C
IE
N
C E, IN
C
. A N
D
IS
N O
T
TO
B E
R
EP
R O
D U
C
ED
, M O
D
IF
IE
D
O R
U
SE
D
IN
W H
O
LE
O R
IN
PA
R T, F O
R A
N Y
O
TH
ER
P
R O
JE
C
T O
R E
XT
EN
SI
O
N O
F
TH
IS
P
R O
JE
C
T
EX
C
EP
T
BY
W R
IT
TE
N A
U
TH
O R
IZ
AT
IO
N
O F
C
IV
IL
S
C
IE
N C
E, IN
C
PROJECT NO:
DATE:
DESIGN BY:
CHECKED BY:
FI
LE
N
AM
E:
L:
\U ta h\ Pr oj ec ts \A ct iv e
\IF
9.
St
. G eo rg e
C ity
D ow nt ow n C em et er y
C ol um ba riu m
P la za \8
C
AD
\8
Sh ee ts
\2
-G
-0
.d w g
- P
LO
TT
ED
:J
G O
FF
D
AT
E:
7/
/2
1:
P M
SHEET TITLE
S.
D ixi e D riv e, St e.
St . G eo rg e, UT
5.9
.0
1. STANDARD DRAWINGS & SPECIFICATIONS: ALL CONSTRUCTION SHALL CONFORM TO ST. GEORGE CITY STANDARDS, UNLESS
SPECIFIED OTHERWISE.
2. PROPERTY & CONSTRUCTION LIMITS: ALL CONSTRUCTION WORK INCLUDING VEHICLES, EQUIPMENT, MATERIALS, ETC. SHALL BE KEPT WITHIN THE PROJECT BOUNDARIES. CONSTRUCTION IS INTENDED TO BE WITHIN THE SITE PROPERTY LIMITS. ANY WORK BEYOND CONSTRUCTION LIMITS IS TO BE APPROVED BY OWNER OR ENGINEER'S REPRESENTATIVE. THE CONTRACTOR SHALL BE RESPONSIBLE TO OBTAIN WRITTEN RIGHT OF INGRESS AND EGRESS SHOULD THEY VENTURE ONTO
PRIVATE PROPERTY WHICH IS NOT INCLUDED IN CONSTRUCTION LIMITS.
3. EXISTING IMPROVEMENTS: CONTRACTOR SHALL TAKE NECESSARY MEASURES TO PRESERVE AND PROTECT EXISTING STRUCTURES, WALLS, DRIVEWAYS, TRAFFIC SIGNS, WATERWAYS, FENCES, LANDSCAPING, TREES, RIPRAP, DITCHES, ASPHALT AND CONCRETE TRAILS, CURB AND GUTTER, MAILBOXES, SIDEWALK, AND OTHER IMPROVEMENTS. ANY SUCH IMPROVEMENTS REMOVED OR DAMAGED BY CONTRACTOR'S ACTIVITY SHALL BE REPLACED OR REPAIRED TO ORIGINAL OR BETTER CONDITION ACCORDING TO THE SPECIFICATIONS OF THE GOVERNMENTAL ENTITY HAVING JURISDICTION, AT THE
SOLE EXPENSE OF THE CONTRACTOR.
4. TESTING: THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL REQUIRED INSPECTION AND TESTING. WORK CONCEALED WITHOUT THE REQUIRED INSPECTION OR TESTING SHALL BE SUBJECT TO EXPOSURE AT THE CONTRACTOR'S SOLE
EXPENSE.
5. NON-CONFORMING WORK: WORK PERFORMED WHICH IS NOT IN CONFORMANCE WITH THE DRAWINGS AND/OR SPECIFICATIONS OR WITHOUT OWNER OR ENGINEER REPRESENTATIVE'S APPROVAL SHALL BE SUBJECT TO REMOVAL AND
REPLACEMENT AT THE CONTRACTOR'S SOLE EXPENSE.
6. WORK HOURS & CONSTRUCTION NOISE: THE CONTRACTOR SHALL LIMIT CONSTRUCTION ACTIVITIES FROM 7 AM TO 7 PM ONLY AND NO CONSTRUCTION WORK WILL BE ALLOWED ON SATURDAYS, SUNDAYS, OR HOLIDAYS OBSERVED BY THE
OWNER UNLESS OTHERWISE APPROVED BY THE OWNER OR ENGINEER'S REPRESENTATIVE.
7. OSHA COMPLIANCE: IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO ENSURE THAT ALL OSHA REGULATIONS AND
STANDARDS ARE COMPLIED WITH ON THE PROJECT SITE DURING THE CONSTRUCTION PERIOD.
8. EPA COMPLIANCE: THE CONTRACTOR SHALL MEET ALL DEPARTMENT OF ENVIRONMENTAL QUALITY AND U.S. EPA
REQUIREMENTS.
9. CONSTRUCTION ACTIVITIES: IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO PERFORM CONSTRUCTION ACTIVITIES PER THE CONTRACT DOCUMENTS. ANY ADDITIONS, DELETIONS, OR MODIFICATIONS SHALL FIRST MEET WITH THE WRITTEN
APPROVAL OF THE OWNER OR ENGINEER'S REPRESENTATIVE.
10. SETTLEMENT: CONTRACTOR SHALL BE RESPONSIBLE FOR CORRECTING ANY SETTLEMENT OF EXCAVATIONS, AND ANY
DAMAGE OF UTILITIES RESULTING FROM SETTLEMENT.
11. SURVEY MONUMENTS: CONTRACTOR SHALL NOT DESTROY, REMOVE, OR DISTURB ANY EXISTING SURVEY MONUMENTS WITHOUT AUTHORIZATION OF CONTROLLING AGENCY. NO PAVEMENT CUTTING OR REMOVAL SHALL BEGIN UNTIL ALL SURVEY MARKERS OR MONUMENT POINTS THAT HAVE THE POTENTIAL OF BEING DISTURBED BY THE CONSTRUCTION OPERATIONS HAVE BEEN PROPERLY REFERENCED BY A REGISTERED LAND SURVEYOR. ALL SURVEY MONUMENTS OR POINTS DISTURBED BY THE CONTRACTOR SHALL BE ACCURATELY RESET BY A REGISTERED LAND SURVEYOR AFTER ALL
RESTORATION AND RESURFACING HAS BEEN COMPLETED.
12. LANDSCAPE RESTORATION: CONTRACTOR SHALL STRIP, STOCKPILE, AND REPLACE EXISTING TOP SOIL (MINIMUM TOP 12 INCHES OF MATERIAL) WITHIN THE TRENCH CUT. CONTRACTOR SHALL GRADE AND RESTORE GROUND MATCHING OR EXCEEDING ORIGINAL LANDSCAPING CONDITIONS. THIS INCLUDES, BUT NOT LIMITED TO: TOPSOIL, GRASS, TREES, CONCRETE TRAIL, BOLLARDS, SPRINKLERS AND LANDSCAPE ROCKS, BARK AND VEGETATION. COORDINATE WITH OWNER ON
LANDSCAPING PRIOR TO RESTORATION.
13. DISCREPANCIES, OMISSIONS AND CONFLICTS: THE CONTRACTOR SHALL NOTIFY THE OWNER OR ENGINEER'S REPRESENTATIVE OF ANY DISCREPANCIES, OMISSIONS OR CONFLICTS BETWEEN THE VARIOUS ELEMENTS OF THE
DRAWINGS AND/OR SPECIFICATIONS BEFORE PROCEEDING WITH RELATED WORK.
14. CONSTRUCTION TIMELINE: THE CONTRACTOR RECOGNIZES THAT TIME IS OF THE ESSENCE WITH THIS PROJECT AND SHALL SELECT AND UTILIZE LABOR, EQUIPMENT, AND MATERIALS THAT MINIMIZE THE CONSTRUCTION TIMELINE. THE CONTRACTOR SHALL ALSO REGULARLY APPRISE THE OWNER OR ENGINEER'S REPRESENTATIVE OF THE ELEMENTS REQUIRING LONG
LEAD, INSTALLATION OR CURE TIMES.
15. PRE-CONSTRUCTION DOCUMENTATION: PRIOR TO CONSTRUCTION, THE CONTRACTOR IS REQUIRED TO DOCUMENT WITH DIGITAL PHOTOGRAPH OR VIDEO THE EXISTING DRIVEWAYS, WALL, FENCES, SIDEWALKS, LANDSCAPING AND ALL OTHER ELEMENTS THAT WILL BE DISTURBED BY CONSTRUCTION. THE DOCUMENTATION MUST BE PROVIDED UPON THE REQUEST
OF THE OWNER OR ENGINEER'S REPRESENTATIVE.
16. INCIDENTAL WORK: WORK INTENDED BY THE DRAWINGS AND SPECIFICATIONS, BUT NOT SPECIFICALLY IDENTIFIED IN A
PARTICULAR BID ITEM SHALL BE CONSIDERED INCIDENTAL TO THE OTHER BID ITEMS.
17. LEGAL DISPOSAL: ANY DEBRIS RESULTING FROM THE PROJECT IS TO BE DISPOSED OF BY THE CONTRACTOR. THE CONTRACTOR SHALL MAKE ARRANGEMENTS FOR DISPOSAL SITES AT WHICH DEBRIS MAY BE LAWFULLY WASTED.
GENERAL NOTES
1. EXISTING UTILITIES: UTILITIES SHOWN ON THE DRAWINGS ARE BASED ON THE BEST AVAILABLE INFORMATION PROVIDED BY OTHERS, AND SHOULD BE CONSIDERED APPROXIMATE AND FOR GENERAL INFORMATION ONLY. CONTRACTOR IS RESPONSIBLE TO LOCATE AND PROTECT ALL UTILITIES IN THE PROJECT AREA, INCLUDING THOSE THAT MAY NOT BE SHOWN OR THAT MAY BE SHOWN INCORRECTLY. CONTRACTOR IS SOLELY RESPONSIBLE FOR THE REPAIR OF ANY UTILITY DAMAGED AS A RESULT OF THE CONTRACTOR'S OPERATIONS. RELOCATIONS AND/OR REPLACEMENTS OF EXISTING UTILITIES SHALL BE COORDINATED BY THE CONTRACTOR WITH THE UTILITY OWNER. CONTRACTOR SHALL CONTACT, SCHEDULE, AND ESTABLISH UTILITY SHUT DOWN TIMES AND DETERMINE THE RELOCATION AND/OR REPLACEMENT REQUIREMENTS OF
EXISTING UTILITIES PRIOR TO THE START OF ANY WORK.
2. UTILITY FIELD VERIFICATION: CONTRACTOR SHALL FIELD VERIFY LOCATIONS AND INVERT ELEVATIONS OF EXISTING MANHOLES, PIPE SIZES AND OTHER UTILITIES BEFORE CONSTRUCTING ANY NEW SEWER, WATER, STORM DRAIN OR OTHER UTILITY LINES. REPORT ANY DISCREPANCIES BETWEEN EXPECTED LOCATION AND ACTUAL LOCATION TO THE OWNER OR
ENGINEER'S REPRESENTATIVE IMMEDIATELY.
3. ALIGNMENT & DEPTH: LAY PIPE TO DEPTH OR SPECIFIC SLOPE AND ALONG HORIZONTAL ALIGNMENT AS DEFINED IN THESE DRAWINGS. CONTRACTOR SHALL NOT DEVIATE FROM PROPOSED ALIGNMENT OR DEPTH. GRAVITY PIPE INSTALLATION SHALL REQUIRE LASER GRADE LINE BE USED AND WILL BE CHECKED PRIOR TO ANY PIPE ACCEPTANCE.
4. UTILITY IMPACTS: AVOID EXISTING UTILITIES WHERE POSSIBLE. WHERE IMPACTS TO UTILITIES ARE EXPECTED OR ENCOUNTERED, COORDINATE RELATED CONSTRUCTION ACTIVITIES AND REQUIRED UTILITY MODIFICATION WITH UTILITY OWNERS AND OWNER OR ENGINEER'S REPRESENTATIVE. THE CONTRACTOR SHALL INFORM AND COORDINATE PLANNED PROJECT CONSTRUCTION WITH ALL UTILITY OWNERS WITHIN PROJECT AREA PRIOR TO CONSTRUCTION.
UTILITY NOTES
1. CONTRACTOR SHALL SUBMIT TRAFFIC CONTROL PLAN AND ALL SIGNING BARRICADES AND TRAFFIC DELINEATION SHALL CONFORM TO THE PROJECT SPECIFICATIONS AND THE MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES - CURRENT EDITION. ALL TRAFFIC CONTROL PLANS ARE TO BE APPROVED BY OWNER OR ENGINEER'S REPRESENTATIVE PRIOR TO TRAFFIC CONTROL IMPLEMENTATION. PROVIDE A MINIMUM OF ONE WEEK FOR TRAFFIC CONTROL REVIEW AND APPROVAL.
2. CONTRACTOR SHALL MAINTAIN TWO-WAY TRAFFIC AT ALL TIMES WHILE CONSTRUCTION OCCURS AND ACCOMMODATE
LOCAL AND THROUGH TRAFFIC. CONTRACTOR MAY NOT DISRUPT MAIL SERVICE TO RESIDENTS.
3. ALL LOCAL CITIES, COUNTIES, EMERGENCY SERVICES (I.E. HOSPITALS), SCHOOL DISTRICTS, AND PROPERTY OWNERS SHALL BE NOTIFIED OF LANE LIMITATION AND/OR ROAD CLOSURES 14 DAYS PRIOR TO COMMENCEMENT OF LIMITATION OR CLOSURE. CENTRAL DISPATCH OF EACH IMPACTED AGENCY AND ADJOINING ENTITIES SHALL RECEIVE NOTIFICATION.
4. BASE COURSE MATERIAL SHALL NOT BE PLACED ON THE SUBGRADE UNTIL SUBGRADE REQUIREMENTS HAVE BEEN
COMPLETED AND ACCEPTED BY THE OWNER OR ENGINEER'S REPRESENTATIVE.
5. EXACT POINTS OF MATCHING, TERMINATION, OVERLAY AND PAVEMENT CUTTING MAY, WHERE APPLICABLE, BE DETERMINED
IN THE FIELD BY THE OWNER OR ENGINEER'S REPRESENTATIVE.
6. NO PAVING CONSTRUCTION SHALL BE STARTED UNTIL ALL UNDERGROUND UTILITIES WITHIN THE ROADWAY ARE
COMPLETED AND HAVE PASSED TESTING REQUIREMENTS.
7. ALL GRINDING AND/OR EPOXY PATCHING OF DAMAGED OR INCORRECTLY INSTALLED ELEMENTS SHALL NOT BE PERMITTED.
ALL REPAIRS SHALL BE MADE BY REPLACING WHOLE UNITS.
8. NO MATERIALS OR EQUIPMENT OF ANY KIND SHALL BE STORED OR STOCKPILED ON NEWLY PAVED ASPHALT OR CONCRETE
SURFACES.
9. ALL NEW PAVEMENTS AND CONCRETE SURFACE SHALL BE SWEPT CLEAN AND DEBRIS PROPERLY DISPOSED OF AND ALL SURVEY MONUMENTS SHALL BE FULLY INSTALLED AS WELL AS ALL UTILITY ADJUSTMENTS MADE PRIOR TO THE OWNER OR
ENGINEER'S REPRESENTATIVE RECOMMENDING FINAL ACCEPTANCE.
10. ALL PAVEMENT MARKINGS SHALL COMPLY WITH THE REQUIREMENTS OF THE MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES - CURRENT EDITION AND INSTALLED WITHIN FIVE DAYS OF COMPLETION OF THE FINAL LIFT OF ASPHALT.
CONTRACTOR SHALL SPOT MARK THE ENTIRE PROJECT BEFORE APPLYING ANY PAVEMENT MARKINGS AND NOTIFY THE OWNER OR ENGINEER'S REPRESENTATIVE FOR ACCEPTANCE BEFORE APPLYING ANY PERMANENT MARKINGS.
11. WHEN STRIPING OBLITERATION IS REQUIRED, IT SHALL BE ACCOMPLISHED BY WATER BLASTING UNLESS OTHERWISE APPROVED BY OWNER OR ENGINEER'S REPRESENTATIVE AND MAY BE REQUIRED BEYOND THE PROJECT LIMITS SO THAT THE NEW STRIPING WILL MATCH PERMANENT EXISTING PAVEMENT MARKINGS. IF OBLITERATION CAUSES SHADOWING, OR IN THE OPINION OF THE OWNER OR ENGINEER'S REPRESENTATIVE WILL CAUSE CONFUSION ON THE PART OF THE DRIVER, THE CONTRACTOR SHALL SEAL THE AREA WITH SLURRY. APPLYING PAINT OVER STRIPING SHALL NOT CONSTITUTE STRIPE
OBLITERATION.
ROADWAY & TRAFFIC CONTROL NOTES
UTILITY CONFLICT INFORMATION
UTILITY COMPANY CONTACT NAME UTILITY TELEPHONE
ST. GEORGE CITY KADE BRINGHURST SEWER & WATER 435-632-4001
ST. GEORGE CITY BARBARA BERRETT POWER 435-627-4896
LUMEN ROBERT VIGIL COMMUNICATION 801-238-0235
TDS TELECOM TIM WEESE CABLE 435-879-5201
ENBRIDGE GAS MARK HANSEN GAS 435-627-4896
UTAH TECH UNIVERSITY JON GIBB ELECTRIC, FIBER, GAS,
WATER, & SEWER 435-652-7551
1. ALL WATERLINE WORKS MUST BE INSTALLED BY A CONTRACTOR THAT HAS BEEN PRE-QUALIFIED BY THE CITY OF ST.
GEORGE WATER DEPARTMENT.
2. ALL CONSTRUCTION SHALL CONFORM TO THE “CITY OF ST. GEORGE STANDARD SPECIFICATIONS FOR DESIGN AND CONSTRUCTION”, “THE INTERNATIONAL PLUMBING CODE”, AND THE “UNIFORM BUILDING CODE” LATEST EDITION AS
ADMINISTERED BY THE CITY OF ST. GEORGE.
3. CONTRACTOR SHALL POTHOLE ALL PIPELINES AND VERIFY LOCATION AND DEPTH PRIOR TO PROCEEDING WITH ANY BUILDING OR PIPELINE CONSTRUCTION. IF THE IN-FIELD CONDITION VARIES FROM DESIGN THE CONTRACTOR IS RESPONSIBLE FOR COSTS DUE TO CHANGES IN CONDITION. CITY MAPS ARE “BEST KNOWLEDGE” AND APPROXIMATE.
4. THE POTABLE WATER SUPPLY TO LAWN IRRIGATION SYSTEMS SHALL BE PROTECTED AGAINST BACKFLOW PER THE “INTERNATIONAL PLUMBING CODE (IPC)” SECTION 608.16.5 AND FIRE SPRINKLER SYSTEMS PER (IPC) 608.16.4.
5. ALL BACKFLOW ASSEMBLY INSTALLATION AND TEST REQUIREMENTS SHALL BE IN ACCORDANCE WITH THE CITY OF ST.
GEORGE BACKFLOW ORDINANCE 9-1-1997-5-6-5.
6. 14 GAUGE WIRE SHALL BE TAPED TO ALL WATER LINES FOR LOCATING PURPOSES. THE WIRE SHALL ALSO BE BROUGHT UP
AT EACH VALVE BOX AND HYDRANT.
7. THRUST RESTRAINT ON THE NEW PIPELINE WILL BE AS SHOWN ON THE DETAILS. USE MEGA-LUG ON THE FITTINGS AND
FIELD LOCK GASKETS ON THE REQUIRED LENGTH OF RESTRAINED PIPE.
8. ASPHALT REPLACED OVER THE PIPE TRENCHING IS TO MATCH EXISTING PAVEMENT DEPTHS WITH A 6” OVER CUT FROM
EDGE OF THE TRENCH ON EACH SIDE OF THE TRENCH.
9. CONTRACTORS SHALL CUT OFF AND CAP (BACK AT THE WATER MAIN), ALL EXISTING SERVICE LINES OR UNUSED STUB LINES
THAT WILL BE ABANDONED.
10. ANY CHANGES MADE IN THE FIELD MUST BE FIRST APPROVED AND DOCUMENTED BY THE CITY OF ST. GEORGE WATER
SERVICES REPRESENTATIVE.
11. ALL NEW FIRE HYDRANTS SHALL BE INSTALLED AT THE CORRECT HEIGHT. RISERS WILL NOT BE ALLOWED.
12. IRRIGATION WATER WORKS MAY REQUIRE ADDITIONAL APPROVALS FROM RESPECTIVE IRRIGATION COMPANIES.
CITY OF ST. GEORGE WATER NOTES
1. NO SEWER UNDER 9’ DEEP UNLESS APPROVED BY THE CITY OF ST. GEORGE.
2. ANY SEWERS NOT IN PUBLIC STREETS SHALL SHOW RECORDED EASEMENTS.
3. BUILDINGS MAY REQUIRE INTERCEPTORS AT A LATER DATE.
4. ALL SEWER MANHOLES SHALL HAVE “CITY OF ST GEORGE” LOGO LIDS FOR FINAL INSPECTION.
5. 100’ MAXIMUM SPACE BETWEEN SEWER LATERAL CLEANOUTS.
6. ALL CONSTRUCTION SHALL CONFORM TO THE “CITY OF ST. GEORGE STANDARD SPECIFICATIONS FOR DESIGN AND
CONSTRUCTION”, “THE INTERNATIONAL PLUMBING CODE”, AND THE “UNIFOM BUILDING CODE” LATEST EDITION AS
ADMINISTERED BY THE CITY OF ST. GEORGE
CITY OF ST. GEORGE WASTEWATER NOTES
1. PRIMARY POWER FROM SWITCH TO SWITCH SHALL BE 750 WIRE IN 3” CONDUIT (90°C TEMP. RATING).
2. PRIMARY POWER FROM VAULT TO TRANSFORMER SHALL BE 1/0 WIRE IN 3” CONDUIT UNLESS OTHERWISE NOTED. ALL WIRE
SHALL HAVE A TEMPERATURE RATING OF 90°C.
3. SECONDARY POWER FROM TRANSFORMER TO METER: ALL WIRE SHALL HAVE A TEMPERATURE RATING OF 90°C AND
CONFORM TO CURRENT NEC REQUIREMENTS FOR ALLOWABLE AMPACITIES AND VOLTAGE DROP. WHERE SECONDARY POWER IS MAINTAINED BY ST. GEORGE ENERGY SERVICES (SGES), WIRE AND CONDUIT SIZES WILL BE SPECIFIED ON THE APPROVED JUC PLAN. SECONDARY WIRE MAINTAINED BY SGES SHALL BE ALUMINUM. OTHERWISE, SECONDARY WIRE AND
CONDUIT SHALL BE SIZED BY THE BUILDING ELECTRICAL ENGINEER.
4. CONTRACTOR TO FOLLOW ALL BLUE STAKES PROTOCOLS.
5. THE POWER DESIGN ON THIS UTILITY PLAN IS CONSIDERED BY SGES AS PRELIMINARY AND NON-BIDABLE UNTIL
ACCOMPANIED BY A JUC APPROVAL STAMP.
6. ALL PRIMARY UNDERGROUND POWER WORK AND STREET LIGHT INSTALLATION MUST BE PROVIDED AND INSTALLED BY A
CONTRACTOR THAT HAS BEEN PREQUALIFIED BY SGES AND MEET ALL SGES STANDARDS. ALL OVERHEAD WORK/INSTALLATION MUST BE COMPLETED BY SGES. INSPECTION FEES AND OTHER APPLICABLE COSTS ASSESSED BY SGES UPON JUC APPROVAL SHALL BE PAID PRIOR TO A PERMIT BEING ISSUED. OVERHEAD POWER OR OTHER WORK COMPLETED BY SGES WILL BE BILLED TO THE PREQUALIFIED CONTRACTOR/OWNER AND PAID PRIOR TO THE FINAL
INSPECTION.
7. IT IS THE RESPONSIBILITY OF THE OWNER TO PROVIDE LOCATIONS, ELEVATIONS, AND APPLICABLE EASEMENTS FOR EACH OF THE POWER FACILITIES THAT ARE TO BE INSTALLED WITH THE PROJECT. THE FINAL GRADE OF THE AREA/EASEMENT SHALL BE ESTABLISHED BEFORE CONSTRUCTION CAN BEGIN FOR ANY BURIED POWER, PAD MOUNT EQUIPMENT, OR OVERHEAD POWER. IF THE GRADE CHANGES AFTER THE CONSTRUCTION HAS BEEN COMPLETED, THE COST TO CHANGE THE ELEVATION SHALL BE BILLABLE TO THE OWNER. PAD MOUNT EQUIPMENT IS TYPICALLY PLACED 6-FT BEHIND TBC BUT SHALL NOT BE LESS THAN PAD MOUNT CLEARANCES IDENTIFIED IN THE CURRENT SGES UNDERGROUND STANDARDS.
CONTRACTOR SHALL PROVIDE APPLICABLE CONTROL SUCH AS TBC LOCATION AND ELEVATION, OR OTHER, PRIOR TO
PLACEMENT OF ELECTRICAL EQUIPMENT.
8. ALL JUC TRENCHES WILL BE BACKFILLED AND COMPACTED IN 6” TO 8” LIFTS TO A COMPACTION OF 95% IN ROADWAYS/SIDEWALKS AND 90% BEHIND SIDEWALK. TESTING IS TO BE DONE AT MIDDLE AND TOP OF TRENCH. TRENCH CONSTRUCTION SHALL CONFORM TO SGES DETAILS D13, D14, D15, & D18. ALTERNATE TRENCH CONSTRUCTION SHALL BE APPROVED BY SGES PRIOR TO INSTALLATION. TRANSFORMER PADS AND OTHER HEAVY ELECTRICAL EQUIPMENT SHALL BE BACKFILLED AND COMPACTED IN 6” TO 8” LIFTS TO A COMPACTION OF 95%. FIELD DENSITY REPORTS FROM AN ACCREDITED GEOTECHNICAL ENGINEERING COMPANY SHALL BE SUBMITTED TO THE SGES ENGINEERING DEPARTMENT UPON
COMPLETION OF THE PROJECT.
9. ALL CHANGES TO EXISTING GRADES NEAR EXISTING POWER UTILITIES MUST BE APPROVED BY SGES PRIOR TO
CONSTRUCTION.
10. ANY IN-FIELD CHANGES TO THE JUC APPROVED POWER DESIGN WILL BE AT THE DEVELOPER’S EXPENSE AND MUST BE
PRE-APPROVED AND DOCUMENTED BY SGES PRIOR TO INSTALLATION.
11. LANDSCAPING AROUND ALL PRIMARY POWER EQUIPMENT SHALL CONFORM TO SGES STANDARDS AND APPLICABLE SGES DETAILS. TREES PLANTED UNDER OVERHEAD POWER SHALL NOT GROW MORE THAN 15-FT WHEN FULLY MATURED. MATURE VEGETATION SHALL NOT OBSTRUCT SGES ACCESS TO OR INTO PAD MOUNT EQUIPMENT. NO ABOVE-GROUND IRRIGATION SYSTEMS ARE PERMITTED WITHIN 10-FT AROUND THE EQUIPMENT PADS. LANDSCAPE ROCK SHALL NOT EXCEED 1"
DIAMETER.
12. PLEASE REFERENCE THE CURRENT SGES UNDERGROUND STANDARDS FOR INFORMATION ON INSTALLATION GUIDELINES AND METERING STANDARDS. COORDINATE EQUIPMENT MARKING AND TAGGING REQUIREMENTS WITH THE SGES INPECTOR.
ST. GEORGE ENERGY SERVICES POWER NOTES
1. CALL ENBRIDGE GAS (FORMERLY DOMINION GAS) AT 801-324-3370, 48 HOURS PRIOR TO WORKING WITHIN 10 FEET OF ANY HIGH PRESSURE GAS LINE. THIS WILL SCHEDULE A COMPANY HIGH PRESSURE INSPECTOR TO BE PRESENT DURING
CONSTRUCTION ACTIVITIES NEAR THE HP GAS PIPELINES.
2. ALL HIGH PRESSURE GAS PIPELINES SHALL BE PROTECTED IN PLACE.
3. MAINTAIN AT LEAST 3 FEET HORIZONTAL AND 1 FOOT VERTICAL CLEARANCE, (OUTSIDE TO OUTSIDE) BETWEEN HIGH
PRESSURE GAS PIPELINES AND OTHER UTILITY PIPES, BOXES, MANHOLES, ETC.
4. NO VIBRATORY ON COMPACTION EQUIPMENT ALLOWED WITHIN 5 FEET OF THE OUTSIDE OF THE HIGH PRESSURE GAS LINE.
IF STATIC ROLLING OF THE ROAD BASE DOESN'T ACHIEVE MINIMUM COMPACTION SPECIFICATIONS, FLOW FILL WILL NEED TO BE USED OVER THE HP GAS PIPELINES. VIBRATORY PAVING EQUIPMENT IS OK TO USE OVER THE HP GAS PIPELINES.
5. FLOW FILL WILL ALSO NEED TO BE USED TO BACKFILL PROPOSED UTILITY CROSSINGS WITH THE HIGH PRESSURE GAS LINE, WHEN THE VERTICAL CLEARANCE IS LESS THAN 2 FEET FROM OUTSIDE OF PIPE TO OUTSIDE OF PIPE. AT LEAST 12" MINIMUM FLOW SAND NEEDS TO BE INSTALLED DIRECTLY OVER THE HIGH PRESSURE GAS LINE, UNDER THE FLOW FILL. VISQUEEN PLASTIC NEEDS TO BE LAID OVER THE SAND TO PREVENT MIGRATION OF THE FLOW FILL INTO THE SAND.
6. CONTRACTOR TO PROVIDE ENBRIDGE GAS HP ENGINEER WITH A LIST OF CONSTRUCTION EQUIPMENT THAT WILL BE CROSSING AND WORKING OVER THE HIGH PRESSURE GAS PIPELINES. LOADING ANALYSIS NEEDS TO BE PERFORMED PRIOR TO THE START OF CONSTRUCTION TO DETERMINE IF THE EQUIPMENT IS SAFE TO CROSS THE HP GAS PIPELINES.
7. POTHOLES OF THE HIGH PRESSURE GAS PIPELINES SHALL BE DONE AT POINTS WHERE COVER DEPTHS ARE UNKNOWN, ESPECIALLY AT PROPOSED UTILITY CROSSINGS, SO THAT THE ABOVE REQUIREMENTS CAN BE FOLLOWED.
8. BLADED EXCAVATION VEHICLES SHALL NOT DROP THEIR BLADE TO CUT DIRECTLY OVER THE HIGH PRESSURE GAS LINES, WHERE THE COVER DEPTH IS LESS THAN 3 FEET. CAREFULLY DIG WITH A TRACKED EXCAVATOR ABOVE THE HIGH
PRESSURE GAS, WITH A COMPANY HIGH PRESSURE INSPECTOR OBSERVING.
ENBRIDGE GAS HP GAS NOTES
1. THE DEVELOPER WILL PROVIDE ALL REQUIRED TRENCH WITHIN THE PROJECT. ANY MODIFICATIONS ALONG THE PERIPHERY
TO FEED THIS PROJECT WILL BE BILLED TO THE DEVELOPER.
2. TDS WILL PLACE CONDUITS IN AN OPEN/JOINT TRENCH. PLEASE CONTACT TDS ENGINEERING AT 435-288-1415 AT LEAST 3
WEEKS PRIOR TO OPENING TRENCH TO CREATE DESIGN AND SCHEDULE WORK.
3. CONTACT TDS PRIOR TO CONSTRUCTING BUILDINGS FOR PREWIRE OPTIONS FOR FIBER OPTIC SERVICE. ANY OTHER QUESTIONS REGARDING CONSTRUCTION OF SERVICE SHOULD BE DIRECTED TO TDS ENGINEERING AT 435-288-1415.
4. RELOCATION OF NEW OR EXISTING TDS FACILITIES WILL BE BILLABLE TO THE DEVELOPER/CONTRACTOR.
5. ANY MODIFICATIONS AFTER CONDUIT/CABLE PLACEMENT WILL BE BILLABLE TO THE DEVELOPER/CONTRACTOR AS WILL
DAMAGES CAUSED BY OTHER CONTRACTORS WORKING FOR THE DEVELOPER ON THIS PROJECT.
TDS, CATV BROADBAND NOTES
1. DEVELOPER TO PLACE CONDUIT IN ALL JUC TRENCH AND STUB UP AT ALL POWER LOCATIONS. CONTACT LUMEN ENGINEER
FOR PRINT IF NEEDED.
2. LUMEN WILL PROVIDE ALL CONDUIT AND DELIVER TO JOB SITE. CALL 435-632-6553 SEVEN (7) DAYS PRIOR TO REQUIRING
CONDUIT TO SCHEDULE DELIVERY.
3. CONTRACTOR TO INSTALL CONDUIT AND PLACE PULL STRING IN ALL CONDUIT TO VERIFY CONDUIT INTEGRITY.
4. ALL CONDUIT IS 2" UNLESS OTHERWISE NOTED.
5. ANY QUESTIONS TO JUC APPROVED PLANS, PLEASE CONTACT LUMEN ENGINEER ZACH MATHEWS AT 435-673-9639.
6. ANY LUMEN FACILITY RELOCATIONS ASSOCIATED WITH PROJECT WILL BE BILLABLE TO OWNER/DEVELOPER. LUMEN
ENGINEER MUST BE CONTACTED A MINIMUM OF FOUR (4) WEEKS.
7. DEVELOPER IS RESPONSIBLE TO PROVIDE ALL STREET NAMES AND ADDRESSES WITHIN THREE (3) WEEKS OF UTILITY PLAN
APPROVAL. FAILURE TO PROVIDE ADDRESSED WILL RESULT IN A DELAY OF SERVICE TO PROJECT.
CENTURYLINK/LUMEN TELEPHONE NOTES
5. FLOW DIVERSION: CONTRACTOR WILL BE REQUIRED TO DIVERT EXISTING FLOWS OF WATER, STORMWATER, OR WASTEWATER FOR FULL DURATION OF PROJECT, OR UNTIL NEW UTILITIES ARE APPROVED AND ACTIVE.
6. UTILITY SHUTDOWN: ALL UTILITY SHUTDOWNS REQUIRE NOTICE AT LEAST 72 HOURS IN ADVANCE OR AS REQUIRED BY
UTILITY COMPANY.
7. TRENCH OPERATIONS: CONTRACTOR IS SOLELY RESPONSIBLE FOR CONFORMANCE WITH LOCAL AND FEDERAL CODES GOVERNING SHORING AND BRACING OF EXCAVATIONS AND TRENCHES. CONTRACTOR IS RESPONSIBLE FOR THE SAFETY OF THE PUBLIC AND PROTECTION OF PERSONNEL AND WORKERS. TRENCH SUPPORTS AND DEWATERING SHALL BE RESPONSIBILITY OF THE CONTRACTOR. MAXIMUM OPEN TRENCH DURING WORK HOURS SHALL BE 200 FEET AND ALL
TRENCHES SHALL BE BACKFILLED AND/OR PLATED DURING NON-WORKING HOURS.
8. POT HOLING: CONTRACTOR SHALL VERIFY THE EXACT LOCATION, SIZE, TYPE, AND ELEVATION OF ALL UTILITIES PRIOR TO CONSTRUCTION BY POT HOLING A MINIMUM OF 400 FEET IN ADVANCE OF TRENCHING OPERATIONS TO CONFIRM
CLEARANCE FROM THE PROPOSED PIPELINES.
9. NEW PIPE PROTECTION: CONTRACTOR SHALL IMPLEMENT MEASURES DURING CONSTRUCTION THAT WILL PREVENT RUNOFF, DEBRIS AND SEDIMENT FROM ENTERING UNFINISHED PORTIONS OF THE NEW PIPE DURING CONSTRUCTION.
10. DEWATERING: GROUND WATER AND SURFACE WATER CONTROL SHALL BE PERFORMED AND RESPONSIBLY HANDLED BY THE CONTRACTOR ACCORDING TO, AND IN COMPLIANCE WITH, ALL LOCAL GOVERNING AUTHORITIES. HEAVY GROUND WATER AND/OR SURFACE WATER PUMPING MAY BE REQUIRED. IT IS THE CONTRACTOR'S SOLE RESPONSIBILITY TO DETERMINE POTENTIAL PUMPING NEEDS. THE CONTRACTOR SHALL NOT RELY ON OWNER SUPPLIED PROCTOR, GROUND WATER AND/OR SURFACE WATER DATA. CONTRACTOR SHALL OBTAIN DEWATERING PERMIT AS NECESSARY.
11. MATERIAL CONDITION: INSTALL ALL MATERIALS ACCORDING TO MANUFACTURER RECOMMENDATIONS AND STATE AND LOCAL REQUIREMENTS. USE ONLY NEW AND UNUSED MATERIALS. ALL MATERIALS SHALL BE PROVIDED BY MANUFACTURERS REGULARLY ENGAGED IN PRODUCING SAID ITEMS, AND WHICH SHALL BE FIRST QUALITY, HEAVY DUTY, COMMERCIAL/INDUSTRIAL GRADE, SUITABLE FOR THE INTENDED USE.
O
W N
TO
W
N C
EM
ET
ER
Y
C O
LU
M
BA
R
IU
M
P
LA
ZA
ST
. G
EO
R
G E, U T
25539.00
JULY, 2026
CC, JG
JH, JG
G-003
LEGEND &
ABBREVIATIONS
3 12
M
AR
K D
AT
E
D
ES
C R
IP
TI
O N
R
EV
IS
IO
N S
R
EU
SE
O
F D
R A
W
IN
G S
TH
IS
D O
C U
M
EN
T
AN
D T
H E
ID
EA
S H
ER
EI
N A
R E
TH
E
PR
O
PE
R
TY
O
F C
IV
IL
S C
IE
N
C E, IN
C
. A N
D
IS
N O
T
TO
B E
R
EP
R O
D U
C
ED
, M O
D
IF
IE
D
O R
U
SE
D
IN
W H
O
LE
O R
IN
PA
R T, F O
R A
N Y
O
TH
ER
P
R O
JE
C
T O
R E
XT
EN
SI
O
N O
F
TH
IS
P
R O
JE
C
T
EX
C
EP
T
BY
W R
IT
TE
N A
U
TH
O R
IZ
AT
IO
N
O F
C
IV
IL
S
C
IE
N C
E, IN
C
PROJECT NO:
DATE:
DESIGN BY:
CHECKED BY:
FI
LE
N
AM
E:
L:
\U ta h\ Pr oj ec ts \A ct iv e
\IF
9.
St
. G eo rg e
C ity
D ow nt ow n C em et er y
C ol um ba riu m
P la za \8
C
AD
\8
Sh ee ts
\2
-G
-0
.d w g
- P
LO
TT
ED
:J
G O
FF
D
AT
E:
7/
/2
1:
P M
SHEET TITLE
S.
D ixi e D riv e, St e.
St . G eo rg e, UT
5.9
.0
E E
LEGEND
EXISTING PROPOSED DESCRIPTION
MAJOR CONTOUR
MINOR CONTOUR
CURB AND GUTTER
EDGE OF PAVEMENT
EDGE OF GRAVEL
STREET CENTERLINE
PROPERTY LINE
LOT LINE
SECTION LINE
SECTION CORNER
RIGHT-OF-WAY LINE
EASEMENT LINE
FENCE
SANITARY SEWER LINE
SANITARY SEWER - FORCE
SANITARY SEWER MANHOLE
SANITARY SEWER CLEAN
OUT
WATER LINE
WATER TEE
WATER VALVE
WATER BEND (ANGLE NOTED)
WATER STUB / CAP
FIRE HYDRANT
WATER METER
WATER MANHOLE
PRESSURIZED IRRIGATION
LINE
IRRIGATION LINE
IRRIGATION TEE
IRRIGATION VALVE
IRRIGATION BEND (ANGLE
NOTED)
IRRIGATION STUB / CAP
IRRIGATION METER
IRRIGATION MANHOLE
IRRIGATION BOX
STORM DRAIN PIPE
CULVERT WITH FLARED END
SECTION
STORM DRAIN MANHOLE
LEGEND
EXISTING PROPOSED DESCRIPTION
STORM DRAIN COMBO BOX
STORM DRAIN INLET/CATCH
BASIN
JUNCTION STRUCTURE
BURIED ELECTRIC LINE
OVERHEAD ELECTRIC LINE
POWER POLE
GUY WIRE ANCHOR
ELECTRICAL EQUIPMENT
ELECTRICAL TRANSFORMER
GAS LINE
GAS VALVE
GAS METER
BURIED TELEPHONE
OVERHEAD
COMMUNICATIONS LINE
BURIED COMMUNICATIONS
LINE
OVERHEAD CABLE TV
BURIED CABLE TV
BURIED FIBER OPTIC LINE
COMMUNICATIONS
PEDESTAL
COMMUNICATIONS
HANDHOLE
GRADE TO DRAIN
EXTENTS OF GRADING
FIRE DEPARTMENT
CONNECTION
FIRE SPRINKLER RISER
STREET LIGHT
SIGN (SINGLE POLE, 2 OR
MORE POLES)
MAILBOX
ASPHALT PAVEMENT
CONCRETE FLATWORK
UNTREATED BASE COURSE
LANDSCAPE
RIP-RAP
UNDISTURBED EARTHWORK
COMPACTED FILL EARTWORK
FILTRATION BED
SPOT ELEVATION
SECTION INDICATOR
DETAIL
INDICATOR
EXISTING
IRR
AC ACRE
ACE ARMY CORPS OF ENGINEERS
AGGR AGGREGATE
ALT. ALTERNATE
APPR. APPROXIMATE
AR MH AIR RELEASE MANHOLE
ARV AIR RELEASE VALVE
ASSY. ASSEMBLY
ASTM AMERICAN SOCIETY FOR TESTING MATERIALS
AVE AVENUE
BFV BUTTERFLY VALVE
BH BORE HOLE
BITUM. BITUMINOUS
BK BACK
B.O. BY OTHERS
BOA BEGINNING OF ALIGNMENT
BOP BEGINNING OF PROJECT
BS BOTTOM OF STAIRS
BSW BACK OF SIDEWALK
BVC BEGIN VERTICAL CURVE
BW BOTTOM OF WALL
C&G CURB AND GUTTER
CB CATCH BASIN
C-C CENTER TO CENTER
CE/L CONSTRUCTION EASEMENT LINE
CF CUBIC FEET
CFS CUBIC FEET PER SECOND
CI CAST IRON
CIP CAST IRON PIPE
CL CENTERLINE
CMP CORRUGATED METAL PIPE
CO CLEANOUT
COMM. COMMUNICATION
CONC. CONCRETE
CONST. CONSTRUCTION
CU COPPER
CY/CU YD CUBIC YARD
DBL DOUBLE
DI DUCTILE IRON
DIA/D DIAMETER
DIP DUCTILE IRON PIPE
DR DRIVE
DRWY DRIVEWAY
DWG DRAWING
E. EAST
EA. EACH
EG EXISTING GRADE
EP/EOP EDGE OF PAVEMENT
ELEC. ELECTRICAL
EL/ELEV. ELEVATION
ELOH OVERHEAD ELECTRICAL
EOA END OF ALIGNMENT
ESMT EASEMENT
EVC END VERTICAL CURVE
EX/EXIST. EXISTING
EXT. EXTENSION
FEMA FEDERAL EMERGENCY MANAGEMENT AGENCY
FES FLARED END SECTION
FG FINISHED GRADE
FH FIRE HYDRANT
FIRM FLOOD INSURANCE RATE MAP
FL FLOWLINE
FM FORCE MAIN
FO FIBER OPTIC
FS FINISHED SURFACE
FT FOOT/FEET
GALV. GALVANIZED
GB GRADE BREAK
GR GRATE
GV GATE VALVE
HDPE HIGH-DENSITY POLYETHYLENE
HMA HOT MIX ASPHALT
HOR. HORIZONTAL
HP HIGH POINT
HYD. HYDRANT
IN. INCH
I.D. INSIDE DIAMETER
INV. INVERT
IRR. IRRIGATION
INS. INSERT
LEN. LENGTH
LF LINEAR FEET
LP LOW POINT
LT LEFT
MAX MAXIMUM
MFG. MANUFACTURER
MH MANHOLE
MIN. MINIMUM
MJ MECHANICAL JOINT
N. NORTH
NO. NUMBER
NTS NOT TO SCALE
O.C. ON CENTER
O.D. OUTSIDE DIAMETER
OH OVERHEAD
OSHA OCCUPATION SAFETY & HEALTH ADMIN.
PC POINT OF CURVATURE
PCC POINT OF COMPOUND CURVATURE
PI POINT OF INTERSECTION
PL PROPERTY LINE
POLY POLYETHYLENE
POT. POTABLE
PP POWER POLE
PRC POINT OF REVERSE CURVATURE
PRV PRESSURE REDUCING VALVE
PSI POUNDS PER SQUARE INCH
PT POINT OF TANGENCY
PVC POLYVINYL CHLORIDE
PVI POINT OF VERTICAL INTERSECTION
PUE PUBLIC UTILITY EASEMENT
RAD/R RADIUS
RCP REINFORCED CONCRETE PIPE
REQ'D REQUIRED
ROW RIGHT-OF-WAY
RR RAILROAD
RT RIGHT
S. SOUTH
SAN SANITARY
SCH. SCHEDULE
SD STORM DRAIN
SDR STANDARD DIMENSION RATIO
SF/SQ FT SQUARE FEET
SHT SHEET
SIM. SIMILAR
SS SANITARY SEWER
ST STREET
STA STATION
STD STANDARD
SW SIDEWALK
SY/SQ YD SQUARE YARD
TA TOP OF ASPHALT
TBC TOP BACK OF CURB
TBR TO BE REMOVED
TC TOP OF CONCRETE
TOP TOP OF PIPE
TS TOP OF STAIRS
TW TOP OF WALL
TYP. TYPICAL
VAR. VARIES
VERT. VERTICAL
WAT. WATER
WL WATER LINE
ABBREVIATIONS
OHE
UGE
SD
IRR
PI
W W
SAN
R/W
UGE
UGE
CP CP
SD
IRR
W W
SAN
R/W
CATV
CATV
COMM
COMM
CATV
CATV
COMM
COMM
T T T
G
FO
G
IRR
S
CO
W
W
D
G
H
CP
FD
A1 A-101
IRR
IRR
W
W
D
CI
S
CO
G
H
CP
FD
PI
D D
CP CP
FO
T T T
9990.359990.35
IRRIRR
IRR IRR
SS SSSS SS
G G
CB
A1 A-101
CUT FILL
COORDINATE SYSTEM & PROJECT INFO
THE "PROJECT COORDINATES" AND BEARINGS AND
DISTANCES DERIVED THEREFROM ARE EXPRESSED
IN A LOCAL GROUND SYSTEM DEFINED AS FOLLOWS:
HORIZONTAL DATUM: NORTH AMERICAN DATUM OF
1983 (NAD83)
VERTICAL DATUM: NORTH AMERICAN VERTICAL
DATUM 1988 (NAVD88)
COORDINATE SYSTEM: US STATE PLANE 1983, (2011)
UTAH SOUTH ZONE 4303
PROJECT UNITS: US SURVEY FOOT
PROJECT HEIGHT: 2681.00
GEOID MODEL: GEOID18 (CONUS)
FALSE NORTHING: 0
FALSE EASTING: 0
COMBINED SCALE FACTOR: 1.00011069
NOTE:
THE CONTROL SURVEY WAS PERFORMED IN ST.
GEORGE HCN WITH A GROUND SCALE FACTOR OF
1.00011069. ALL SURVEY CONTROL COORDINATES
AND ELEVATIONS WERE ESTABLISHED USING THE
UTAH REFERENCE
NETWORK GLOBAL POSITIONING SYSTEM (TURN
GPS).
POINTS WERE SCALED FROM COORDINATE 0,0 IN THE
NAD 83 US STATE PLANE UTAH SOUTH ZONE
COORDINATE SYSTEM USING THE COMBINED SCALE
FACTOR LISTED ABOVE.
SURVEY CONTROL MAG NAIL
LEGEND
X X
X X
X X
X X
IRR
IRR
IRR
IRR
IRR
E
TABERNACLE ST.
1OO SOUTH
EA
ST
EA
ST
SURVEY CONTROL POINTS
POINT #
NORTHING
10010652.30
10010750.75
10010702.25
EASTING
1037558.30
1037561.11
1037604.74
ELEVATION
2757.6560
2762.4480
2761.2990
DESCRIPTION
CP MAG
CP MAG
CP MAG
0 40' 80'20'
N
OF
D O
W N
TO
W
N C
EM
ET
ER
Y
C O
LU
M
BA
R
IU
M
P
LA
ZA
ST
. G
EO
R
G E, U T
25539.00
JULY, 2026
CC, JG
JH, JG
V-101
SURVEY
CONTROL
4 12
M
AR
K D
AT
E
D
ES
C R
IP
TI
O N
R
EV
IS
IO
N S
R
EU
SE
O
F D
R A
W
IN
G S
TH
IS
D O
C U
M
EN
T
AN
D T
H E
ID
EA
S H
ER
EI
N A
R E
TH
E
PR
O
PE
R
TY
O
F C
IV
IL
S C
IE
N
C E, IN
C
. A N
D
IS
N O
T
TO
B E
R
EP
R O
D U
C
ED
, M O
D
IF
IE
D
O R
U
SE
D
IN
W H
O
LE
O R
IN
PA
R T, F O
R A
N Y
O
TH
ER
P
R O
JE
C
T O
R E
XT
EN
SI
O
N O
F
TH
IS
P
R O
JE
C
T
EX
C
EP
T
BY
W R
IT
TE
N A
U
TH
O R
IZ
AT
IO
N
O F
C
IV
IL
S
C
IE
N C
E, IN
C
PROJECT NO:
DATE:
DESIGN BY:
CHECKED BY:
FI
LE
N
AM
E:
L:
\U ta h\ Pr oj ec ts \A ct iv e
\IF
9.
St
. G eo rg e
C ity
D ow nt ow n C em et er y
C ol um ba riu m
P la za \8
C
AD
\8
Sh ee ts
\2
-V
-1
.d w g
- P
LO
TT
ED
:J
M
IT
C H
EL
L
- D
AT
E:
7/
/2
1:
P M
SHEET TITLE
S.
D ixi e D riv e, St e.
St . G eo rg e, UT
5.9
.0
SCALE: 1" = 40'
SURVEY CONTROL PLAN1
07.20.26
SHEET NOTES
1. IF AN UNMARKED GRAVE IS FOUND DURING
WORK ACTIVITIES, THE CONTRACTOR SHALL
CEASE WORK IMMEDIATELY AND CONTACT
CEMETERY PERSONNEL FOR DIRECTION ON
HOW TO PROCEED.
2. PROTECT ALL EXISTING SITE FEATURES
INCLUDING TREES, BURIAL MONUMENTS, SIGNS,
LANDSCAPE, HARDSCAPE, UTILITIES, AND
OTHER EXISTING FEATURES UNLESS
OTHERWISE NOTED.
3. 3. EXISTING LANDSCAPING IMPACTED BY
CONTRACTOR SHALL BE GRADED AND
RESTORED TO MATCH OR EXCEED ORIGINAL
CONDITIONS.
4. COORDINATE CONSTRUCTION SEQUENCING
WITH CITY STAFF WHICH INCLUDES SENSITIVITY
AROUND CEMETERY EVENTS SCHEDULING.
LEGEND
DEMOLITION KEYNOTES
REMOVE ASPHALT
REMOVE CURB & GUTTER
DEMOLISH BUILDING
REMOVE RETAINING WALL
REMOVE HEDGE
RELOCATE IRRIGATION VALVE BOX, SEE
SHEET L-201
RELOCATE ELECTRICAL SERVICE METER
(COORDINATE W/ ST. GEORGE POWER
DEPARTMENT)
PROTECT IN PLACE ASPHALT
PROTECT IN PLACE CURB & GUTTER
PROTECT IN PLACE HEADSTONE MONUMENT
PROTECT IN PLACE TREE
PROTECT IN PLACE IRRIGATION VALVE BOX
NOT USED
LIMIT OF DISTURBANCE; NO WORK,
EQUIPMENT, OR STOCKPILING BEYOND
REMOVE CONCRETE FLATWORK
REMOVE CONCRETE FLATWORK
REMOVE ASPHALT
REMOVE CURB & GUTTER
DEMOLISH BUILDING
REMOVE RETAINING WALL
LIMIT OF DISTURBANCE
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
IRR
IRR
IRR
IRR
IRR
E
O H
E O
H E
O H
E O
H E
O H
E O
H E
O H
E O
H E
O H
E O
H E
O H
E O
H E
U G
E U
G E
U G
E U
G E
U G
E U
G E
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
1 3
10 10
X X
X X
X X
X X
IRR
IRR
IRR
IRR
IRR
E
TABERNACLE ST.
1OO SOUTH
EA
ST
SEE COLUMBARIUM
DEMOLITION PLAN
10'
10'
O H
E O
H E
O H
E O
H E
O H
E O
H E
O H
E O
H E
O H
E O
H E
O H
E O
H E
O H
E O
H E
O H
E O
H E
O H
E O
H E
OHEOHE
O H
E O
H E
O H
E O
H E
OHEOHE
O H
E O
H E
O H
E O
H E
O H
E O
H E
O H
E O
H E
O H
E
O H
E O
H E
OHE OHE
OH
E
OHE
O H
E O
H E
O H
E O
H E
O H
E O
H E
O H
E
U G
E U
G E
U G
E
UGE
UGE
U G
E
SDSD
SD
SD
CB
D CBCB
D
CB
CB
D CB
D
CB
CB
CB
IRRIRRIRRIRRIRRIRRIRRIRR
IR
R
IR
R
IR
R
IR
R
IR
R
IR
R
IR
R
IR
R
IR
R
IR
R
IR
R
IR
R
IR
R
IR
R
IRR
IRR
IRR
SANSAN
SAN
SA
N
SANSANSANSANSANSANS
S
S
W W W W W W W W W W W W W
W W W W W W W W W W
W W
J
J
J
J
J
J
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
FOFOFOFOFO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO FO FO FOFO
FO
FO
FO
FO
FO
FO
FO
FO
FO
E
E
SCALE: 1" = 10'
COLUMBARIUM DEMOLITION PLAN2 0 10' 20'
N
OF
D O
W N
TO
W
N C
EM
ET
ER
Y
C O
LU
M
BA
R
IU
M
P
LA
ZA
ST
. G
EO
R
G E, U T
25539.00
JULY, 2026
CC, JG
JH, JG
C-101
DEMOLITION
PLAN
5 12
M
AR
K D
AT
E
D
ES
C R
IP
TI
O N
R
EV
IS
IO
N S
R
EU
SE
O
F D
R A
W
IN
G S
TH
IS
D O
C U
M
EN
T
AN
D T
H E
ID
EA
S H
ER
EI
N A
R E
TH
E
PR
O
PE
R
TY
O
F C
IV
IL
S C
IE
N
C E, IN
C
. A N
D
IS
N O
T
TO
B E
R
EP
R O
D U
C
ED
, M O
D
IF
IE
D
O R
U
SE
D
IN
W H
O
LE
O R
IN
PA
R T, F O
R A
N Y
O
TH
ER
P
R O
JE
C
T O
R E
XT
EN
SI
O
N O
F
TH
IS
P
R O
JE
C
T
EX
C
EP
T
BY
W R
IT
TE
N A
U
TH
O R
IZ
AT
IO
N
O F
C
IV
IL
S
C
IE
N C
E, IN
C
PROJECT NO:
DATE:
DESIGN BY:
CHECKED BY:
FI
LE
N
AM
E:
L:
\U ta h\ Pr oj ec ts \A ct iv e
\IF
9.
St
. G eo rg e
C ity
D ow nt ow n C em et er y
C ol um ba riu m
P la za \8
C
AD
\8
Sh ee ts
\2
-C
-1
.d w g
- P
LO
TT
ED
:C
C H
R
IS
TE
N
SE
N
D
AT
E:
7/
/2
1:
P
M
SHEET TITLE
S.
D ixi e D riv e, St e.
St . G eo rg e, UT
5.9
.0
0 40' 80'20'
N
SCALE: 1" = 40'
OVERALL DEMOLITION PLAN1
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
IRR
IRR
IRR
IRR
IRR
E
452 LF
452 LF
412 LF
413 LF
412 LF
46 LF
5 96 LF
5 23 LF
6 9
7 EA
7 EA
3 EA
3 EA
3 EA
3 EA
11 11
6 EA
18 LF
N: 10010719.4630 E: 1037632.7346
N: 10010718.6211 E: 1037662.7370
N: 10010681.6356 E: 1037661.7015
N: 10010682.4776 E: 1037631.6967
N: 10010698.9711 E: 1037632.1596
N: 10010703.9691 E: 1037632.2998
R6' TYP.
5'
EXTEND TURF TO PROPOSED
LANDSCAPE CURB (TYP) 19
EXTEND TURF TO PROPOSED
LANDSCAPE CURB (TYP) 19
2' MIN TO BURIAL PLOT
+/- 3'
2' MIN TO BURIAL PLOT
+/- 4'
SHEET NOTES
1. IF AN UNMARKED GRAVE IS FOUND DURING
WORK ACTIVITIES, THE CONTRACTOR SHALL
CEASE WORK IMMEDIATELY AND CONTACT
CEMETERY PERSONNEL FOR DIRECTION ON
HOW TO PROCEED.
2. PROTECT ALL EXISTING SITE FEATURES
INCLUDING TREES, BURIAL MONUMENTS, SIGNS,
LANDSCAPE, HARDSCAPE, UTILITIES, AND
OTHER EXISTING FEATURES UNLESS
OTHERWISE NOTED.
3. EXISTING LANDSCAPING IMPACTED BY
CONTRACTOR SHALL BE GRADED AND
RESTORED TO MATCH OR EXCEED ORIGINAL
CONDITIONS.
4. COORDINATE CONSTRUCTION SEQUENCING
WITH CITY STAFF WHICH INCLUDES SENSITIVITY
AROUND CEMETERY EVENTS SCHEDULING.
LEGEND
SITE KEYNOTES
ASPHALT PATCH W/BASE
4" CONCRETE FLATWORK W/BASE
CONCRETE CURB & GUTTER
6" CONCRETE LANDSCAPE CURB
8" BRICK PAVERS W/ METAL
RESTRAINTS
REINFORCED COLUMBARIUM PAD
W/BASE
COLUMBARIUM - TYPE A, Ø 6'-8"
(BY OTHERS)
COLUMBARIUM - TYPE B, 9'-6" x 3'
(BY OTHERS)
COLUMBARIUM - TYPE C, 20'-5" x 1'-9"
(BY OTHERS)
GROUND BURIAL URN (BY OTHERS)
3'-6" CREMATION BENCH (BY OTHERS)
INSTALL OVERHEAD TRELLIS
CONCRETE CURB WALL
CONCRETE SEAT WALL W/ PRE-CAST
CAP
CMU BLOCK FENCE & RETAINING
WALL
LANDSCAPE AREA, SEE SHEET L-101
NOT USED
5" COLUMBARIUM PLAZA FLATWORK
W/ BASE
TURF GRASS & SPRAY IRRIGATION
SYSTEM REPAIR, SEE SHEET L-102
1 C-401
2 C-401
3 STD
4 C-401
5 C-401
6 C-401
C-401
C-401
C-401
C-401
18 C-401
ASPHALT PATCH
CONCRETE
REINFORCED CONCRETE
LANDSCAPE AREA, SEE SHEET L-101
8" BRICK PAVERS W/ METAL RESTRAINTS
LIMIT OF DISTURBANCE
X X
X X
X X
X X
IRR
IRR
IRR
IRR
IRR
E
TABERNACLE ST.
1OO SOUTH
EA
ST
SEE COLUMBARIUM
SITE PLAN
CONTRACTOR TO ADJUST IRRIGATION
SYSTEM, COORDINATE W/ CITY
GRADE TO MATCH
SURROUNDING
AREA
EXTEND TURF TO PROPOSED
LANDSCAPE CURB (TYP) 19
EXTEND TURF TO PROPOSED
LANDSCAPE CURB (TYP)
EXTEND TURF TO PROPOSED
LANDSCAPE CURB (TYP) 19
SCALE: 1" = 10'
COLUMBARIUM SITE PLAN2 0 10' 20'
N
OF
D O
W N
TO
W
N C
EM
ET
ER
Y
C O
LU
M
BA
R
IU
M
P
LA
ZA
ST
. G
EO
R
G E, U T
25539.00
JULY, 2026
CC, JG
JH, JG
C-201
SITE PLAN
6 12
M
AR
K D
AT
E
D
ES
C R
IP
TI
O N
R
EV
IS
IO
N S
R
EU
SE
O
F D
R A
W
IN
G S
TH
IS
D O
C U
M
EN
T
AN
D T
H E
ID
EA
S H
ER
EI
N A
R E
TH
E
PR
O
PE
R
TY
O
F C
IV
IL
S C
IE
N
C E, IN
C
. A N
D
IS
N O
T
TO
B E
R
EP
R O
D U
C
ED
, M O
D
IF
IE
D
O R
U
SE
D
IN
W H
O
LE
O R
IN
PA
R T, F O
R A
N Y
O
TH
ER
P
R O
JE
C
T O
R E
XT
EN
SI
O
N O
F
TH
IS
P
R O
JE
C
T
EX
C
EP
T
BY
W R
IT
TE
N A
U
TH
O R
IZ
AT
IO
N
O F
C
IV
IL
S
C
IE
N C
E, IN
C
PROJECT NO:
DATE:
DESIGN BY:
CHECKED BY:
FI
LE
N
AM
E:
L:
\U ta h\ Pr oj ec ts \A ct iv e
\IF
9.
St
. G eo rg e
C ity
D ow nt ow n C em et er y
C ol um ba riu m
P la za \8
C
AD
\8
Sh ee ts
\2
-C
-2
.d w g
- P
LO
TT
ED
:J
G O
FF
D
AT
E:
7/
/2
1:
P M
SHEET TITLE
S.
D ixi e D riv e, St e.
St . G eo rg e, UT
5.9
.0
0 40' 80'20'
N
SCALE: 1" = 40'
OVERALL SITE PLAN1
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
IRR
IRR
IRR
IRR
IRR
E
27602760
M
M
O H
E O
H E
O H
E O
H E
O H
E O
H E
O H
E O
H E
O H
E O
H E
O H
E
OHE
OHE
OHE
OHE
OHE
OHE
O H
E
U G
E U
G E
U G
E U
G E
U G
E U
G E
UGE
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FG:2762.27
FG:2762.49
FG:2762.10 FG:2762.46
FG:2762.08
FG:2761.91FG:2761.70
FG:2761.72
FF:2762.37
FF:2762.43
FF:2762.16
FF:2761.97
FG:2761.95
FG:2761.87
SW:2760.98
SW:2761.32
SW:2761.56 SW:2761.85
SW:2760.76
SW:2761.24 SW:2761.48 SW:2761.77
TC:2760.67
TC:2760.90
EG:±2760.35
EG:±2760.87
FG:2762.37
FG:2762.26
FG:2762.21 FG:2762.32
FG:2762.42
FG:2762.44
FG:2762.09
FG:2762.11
FG:2761.81
FG:2761.86
FG:2761.97
FG:2761.93
FG:2762.03FG:2762.04
FG:2762.15
FG:2762.14
TRANSITION CONCRETE
TO MATCH SIDEWALK
TRANSITION CONCRETE
TO MATCH SIDEWALK
SHEET NOTES
1. IF AN UNMARKED GRAVE IS FOUND DURING
WORK ACTIVITIES, THE CONTRACTOR SHALL
CEASE WORK IMMEDIATELY AND CONTACT
CEMETERY PERSONNEL FOR DIRECTION ON
HOW TO PROCEED.
2. PROTECT ALL EXISTING SITE FEATURES
INCLUDING TREES, BURIAL MONUMENTS, SIGNS,
LANDSCAPE, HARDSCAPE, UTILITIES, AND
OTHER EXISTING FEATURES UNLESS
OTHERWISE NOTED.
3. EXISTING LANDSCAPING IMPACTED BY
CONTRACTOR SHALL BE GRADED AND
RESTORED TO MATCH OR EXCEED ORIGINAL
CONDITIONS.
4. EXISTING ELEVATIONS ARE APPROXIMATE.
5. COORDINATE WITH THE CITY FOR AN
APPROVED LOCATION TO WASTE ALL
ADDITIONAL CLEAN EXCESS EXCAVATED
NATIVE MATERIAL.
6. COORDINATE CONSTRUCTION SEQUENCING
WITH CITY STAFF WHICH INCLUDES SENSITIVITY
AROUND CEMETERY EVENTS SCHEDULING.
LEGEND
GRADING KEYNOTES
MATCH EXISTINGM
ASPHALT PATCH
CONCRETE
REINFORCED CONCRETE
LANDSCAPE AREA, SEE SHEET L-101
8" BRICK PAVERS W/ METAL RESTRAINTS
LIMIT OF DISTURBANCE
SCALE: 1" = 10'
GRADING PLAN1 0 10' 20'
N
OF
D O
W N
TO
W
N C
EM
ET
ER
Y
C O
LU
M
BA
R
IU
M
P
LA
ZA
ST
. G
EO
R
G E, U T
25539.00
JULY, 2026
CC, JG
JH, JG
C-301
GRADING PLAN
7 12
M
AR
K D
AT
E
D
ES
C R
IP
TI
O N
R
EV
IS
IO
N S
R
EU
SE
O
F D
R A
W
IN
G S
TH
IS
D O
C U
M
EN
T
AN
D T
H E
ID
EA
S H
ER
EI
N A
R E
TH
E
PR
O
PE
R
TY
O
F C
IV
IL
S C
IE
N
C E, IN
C
. A N
D
IS
N O
T
TO
B E
R
EP
R O
D U
C
ED
, M O
D
IF
IE
D
O R
U
SE
D
IN
W H
O
LE
O R
IN
PA
R T, F O
R A
N Y
O
TH
ER
P
R O
JE
C
T O
R E
XT
EN
SI
O
N O
F
TH
IS
P
R O
JE
C
T
EX
C
EP
T
BY
W R
IT
TE
N A
U
TH
O R
IZ
AT
IO
N
O F
C
IV
IL
S
C
IE
N C
E, IN
C
PROJECT NO:
DATE:
DESIGN BY:
CHECKED BY:
FI
LE
N
AM
E:
L:
\U ta h\ Pr oj ec ts \A ct iv e
\IF
9.
St
. G eo rg e
C ity
D ow nt ow n C em et er y
C ol um ba riu m
P la za \8
C
AD
\8
Sh ee ts
\2
-C
-3
.d w g
- P
LO
TT
ED
:C
C H
R
IS
TE
N
SE
N
D
AT
E:
7/
/2
1:
P
M
SHEET TITLE
S.
D ixi e D riv e, St e.
St . G eo rg e, UT
5.9
.0
SYM BOTANICAL NAME COMMON NAME SIZE
LANDSCAPING LEGEND
TREES
LAGERSTROEMIA 'ARAPAHO' ARAPAHO CRAPE MYRTLE 24" BOX
LAGERSTROEMIA 'MUSKOGEE' MUSKOGEE CRAPE MYRTLE 24" BOX
PISTACIA CHINENSIS 'RED PUSH' RED PUSH PISTACHE 24" BOX
QUERCUS BUCKLEYI RED ROCK OAK 24" BOX
QUERCUS VIRGINIANA SOUTHERN LIVE OAK 24" BOX
SHRUBS
CHAMAEROPS HUMILIS MEDITERRANEAN FAN PALM 15 GAL
HYMENOXYS ACAULIS PERKY SUE 1 GAL
ILEX VOMITORIA 'NANA' DWARF YAUPON HOLLY 5 GAL
LAGERSTROEMIA 'DYNAMITE RED' MULTIDYNAMITE RED CRAPE MYRTLE 15 GAL
LAGERSTROEMIA 'MONKIE' PINKY PETITE CRAPE MYRTLE 15 GAL
LEUCOPHYLLUM FRUTESCENS 'GREEN CLOUD'GREEN CLOUD TEXAS SAGE 5 GAL
LIGUSTRUM JAPONICUM 'TEXANUM' TEXAS PRIVET 5 GAL
NERIUM OLEANDER 'DWARF RED' DWARF RED OLEANDER 5 GAL
NERIUM OLEANDER 'DWARF WHITE' DWARF WHITE OLEANDER 5 GAL
SOPHORA SECUNDIFLORA TEXAS MOUNTAIN LAUREL 15 GAL
LANDSCAPE MATERIALS LEGEND
ROCK - REBEL RED, 1" IN. - 2" DEPTH IN PLANTING
AREAS WHERE SHOWN
Know what's below.
before you dig.Call
R
NORTH
MATCHLINE B-B
1 inch = ft.
( IN FEET )
020 20 40
A
LD-1
A
LD-1
DETAIL #
SHEET #
PL
A
N
TI
N G
P
LA
N
L-1
DATE:
DRAWN BY:
CHECKED BY:
CH
PS
10/22/2026
SHEET
C
IT
Y O
F
ST
. G
EO
R G
E
PA
R K
P
LA
N N
IN
G
D
IV
IS
IO
N
N
O R
TH
EA
ST
ST
. G
EO
R
G E, U
TA
H
(4
) 6
-4
R
EV
IS
IO
N S:
N O
D
AT
E
BY
D
ES
C
R
IP
TI
O
N
G :\S ha re d dr iv es
\P ar kP la nn in g\ C ity F ac ilit ie s\
C em et er ie s\
E C em et er y\
-C ol um ba riu m
P la za \1
C on st ru ct io n
Ad m in is tra tio n\ C on st ru ct io n
D ra w in gs \C
D s\
0E
_C em et ar y_ La nd sc ap e
Pl an
_1 0-
-2
6.
dw g
/2
2/
:4
PM
D O
W N
TO
W
N C
EM
ET
ER
Y
C O
LU
M
B A
R
IU
M P
LA
ZA
EA
ST
S O
U
TH
St . G eo rg e, U ta h
L
IC
E N
S
ED LA NDSCA PE A
RC
H
IT
E
C
TPAUL K. STEAD
#8857289-5301
ST A T E OF UT A H
MATCHLINE A-A
MATCHLINE B-B
MATCHLINE A-A
TABERNACLE ST.
100 S.
B
LD-1
A
LD-1
B
LD-1
A
LD-1
B
LD-1
EXISTING TREES TO REMAIN
EXISTING TREE TO REMAIN
8"
MIN.
FLEX STRAP™ TREE TIE. TIGHTEN ONLY
ENOUGH TO KEEP RUBBER STRAP FROM
SLIPPING.
FOR FLAT AREAS PLACE STAKES PARALLEL
TO PREVAILING WINDS.
FOR SLOPE AREAS PLACE STAKES
PARALLEL TO CONTOUR.
BAMBOO STAKES 1" DIAMETER
1 FOR 1 GALLON, WINDWARD SIDE,
TREES TALLER THAN 3' FEET IN HEIGHT
LODGEPOLE PINE STAKES 2" DIAMETER
1 FOR 5 GALLON, WINDWARD SIDE
2 FOR 15 GALLON & 24" BOX
DO NOT STAKE 36" AND GREATER BOX
SIZE. USE TREE GUYING.
STAPLE OR NAIL FLEX STRAP™
TREE TIE TO TREE STAKE
TREE STAKE
FLEX STRAP™
TREE TIE
TREE TRUNK
6" MIN.
5' -0
" M
IN
SE
E N
O
TE
2x WIDTH OF CONTAINER
PREVAILING
WINDS
PREPARED PLANTING AREA
8"
REMOVE NURSERY STAKE & TIES
2" LAYER OF MULCH. KEEP MULCH
12" CLEAR FROM TRUNK.
CUT CIRCLED AND MATTED ROOTS FROM
NURSERY ROOTBALL
UNDISTURBED NATIVE OR COMPACTED
IMPORT DIRECTLY UNDER ROOTBALL
NOTE:
PLANT PIT DEPTH TO BE 1" LESS THAN
ROOTBALL DEPTH. CROWN BOTTOM OF PIT
SO THAT TREE WILL SIT AT 3" ABOVE GRADE.
SCARIFY SIDES OF PLANTING HOLE
PLANTING SOIL FIRM BUT NOT COMPACTED
6" TALL BERM TO MAKE WATER BASIN.
REMOVE 60 DAYS AFTER PLANTING.
INSTALL SHRUB ROOT BALL
EVEN WITH FINISH GRADE
AND KEEP MULCH AWAY
FROM BASE OF PLANT
CONSTRUCT 2-3" TALL
WATERING RING AROUND
EDGE OF PLANTING PIT
TAPER DOWN DEPTH
OF MULCH AT CROWN
OF PLANT
SCARIFY SIDES OF
PLANTING HOLE
2 X ROOTBALL
DIAMETER
NOTE: EXCAVATE SHRUB
PITS AS ROUND PLANTING
HOLES
EXISTING SUBGRADE
PLANTING SOIL
MULCH
Know what's below.
before you dig.Call
R
PL
A
N
TI
N G
D
ET
A
IL
S, N
O
TE
S, S C
H
ED
U
LE
LD-1
DATE:
DRAWN BY:
CHECKED BY:
CH
PS
10/22/2026
SHEET
C
IT
Y O
F
ST
. G
EO
R G
E
PA
R K
P
LA
N N
IN
G
D
IV
IS
IO
N
N
O R
TH
EA
ST
ST
. G
EO
R
G E, U
TA
H
(4
) 6
-4
R
EV
IS
IO
N S:
N O
D
AT
E
BY
D
ES
C
R
IP
TI
O
N
G :\S ha re d dr iv es
\P ar kP la nn in g\ C ity F ac ilit ie s\
C em et er ie s\
E C em et er y\
-C ol um ba riu m
P la za \1
C on st ru ct io n
Ad m in is tra tio n\ C on st ru ct io n
D ra w in gs \C
D s\
0E
_C em et ar y_ La nd sc ap e
Pl an
_1 0-
-2
6.
dw g
/2
2/
:4
PM
D O
W N
TO
W
N C
EM
ET
ER
Y
C O
LU
M
B A
R
IU
M P
LA
ZA
EA
ST
S O
U
TH
St . G eo rg e, U ta h
L
IC
E N
S
ED LA NDSCA PE A
RC
H
IT
E
C
TPAUL K. STEAD
#8857289-5301
ST A T E OF UT A H
MATERIAL SCHEDULE
(ALL QUANTITIES LISTED ARE FOR CONVENIENCE. IT IS THE CONTRACTOR'S RESPONSIBILITY TO VERIFY THESE QUANTITIES.)
MATERIAL DESCRIPTION SIZE DEPTH UNIT QUANTITY
ROCK MULCH REBEL RED ROCK 1/2" - 1" DIA. 2" DEPTH IN ALL PLANTING AREAS WHERE SHOWN CY 84
PLANTING SOIL PER SECTION 329100 - PLANTING SOIL
FOR PLANTS N/A SEE PLANTING DETAILS A-B CY 8 - ORGANIC MATTER
29 - EXISTING SOIL
PLANT SCHEDULE
(ALL QUANTITIES LISTED ARE FOR CONVENIENCE. IT IS THE CONTRACTOR'S RESPONSIBILITY TO VERIFY THESE QUANTITIES.)
PLANTS SCIENTIFIC NAME COMMON NAME SIZE SPACING UNIT QTY.
TREES LAGERSTROEMIA 'ARAPAHO' ARAPAHO RED CRAPE MYRTLE 24" BOX AS SHOWN EA 7
LAGERSTROEMIA 'MUSKOGEE' MUSKOGEE CRAPE MYRTLE 24" BOX AS SHOWN EA 4
PISTACIA 'RED PUSH' RED PUSH PISTACHE 24" BOX AS SHOWN EA 6
QUERCUS BUCKLEYI RED ROCK OAK 24" BOX AS SHOWN EA 2
QUERCUS VIRGINIANA SOUTHERN LIVE OAK 24" BOX AS SHOWN EA 6
SHRUBS CHAMAEROPS HUMLIS MEDITERRANEAN FAN PALM 15 GAL AS SHOWN EA 18
HYMENOXYS ACAULIS PERKY SUE 1 GAL AS SHOWN EA 49
ILEX VOMITORIA 'NANA' DWARF YAUPON HOLLY 5 GAL AS SHOWN EA 29
LAGERSTROEMIA 'DYNAMITE RED' DYNAMITE RED CRAPE MYRTLE 15 GAL AS SHOWN EA 4
LAGERSTROEMIA 'MONKIE' PINKY PETITE CRAPE MYRTLE 15 GAL AS SHOWN EA 4
LEUCOPHYLLUM 'GREEN CLOUD' GREEN CLOUD TEXAS SAGE 5 GAL AS SHOWN EA 8
LIGUSTRUM JAPONICUM 'TEXANUM' TEXAS PRIVET 5 GAL AS SHOWN EA 13
NERIUM OLEANDER 'DWARF RED' DWARF RED OLEANDER 5 GAL AS SHOWN EA 11
NERIUM OLEANDER 'DWARF WHITE' DWARF WHITE OLEANDER 5 GAL AS SHOWN EA 12
SOPHORA SECUNDIFLORA TEXAS MOUNTAIN LAUREL 15 GAL AS SHOWN EA 8
LANDSCAPING AND PLANTING NOTES
1. THESE GENERAL NOTES ARE PROVIDED FOR CONVENIENCE ONLY. TECHNICAL SPECIFICATIONS ARE FULLY COVERED IN SECTIONS 328400, 329100, 329200A AND
329300.
2. THE CONTRACTOR SHALL LOCATE AND VERIFY THE EXISTENCE OF ALL UTILITIES PRIOR TO STARTING WORK.
3. THE CONTRACTOR SHALL SUPPLY ALL PLANT MATERIALS IN THE QUANTITIES AND SIZES SUFFICIENT TO COMPLETE THE PLANTING SHOWN ON ALL DRAWINGS. ALL QUANTITIES SHOWN ON THE DRAWINGS ARE FOR CONVENIENCE. IT IS THE CONTRACTOR'S RESPONSIBILITY TO VERIFY THESE QUANTITIES.
4. ALL MATERIAL SHALL CONFORM TO THE GUIDELINES ESTABLISHED BY THE CURRENT AMERICAN STANDARD FOR NURSERY STOCK, PUBLISHED BY THE AMERICAN
NURSERY AND LANDSCAPE ASSOCIATION (ANLA).
5. NO PLANT SHALL BE PUT INTO THE GROUND BEFORE ROUGH GRADING HAS BEEN FINISHED AND APPROVED BY PROJECT MANAGER OR LANDSCAPE ARCHITECT.
6. ALL PLANTS SHALL BEAR THE SAME RELATIONSHIP TO FINISHED GRADE AS THE PLANT'S ORIGINAL GRADE IN ITS CONTAINER. (i.e. DO NOT SET ROOT FLAIR OF PLANT
BELOW TOP OF FINISHED GRADE)
7. ALL PLANTS SHALL BE BALLED AND WRAPPED OR CONTAINER GROWN AS SPECIFIED. NO CONTAINER GROWN STOCK WILL BE ACCEPTED IF IT IS ROOT BOUND. ALL ROOT WRAPPING MATERIAL MADE OF SYNTHETICS OR PLASTICS SHALL BE REMOVED AT TIME OF PLANTING AND WITH CONTAINER GROWN STOCK, THE CONTAINER SHALL BE REMOVED AND THE CONTAINER BALL SHALL BE CUT THROUGH THE SURFACE IN TWO VERTICAL LOCATIONS.
8. ALL PLANTS SHALL BE INSTALLED AS PER DETAILS AND THE CONTRACT SPECIFICATIONS.
9. ALL PLANTS AND STAKES SHALL BE SET PLUMB UNLESS OTHERWISE SPECIFIED.
10. ALL PLANTS SHALL BE INSTALLED AT LEAST 24" FROM BACK OF CURB OR SIDEWALK EXCEPT FOR 1 GALLON PLANTS THAT MAY BE INSTALLED AT LEAST 18" FROM
BACK OF CURB OR SIDEWALK.
11. THE CONTRACTOR SHALL PROVIDE PLANTING SOIL AS PER THE CONTRACT SPECIFICATIONS.
12. ALL PLANTS SHALL BE WATERED THOROUGHLY TWICE DURING THE FIRST 24 HOUR PERIOD AFTER PLANTING. ALL PLANTS ON DRIP SYSTEM SHALL THEN BE WATERED
ON A REGULAR SCHEDULE DURING THE FIRST GROWING SEASON.
13. THE CONTRACTOR SHALL WARRANTY ALL PLANT MATERIAL ON DRIP SYSTEM FOR ONE-YEAR AFTER DATE OF FINAL ACCEPTANCE.
14. PLANTING PITS- THE PLANTING SOIL SHALL HAVE A MINIMUM OF 20% ORGANIC MATERIAL. REFER TO SPECIFICATIONS.
15. FINISH GRADE OF ROCK MULCH WILL BE 1" BELOW TOP OF CURB OR SIDEWALK, EXCEPT WHERE INDICATED.
16. ALL WORK AND MATERIALS MUST MEET CITY OF ST. GEORGE STANDARDS.
17. LANDSCAPE TO BE INSTALLED BY A LANDSCAPE CONTRACTOR THAT MEETS STATE AND LOCAL LICENSE REQUIREMENTS.
SCALE: NO SCALE
TREE PLANTING AND STAKING DETAILA
SCALE: NO SCALE
SHRUB PLANTING DETAILB
AutoCAD SHX Text 12"
E
C
PB
E
C
CW CW CW CW CW CW CW CW CW
CW
CW
CW
C W
C W
C W
CW
CW CW CW CW CW CW CW CW
CW
CW
C W
C W
C W
C W
PB
Know what's below.
before you dig.Call
R
NORTH
1 inch = ft.
( IN FEET )
020 20 40
IR
R
IG
A
TI
O
N P
LA
N
TR
EE
S
S
H R
U B
S
I-1
DATE:
DRAWN BY:
CHECKED BY:
CH
PS
10/22/2026
SHEET
C
IT
Y O
F
ST
. G
EO
R G
E
PA
R K
P
LA
N N
IN
G
D
IV
IS
IO
N
N
O R
TH
EA
ST
ST
. G
EO
R
G E, U
TA
H
(4
) 6
-4
R
EV
IS
IO
N S:
N O
D
AT
E
BY
D
ES
C
R
IP
TI
O
N
G :\S ha re d dr iv es
\P ar kP la nn in g\ C ity F ac ilit ie s\
C em et er ie s\
E C em et er y\
-C ol um ba riu m
P la za \1
C on st ru ct io n
Ad m in is tra tio n\ C on st ru ct io n
D ra w in gs \C
D s\
0E
_C em et ar y_ Irr ig at io n
Pl an
_1 0-
-2
6.
dw g
/2
2/
:5
PM
D O
W N
TO
W
N C
EM
ET
ER
Y
C O
LU
M
B A
R
IU
M P
LA
ZA
EA
ST
S O
U
TH
St . G eo rg e, U ta h
L
IC
E N
S
ED LA NDSCA PE A
RC
H
IT
E
C
TPAUL K. STEAD
#8857289-5301
ST A T E OF UT A H
MATCHLINE B-B
MATCHLINE A-A
TABERNACLE ST.
100 S.
SH
R
U
BS
TR
EE
S
MATCHLINE A-A
MATCHLINE B-B
SH
R
U
BS
TR
EE
S
SHRUBS
VALVE #
VALVE SIZE
20 GPM 0
2"
GALLONS PER MINUTE
9 GPM
SHRUBS 1"
SEE SHEET I-2 FOR
IRRIGATION EQUIPMENT
SCHEDULE
(1) 4" SLEEVE
(2) 4" SLEEVES
(1) 4" SLEEVE
1" SCH 40 PVC DRIP
LINE IN TURF, TYP.
TREES
1" SCH 40 PVC DRIP
LINE IN TURF, TYP.
(1) 4" SLEEVE
(1) 4" SLEEVE
EXISTING MAINLINE
9 GPM
SHRUBS 1"
9 GPM
13 TREES 1"
8 GPM
11 TREES 1"
LOCATION OF NEW
CONTROLLER T.B.D.
1. LOCATION OF THE MAINLINES & CONTROLLER WIRE
AS SHOWN ON PLAN IS DIAGRAMMATIC ONLY.
2. SEE SHEET I-1 FOR NUMBER & LOCATION OF SLEEVES
& CONTROLLER WIRE.
3. POC's, BALL VALVES, QUICK COUPLERS, VALVES, PULL BOXES, MAINLINES, & SLEEVES SHOWN ON THE
PLAN ARE FOR REFERENCE ONLY. CONTRACTOR
SHALL VERIFY ALL QUANTITIES TO ENSURE A
WORKING AND COMPLETE IRRIGATION SYSTEM.
4. ALL MAINLINES, LATERAL LINES, DRIP LINES THAT
ARE INSTALLED IN THE TURF AREA SHALL NOT BE
MORE THAN 12" INCHES FROM THE BACK OF CURB
OR WALL IN THE TURF AREA.
5. IRRIGATION TRENCHES SHALL NOT BE EXCAVATED UNTIL
LOCATION IS MARKED BY CONRACTOR & APPROVED BY
THE SEXTON AND/OR CITY PROJECT MANAGER.
NOTES:
E
C
1"
1"
2"
1-1/2"2"
1- 1/ 2"
1- 1/ 2"
1-1/2"
1-1/2"
PB
2"2"
SYMBOL MAKER DESCRIPTION DETAIL
RAIN BIRD TURF VALVE, SIZE ON PLAN; MODEL NO. 200-PESB-R; WITH
RAIN BIRD TWO-WIRE DECODER, MODEL NO. FD-TURF
CONTROL ZONE KIT, MODEL NO. XCZ-100-PRB-COM; WITH
RAIN BIRD TWO-WIRE DECODER, MODEL NO. FD-TURF
APPROVED PULL BOX
2" SCH 40 PVC MAINLINE
SCH 40 PVC SLEEVE. SIZE & NUMBER NOTED ON PLAN.
14 U.F. MAXI-WIRE CONTROLLER WIRE IN 1" GRAY
SCH 40 PVC CONDUIT
A,B,D,E,H,K
TORO 1" BLUE STRIPE HOSE, MODEL NO. T-EHD2667-066A B,D,H,I,J
5/8" BROWN DRIP IN® PC, MODEL NO. PCB1810-12 WITH 1.0
GPH, 12" EMITTER SPACING
C
PB
IRRIGATION LEGEND
RAIN BIRD
APPROVED
APPROVED
APPROVED
TORO
APPROVED SCH 40 PVC LATERAL LINE, SIZE NOTED ON PLAN C,D,E,G,H
B,D,E,F,G,H
NOTE: SEE SHEETS ID-1 & ID-2 FOR IRRIGATION DETAILS
APPROVED 2" BRASS GATE VALVE B, E, F
SINGLE OUTLET EMITTER SCHEDULE
ONE - (1) 2.0 GPH EMITTER PER 1 GAL. SHRUBS
TWO - (2) 2.0 GPH EMITTERS PER 5 GAL. SHRUBS
THREE - (3) 2.0 GPH EMITTERS PER 15 GAL. SHRUBS
A
E
B
K
H
J
RAIN BIRD RAINBIRD ESP TWO-WIRE CONTROLLER, MODEL NO. ESP-LXD, WITH IQ RADIO
CONTROLLER, MODEL NO. IQ-NCC-RS; PEDESTAL MODEL NO. LXMMSSPED
CW
APPROVED 1" SCH 40 PVC BALL VALVE (MANUAL DRAIN VALVE) L
MAKER MODEL NUMBER - DESCRIPTION
TURF IRRIGATION LEGEND
PATTERNNOZZLE IN / HR PSI RADIUS DETAILGPMHEAD SYMBOL
LEGEND
8005-SS-NP-08 ROTORRAIN BIRD 0.53 49'6.6VARIABLE 0° - 360°#8 NOZZLE - RAIN CURTAIN 50 C
RAIN BIRD12
8005-SS-NP-12 ROTOR 0.66 57'11.1VARIABLE 0° - 360°#12 NOZZLE - RAIN CURTAIN 50 C
Know what's below.
before you dig.Call
R
NORTH
1 inch = ft.
( IN FEET )
010 10 20
IR
R
IG
A
TI
O
N P
LA
N
TU
R F
I-2
DATE:
DRAWN BY:
CHECKED…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .