Facility_Planning_Report_(Vol._2).pdf

PDF 17 MB Posted

Attached to
Post Request for Proposal (RFP) to operate the Ala Federal contract opportunity
Solicitation number
1630J6-17-R-00001
Issued by
Department of Labor Employment and Training Administration

About this file

Facility Planning Report (Vol. 2)

View the file

Other files for this federal contract opportunity

Other files attached to Post Request for Proposal (RFP) to operate the Ala, newest first.
File Type Posted
Amendment_10.pdf PDF
Amendment_9.pdf PDF
Price_Detail_Template_(Attachment_J-1_Revised_1-25-2018).xlsx XLSX spreadsheet
Amendment_8.pdf PDF
Amendment_7.pdf PDF
Price_Detail_Template_(Attachment_J-1_Revised_1-3-2018).xlsx XLSX spreadsheet
Amendment_6_for_Alaska.pdf PDF
Price_Detail_Template_(Attachment_J-1_Revised_12-29-2017).xlsx XLSX spreadsheet
Price_Detail_Template_(Attachment_J-1_Revised_12-21-2017).xlsx XLSX spreadsheet
Amendment_5.pdf PDF
Amendment_4.pdf PDF
Amendment_3.pdf PDF
Section_G.3_(Revised).docx DOCX document
Price_Detail_Template_(Revised_Attachment_J-1).xlsx XLSX spreadsheet
Pricing_Schedule_(Revised).docx DOCX document
Vehicles_Listing.xls XLS spreadsheet
Sol_1630J6-17-R-00001_Amd_0001.pdf PDF
Electronic_Property_Management_Listing.pdf PDF
Inventory_Estimate.pdf PDF
Sol_1630J6-17-R-00001.pdf PDF
Facility_Planning_Report_(Vol._1).pdf PDF
Show all 21

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ALASKA

Job Corps Center Palmer, AK

Facility Planning Report Volume II

Supporting Data

Final May 2016

Department of Labor/ Office of Job Corps

ALASKA

Job Corps Center Palmer, AK

Facility Planning Report Volume II

Supporting Data

Final May 2016

Gazebo Structue A

VOLUME II - SUPPORTING DATA

EXECUTIVE SUMMARY

1.0 SITE LAYOUT AND PLANS

• Location Map

• Exisiting Site Plan

2.0 DESCRIPTIONS

• Buildings and Structures

• Space Utilization By Function

• NSF by Building

• Environmental Management Report

• Radon Report

• Site Descriptions

• Building Descriptions

3.0 DEFICIENCIES

APPENDICES - CORRESPONDENCE AND REPORTS

Appendix A.

• Center Review Meeting Minutes

• Survey Brief

• Student Questionnaire

Appendix B.

• Life Safety Defi ciencies and List

Appendix C.

• O&M Defi ciencies List

Appendix D.

• Active Warranty List

Executive Summary

The facility survey for the Alaska JCC was completed July 27th through July 30, 2015.

The information presented in Volume II, Supporting Data, represents the current status of the campus.

The information includes the following:

Existing site layout Overall status of existing building and structures Space utilization by building and function compared to recommended standards Status of environmental elements of the Center’s operations Details on the site and buildings and structures based on architectural, electrical, and mechanical survey and supporting documentation Presentation of the status of historical deficiencies and compilation of deficiencies documented through this survey Supporting documentation, as presented in the appendices of the center review meeting; survey brief and student questionnaire; life safety IA/IIA transmittal;

active warranties; and Federal Real Property Council (FRPC) Measures Matrix

Section 1.0 of this volume addresses site layout and plans while Section 2.0 presents details on the buildings and structures. Section 3.0 presents historic deficiencies and their status as well as new ones identified in this survey. The appendices provide additional information as noted below:

Appendix A. Survey Brief Questionnaire Appendix B. Life Safety Deficiencies and List Appendix C. O&M Deficiencies List Appendix D. Active Warranty Report Appendix E. FRPC Performance Measures Matrix

EXECUTIVE SUMMARY

1.0 - Site Layout and Plans

ALASKA

JOB CORPS CENTER

PALMER, ALASKA

ALASKA JCC

10 MI5 0

2.0 - Descriptions

BUILDINGS AND STRUCTURES

01011 ALASKA 05/03/2016

1Page: of Date:

0001 - ADMIN/HEALTH SERVICES

0002 - VOCATION/EDUCATION

0003 - WAREHOUSE

0004 - DINING

0005 - RECREATION CENTER

0006 - MALE DORMITORY

0007 - FEMALE/INDEPENDENT

DORMITORY

0008 - CONFERENCE CENTER

0009 - VACANT

0010 - VOCATIONAL STORAGE

0011 - WALT HALL VOCATIONAL ANNEX

0002A - MOCK-UP (8FT X 6FT)

0003A - STORAGE (8 FT x 11 FT) 0003B - STORAGE (8 FT x 11 FT)

0003C - STORAGE (8FT X 5FT)

0012 - VOCATIONAL STORAGE

0014 - RECREATIONAL STORAGE

0015 - RECREATIONAL STORAGE

0016 - RECREATIONAL STORAGE

0017 - ARCHERY RANGE SHELTER

0018 - CANOE STORAGE

0019 - MULTIPLEX WBL

0019A - STORAGE (8FT X 6FT)

A -GAZEBO

CC1 - STORAGE (8 FT x 10 FT) CC2 - STORAGE (8 FT x 10 FT) FD1 - STORAGE (8 FT x 11 FT) FDB1 - STORAGE (8 FT x 11 FT) GR1 - STORAGE (8 FT x 10 FT) GR2 - STORAGE (8 FT x 10 FT) M1 - MAINT. STORAGE (8 FT x 10 FT) M2 - MAINT. STORAGE (8 FT x 10 FT) M3 - MAINT. STORAGE (8 FT x 10 FT) M4 - MAINT. STORAGE (8 FT x 10 FT) M5 - MAINT. STORAGE (8 FT x 10 FT) M6 - MAINT. STORAGE (8 FT x 10 FT) M7 - MAINT. STORAGE (8 FT x 10 FT) M8 - MAINT. STORAGE (8 FT x 10 FT) MDB1 - STORAGE (8 FT x 10 FT) R1 - RECYCLING (8 FT x 11 FT) R10 - RECYCLING (8FT x 11FT) R2 - RECYCLING (8 FT x 11 FT) R3 - RECYCLING (8 FT x 11 FT) R4 - RECYCLING (8FT x 11FT) R5 - RECYCLING (8FT x 11FT) R6 - RECYCLING (8FT x 11FT) R7 - RECYCLING (8FT x 11FT) R8 - RECYCLING (8FT x 11FT) R9 - RECYCLING (8FT x 11FT)

Name GSF

7,420 24,700 7,700

10,525 15,575 21,870 29,880

5,470 3,400 5,200 5,888

Active Active Active Active Active Active Active

Active Active Active Active Active Active Active Active Active Active Active Active Active Active Active Active Active Active Active Active Active Active Active Active Active Active Active Active Active Active Active Active Active Active Active Active Active Active Active Active Active Active

StatusType

Building Building Building Building Building Building Building

Building Building Building Building Structure Structure Structure Structure Structure Structure Structure Structure Structure Structure Structure Structure Structure Structure Structure Structure Structure Structure Structure Structure Structure Structure Structure Structure Structure Structure Structure Structure Structure Structure Structure Structure Structure Structure Structure Structure Structure Structure

Use Group Built Flrs Const

B B S-2 A-2 A-3 R-2 R-2

B B S-2 B S-2 S-2 S-2 S-2 S-2 S-2 S-2 S-2 A-3 S-2 U S-2 A-3 S-2 S-2 S-2 S-2 S-2 S-2 S-2 S-2 S-2 S-2 S-2 S-2 S-2 S-2 S-2 S-2 S-2 S-2 S-2 S-2 S-2 S-2 S-2 S-2 S-2

Good Good Good Good Good Good Good

Good Fair

Good Good Good Good Good Good Good Good Good Good Good Good Good Fair

Good Good Good Good Good Good Good Good Good Good Good Good Good Good Good Good Good Good Good Good Good Good Good Good Fair

Good

ConditionAsset Number

0101100002 0101100003 0101100004 0101100005 0101100006 0101100007 0101100008

0101100009 0101100010 0101108021 0101108039 0101108068 0101108040 0101108041 0101108067 0101108026 0101108028 0101108029 0101108030 0101108036 0101108037 0101108038 0101108069 0101108022 0101108055 0101108056 0101108042 0101108043 0101108044 0101108045 0101108047 0101108048 0101108049 0101108050 0101108051 0101108052 0101108053 0101108054 0101108046 0101108057 0101108066 0101108058 0101108059 0101108060 0101108061 0101108062 0101108063 0101108065 0101108064

BUILDINGS AND STRUCTURES

01011 ALASKA 05/03/2016

2Page: of Date:

11 137,628

38 5,404

49 143,032

Buildings

Structures

Total

GSF

GSF

GSF

Summary

05/03/2016

Space Utilization By Function 01011 Alaska Page: 1 of Date:

HOUSING

EDUCATION

FOOD SERVICE

SUGGESTED

NSF/

ENROLLEE

SUGGESTED

TOTAL

NSF

ACTUAL

TOTAL

NSF

TYPE OF SPACE

SUB TOTAL

SUB TOTAL

SUB TOTAL

Resident Men Resident Women Total Residents

Residents 216 Non Residents 10

226Total Students

(216)

(226)

(226)

DIFFERENCE

20,736

17,200

4,068

34,615

24,806

6,109

Lounge Other Single Parent Dormitory(48 rms; 138 beds Sleeping excl. SPD(80 rooms; 258 beds) Storage

Academic (226) Non-Academic

20 -- ACT (Off-Ctr) 30 -- Accounting Clerk 20 -- Carpentry + 20 -- Culinary Arts + 24 -- Electrician Apprentice + 24 -- Facilities Maint. and Const. + 30 -- Nursing Assistant + 30 -- Office Administration 30 -- Security Services 20 -- Waste Water Management

Vocational Theory (118)

Dining (2 Servings) Food Preparation Food Storage

4,270 3,760 6,173

19,620

2,707 4,789

2,248 3,150 1,197 2,480 3,265 1,530 1,000

1,625

3,482 1,277 1,350

2,160 1,728

15,552 1,296

2,260 2,260

1,500 1,200 1,200 1,800 1,200 1,350 1,050 1,300

1,180

1,808 1,356

2,110 2,032 6,173 4,068

-504

2,529

1,348 1,650

-3 1,280 1,465

-350 -570

-845

1,674 -79

Vocations

13,879

7,606

2,041

05/03/2016

Space Utilization By Function 01011 Alaska Page: 2 of Date:

RECREATION

MEDICAL/DENTAL

ADMINISTRATION

STORAGE/SUPPORT

VACANT

SUGGESTED

NSF/

ENROLLEE

SUGGESTED

TOTAL

NSF

ACTUAL

TOTAL

NSF

TYPE OF SPACE

SUB TOTAL

SUB TOTAL

SUB TOTAL

SUB TOTAL

SUB TOTAL

TOTAL 280.70 63,439 95,689

(226)

(226)

(226)

(226)

(0)

DIFFERENCE

137,628

0.70

TOTAL GSF

NET TO GROSS RATIO

10,950

1,445

4,520

10,508

1,940

4,660

6,904

6,147

Aerobics/Exercise Arts & Crafts Gymnasium Learning Resource Center/Library Pool Hall Weight Room

Medical/Dental

Administration

Operations & Maintenance Warehouse

Under Renovation - Education Under Renovation - Medical/Dental Vacant

6.39

7,220

1,113

1,940

4,660

1,691 5,213

5,127

1,445

1,808 2,712

7,220

1,113

-117 2,501

5,127

RESIDENT

NON-RESIDENT

(216)

(10) 15

50 10,800

-442

2,384

6,147

32,250

Net Square Footage By Building Date: 05/03/2016 Page: 1

Center: ALASKA (01011) of 4

HOUSING

Sleeping excl. SPD

Lounge

Storage

Other

Single Parent Dormitory

Function Suggested

NSF

8,680 10,940

2,500 1,770

1,650 2,110

6,173

0007 - FEMALE/INDEPENDENT DORMITORY

0006 - MALE DORMITORY

0007 - FEMALE/INDEPENDENT DORMITORY

0006 - MALE DORMITORY

0007 - FEMALE/INDEPENDENT DORMITORY

0006 - MALE DORMITORY

0006 - MALE DORMITORY

0007 - FEMALE/INDEPENDENT DORMITORY

0007 - FEMALE/INDEPENDENT DORMITORY

Bldg Name Actual NSF Difference

19,620

4,270

3,760

6,173

Sub Total: 34,615

15,552

2,160

1,296

1,728

20,736

4,068

2,110

-504

2,032

6,173

( 216

13,879

48 rooms; 138 beds 32 rooms; 120 beds

Page: 2

Center: ALASKA (01011) of 4

EDUCATION

Academic

Vocational Theory (118)

Carpentry

Culinary Arts

Facilities Maint. and Const.

Security Services

Non-Academic

Electrician Apprentice

Nursing Assistant

Accounting Clerk

Office Administration

Waste Water Management

Function Suggested

NSF

1,620

2,400

1,197

2,515

1,618 1,250

1,930

1,530

1,223 1,025

1,000

1,625

0011 - WALT HALL VOCATIONAL ANNEX

0002 - VOCATION/EDUCATION

0002 - VOCATION/EDUCATION

0011 - WALT HALL VOCATIONAL ANNEX

0003 - WAREHOUSE

0002 - VOCATION/EDUCATION

0010 - VOCATIONAL STORAGE

0004 - DINING

0010 - VOCATIONAL STORAGE

0002 - VOCATION/EDUCATION

0003 - WAREHOUSE

0005 - RECREATION CENTER

0005 - RECREATION CENTER

0002 - VOCATION/EDUCATION

0006 - MALE DORMITORY

0002 - VOCATION/EDUCATION

0011 - WALT HALL VOCATIONAL ANNEX

0007 - FEMALE/INDEPENDENT DORMITORY

0002 - VOCATION/EDUCATION

0010 - VOCATIONAL STORAGE

0002 - VOCATION/EDUCATION

0002 - VOCATION/EDUCATION

0011 - WALT HALL VOCATIONAL ANNEX

0011 - WALT HALL VOCATIONAL ANNEX

0002 - VOCATION/EDUCATION

Bldg Name Actual NSF Difference

2,707

3,150

1,197

3,265

4,789

2,480

1,530

2,248

1,000

1,625

Sub Total: 24,806

2,260

1,180

1,500

1,200

1,800

1,050

2,260

1,200

1,200

1,350

1,300

17,200

-845

1,650

-3

1,465

-570

2,529

1,280

1,348

-350

( 226

7,606

Page: 3

Center: ALASKA (01011) of 4

FOOD SERVICE

RECREATION

MEDICAL/DENTAL

ADMINISTRATION

Dining (2 Servings)

Food Preparation

Food Storage

Arts & Crafts

Gymnasium

Weight Room

Pool Hall

Aerobics/Exercise

Learning Resource Center/Lib

Medical/Dental

Administration

Function Suggested

NSF

3,482

1,277

1,350

7,220

1,113

1,940

1,960

2,550

0004 - DINING

0004 - DINING

0004 - DINING

0005 - RECREATION CENTER

0005 - RECREATION CENTER

0005 - RECREATION CENTER

0005 - RECREATION CENTER

0005 - RECREATION CENTER

0005 - RECREATION CENTER

0001 - ADMIN/HEALTH SERVICES

0008 - CONFERENCE CENTER

0005 - RECREATION CENTER

0001 - ADMIN/HEALTH SERVICES

Bldg Name Actual NSF Difference

3,482

1,277

1,350

7,220

1,113

1,940

4,660

Sub Total:

Sub Total:

Sub Total:

Sub Total:

6,109

10,508

1,940

4,660

1,808

1,356

1,445

4,520

4,068

10,950

1,445

4,520

1,674

-79

2,041

-442

Page: 4

Center: ALASKA (01011) of 4

STORAGE/SUPPORT

VACANT

Warehouse

Operations & Maintenance

Vacant

Under Renovation - Education

Under Renovation - Medical/De

Function Suggested

NSF

1,550 3,663

1,421

2,100 2,735

0010 - VOCATIONAL STORAGE

0003 - WAREHOUSE

0010 - VOCATIONAL STORAGE

0003 - WAREHOUSE

0008 - CONFERENCE CENTER

0009 - VACANT

0003 - WAREHOUSE

0010 - VOCATIONAL STORAGE

0001 - ADMIN/HEALTH SERVICES

Bldg Name Actual NSF Difference

5,213

1,691

5,127

Sub Total:

Sub Total:

6,904

6,147

2,712

1,808

4,520

2,501

-117

5,127

2,384

6,147

Environmental Management Report

Center: ALASKA (01011) Page: 1 Date: 05/03/2016 of 1

SOLID & HAZARDOUS WASTE MANAGEMENT (RCRA)

Commercial Waste Service

HAZARDOUS MATERIALS STORAGE (EPCRA)

N/A N/A

N/A No

PETROLEUM UNDERGROUND STORAGE TANKS (RCRA)

N/A0

PETROLEUM ABOVEGROUND STORAGE TANKS (CWA)

ASBESTOS AND PCB MANAGEMENT (TSCA)

AIR POLLUTION CONTROL (CAA)

N/A None

Attainment

Solid Waste Disposal :

Hazardous Waste Generator :

Hazardous Waste ID :

Generator Classification :

Hazadous Materials Storage :

Hazardous Materials ID :

HazMat Storage Area :

HazMat Spill Response Plan :

Number of Regulated USTs :

Number of Un-regulated USTs :

Local Hazardous Use Permit :

LEPC Notification :

EPA Generator ID Number :

Hazardous Waste Disposal :

RCRA Compliance :

ID LocationFuel Type Capacity

Number of ASTs :

Asbestos Survey Date :

Asbestos Type :

Asbestos Coordinator :

Coordinator Training Date:

Custodial/Maintenance Training :

AHERA Regulated :

Management Plan Approval :

PCB Transformer Testing :

PCB Transformers :

PCB-Contaminated Transformers :

Transformers Labelled :

Regional Air Quality :

Permitted Air Pollution Source :

Source Description :

Alaska Waste Management Yes Waste oil (4 gals/month)

Conditionally Exempt Small Quantity Generator N/A Hazardous Waste Recycling Service Emerald, Inc.

N/A N/A

Overfill Leak Corrosion

SPCC Plan Required : SPCC Plan Completed :

No N/A

No Survey Performed None N/A

N/A N/A N/A No Yes

ID Fuel Type Capacity Location Overfill

Prevention Secondary ContainmentTank Status

Tank Status Prevention/Detection

Radon

Date: 05/03/2016Center : Alaska (01011) Page: 1 of 1

0001 - ADMIN/HEALTH SERVICES

0002 - VOCATION/EDUCATION

0003 - WAREHOUSE

0004 - DINING

0005 - RECREATION CENTER

0006 - MALE DORMITORY

0007 - FEMALE/INDEPENDENT DORMITORY

0008 - CONFERENCE CENTER

0009 - VACANT

0010 - VOCATIONAL STORAGE

0011 - WALT HALL VOCATIONAL ANNEX

Bldg Name

04/20/2004

04/20/2004

04/20/2004

04/20/2004

04/20/2004

04/20/2004

04/20/2004

04/20/2004

Test Date

Yes

Yes

Yes

Yes

Yes

Yes

Yes

Yes

N/A

N/A

No

Radon Testing

< 4 pCi

< 4 pCi

< 4 pCi

< 4 pCi

< 4 pCi

< 4 pCi

< 4 pCi

< 4 pCi

Test Result

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

Mitigation Mitigation Date

RADON EXPLANATORY NOTES

The US Environmental Protection Agency (EPA) has established a radon action level of 4.0 picoCuries per liter (pCi/L). Occupied buildings with radon concentrations less than 4.0 pCi/L do not require radon mitigation; un-occupied buildings, or those buildings which are occupied only infrequently for brief periods of time, also do not require radon mitigation. Occupied buildings with radon concentrations greater than

4.0 pCi/L require radon mitigation and verification of radon reductions as soon as possible, with priority given to dormitories and student recreation buildings. Occupied buildings with radon concentrations greater than 20.0 pCi/L should be considered significant radon exposure hazards, and priority for mitigation should be given to buildings with these highly elevated radon concentrations.

Radon mitigation techniques include: (1) adjustment of the building HVAC system to create a positive pressure within the building; (2) sealing of foundation wall cracks, penetrations, or other openings;

(3) sealing crawlspace openings and sump pits; (4) installing an active subslab depressurization (ASD) system.

Site Description

Aerial view from Google Earth

Page: 1 Date: 05/03/2016 of 5

Paving Type for Roads & Parking Paving Type for Sidewalks

Asphalt and Gravel Asphalt & Concrete

Comments:

Topography Buildings and Structures

Center is not fully enclosed by fencing.

ROADS, PARKING & SIDEWALKS

Water Source Water Authority Service Meter On-Site Treatment Plant

1. Water System

Treatment Type Storage Type Storage Capacity(Gallons)

NoMasterCity of PalmerPublic Water Authority

None 0None

The city of Palmer has installed two water meters. When the center uses more than one fire hydrant for irrigation, the second meter senses the higher flow and meters the usage at a higher usage fee.

Comments:

Comments:

Fire Hydrants On-Site Water Supply Storage Capacity

(Gallons) Pressure Source FD Response Time

(Minutes)

Yes 0 7None Municipal

Adequate Fire Hydrants (7 units) are provided and the pressure is adequate. Palmer fire department has a response time of 5 - 7 minutes.

Number of Deficiencies = 1

Number of Deficiencies = 4

SITE FEATURES

UTILITIES

2. Fire Protection System

Buildings Structures11 38Flat

Surrounding

Outdoor Recreation

Rural

Archery, Basketball, Rope Climbing, Volleyball Detention Pond

Propane Tanks

Warehouse

Wood

Chain Link

Location Type

Maintenance Responsibility System Capacity Adequate System Condition

Center Center Yes Good

Separate Loop

No

Ownership Maintenance Responsibility System Capacity Adequate System Condition

Center Center Yes Good

Ownership

Roads & Parking Adequate Roads & Parking Condition Sidewalks Adequate Sidewalk Condition Yes Good Yes Fair

Number of Deficiencies = 1

Fencing

Other Features

Page: 2 Date: 05/03/2016 of 5

Sewage Treatment Flow

Utility

Publicly Owned Treatment Works

Center

Gravity

Maintenance ResponsibilityOwnership

Marathon Alaska Natural Gas Company

3. Sanitary Sewer System/ Sewage Treatment Plant

5. Fuel Distribution System

System Capacity Adequate System Condition

N/A Unknown

4. Storm Water System Number of Deficiencies = 5

Drain Type On-Site Storm Water Management

Surface and Underground Detention Pond

Ownership Maintenance Responsibility System Capacity Adequate System Condition

Center Yes GoodCenter

Comments: On-site storm water run-off is conducted to swales, catch basins and culverts to collect into a detention pond for gradual seepage into the ground.

Gas Company Metering

Individual

Ownership Maintenance Responsibility System Capacity Adequate System Condition

Center Center Yes Unknown

6. Central Plant: None

Page: 3 Date: 05/03/2016 of 5

Comments:

Electric Company PCB Trans.

Transformer Mounting Transformer Ownership

Systems Ownership Maintenance Responsibility

Matanuska Electric Assoc., Inc.

The center has a single primary-metered overhead utility feeder, a central pad-mounted sectionalizing enclosure and a closed-loop configuration of 500 kVA, 120/208V primary transformers. One smaller primary transformer, having two feeders brought directly from the sectionalizing enclosure, provides power for engine block heater outlets and site lighting. A pole-mounted fused cutout switch is located at the center's entrance pole, where primary power transitions to underground. The primary transformers have a primary oil-filled integral disconnect and enclosed secondary main circuit breaker section. Load-break elbows provide primary cable terminations (in and out), both at the transformers and at the sectionalizing enclosure. Building and zone metering is provided on equipment racks beside respective primary transformers. A 300 kW, Caterpillar Model 3408B, natural gas (with standby LPG) generator is located in Warehouse Building 3. The 480V backup power is distributed from a 500A shunt-trip generator main breaker, through an underground open-loop configuration having three key-interlocked tie breakers. The backup power loop is tapped from 480V disconnects, located at site equipment racks, serving dry-type step-down transformers (480V closed-delta primary - 120/208V, 3 Ph, 4 W secondary) and 120/208V automatic transfer switches within building mechanical rooms. No buildings use 480/277V for other than feeding the backup power step-down transformers. A generator and automatic transfer switch status indication panel is located at the security office, Building 1.

Pad Center

Center Center

No

12.47/7.2 kV, 3-Phase 4 Wire

120/208V, 3-Ph, 4 W; 480V, 3-Ph, 3 WUnderground

UndergroundPrimary Service

Secondary Service

Distribution Characteristics

Number of Deficiencies = 17. Electrical (Service)

Transformer Maint Resp

Center

System Capacity Adequate System Condition

Yes Good

Generator

Natural Gas

8. Electrical (Site Lighting)

Roadways Parking Walkways Building Outdoor Sports

Mounting

Control

Pole Pole Pole Building Pole

Photocell Photocell Photocell Photocell Switch

System Ownership Maintenance Responsibility System Capacity Adequate System Condition

Center Center Yes Good

Comments: Site lighting includes 35 feet metal pole street lights served at 480V, 10 feet pole walkway lights served at 277V and building-mounted exterior lights served at 120V. In general, building-mounted and site lighting fixtures are controlled by photocell. Most photocell-controlled circuits have hand-off-automatic selector switches for testing.

CTST-installed sports lighting is switch controlled.

ATS MTS

Yes No

Metering Master

Page: 4 Date: 05/03/2016 of 5

ACCESSIBILITY

Yes

NoNoNoNo

Nationally Registered Site

Site Eligible for National Register

Located in Historic District

Archaeological Significance

Comments:

Telephone Company

On-site Line Owner

The main communications room (MC)and demark is located in Building 2. Routers are connected via five T1 data lines which transfer LAN traffic to the Job Corps WAN. One T1 line services the VoIP long distance telecommunications switch. Local telephone traffic is routed through the local telephone utility. The dormitories have magnetic door alarm contacts monitored by system-integrated security panels located in RA offices.

Matanuska Telephone Assoc., Inc.

Maint. Responsibility

Center Center

Magnetic Door Contacts

01/01/1995CenterActive AbovegroundNear Warehouse NoPropane

STORAGE TANKS

TypeStatus Location Owner Fuel Type Capacity (Gallons) Install DateID

Reg.

Number of Deficiencies = 5

Accessible Parking: Accessible Slope:

Yes

Curb Cuts:

Yes

Ramps:

YesYes

Site Accessible Route:

HISTORIC PRESERVATION

9. Electrical (Communication/Alarm/Security)

Generator

Purpose

Yes

Central

VOIP

System Capacity Adequate System Condition

GoodYes

Number of Deficiencies = 3

Fire Alarm Security

Active Energy Use Reduction Program

Active Water Use Reduction Program

Approximate or Measured Waste Recycled

Use of School Dude or CMMS for Preventative Maintenance

Green Purchasing Policy Practiced

Site Stormwater Absorption Measures in Place

Center has Onsite Renewable Energy (PV or Wind)

Center has a Chartered Green Committee & Roster

Center Uses Green Cleaning Practices

SUSTAINABILITY

Yes

Yes

Yes

Yes

Yes

Yes

Yes

Yes

50 %

Page: 5 Date: 05/03/2016 of 5

Earthquake Risk

High Low LowLow LowIBC Low

LightningEarthquake Def. Authority Flooding Tornado Hurricane Forest

Fire

Snow hazard is high.Comments:

GENERAL SITE CONDITION

Rating X Good Fair Poor

The asphalt sidewalks are in fair condition.

NATURAL HAZARDS

The site condition is not impacting the functional use of the facilities.

The site condition IS impacting the functional use of the facilities.

The site condition IS SIGNIFICANTLY impacting the functional use of the facilities.

Building Descriptions and Structures

BUILDING 1 - ADMIN/HEALTH SERVICES

Building Descriptions

Page: 1 of 57

Building: 0001 - ADMIN/HEALTH SERVICES

BUILDING ENVELOPE

Foundation RoofBuilding

Concrete Wood Wood

EIFS Wood Shingles

Wall Roof Batt Batt

Metal Unit - Metal Frame Storefront - Metal Frame

AccessibilityFeature

GSF NSF Year Built Use Group Historic Ownership #Floors

B 7,420 4,790 1 Owned 1993 Not Evaluated

REAL ESTATE

Access to Building

Ramps

Entrance

2nd Egress

Visual Alarm

Corridor/Aisle

Rooms

Stairs

Elevator

Restrooms

Drinking Fountain

Telephone

Yes

Yes

Yes

Yes

Yes

Yes

Yes

N/A

N/A

Yes

Yes

N/A

ACCESSIBILITY

Structural Systems1.

Exterior Walls2.

Insulation4.

Exterior Doors5. Number of Deficiencies = 1

Material

The life expectancy of the roof was based on observations made during the July 2015 Facility Survey.

Drainage Year Life

Type Area Served

Asphalt Shingles Gutters and Downspouts 1994 5 Hip Entire Building

Comments:

3. Roof

Entire Building

Area Served

Page: 2 of 57

Building: 0001 - ADMIN/HEALTH SERVICES

INTERIOR FINISH

Carpet Ceramic Tile Resilient

Ceramic Tile Drywall Vinyl Wall Covering

Wood Unit - Metal Frame

VERTICAL CIRCULATION

Ramp Comments: Asphalt Ramp at the Medical/Dental entrance.

Awning Unit - Aluminum Frame; Double Glazing; Casement - Aluminum Frame; Double Glazing;

Fixed - Aluminum Frame; Double Glazing;

Acoustical Tile Gypsum Board

Number of Deficiencies = 1

Windows6.

Floors1. Number of Deficiencies = 1

Interior Walls2.

3.

Interior Doors4.

Heat Source

Heat Distribution

Piping System

Control System

Fresh Air Intake

Energy Conservation

Measure

Area Served

Heating hot water is provided by two Burnham Model P805 boilers. There are two Temtrol air handlers.

Baseboard convectors serve perimeter spaces.

The mechanical room is provided with a unit heater for freeze protection.

Cabinet unit heaters serve vestibules.

Comments:

Comments:

Comments:

Comments:

HVAC

Heat1.

Gas-Fired Hot Water Boiler

Gas-Fired Hot Water Boiler

Gas-Fired Hot Water Boiler

Gas-Fired Hot Water Boiler

Single Duct

Baseboard Convector

Unit Heater

Unit Heater

Two-Pipe

Two-Pipe

Two-Pipe

Two-Pipe

Direct Digital Control (DDC)

Direct Digital Control (DDC)

Electric

Electric

Mechanical

Natural

Mechanical

Natural

None

None

None

None

Entire Building

Offices

Equipment Room

Vestibules

Ceilings

Page: 3 of 57

Building: 0001 - ADMIN/HEALTH SERVICES

Mechanical

Mechanical

Mechanical

Janitor's Closet

Kitchen/Copy Room

Toilet/Shower

Domestic hot water is provided by an A.O. Smith gas-fired, 86-gallon water heater located in the mechanical room. The model is BTP139 880 and it operates with a rated input of 140 MBH.

Comments:

Cast-Iron None None

Electric Water Cooler Fixed Emergency Eyewash Hose Bibb Lavatory Portable Bottled Water Cooler Shower/Bathtub Sink Urinal Water Closet (Flush Valve)

Gas (Natural)

None None ABC Type Fire Extinguisher

Ventilation Area Served

Copper Copper Gas-Fired None No

Hot Water Cold Water Water Heater Water Treatment HW Storage Tank

Grease InterceptorWaste / Vent Interior Storm

None None None None Natural None Entire Building

Sprinkler System Stand Pipe System Fire Suppression

PLUMBING

Exhaust Ventilation

Ventilation2.

System Type

Air Distribution

Piping System

Control System

Fresh Air Intake

Energy Conservation Area

Served

Water Distribution1.

Sanitary Distribution2.

Fixtures3.

Fuel Distribution4.

FIRE PROTECTION

3. Air Conditioning

Page: 4 of 57

Building: 0001 - ADMIN/HEALTH SERVICES

Comments: Underground service is provided to a 400A panelboard with 400A main circuit breaker (MCB).

Underground backup power is provided from the center's backup power loop to a 75 kVA step-down transformer having a 225A secondary MCB disconnect. One automatic transfer switch is provided which serves a 150A MCB standby power panel and a 100A MCB emergency power panel. A generator and automatic transfer switch status indication panel for the center is located in the security office.

FIRE ALARM

Comments: The fire alarm panel is a Notifier System 5000. The graphic annunciator panel, Detection Systems Technology, is located near the main entrance. A small digital annunciator, Moose Security Terminal, provides fire alarm system status monitoring for the center and is located at the security office.

Service Entrance Electrical Characteristics Distribution Equipment Wiring Devices

Audible Alarm Central Annunciator Control/Annunciator Panel Duct Smoke Detector External Audible Alarm Graphic Annunciator Panel Heat Detector Manual Pull Station Smoke Detector Visual Alarm

Comments: Recorded footcandle levels include natural light contribution. Compact fluorescent down lights supplement linear fluorescent fixtures (mostly parabolic). Task lighting is provided in examination rooms of health services.

Comments: Tritium gas exit signs expired in December 2012.

High Intensity Discharge (HID)

T8 - Fluorescent

T8 - Fluorescent

T8 - Fluorescent

T8 - Fluorescent

T8 - Fluorescent

T8 - Fluorescent

T8 - Fluorescent

T8 - Fluorescent

T8 - Fluorescent

Offices

Conference Rooms

Corridors & Stairs

Equipment Rooms (Elec/Mech)

Toilets

Classrooms

Medical/Dental

Wards (Patient)

Storage/Warehouse-Active

Area Recommended Recorded Light Type

Generator and Battery Backup Tritium Gas/Battery Backup

Main Distribution Panel 120/208V, 3-Phase, 4 Wire Panelboard Receptacles, GFCI, Switches

Emergency Exit

ELECTRICAL SERVICES Number of Deficiencies = 3

Exterior Lighting1.

Interior Lighting2.

Emergency /Exit Lighting3.

LIGHTING

Page: 5 of 57

Building: 0001 - ADMIN/HEALTH SERVICES

Comments: The center's main telephone closet is located in this building. Two telephone switches and underground multi-paired voice cables provide telephone service to the center. A portable teleconferencing setup is located in the conference room. In addition to hard-wired data outlets, a wireless router is provided for LAN connection.

Connected to Main System None None TV with VCR

Telephone Security Public Address Television

GENERAL BUILDING CONDITION

Rating

Comments:

X Good Fair Poor

Exterior siding needs repainting.

COMMUNICATION

The facility condition is not impacting the functional use of the facility.

The facility condition IS impacting the functional use of the facility.

The facility condition IS SIGNIFICANTLY impacting the functional use of the facility.

Electric Water Gas No YesYes

BUILDING UTILITY METERING

Structure: Good Exterior: Fair Interior: Good Mechanical: Good Electrical: Good

Type Location 120V w/Battery Backup Corridor and rooms

There is no plausible means by which harmful levels of CO could enter sleeping rooms.

CARBON MONOXIDE DETECTION

Detection Required No

Number of Deficiencies = 0

IMPAIRMENT

Potentially Impaired

DOL Responded

DOL Determination

Potential Impaired Comments DOL Determination Discussion/Comments

BUILDING 2 - VOCATION/EDUCATION

Page: 6 of 57

Building: 0002 - VOCATION/EDUCATION

BUILDING ENVELOPE

Foundation RoofBuilding

Concrete Structural Steel Steel

EIFS Wood Shingles

Wall Roof Batt Batt

Metal Overhead - Metal Frame Metal Unit - Metal Frame Storefront - Metal Frame

AccessibilityFeature

GSF NSF Year Built Use Group Historic Ownership #Floors

B 24,700 15,323 1 Owned 1993 Not Evaluated

Comments: The mezzanine spaces above each of the four vocational shops for storage, classroom, lab and HVAC are accessed via stairs or ladders.

REAL ESTATE

Access to Building

Ramps

Entrance

2nd Egress

Visual Alarm

Corridor/Aisle

Rooms

Stairs

Elevator

Restrooms

Drinking Fountain

Telephone

Yes

N/A

Yes

Yes

Yes

Yes

Yes

Yes

N/A

Yes

Yes

N/A

ACCESSIBILITY

Structural Systems1.

Exterior Walls2. Number of Deficiencies = 1

Insulation4.

Exterior Doors5. Number of Deficiencies = 1

Material

Asphalt shingle roofing and roof venting were replaced/repaired in December 2015.

Drainage Year Life

Type Area Served

Asphalt Shingles Surface Run-off 2015 20 Gable Entire Building

Number of Deficiencies = 1

Comments:

3. Roof

Page: 7 of 57

Building: 0002 - VOCATION/EDUCATION

INTERIOR FINISH

Carpet Ceramic Tile Concrete Sheet vinyl Vinyl Tile

Ceramic Tile Drywall Fencing Wood Paneling

Metal Unit - Metal Frame Wood Unit - Metal Frame

VERTICAL CIRCULATION

Metal Ladders Wood Stairs Comments: Three wood stairs and three steel ladders lead to the mezzanine.

Casement - Aluminum Frame; Double Glazing; Fixed - Aluminum Frame; Double Glazing;

Acoustical Tile Exposed Structure Gypsum Board

Windows6.

Floors1. Number of Deficiencies = 1

Interior Walls2.

3.

Interior Doors4. Number of Deficiencies = 2

Page: 8 of 57

Building: 0002 - VOCATION/EDUCATION

Mechanical

Mechanical

Mechanical

Shop Area

Restroom

Center Maint. Paint Storage

Comments: The paint storage exhaust fan is explosion proof.

Ventilation Area Served

Split Direct Expansion (Air

Source)

Fan Coil Refrigerant Electric Natural None Electronic Equipment

Room

Exhaust Ventilation

The air conditioner is a Mitsubishi Mr. Slim model PK18 split-ductless system with 1.5 tons of cooling capacity.

Comments:

Heat Source

Heat Distribution

Piping System

Control System

Fresh Air Intake

Energy Conservation

Measure

Area Served

Heating hot water is provided by two Burnham Model PF-512 boilers, each with 1944 MBH input.

There are six Temtrol air handlers.

Shop areas are provided with supplemental heat from ceiling-hung unit heaters.

Baseboard convectors serve perimeter spaces.

Cabinet unit heaters serve vestibules.

The mechanical room is provided with a unit heater for freeze protection.

Comments:

Comments:

Comments:

Comments:

Comments:

HVAC

Heat1.

Gas-Fired Hot Water Boiler

Gas-Fired Hot Water Boiler

Gas-Fired Hot Water Boiler

Gas-Fired Hot Water Boiler

Gas-Fired Hot Water Boiler

Single Duct

Unit Heater

Baseboard Convector

Unit Heater

Unit Heater

Two-Pipe

Two-Pipe

Two-Pipe

Two-Pipe

Two-Pipe

Direct Digital Control (DDC)

Direct Digital Control (DDC)

Direct Digital Control (DDC)

Electric

Electric

Mechanical

Natural

Natural

Natural

Mechanical

None

None

None

None

None

Common Area

Shop Area

Classrooms and Offices

Vestibules

Equipment Room

Ventilation2.

System Type

Air Distribution

Piping System

Control System

Fresh Air Intake

Energy Conservation Area

Served

Page: 9 of 57

Building: 0002 - VOCATION/EDUCATION

Domestic hot water is provided by a Rheem BTH 199 100 gas-fired unit built 12/2012. Water is circulated by a Grundfos pump.

Comments:

Cast-Iron None None

Electric Water Cooler Fixed Emergency Eyewash Hose Bibb Lavatory Sink Urinal Water Closet (Flush Valve)

Gas (Natural)

None None ABC Type Fire Extinguisher

Comments: Underground service is metered and provided to a 1000A panelboard with 1000A main circuit breaker (MCB) which also serves Buildings 9, 10 and 12. Underground backup power is provided from the center's backup power loop to a 45 kVA step-down transformer having a 150A secondary MCB disconnect. One automatic transfer switch is provided which serves a 60A MCB standby power panel, a 60A MCB emergency power panel and backup power to Building 9. Emergency power off switches are provided in shops.

Copper Copper Hot Water/Hot Water Heat Exch.

None No

Hot Water Cold Water Water Heater Water Treatment HW Storage Tank

Grease InterceptorWaste / Vent Interior Storm

Service Entrance Electrical Characteristics Distribution Equipment Wiring Devices

High Intensity Discharge (HID)

Main Distribution Panel 120/208V, 3-Phase, 4 Wire Panelboard Receptacles, GFCI, Switches

Sprinkler System Stand Pipe System Fire Suppression

PLUMBING

Water Distribution1.

Sanitary Distribution2.

Fixtures3.

Fuel Distribution4.

FIRE PROTECTION

ELECTRICAL SERVICES Number of Deficiencies = 1

Exterior Lighting1.

Page: 10 of 57

Building: 0002 - VOCATION/EDUCATION

FIRE ALARM

Comments: The fire alarm panel is a Notifier System 5000. The graphic annunciator panel, Detection Systems Technology, is located near the main entrance. The system is monitored at the security office, Building 1.

Comments: The main data communications room (MC) is located in this building and serves all buildings via underground fiber optic cable. The network backbone is from a Cisco 6500 series switch. Each of the 11 buildings have a Cisco 3500 series switch. The buildings are wired with either Cat 5 or 6 cable.

Each building is also provided with at least one Cisco Aironet 1200 wireless access point. The MC room contains the Cisco C6500e switch, two 3800 series routers, a Blue Coat network security system, a Cisco 4400 series wireless LAN controller and 1700 voice gateway for fax capabilities.

UPS power is provided for up to 20 minutes before an automated graceful shutdown. The MC also contains two network domain file servers for center administration and CTT vocations. The facility maintenance work order server is also located in the MC. A bell system is provided with control at the reception desk.

Audible Alarm Control/Annunciator Panel Duct Smoke Detector External Audible Alarm Graphic Annunciator Panel Heat Detector Manual Pull Station Smoke Detector Visual Alarm

Connected to Main System None None TV with VCR

Telephone Security Public Address Television

Comments: Recorded footcandle levels include natural light contribution. Compact fluorescent down lights supplement linear fluorescent fixtures in some areas. The carpentry shop is illuminated with HID fixtures. Most rooms have dual switching.

Comments: Tritium gas exit signs expired in December 2012.

T8 - Fluorescent

T8 - Fluorescent

T8 - Fluorescent

T8 - Fluorescent

T8 - Fluorescent

T8 - Fluorescent

High Intensity Discharge (HID)

T8 - Fluorescent

Offices

Corridors & Stairs

Equipment Rooms (Elec/Mech)

Toilets

Classrooms

Classrooms

Vocational

Storage/Warehouse-Active

Area Recommended Recorded Light Type

Generator and Battery Backup Tritium Gas/Battery Backup

Emergency Exit

Number of Deficiencies = 1

Interior Lighting2.

Emergency /Exit Lighting3.

COMMUNICATION

Type Location 120V w/Battery Backup Corridor

CARBON MONOXIDE DETECTION

Detection Required No

Number of Deficiencies = 0

Page: 11 of 57

Building: 0002 - VOCATION/EDUCATION

GENERAL BUILDING CONDITION

Rating

Comments:

X Good Fair Poor

Exterior siding needs repainting.

The facility condition is not impacting the functional use of the facility.

The facility condition IS impacting the functional use of the facility.

The facility condition IS SIGNIFICANTLY impacting the functional use of the facility.

Electric Water Gas No YesZone

BUILDING UTILITY METERING

Structure: Good Exterior: Fair Interior: Good Mechanical: Good Electrical: Good

IMPAIRMENT

Potentially Impaired

DOL Responded

BUILDING 3 - WAREHOUSE

Page: 12 of 57

Building: 0003 - WAREHOUSE

BUILDING ENVELOPE

Foundation RoofBuilding

Concrete Wood Steel

EIFS Wood Shingles

Wall Roof Batt Batt

Metal Overhead - Metal Frame Metal Unit - Metal Frame Storefront - Metal Frame

AccessibilityFeature

GSF NSF Year Built Use Group Historic Ownership #Floors

S-2 7,700 5,961 1 Owned 1993 Not Evaluated

Comments: A mezzanine storage above the two receiving offices is accessed via stairs.

REAL ESTATE

Access to Building

Ramps

Entrance

2nd Egress

Visual Alarm

Corridor/Aisle

Rooms

Stairs

Elevator

Restrooms

Drinking Fountain

Telephone

Yes

No

Yes

Yes

Yes

Yes

Yes

Yes

N/A

Yes

Yes

N/A

ACCESSIBILITY

Structural Systems1.

Exterior Walls2. Number of Deficiencies = 1

Insulation4.

Exterior Doors5.

Material

The life expectancy of the roof was based on observations made during the July 2015 Facility Survey.

Drainage Year Life

Type Area Served

Asphalt Shingles Surface Run-off 1994 5 Gable Entire Building

Comments:

3. Roof

Page: 13 of 57

Building: 0003 - WAREHOUSE

INTERIOR FINISH

Carpet Ceramic Tile Concrete Plywood Resilient

Drywall Plywood

Wood Unit - Metal Frame

VERTICAL CIRCULATION

Concrete Ramp Concrete Stairs Wood Stairs Comments: Wood stairs lead to the mezzanine file/records storage, two concrete stairs (one interior, one exterior) lead to the loading dock. and one interior ramp leads to the loading dock.

Awning Unit - Aluminum Frame; Double Glazing; Fixed - Aluminum Frame; Double Glazing;

Acoustical Tile Gypsum Board

Windows6.

Floors1. Number of Deficiencies = 1

Interior Walls2.

3.

Interior Doors4. Number of Deficiencies = 2

Heat Source

Heat Distribution

Piping System

Control System

Fresh Air Intake

Energy Conservation

Measure

Area Served

Heating hot water is provided by three Burnham Model PXG-2006A-WNI boilers. There is one Temtrol air handler.

The mechanical room is also provided with a unit heater for freeze protection.

Comments:

Comments:

HVAC

Heat1. Number of Deficiencies = 1

Gas-Fired Hot Water Boiler

Gas-Fired Hot Water Boiler

Single Duct

Unit Heater

Two-Pipe

Two-Pipe

Direct Digital Control (DDC)

Electric

Mechanical

Natural

None

None

Offices

Storage

Page: 14 of 57

Building: 0003 - WAREHOUSE

Mechanical

Mechanical

Mechanical

Restroom

Janitor's Closet

Record Storage

Water heater is an electric 17-gallon State Model PV 17 10M S8 FX.Comments:

Cast-Iron None None

Fixed Emergency Eyewash Hose Bibb Lavatory Portable Bottled Water Cooler Sink Urinal Water Closet (Flush Valve)

Gas (Natural)

Comments:

Wet None ABC Type Fire Extinguisher

Comments: Only the warehouse area is sprinklered.

Ventilation Area Served

Copper Copper Electric None No

Hot Water Cold Water Water Heater Water Treatment HW Storage Tank

Grease InterceptorWaste / Vent Interior Storm

None None None None Natural None Entire Building

Sprinkler System Stand Pipe System Fire Suppression

PLUMBING

Exhaust Ventilation

Ventilation2.

System Type

Air Distribution

Piping System

Control System

Fresh Air Intake

Energy Conservation Area

Served

Water Distribution1.

Sanitary Distribution2.

Fixtures3.

Fuel Distribution4.

FIRE PROTECTION

The emergency generator is provided with a 500-gallon propane tank for a backup fuel supply.

Page: 15 of 57

Building: 0003 - WAREHOUSE

Comments: Underground service is provided to a 225A panelboard with 175A main circuit breaker (MCB). A 15 kVA step-down transformer and automatic transfer switch is provided which serves a 30A MCB standby power panel and a 30A MCB emergency power panel. Backup power for essential loads on center is provided by a 300 kW emergency generator located in the generator room of this building.

FIRE ALARM

Comments: The fire alarm panel is a Notifier System 5000. The graphic annunciator panel, Detection Systems Technology, is located near the main entrance. The system is monitored at the security office, Building 1.

Service Entrance Electrical Characteristics Distribution Equipment Wiring Devices

Audible Alarm Control/Annunciator Panel Duct Smoke Detector External Audible Alarm Flow/Tamper Switch Graphic Annunciator Panel Heat Detector Manual Pull Station Smoke Detector Sprinkler Bell Visual Alarm

Comments: Recorded footcandle levels include natural light contribution. The large warehouse room is illuminated by HID fixtures.

High Intensity Discharge (HID)

T8 - Fluorescent

T8 - Fluorescent

T8 - Fluorescent

T8 - Fluorescent

High Intensity Discharge (HID)

T8 - Fluorescent

Offices

Corridors & Stairs

Equipment Rooms (Elec/Mech)

Toilets

Storage/Warehouse-Active

Storage/Warehouse-Active

Area Recommended Recorded Light Type

Generator and Battery Backup Battery Backup

Main Distribution Panel 120/208V, 3-Phase, 4 Wire Panelboard Receptacles, GFCI, Switches

Emergency Exit

ELECTRICAL SERVICES Number of Deficiencies = 2

Exterior Lighting1.

Interior Lighting2. Number of Deficiencies = 2

Emergency /Exit Lighting3. Number of Deficiencies = 1

Type Location None None

CARBON MONOXIDE DETECTION

LIGHTING

Detection Required

Page: 16 of 57

Building: 0003 - WAREHOUSE

Comments: LAN connection is provided for data outlets. The Siemens Building Automation direct digital controls (DDC) graphic interface is located in this building.

Connected to Main System None None None

Telephone Security Public Address Television

GENERAL BUILDING CONDITION

Rating

Comments:

X Good Fair Poor

Exterior siding needs repainting.

COMMUNICATION

The facility condition is not impacting the functional use of the facility.

The facility condition IS impacting the functional use of the facility.

The facility condition IS SIGNIFICANTLY impacting the functional use of the facility.

Electric Water Gas No YesYes

BUILDING UTILITY METERING

Structure: Good Exterior: Fair Interior: Good Mechanical: Good Electrical: Good

IMPAIRMENT

Potentially Impaired

DOL Responded

BUILDING 4 - DINING

Page: 17 of 57

Building: 0004 - DINING

BUILDING ENVELOPE

Foundation RoofBuilding

Concrete Wood Wood

EIFS Wood Shingles

Wall Roof Batt Batt

Metal Unit - Metal Frame Storefront - Metal Frame

AccessibilityFeature

GSF NSF Year Built Use Group Historic Ownership #Floors

A-2 10,525 7,306 1 Owned 1993 Not Evaluated

REAL ESTATE

Access to Building

Ramps

Entrance

2nd Egress

Visual Alarm

Corridor/Aisle

Rooms

Stairs

Elevator

Restrooms

Drinking Fountain

Telephone

Yes

N/A

Yes

Yes

Yes

Yes

Yes

No

N/A

Yes

Yes

N/A

ACCESSIBILITY

Structural Systems1.

Exterior Walls2. Number of Deficiencies = 3

Insulation4.

Exterior Doors5.

Material

The life expectancy of the roof was based on observations made during the July 2015 Facility Survey.

Drainage Year Life

Type Area Served

Asphalt Shingles Surface Run-off 1994 5 Hip Entire Building

Comments:

3. Roof

Page: 18 of 57

Building: 0004 - DINING

INTERIOR FINISH

Carpet Ceramic Tile Concrete Quarry Tile Resilient

Ceramic Tile Drywall Fiberglass Panel

Metal Rollup - Metal Frame Wood Unit - Metal Frame

VERTICAL CIRCULATION

Concrete Stairs Metal Ladder Metal Stairs Comments: One portable steel ladder provides access to the mechanical room above the kitchen. Concrete stairs lead to the loading dock.

Awning Unit - Aluminum Frame; Double Glazing; Fixed - Aluminum Frame; Double Glazing;

Storefront - Aluminum Frame; Double Glazing;

Acoustical Tile Plaster

Number of Deficiencies = 1

Windows6.

Floors1. Number of Deficiencies = 1

Interior Walls2.

3.

Interior Doors4. Number of Deficiencies = 2

Heat Source

Heat Distribution

Piping System

Control System

Fresh Air Intake

Energy Conservation

Measure

Area Served

Heating hot water is provided by two Burnham Model PF-512 boilers. There are three Temtrol air handlers, one of which is used as a makeup air unit for the kitchen hoods.

Baseboard convectors serve perimeter spaces.

Cabinet unit heaters serve vestibules.

The mechanical room is also provided with a unit heater for freeze protection.

Comments:

Comments:

Comments:

Comments:

HVAC

Heat1.

Electric Hot Water Boiler

Gas-Fired Hot Water Boiler

Gas-Fired Hot Water Boiler

Electric Hot Water Boiler

Single Duct

Baseboard Convector

Unit Heater

Unit Heater

Two-Pipe

Two-Pipe

Two-Pipe

Two-Pipe

Direct Digital Control (DDC)

Direct Digital Control (DDC)

Electric

Electric

Mechanical

Natural

Natural

Natural

None

None

None

None

Entire Building

Entire Building

Vestibules

Storage

Page: 19 of 57

Building: 0004 - DINING

Mechanical

Mechanical

Mechanical

Restroom

Kitchen

Janitor's Closet

There are six heat exchanger water heaters. All are Amtrol 80 gallon units.Comments:

Cast-Iron Indoor None

Electric Water Cooler Fixed Emergency Eyewash Hose Bibb Lavatory Sink Urinal Water Closet (Flush Valve)

Gas (Natural)

None None ABC Type Fire Extinguisher, K Type Fire Extinguisher, Wet Chemical

Ventilation Area Served

Copper Copper Hot Water/Hot Water Heat Exch.

Water Softener No

Hot Water Cold Water Water Heater Water Treatment HW Storage Tank

Grease InterceptorWaste / Vent Interior Storm

None None None None Natural None Entire Building

Sprinkler System Stand Pipe System Fire Suppression

PLUMBING

Exhaust Ventilation

Ventilation2.

System Type

Air Distribution

Piping System

Control System

Fresh Air Intake

Energy Conservation Area

Served

Water Distribution1.

Sanitary Distribution2. Number of Deficiencies = 1

Fixtures3. Number of Deficiencies = 1

Fuel Distribution4.

Number of Deficiencies = 1FIRE PROTECTION

Page: 20 of 57

Building: 0004 - DINING

Comments: Underground service is provided to a 1200A panelboard with 1200A main circuit breaker (MCB).

Underground backup power is provided from the center's backup power loop to a 112.5 kVA step-down transformer having a 300A secondary MCB disconnect. One automatic transfer switch is provided which serves a 250A MCB standby power panel and a 100A MCB emergency power panel. Shunt-trip breakers are utilized for interlocking electric power under hoods with fire suppression controls.

Service Entrance Electrical Characteristics Distribution Equipment Wiring Devices

Comments: Recorded footcandle levels include natural light contribution. The dining area is provided with pendant-mounted indirect lights with remote dimming ballasts located in the storage room near the loading dock. Task lighting is also used. Compact fluorescent down lights supplement linear fluorescent fixtures in the salad bar.

Comments: Tritium gas exit signs expired in December 2012.

High Intensity Discharge (HID)

T8 - Fluorescent

T8 - Fluorescent

T8 - Fluorescent

T8 - Fluorescent

High Intensity Discharge (HID)

High Intensity Discharge (HID)

T8 - Fluorescent

T8 - Fluorescent

T8 - Fluorescent

Offices

Corridors & Stairs

Equipment Rooms (Elec/Mech)

Toilets

Dining/Lunch Rooms

Food Preparation

Food Preparation

Classrooms

Storage/Warehouse-Active

Area Recommended Recorded Light Type

Generator and Battery Backup Tritium Gas/Battery Backup

Main Distribution Panel 120/208V, 3-Phase, 4 Wire Panelboard Receptacles, GFCI, Switches

Emergency Exit

ELECTRICAL SERVICES Number of Deficiencies = 1

Exterior Lighting1.

Interior Lighting2.

Emergency /Exit Lighting3. Number of Deficiencies = 1

Location UL300 Compliance Status Main Kitchen and Culinary Arts Kitchen Compliant

Comments: The two hoods in the main kitchen have UL 300 compliant fire extinguishing systems. The culinary arts kitchen has one hood and its fire extinguishing system is UL 300 compliant.

UL300 COMMERCIAL KITCHEN HOOD FIRE SUPPRESSION

Page: 21 of 57

Building: 0004 - DINING

FIRE ALARM

Comments: The fire alarm panel is a Notifier System 5000. The graphic annunciator panel, Detection Systems Technology, is located in the kitchen. The system is monitored at the security office, Building 1.

Comments: In addition to hard-wired data outlets, a wireless router is provided for LAN connection.

Audible Alarm Control/Annunciator Panel Duct Smoke Detector External Audible Alarm Graphic Annunciator Panel Heat Detector Kitchen Hood Manual Pull Station Smoke Detector Visual Alarm

Connected to Main System None None TV with VCR

Telephone Security Public Address Television

GENERAL BUILDING CONDITION

Rating

Comments:

X Good Fair Poor

Exterior siding needs repainting.

COMMUNICATION

The facility condition is not impacting the functional use of the facility.

The facility condition IS impacting the functional use of the facility.

The facility condition IS SIGNIFICANTLY impacting the functional use of the facility.

Electric Water Gas No YesYes

BUILDING UTILITY METERING

Structure: Good Exterior: Fair Interior: Good Mechanical: Good Electrical: Good

Type Location None None

CARBON MONOXIDE DETECTION

Detection Required No

Number of Deficiencies = 0

IMPAIRMENT

Potentially Impaired

DOL Responded

BUILDING 5 - RECREATION CENTER

Page: 22 of 57

Building: 0005 - RECREATION CENTER

BUILDING ENVELOPE

Foundation RoofBuilding

Concrete Structural Steel Steel

EIFS Wood Shingles

Wall Roof Batt Batt

Metal Unit - Metal Frame Storefront - Storefront Frame

AccessibilityFeature

GSF NSF Year Built Use Group Historic Ownership #Floors

A-3 15,575 11,030 1 Owned 1993 Not Evaluated

REAL ESTATE

Access to Building

Ramps

Entrance

2nd Egress

Visual Alarm

Corridor/Aisle

Rooms

Stairs

Elevator

Restrooms

Drinking Fountain

Telephone

Yes

Yes

Yes

Yes

Yes

Yes

Yes

N/A

N/A

Yes

Yes

N/A

ACCESSIBILITY

Structural Systems1.

Exterior Walls2.

Insulation4.

Exterior Doors5.

Material

Asphalt shingle roofing and roof venting were replaced/repaired in December 2015.

Drainage Year Life

Type Area Served

Asphalt Shingles Surface Run-off 2015 20 Hip Entire Building

Number of Deficiencies = 1

Comments:

3. Roof

Page: 23 of 57

Building: 0005 - RECREATION CENTER

INTERIOR FINISH

Carpet Ceramic Tile Concrete Interlocking Rubber Tiles Resilient Synthetic Sports Flooring

Carpet Ceramic Tile Drywall

Metal Unit - Metal Frame Wood Unit - Metal Frame

VERTICAL CIRCULATION

Exterior Ramp Metal Ladder Comments: A metal ladder provides access to the fan room above the mechanical room.

Casement - Aluminum Frame; Double Glazing; Fixed - Aluminum Frame; Double Glazing;

Acoustical Tile Plaster Tectum Acoustical Panels

Windows6.

Floors1. Number of Deficiencies = 1

Interior Walls2.

3.

Interior Doors4.

Page: 24 of 57

Building: 0005 - RECREATION CENTER

Mechanical

Mechanical

Mechanical

Mechanical

Restroom

Kiln Area

Model Spray Painting Hood

Janitor's Closet

Ventilation Area Served

Split Direct Expansion (Air

Source)

Fan Coil Refrigerant Electric Natural None Classrooms

Exhaust Ventilation

The server room for the learning resource center is provided with a Mitsubishi model PU18EK1 split-ductless system with 1.5 tons of cooling capacity.

Comments:

Heat Source

Heat Distribution

Piping System

Control System

Fresh Air Intake

Energy Conservation

Measure

Area Served

Heating hot water is provided by two Burnham Model V911A boilers with rated input of 2136 MBH and output of 1714 MBH. There are two Temtrol air handlers.

Supplemental heat for the gymnasium is provided by cabinet unit heaters on the outside wall.

Cabinet unit heaters also serve vestibules, and are controlled by electric thermostats.

All perimeter spaces except for the gymnasium are served by baseboard convectors.

Bathrooms are provided with ceiling radiant panels.

The mechanical room is provided with a unit heater for freeze protection.

Comments:

Comments:

Comments:

Comments:

Comments:

HVAC

Heat1.

Gas-Fired Hot Water Boiler

Gas-Fired Hot Water Boiler

Gas-Fired Hot Water Boiler

Gas-Fired Hot Water Boiler

Gas-Fired Hot Water Boiler

Single Duct

Unit Heater

Baseboard Convector

Radiant Panel

Uni…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .