16-NAT-12844 - Supplier Monthly Performance Report - Rev. 2.xlsx

XLSX spreadsheet 60 KB Posted

Attached to
RFP-2025-9827 RAC Pressure Drop Testing
Solicitation number
RFP-2025-9827
Issued by
Washington

About this file

The file "16-NAT-12844 - Supplier Monthly Performance Report - Rev. 2.xlsx" is a document related to a TerraPower, LLC contract opportunity in Washington state for the Natrium Demonstration Project. The specific opportunity is an RFP for Reactor Air Cooling (RAC) Pressure Drop Testing, which requires a supplier to support the project's test program. The solicitation involves export-controlled information, and potential bidders must have or establish a TP-ShareFile account and sign a Non-Disclosure Agreement (NDA) to access project documents. Questions and comments must be submitted through the Bonfire Q&A section by the specified deadline.

The RFP emphasizes strict confidentiality protocols, with bidders required to appropriately mark any confidential or proprietary information submitted. TerraPower retains sole discretion in contract award decisions. The opportunity appears to be a specialized technical procurement with specific access requirements, including mandatory NDA signing before accessing the full project opportunity package. While specific pricing, funding sources, and contract term details are not explicitly stated in the provided document, the solicitation suggests a rigorous technical procurement process with controlled information sharing and strict compliance expectations.

View the file

Other files

File Type Posted
12-SWAR Form - RAC Pre-Proposal Meeting Only.pdf PDF
5-13 Exh A Supplement 2 (Equipment) - Natrium Subcontractor Flowdown Final.docx DOCX document
9-TP-PRC-FORM-0006 Rev 10.docx DOCX document
10-TerraPower SCR Guide Rev 9.pdf PDF
11-NAT-17712, SOW - RAC Pressure Drop Test.pdf PDF
17-RFP Instructions - RFP-2025-9827 RAC Pressure Drop Testing.doc DOC document
4-12 Exh A Supplement 1c (Rights in Data Universities Foreign Business Patent Rights) - Natrium Subcontractor Flowdown Final.docx DOCX document
6-NAT-3279 Rev 2 - Natrium Supplier Metadata Form (2).xlsx XLSX spreadsheet
7-Natrium Supplier Submittal Guide Rev. 1.pdf PDF
1-09 Exh A to USG PO TC - Natrium Subcontractor Flowdowns Final.docx DOCX document
13-TP-ITS-FORM-0001 Rev 7c SWAR Form RAC Pressure Drop Testing.pdf PDF
14-TP-LGL-TEMP-0008 TerraPower PO (Long Form) Terms and Conditions USG - Rev 8.docx DOCX document
15-NAT-8814 - Supplier Scheduling and Reporting Requirements Rev. 1.pdf PDF
2-10 Exh A Supplement 1a (Rights in Data Large Business Class Patent Waiver) - Natrium Subcontractor Flowdown Final.docx DOCX document
3-11 Exh A Supplement 1b (Rights in Data Small Business Patent Rights) - Natrium Subcontractor Flowdown Final.docx DOCX document
8-Guidance on DOE Foreign Country of Risk Sponsored or Affiliated Activities.pdf PDF
Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Definitions & Instructions

AcronymFull TermStatus BarsDrop DownsNext Step
BCWSBudgeted Cost of Work ScheduledGStatus is green. On track, no issues to report, meets statement of work requirementsIf green, no action
BCWPBudgeted Cost of Work PerformedYStatus is yellow. Trending off track, issues are being worked and/or mitigatedIf yellow, start developing mitigation plans & capture in risk register
ACWPActual Cost of Work PerformedRStatus is red. Off track and currently not meeting requirements. Action needs to be taken to get back to greenIf red, risk register item should be reviewed regularly along with any mitigation efforts. This is where a "get to green" plan is finalized
ETCEstimate to Complete
EACEstimate at Complete
VACVariance at Complete
CPCurrent Period
CTDCumulative To Date
Risk CubeInstructions
No.Important Information1List the risk number, risk name and expected monetary impact
1Cost Plus Purchase Orders are required to fill out the Cost Plus Monthly Report and the CP- Time Phased Forecast every month2Place an x in the risk cube for where the associated risks fall (not expected to put the risk number as this would heavily crowd the risk cube if numerous risks were in the same space)
2Firm Fixed Price Purchase Orders are only required to fill out the firm fixed price report tab3Capture total value of risks being monitored
3CP - Time phased forecast captures the full period of performance of the purchase order, if you need to add additional months to the tab, feel free4In row 42, indicate if any recognized risk is being captured in the EAC
4If more than one contract type is utilized on a single PO, only fill out lines 4-23 on the FFP reporting tab. Everything else can be captured in the cost plus monthly report tab5Risk impact analysis should be done with the TerraPower Supplier Project Engineer and the TerraPower Project Manager
Note:Risk and opportunities text box to the left of the risk cube is intended to explain risks in further detail, should it be needed

Cost Plus Monthly Report

ONLY INPUT THE COST PLUS LINE ITEM DATA IN THIS TAB
Project Title:Natrium Demonstration Project(See Defintions Page)Report Date;Month/Year
Vendor:Budget at Complete - Original

tc={8E1C3180-074F-4BAD-A90A-CB41BE0BDEFC}: [Threaded comment]

Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924

Comment:

BAC at contract award (Does not include fee) $ - 0 Estimate to Complete (ETC) $ - 0 Current Period Safety Y Unapproved Changes:

tc={E1E6C364-979F-4FDF-9EC0-09B289990B13}: [Threaded comment]

Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924

Comment:

Changes that have not been approved but are seeking approval$ - 0
Project Manager:Budget at Complete - Current

tc={7E3D55D6-E14F-4593-9D6B-9CBF1BD61AB6}: [Threaded comment]

Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924

Comment:

BAC at time of submittal (Does not include fee) $ - 0 Variance at Complete (VAC) $ - 0 Cost Variance tc={B5EC02C2-2A41-46F9-880C-B48BA21E9EFD}: [Threaded comment]

Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924

Comment:

= Current period BCWP - Current Period ACWP $ - 0 Quality G Approved Changes tc={5453FFC4-7190-48FB-9C7F-720B83D0ED82}: [Threaded comment]

Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924

Comment:

Changes that have been approved and are on contract$ - 0
Company ContactEstimate at Complete (EAC)$ - 0CTD - SPI$ - 0Schedule Variance

tc={8347D986-3A29-41EA-8E4C-490ADFEB6A4A}: [Threaded comment]

Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924

Comment:

= Current Period BCWP - Current Period BCWS $ - 0 Risk R Base Contract Value tc={161A5613-EE85-4555-B4DB-AC033CDA2638}: [Threaded comment]

Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924

Comment:

Total Cost Plus PO Value minus fee$ - 0
Contract Number:CTD - Actual Cost$ - 0CTD - CPI$ - 0Cumulative to Date (CTD)TechnicalYFee Percentage0%
Project Start:CTD - Earned Value$ - 0$ - 0Cost Variance$ - 0Fee Value$ - 0
Project FinishSchedule Variance$ - 0Total PO Value$ - 0
Project Objective & Scope:
FILL THIS OUT

CURRENT CALENDAR YEAR

tc={34F12C8A-7534-44AA-BD81-C7630967F8F6}: [Threaded comment]

Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924

Comment:

Updated report template will be provided by TerraPower each new calendar year tc={161A5613-EE85-4555-B4DB-AC033CDA2638}: [Threaded comment]

Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924

Comment:

Total Cost Plus PO Value minus feeNOTE: Do not change formulas for CTD calculations
BASELINE

tc={75647DEA-E77F-469F-83F0-337724CD8302}: [Threaded comment]

Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924

Comment:

NOTE: All period of performance BCWS, ACTUALS, ETC are expected to be captured on the CP - Time phased forecast tabJan-25Feb-25Mar-25Apr-25May-25Jun-25Jul-25Aug-25Sep-25Oct-25Nov-25Dec-25Plan CY Total
CP BCWS$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -<--- Input data in this row
CTD BCWS

tc={BDB698BD-67B7-40AA-B553-E6236DF93397}: [Threaded comment]

Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924

Comment:

Do not change the formulas in this row$ -0$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -
ACTUALJan-25Feb-25Mar-25Apr-25May-25Jun-25Jul-25Aug-25Sep-25Oct-25Nov-25Dec-25Actual CY Total
CP ACWP$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -<--- Input data in this row
CTD ACWP

tc={481617F1-B96F-4FDA-8D67-2B20F1CA316D}: [Threaded comment]

Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924

Comment:

Do not change the formulas in this row tc={8E1C3180-074F-4BAD-A90A-CB41BE0BDEFC}: [Threaded comment]

Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924

Comment:

BAC at contract award (Does not include fee) tc={7E3D55D6-E14F-4593-9D6B-9CBF1BD61AB6}: [Threaded comment]

Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924

Comment:

BAC at time of submittal (Does not include fee) tc={B5EC02C2-2A41-46F9-880C-B48BA21E9EFD}: [Threaded comment]

Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924

Comment:

= Current period BCWP - Current Period ACWP tc={8347D986-3A29-41EA-8E4C-490ADFEB6A4A}: [Threaded comment]

Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924

Comment:

= Current Period BCWP - Current Period BCWS$ -
EARNEDJan-25Feb-25Mar-25Apr-25May-25Jun-25Jul-25Aug-25Sep-25Oct-25Nov-25Dec-25Earned CY Total
CP BCWP$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -<--- Input data in this row
CTD BCWP$ -
FORECASTJan-25Feb-25Mar-25Apr-25May-25Jun-25Jul-25Aug-25Sep-25Oct-25Nov-25Dec-25ETC CY Total
Monthly ETC$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ -<--- Input data in this row
SCHEDULE VARIANCEJan-25Feb-25Mar-25Apr-25May-25Jun-25Jul-25Aug-25Sep-25Oct-25Nov-25Dec-25SV CY Total
Monthly VAR$ -$ -
CTD VAR$ -----------
COST VARIANCEJan-25Feb-25Mar-25Apr-25May-25Jun-25Jul-25Aug-25Sep-25Oct-25Nov-25Dec-25CV CY Total
Monthly VAR$ -$ -
CTD VAR$ -----------
Schedule Performance IndexJan-25Feb-25Mar-25Apr-25May-25Jun-25Jul-25Aug-25Sep-25Oct-25Nov-25Dec-25
CP SPI
CTD SPI
Cost Performance IndexJan-25Feb-25Mar-25Apr-25May-25Jun-25Jul-25Aug-25Sep-25Oct-25Nov-25Dec-25
CP CPI
CTD CPI-----------
Schedule Variance Analysis:Cost Variance Analysis:

Work Completed This Period: 3-Month Look Ahead:

Risks and Opportunities: (See definitions & information tab) Risk Matrix tc={7321DB30-FBDB-423E-99B6-E179BD284167}: [Threaded comment]

Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924

Comment:

Risks that are expected to occur, should be captured in line 45 and captured in the ETC tc={E1E6C364-979F-4FDF-9EC0-09B289990B13}: [Threaded comment]

Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924

Comment:

Changes that have not been approved but are seeking approvalImpact
12345
Probability1
2
3
4
5
Risk IDRiskExpected Cost Impact

Risk Total: $ - 0

Jan, 120 & 12 Frcst
Feb, 121 & 11 Frcst
Mar, 122 & 10 Frcst
Apr, 123 & 9 Frcst
May, 124 & 8 Frcst
Jun, 125 & 7 Frcst
Jul, 126 & 6 Frcst
Aug, 127 & 5 Frcst
Sep, 128 & 4 Frcst
Oct, 129 & 3 Frcst
Nov, 1210 & 2 Frcst
Dec, 1211 & 1 Frcst
Year-Ending ('12)12 & 0

BAC at contract award (Does not include fee)

Changes that have not been approved but are seeking approval

BAC at time of submittal (Does not include fee)

= Current period BCWP - Current Period ACWP

Changes that have been approved and are on contract

= Current Period BCWP - Current Period BCWS

Total Cost Plus PO Value minus fee

Updated report template will be provided by TerraPower each new calendar year

NOTE: All period of performance BCWS, ACTUALS, ETC are expected to be captured on the CP - Time phased forecast tab

Do not change the formulas in this row

Do not change the formulas in this row

Risks that are expected to occur, should be captured in line 45 and captured in the ETC

Performance to Plan

CP BCWS 45682 45713 45741 45772 45802 45833 45863 45894 45925 45955 45986 46016 0 0 0 0 0 0 0 0 0 0 0 0 CTD BCWS 45682 45713 45741 45772 45802 45833 45863 45894 45925 45955 45986 46016 0 0 0 0 0 0 0 0 0 0 0 0 CP ACWP 0 0 0 0 0 0 0 0 0 0 0 0 CTD ACWP 0 0 0 0 0 0 0 0 0 0 0 0 Monthly ETC 0 0 0 0 0 0 0 0 0 0 0 0 #REF! 1

CPI/SPI Performance

CP CPI 45713 45741 45772 45802 45833 45863 45894 45925 45955 45986 46016 0 0 0 0 0 0 0 0 0 0 0 CP BCWS 45713 45741 45772 45802 45833 45863 45894 45925 45955 45986 46016 0 0 0 0 0 0 0 0 0 0 0 CP BCWP 45713 45741 45772 45802 45833 45863 45894 45925 45955 45986 46016 0 0 0 0 0 0 0 0 0 0 0 CP ACWP 45713 45741 45772 45802 45833 45863 45894 45925 45955 45986 46016 0 0 0 0 0 0 0 0 0 0 0 CP SPI 45713 45741 45772 45802 45833 45863 45894 45925 45955 45986 46016 0 0 0 0 0 0 0 0 0 0 0

TEMPLATE

CP - Time-Phased Forecast

BASELINEMonth XMonth XMonth XMonth XMonth XMonth XMonth XMonth XMonth XMonth XMonth XMonth XMonth XMonth XMonth XMonth XMonth XMonth XMonth XMonth XMonth XMonth XMonth XMonth X
Monthly BCWS
CTD BCWS00000000000000000000000
ACTUALMonth XMonth XMonth XMonth XMonth XMonth XMonth XMonth XMonth XMonth XMonth XMonth XMonth XMonth XMonth XMonth XMonth XMonth XMonth XMonth XMonth XMonth XMonth XMonth X
Monthly ACWP
CTD ACWP00000000000000000000000
EARNEDMonth XMonth XMonth XMonth XMonth XMonth XMonth XMonth XMonth XMonth XMonth XMonth XMonth XMonth XMonth XMonth XMonth XMonth XMonth XMonth XMonth XMonth XMonth XMonth X
Monthly BCWP
CTD BCWP00000000000000000000000
FORECASTMonth XMonth XMonth XMonth XMonth XMonth XMonth XMonth XMonth XMonth XMonth XMonth XMonth XMonth XMonth XMonth XMonth XMonth XMonth XMonth XMonth XMonth XMonth XMonth X
Monthly ETC
CTD ETC00000000000000000000000
*Input data to the end of approved contract. May need to add in additional months*

Firm Fixed Price Report

ONLY INPUT THE FIRM FIXED PRICE LINE ITEM DATA IN THIS TAB
Project Title:Natrium Demonstration ProjectSee Definitions PageReport Thru Date:'Month' 'Year'
Vendor:Original Contract Value$ - 0Unapproved Changes:$ - 0SafetyR
Project Manager:Current Contract Value$ - 0Approved Changes$ - 0QualityG
Company Contact:CTD Actual Cost$ - 0RiskY
Contract Number:CTD Earned Value$TechnicalR
Project Start:
Project Finish
Project Objective & Scope:
Milestone Payment Schedule
Payment Milestones

tc={42FC7822-F3A8-4CE8-9208-C75D42A73651}: [Threaded comment]

Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924

Comment:

Add in rows if there are more milestonesValueBaseline/Contractual FinishForecasted FinishCompleted (Y/N)Invoiced (Y/N)
Milestone 1$ - 0
Milestone 2$ - 0
Milestone 3$ - 0
Milestone 4$ - 0
Milestone 5$ - 0
Milestone 6$ - 0
Schedule Variance Analysis:

Work Completed This Period: 3-Month Look Ahead:

Risks and Opportunities:Top Risks:
Impact
12345
Probability1
2
3
4
5
Risk IDRiskExpected Cost Impact

Risk Total $ - 0

Jan, 120 & 12 Frcst
Feb, 121 & 11 Frcst
Mar, 122 & 10 Frcst
Apr, 123 & 9 Frcst
May, 124 & 8 Frcst
Jun, 125 & 7 Frcst
Jul, 126 & 6 Frcst
Aug, 127 & 5 Frcst
Sep, 128 & 4 Frcst
Oct, 129 & 3 Frcst
Nov, 1210 & 2 Frcst
Dec, 1211 & 1 Frcst
Year-Ending ('12)12 & 0

Add in rows if there are more milestones

TEMPLATE EXAMPLE