16-NAT-12844 - Supplier Monthly Performance Report - Rev. 2.xlsx
XLSX spreadsheet 60 KB Posted
- Attached to
- RFP-2025-9827 RAC Pressure Drop Testing
- Solicitation number
- RFP-2025-9827
- Issued by
- Washington
About this file
The file "16-NAT-12844 - Supplier Monthly Performance Report - Rev. 2.xlsx" is a document related to a TerraPower, LLC contract opportunity in Washington state for the Natrium Demonstration Project. The specific opportunity is an RFP for Reactor Air Cooling (RAC) Pressure Drop Testing, which requires a supplier to support the project's test program. The solicitation involves export-controlled information, and potential bidders must have or establish a TP-ShareFile account and sign a Non-Disclosure Agreement (NDA) to access project documents. Questions and comments must be submitted through the Bonfire Q&A section by the specified deadline.
The RFP emphasizes strict confidentiality protocols, with bidders required to appropriately mark any confidential or proprietary information submitted. TerraPower retains sole discretion in contract award decisions. The opportunity appears to be a specialized technical procurement with specific access requirements, including mandatory NDA signing before accessing the full project opportunity package. While specific pricing, funding sources, and contract term details are not explicitly stated in the provided document, the solicitation suggests a rigorous technical procurement process with controlled information sharing and strict compliance expectations.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Definitions & Instructions
| Acronym | Full Term | Status Bars | Drop Downs | Next Step |
| BCWS | Budgeted Cost of Work Scheduled | G | Status is green. On track, no issues to report, meets statement of work requirements | If green, no action |
| BCWP | Budgeted Cost of Work Performed | Y | Status is yellow. Trending off track, issues are being worked and/or mitigated | If yellow, start developing mitigation plans & capture in risk register |
| ACWP | Actual Cost of Work Performed | R | Status is red. Off track and currently not meeting requirements. Action needs to be taken to get back to green | If red, risk register item should be reviewed regularly along with any mitigation efforts. This is where a "get to green" plan is finalized |
| ETC | Estimate to Complete | |||
| EAC | Estimate at Complete | |||
| VAC | Variance at Complete | |||
| CP | Current Period | |||
| CTD | Cumulative To Date | |||
| Risk Cube | Instructions | |||
| No. | Important Information | 1 | List the risk number, risk name and expected monetary impact | |
| 1 | Cost Plus Purchase Orders are required to fill out the Cost Plus Monthly Report and the CP- Time Phased Forecast every month | 2 | Place an x in the risk cube for where the associated risks fall (not expected to put the risk number as this would heavily crowd the risk cube if numerous risks were in the same space) | |
| 2 | Firm Fixed Price Purchase Orders are only required to fill out the firm fixed price report tab | 3 | Capture total value of risks being monitored | |
| 3 | CP - Time phased forecast captures the full period of performance of the purchase order, if you need to add additional months to the tab, feel free | 4 | In row 42, indicate if any recognized risk is being captured in the EAC | |
| 4 | If more than one contract type is utilized on a single PO, only fill out lines 4-23 on the FFP reporting tab. Everything else can be captured in the cost plus monthly report tab | 5 | Risk impact analysis should be done with the TerraPower Supplier Project Engineer and the TerraPower Project Manager | |
| Note: | Risk and opportunities text box to the left of the risk cube is intended to explain risks in further detail, should it be needed |
Cost Plus Monthly Report
| ONLY INPUT THE COST PLUS LINE ITEM DATA IN THIS TAB | |||||
| Project Title: | Natrium Demonstration Project | (See Defintions Page) | Report Date; | Month/Year | |
| Vendor: | Budget at Complete - Original |
tc={8E1C3180-074F-4BAD-A90A-CB41BE0BDEFC}: [Threaded comment]
Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924
Comment:
BAC at contract award (Does not include fee) $ - 0 Estimate to Complete (ETC) $ - 0 Current Period Safety Y Unapproved Changes:
tc={E1E6C364-979F-4FDF-9EC0-09B289990B13}: [Threaded comment]
Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924
Comment:
| Changes that have not been approved but are seeking approval | $ - 0 | ||
| Project Manager: | Budget at Complete - Current |
tc={7E3D55D6-E14F-4593-9D6B-9CBF1BD61AB6}: [Threaded comment]
Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924
Comment:
BAC at time of submittal (Does not include fee) $ - 0 Variance at Complete (VAC) $ - 0 Cost Variance tc={B5EC02C2-2A41-46F9-880C-B48BA21E9EFD}: [Threaded comment]
Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924
Comment:
= Current period BCWP - Current Period ACWP $ - 0 Quality G Approved Changes tc={5453FFC4-7190-48FB-9C7F-720B83D0ED82}: [Threaded comment]
Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924
Comment:
| Changes that have been approved and are on contract | $ - 0 | ||||||
| Company Contact | Estimate at Complete (EAC) | $ - 0 | CTD - SPI | $ - 0 | Schedule Variance |
tc={8347D986-3A29-41EA-8E4C-490ADFEB6A4A}: [Threaded comment]
Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924
Comment:
= Current Period BCWP - Current Period BCWS $ - 0 Risk R Base Contract Value tc={161A5613-EE85-4555-B4DB-AC033CDA2638}: [Threaded comment]
Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924
Comment:
| Total Cost Plus PO Value minus fee | $ - 0 | |||||||||||
| Contract Number: | CTD - Actual Cost | $ - 0 | CTD - CPI | $ - 0 | Cumulative to Date (CTD) | Technical | Y | Fee Percentage | 0% | |||
| Project Start: | CTD - Earned Value | $ - 0 | $ - 0 | Cost Variance | $ - 0 | Fee Value | $ - 0 | |||||
| Project Finish | Schedule Variance | $ - 0 | Total PO Value | $ - 0 | ||||||||
| Project Objective & Scope: | ||||||||||||
| FILL THIS OUT |
CURRENT CALENDAR YEAR
tc={34F12C8A-7534-44AA-BD81-C7630967F8F6}: [Threaded comment]
Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924
Comment:
Updated report template will be provided by TerraPower each new calendar year tc={161A5613-EE85-4555-B4DB-AC033CDA2638}: [Threaded comment]
Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924
Comment:
| Total Cost Plus PO Value minus fee | NOTE: Do not change formulas for CTD calculations | |
| BASELINE |
tc={75647DEA-E77F-469F-83F0-337724CD8302}: [Threaded comment]
Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924
Comment:
| NOTE: All period of performance BCWS, ACTUALS, ETC are expected to be captured on the CP - Time phased forecast tab | Jan-25 | Feb-25 | Mar-25 | Apr-25 | May-25 | Jun-25 | Jul-25 | Aug-25 | Sep-25 | Oct-25 | Nov-25 | Dec-25 | Plan CY Total | |||
| CP BCWS | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | <--- Input data in this row | ||
| CTD BCWS |
tc={BDB698BD-67B7-40AA-B553-E6236DF93397}: [Threaded comment]
Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924
Comment:
| Do not change the formulas in this row | $ - | 0 | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | |||
| ACTUAL | Jan-25 | Feb-25 | Mar-25 | Apr-25 | May-25 | Jun-25 | Jul-25 | Aug-25 | Sep-25 | Oct-25 | Nov-25 | Dec-25 | Actual CY Total | |||
| CP ACWP | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | <--- Input data in this row | ||
| CTD ACWP |
tc={481617F1-B96F-4FDA-8D67-2B20F1CA316D}: [Threaded comment]
Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924
Comment:
Do not change the formulas in this row tc={8E1C3180-074F-4BAD-A90A-CB41BE0BDEFC}: [Threaded comment]
Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924
Comment:
BAC at contract award (Does not include fee) tc={7E3D55D6-E14F-4593-9D6B-9CBF1BD61AB6}: [Threaded comment]
Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924
Comment:
BAC at time of submittal (Does not include fee) tc={B5EC02C2-2A41-46F9-880C-B48BA21E9EFD}: [Threaded comment]
Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924
Comment:
= Current period BCWP - Current Period ACWP tc={8347D986-3A29-41EA-8E4C-490ADFEB6A4A}: [Threaded comment]
Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924
Comment:
| = Current Period BCWP - Current Period BCWS | $ - | |||||||||||||||
| EARNED | Jan-25 | Feb-25 | Mar-25 | Apr-25 | May-25 | Jun-25 | Jul-25 | Aug-25 | Sep-25 | Oct-25 | Nov-25 | Dec-25 | Earned CY Total | |||
| CP BCWP | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | <--- Input data in this row | ||
| CTD BCWP | $ - | |||||||||||||||
| FORECAST | Jan-25 | Feb-25 | Mar-25 | Apr-25 | May-25 | Jun-25 | Jul-25 | Aug-25 | Sep-25 | Oct-25 | Nov-25 | Dec-25 | ETC CY Total | |||
| Monthly ETC | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - | <--- Input data in this row | ||
| SCHEDULE VARIANCE | Jan-25 | Feb-25 | Mar-25 | Apr-25 | May-25 | Jun-25 | Jul-25 | Aug-25 | Sep-25 | Oct-25 | Nov-25 | Dec-25 | SV CY Total | |||
| Monthly VAR | $ - | $ - | ||||||||||||||
| CTD VAR | $ - | - | - | - | - | - | - | - | - | - | - | |||||
| COST VARIANCE | Jan-25 | Feb-25 | Mar-25 | Apr-25 | May-25 | Jun-25 | Jul-25 | Aug-25 | Sep-25 | Oct-25 | Nov-25 | Dec-25 | CV CY Total | |||
| Monthly VAR | $ - | $ - | ||||||||||||||
| CTD VAR | $ - | - | - | - | - | - | - | - | - | - | - | |||||
| Schedule Performance Index | Jan-25 | Feb-25 | Mar-25 | Apr-25 | May-25 | Jun-25 | Jul-25 | Aug-25 | Sep-25 | Oct-25 | Nov-25 | Dec-25 | ||||
| CP SPI | ||||||||||||||||
| CTD SPI | ||||||||||||||||
| Cost Performance Index | Jan-25 | Feb-25 | Mar-25 | Apr-25 | May-25 | Jun-25 | Jul-25 | Aug-25 | Sep-25 | Oct-25 | Nov-25 | Dec-25 | ||||
| CP CPI | ||||||||||||||||
| CTD CPI | - | - | - | - | - | - | - | - | - | - | - | |||||
| Schedule Variance Analysis: | Cost Variance Analysis: |
Work Completed This Period: 3-Month Look Ahead:
Risks and Opportunities: (See definitions & information tab) Risk Matrix tc={7321DB30-FBDB-423E-99B6-E179BD284167}: [Threaded comment]
Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924
Comment:
Risks that are expected to occur, should be captured in line 45 and captured in the ETC tc={E1E6C364-979F-4FDF-9EC0-09B289990B13}: [Threaded comment]
Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924
Comment:
| Changes that have not been approved but are seeking approval | Impact | |||||||
| 1 | 2 | 3 | 4 | 5 | ||||
| Probability | 1 | |||||||
| 2 | ||||||||
| 3 | ||||||||
| 4 | ||||||||
| 5 | ||||||||
| Risk ID | Risk | Expected Cost Impact |
Risk Total: $ - 0
| Jan, 12 | 0 & 12 Frcst |
| Feb, 12 | 1 & 11 Frcst |
| Mar, 12 | 2 & 10 Frcst |
| Apr, 12 | 3 & 9 Frcst |
| May, 12 | 4 & 8 Frcst |
| Jun, 12 | 5 & 7 Frcst |
| Jul, 12 | 6 & 6 Frcst |
| Aug, 12 | 7 & 5 Frcst |
| Sep, 12 | 8 & 4 Frcst |
| Oct, 12 | 9 & 3 Frcst |
| Nov, 12 | 10 & 2 Frcst |
| Dec, 12 | 11 & 1 Frcst |
| Year-Ending ('12) | 12 & 0 |
BAC at contract award (Does not include fee)
Changes that have not been approved but are seeking approval
BAC at time of submittal (Does not include fee)
= Current period BCWP - Current Period ACWP
Changes that have been approved and are on contract
= Current Period BCWP - Current Period BCWS
Total Cost Plus PO Value minus fee
Updated report template will be provided by TerraPower each new calendar year
NOTE: All period of performance BCWS, ACTUALS, ETC are expected to be captured on the CP - Time phased forecast tab
Do not change the formulas in this row
Do not change the formulas in this row
Risks that are expected to occur, should be captured in line 45 and captured in the ETC
Performance to Plan
CP BCWS 45682 45713 45741 45772 45802 45833 45863 45894 45925 45955 45986 46016 0 0 0 0 0 0 0 0 0 0 0 0 CTD BCWS 45682 45713 45741 45772 45802 45833 45863 45894 45925 45955 45986 46016 0 0 0 0 0 0 0 0 0 0 0 0 CP ACWP 0 0 0 0 0 0 0 0 0 0 0 0 CTD ACWP 0 0 0 0 0 0 0 0 0 0 0 0 Monthly ETC 0 0 0 0 0 0 0 0 0 0 0 0 #REF! 1
CPI/SPI Performance
CP CPI 45713 45741 45772 45802 45833 45863 45894 45925 45955 45986 46016 0 0 0 0 0 0 0 0 0 0 0 CP BCWS 45713 45741 45772 45802 45833 45863 45894 45925 45955 45986 46016 0 0 0 0 0 0 0 0 0 0 0 CP BCWP 45713 45741 45772 45802 45833 45863 45894 45925 45955 45986 46016 0 0 0 0 0 0 0 0 0 0 0 CP ACWP 45713 45741 45772 45802 45833 45863 45894 45925 45955 45986 46016 0 0 0 0 0 0 0 0 0 0 0 CP SPI 45713 45741 45772 45802 45833 45863 45894 45925 45955 45986 46016 0 0 0 0 0 0 0 0 0 0 0
TEMPLATE
CP - Time-Phased Forecast
| BASELINE | Month X | Month X | Month X | Month X | Month X | Month X | Month X | Month X | Month X | Month X | Month X | Month X | Month X | Month X | Month X | Month X | Month X | Month X | Month X | Month X | Month X | Month X | Month X | Month X |
| Monthly BCWS | ||||||||||||||||||||||||
| CTD BCWS | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| ACTUAL | Month X | Month X | Month X | Month X | Month X | Month X | Month X | Month X | Month X | Month X | Month X | Month X | Month X | Month X | Month X | Month X | Month X | Month X | Month X | Month X | Month X | Month X | Month X | Month X |
| Monthly ACWP | ||||||||||||||||||||||||
| CTD ACWP | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| EARNED | Month X | Month X | Month X | Month X | Month X | Month X | Month X | Month X | Month X | Month X | Month X | Month X | Month X | Month X | Month X | Month X | Month X | Month X | Month X | Month X | Month X | Month X | Month X | Month X |
| Monthly BCWP | ||||||||||||||||||||||||
| CTD BCWP | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| FORECAST | Month X | Month X | Month X | Month X | Month X | Month X | Month X | Month X | Month X | Month X | Month X | Month X | Month X | Month X | Month X | Month X | Month X | Month X | Month X | Month X | Month X | Month X | Month X | Month X |
| Monthly ETC | ||||||||||||||||||||||||
| CTD ETC | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| *Input data to the end of approved contract. May need to add in additional months* |
Firm Fixed Price Report
| ONLY INPUT THE FIRM FIXED PRICE LINE ITEM DATA IN THIS TAB | |||||||||
| Project Title: | Natrium Demonstration Project | See Definitions Page | Report Thru Date: | 'Month' 'Year' | |||||
| Vendor: | Original Contract Value | $ - 0 | Unapproved Changes: | $ - 0 | Safety | R | |||
| Project Manager: | Current Contract Value | $ - 0 | Approved Changes | $ - 0 | Quality | G | |||
| Company Contact: | CTD Actual Cost | $ - 0 | Risk | Y | |||||
| Contract Number: | CTD Earned Value | $ | Technical | R | |||||
| Project Start: | |||||||||
| Project Finish | |||||||||
| Project Objective & Scope: |
| Milestone Payment Schedule |
| Payment Milestones |
tc={42FC7822-F3A8-4CE8-9208-C75D42A73651}: [Threaded comment]
Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924
Comment:
| Add in rows if there are more milestones | Value | Baseline/Contractual Finish | Forecasted Finish | Completed (Y/N) | Invoiced (Y/N) |
| Milestone 1 | $ - 0 | ||||
| Milestone 2 | $ - 0 | ||||
| Milestone 3 | $ - 0 | ||||
| Milestone 4 | $ - 0 | ||||
| Milestone 5 | $ - 0 | ||||
| Milestone 6 | $ - 0 | ||||
| Schedule Variance Analysis: |
Work Completed This Period: 3-Month Look Ahead:
| Risks and Opportunities: | Top Risks: | ||||||
| Impact | |||||||
| 1 | 2 | 3 | 4 | 5 | |||
| Probability | 1 | ||||||
| 2 | |||||||
| 3 | |||||||
| 4 | |||||||
| 5 | |||||||
| Risk ID | Risk | Expected Cost Impact |
Risk Total $ - 0
| Jan, 12 | 0 & 12 Frcst |
| Feb, 12 | 1 & 11 Frcst |
| Mar, 12 | 2 & 10 Frcst |
| Apr, 12 | 3 & 9 Frcst |
| May, 12 | 4 & 8 Frcst |
| Jun, 12 | 5 & 7 Frcst |
| Jul, 12 | 6 & 6 Frcst |
| Aug, 12 | 7 & 5 Frcst |
| Sep, 12 | 8 & 4 Frcst |
| Oct, 12 | 9 & 3 Frcst |
| Nov, 12 | 10 & 2 Frcst |
| Dec, 12 | 11 & 1 Frcst |
| Year-Ending ('12) | 12 & 0 |
Add in rows if there are more milestones
TEMPLATE EXAMPLE