This document is a Statement of Work (SOW) for a Reactor Air Cooling (RAC) Pressure Drop Test for the Natrium™ Demonstration Project, involving TerraPower, LLC and a supplier. The project focuses on designing, fabricating, and executing a comprehensive test program for a test system and support structure to measure pressure drop characteristics. Key milestones include a Design and Manufacturability Review by 2 months After Receipt of Order (ARO), Projected Fabrication Start in January 2026, Testing Campaign Start at 5 months ARO, and Test Report Completion by July 2026.

The work is categorized as Non-Safety Related with a Quality Level 3 (QL-3) assignment, to be performed under a Department of Energy (DOE) Cooperative Agreement. The supplier is responsible for all aspects of the test program, including test system design, material/component acquisition, fabrication, inspection, test execution, and reporting. The document outlines detailed requirements for project management, submittal processes, and deliverables, with an emphasis on comprehensive documentation, quality assurance, and compliance with technical requirements specified in the Test Requirements Document (NAT-16668). The project is subject to export control regulations and is marked as proprietary and confidential.

View the file

Other files

File Type Posted
2-10 Exh A Supplement 1a (Rights in Data Large Business Class Patent Waiver) - Natrium Subcontractor Flowdown Final.docx DOCX document
3-11 Exh A Supplement 1b (Rights in Data Small Business Patent Rights) - Natrium Subcontractor Flowdown Final.docx DOCX document
8-Guidance on DOE Foreign Country of Risk Sponsored or Affiliated Activities.pdf PDF
12-SWAR Form - RAC Pre-Proposal Meeting Only.pdf PDF
16-NAT-12844 - Supplier Monthly Performance Report - Rev. 2.xlsx XLSX spreadsheet
5-13 Exh A Supplement 2 (Equipment) - Natrium Subcontractor Flowdown Final.docx DOCX document
9-TP-PRC-FORM-0006 Rev 10.docx DOCX document
10-TerraPower SCR Guide Rev 9.pdf PDF
17-RFP Instructions - RFP-2025-9827 RAC Pressure Drop Testing.doc DOC document
4-12 Exh A Supplement 1c (Rights in Data Universities Foreign Business Patent Rights) - Natrium Subcontractor Flowdown Final.docx DOCX document
6-NAT-3279 Rev 2 - Natrium Supplier Metadata Form (2).xlsx XLSX spreadsheet
7-Natrium Supplier Submittal Guide Rev. 1.pdf PDF
1-09 Exh A to USG PO TC - Natrium Subcontractor Flowdowns Final.docx DOCX document
13-TP-ITS-FORM-0001 Rev 7c SWAR Form RAC Pressure Drop Testing.pdf PDF
14-TP-LGL-TEMP-0008 TerraPower PO (Long Form) Terms and Conditions USG - Rev 8.docx DOCX document
15-NAT-8814 - Supplier Scheduling and Reporting Requirements Rev. 1.pdf PDF
Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .