The document is an Asbestos Survey report for the Denver Air Route Traffic Control Center (ARTCC) located in Longmont, Colorado, prepared by Terracon Consultants, Inc. for Parsons on July 9, 2021. The survey, conducted from April 29 to May 3, 2019, identified multiple asbestos-containing materials (ACM) in the ARTCC Building and Power Service Building, including firestop, fiberglass pipe sealants, vinyl floor tiles, wall plaster, drywall, and various mastics. Specific locations with ACM include the Administration Wing basement, Control Wing basement, Automation Wing, and first and second floors, with estimated quantities ranging from 1 square foot to 11,700 square feet.
The related federal contract opportunity (Solicitation Number 6973GH-26-R-00024) involves installing a new 18-inch raised access floor system of approximately 2,982 square feet in the Control Wing Basement at ZDV. The project scope includes constructing two ADA-compliant ramps and stairs, building a 9'-6" partition to enclose the raised floor system, removing a non-conforming east door, and creating a new door within a two-hour rated alcove. The solicitation is issued by the Department of Transportation's Federal Aviation Administration Franchise Acquisition Services, with the contractor required to provide all necessary labor, materials, and equipment to complete the specified work.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Asbestos Survey Denver ARTCC (ZDV)
2211 17th Avenue Longmont, CO 80501
July 9, 2021 Terracon Project No. 25197220
Prepared for:
Parsons
Washington, D.C.
Prepared by:
Terracon Consultants, Inc.
Lenexa, KS i
July 9, 2021
Parsons 955 L’Enfant Plaza S.W. Suite 6100 Washington, D.C. 20024
Attn: Alex Golden, PMP P: (202) 484-3667 E: alexander.ctr.golden@faa.gov
Re: Asbestos Survey Denver ARTCC (ZDV) 2211 17th Avenue Longmont, Colorado 80501 Terracon Project No. 25197220
Terracon Consultants, Inc. (Terracon) is pleased to submit the attached report for the above-referenced site to Parsons and the Federal Aviation Administration (FAA). The purpose of this report is to present the results of an asbestos survey performed on April 29-May 3, 2019. This survey was conducted in general accordance with Parsons request for proposal dated November 28, 2018. We understand that this survey was requested due to planned renovation activities within the above-referenced buildings.
Asbestos-containing materials (ACM) were identified in the samples collected and analyzed from the Air Route Traffic Control Center (ARTCC) Building and Power Service Building. Below are listed identified asbestos-containing materials. No ACM was identified in the AAS Support Building, Engineering Trailer, Guard House, Pump House, or Storage Building.
Material Description Material Location – ARTCC Building Estimated Quantity*
Brown Firestop Administration Wing – Basement Room B103 (East Wall) 1 SF
Pink Fiberglass Sealant Administration Wing – Basement Rooms
B103B, B129 6 SF
Green Fiberglass Pipe Sealant Administration Wing – Basement Rooms
B114, B116 8 SF
Tan 9"x9" Vinyl Floor Tile with Black and Tan Mastic (Gray Floor Tile
Sublayer)
Administration Wing – Basement Room B113 - floor (beneath 12”x12” Floor Tile) 400 SF
Black Pipe Sealant Administration Wing – Basement Room B113A - pipe within north wall 1 SF
Tan 9"x9" Vinyl Floor Tile with Black Mastic
Control Wing – Basement Rooms B118 -floor (beneath 12x12) and B117 - floor
(beneath covering)
800 SF
Denver ARTCC (ZDV) ■ Longmont, CO July 9, 2021 ■ Terracon Project No.25197220 ii
Material Description Material Location – ARTCC Building Estimated Quantity*
Light Brown Wall Plaster with White Skim Coat
Control Wing – Basement Rooms B101, B120, 1st Floor Room 1026, Administration Wing - Basement Room B115, 1st Floor Rooms 1023, 1007, 2nd
Floor Rooms 212, 2015, Automation Wing – 1st Floor Room 108A
5,600 SF
Mottled Light Brown 12”x12” Vinyl Floor Tile with Black Mastic
Control Wing – Basement Rooms B101, B83, B81, B88 (floor beneath carpet), Stair
No. 7 (attic level landing) Automation Wing – Basement Room B21A
Administration Wing - Stair No. 6, Utility chase to west of 2nd Floor Room 2018, 1st
Floor Room 1037
1,600 SF
Black Residual 9”x9” Mastic Control Wing – Basement Room B86 & B87 - floor 150 SF
Blue Sink Undercoating Automation Wing – Basement Room B21A -sink 1 Each
Grey Mottled 24"x24" Vinyl Floor Tile with Yellow Mastic and Black Mastic
Control Wing – 1st Floor Rooms 1004A, 1026 1,210 SF
Light Brown 9”x9” Vinyl Floor Tile with Yellow Mastic and Brown Mastic
Administration Wing – 1st Floor Rooms 1031A - floor beneath white vinyl and 1031 -floor beneath white vinyl
668 SF
Light Yellow Carpet Adhesive under 24"x24" Carpet Squares
Automation Wing – 2nd Floor Rooms A216, A238, A240, A242-A254, South Control
Wing - 2nd Floor Room A240
11,700 SF
White 5/8" Drywall with Light Brown Paper and Joint Compound
Automation Wing – 2nd Floor Rooms A217, A218A, A222, A241 and Janitor’s closet.
Administration Wing – 2nd Floor Rooms
210, 217-219, 222-225, 2001-2007
6,300 SF
Brown Mudded Fiberglass Pipe Elbow Control Wing – Attic Level Stair No. 7 - Pipe 5 SF
Material Description Material Location – RCI Tower Estimated Quantity*
Grey Expansion Joint Caulking RCI Tower – Base Perimeter 15 LF
Material Description Material Location – Power Services Building
Estimated Quantity*
9"x9" Mottled Black Vinyl Floor Tile with Black Mastic 1st Floor Garage - floor 900 SF
Brown Mudded Fiberglass Pipe Elbow 1st Floor Sprinkler System Control Valve
Room 1 Each
White Exterior Caulking 1st Floor Garage Exterior 5 SF
July 9, 2021 ■ Terracon Project No.25197220 iii
Material Description Material Location – Power Services Building
Estimated Quantity*
Pink 5/8” Drywall with Joint Compound 1st Floor Office (Wall) 480 SF
Asbestos detected at 1% or less was identified in the samples collected and analyzed in the table below.
Material Description Material Location – ARCTCC Building % and Type Asbestos
Yellow Stair Tread Adhesive Administration Wing – Stair No.1, Stair No. 4
Yellow Mastic – None Detected Black Mastic P.C. <0.25% Chrysotile
Tan Carpet Adhesive Control Wing – Basement Room B81 Tan Mastic – TEM - <0.25% Chrysotile
Yellow Adhesive Behind Grey 4" Cove Base
Control Wing – 1st Floor Rooms 1052, 1001B, Automation Wing – 1st Floor Rooms 106A, 108C, 108B, 108A
Yellow Mastic – TEM - <0.25% Chrysotile
Black 12"x12" Vinyl Floor Tiles Administration Wing – 1st
Floor Room 1023 and Second Floor Room 2015
Black Floor Tile - TEM - <0.25% Chrysotile
Black Mastic – None Detected
Materials containing less than 1% asbestos are not regulated by NESHAP or AHERA; however, the OSHA personal exposure limits (0.1 f/cc of air as an eight-hour time weighted average or 1.0 f/cc of air over 30 minutes) for asbestos apply when materials containing 1% asbestos or less are disturbed during renovations or demolitions. A listing of materials that contain 1% asbestos or less is provided above to enable the renovation/demolition contractor to make appropriate decisions concerning compliance issues with applicable OSHA regulations.
The following materials are assumed to contain asbestos until sampling and analysis is performed.
Material Description Material Location – ARCTCC Building
Estimated Quantity
Grey grout and mortar associated with ceramic backsplash
Basement Room B113 (northeast corner) 30 SF
Grout and mortar associated with 2”x2” ceramic floor tile
Administration Wing - Basement Rooms - B106 and B106A 600 SF
Grout/mortar associated with 4”x4” ceramic wall tile
Administration Wing - Basement Rooms - B106 and B106A 1000 SF
Pink Firestop Control Wing – Basement Room
B120A (ceiling), Automation Wing – Basement Rooms B12A and B10A
2 SF
Grout and Mortar associated with 12”x12” Grey Ceramic Tile
Automation Wing – Basement Room
B15A 200 SF
July 9, 2021 ■ Terracon Project No.25197220 iv
Material Description Material Location – ARCTCC Building
Estimated Quantity
Grout and mortar associated with 1’x2’ brown ceramic tile
Automation Wing – Basement Rooms B20A and B137, 1st Floor Rooms
118A, 135A, and 117A
600 SF
Grout and mortar associated with 9”x18” yellow ceramic tile
Automation Wing – Basement Rooms B20A and B137, 1st Floor Rooms
118A, 135A, and 117A
900 SF
Grout and mortar associated with 4”x12” white ceramic tile
Administration Wing – 1st Floor Rooms 1031 and 1031A 500 SF
Grout and mortar associated with 4”x4” ceramic tile (wall)
Administration Wing – 1st Floor Rooms 1022 and 1021. 2nd floor rooms 2013 and 2014
1,000 SF
Grout and mortar associated with 4”x4” ceramic tile (floor)
Administration Wing – 1st Floor Rooms 1022 and 1021. 2nd floor rooms 2013 and 2014
400 SF
Grout and mortar associated with 12”x12” mottled grey ceramic tile
Administration Wing – 1st Floor Room
1005, 1006 500 SF
Grout and mortar associated with 6”x6” clay tile (floor)
Administration Wing – 1st Floor Rooms 1045, 1042, 1038 and 1044 430 SF
Grout and mortar associated with 1”x1” yellow tile (floor)
Administration Wing – 1st Floor Room
1035 110 SF
Adhesive behind fiber-reinforced paneling
Administration Wing – 1st Floor Room
1044 470 SF
Grout and mortar associated with 2”x2” blue ceramic tile (floor)
Administration Wing – 1st Floor Room
1034 80 SF
Grout and mortar associated with 1'x2' ceramic floor tile
Administration Wing – 1st Floor Room
1024, 1030, 1023 290 SF
Grout and mortar associated with 6”x12” ceramic wall tile
Administration Wing – 1st Floor Room
1024 90 SF
Grout and mortar associated with 2”x2” ceramic floor tile
Automation Wing – 2nd Floor Rooms A219 and A220, adjacent north
Janitor Closet
140 SF
Grout and mortar associated with 4”x4” ceramic wall tile
Automation Wing – 2nd Floor Rooms A219 and A220, adjacent north
Janitor Closet
120 SF
Material Description Material Location – AAS Support Building
Estimated Quantity
Grout and mortar associated with 1"x1" Black Ceramic Floor Tile
AAS Support Building – 1st Floor Rooms 103 and 104 250 SF
Grout and mortar associated with 6"x6" Black Ceramic Walls Tile
AAS Support Building – 1st Floor Rooms 103 and 104 320 SF
Material Description Material Location – Guard House Estimated Quantity
Grout and mortar associated with 2”x2” ceramic floor tile Guard House – GH04 100 SF
July 9, 2021 ■ Terracon Project No.25197220 v
The following materials are assumed to contain asbestos until negative PLM result verified by TEM analysis.
Material Description Material Location – ARCTCC Building
Estimated Quantity
Salmon 12”x12” Vinyl Floor Tile with Yellow Mastic
Administration Wing – Basement Room B113A - Floor 50 SF
Material Description Material Location – ARCTCC Building
Estimated Quantity
White 12"x12" Vinyl Floor Tile with Tan Mastic
Control Wing – Basement Rooms B118 - floor, B116 - floor 2,600 SF
Tan 12"x12" Vinyl Floor Tile with Yellow Mastic
Control Wing – Basement Room B119 - northern floor 200 SF
Tan Stair Tread Mastic under Gray Rubberized Tread
Control Wing – Basement Rooms B119 - steps, B120A – stairs. 2nd
Floor Room A240 - ramp
35 SF
Grey 24"x24" Vinyl Floor Tile with Tan Mastic
Control Wing – Basement Room B107 - floor 150 SF
Green Carpet Adhesive Control Wing – Basement Room B83
- floor 300 SF
White Mottled 24"x24" Vinyl Floor Tile with Yellow/Brown Mastic Administration Wing - 1st Floor
Rooms 1031 - floor, 1031A - floor 630 SF
White Mottled 12"x12" Vinyl Floor Tile with Yellow Mastic Administration Wing – 1st Floor
Rooms 1032, 1046, 1033 500 SF
Black Mottled 12"x12" Vinyl Floor Tile with Tan Mastic
Administration Wing – 1st Floor Rooms 1032, 1046, 1033 500 SF
Grey and Brown Mottled 12"x12" Vinyl Floor Tile with Yellow Mastic
Administration Wing – 2nd Floor Stair No. 6 Corridor 140 SF
Material Description Material Location – Power Services Building
Estimated Quantity*
Tan Mottled 12”x12” Floor Tile with Yellow Mastic Generator Room (south area), Office, SWGR Room (south portion) 1,650 SF
Material Description Material Location – Engineering Trailer Estimated Quantity*
Yellow adhesive beneath roll-on carpet Throughout Trailer (Floors) 2,500 SF
Tan Mottled 12”x12” Vinyl Floor Tile with Yellow Mastic Mechanical Room, Restrooms 110 SF
Material Description Material Location – Guard House Estimated Quantity*
Brown speckled 24"x24" Vinyl Floor Panels with Yellow Mastic Rooms GH01, GH02, GH03, GH07 1,000 SF
July 9, 2021 ■ Terracon Project No.25197220 vi
Terracon appreciates the opportunity to provide this service to Parsons and the FAA. If you have any questions regarding this report, please contact the undersigned at 303-423-5241.
Sincerely, Terracon Consultants, Inc.
Kyle Leonard Mitch Reiber Colorado Licensed Asbestos Consultant National Director – Asbestos Services License No. 22871 i
TABLE OF CONTENTS
1.0 INTRODUCTION
1.1 Project Objective
1.2 Reliance
2.0 BUILDING DESCRIPTION
3.0 FIELD ACTIVITIES
3.1 Visual Assessment
3.2 Physical Assessment
3.3 Sample Collection
3.4 Sample Analysis
4.0 REGULATORY OVERVIEW
5.0 FINDINGS
6.0 LIMITATIONS/GENERAL COMMENTS
APPENDIX A IDENTIFIED ASBESTOS-CONTAINING MATERIALS BY HOMOGENEOUS
AREA (HA), ASSUMED ASBESTOS CONTAINING MATERIALS BY HA AND
MATERIALS CONTAINING 1% OR LESS ASBESTOS BY HA
APPENDIX B ASBESTOS SURVEY SAMPLE LOCATION SUMMARY
APPENDIX C LICENSES AND CERTIFICATIONS
APPENDIX D PHOTOGRAPHS
APPENDIX E IDENTIFIED ASBESTOS CONTAINING MATERIALS DRAWING
APPENDIX F IDENTIFIED MATERIALS CONTAINING <1% ASBESTOS AND MATERIALS
ASSUMED TO BE ASBESTOS CONTAINING DRAWING
APPENDIX G BULK SAMPLING OF SUSPECT ASBESTOS-CONTAINING MATERIAL
STANDARD OPERATING PROCEDURE
APPENDIX H ASBESTOS ANALYTICAL LABORATORY DATA
Responsive ■ Resourceful ■ Reliable 1
ASBESTOS SURVEY
Denver ARTCC (ZDV)
2211 17th Avenue Longmont, CO 80501
Terracon Project No. 25197220 July 9, 2021
1.0 INTRODUCTION
Terracon Consultants, Inc. (Terracon) conducted an asbestos survey of 9 buildings on the Denver ARTCC (ZDV) campus located at 2211 17th Avenue, Longmont, CO 80501. The survey was conducted on April 29, 2019 through May 3, 2019, by State of Colorado-certified asbestos inspectors in general accordance with Parsons request for proposal dated November 28, 2018. The interior building components were surveyed, and homogeneous areas of suspect asbestos-containing materials (ACM) were visually identified and documented in the following buildings:
n ARTCC Building - Administration, Control and Automation Wings n RCI Tower n AAS Support Building n Power Services Building n Engineering Trailer n Guard House n Storage Building n Pump House
Building exteriors and roofs were not included as a part of this survey
Although reasonable effort was made to survey accessible suspect materials, additional suspect but un-sampled materials could be located in walls, in voids or in other concealed areas. Suspect ACM samples were collected in general accordance with the sampling protocols outlined in United States Environmental Protection Agency (USEPA) 40 Code of Federal Regulations (CFR) Part 763 Subpart E 763.86, known as the Asbestos Hazard Emergency Response Act (AHERA).
Samples were delivered to an accredited laboratory for analysis by Polarized Light Microscopy (PLM) and Transmission Electron Microscopy (TEM).
1.1 Project Objective
We understand this asbestos survey was requested due to the planned renovation of the subject buildings listed above to satisfy requirements of the USEPA 40 CFR Part 61, Subpart M, the asbestos National Emission Standards for Hazardous Air Pollutants (NESHAP).
July 9, 2021 ■ Terracon Project No. 25197220
Responsive ■ Resourceful ■ Reliable 2
1.2 Reliance
This report is for the exclusive use of Parsons and the Federal Aviation Administration (FAA) for the project being discussed. Reliance by any other party on this report is prohibited without written authorization of Terracon, Parsons and the FAA.
2.0 BUILDING DESCRIPTION
ARTCC
The subject building consists of three main areas, the Administration Wing, Control Wing and Automation.
The Administration Wing is a two-story structure with a basement and is approximately 31,000 square feet. The main structure of the building is metal with brick and metal comprising the exterior walls. The roof deck is metal. The ceilings are finished with a drop ceiling tile system, pipes fitted with foam glass or fiberglass insulation, and the heating, ventilation, and air conditioning (HVAC) system consisted of fiberglass insulation. The floor is concrete with finishes of vinyl tile, raised flooring panels, carpet, and ceramic tile. The HVAC unit is roof- mounted. Interior walls were comprised of drywall, concrete block, and/or plaster.
The Control Wing is a two-story structure with a basement and mechanical mezzanine and is approximately 81,000 square feet. The building consists of metal framing with drywall and concrete block interior walls. Exterior walls are comprised of metal sheeting. Floors are concrete with flooring finishes of carpet, raised flooring, and/or vinyl tile. The roof deck is metal with spray-applied fireproofing. The ceilings are finished with a drop ceiling tile system, pipes are wrapped in fiberglass insulation or foam glass insulation, and the HVAC ducts have fiberglass insulation.
The building air handler units are located on the mezzanine.
The Automation Wing is a two-story structure with a basement and mechanical mezzanine and is approximately 36,000 square feet. The main structure of the building is metal with metal sheeting and brick comprising the exterior walls. The building has a metal roof deck with spray-applied fireproofing. The ceilings are finished with drop ceiling tiles or drywall. Pipes and HVAC ductwork are insulated with fiberglass. Floors are finished with carpet, vinyl floor tile, ceramic floor tile, and/or raised flooring, or are unfinished concrete. Interior walls consisted of drywall, concrete block, and/or plaster. The air handler units are located in the mechanical mezzanine.
AAS Support Building The AAS Support Building is slab on grade, two story, and is approximately 5,100 square feet.
The main structure is metal with metal exterior walls. The roof consists of a metal deck and gable metal roof. The building is insulated with fiberglass. HVAC ductwork is insulated with fiberglass.
July 9, 2021 ■ Terracon Project No. 25197220
Responsive ■ Resourceful ■ Reliable 3
Piping is insulated with foam. Ceilings are finished with drop ceiling tile. The floor is finished with vinyl tile or carpet. The interior walls are drywall. The HVAC unit is pad-mounted.
RCI Tower The RCI Tower is a fully opened metal framed structure with various antennae attached and is slab on grade.
Power Services Building The building is two-story and approximately 17,000 square feet. All sections have concrete slab flooring with some small areas with floor tile. The subject building has metal and brick exterior walls and a metal roof. Foam glass and fiberglass insulation can be found throughout the building on pipes and the HVAC ductwork. Interior walls consist of drywall, metal, and/or concrete block.
Engineering Trailer The Engineering Trailer is elevated modular trailer, one story, and is approximately 2,800 square feet. The main structure is wood framing and the exterior consists of wood sheeting. The roof is comprised of metal. The ceiling is finished with a drop ceiling tile system. The building is insulated with fiberglass. The HVAC ductwork is insulated with fiberglass. The floor is finished with vinyl tile, carpet, and/or faux wood laminate. Interior walls are finished with drywall. There is a pad-mounted HVAC unit.
Guard House The Guard Shack building is slab on grade, one story, and is approximately 570 square feet. The main structure is metal with metal exterior walls. The roof consists of a metal deck and the ceiling is finished with a drop ceiling tile system. The building is insulated with fiberglass. Piping is insulated with either fiberglass or foam insulation. The HVAC ductwork is insulated with fiberglass and the HVAC unit is pad mounted. The floor is finished with vinyl tile and ceramic tile. The interior walls are finished with drywall.
Storage Building The storage building is a slab on grade metal structure, two story, and is approximately 2,000 square feet. The main structure is metal with metal siding for the exterior and a metal roof. The walls and ceiling have fiberglass insulation. The floor is an unfinished concrete slab. There is no HVAC system.
Pump House The Pump House is a slab on grade metal structure, one story, and is approximately 600 square feet. The main structure is metal with metal siding for the exterior and a metal roof. The walls and ceiling have fiberglass insulation. The floor is an unfinished concrete slab. There is no HVAC system.
July 9, 2021 ■ Terracon Project No. 25197220
Responsive ■ Resourceful ■ Reliable 4
3.0 FIELD ACTIVITIES
The survey was conducted by Mr. Kyle Leonard and Mr. Aaron Varnell, State of Colorado-certified AHERA-accredited asbestos inspectors. Copies of Mr. Leonard’s and Mr. Varnell’s asbestos inspector certifications are attached in Appendix C. The survey was conducted in general accordance with the sample collection protocols established in USEPA 40 CFR Part 763 Subpart E 763.86, AHERA. A summary of survey activities is provided below.
3.1 Visual Assessment
Survey activities were initiated with visual observation of the interior and exterior of the buildings to identify homogeneous areas of suspect ACM. A homogeneous area (HA) consists of building materials that appear similar throughout in terms of color and texture with consideration given to the date of application. Interior assessment was conducted in visually accessible areas of the buildings proposed for renovation. Building materials identified as glass, wood, metal and rubber were not considered suspect ACM.
3.2 Physical Assessment
A physical assessment of each homogeneous area (HA) of suspect ACM was conducted to assess the friability and condition of the materials. A friable material is defined by the USEPA as a material which can be crumbled, pulverized or reduced to powder by hand pressure when dry.
Friability was assessed by physically touching suspect materials.
3.3 Sample Collection
Based on results of the visual observation, bulk samples of suspect ACM were collected in general accordance with USEPA AHERA sampling protocols. Samples of suspect materials were collected from randomly selected locations in each homogeneous area. Bulk samples were collected using wet methods as applicable to reduce the potential for fiber release. Samples were placed in sealable containers and labeled with unique sample numbers using an indelible marker.
The selection of sample locations and frequency of sampling were based on Terracon’s observations and the assumption that like materials in the same area are homogeneous in content.
Terracon collected 352 bulk samples from 111 homogeneous areas of suspect ACM from the ARTCC Building, 9 bulk samples from 3 homogeneous areas from the AAS Support Building, 3 bulk samples from 1 homogenous area from the RCL Tower, 67 bulk samples from 22 homogeneous areas of suspect ACM from the Power Service Building, 18 bulk samples from 6 homogeneous areas of suspect ACM from the Engineering Trailer, 23 bulk samples from 8
July 9, 2021 ■ Terracon Project No. 25197220
Responsive ■ Resourceful ■ Reliable 5 homogeneous areas of suspect ACM from the Guard House, 6 bulk samples from 2 homogeneous areas of suspect ACM from the Pump House, and 2 bulk samples from 1 homogeneous area of suspect ACM from the Storage Building.
Due to very limited quantities of the materials (3 square feet and 1 square foot respectively), two samples were collected of the white firestop (21-CA8-65, 21-CA8-66) and light red firestop (SB- 01-CA8-01, SB-01-CA8-02) materials.
A total of seven samples were collected for each of the white spray-on fire retardant (74-FP1) and the pink spray-on fire retardant (75-FP1A8-02) materials. All samples collected for these materials are listed on page 15 of Appendix B-1, ARTCC Building, Asbestos Sample Location Summary.
3.4 Sample Analysis
Bulk samples were submitted under chain of custody to International Asbestos Testing Laboratories (iATL) of Mount Laurel, New Jersey for analysis by Polarized Light Microscopy (PLM) with dispersion staining techniques per USEPA methodology 600/R-93/116. The percentage of asbestos, where applicable, was determined by microscopic visual estimation. iATL is accredited under the National Voluntary Laboratory Accreditation Program (NVLAP) Accreditation No. 101165.
iATL is a registered CDPHE asbestos laboratory (Registration No. 18632).
The laboratory was instructed to analyze all samples from each homogeneous area. Additional point counting analysis was required for any sample that was analyzed by PLM and reported to contain “trace” amounts of asbestos. Trace amounts are defined as less than or equal to one percent (1%) asbestos.
Additionally, if PLM results of floor tiles, mastic, plaster or joint compound were reported with asbestos detected at less than one percent (after point count) or non-detect, then one sample from each homogeneous material was also reanalyzed using TEM after gravimetric reduction in accordance with USEPA Method for the Determination of Asbestos in Bulk Building Materials (USEPA/600/R-93/116, July 1993).
Joint compound was not identified in 9 samples of 3 different types of wallboard (55-WB1-167, 55-WB1-168, 55-WB1-169, PS-04-WB1-12, PS-04-WB1-13, PS-04-WB1-14, ET-05-WB1-13, ET-05-WB-14, WT-05-WB1-1) during sampling or laboratory analysis; therefore, TEM analysis was not performed.
4.0 REGULATORY OVERVIEW
The Colorado Department of Public Health and Environment (CDPHE) incorporates the Asbestos NESHAP by reference in Regulation No. 8, Part B, 5 CCR 1001-10, Part B. The owner or operator
July 9, 2021 ■ Terracon Project No. 25197220
Responsive ■ Resourceful ■ Reliable 6 must provide CDPHE with written notification at least 10 working days prior to the commencement of asbestos abatement activities that will disturb RACM in amounts greater than to 160 square feet, 260 linear feet or a 55-gallon drum.
The asbestos NESHAP (40 CFR Part 61, Subpart M) regulates asbestos fiber emissions and asbestos waste disposal practices. The asbestos NESHAP regulation also requires the identification and classification of existing ACM according to friability prior to demolition or renovation activity. Friable ACM is a material containing more than 1% asbestos that, when dry, can be crumbled, pulverized, or reduced to powder by hand pressure. All friable ACM is considered regulated asbestos containing material (RACM).
The asbestos NESHAP regulation classifies material subject to demolition or renovation as either RACM, Category I non-friable ACM, or Category II non-friable ACM. RACM includes all friable ACM (pre-disturbance), along with Category I non-friable ACM that becomes friable (during disturbance), and Category I non-friable ACM subject to sanding, grinding, cutting, or abrading, or Category II non-friable ACM with a high probability of becoming crumbled, pulverized, or reduced to powder by forces expected to act on the material during disturbance. Category I non-friable ACM are exclusively asbestos-containing packings, gaskets, resilient floor coverings, and asphalt roofing products that contain more than 1% asbestos. Category II non-friable ACM are all other non-friable materials (other than Category I non-friable ACM) that contain more than 1% asbestos. Category II non-friable ACM generally includes (but is not limited to) cementitious material such as: cement pipes, cement siding, cement panels, glazing, mortar, and grouts.
The United States Occupational Safety and Health Administration (USOSHA) asbestos standard for construction (29 CFR 1926.1101) regulates workplace exposure to asbestos. The USOSHA standard requires that employee exposure to airborne asbestos must not exceed 0.1 fibers per cubic centimeter of air (0.1 f/cc) as an eight-hour time weighted average (TWA) and not exceed
1.0 f/cc over a 30-minute time period known as an excursion limit (EL). The TWA and EL are known as USOSHA’s asbestos permissible exposure limits (PELs). The USOSHA standard classifies construction and maintenance activities which could disturb ACM and specifies work practices and precautions which employers must follow when engaging in each class of regulated work.
July 9, 2021 ■ Terracon Project No. 25197220
Responsive ■ Resourceful ■ Reliable 7
5.0 FINDINGS
The following materials were identified by laboratory analysis to be asbestos-containing:
Material Description Material Location – ARTCC Building
NESHAP
Classification
Estimated Quantity
Brown Firestop Administration Wing – Basement Room B103 (East Wall) CAT II 1 SF
Pink Fiberglass Sealant Administration Wing – Basement Rooms B103B, B129 CAT II 6 SF
Green Fiberglass Pipe Sealant
Administration Wing – Basement Rooms B114, B116 CAT II 8 SF
Tan 9"x9" Vinyl Floor Tile with Black and Tan Mastic (Gray Floor Tile Sublayer)
Administration Wing – Basement Room B113 - floor (beneath 12”x12”
Floor Tile)
CAT I 400 SF
Black Pipe Sealant Administration Wing – Basement Room B113A - pipe within north wall CAT II 1 SF
Tan 9"x9" Vinyl Floor Tile with Black Mastic
Administration Control Wing – Basement Rooms B118 - floor
(beneath 12x12) and B117 - floor (beneath covering)
CAT I 800 SF
Light Brown Plaster with White Skim Coat
Control Wing – Basement Rooms B101, B120, 1st Floor Room 1026 Administration Wing - Basement
Room B115, 1st Floor Rooms 1023, 1007, 2nd Floor Rooms 212, 2015, Automation Wing – 1st Floor Room
108A
RACM 5,600 SF
Mottled Light Brown 12”x12” Vinyl Floor Tile with Black Mastic
Control Wing – Basement Rooms B101, B83, B81, B88 (floor beneath carpet), Stair No. 7 (attic level landing)
Automation Wing – Basement Room B21A
Administration Wing - Stair No. 6, Utility chase to west of 2nd Floor Room 2018, 1st Floor Room 1037
CAT I 1,600 SF
Black Residual 9”x9” Mastic
Control Wing – Basement Room B86 & B87 - floor CAT II 150 SF
Blue Sink Undercoating Automation Wing – Basement Room B21A - sink CAT II 1 Each
July 9, 2021 ■ Terracon Project No. 25197220
Responsive ■ Resourceful ■ Reliable 8
Material Description Material Location – ARTCC Building
NESHAP
Classification
Estimated Quantity
Grey Mottled 24"x24" Vinyl Floor Tile with Yellow
Mastic and Black Mastic
Control Wing – 1st Floor Rooms
1004A, 1026 CAT II 1,210 SF
Light Brown 9”x9” Vinyl Floor Tile with Yellow
Mastic and Brown Mastic
Administration Wing – 1st Floor Rooms 1031A - floor beneath white vinyl and 1031 - floor beneath white vinyl
CAT I 668 SF
Light Yellow Carpet Adhesive under 24"x24"
Carpet Squares
Automation Wing – 2nd Floor Rooms A216, A238, A240, A242-A254, South Control Wing - 2nd Floor
Room A240
CAT II 11,700 SF
White 5/8" drywall with Light Brown Paper and
Joint Compound
Automation Wing – 2nd Floor Rooms A217, A218A, A222, A241 and
Janitor’s closet.
Administration Wing – 2nd Floor Rooms 210, 217-219, 222-225, 2001-2007
CAT II 6,300 SF
Brown Mudded Fiberglass Pipe Elbow
Control Wing – Attic Level Stair No.
7 - Pipe RACM 5 SF
Material Description Material Location – RCI Tower
NESHAP
Classification Estimated Quantity
Grey Expansion Joint Caulking RCI Tower – Base Perimeter CAT II 15 LF
Material Description Material Location – Power Services Building
NESHAP
Classification
Estimated Quantity
9"x9" Mottled Black Vinyl Floor Tile with Black Mastic
1st Floor Garage - floor CAT I 900 SF
Brown Mudded Fiberglass Pipe Joint
1st Floor Sprinkler System Control Valve Room RACM 1 Each
White Exterior Caulking 1st Floor Garage Exterior CAT II 5 SF
Pink 5/8” Drywall with Joint Compound
1st Floor Office (Wall) CAT II 480 SF
No ACM was identified in the AAS Support Building, Engineering Trailer, Guard House, Pump House, or Storage Building.
July 9, 2021 ■ Terracon Project No. 25197220
Responsive ■ Resourceful ■ Reliable 9
Asbestos detected at 1% or less was identified in the samples collected and analyzed in the table below.
Material Description Material Location – ARCTCC Building % and Type Asbestos
Yellow Stair Tread Adhesive Administration Wing – Stair No.1, Stair No. 4
Yellow Mastic – None Detected Black Mastic P.C. <0.25% Chrysotile
Tan Carpet Adhesive Control Wing – Basement Room B81 Tan Mastic – TEM - <0.25% Chrysotile
Yellow Adhesive Behind Grey 4" Cove Base
Control Wing – 1st Floor Rooms 1052, 1001B, Automation Wing – 1st Floor Rooms 106A, 108C, 108B, 108A
Yellow Mastic – TEM - <0.25% Chrysotile
Black 12"x12" Vinyl Floor Tiles Administration Wing – 1st
Floor Room 1023 and Second Floor Room 2015
Black Floor Tile - TEM - <0.25% Chrysotile
Black Mastic – None Detected
Materials containing less than 1% asbestos are not regulated by NESHAP or AHERA; however, the OSHA personal exposure limits (0.1 f/cc of air as an eight-hour time weighted average or 1.0 f/cc of air over 30 minutes) for asbestos apply when materials containing 1% asbestos or less are disturbed during renovations or demolitions. A listing of materials that contain 1% asbestos or less is provided above to enable the renovation/demolition contractor to make appropriate decisions concerning compliance issues with applicable OSHA regulations.
The following materials are assumed to contain asbestos until sampling and analysis is performed.
Material Description Material Location – ARCTCC Building
Estimated Quantity
Grey grout and mortar associated with ceramic backsplash
Basement Room B113 (northeast corner) 30 SF
Grout and mortar associated with 2”x2” ceramic floor tile
Administration Wing - Basement Rooms - B106 and B106A 600 SF
Grout/mortar associated with 4”x4” ceramic wall tile
Administration Wing - Basement Rooms - B106 and B106A 1000 SF
Pink Firestop Control Wing – Basement Room
B120A (ceiling), Automation Wing – Basement Rooms B12A and B10A
2 SF
Grout and Mortar associated with 12”x12” Grey Ceramic Tile
Automation Wing – Basement Room
B15A 200 SF
Grout and mortar associated with 1’x2’ brown ceramic tile
Automation Wing – Basement Rooms B20A and B137, 1st Floor Rooms
118A, 135A, and 117A
600 SF
July 9, 2021 ■ Terracon Project No. 25197220
Responsive ■ Resourceful ■ Reliable 10
Material Description Material Location – ARCTCC Building
Estimated Quantity
Grout and mortar associated with 9”x18” yellow ceramic tile
Automation Wing – Basement Rooms B20A and B137, 1st Floor Rooms
118A, 135A, and 117A
900 SF
Grout and mortar associated with 4”x12” white ceramic tile
Administration Wing – 1st Floor Rooms 1031 and 1031A 500 SF
Grout and mortar associated with 4”x4” ceramic tile (wall)
Administration Wing – 1st Floor Rooms 1022 and 1021. 2nd floor rooms 2013 and 2014
1,000 SF
Grout and mortar associated with 4”x4” ceramic tile (floor)
Administration Wing – 1st Floor Rooms 1022 and 1021. 2nd floor rooms 2013 and 2014
400 SF
Grout and mortar associated with 12”x12” mottled grey ceramic tile
Administration Wing – 1st Floor Room
1005, 1006 500 SF
Grout and mortar associated with 6”x6” clay tile (floor)
Administration Wing – 1st Floor Rooms 1045, 1042, 1038 and 1044 430 SF
Grout and mortar associated with 1”x1” yellow tile (floor)
Administration Wing – 1st Floor Room
1035 110 SF
Adhesive behind fiber-reinforced paneling
Administration Wing – 1st Floor Room
1044 470 SF
Grout and mortar associated with 2”x2” blue ceramic tile (floor)
Administration Wing – 1st Floor Room
1034 80 SF
Grout and mortar associated with 1'x2' ceramic floor tile
Administration Wing – 1st Floor Room
1024, 1030, 1023 290 SF
Grout and mortar associated with 6”x12” ceramic wall tile
Administration Wing – 1st Floor Room
1024 90 SF
Grout and mortar associated with 2”x2” ceramic floor tile
Automation Wing – 2nd Floor Rooms A219 and A220, adjacent north
Janitor Closet
140 SF
Grout and mortar associated with 4”x4” ceramic wall tile
Automation Wing – 2nd Floor Rooms A219 and A220, adjacent north
Janitor Closet
120 SF
Material Description Material Location – AAS Support Building
Estimated Quantity
Grout and mortar associated with 1"x1" Black Ceramic Floor Tile
AAS Support Building – 1st Floor Rooms 103 and 104 250 SF
Grout and mortar associated with 6"x6" Black Ceramic Walls Tile
AAS Support Building – 1st Floor Rooms 103 and 104 320 SF
Material Description Material Location – Guard House Estimated Quantity
Grout and mortar associated with 2”x2”
July 9, 2021 ■ Terracon Project No. 25197220
Responsive ■ Resourceful ■ Reliable 11
The following materials are assumed to contain asbestos until negative PLM result verified by TEM analysis.
Material Description Material Location – ARCTCC Building
Estimated Quantity
Salmon 12”x12” Vinyl Floor Tile with Yellow Mastic
Administration Wing – Basement Room B113A - Floor 50 SF
White 12"x12" Vinyl Floor Tile with Tan Mastic
Control Wing – Basement Rooms B118 - floor, B116 - floor 2,600 SF
Tan 12"x12" Vinyl Floor Tile with Yellow Mastic
Control Wing – Basement Room B119 - northern floor 200 SF
Tan Stair Tread Mastic under Gray Rubberized Tread
Control Wing – Basement Rooms B119 - steps, B120A – stairs. 2nd
Floor Room A240 - ramp
35 SF
Grey 24"x24" Vinyl Floor Tile with Tan Mastic
Control Wing – Basement Room B107 - floor 150 SF
Green Carpet Adhesive Control Wing – Basement Room B83
- floor 300 SF
White Mottled 24"x24" Vinyl Floor Tile with Yellow/Brown Mastic Administration Wing - 1st Floor
Rooms 1031 - floor, 1031A - floor 630 SF
White Mottled 12"x12" Vinyl Floor Tile with Yellow Mastic Administration Wing – 1st Floor
Rooms 1032, 1046, 1033 500 SF
Black Mottled 12"x12" Vinyl Floor Tile with Tan Mastic
Administration Wing – 1st Floor Rooms 1032, 1046, 1033 500 SF
Grey and Brown Mottled 12"x12" Vinyl Floor Tile with Yellow Mastic
Administration Wing – 2nd Floor Stair No. 6 Corridor 140 SF
Material Description Material Location – Power Services Building
Estimated Quantity*
Tan Mottled 12”x12” Floor Tile with Yellow Mastic Generator Room (south area), Office, SWGR Room (south portion) 1,650 SF
Material Description Material Location – Engineering Trailer Estimated Quantity*
Yellow adhesive beneath roll-on carpet Throughout Trailer (Floors) 2,500 SF
Tan Mottled 12”x12” Vinyl Floor Tile with Yellow Mastic Mechanical Room, Restrooms 110 SF
Material Description Material Location – Guard House Estimated Quantity*
Brown speckled 24"x24" Vinyl Floor
July 9, 2021 ■ Terracon Project No. 25197220
Responsive ■ Resourceful ■ Reliable 12
The above listed RACMs must be removed by a State of Colorado-certified general abatement contractor prior to any activities (renovation and/or demolition) that may disturb this material in accordance with applicable federal, state and local regulations.
The above listed Category I non-friable ACM that is damaged or could be damaged to the extent that it could be crumbled, pulverized or reduced to powder when dry, making it friable, must be removed prior to any activities (renovation and/or demolition) that may disturb this material in accordance with applicable federal, state and local regulations.
The above listed Category II non-friable ACM that has a high probability of becoming crumbled, pulverized, or reduced to powder when dry, making it friable, must be properly removed prior to any activities (renovation and/or demolition) that may disturb this material in accordance with applicable federal, state and local regulations. USEPA believes that most demolition activities will subject Category II non-friable ACM to the asbestos NESHAP regulation.
A summary of the classification, condition and approximate quantity of identified ACM is presented in Appendix A. The summary of sample locations is presented in Appendix B. Laboratory analytical reports are included in Appendix C.
At your request, Terracon can provide a proposal for developing asbestos abatement specifications (project design) and for performing abatement oversight and air monitoring.
6.0 LIMITATIONS/GENERAL COMMENTS
Terracon did not perform sampling requiring demolition or destructive activities such as knocking holes in walls, dismantling of equipment or removal of protective coverings. Concrete materials were not sampled during the time of the survey. Reasonable efforts to access suspect materials within known areas of restricted access (e.g., crawl spaces) were made; however, confined spaces or areas which may pose a health or safety risk to Terracon personnel were not sampled.
Sampling did not include suspect materials which could not be safely reached with available ladders/man-lifts. Terracon did not sample suspect materials that may be present in movable equipment such as freezers, kitchen equipment and hoods. Terracon typically investigated for flooring beneath carpeting by lifting small corner sections of carpet. If tiles were seen, they have been identified in the report. If tiles were not seen at corners under the carpet, it does not imply that there are no tiles beneath the carpeted floor. Terracon sampled accessible flooring materials but did not conduct destructive investigation on floors to identify multi-layered tile/underlayment systems, concealed paper, vapor barriers, or floor tiles/mastics under wood floor systems.
Terracon did not conduct destructive investigation of doors in the building to determine if the doors were insulated for fire-rating purposes. Previously identified asbestos-containing materials that could not be visually verified as remaining or have been documented as removed may still exist behind or under wall systems (i.e. such as but not limited to pipe insulation, fireproofing overspray, July 9, 2021 ■ Terracon Project No. 25197220
Responsive ■ Resourceful ■ Reliable 13 tile and mastic beneath walls). The facility management also requested that ceramic tile grouts and mortars be assumed to reduce damage. Additionally, exterior and roofing materials were not sampled during this survey.
This asbestos survey was conducted in a manner consistent with the level of care and skill ordinarily exercised by members of the profession currently practicing under similar conditions in the same locale. The results, findings, conclusions and recommendations expressed in this report are based on conditions observed during our survey of the building. The information contained in this report is relevant to the date on which this survey was performed and should not be relied upon to represent conditions at a later date. This report has been prepared on behalf of and exclusively for use by Parsons and the FAA for specific application to their project as discussed.
This report is not a bidding document. Contractors or consultants reviewing this report must draw their own conclusions regarding further investigation or remediation deemed necessary. Terracon does not warrant the work of regulatory agencies, laboratories or other third parties supplying information which may have been used in the preparation of this report. No warranty, express or implied is made.
APPENDIX A
IDENTIFIED ASBESTOS-CONTAINING MATERIALS BY
HOMOGENEOUS AREA (HA), ASSUMED ASBESTOS CONTAINING
MATERIALS BY HA AND MATERIALS CONTAINING 1% OR LESS
ASBESTOS BY HA
Denver ARTCC (ZDV) 2211 17th Avenue
Longmont, CO 80501
IDENTIFIED ASBESTOS-CONTAINING MATERIALS BY HOMOGENEOUS AREA (HA)
ARTCC Building HA No. Material Description Material Location % and Type
Asbestos*
NESHAP
Classification Condition Estimated Quantity**
06-CA8 Brown Firestop Administration Wing – Basement Room B103
(East Wall) P.C. 5.4-5.6%
Chrysotile CAT II Good 1 SF
09-SC7
Pink Fiberglass
Sealant Administration Wing – Basement Rooms
B103B, B129 P.C. – 2.3-2.5%
Chrysotile CAT II Good 6 SF
14-SC7
Green Fiberglass
Pipe Sealant Administration Wing – Basement Rooms
B114, B116 P.C. – 2.2-2.9%
Chrysotile CAT II Good 8 SF
27-FT1
Tan 9”x9” Vinyl Floor Tile with Black and Tan Mastic (Gray
Floor Tile Sublayer)
Administration Wing – Basement Room B113
- floor (beneath 12”x12” Floor Tile)
P.C. – 1.3-1.5% Chrysotile CAT I Good 400 SF
31-SC5 Black Pipe Sealant Administration Wing – Basement Room B113A - pipe within north wall
P.C. – 3.1-3.4% Chrysotile CAT II Good 1 SF
33-FT1 Tan 9"x9" Vinyl Floor Tile with Black Mastic
Administration Control Wing – Basement Rooms B118 - floor (beneath 12x12) and
B117 - floor (beneath covering)
Tan Floor Tile - P.C. – 1.3-1.5% Chrysotile Black Mastic - P.C. – 1.2-1.5% Chrysotile
CAT I Good 800 SF
37-PL1 Light Brown Plaster with White Skim Coat
Control Wing – Basement Rooms B101, B120, 1st Floor Room 1026
Administration Wing - Basement Room B115, 1st Floor Rooms 1023, 1007, 2nd Floor
Rooms 212, 2015, Automation Wing – 1st Floor Room 108A
White Plaster - P.C.
1.2% Chrysotile RACM Good 5,600 SF
IDENTIFIED ASBESTOS-CONTAINING MATERIALS BY HOMOGENEOUS AREA (HA)
ARTCC Building, Continued
HA No. Material Description Material Location % and Type Asbestos*
NESHAP
Classification Condition Estimated
Quantity**
61-FT2
Mottled Light Brown 12”x12” Vinyl Floor
Tile with Black Mastic
Control Wing – Basement Rooms B101, B83, B81, B88 (floor beneath carpet), Stair No. 7
(attic level landing) Automation Wing – Basement Room B21A
Administration Wing - Stair No. 6, Utility chase to west of 2nd Floor Room 2018, 1st
Floor Room 1037
Tan Floor Tile - P.C. – 1.2-1.5% Chrysotile Black Mastic - P.C. – 1.4-1.5% Chrysotile
CAT I Good 1,600 SF
67-MG5 Black Residual 9”x9” Mastic
Control Wing – Basement Room B86 & B87 - floor
Black Mastic - P.C. – 1.4-1.5% Chrysotile CAT II Good 150 SF
77-SC6 Blue Sink Undercoating
Automation Wing – Basement Room B21A -sink
Blue Sink Undercoating - P.C. – 1.9-2.2% Chrysotile
CAT II Good 1 Each
86-FT5
Grey Mottled 24"x24" Vinyl Floor Tile with Yellow Mastic and
Black Mastic
Control Wing – 1st Floor Rooms 1004A, Yellow Mastic – TEM – 2.2% Chrysotile
CAT II Good 1,210 SF
89-FT1
Light Brown 9”x9” Vinyl Floor Tile with Yellow Mastic and
Brown Mastic
Administration Wing – 1st Floor Rooms 1031A - floor beneath white vinyl and 1031 -floor beneath white vinyl
Tan Floor Tile - P.C. – 1.2-1.4% Chrysotile
CAT I Good 668 SF
103-
MG7
Light Yellow Carpet Adhesive under 24"x24" Carpet
Squares
Automation Wing – 2nd Floor Rooms A216, A238, A240, A242-A254, South Control Wing
- 2nd Floor Room A240
Light Yellow/Black Mastic - P.C. - 1.2%
Chrysotile CAT II Good 11,700 SF
104-
WB1
White 5/8" drywall with Light Brown Paper and Joint
Compound
Automation Wing – 2nd Floor Rooms A217, A218A, A222, A241 and Janitor’s closet.
Administration Wing – 2nd Floor Rooms 210, 217-219, 222-225, 2001-2007
White Joint Compound
- TEM – 23.9%
Chrysotile CAT II Good 6,300 SF
ARTCC Building, Continued
HA No. Material Description Material Location % and Type Asbestos*
NESHAP
Classification Condition Estimated
Quantity**
109-
MJ4
Brown Mudded Fiberglass Pipe
Elbow Control Wing – Attic Level Stair No. 7 - Pipe
White insultation – P.C. – 3.2-5.5%
Chrysotile P.C. – 5.3-6.1%
Amosite
RACM Good 5 SF
RCL Tower HA No. Material Description Material Location % and Type
Asbestos*
NESHAP
Classification Condition Estimated Quantity**
114-
CA5
Grey Expansion Joint Caulking
RCL Tower – Base Perimeter 10% Chrysotile CAT II Damaged 15 LF
Power Services Building HA No. Material Description Material Location % and Type
Asbestos*
NESHAP
Classification Condition Estimated Quantity**
01-FT1
9"x9" Mottled Black Vinyl Floor Tile with
Black Mastic 1st Floor Garage - floor P.C. – 2.4-3.3%
Chrysotile CAT I Good 900 SF
03-MJ4
Brown Mudded Fiberglass Pipe
Elbow
1st Floor Sprinkler System Control Valve Room
10% Amosite 5.1% Chrysotile
RACM Good 1 Each
05-CA5
White Exterior
Caulking 1st Floor Garage Exterior P.C. 2.1-2.6% Chrysotile CAT II Good 5 SF
16-WB1 Pink 5/8” Drywall with Joint Compound 1st Floor Office (Wall)
Composite - P.C. 0.75- 1.2%
White Joint Compound
- P.C. 3.5-3.8%
CAT II Good 480 SF
*% & Type Asbestos = this column contains both the analytical result of the sample with the highest concentration of asbestos detected in the samples that make up the HA and the types of asbestos identified.
**Estimated quantities are based on a cursory field evaluation, and actual quantities may vary significantly, especially if asbestos containing materials are present in hidden and/or inaccessible areas not evaluated as part of this survey.
P.C.-indicates that stratified point count method of analysis was performed.
MATERIALS CONTAINING 1% OR LESS ASBESTOS BY HA
ARTCC Building HA No. Material Description Material Location % and Type
Asbestos Condition
23-MG4
Yellow Stair Tread
Adhesive with Black Mastic
Administration Wing – Stair No.1, Stair No. 4
Yellow Mastic – None Detected
Black Mastic P.C.
<0.25% Chrysotile
Good
64-MG7 Tan Carpet Adhesive Control Wing – Basement Room B81 Tan Mastic – TEM - <0.25% Chrysotile Good
71-MG3
Yellow Adhesive
Behind Grey 4" Cove Base
Control Wing – 1st Floor Rooms 1052, 1001B, Automation Wing – 1st Floor Rooms 106A, 108C, 108B, 108A
Yellow Mastic – TEM
- <0.25% Chrysotile Good
94-FT2
Black 12"x12" Vinyl
Floor Tiles with Black Mastic
Administration Wing – 1st Floor Room 1023 and 2nd Floor Room 2015
Black Floor Tile -
TEM - <0.25%
Chrysotile Black Mastic – None
Detected
Good
Materials containing less than 1% asbestos are not regulated by NESHAP or AHERA; however, the OSHA personal exposure limits (0.1 f/cc of air as an eight-hour time weighted average or 1.0 f/cc of air over 30 minutes) for asbestos apply when materials containing 1% asbestos or less are disturbed during renovations or demolitions. A listing of materials that contain 1% asbestos or less is provided above to enable the renovation/demolition contractor to make appropriate decisions concerning compliance issues with applicable OSHA regulations.
ASSUMED ASBESTOS CONTAINING MATERIALS BY HA
The following materials are assumed to contain asbestos until sampling and analysis is performed.
HA No. Material Description Material Location – ARCTCC Building Estimated Quantity 117-
MA3
Grey grout and mortar associated with ceramic backsplash Basement Room B113 (northeast corner) 30 SF
118-
MA3
Grout and mortar associated with 2”x2” ceramic floor tile
Administration Wing - Basement Rooms
- B106 and B106A 600 SF
119-
MA3
Grout/mortar associated with 4”x4” ceramic wall tile
Administration Wing - Basement Rooms
- B106 and B106A 1000 SF
120-CA6
Pink Firestop
Control Wing – Basement Room B120A (ceiling), Automation Wing – Basement
Rooms B12A and B10A
2 SF
121-
MA3
Grout and Mortar associated with 12”x12” Grey Ceramic Tile
Automation Wing – Basement Room
B15A 200 SF
122- MA3 Grout and mortar associated with 1’x2’ brown ceramic tile Automation Wing – Basement Rooms
B20A and B137, 1st Floor Rooms 118A, 135A, and 117A
600 SF
123- MA3 Grout and mortar associated with 9”x18” yellow ceramic tile
Automation Wing – Basement Rooms B20A and B137, 1st Floor Rooms 118A, 135A, and 117A
900 SF
124-
MA3
Grout and mortar associated with 4”x12” white ceramic tile
Administration Wing – 1st Floor Rooms 1031 and 1031A 500 SF
125- MA3 Grout and mortar associated with 4”x4” ceramic tile (wall)
Administration Wing – 1st Floor Rooms 1022 and 1021. 2nd floor rooms 2013 and
1,000 SF
126- MA3 Grout and mortar associated with 4”x4” ceramic tile (floor)
Administration Wing – 1st Floor Rooms 1022 and 1021. 2nd floor rooms 2013 and
400 SF
127-
MA3
Grout and mortar associated with 12”x12” mottled grey ceramic tile
Administration Wing – 1st Floor Room
1005, 1006 500 SF
The following materials are assumed to contain asbestos until sampling and analysis is performed.
HA No. Material Description Material Location – ARCTCC Building Estimated Quantity 128-
MA3
Grout and mortar associated with 6”x6” clay tile (floor)
Administration Wing – 1st Floor Rooms 1045, 1042, 1038 and 1044 430 SF
129-
MA3
Grout and mortar associated with 1”x1” yellow tile (floor)
Administration Wing – 1st Floor Room
1035 110 SF
130- MA3 Adhesive behind fiber-reinforced paneling Administration Wing – 1st Floor Room
1044 470 SF
131-
MA3
Grout and mortar associated with 2”x2” blue tile (floor)
Administration Wing – 1st Floor Room
1034 80 SF
132-
MA3
Grout and mortar associated with 1'x2' ceramic floor tile
Administration Wing – 1st Floor Room
1024, 1030, 1023 290 SF
133-
MA3
Grout and mortar associated with 6”x12” ceramic wall tile
Administr…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .