15F06719R0000004_0007,_Atch_21_OCONUS_Gen_Reqmts&Prov_Div_1.pdf

PDF 4 MB Posted

Attached to
REGIONAL MULTIPLE AWARD CONSTRUCTION CONTRACT Federal contract opportunity
Solicitation number
15F06719R0000004
Issued by
Department of Justice Federal Bureau of Investigation Headquarters Division

About this file

This document is an attachment to a Regional Multiple Award Construction Contract solicitation. It provides requirements for life safety and construction standards for overseas projects. Key details include that applicable codes will be furnished with each task order's program of requirements. Occupancy classifications and means of egress requirements are outlined. Construction standards cover building separation, fire barriers, structural fire resistance, and temporary facilities controls. The solicitation was issued by the Department of Justice Federal Bureau of Investigation Headquarters Division as solicitation number 15F06719R0000004 to establish blanket purchase agreements for construction services worldwide in support of the FBI.

15F06719R0000004 0007, Atch 21 OCONUS Gen Reqmts&Prov Div 1

View the file

Other files for this federal contract opportunity

Other files attached to REGIONAL MULTIPLE AWARD CONSTRUCTION CONTRACT, newest first.
File Type Posted
15F06719R0000004_0013_Atch_8_Responses_7OCT19.pdf PDF
SF_30,_15F06719R0000004_0013_7OCT19.pdf PDF
15F06719R0000004_0012_Atch_8_Responses_20SEP19.pdf PDF
SF_30,_15F06719R0000004_0012_20SEP19.pdf PDF
15F06719R0000004_0011,_Atch_1_SF_1442_13SEP19.pdf PDF
SF_30,_15F06719R0000004_0011_17SEP19.pdf PDF
15F06719R0000004_0011_Atch_8_Responses_13SEP19.pdf PDF
15F06719R0000004_Atch_19_Request_For_Const_Docs_Cert.pdf PDF
SF_30,_15F06719R0000004_0010_30AUG19Final.pdf PDF
SF_30,_15F06719R0000004_0009_23AUG19Final.pdf PDF
15F06719R0000004_0009,_Atch_1_SF_1442_23AUG19Final.pdf PDF
15F06719R0000004_0009_23AUG19Final.pdf PDF
15F06719R0000004_0009,_Atch_19,_Request_For_Const_Docs_Cert.pdf PDF
SF_30,_15F06719R0000004_0008__16AUG19Final.pdf PDF
15F06719R0000004_0007,_Atch_12_Price_Model_Template.xlsx XLSX spreadsheet
15F06719R0000004_0007,_Atch_15_Resume_Template.docx DOCX document
15F06719R0000004_0007,_Atch_24_FD_219_Visitor_Request_Form.xlsx XLSX spreadsheet
15F06719R0000004_0007,_Atch_23_Submitting_Candidates_for_Access_to_FBI_Facilities.pdf PDF
15F06719R0000004_0007,_Atch_20_Policy_Directive_0130D.pdf PDF
15F06719R0000004_0007,_Atch_17_FBI_LAR_Guide_&_SF_85.pdf PDF
15F06719R0000004_0007,_Atch_19,_Request_For_Const_Docs_Cert.pdf PDF
15F06719R0000004_0007,_Atch_8_Submission_of_Questions_Form.xlsx XLSX spreadsheet
15F067-19-R0000004_Amendment_0006,_Responses_FBO_Post_11JAN19Final.pdf PDF
SF_30,_15F067-19-R0000004_Amendment_0006_11JAN19Final.pdf PDF
SF_30,_15F067-19-R0000004_Amendment_0005_10JAN19Final.pdf PDF
15F067-19-R0000004_Amendment_0005,_Inquiries_and_Responses_FBO_Post_10JAN19Final.pdf PDF
15F067-19-R0000004_Rev_2,_Amendment_0005_FBO_Post_10JAN19Final.pdf PDF
SF_30,_15F067-19-R0000004_Amendment_0004_02JAN19Final.pdf PDF
Atch_1_SF_1442_Amendment_0004_02JAN19Final.pdf PDF
SF_30,_15F067-19-R0000004_Amendment_0003_21DEC18Final.pdf PDF
Atch_1_SF_1442_Amendment_0003_21DEC18Final.pdf PDF
Atch_11_List_of_Projects,_HSV_Only,_Amendment_0002_20DEC18Final.pdf PDF
Atch_1_SF_1442_Amendment_0002_20DEC18Final.pdf PDF
15F067-19-R0000004_Amendment_0002,_Responses-FBO_Copy_20DEC18Final.pdf PDF
SF_30,_15F067-19-R0000004_Amendment_0002_20DEC18Final.pdf PDF
15F067-19-R0000004_Revision_1,_Amendment_0002_20DEC19Final.pdf PDF
Atch_5_PPQ,_Amendment_0002_20DEC18Final.docx DOCX document
Atch_10_Corp_Perform_Ref_Info,_Amendment_0002_20DEC18Final.docx DOCX document
15F067-19-R0000004_Amendment_0001_14DEC18Final_1.pdf PDF
ATTACHMENT_5_Past_Performance_Questionnaire.docx DOCX document
Sol__Cvr_Ltr_14NOV18Final-signed.pdf PDF
ATTACHMENT_1_SF_1442.pdf PDF
Atch_4_DOS_Security_Rqmts_for_Overseas_Work_FINAL.pdf PDF
Atch_6_Resume_Template_FINAL.docx DOCX document
Atch_2_Key_Mgt_Personnel_Listing_FINAL.pdf PDF
ATTACHMENT_10_Corporate_Performance_Reference_Information_Design.docx DOCX document
Atch_7_Gen_ReqmtsProv_Div_1_CONUS_FINAL.pdf PDF
15F067-19-R0000004_14NOV19_FINAL.pdf PDF
Atch_3_Acquisition_Risk_Questionnaire_FINAL.pdf PDF
Atch_8_Questions_Submission_Form_FINAL.xlsx XLSX spreadsheet
Show all 50

REGIONAL MULTIPLE AWARD CONSTRUCTION CONTRACT has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SENSITIVE BUT UNCLASSIFIED (SBU) – PROPERTY OF THE UNITED STATES GOVERNMENT

FOR OFFICIAL USE ONLY. Do not remove this notice. Properly destroy or return documents when no longer needed.

April 10, 2018 – Division 1 Document

Attachment 7 15F067-19-R0000004 RMACC

GENERAL REQUIREMENTS &

PROVISIONS

FOR

REGIONAL MULTIPLE AWARD

CONSTRUCTION CONTRACT (RMACC)

24 October 2018

FOR OFFICIAL USE ONLY. Do not remove this notice. Properly destroy or return documents when no longer needed.

April 10, 2018 – Division 1 Document

GENERAL REQUIREMENTS AND PROVISIONS

DIVISION 01 00 00 CONUS

LIFE SAFETY

I. INTRODUCTION

General Description: This information will be furnished in conjunction with the

Task Order’s Program of Requirements.

II. APPLICABLE CODES AND STANDARDS

A. The National Fire Codes (NFC) published by National Fire Protection

Association (NFPA) to include, but not limited to: This information will be furnished in conjunction with the Task Order’s Program of Requirements.

B. The International Building Codes published by International Code Council

(ICC) to include, but not limited to: This information will be furnished in conjunction with the Task Order’s Program of Requirements.

C. The Architectural Barriers Act (ABA) Standards - 2015 ed.

D. Where conflicts exist between codes, the more stringent code will be followed.

III. GENERAL BUILDING DESCRIPTIONS

This information will be furnished in conjunction with the Task Order’s Program of

Requirements.

IV. OCCUPANCY CLASSIFICATION

General Description

The new building will be provided the following use groups: This information will be furnished in conjunction with the Task Order’s Program of Requirements.

B-Business

Data hall, Offices and supporting areas: This information will be furnished in

S-1– Storage

Generator room, Boiler room: This information will be furnished in conjunction with the Task Order’s Program of Requirements.

S-2– Storage

Accessory storage rooms, Mechanical/Electrical rooms, UPS rooms: This information will be furnished in conjunction with the Task Order’s Program of

FOR OFFICIAL USE ONLY. Do not remove this notice. Properly destroy or return documents when no longer needed.

April 10, 2018 – Division 1 Document

Federal Bureau of Investigation

R M AC C D i vi s io n 0 1 0 0 0 0

H-3 – High Hazard

Day tank storage: This information will be furnished in conjunction with the

Task Order’s Program of Requirements.

V. BUILDING CONSTRUCTION AND LIMITATIONS

VI. BUILDING SEPARATION AND EXPOSURE PROTECTION

VII. FIRE BARRIER

VIII. FIRE WALL

IX. STRUCTURAL FIRE RESISTANCE

General Description: This information will be furnished in conjunction with the Task Order’s Program of Requirements.

X. MEANS OF EGRESS

General Description: This information will be furnished in conjunction with the Task Order’s Program of Requirements.

A. Occupant Loads: This information will be furnished in conjunction with the

B. Exit Capacity: This information will be furnished in conjunction with the Task

Order’s Program of Requirements.

C. Number and Remoteness of Exits: This information will be furnished in

FOR OFFICIAL USE ONLY. Do not remove this notice. Properly destroy or return documents when no longer needed.

April 10, 2018 – Division 1 Document

D. Arrangement of Means of Egress: This information will be furnished in

E. Measurement of Egress Component Limits per NFPA 101 Table A.7.6

(fully sprinklered)

F. Doors: This information will be furnished in conjunction with the Task Order’s

Program of Requirements.

G. Marking of Means of Egress: This information will be furnished in conjunction with the Task Order’s Program of Requirements.

H. Illumination of Means of Egress: This information will be furnished in

SENSITIVE BUT UNCLASSIFIED (SBU) – PROPERTY OF THE UNITED STATES GOVERNMENT

FOR OFFICIAL USE ONLY. Do not remove this notice. Properly destroy or return documents when no longer needed.

September 4th, 2015 – 100% Bridging Document

Codes and Standards

A. Overview

Design shall comply with all applicable Standards, Industry Standards, and Building Codes and shall meet the design criteria set forth in this POR. The most stringent requirements will be applied when conflicts between the applicable codes and standards are found, or when conflicts between this document and the applicable codes and standards are found.

The references cited below contain design guidelines applicable to all parts of the Program of

Requirements (POR) document and are implied if not specifically restated as references in each section.

B. Applicable Codes

Latest edition of the following:

International Building Code (IBC)

International Fire Code (IFC)

International Mechanical Code (IMC)

International Energy Conservation Code (IECC)

International Fuel Gas Code (IFGC)

International Plumbing Code (IPC)

National Fire Protection Association’s Life Safety Code (NFPA 101)

National Fire Protection Association’s Life Safety Code (NFPA 75)

All adopted Federal, State, and Local amendments and ordinances

C. Standards(alphabeticallylisted)

American Association of State and Highway and Transportation Officials (AASHTO) o AASHTO Guide for Design of Pavement Structures

American Concrete Institute (ACI) o American Concrete Institute (ACI) 318‐05, Building Code Requirements for Structural Concrete o American Concrete Institute (ACI) 530/530.1 (2005) Building Code Requirements for Masonry Structures

American Institute of Steel Construction (AISC) o AISC Manual of Steel Construction, Thirteenth Edition

American Architectural Manufacturers Association (AAMA) o AAMA Standard101/I.S. Voluntary Performance Specification for Windows, Skylights and Glass Doors o AAMA 2605 Voluntary Specification, Performance Requirements and Test

Procedures for Superior Performing Organic Coatings on Aluminum Extrusions

SENSITIVE BUT UNCLASSIFIED (SBU) – PROPERTY OF THE UNITED STATES GOVERNMENT

FOR OFFICIAL USE ONLY. Do not remove this notice. Properly destroy or return documents when no longer needed.

American National Standards Institute (ANSI) o ANSI/TIA‐568‐C.0 Generic Telecommunications Cabling for Customer Premises o ANSI/TIA‐568‐C.1 Commercial Building Telecommunications Cabling Standard o ANSI/TIA‐568‐C.2 Balanced Twisted‐Pair Telecommunications Cabling and

Components Standard o ANSI/TIA‐568‐C.3 Optical Fiber Cabling Components Standard o TIA‐569‐B Commercial Building Standard for Telecommunications Pathways and Spaces o ANSI/TIA‐606A Administration Standard for Commercial Telecommunications

Infrastructure o ANSI/TIA‐607‐B Telecommunications Grounding (Earthing) and Bonding for Customer Premise o ANSI/TIA‐758‐A Customer‐Owned Outside Plant Telecommunications

Infrastructure Standard o ANSI/TIA‐862 Building Automation Systems Cabling Standard for

Commercial Buildings o ANSI/TIA‐942 Telecommunications Infrastructure Standard for Data Centers

American Society of Civil Engineers (ASCE) o ASCE 7‐05 Minimum Design Loads for Buildings and Other Structures. [In addition to providing design criteria that may be uniformly applied throughout the country, ASCE 7‐05 has provisions for a more robust structural design suitable for facilities to be occupied during periods of emergency or shortly thereafter. ]

American Society for Testing and Materials (ASTM) o ASTM A36 Standard Specification for Carbon Structural Steel o ASTM A53 Standard Specification for Pipe o ASTM A325 ‐ 09a Standard Specification for Structural Bolts o ASTM A653/A653M ‐ Standard Specification for Steel Sheet, Zinc‐Coated

(Galvanized) or Zinc‐Iron Alloy Coated (Galvannealed) by the Hot‐Dip Process.

o ASTM A992 Standard Specification for Structural Steel Shapes o ASTM B117 ‐ Practice for Operating Salt‐Spray (Fog) Apparatus.

o ASTM C1028‐07 Standard Test Method for Determining the Static Coefficient of Friction of Ceramic Tile o ASTM D523 ‐ Test Method for Specular Gloss.

o ASTM D714 ‐ Test Method for Evaluating Degree of Blistering in Paint.

o ASTM D822 ‐ Practice for Conducting Tests on Paint and Related Coatings and Materials using Filtered Open‐Flame Carbon‐Arc Light and Water Exposure Apparatus.

SENSITIVE BUT UNCLASSIFIED (SBU) – PROPERTY OF THE UNITED STATES GOVERNMENT

FOR OFFICIAL USE ONLY. Do not remove this notice. Properly destroy or return documents when no longer needed.

o ASTM D1654 ‐ Test Method for Evaluation of Painted or Coated Specimens

Subjected to Corrosive Environments.

o ASTM D2244 ‐ Test Method for Calculation of Color Differences from

Instrumentally Measured Color Coordinates.

o ASTM D2794 ‐ Test Method for Resistance of Organic Coatings to the Effects of Rapid Deformation (Impact).

o ASTM D3359 ‐ Test Method for Measuring Adhesion by Tape Test.

o ASTM F1303, Backed vinyl sheet standard

American Society of Heating, Refrigerating and Air‐Conditioning Engineers, Inc. (ASHRAE) o ASHRAE Standard 62.1 – 2007, Ventilation for Acceptable Indoor Air Quality o ASHRAE Standard 90.1 – 2007, Energy Standard for Buildings, except Low‐ Rise Residential Buildings o ASHRAE Standard 189.1‐2009, Standard for the Design of High‐Performance

Green Buildings (ANSI Approved; USGBC and IES Co‐sponsored) o Handbook of Fundamentals for acoustical design standards o Technical Committee TC9.9 edits to the 2007 Handbook, HVAC Applications, Chapter 17, Data Processing and Electronic Office Areas o Latest Supplement to ASHRAE’s Datacom series, Thermal Guidelines for Data Processing Environments (ASHRAE 2004). Supplement: 2008 ASHRAE Environmental Guidelines for Datacom Equipment – Expanding the Recommended Environmental Envelope o Latest Supplement to ASHRAE’s Datacom series, Particulate and Gaseous

Contamination in Datacom Environments (ASHRAE 2009). Supplement:

“Particulate and Gaseous Contamination Guidelines for Data Centers o ASHRAE Technical Committee TC9.9 edits to the 2007 Handbook, HVAC Applications, Chapter 17, Data Processing and Electronic Office Areas o Datacom series of Guidelines for Data Centers o Thermal Guidelines for Data Processing Environments (ASHRAE 2004).

Supplement: 2008 ASHRAE Environmental Guidelines for Datacom

Equipment – Expanding the Recommended Environmental Envelop.

o Particulate and Gaseous Contamination in Datacom Environments (ASHRAE 2009) Supplement: Particulate and Gaseous Contamination Guidelines for Data Centers.

American Society of Mechanical Engineers (ASME) o ASME A17.1 Safety Code for Elevators and Escalators

American Society of Plumbing Engineers (ASPE):

SENSITIVE BUT UNCLASSIFIED (SBU) – PROPERTY OF THE UNITED STATES GOVERNMENT

FOR OFFICIAL USE ONLY. Do not remove this notice. Properly destroy or return documents when no longer needed.

o ASPE Data and Design Handbooks

American Welding Society (AWS) o AWS D1.1, Structural Welding Code ‐ Steel

Architectural Barriers Act Accessibility Standard (ABAAS) o Or local accessibility requirements, whichever is more stringent

Architectural Woodwork Institute (AWI) o AWI Architectural Woodwork Standards

Brick Institute of America (BIA) o BIA Technical Notes on Brick Construction

Building Owners and Managers Association (BOMA) o Standard Method for Measuring Floor Area in Office Buildings ANSI/BOMA Z65.1, Building Hardware Manufacturers Association (BHMA) o BHMA ‐ ANSI standard series

Building Industry Consulting Services International, Inc. (BICSI) o BICSI Telecommunications Distribution Design Methods Manual (TDMM)

12th Edition o BICSI 002 Data Center Design and Implementation Best Practices (Expected To

Be Published Prior To Commencement of Project Design)

Carpet and Rug Institute (CRI) o CRI Fact Sheet, Guidelines for levels of traffic by category o CRI Carpet Installation Standard

Ceiling and Interior Systems Construction Association (CISCA) o Recommended Test Procedures for Access Floors

Code of Federal Regulations (CFR) o CFR Title 29, Chapter XVII, Part 1910 Occupational Safety and Health

Cool Roof Rating Council (CRRC) o CRRC‐1, Product Rating Program

Design‐Basis Threat (U), an Interagency Security Committee Report, April 12, 2010, Unclassified (FUOU)

Facility Security Level Determinations for Federal Facilities, an Interagency

Security Committee Standard, February 21, 2008

Factory Mutual (FM) o FM Global Property Loss Prevention Data Sheets 1‐28R/ 1‐29R Roof Systems o FM Global Property Loss Prevention Data Sheets 1‐29 Roof Deck Securement and Above‐Deck Roof Components

FOR OFFICIAL USE ONLY. Do not remove this notice. Properly destroy or return documents when no longer needed.

September 4th, 2015 – 100% Bridging Document

Project – Program of Owner’s Requirements o FM Approvals 4470 Approval Standard for Class 1 Roof Covers o FM Global Property Loss Prevention Data Sheets 1‐49 Perimeter Flashing o FM Global Data Sheet 5‐32

Federal Emergency Management Agency (FEMA) o FEMA 350, Recommended Seismic Design Criteria for New Steel Moment‐ Frame Buildings o FEMA 351, Recommended Seismic Evaluation and Upgrade Criteria for

Existing Welded Steel Moment‐Frame Buildings o FEMA 352, Recommended Post‐Earthquake Evaluation and Repair Criteria for

Welded Steel Moment‐Frame Buildings o FEMA 353, Recommended Specifications and Quality Assurance Guidelines for

Steel Moment‐Frame Construction for Seismic Applications

FHWA Manual on Uniform Traffic Control Devices, 2003 Edition Rev 1, November 2004

Green Seal (GS) o GS‐11 Environmental Standard for Paints and Coatings, Third Edition, 2010

Gypsum Association (GA) o GA‐214 Recommended Levels of Gypsum Board Finish o GA‐216 Application and Finishing of Gypsum Board o GA‐600 Fire Resistance (and acoustical control) Design Manual

Institute of Electrical and Electronics Engineers (IEEE) o IEEE C2 National Electrical Safety Code (NESC) o IEEE 81 – Guide for Measuring Earth Resistivity, Ground Impedance, and

Earth Surface Potentials of a Ground System, Part 1: Normal Measurements

Instrument Society of America (ISA) o ISA‐S71.04 – 1985: “Environmental Conditions for Process Measurement and

Control Systems: Airborne Contaminants”

International Code Council (ICC) o Latest editions of International Model Codes (IBC, IECC, IFC,IMC, IFGC, and IPC)

International Energy Conservation Code (IECC) o Current adopted edition

National Association of Architectural Metal Manufacturers (NAAMM) o Metal Stairs Manual, Fifth Edition o Pipe Railing System Manual, Fourth Edition

National Concrete Masonry Association (NCMA) o NCMA TEK Notes

FOR OFFICIAL USE ONLY. Do not remove this notice. Properly destroy or return documents when no longer needed.

September 4th, 2015 – 100% Bridging Document

National Fire Protection Association (NFPA) latest editions of o NFPA 1, Fire Code o NFPA 10, Standard for Portable Fire Extinguishers o NFPA 13, Standard for the Installation of Sprinkler Systems o NFPA 20, Standard for the Installation of Stationary Pumps for Fire Protection o NFPA 22, Standard for Water Tanks for Private Fire Protection o NFPA 24, Standard for the Installation of Private Service Mains and Their

Appurtenances o NFPA 30, Flammable and Combustible Liquids Code o NFPA 37, Standard for the Installation and Use of Stationary Combustion Engines and Gas Turbines o NFPA, 70 National Electrical Code, 2008 Edition o NFPA, 72 National Fire Alarm and Signaling Code o NFPA 75, Standard for the Protection of Information Technology Equipment.

o NFPA, 90 A & B Standard of Installation of Air‐Conditioning and

Ventilation Systems o NFPA 101, Life Safety Code o NFPA, 110 Standard for Emergency and Standby Power Systems o NFPA, 780 Standard for the Installation of Lighting Protection Systems o NFPA 2001, Standard on Clean Agent Fire Extinguishing Systems

National Roofing Contractors Association (NRCA) o NRCA Roofing and Waterproofing Manual

National Terrazzo & Mosaic Association (NTMA) o NTMA Terrazzo Specifications and Design Guide

National Electrical Manufacturers Association (NEMA) o NEMA LD‐3 High‐Pressure Decorative Laminates

Plumbing and Drainage Institute (PDI) o PDI‐WH201, ANSI/ASME A112.26.1M

Precast Concrete Institute (PCI ) o Architectural Precast Concrete, 3rd Edition o Design Handbook, 6th Edition o Architectural Precast Concrete Color & Texture Guide, 2nd Edition

Progressive Collapse Analysis and Design Guidelines for New Federal Office Buildings and

Major Modernization Projects, June 2003

SDDCTEA Pamphlet 55‐15, Traffic and Safety Engineering for Better Entry Control Facilities

FOR OFFICIAL USE ONLY. Do not remove this notice. Properly destroy or return documents when no longer needed.

September 4th, 2015 – 100% Bridging Document

Sheet Metal and Air Conditioning Contractors’ National Association (SMACNA) o Architectural Sheet Metal Manual o Ductwork Design and Ductwork Construction Standards

Steel Deck Institute (SDI) o Design Manual for Composite Decks, Form Decks, and Roof Decks – No. 31 o Diaphragm Design Manual, 3rd Edition – No. DDM03

Steel Joint Institute (SJI) o 42nd Edition Catalog of Standard Specifications, and Load Tables for Steel Joists and Joist Girders

Structural Design for Physical Security – State of the Practice Structures to Resist the

Effects of Accidental Explosions, Six Volumes, TM 5

Tile Council of North America (TCNA) o TCNA Handbook for Ceramic Tile Installation, 2009

Underwriters’ Laboratories, Inc. (UL) o UL Fire Resistance Directory

Uptime Institute, LLC:

o Data Center Site Infrastructure Tier Standard: Topology o Continuous Cooling is Required for Continuous Availability o How to Meet “24 by Forever” Cooling Demands of your Data Center o Fault Tolerant Power Compliance Specification, Version 2.0

U.S. Department of Transportation (DOT) o Federal Highway Administration Manual on Uniform Traffic Control Devices

(MUTCD)

o State (TBD) Department of Transportation, State Highway Administration Standards for Highway Construction

D. Sustainability

The Interagency Sustainability Working Group, High Performance and Sustainable Buildings

Guidance, Final December 2008, http://www.wbdg.org/sustainableEO)

U.S. Green Building Council (USGBC), LEED for New Construction, v3.0, 2009

E. EnergyEfficiency

The Interagency Sustainability Working Group, High Performance And Sustainable

Buildings Guidance, Final, December 2008

U.S. Green Building Council (USGBC) LEED for New Construction, v3.0, 2009

LBNL Self‐Benchmarking Guide for Data Centers: Metrics, Benchmarks, Actions

U.S. GSA Public Building Service, Design Excellence Policies and Procedures http://www.wbdg.org/sustainableEO)

FOR OFFICIAL USE ONLY. Do not remove this notice. Properly destroy or return documents when no longer needed.

September 4th, 2015 – 100% Bridging Document

The Green Grid Data Center Power Efficiency Metrics: PUE and DCiE, 2012

10 CFR, Part 433 – Energy Efficiency Standards for the Design and Construction of

New Federal Commercial and Multi‐Family High Rise Residential Buildings (2008)

The Energy Policy Act of 2005 (EPACT)

The Energy Independence and Security Act of 2007 (EISA)

Executive Order 13423— Strengthening Federal Environmental, Energy, and Transportation

Management (2007)

EPA report to congress on server and data center energy efficiency, August 2, 2007

DOE Annual Energy Outlook 2007, Energy Information Administration Report

DOE/EIA‐ 0383(2007)

F. Security

The Risk Management Process for Federal Facilities: An Interagency Security Committee

Standard August 2013 1st Edition (FOUO)

UNCLASSIFIED// FOR OFFICIAL USE ONLY

Division 1 – National and Regional RMACC 10 APR 2018

SENSITIVE BUT UNCLASSIFIED (SBU)

PROPERTY OF THE UNITED STATES GOVERNMENT

FOR OFFICIAL USE ONLY

Do not remove this notice

Properly destroy or return document when no longer needed

SECTION 00 01 10

TABLE OF

CONTENTS

Abbreviations and Acronyms List

Definitions

Division 01 - General Requirements

Sections

01 00 00 Administrative Requirements

01 01 20 Design After Award

01 05 00 Job Conditions for Design-Build

01 11 00 Statement of Work

01 20 00 Warranty Requirement

01 20 00.05 20 Price and Payment Procedures for Design-Build

01 32 01.00 10 Project Schedule

01 32 17.05 20 Network Analysis Schedules (NAS) for Design- Build

01 33 00 Submittal Procedures

01 35 29 Safety and Occupational Health Requirementsfor Design-Build

01 42 00 Sources for Reference Publications

01 45 00.00 10 Quality Control

01 45 00.10 10 Quality Control System (QCS)

01 45 23 Factory Acceptance Testing

01 50 00 Temporary Construction Facilities and Controls

01 57 20 Construction and Demolition Waste Management for Design-Build

01 57 20.00 10 Environmental Protection

01 57 23.00 10 Storm Water Pollution ProtectionMeasures

01 67 00 Recycled/Recovered Materials for Design-Build

01 72 00 As-Built Drawings for Design-Build

01 78 00 Closeout Submittals

01 78 23 Operation and Maintenance Data

01 80 00 Commissioning Option

TOC - 1

UNCLASSIFIED//FOR OFFICIAL USE ONLY

Abbreviations and Acronyms List

A Ampere AA Aluminum Association AABC American Air Balance Council AAC All Aluminum Conductor

AAMA American Architectural Manufacturers Association AASHTO American Association of State Highway and Transportation Officials AATCC American Association of Textile Chemists and Colorists ABA Architectural Barriers Act 2010 AC Alternating Current

ACI American Concrete Institute ACS Access Control System ADT Average Daily Traffic A/E Architect/Engineering Firm AFF Above Finish Floor AFG Above Finished Grade AHRI Air-Conditioning, Heating, and Refrigeration Institute AHU Air Handling Unit AI Analog Input control signal or point AIC Ampere Interrupting Capacity AISC American Institute of Steel Construction AISI American Iron and Steel Institute AKAM Automated Key Access Machine ANSI American National Standards Institute AO Analog Output control signal or point Approx. Approximate

ASCE American Society of Civil Engineers ASD Allowable Stress Design

ASHRAE American Society of Heating, Refrigeration and Air Conditioning Engineers ASME American Society of Mechanical Engineers International ASSE American Society of Structural Engineers ASSIST Acquisition Streamlining and Standardization Information System

ASTM ASTM International (formerly American Society for Testing and Materials) ATC Automatic Transfer Control ATS Automatic Transfer Switch A/V Audio/Visual AW American Water Military Services Group

AWG American Wire Gauge AWI Architectural Woodwork Institute AWPA American Wood Protection Association AWS American Welding Society AWWA American Water Works Association

BACnet ASHRAE BMS Protocol Specification BBMD Broadcast Management Devices BGE Baltimore Gas & Electric BHMA Builders Hardware Manufacturers Association BICSI Building Industry Consulting Service International BIL Basic Impulse Level (Electrical Equipment Insulation Rating) BIM Building Information Model BMP Best Management Practices BMS Building Management System BMS Balanced Magnetic Switch (Electronic Security System)

BOD Basis of Design BOD Beneficial Occupancy Date

Abbreviations and Acronyms – Page 4

BTGB Black (System) Terminal Ground Bar BW Butt-Weld

C Celsius CAD Computer Aided Design

CADD Computer Aided Design and Drafting CATV Community Access Television or Cable TV CBR California Bearing Ratio CCC Command Control Center CCR Central Contractor Registration CCTV Closed Circuit Television CESM Campus Electrical System Model CFD Computational Fluid Dynamics CFR Code of Federal Regulations CID Comprehensive Interior Design CM Centimeter CMU Concrete Masonry Unit CP Cathodic Protection CP Chiller Plant

CPT Control Power Transformer

CRAC Computer Room Air Conditioning or Computer Room Air Handling Units CRSI Concrete Reinforcing Steel Institute CS Carbon Steel CSA Canadian Standards Association CSA Cognizant Security Authorities CSR Center for Scientific Review CSS Central Security Service CT Current Transformers CTR Center CU Copper CWA Clean Water Act Cx Commissioning CZ Clear Zone

D Deep dB Decibel DB Design Build DB Dry Bulb DBC Determined BY Contractor DBMS Data Base Management System DC Direct Current DCM Data Center Module DDC Direct Digital Control

DFT Dry Film Thickness DG Diesel Engine-Generator DHS Department of Homeland Security DI Deionized (Mechanical – Humidification system H2O) DI Digital Input control signal or point DIP Ductile Iron Pipe DMT Dilatometer Field Test

DNP3.0 Standard Communications Protocol DOR Designer of Record DP Dew Point DPW Department of Public Works

DSLC Digital Synchronizing and Load Control

Abbreviations and Acronyms – Page 5

Regional RMACC 10 APR 2018

Abbreviations and Acronyms – Page 6

DTI Direct Tension Indicator DWV Drain Waste & Vent

EA Environmental Assessment ECM Engine Control Module

ECMS Energy Control Management System EIA Electronics Industries Association EIS Environmental Impact Statement EMCS Energy Management Control System EMCP Engine Monitoring and Control Panel EMT Electrical Metal Tubing EPA U.S. Environmental Protection Agency EPACT Energy Policy Act

EPC Electrical Polyvinyl Chloride

EPDM Ethylene Propylene Diene Monomer EPO Emergency Power Off EPR Ethylene Propylene Rubber ERW Electric Resistance Welding ES Emergency Shower E&SC Erosion and Sediment Control ESD Environmental Site Design ESZ Exclusive Standoff Zone ETAP Electrical Transient Analyzer Program ETL Extract, Transform, Load EWS Eye-face Wash Station

F Fahrenheit FA Fire Alarm FA Forced Air Flow FACP Fire Alarm Control Panel FAR Federal Acquisition Regulation FBI Federal Bureau of Investigation FC (fc) Foot-Candle

FCU Fan Coil Unit

FEMA Federal Emergency Management Agency FF&E Furniture Fixtures and Equipment FGGM Fort George G. Meade FHWA Federal Highway Administration FLIR Forward-Looking Infrared Imaging FM Factory Mutual FMC Flexible Metal Conduit FMG Factory Mutual Global FS Federal Specification(s) Ft. Fort

Ft. foot/feet FWT Factory Witness Test

GAC Generator Auxiliary Controller

GB Gigabyte GCP Generator Control Panel

GFGI Government Furnished Government Installed Equipment GFI Ground Fault Interrupter GMC Generator Master Controller GND Ground GOVs Government Owned Vehicles

GPH Gallons per Hour GPS Generator Paralleling Switchgear GPS Global Positioning System

Regional RMACC 10 APR 2018

Abbreviations and Acronyms – Page 7

GSA General Services Administration GUI Graphical User Interface

GWB Gypsum Wallboard

H High HDC High Density Computing HDPE High Density Polyethylene HMI Human-Machine Interface HOA Hand/Off/Auto

HV High Voltage

HVAC Heating Ventilating and Air Conditioning Hz Hertz

IAW In accordance with IBC International Building Code ICC International Code Council

ICCP Inter-Control Center Communications Protocol ICD Intelligence Community Directive ICEGE International Conference of Earthquake Geotechnical Engineering ICS Intelligence Community Standard ICS Industrial Control and Systems ICSDEE International Conference on Soil Dynamics Earthquake Engineering IDF Intermediate Distribution Frame IDOT Idaho Department of Transportation IDS Intrusion Detection System

IEEE Institute of Electrical and Electronics Engineers IED Intelligent Electrical Device IESNA Illumination Engineering Society of North America IGBT Insulated Gate Bi-polar Transistor IIC Impact Insulation Class IMC Intermediate Metal Conduit I/O EMCS sensor input and output

ISP Inside Plant IP Internet Protocol IPC International Plumbing Code

IRIG-B Parallel Time Codes Used in Electronic Communications ISC Interagency Security Criteria ISO International Organization for Standardization IT Information Technology

KAIC Kilo-Amperes Interrupting Capacity Kcmil Thousand Circular Mils

Kg Kilogram

KNAF Less Flammable insulating fluid Natural/Air Forced, Oil Immersed Self-Cooled / Forced Air Cooled (Electrical Transformer Rating)

KNAN Less Flammable insulating fluid Natural/Air Natural, Oil Immersed Self-Cooled (Electrical Transformer Rating) kV Kilovolt kVA Kilovolt-Ampere KVAR Kilovolt-Ampere Reactive KVARH Kilovolt-Ampere Reactive Hour kW Kilowatt

LAN Local Access Network LBS (lbs) Pounds

LCD Liquid Crystal Display

LDC Low Density Computing

Regional RMACC 10 APR 2018

Abbreviations and Acronyms – Page 8

LED Light Emitting Diode LFMC Liquid-Tight Metal Conduit

LMR Land Mobile Radio LPS Lightning Protection System LRFD Load and Resistance Factor Design LSC Life Safety Code (NFPA 101) LTC Load Tap Changer LV Low Voltage (<600 V)

MAU Makeup Air Handling Unit MAX Maximum

MBMA Metal Building Manufacturers Association MC Metal Conduit MCC Motor Control Center MCOV Maximum Continuous Operating Voltage (Surge Arrester Rating) MDF Main Distribution Frame MECH Mechanical MERV Minimum Efficiency Reporting Value MG Motors and Generators MIL Millimeter (0.001 Inch) Mil Military MICA Midwest Insulation Contractors Association MILCON Military Construction MN Mass Notification MNS Mass Notification System

MOC Mechanism Operated Cell Switch MOT Maintenance of Traffic (as in Plan) mph Miles per hour MPI Master Painter’s Institute MPOE Main Point of Entrance

MS Microsoft MSG Manufacturer’s Standard Gauge

MSS Manufacturers Standardization Society for Valve and Fittings Industry MTTM Main-Tie-Tie-Main MV Medium Volt

MVA Mega Volt Ampere MW Megawatt

N Neutral N Total number of Blows for Standard Split Spoon to advance from 6 inches to 18 inches of depth during impacts of a dropped 140 pound hammer N Quantity of equipment or systems necessary to meet the load

N+1 Components required to meet the design requirement (N); number of independent backup components (+1).

N+x Quantity of equipment or systems necessary to meet the load plus x additional pieces of equipment or systems, where x could be a percentage (e.g. 25%) or an integer (e.g. 1)

NAC Notification Appliance Circuit

NACE National Association of Corrosion Engineers International NAGDM National Association of Garage Door Manufacturers NAVFAC Naval Facilities Engineering Command NC Noise Criteria

NCC Networked Command Computer NCMA National Concrete Masonry Association NEBB National Environmental Balancing Bureau NEC National Electrical Code (NFPA 70) NEHRP National Earthquake Hazard Reduction Program NEMA National Electrical Manufacturers Association

Regional RMACC 10 APR 2018

Abbreviations and Acronyms – Page 9

NEPA National Environmental Policy Act NESC National Electric Safety Code

NESC (IEEE C2) National Electric Safety Code - Safety Rules for Construction Activities NETA ATS International Electrical Testing Association-Acceptance Testing Specifications NFPA National Fire Protection Association NIC Noise Isolation Class

NIST National Institute of Standards and Technology No. Number NOAA National Oceanic and Atmospheric Administration NOI Notice of Intent NPDES National Pollutant Discharge Elimination System NPT National Pipe Thread NRC Noise Reduction Coefficient

NRCA National Roofing Contractor’s Association NSF National Sanitation Foundation, International NTMA National Terrazzo & Mosaic Association

OCPD Overcurrent Protective Device ODBC Open Data Base Connectivity ODNI Office of the Director of National Intelligence OHESS Occupational Health, Environmental, and Safety Services OPC Object Linking and Embedding for Process Control OSHA Occupational Safety and Health Administration OSP Outside Plant

PBX Private Branch Exchange PCASE Pavement Transportation Computer Assisted Structural Engineering PCB Polychlorinated Biphenyls

PCI Precast/Prestressed Concrete Institute pCi/L Picocuries per liter of air

PDC United States Army Protective Design Center PDI Plumbing and Drain Institute PDS Protected Distribution System PDU Power Distribution Units PE Polyethylene PF Power Factor PGB Power Ground Bus PH Phase pH Measure of the acidity or basicity of an aqueous solution.

PLC Programmable Logic Controller PMP Probable Maximum Precipitation POC Point of Contact POV Privately Owned Vehicle

PPE Personal Protective Equipment PQMS Power Quality Monitoring System psf Pounds per Square Foot psi Pounds per Square Inch psi-msec Pounds per Square Inch Milliseconds PT Potential Transformer PVC Polyvinyl Chloride

PVDF Polyvinylidene Fluoride

QA Quality Assurance QC Quality Control QCS Quality Control System

Regional RMACC 10 APR 2018

Abbreviations and Acronyms – Page 10

RAF Raised Access Flooring RIV Radio Influence Voltage RC Resistor-Capacitor RCP Reinforced Concrete Pipe

RDBMS Relational Database Management System RDC Remote Distribution Cabinet RF Radio Frequency RFI Radio Frequency Interference RFP Request for Proposal RGS Rigid Galvanized Steel RMC Rigid Metal Conduit RMS Resident Management System

Rms Root, Mean, Square (Effective Continuous Electrical Rating in Three-Phase System) ROW Right of Way RPM Revolutions Per Minute RPP Remote Power Panel RTD Resistance Temperature Detector RTGB Red (System) Terminal Ground Bar RTU Remote Terminal Unit (SCADA RTU) RTU Rooftop Unit

RVF Rated Voltage Factor

SAT

SATCOM

SC

SCADA

Site Acceptance Test Satellite Communications Operation Center Sand (Geotechnical) Supervisory Control and Data Acquisition

SCI Sensitive Compartmented Information SCIF Sensitive Compartmented Information Facility SCPTu Seismic Piezocone Penetration Test SCR Selective Catalytic Reduction SCR Silicon Controlled Rectifiers SCS Structured Cable System SCS U.S. Soil Conservation Service SCSP Site Construction Security Plan SDDCTEA Surface Deployment and Distribution Command Transportation Engineering Agency SDI Steel Deck Institute SDI Steel Door Institute SDR Standard Dimension Ratio SER Security Equipment Room SF Standard Form SF Square Foot SID Structural Interior Design SIPRNet Secure Internet Protocol Router Network SJI Steel Joist Institute SMACNA Sheet Metal and Air Conditioning Contractors’ National Association SOE Sequence of Events SOO Sequence of Operations

SPCC

SPD

Spill Prevention, Control, and Countermeasure Surge Protective Device

Sq.

SQFT

SQL

SSC

SSMA

STC

STD

Square Square Feet Structured Query Language Security Control Center Steel Stud Manufacturers Association Sound Transmission Class Standard

Regional RMACC 10 APR 2018

Abbreviations and Acronyms – Page 11

SUS Secondary Unit Substation SWM Storm Water Management SWPP Storm Water Pollution Prevention

TB Technical Bulletin TBD To be Determined TCA Tile Council of America

TCP/IP Transport Control Protocol/Internet Protocol TES Thermo Energy Storage TGB Telecommunication Ground Bar THD Total Harmonic Distortion

TMGB Telecommunication Main Ground Bar TIA Telecommunications Industry Association

TMS The Masonry Society TOC Table of Contents TOC Truck Operated Cell Switch (Electrical Switchgear) TOV Temporary Over-Voltage (Surge Arrester Rating) TVSS Transient Voltage Surge Suppression

UF Urea Formaldehyde UFAD Under Floor Air Distribution

UFAS Uniform Federal Accessibility Standards UFC Unified Facilities Criteria UL Underwriter’s Laboratory

UNO Unless Noted Otherwise UPS Uninterruptible Power Supply

USGBC United States Green Building Council UTS Utility Transfer Switchgear UV Ultraviolet

UXO Unexploded Ordinance

V Volt VA Volt Ampere VAC Volt Alternating Current VAR Volt-Ampere Reactive VAV Variable Air Volume VCC Visitor Control Center VDC Volt Direct Current

VESDA Laser-based air-aspirating system VFD Variable Frequency Drives VOC Volatile Organic Compound VOIP Voice Over Internet Protocol VSD Variable Speed Drives

VTs Voltage Transformers VMware Provider of server virtualizationsoftware

W Watt W Wide W Wire

WBDG Whole Building Design Guide

WDMA Window and Door Manufacturers Association WSOC Wideband Satellite Operations Center

Regional RMACC 10 APR 2018

Abbreviations and Acronyms – Page 12

Y Wye

# Number 1PH Single Phase

3PH Three Phase

Regional RMACC 10 APR 2018

Section 01 00 00 Page 1

UNCLASSIFIED / FOR OFFICIAL USE ONLY

PART 1 GENERAL

SECTION TABLE OF CONTENTS

SECTION 01 00 00

ADMINISTRATIVE REQUIREMENTS

1.1 SUBMITTALS

1.2 PROJECT SCHEDULING AND REPORTING (DEC 1998)

1.2.1 Project Schedule

1.2.2 Software Package

1.2.3 Commissioning

1.3 PAYMENTS TO CONTRACTORS: (NOV 1976)

1.4 PURCHASE ORDER: (SEP 1975)

1.5 EQUIPMENT OWNERSHIP AND OPERATING EXPENSE SCHEDULE (EFARS 52.0231.5000

(OCT 1995))

1.6 NEGOTIATED MODIFICATIONS: (OCT 84)

1.7 PARTNERING: (NOV 92)

1.8 PERMITS

1.9 SITE SECURITY PERSONNEL

1.9.1 Site Security Manager (SSM)

1.9.2 Construction Security Coordinator (CSC)

1.10 SITE SECURITY MEASURES

1.10.1 Contractor Personnel Security Processing

1.10.2 Visitor Control Procedures

1.10.3 Vehicle and Personnel Inspection Procedures

1.11 DOCUMENT CONTROL PROCEDURES

1.12 SECURITY SIGNAGE

1.13 PROHIBITED AND RESTRICTED ITEMS

1.13.1 Prohibited Items

1.13.2 Restricted Items

1.13.3 Photography and Video Recording

1.13.4 Computers and Removal Memory Devices

1.14 PERSONNEL BEHAVIOR

1.15 GOVERNMENT SURVEILLANCE

1.16 WORK HOURS

PART 2 PRODUCTS

PART 3 EXECUTION

-- End of Section Table of Contents --

Regional RMACC 10 APR 2018

Section 01 00 00 Page 2

SECTION 01 00 00

ADMINISTRATIVE REQUIREMENTS

1.1 SUBMITTALS

Government approval is required for submittals with a "G" designation; submittals not having a "G" designation are for Contractor Quality Control approval. The following shall be submitted in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-01 Preconstruction Submittals

Title Evidence

Proof of purchase for equipment and/or materials.

Invoice Copies

Proof of rental equipment costs.

Payment Evidence

Proof of full payment.

Personnel Information; G

List of all Contractor and Subcontractor personnel for vetting.

SD-03 Product Data

Cost or Pricing Data

Proof of actual equipment costs.

SD-05 Design Data

Project Schedule; G

A schedule that shows the manner in which the Contractor intends to prosecute the work.

SD-10 Operation and Maintenance Data

Commissioning

The Contractor shall provide a separate activity in the Project Schedule for commissioning.

Regional RMACC 10 APR 2018

Section 01 00 00 Page 3

1.2 PROJECT SCHEDULING AND REPORTING (DEC 1998)

1.2.1 Project Schedule

The Contractor shall submit for approval a Project Schedule in accordance with specification Section 01 32 01.00 10 PROJECT SCHEDULE showing the manner in which he intends to prosecute the work.

1.2.2 Software Package and Equipment

The Contractor shall utilize a scheduling software to implement the requirements of Section 01 32 01.0010 PROJECT SCHEDULE. The program and data must be Windows compatible. These requirements are not intended to restrict the Contractors selection of an automated scheduling system but to establish a format which will allow use of the same program with government computers and automated information systems. The Contractor will provide at least one program installation and maintenance on a standalone government hardware complete with all program and data files. In accordance with Government instructions for system acquisition. Such installation shall be maintained for the duration of the project until fiscal completion and shall allow analysis of the project schedule by government personnel or agents without further cost to the Government. The Contractor will be required to submit a submittal register, transmittal log and schedule that are compatible with the Corps of Engineers Quality Control System (QCS).

1.2.3 Commissioning Option

If authorized in writing by the FBI Contracting Officer, the Contractor shall provide activities in the Project Schedule for the commissioning of each of the mechanical and electrical systems listed in Section 01 80 00 COMMISSIONING. Commissioning shall start only after all related work has been completed and all O&M manuals have been submitted and approved by the Government. However, in the development of the project schedule the contractor shall include sufficient time for the performance of all commissioning activities identified.

1.3 PAYMENTS TO CONTRACTORS:

The FBI shall not pay for on-site or off-site stored materials. Material shall only be paid for as the material is put in place/installed into the project and as the job progresses. This payment will only be made as satisfactory job progress is being made. See FAR clause 52.232-5 and Supplementary Provisions, paragraph 1.10 – 52.232-5.

1.4 PURCHASE ORDER:

One readable copy of all purchase orders for material and equipment, showing firm names and addresses, and all shipping bills, or memoranda of shipment received regarding such material and equipment shall be furnished to the Contracting Officer as soon as issued. Such orders, shipping bills or memoranda shall be so worded or marked that all material and each item, piece or member of equipment can be definitely identified on the drawings. Where a priority rating is assigned to a contract, this rating, the required delivery date, and the scheduled shipping date shall also be shown on the purchase order. At the option of the Contractor, the copy of the purchase order may or may not indicate the purchase price. (CENAB-CO-E)

1.5 EQUIPMENT OWNERSHIP AND OPERATING EXPENSE SCHEDULE

See 52.249-5000, Basis for settlement of proposals and FAR Part 49.

Regional RMACC 10 APR 2018

Section 01 00 00 Page 4

Allowable cost for construction and equipment in sound workable conditions owned or controlled and furnished by a contractor or subcontractor at any tier shall be based on actual costs data for each piece of equipment or groups of similar serial and services for which the government can determine both ownership and operating costs from the contractor’s accounting records. When both ownership and operating costs cannot be determined for any piece of equipment or groups of similar serial or series equipment from the contractor’s accounting records, costs for that equipment shall be based upon the applicable provisions of EP1110-1-8 Construction Equipment Ownership and Operating Expenses Schedule, Region East. Working conditions shall be considered to be average for determining equipment rates using the schedule unless specified otherwise by the Contracting Officer. For equipment not included in the schedule, rates for comparable pieces of equipment may be used or a rate may be developed using the formula provided in the schedule. For forward pricing, the schedule in effect at the time of negotiations shall apply. For retroactive pricing, the schedule in effect at the time the work was performed shall apply.

Equipment rental costs are allowable, subject to the provisions of FAR 31.105(d) (ii) and Far 31.205-36. Rates for equipment rented from an organization under common control, lease- purchase arrangements, and sale-leaseback arrangements, will be determined using the schedule, except that actual rates will be used for equipment leased from an organization under common control that has an established proactive of leasing the same or similar equipment to unaffiliated leases.

When actual equipment costs are proposed and the total amount of the pricing action exceeds the small purchase threshold, the Contracting Officer shall request the contractor to submit either certified cost or pricing data, or partial/limited data, as appropriate. The data shall be submitted on Standard Form 1411, Contract Pricing Proposal Cover Sheet.

1.6 NEGOTIATED MODIFICATIONS

Whenever profit is negotiated as an element of price for any modification to this contract with either prime or subcontractor, a reasonable profit shall be negotiated.

1.7 PARTNERING: (NOV 92)

In order to most effectively accomplish this contract, the Government is willing to form a cohesive partnership with the Contractor and its subcontractors. This partnership would strive to draw on the strengths of each organization in an effort to achieve a quality project done right the first time, within budget and on schedule. This partnership would be bilateral in make-up and participation will be totally voluntary. The partnering process is expected to be two days in duration and shall be initiated before the Initial Design Conference.

1.8 PERMITS

The permits listed below have been initiated by the Government. The Contractor is responsible for submitting updated concept permits to the respective agencies for final approval. After final approvals by the respective state agencies are received, the Government will furnish approval letters and permits to the Contracting Officer who will furnish the Contractor all such permits before or during construction. The Contractor shall abide by all permit requirements.

a. Erosion and Sediment Control (E&SC) Plans: The Contractor is responsible for submitting a concept plan for DEQ approval, and all subsequent phased development permit applications required to obtain the appropriate DEQ permits. All submittals shall be submitted to the Government for review and approval prior to going to DEQ.

b. Stormwater Management (SWM) Plans: The Contractor is responsible for submitting a concept plan for DEQ approval, and all subsequent phased development permit applications required to obtain the appropriate DEQ permits. All submittals shall be submitted to the Government for review and approval prior to going to DEQ.

Regional RMACC 10 APR 2018

Section 01 00 00 Page 5

c. Notice of Intent (NOI) to comply with the General Permit for construction activities in accordance with EPA's National Pollution Discharge Elimination System (NPDES) stormwater management program. The NOI form and general permit must be obtained by the Contractor. The NOI application shall be reviewed and approved by the Government and MPO prior to submittal to DEQ.

1.9 SITE SECURITY PERSONNEL

Site Security personnel shall be consistent with Government requirements. Specific requirements will be determined based on location and nature of the project. Individual Task Orders will provide specific requirements.

1.10 SITE SECURITY MEASURES

Site Security measures shall be consistent with Government requirements. Specific requirements will be based on location and nature of the project. Requirements will be dictated in each Individual Task Order.

1.11 SECURITY SIGNAGE

Signage, to include signs dealing with security requirements, shall be consistent with Government requirements.

Specific requirements will be determined based on design. Security related signage will be provided by the Government including signs to be posted at all pedestrian/vehicle access control points identifying prohibited items and activities that are not authorized on the construction site.

1.12 PROHIBITED AND RESTRICTED ITEMS

1.13.1 Prohibited Items

The items and activities that are prohibited on the construction site are listed in paragraph PROHIBITED ITEMS in the SCSP. The SSM, however, has the authority to grant waivers on a case- by-case basis. The Government also reserves the right to prohibit additional items not covered in the SCSP. If the Contractor wishes to use powder-actuated tools on the construction site, he shall complete and submit to the Contracting Officer the Use Permit for Powder-Actuated Fastening Systems attached at the end of this section.

1.13.2 Restricted Items

Photographic, video recording equipment, computers, and removable computer memory devices are restricted on the construction site. Waivers to this restriction can only be approved by the SSM.

1.13.3 Photography and Video Recording

a. No photography/video recording shall be permitted on the construction site unless authorized in writing by the SSM and coordinated through the Contracting Officer. This restriction includes all cell phone/PDA cameras.

b. Only FBI personnel shall be authorized to take photographs or video recordings. The Contractor may request photographs or the videoing of work by identifying the work, objects, or areas to be photographed, furnishing the name of the individual and the associated company requesting the recordings. These request must be submitted not less than forty-eight (48) hours in advance. No separate or independent photography or video recording shall be permitted by the FBI.

c. Any person found taking unauthorized photographs or video recordings shall be stopped immediately, may be held for questioning and, at the option of the Government, result in removal of the person from the site. Their camera equipment and photographs may be destroyed with no liability to be incurred by the Government. All resultant costs shall be borne entirely by the Contractor.

Regional RMACC 10 APR 2018

Section 01 00 00 Page 6

1.13.4 Computers and Removal Memory Devices

a. No personal computer, either individually- or company-owned, and/or removable memory device (e.g.

memory sticks, read-write CDs) shall be permitted on the construction site unless authorized in writing by the SSM and coordinated through the Contracting Officer.

b. Requests for using personal computers on-site shall be submitted in writing not less than forty-eight (48) hours prior to bringing them onsite. Request forms are available from the SSM.

c. Unauthorized computers and/or removable memory devices may be seized, and possibly destroyed, by the Government with no liability incurred by the Government. All resultant costs shall be borne entirely by the Contractor.

1.14 PERSONNEL BEHAVIOR

a. An acceptable standard of conduct and dress shall prevail at the construction site at all times. The SSM Security Office, through the Contracting Officer, reserves the right to exclude or remove from the site any person whose dress or conduct is deemed to be inappropriate, careless, uncooperative, or otherwise contrary to the public interest.

b. The use of alcohol or any illegal drugs on the construction site is prohibited. Any person caught consuming alcohol or reports to the site in an intoxicated or impaired condition willbe denied access to the site. Any person caught using illegal drugs on the construction site will be turned over to law enforcement authorities and removed from the construction site.

c. The Government has a zero tolerance policy for harassing behavior and it will not be tolerated on the construction site. Writing or display of offensive language, graffiti, sexual graphics, or offensive bumper stickers will be considered a form of harassing behavior. Any person found to be culpable in incidents of harassment may be immediately escorted from the site and denied further access.

d. All persons entering the construction site shall comply with the Government policy that smoking is permitted in designated areas only. Smoking is prohibited inside all Government facilities.

1.15 GOVERNMENT SURVEILLANCE

During construction, the Government will maintain security surveillance of the construction site. This surveillance may include radio controlled vehicular and/or aerial patrols, CCTV, Government Security Representatives maintaining visual coverage of the site, illumination of the construction site, or by other means at the option of the Government.

This security protection is not designed to prevent pilferage of…

This is the start of the file's text. The full file is on GovTribe.