This solicitation seeks proposals for a Regional Multiple Award Construction Contract to provide construction services to the Federal Bureau of Investigation. Offerors will compete for multiple award ID/IQ contracts in one of two regions. Region 1 has an emphasis on supporting Redstone Arsenal and includes projects across the continental US. Region 2 projects must be within 200 miles of Redstone Arsenal or the National Capital Region. A minimum of three contracts will be awarded per region. Proposals are due by January 7, 2019 and must include the offeror's past performance history, management approach, and security information. Resumes for key personnel and a past performance questionnaire are required attachments. Subcontractors do not need to provide past performance information.

15F06719R0000004 Amendment 0002 Responses to Inquires

View the file

Other files for this federal contract opportunity

Other files attached to REGIONAL MULTIPLE AWARD CONSTRUCTION CONTRACT, newest first.
File Type Posted
SF_30,_15F06719R0000004_0013_7OCT19.pdf PDF
15F06719R0000004_0013_Atch_8_Responses_7OCT19.pdf PDF
SF_30,_15F06719R0000004_0012_20SEP19.pdf PDF
15F06719R0000004_0012_Atch_8_Responses_20SEP19.pdf PDF
15F06719R0000004_0011,_Atch_1_SF_1442_13SEP19.pdf PDF
SF_30,_15F06719R0000004_0011_17SEP19.pdf PDF
15F06719R0000004_0011_Atch_8_Responses_13SEP19.pdf PDF
15F06719R0000004_Atch_19_Request_For_Const_Docs_Cert.pdf PDF
SF_30,_15F06719R0000004_0010_30AUG19Final.pdf PDF
SF_30,_15F06719R0000004_0009_23AUG19Final.pdf PDF
15F06719R0000004_0009,_Atch_1_SF_1442_23AUG19Final.pdf PDF
15F06719R0000004_0009_23AUG19Final.pdf PDF
15F06719R0000004_0009,_Atch_19,_Request_For_Const_Docs_Cert.pdf PDF
SF_30,_15F06719R0000004_0008__16AUG19Final.pdf PDF
15F06719R0000004_0007,_Atch_19,_Request_For_Const_Docs_Cert.pdf PDF
15F06719R0000004_0007,_Atch_12_Price_Model_Template.xlsx XLSX spreadsheet
15F06719R0000004_0007,_Atch_15_Resume_Template.docx DOCX document
15F06719R0000004_0007,_Atch_21_OCONUS_Gen_Reqmts&Prov_Div_1.pdf PDF
15F06719R0000004_0007,_Atch_24_FD_219_Visitor_Request_Form.xlsx XLSX spreadsheet
15F06719R0000004_0007,_Atch_23_Submitting_Candidates_for_Access_to_FBI_Facilities.pdf PDF
15F06719R0000004_0007,_Atch_20_Policy_Directive_0130D.pdf PDF
15F06719R0000004_0007,_Atch_17_FBI_LAR_Guide_&_SF_85.pdf PDF
15F06719R0000004_0007,_Atch_8_Submission_of_Questions_Form.xlsx XLSX spreadsheet
15F067-19-R0000004_Amendment_0006,_Responses_FBO_Post_11JAN19Final.pdf PDF
SF_30,_15F067-19-R0000004_Amendment_0006_11JAN19Final.pdf PDF
15F067-19-R0000004_Amendment_0005,_Inquiries_and_Responses_FBO_Post_10JAN19Final.pdf PDF
SF_30,_15F067-19-R0000004_Amendment_0005_10JAN19Final.pdf PDF
15F067-19-R0000004_Rev_2,_Amendment_0005_FBO_Post_10JAN19Final.pdf PDF
SF_30,_15F067-19-R0000004_Amendment_0004_02JAN19Final.pdf PDF
Atch_1_SF_1442_Amendment_0004_02JAN19Final.pdf PDF
SF_30,_15F067-19-R0000004_Amendment_0003_21DEC18Final.pdf PDF
Atch_1_SF_1442_Amendment_0003_21DEC18Final.pdf PDF
Atch_11_List_of_Projects,_HSV_Only,_Amendment_0002_20DEC18Final.pdf PDF
Atch_1_SF_1442_Amendment_0002_20DEC18Final.pdf PDF
SF_30,_15F067-19-R0000004_Amendment_0002_20DEC18Final.pdf PDF
15F067-19-R0000004_Revision_1,_Amendment_0002_20DEC19Final.pdf PDF
Atch_10_Corp_Perform_Ref_Info,_Amendment_0002_20DEC18Final.docx DOCX document
Atch_5_PPQ,_Amendment_0002_20DEC18Final.docx DOCX document
15F067-19-R0000004_Amendment_0001_14DEC18Final_1.pdf PDF
Atch_6_Resume_Template_FINAL.docx DOCX document
ATTACHMENT_5_Past_Performance_Questionnaire.docx DOCX document
Sol__Cvr_Ltr_14NOV18Final-signed.pdf PDF
ATTACHMENT_1_SF_1442.pdf PDF
Atch_4_DOS_Security_Rqmts_for_Overseas_Work_FINAL.pdf PDF
Atch_3_Acquisition_Risk_Questionnaire_FINAL.pdf PDF
Atch_8_Questions_Submission_Form_FINAL.xlsx XLSX spreadsheet
Atch_2_Key_Mgt_Personnel_Listing_FINAL.pdf PDF
ATTACHMENT_10_Corporate_Performance_Reference_Information_Design.docx DOCX document
Atch_7_Gen_ReqmtsProv_Div_1_CONUS_FINAL.pdf PDF
15F067-19-R0000004_14NOV19_FINAL.pdf PDF
Show all 50

REGIONAL MULTIPLE AWARD CONSTRUCTION CONTRACT has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Region 1: Experience projects can be anywhere on the CONUS;

Region 2: Experience projects must be within 200 miles of Redstone Arsenal (RSA) region centered in Huntsville, AL and the National Capital Region (NCR), including but not limited to, the FBI Academy in Quantico, VA, FBI Headquarters in Washington, DC and the Criminal Justice Information Services (CJIS) Division in Clarksburg, WV)

The previous solicitation you reference was canceled and has no impact to 15F067-19-R0000004 RMACC. As written thoughout the solicitation, the Government is only specifying its intent for the minimum number of awards for IDIQ contracts per Region/Pool.

Reference "C.3.1 REGION 1: Region 1 will consist of large and small businesses located throughout the Continental United States (CONUS) who will bid on projects with estimated values greater than $12,000,001, not including fit-out costs." and "Table 1 RMACC REGIONS"

Use 1 inch for the top and bottom margins and 1 inch for the left and right margins and is inclusive of the header/foot information.

5 This requirement is removed; see Amendment 0002.

The Offeror shall provide present/past performance for the prime contractor for applicable present/past projects. It could be performance under an entire IDIQ contract or a task order if it meets the criteria of similar size, scope, cost, and complexity; see Amendment 0002.

7 "Substantial completion" removed; see Amendment 0002

Attachment 10 is to be completed for all Attachment 5 Past Performance references. Disregard the reference to block 29; see Amendment 0002

9 Please include the JV under Tab C as written in L15.3 Past Performance; see Amendment 0002

No; completed Attachments 5 and 10 shall be submitted as written in the solicitation. Submission of CPAR evaluations are not acceptable; see Amendment 0002

11 See proposal submission extension to January 1, 2019 in Amendment 0001

The design shall be completed within the past five years. The construction project can be on-going as long as it meets the guidelines specified under Section L.15.3 Past Performance; see Amendment 0002.

13 One (1) original and five (5) copies; a total of six (6) hard copies. See revisions in Amendment 0002

Region 1: Experience projects can be anywhere on the CONUS;

Region 2: Experience projects must be within 200 miles of Redstone Arsenal (RSA) region centered in Huntsville, AL and the National Capital Region (NCR), including but not limited to, the FBI Academy in Quantico, VA, FBI Headquarters in Washington, DC and the Criminal Justice Information Services (CJIS) Division in Clarksburg, WV.

Each solicitation stands alone. You shall comply with all requirements of this solicitation to be considered for award. Submission of CPARS is not acceptable. We have access to the CPARS database.

N33 See amendment 0002 revising paragraph L15.3 Past Performance removing the requirement for submission of Attachment 5 for subcontractors.

Region 1: Experience projects can be anywhere on the CONUS;

Region 2: Experience projects must be within 200 miles of Redstone Arsenal (RSA) region centered in Huntsville, AL and the National Capital Region (NCR), including but not limited to, the FBI Academy in Quantico, VA, FBI Headquarters in Washington, DC and the Criminal Justice Information Services (CJIS) Division in Clarksburg, WV.

December 20, 2018 RFP 15F067-19-R0000004 RMACC, Responses to Inquiries

RFP Section L, L15.2

Region 1: Experience projects can be anywhere on the CONUS; Region 2: Experience projects must be within 200 miles of Redstone Arsenal (RSA) region centered in Huntsville, AL and the National Capital Region (NCR), including but not limited to, the FBI Academy in Quantico, VA, FBI Headquarters in Washington, DC and the Criminal Justice Information Services (CJIS) Division in Clarksburg, WV)

Section L.15.3, Volume I, Tab C: Past Performance states: "Projects should have achieved at least the level of substantial completion within the last five (5) years, be located within 200 miles of the region/pool named and be of similar size/scope/dollar value"

Since so much of the work in Region 1 Unrestricted is planned for Redstone Arsenal, is our assumption that the 200 mile radius of Redstone Arsenal for the Past Performance Example Projects must be maintained. We recommend that 200 mile radius for projects be from Huntsville, so experience can show that the Prime Contractor knows the market and has a proven track record of experience in the region. In other words, PPQ projects submitted must be performed within a 200 mile radius of Redstone Arsenal (and not all CONUS) for Region 1 Unrestricted responses?

The RFP requires projects submitted to demonstrate past performance "be located within 200 miles of the region/pool named…" For Region 1 which will include projects throughout the continental United States (CONUS), may past projects be located anywhere within CONUS or should they be limited to those within 200 miles from the Redstone Arsenal, Huntsville, AL?

Regarding Design firm's projects, does only the design need to have been completed within the past five years, or also the construction of the project?

Given the recent Thanksgiving Holiday and pending Christmas Holiday, and the difficulty of securing PPQs from clients who are often unavailable at this time of year, please consider a one week extension to the proposal due date.Section L.15.3 Past Performance

L.10.1 Page Format

Section L8

L.15.3 TAB C

L.14 Delivery Instructions

Page 56 of the RFP states that Offerors shall submit "an electronic copy (CD or DVD) and five (5) duplicate hardcopy sets, whereas Table 2 on page 57 states 6 Total Hard Copies for Volume 1. Please clarify the number of hard copies to be submitted.

Section L.15.3 Past Performance Is it acceptable to submit previously completed PPQs or CPAR evaluations from our clients in lieu of soliciting new PPQs?

Section L.15.3 Past Performance

The instructions state to use 1" margins on the top and bottom. Please clarify whether this 1" margin is in addition to the Headers and Footers, or only in addition to the text.

Section L15.3

Section L8

Past Performance - The RFP states that "Projects should be… located within 200 miles of the region/pool named…." As the Region 1 pool is for "Emphasis on supporting Redstone Arsenal and other projects throughout the CONUS", please clarify whether experience projects have to be within 200 miles of Redstone Aresenal, or could be anywhere within the

CONUS.

Multiple Awards - "The Government intends to award a minimum of three (3) IDIQ contracts per region/pool." This is changed from the October RFP that stated up to five (5) contracts. Does this change indicate that the Government might contemplate making more than 5 awards per pool, or is the preference now to have a smaller pool?

N/A

N/A

RFP

Section L.15 Table 2

According to Table 2, the Tab F Organizational Conflict of Interest information is included in Volume 1, but we are only to provide 2 copies. Should this be included in Volume II, which requires two copies, rather than Volume I, which requires 6 copies?

Section L.15.3 Past Performance

The instructions state that "Experience by other corporate entities or JVs not named on the Standard Form (SF) 1442 is prohibited and will not be evaluated." We are a wholly-owned subsidiary of a larger corporation, and we perform projects under both our own name and under our parent corporation's name. The relevant projects we need to submit include both. Please confirm that this is acceptable, as long as we clearly state that we are the entity that performed the work.

Section L.15.3 Past Performance Attachment 10 Corporate Performance Reference appears to be specific to Design firm experience, and does not include a block 29, as referenced in the instructions. Should there be a different form for construction projects?

Section L.15.3 Past Performance We have found that different agencies define "substantial completion" differently, with respect to project relevance criteria. Would a project that is 90% complete be considered to have achieved substantial completion?

RFP Section L, L15.3

The RFP requires submission of Attachment 5 PPQ for relevant projects. Several of our clients for our relevant past performance prefer we utilize previously completed PPQs provided while others have informed us they cannot complete the requested PPQ form in addition to a completed CPARS evaluation. Please confirm that a previous completed PPQ or completed CPARS evaluation is acceptable for submission to document our Past Performance.

Section L.15.3 Past Performance Please clarify whether our 3 Past Performance projects should be for entire IDIQ contracts, or for specific projects, i.e.

task orders, under an IDIQ type contract, as the instructions use both terms.

The requirement will be changed to read: "The Offeror shall provide present/past performance for a maximum of three (3) projects for the Prime Contractor.

Region 1: Experience projects can be anywhere on the CONUS;

Region 2: Experience projects must be within 200 miles of Redstone Arsenal (RSA) region centered in Huntsville, AL and the National Capital Region (NCR), including but not limited to, the FBI Academy in Quantico, VA, FBI Headquarters in Washington, DC and the Criminal Justice Information Services (CJIS) Division in Clarksburg, WV. see Amendment 0002

The paragraph will be revised to specify "Contractor key personnel"; two (2) page limit with the lastfive years. The Contractor shall determine its key personnel. All other requirements remain as written. see Amendment 0002

Section H Special Contract Requirements not provde a definition of "foreign ownership" as FAR Part

9.108 Prohibition on Contracting With Inverted Domestic Corporations and FAR clauses in the soliciation to address such situations of "foreign ownership" i.e. (not all inclusive) FAR 52.209-2 Prohibition on Contracting with Inverted Domestic Corporations--Representation and 52.209-10 Prohibition on Contracting with Inverted Domestic Corporation.

A TS FCL shall be required for all awarded IDIQ contracts. While the Government will sponsor non- TS Cleared, certain restrictions apply to Region 3. Offerors who are deemed the highest rating and within the competitive range for Region 3 Phase II must have an active TS FCL at time of proposal submission in order to receive documents for competition within in the final phase.

Contract Data Requirement List (CDRLs). There are no CDRLs for Phase I of the solicitation.

It is up to the contractor to determine how to prepare its matrix. See the revised Table 2 and 3 for placements; see Amendment 0002

22 See the revised Table 2 and 3 for placements; see Amendment 0002

23 Unless an amendment is issued to the solicitation,these requirements remain as written.

24 The agency and office for which the design/construction project was or is being performed.

25 The Table of Contents is not included in the page count.

26 Yes, for three (3) projects only using Attachment 5 Past Performance Questionnaire.

The Offeror shall provide present/past performance for the prime contractor for applicable present/past projects. Past performance shall demonstrate present/past performance on projects of the similar size, scope, cost, and complexity (IDIQs for Design-Build, Design-Bid-Build construction, renovation, new construction) . . . . Disregard the reference to block 29; see Amendment 0002.

Paragraph L15.3 addresses submission of Attachment 5 Past Performance Questionnaire (Unlimited pages; 3 projects only), Attachment 10 Corporate Performance Reference Questionnaire (2 pages per project), and a copy of teaming/joint venture agreement(s) in accordance with SBA policy.

Disregard reference to block 29; see Amendment 0002. TAB C: Past Performance, Page 58

One paragraph requires Attachment 10, Corporate Performance Reference Information be provided. The last sentence states the tab is limited to a page limitation of 2 pages per project. What exactly is to be submitted for each project? Is this the same information that is prepared with the Past Performance Questionnaire? Please clarify. Also, clarify "Block 29".

The first paragraph on Page 52 requires the Offeror to prepare a cross-reference matrix for each of the volumes. This is confusing as to exactly how this matrix is to be prepared with so much information requested. Can an example be presented in the RFP. Also, where is this matrix presented in the Offeror's proposal? Also define CDRLs.

Paragraph L.12.2 discusses a matrix again. Where is this matrix presented in the Offeror's proposal ?

This paragraph requires volume number, tab section and page number to be placed at the bottom (foot note) of each page. Additionally, Paragraph L.7.2, Page 51 and subparagraph permits the Offeror to add additional information at the bottom of each page. All this required/permitted information at the bottom of each page becomes way too much. It is requested that some of the requirements be deleted.

Paragraph L.16 references "Releasing agency and office". Who is this?

This Table states that the page limit for Tab A is one ? A table of contents and a title page is required. Are both of these considered to be one page?

Section L, Paragraph L.15, Page 57

Section L, Paragraph L.10.1, Page 52

Section L, Paragraph L.12, Page 55

Section L, Paragraph L.15, Table 2, Page 57

TAB C: Past Performance, Page 58

TAB C: Past Performance requires that past performance be provided for the prime contractor and subcontractors.

Which particular subcontractors past performance is to be submitted? Just design firm or various subcontractors such as electrical, mechanical, etc.?

L15.3 TAB C

Section L.15.3, Volume I, Tab C: Past Performance states: "The Offeror shall provide past performance for the Prime Contractor and all proposed subcontractors."

Please consider narrowing the proposed Subcontractors we are asked to provide. Since there are so many different project types that will be in this RMACC (e.g. Opps, Tech, Commons) we would like to only submit our information as the Prime Offeror. We believe this benefits the Government. This will allow us to choose team partners and subcontractors that specialize in each of the different types of buildings per Task Orders, such as SCIF Office Buildings, Fitness Centers, Retail, Repositories, Training Centers, Parking Garages, etc…

RFP L15.4.2.2 Project Management Plan

Section L15.4.2.2 Project Management Plan asks for the following resumes: “Include resumes using Attachment 6 Resume Template for the following key personnel: Lead Architect, Lead Mechanical Engineer, Lead Civil Engineer, Lead Electrical Engineer and Senior Project Manager, subcontractors and/or consultants.”

We are concerned that the required resumes are not related to the requirements described in Section C.1 Introduction and C.2 Scope for providing “construction services” and “a wide range of construction and alteration services including…but not limited to Design-Build, Design-Bid-Build, or Early Contractor Involvement (ECI).” As we are asked to provide construction services, we would expect the Government to expect to see qualifications for a Project Executive, Senior PM, Superintendent, Quality Control Manager, etc. These personnel would assure our excellence in performing construction services as opposed to the asked for Engineers and Architects, personnel whom would come from our Design Partner and only be relevant on the Design-Build Task Orders released via this RMACC.

Please consider changing the required resumes in Tab D Section L15.4.2.2 Project Management Plan as the current requirements are more suited for an Architect/Engineer (A/E) firm.

RFP

H39.1

AND

L15.5 TAB E

Section 39.1, Company Threat Assessment states: "All entities referenced in a proposal (Offeror, A/E Team, Construction Firm, and all subcontractors) will be subject to a Company Threat Assessment (CTA) by the FBI to screen for potential Supply Chain Risk Management issues. If the Contractor or any of its team members are owned or controlled by a foreign person or entity, either in whole or in part, such foreign ownership, control, or influence must be fully disclosed and the Government may require additional information. The Government reserves the right to restrict participation by any foreign-owned entity or require mitigation of foreign control."

Section L.15.5, Volume I, Tab E: Security states: "Participation by foreign owned entities prohibited for the project."

Section L. 15.5 does not provide a definition of what constitutes "foreign ownership" to determine whether or not a firm is "foreign owned". We find that this is not a simple determination given today's global economy and especially for publicly traded companies where "ownership" is actually held among shareholders. Since Section

39.1 indicates all proposed companies must fully disclose any foreign Ownership and a threat assessment will be performed, could the sentence in Section L 15.5 read that participation by foreign Owned entities "may" be prohibited or could this sentence be struck all together? We are accoustomed to filling out the threat assessments or FOCI Mitigation Plans when faced with secure projects and we plan on doing the same for this project. Will this approach suffice for this RFP or will there be some independent early determination by the government as to each firms' status as foreign owned or not?

RFP

Attachment 4 Department of State Security Requirements for LEGAT OCONUS Work

AND

Attachment 7 General Requirements RMACC

Attachment 4, the Department of State Security Requirements for LEGAT OCONUS Work (Region 3) makes numerous references to required security clearances for overseas work.

Attachment 7, RMACC Division 01 00 00 makes no mention of security clearances.

Please clarify if a security clearance is only required for Region 3, OCONUS work.

RFP

There is an asterisk indicated in the table. Does these mean the pages for this Tab are unlimited?

Section L, Page 52

Section L, Paragraph L.12.2, Page 55

Include resumes using Attachment 6 Resume Template for all Offeror’s Key Personnel including the Offeror’s Program Manager and Lead Architect. Resumes shall include projects of similar size/scope & dollar value and substantially completed within the last five (5) years. Resumes are limited to two (2) pages per individual and shall not be included in the twenty (20) page limitation.

see Amendment 0002.

30 You may include the cover letter if you desire; however, you shall not exceed the page limitations.

It is your choice to include the cover letter within your proposal submission or have the reference return it.

Attachment 10 is to be completed for all Attachment 5 Past Performance references. It shall be placed under Tab C as required. Disregard the reference to block 29; it will be removed. see Amendment 0002

All information on pages 2 through 6 shall be completed by each reference; A max of three (3) projects for prime only; amendment forcoming

34 The intent is to evaluate past performance for the prime Contractor only; see Amendment 0002

No, past performance required under paragraph L15.3 using Attachment 5 shall be completed by references only (commercial companies and/or government agencies for which the work was performed); not the Offeror. It is the goverments intent to evuae past performnce for the Prime contractor.

The Government has assess to CPARS data. Attachment 5 shall be completed and submitted by your past performance reference.

The Offeror shall provide present/past performance for the prime contractor only. If the design team is a part of the prime company, then Attachment 10 would be completed for the prime company as a whole; see Amendment 0002

Include resumes using Attachment 6 Resume Template for all Offeror’s Key Personnel including the Offeror’s Program Manager and Lead Architect. Resumes shall include projects of similar size/scope & dollar value and substantially completed within the last five (5) years. Resumes are limited to two (2) pages per individual and shall not be included in the twenty (20) page limitation.

see Amendment 0002.

39 Yes, Include two (2) sealed envelopes in each hard copy of the proposal.

Region 1: Experience projects can be anywhere on the CONUS;

Region 2: Experience projects must be within 200 miles of Redstone Arsenal (RSA) region centered in Huntsville, AL and the National Capital Region (NCR), including but not limited to, the FBI Academy in Quantico, VA, FBI Headquarters in Washington, DC and the Criminal Justice Information Services (CJIS) Division in Clarksburg, WV)

41 No, Attachment 5 shall be completed and submitted by your past performance reference.

The reference in paragraphs refers to Table 2 Proposal Content and Oorganization. The format for the electronic copy shall be the same as the hard copies.

Include resumes using Attachment 6 Resume Template for all the Contractors Key Personnel including the Offeror’s Program Manager and Lead Architect. Resumes shall include projects of similar size/scope & dollar value and substantially completed within the last five (5) years. Resumes are limited to two (2) pages per individual and shall not be included in the twenty (20) page limitation.

see Amendment 0002.

44 See paragraph L.9 for confirmation at the Table of Contents is not included in the page count.

45 Confirmed that projects may be within the last five (5) years.

46 The requirement for Tab F Organizational Conflict of Interest will be removed. see Amendment 0002

Paragraph L.15.3 - TAB C Past Performance, Please confirm it is acceptable for the Offeror to submit a Contractor Performance Assessment Report (CPARs) for the Prime as part of the Past Performance response in lieu of providing a Past Performance Questionnarie (PPQ) if a CPARs exists?

Referencing L.12.2 Proposal File Matrix on page 55 of 84 – Please clarify that the “Table Below” referenced is referring to “Table 2 PROPOSAL CONTENT AND ORGANIZATION” table on page 57 of 84. Additionally, please clarify if the intent is for each Tab within each Volume to be a separate PDF file in the electronic submission.

Tab F Organizational Conflict of Interest Question 6 states "Address how your company will preclude a perception of impaired objectivity by prohibiting transfers of personnel between contracts."

The Offeror requests removing the resumes for key peronnel from the 20 page limit for Tab D - Management Approach.

Since the key personnel includes subcontractors and/or subconultants that are committed to being part of the Offeror's team, there is potential for over 10 resumes to be provided.

It states the offeror shall have up to three (3) projects each to represent the Past Performance for the Prime and all subcontractors. Q) If it's up to three (3) projects can we use two (2) projects that we've completed with our design team together & one (1) as the Prime Contractor? Q2) Is it the government's intention to evaluate both the Prime Contractor & the Design team separately?

Section L, Paragraph L.15.4.2.2, TAB D:

Management Approach, Page 59

This Paragraph requires resumes on key personnel like Lead Architect, and other. There could be as many as ten (10) resumes to submit if you included the construction superintendent and even subcontractor personnel. TAB D is limited to 20 pages. Are the resumes to be considered part of these 20 pages? Are resumes to be submitted under this TAB or a separate location. It is suggested that a finite list of key personnel be indicated so there is no overkill on resumes.

Please confirm that the Table of Contents is not included in the 1 page limit for Tab A Title Page.

On Page 59 of 84, L15.4.2.2 Project Management Plan, please confirm that projects can be within the last 5 years, not between 3-5 years which would make relevant projects within a 2 year window from 2013-2015. .

Page 58 of 84 of the RFP Section L 15.3 Volume I Tab C Past Performance paragraph

This paragraph requires the preparation of the PPQ which is to be sent to each reference. The reference completes the PPQ and returns directly to the government. Should a copy of the PPQ that was sent to the references be included at

TAB C?

Paragraph L.15.3 - TAB C Past Performance, It states the offeror shall submit key management personnel list and acquisition risk questionnaire for itself and each subcontractor offered in its proposal. page 57 of 84 of the RFp L.15 Phase I Proposal Submission Table 2 Proposal Content & Organization Tab E Security, under total hard copies it states 2 sealed envelopes. Q) Are we to submit the KMPL's & ARQ's within Tab E Security and in two (2) separate sealed envelopes?

L15.3 Volume I - Tab C

We have a great deal of experience working on simliar projects as a prime contractor. However, as a small business, submitting projects completed within 200 miles of the region/pool is limiting. Would you consider extending the requirement to 500 miles?

Page 58 of 84 of the RFP Section L 15.3 Volume I Tab C Past Performance

Q) Will the FBI permit offeror's to use previously completed Past Performance Questionnaires or CPARS in lieu of the Attachment 5 Past Performance Questionnaire? Due to the holiday's and the constant request from our client's to complete the PPQ's we have been having difficulty getting them back because they feel they've already completed them multiple times and don't have the time to continue to complete them.

Paragraph L.15.3 - TAB C Past Performance, The fourth paragraph states that Attachment 10 Corporate Performance Reference Information should be completed and be placed at TAB C. Attachment 10 is titled "Corporate Performance Reference Information - Design Team". It appears that this information is for the design firm and not for information regarding the reference. There is also a mention of "block 29" which is not shown on the PPQ. Please clarify.

Page 58 of 84 of the RFP Section L 15.3 Volume I Tab C Past Performance paragraph

It states to provide past performance for the Prime Contractor & all proposed subcontractors and to use Attachment 5 Past Performance Questionnaire for up to three (3) projects. Q) Is the FBI's intention to have three (3) past performance questionnaires for the Prime Contractor in addition to three (3) from our design team?

Paragraph L15.3, Page 58

The third paragraph permits three (3) projects to be submitted using Attachment 5 Past Performance Questionnaire (PPQ). It states that the Offeror is to complete the first page (cover letter) and provide the PPQ to each reference.

Should the offeror also complete the information at the top of Page 2 of 6 of the PPQ? Or is this information to be entered/prepared by each reference? This identical information on the cover letter.

Page 58 of 84 of the RFP Section L 15.3 Volume I Tab C Past Performance, paragraph

It states the offeror shall provide the completed Attachment 10 Corporate Performance Reference Information for the individual reference we sent the PPQ's to. Q1) Does this apply for the Prime Contractor and the design team?

Attachment X Corporate Reference Information form says-Design Team & appears to be geard towards the design team.

Q2) Can you please clarify if this form is required for both the Prime Contractor & the design team or just the design team?

Page 59 of 84 of the RFP Section L15.4.2.2 Project Management Plan, paragraph 1

It states to include resumes using Attachment 6 Resume Template for the following key personnel. Q) Do the resumes count towards the 20 page limitation for this section?

Page 60 of 84 of the RFP Section L15.5 Volume I-Tab E Security, paragraph 2 & page 57 of 84 of the RFp L.15 Phase I Proposal Submission Table 2 Proposal Content & Organization Tab E Security

There is a cover letter (first page) sent with the prepared PPQ to each reference. Is it necessary for the reference to return the cover letter with the completed PPQ? The cover letter and the PPQ have redundant information.

An amendment is forthcoming to remove the requirement for submission of Tab F Organizational Conflict of Interest document.

Language within the paragraph will be revised to read: "The Offeror shall provide present/past performance for a maximum of three (3) projects for the Prime Contractor."

49 The pages shall be double-sided where applicable.

50 Paragraph "L.14.2 HAND DELIVERY" will be deleted by amendment.

Region 1: Experience projects can be anywhere on the CONUS;

Region 2: Experience projects must be within 200 miles of Redstone Arsenal (RSA) region centered in Huntsville, AL and the National Capital Region (NCR), including but not limited to, the FBI Academy in Quantico, VA, FBI Headquarters in Washington, DC and the Criminal Justice Information Services (CJIS) Division in Clarksburg, WV)

52 The requirement of 5 years remains as written.

Include resumes using Attachment 6 Resume Template for all Offeror’s Key Personnel including the Offeror’s Program Manager and Lead Architect. Resumes shall include projects of similar size/scope & dollar value and substantially completed within the last five (5) years. Resumes are limited to two (2) pages per individual and shall not be included in the twenty (20) page limitation.

see Amendment 0002.

There is no predetermined number of large or small business award for Region 1 other than a mimimun of (3) "contracts" for the region. The business size is unrestricted for this region. see Amendment 0002.

Region 1: Experience projects can be anywhere on the CONUS;

Region 2: Experience projects must be within 200 miles of Redstone Arsenal (RSA) region centered in Huntsville, AL and the National Capital Region (NCR), including but not limited to, the FBI Academy in Quantico, VA, FBI Headquarters in Washington, DC and the Criminal Justice Information Services (CJIS) Division in Clarksburg, WV)

The minimum requirement for past performance per project is zero (0); the maximum number is three (3) for the prime and each subcontractor. For example, if the designee/consultant were a subcontractor, then you would submitt a completed PPQ for that subcontractor. However, he PPQ shall be completed by the entitty for which the work was performed (goverment agency/commercial company). see Amendment 0002

The minimum requirement for past performance zero (0) per project; the maximum number is three

(3) projects for the prime and each subcontractor. For example, if the designee/consultant were a subcontractor, then you would have the entity submit a completed PPQ for that subcontractor as well as one for your company as the prime. However, if the designing team is within the prime company, then you would submit one PPQ for the design work as well as any construction work performed by the prime company. see Amendment 0002

No, Attachment 5 shall be completed and submitted by your past performance reference. see Amendment 0002

No, Attachment 5 shall be completed and submitted by your past performance reference. see Amendment 0002

No, Attachment 5 shall be completed and submitted by your past performance reference. see Amendment 0002

RFP page 6, Table 1; page 51, L.8; and page 58, L15.3

Table 1 on page 6 states that Region 1 will include projects that may encompass “all areas within the CONUS,” while page 51 includes that there will be an “emphasis on supporting Redstone Arsenal and other projects throughout the CONUS.” Page 58 states that projects should “be located within 200 miles of the region/pool named.” Our impression gathered from Industry Day attendees was that Region 1 would not be required to have this experience to qualify. Please clarify for Region 1 whether each relevant project must be within 200 miles from Redstone Arsenal, or if projects further than 200 miles but within the CONUS will be considered for evaluation.

L15.3 Volume I – Tab C Past Performance

Page 58, paragraph L15.3 states that Offerors shall demonstrate past performance through the submission of up to three

(3) projects, while the following paragraph states that the Offeror “shall have up to three (3) projects each to represent the Past Performance for the Prime and all subcontractors.” Please clarify the number of projects permitted: Up to three (3) for the entire proposal response, up to three (3) for each proposed team member entity such as the Offeror, the designers, and select subcontractors, or up to three (3) for the Offeror and up to three (3) for the proposed design team members/subcontractors?

RFP - C.3

Section C.3 states a minimum of three contractor per region will be selected. C.3.1 states Region 1 will consist of large and small businesses.

Please confirm if a minimum of three large and minimum of three small businesses will be selected as well as the maximum number of businesses that will be selection for region 1.

L15.3 Volume I – Tab C Past Performance and Attachment 5

Within L15.3 Volume I - Tab C Past Performance it states that the reference must send their completed Past Performance Questionnaire directly to the Contracting Officer. May these questionnaires instead be collected and submitted by the Offeror as a method of tracking?

L15.3 Volume I – Tab C Past Performance and Attachment 5

If Owner Past Performance evaluations are available for featured projects, such as Federal CPARS or PPQ-0 forms, may these be included under Tab C? Please confirm whether these would these be considered equivalent to Attachment 5.

L15.3 Volume I – Tab C Past Performance

Page 58, paragraph L15.3 states that the Offeror shall provide past performance for the Prime Contractor and all proposed subcontractors. At a minimum, is it acceptable to submit three (3) projects for the Prime Contractor, three (3) for the Designer of Record, and one (1) project each for Consultants or Subcontractors? Please clarify minimum and maximum number of projects requested for evaluation.

L15.3 Volume I – Tab C Past Performance and Attachment 5

Our firm has been a dedicated Government Contractor for over 20 years. Typically, we receive project evaluations in the form of a CPARS. The Government has informed us several times that they do not appreciate when we request a project evaluation that is separate from the official CPARS evaluation provided. In most cases the Government has refused to provide any additional project evaluations which are in addition to the CPARS. If the Offeror has a completed and final CPARS evaluation form on file from the project Owner, may this be submitted in lieu of requesting a new Attachment 5 Past Performance Questionnaire?

RFP - L.15 (Table 2)

Section L.15 - Table 2 states Tabe D - Management plan shall not exceed 20 pages. This section per L.15.4.2.2 includes resumes for at least 5 key personnel. A typical resume is approximately 2 pages. This will utilize 12 of the 20 pages.

Please advise if the 6 required resumes can be excluded from the page count.

RFP - L.15.3

Section F.1.1.1 notes that the majority of workall shall be performed at Restone Arsenal, Huntsville AL but with requirement to be able to provide services to other areas within the CONUS. L.15.3 states the mininum requirement for relevant projects is to be located within 200 miles of the region/pool named.

Please confirm the 200 mile restriction does not apply to Region 1 as the place of performance includes CONUS.

RFP - L.15.3

Section L.15.3 limits Past Performance to project substaintially completed within 5 years of the solicitation.

Since firms are only allowed to submit 3 past projects, please extend this requirement to 8 years to allow more relevant projects to be includes for the FBI's evaluation.

RFP - L.10.1 & L.14

Section L.10.1 states pages may be printed on one sheet of paper (front and back). Section L.14 states the proposal documenation shall be consist of double-sided pages.

Please confirm the proposal shall be double-sided.

RFP - L.14.2 Please advise what is required to receive approval for hand delivered proposals.

Tab F Organizational Conflict of Interest Question 11 states "Provide all documents that your employees are required to sign indicating, which employees are required and how often the requirement is."

Please clarify the intent of all documents. Is the Government requesting the Offeror provide a listing of documents employees are required to sign that relate to security, NDA, and OCI or is the Government requesting the Offeror provide a listing of all documents employees sign overall (For example: payroll deductions, I-9 Forms, Insurance Forms, EEO, etc.)?

Additionally, is the Government requesting the Offeror provide samples of these documents or simply a listing of the documents?

Please reference Volume 1 - Tab C Past Performance. It States "The Offeror shall have up to three (3) projects each to represent the Past Performance for the Prime and all subcontractors".

It is possible the Offeror has committed to multiple design discipline subconsultants (architecture, civil, structural, AT/FP, mechanical, electrical, geotechnical, fire life safety, etc.)

Please confirm it is acceptable to submit Past Performance for the Prime and the Architect Designer of Record only as evidence of the Offerors past performance.

There are no required security markings in the Phase I proposal submission. Reference paragraph

L.7 CONFIDENTIAL INFORMATION AND FREEDOM OF INFORMATION ACT

62 The Offeror shall determine its key personnel for Phase I proposal submissions.

63 All Organizational Conflict of Interest (OCI) requirements are deleted; see Amendment 0002

64 Attachment 3 must be completed and submitted for all parties of the Joint Venture

65 The requirement is removed; see Amendment 0002.

66 Attachment 10 is to be used for all projects submitted by the Offeror; see Amendment 0002.

Attachment 10 is to be used for all projects submitted by the Offeror; the maximum number is three

(3) projects for the prime only.

68 Yes; however,t construction must be 50 percent (50%) or more complete

69 You shall address both scenarios if applicable.

Yes, the FBI intends to provide sponsorship for TS FCL for IDIQ awardees, if necessary, and the Contractor meets all requirements for sponsorship. Please ensure your proposal includes all required documentation for FCL sponsorship. The process will follow the FBI security procedures.

The prime contractor will complete and submit Attachment 10 and its reference will complete and submitt, directly to the FBI CO and CS, Attachment 5 as written in the solicitation; see Amendment

Successful Offerors in Regions 1 and 2 who receive an IDIQ award will be sponsored for a TS facility Clearance, which must be adjudicated within 12 months of award. Offerors who are not eligible for a TS facility clearance will not be eligible for an IDIQ award. Offerors who fail to receive a fully adjudicated TS facility clearance within 12 months of award may have their IDIQ terminated for default. See Amendment 0002

73 It is required under Volume II – Tab A Proposal Documentation; see Amendment 0002.

L15.6 Volume I - Tab F Organizational Conflict Of Interest (Pass/Fail)

Number 12 within L15.6 states to “Describe the process for reassigning personnel, including subcontractors, from one assignment to another, include restrictions.” Please define the scope and definition of the referenced reassignment. For example, is the FBI looking for how our firm reassigning’s personnel once a contract is completed and a new project begins? Or is the FBI looking for how our firm reassigning’s personnel during an ongoing project?

M.3.3 FACTOR 3-SECURITY

M.3.3 provides the following note: “* Prime and subcontractor(s) must be eligible for a Top Secret (TS) facility Clearances at time of proposal submission. Failure to provide this information is an automatic rating of Fail for Security. Successful Offerors who receive an IDIQ award will be sponsored for a TS facility Clearance, which must be adjudicated within 12 months of award. Offerors who are not eligible for a TS facility clearance will not be eligible for an IDIQ award. Offerors who fail to receive a fully adjudicated TS facility clearance within 12 months of award may have their IDIQ terminated for default.” Please confirm that FBI intends to provide sponsorship for TS FCL to IDIQ Awardees. If the answer is Yes, will the process follow the October 2018 Defense Security Service ISFO FCL Orientation Handbook guidelines including Excluded Tier Entity Processes?

L15.3 Volume I – Tab C Past Performance and Attachment 10

M.3.3 FACTOR 3-SECURITY

Number 18 in Attachment 10 “Corporate Performance Reference Information – Design Team” requests the Offeror to provide the firm names for a number of design disciplines if not self-performed. These self-perform disciplines are not typically applicable to a Prime Contractor team, but rather an A/E firm. Is there a separate form to be submitted for the Offeror’s (Construction) projects that outlines construction trades under this self-performance question?

Tab E Security states that “The Offeror shall submit a key management personnel list (KMPL) and Acquisition Risk Questionnaire (ARQ) for itself and each subcontractor offered in its proposal.” If the Offeror discusses a subcontractor relationship in narrative without presence of a formal teaming agreement/letter of commitment, must this security information be submitted for that subcontractor?

L15.3 Volume I – Tab C Past Performance L15.3 Volume I – Tab C Past Performance, under the “Teaming Arrangements and Joint Ventures” topic on pages 58-59 of the RFP states that, “Offerors representing the combining of two or more companies for the purpose of this RFP must describe the nature of the association; indicate whether the firms have experience working together in design-build and/or design-bid-build ventures, including how long and how many projects.” Is this narrative and information permissible and desired for submission under Volume I Tab C, or perhaps Volume II, Tab A? Please clarify desired placement.

L15.6 Volume I - Tab F Organizational Conflict Of Interest (Pass/Fail)

If the Offeror is a Joint Venture (JV), should the Organizational Conflict of Interest (OCI) Mitigation Plan be submitted for the approved Offeror JV entity, or must it be provided for the JV entity as well as the JV partners individually?

L15.5 Volume I - Tab E Security (Pass/Fail) and Attachment 3

If the Offeror is a Joint Venture (JV), may the Acquisition Risk Questionnaire (ARQ) Attachment 3 be submitted for the Offeror JV entity, or must it be provided for the JV entity as well as the JV partners individually?

L.10.4 Binding Of Hard Copy Proposals L.10.4 requires use of appropriate security markings. Please identify if any security markings are required aside from the “do not open” package instructions indicated in L.10.7.1, such as “Property of…”.

L15.5 Volume I - Tab E Security and Attachment 2

L15.5 Volume I - Tab E Security requires submittal of Attachment 2, Key Management Personnel Listing. Please define the “Key Management Personnel” desired to be listed within Attachment 2. Would providing information for the key personnel required under L.28 Volume III - Tab C Workforce/Project Team be sufficient?

L15.3 Volume I – Tab C Past Performance and Attachment 10

Attachment 10 is labeled as “Corporate Performance Reference Information – Design Team.” Is this attachment intended to be used for only projects submitted by proposed design team members/subcontractors? If yes, are the design team/subcontractor team members limited to a total of 3 projects?

L15.3 Volume I – Tab C Past Performance

If a project is being submitted under Volume I – Tab C Past Performance from a design team member/subcontractor, will the Government allow the inclusion of a project which is 100% design-complete, but is not yet substantially construction-complete?

L15.6 Volume I - Tab F Organizational Conflict Of Interest (Pass/Fail) Please clarify the nature of documents intended for discussion within number 11 of L15.6.

L15.3 Volume I – Tab C Past Performance and Attachment 10

Attachment 10 is labeled as “Corporate Performance Reference Information – Design Team.” Is this attachment intended to be used for all projects submitted by the Offeror, or only for projects submitted by proposed design team members/subcontractors? If the latter, is there a separate form to be submitted for the Offeror’s (Construction) projects?

It does not exclude you for consideration for Regions 1 and 2. The FBI intends to provide sponsorship for TS FCL for IDIQ awardees for these Regions, if necessary, and the Contractor meets all requirements for sponsorship. Please ensure your proposal includes all required documentation for FCL sponsorship. The process will follow the FBI security procedures.

75 See paragraph C.3.2 Region 2 and Table 1 RMACC Regions

Yes, you may submit a proposal for Region 1 requirements if you meet all requirements in the solicitation.

The Table of Contents is addressed under paragraph L.9 which will be incorporated into each volume. Paragraph L15.1 addresses the Title Page. Both are included

78 Paragraph "10.1 Page Format" added

79 Yes, reference Section L paragraph L15.3; see Amendment 0002

80 The requirement for a submission letter is removed; see amendment

81 Place the Proposal File Matrix in Volume I under Tab A

No. Include resumes using Attachment 6 Resume Template for all Offeror’s Key Personnel including the Offeror’s Program Manager and Lead Architect. Resumes shall include projects of similar size/scope & dollar value and substantially completed within the last five (5) years. Resumes are limited to two (2) pages per individual and shall not be included in the twenty (20) page limitation.

see Amendment 0002.

Include resumes using Attachment 6 Resume Template for all Offeror’s Key Personnel including the Offeror’s Program Manager and Lead Architect. Resumes shall include projects of similar size/scope & dollar value and substantially completed within the last five (5) years. Resumes are limited to two (2) pages per individual and shall not be included in the twenty (20) page limitation.

see Amendment 0002.

Resumes shall be for any personnel the Offeror determines to be "key personnel" , whether prime or subcontractor. Consultants fall under the category of subcontractor for this solicitation

84 One (1) original and one (1) copy of all documentation.

85 Table of Contents only

86 The requirement has been revised. See Amendment 0002.

87 The Government cannot answer this question as there are not enough details.

The government has no specific requirement. However you shall comply with the all the written terms and conditions in the solicitation

Section L

Table 2 under L.15 states that Tab E should be submitted as 2 sealed envelopes. L15.5 states that Tab E must include both Attachment 2 (KPML) and Attachment 3 (ARQ), each completed by the Offeror and "any of its subcontractors." Is the Government expecting one envelope for the Prime and the other for any subcontractors; one envelope for all teammates' Attachment 3 and another for all teammates' Attachment 4; or is each teammate (offeror and subcontractors) expected to submit two sealed envelopes? Please clarify.

Section L

L.9 requires the following for each volume: Table of Contents, cross-reference-matrix, and Glossary of Acronyms. Since Volume II includes the SFs, and other legal/contractual documents, does the Government require all three items--Tale of Contents, matrix, and Glossary--for this volume as well?

Section L

L.15, Table 3 refers to Tab A as "Title Page Table of Contents," while L15.1 refers to Tab A simply as Title Page. Was the Government's intention to indicate that the Table of Contents is to appear as part of Tab A, following the Title Page? If so, does the Government also intend the Cross-Reference Matrix and Glossary of Acronyms to appear in Tab A as well?

Section L In L15.6, the Government makes it very clear that the numbered items in the section must be addressed "according to the unique numberic designation." Does the Government also expect the items in L15.6.1 to be addressed in order?

Section L In light of the requirements of L15.6, can the Government confirm that it is NOT a conflict of interest for a company to be on multiple teams within the same region?

Section L Section L.9 Table of Contents, Cross Reference Matrix, Glossary ends with a reference to "numbering guidelines under paragraph" but does not reference a paragraph. Please clarify.

Section L

For Volume I - Tab C Past Performance, please confirm that in light of recent GAO rulings, the Government will permit the use of sister company experience and past performance if a meaningful relationship is documented in a commitment letter.

N/A L15.3 We are located in Jacksonville, Florida, are we eligible to submit a proposal?

Section L

L15.4.2.2 lists the key personnel whose resumes are required for this submission. Can the Government please clarify the reference in the same sentence to "subcontractors and/or consultants"? Does the Government want additional resumes for subcontractors and/or consultants? Or is the Government simply asking that offerors clarify whether the Key Personnel cited in the resumes are contractor or consultant personnel?

Section L Is it the Government's intention that the submission letter required in L.14 only be submitted electronically?

Section L

L.12.2 requires that a hard copy of the Proposal File Matrix be included as part of the submission. Please clarify where the hard copy should be placed. If the Government expects the hard copy to be inserted in one of the Volumes, please specify the location (e.g. before or after the TOC, Title Page, etc.)

Section L

In L15.4.2.2, the Government requests resumes for Key Personnel (Attachment 6). Would the Government allow resumes to be included as an appendix to Volume I? Also, since Attachment 6 is limited to 2 pages per resume, will the Government allow resumes not to count against the Tab D page count?

N/A L15.3 Please list the states located in Region 2.

N/A Paragraph L15.5 & M.3.3

Volume I - Tab E Security of Section L (L15.5) states that in order to compete in Phase II and for the government to perform the company threat assessment, the Offeror shall submit a key management personnel list (KMPL) and Acquisition Risk Questionnaire (ARQ) for itself and…