A29 - CONFORMED RFP - 15DDHQ24R00000041 - Amendment 0001.pdf

PDF 2 MB Posted

Attached to
Total Aviation Support Services (TASS) - DEA
Solicitation number
15DDHQ24R00000041
Issued by

About this file

This document is a Request for Proposals (RFP) issued by the U.S. Department of Justice Drug Enforcement Administration (DEA) for Total Aviation Support Services (TASS). The RFP seeks proposals for a contract to provide a wide range of aviation support services including aircraft maintenance, repair, and overhaul, as well as flight support, logistics, and other related services. The period of performance includes a base period and multiple option years. Key requirements include conformance to applicable aviation regulations and standards, transition planning, administrative support, personnel qualifications, and detailed reporting. The RFP provides instructions for submitting proposals, evaluation criteria, and other solicitation details. Responses are due on August 23, 2024.

View the file

Other files

File Type Posted
20. EXHIBIT XX - Area_Wage_Determination - Amendment 0001.pdf PDF
23. EXHIBIT XXIII - Performance_Requirement_Summary R1_Amendment 0001.pdf PDF
10. EXHIBIT X - Government Furnished Property R1-Amendment 0001.pdf PDF
1. EXHIBIT I - GOVERNMENT ASSETS-Monthly Flight Hours (Flight Sheets) R1-Amendment 0001.pdf PDF
16. EXHIBIT XVI - Aircraft Maintenance Cost Per Flight Hour R1-Amendment 0001.pdf PDF
A29 - Amendment 0001 - 15DDHQ24R0000041.pdf PDF
A23 - TASS_Presolicitation QandAs_DEA Draft RFP 15DDHQ24N00000001.pdf PDF
22. EXHIBIT XXII - Quality Assurance Surveillance Plan (QASP)_-DRAFT.pdf PDF
6. EXHIBIT VI - GOVERNMENT FURNISHED PROPERTY Computer Hardware.pdf PDF
8. EXHIBIT VIII - GFP Parts Inventory.pdf PDF
26. EXHIBIT XXVI - ATR42-500 AIP.pdf PDF
25. EXHIBIT XXV - DEA Aviation Division Aviation Maintenance Manual.pdf PDF
16. EXHIBIT XVI - Aircraft Maintenance Cost Per Flight Hour.pdf PDF
10. EXHIBIT X - Government Furnished Property.pdf PDF
4. EXHIBIT IV - Govt Assets - MEL Updated.pdf PDF
7. EXHIBIT VII - GFP (Computer Software - MRO).pdf PDF
23. EXHIBIT XXIII - Performance_Requirement_Summary.pdf PDF
28. EXHIBIT XXVIII - Pilot Equipment Request Form.pdf PDF
11. EXHIBIT XI - GFP GSE-Special Tooling.pdf PDF
17. EXHIBIT XVII - Goverment Furnished Equipment (GSE) - Shop Equipment.pdf PDF
21. EXHIBIT XXI - Statement_of_Equivalent_Rates.pdf PDF
20. Exhibit XX - Area_Wage_Determination.pdf PDF
13. EXHIBIT XIII - Sub-Contractor Vendor List.pdf PDF
2. EXHIBIT II - Average Annual Mission Hours.pdf PDF
30. EXHIBIT XXX - Acknowledgement of Contractor Responsibilities.pdf PDF
A28 - RFP - 15DDHQ24R00000041.pdf PDF
27. EXHIBIT XXVII - Cessna 206 AIP.pdf PDF
24. EXHIBIT XXIV - Electronic Database and Charts.pdf PDF
19. EXHIBIT XIX - Contract_Deliverables.pdf PDF
18. EXHIBIT XVIII - ATR42-320 AIP.pdf PDF
15. EXHIBIT XV - Waste Accumulation Records 2019 - 2023.pdf PDF
12. EXHIBIT XII - GFP Special Purpose Support Vehicles.pdf PDF
5. EXHIBIT V - GFA Recommended Service Bulletins and Maintenance Requirements.pdf PDF
14. EXHIBIT XIV - DEA Aviation Division - Aviation Operations Manual.pdf PDF
9. EXHIBIT IX - Government Furnished Property Aviation Life Support Equipment (ALSE).pdf PDF
3. EXHIBIT III - Govt Assets - Maint Records.pdf PDF
29. EXHIBIT XXIX - Security Clause - DEA-2852.204-83.pdf PDF
1. EXHIBIT I - GOVERNMENT ASSETS-Monthly Flight Hours (Flight Sheets).pdf PDF
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

U.S. DEPARTMENT OF JUSTICE

DRUG ENFORCEMENT

ADMINISTRATION

TOTAL AVIATION SUPPORT SERVICES

(TASS)

Aviation Division (OA)

RFP: 15DDHQ24R00000041

TABLE OF CONTENTS

PART I – THE SCHEDULE

SECTION A - CONTRACT AWARD 1

SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS

B.1 Schedule of Items B-1

SECTION C – DESCRIPTION/SPECIFICATIONS/WORK STATEMENT

C.1 Introduction C-1

C.2 Background C-1

C.3 Scope of Work C-1

C.4 Definitions C-2

C.5 Applicable Standards and Regulations C-5

C.6 Transition C-6

C.7 Administrative Information C-7

C.8 Government Furnished Property C-9

C.9 Contractor Furnished Property C-12

C.10 Direct Authority C-12

C.11 Administrative Requirements C-13

C.12 Specific Requirements C-20

C.13 Reports C-60

C.14 Contractor Personnel C-73

SECTION D – PACKAGING AND MARKING

D.1 General Packaging and Marking Requirements D-1

SECTION E – INSPECTION AND ACCEPTANCE NOTICE

E.1 Notice Listing Contract Clauses Incorporated by Reference E-1

E.2 Inspection and Acceptance E-1

SECTION F – DELIVERIES OR PERFORMANCE

F.1 Clauses by reference F-1

F.2 Period of Performance (Base and Options) F-1

F.3 Deliverables F-1 i

SECTION G – CONTRACT ADMINISTRATION DATA

G.1 Contracting Officers Representative G-1

G.2 Scheduled and Unscheduled closures G-2

G.3 Contractor Performance Assessment G-3

G.4 Invoice Requirements G-4

G.5 Contract Administration Points of Contact G-5

SECTION H – SPECIAL CONTRACT REQUIREMENTS

H.1 Security Requirements H-1

H.2 Certificate of Insurance H-1

H.3 Key Personnel H-1

H.4 Nonpayment for Additional Work H-2

H.5 Incorporation of Contractor’s Proposal H-3

H.6 Contractor Time Keeping Requirements H-3

H.7 Preventing Personal Services Contracts and Performance of Inherently Government Functions

H-3

H.8 Notification to Employees of Whistleblower Rights, Remedies, and Other Information

H-4

H.9 Travel Requirements for Contractors H-5 H.10 Organizational Conflicts of Interest H-7 H.11 Former Employment or Assignment with the DEA H-8 H.12 Telecommuting and Remote Work Arrangements for

Contractor Employees H-9

H.13 Government-Furnished Resources H-10 H.14 Permit and Licenses H-10 H.15 Approval Required for Advertising and Media Releases H-11 H.16 Limitations on Future Contracting H-11 H.17 H.18 H.19 H.20

Information Resellers or Data Brokers Contractor Privacy Requirements Domestic Violence, Sexual Assault, and Stalking Contractor Internal Confidentiality Agreements or Statements Prohibiting or Restricting Reporting of Waste

H-12 H-13 H-18 H-19

PART II—CONTRACT CLAUSES

SECTION I – CONTRACT CLAUSES

I.1 Clauses Incorporated by Reference I-1

I.2 Clauses Incorporated by Full Text I-4

I.3 Basic Safeguarding of Covered Contractor Information Systems I-4

I.4 Updates of Publicly Available Information I-6

I.5 Option to Extend Services I-7

I.6 Option to Extend the Term of the Contract I-7

I.7 Availability of Funds for Next Fiscal Year I-7

I.8 Equal Opportunity for Veterans I-8

I.9 Equal Opportunity for Workers with Disabilities I-8

I.10 Hazardous Material Identification and Material Safety Data I-9 I.11 Final Invoice and Release of Residual Funds I-10 ii

PART III — LIST OF EXHIBITS

SECTION J – LIST OF ATTACHMENTS/EXIBITS J-1

PART IV — REPRESENTATIONS AND INSTRUCTIONS

SECTION K – REPRESENTATIONS, CERTIFICATIONS, AND OTHER STATEMENTS OF

OFFERORS OR RESPONDENTS

K.1 Solicitation provisions incorporated by reference K-1

K.2 Clauses incorporated by reference K-1

K.3 Annual Representations and Certifications K-2

K.4 Certification regarding responsibility matters K-6

K.5 Information regarding responsibility matters K-8

K.6 Certification Regarding Tax Matters K-9

K.7 Previous Contracts and Compliance Reports K-10

K.8 Affirmative Action Compliance K-10

K.9 Biobased Product Certification K-10

K.10 Cost Accounting Standards Notices and Certification K-11 K.11 Proposal Disclosure – Cost Accounting Practice Changes K-13

K.12 Place of Manufacture K-14

SECTION L – INSTRUCTIONS, CONDITIONS, AND NOTICE TO OFFERORS OR

RESPONDENTS

L.1 Solicitation Provisions Incorporated by Reference L-1

L.2 Commercial and Government Entity Code Maintenance L-2

L.3 Type of Contract L-2

L.4 Service of Protest L-2

L.5 Protests Filed Directly with the Department of Justice L-3

L.6 Alternate Proposal Information L-4

L.7 Offeror Acceptance Period L-4

L.8 Communications L-4

L.9 Proposal Instructions L-4

L.10 Small Business Subcontracting Plan L-10

L.11 Expenses Related to Offeror Submissions L-10

L.12 Determination of contractor’s responsibility L-10

L.13 Proposal submission – date, time & location L-10

L.14 Final proposal revisions L-11

L.15 Non-government personnel L-11 L.16 Post award conference L-11

SECTION M – EVALUATION FACTORS FOR AWARD

M.1 Notice Listing Solicitation Provisions Incorporated By Reference M-1

M.2 Evaluation M-1

M.3 Evaluation of Options M-5

M.4 Basis for Award M-5 iii

15DDHQ24R00000041 Page 1

SOLICITATION OFFER AND AWARD 11. This Contract Isa Rated Order under tt,e Defense Prlorttles and Allocallons IRATING ' ' System (DPAS) - Code of Federal Regulaaons - at 15 CFR 700. I

2. CONTRACT NUMBER 3. SOLICITATION NUMBER 4. TYPE OF SOLICITATION 5 .DATE 6. REQUISITION/PURCHASE

SEALED BID (IFB) INVITATION FOR BID ISSUED NUMBER

15DDHQ24R00000041

NEGOTIATED (RFP) REQUEST FOR

07/23/2024 PR""""A'

7. ISSUED BY CODE I 15DDHQ 8. ADDRESS OFFER TO (If other than Item 7')

DEA

Ryan Burke

Attn: Office of Acquisition (FA) 8701 Morrissette Drive ryan.f.burke@dea.gov

Springfield, VA 22152-1080

NOTE: In sealed bid sollcl1aUons "offer" and "offeror" mean "bid" and "bidder'.

SOLICITATION

9. Sealed offers In o�glnal and-��--copies for furnishing tt,e supplies or services In tt,e Schedu� wUI be rvcelved at tt,e place specified In 11am 8, or W hand car�. In the depository located In See SECTION L for Instructions until 14 ·00 ET local ame 08/23/2024

(Hour) (Da18) CAUTION - LATE Submissions, Modifications, and Wltt,drawalS: See Section L, Provision Number 52.214-7 or 52.215-1. All offers are subject to all 1&rms and condtlons contained In this sol lcltatlon.

10. FOR A. NAME B. TELEPHONE (NO COllECT CAll.S) C. EMAIL ADDRESS

INFORMATION AREA CODE NUMBER EXTENSION

CALL: R Burke ea. ov

11. TABLE OF CONTENTS

(X) SECTION DESCRIPTION I PAGE($) (X) SECTION DESCRIPTION PAGE($)

PART I - THE SCHEDULE PART II-CONTRACT CLAUSES

X A SOLICITATION/CONTRACT FORM 1 X I CONTRACT CLAUSES 11

X B SUPPLIES OR SERVICES AND PRICES/COSTS 2 PART HI-LISTOF DOCUMENT$, EXHIBITS AND OTHER ATTACHMENT$

X C DESCRIPTIONISPECIFICA TIONSIWORK STATEMENT 79 X J LIST OF ATTACl-tMENTS 1

X D PACKAGING AND MARKING 1 PART IV-REPRESENTATIONS AND INSTRUCTIONS

X E INSPECTION AND ACCEPTANCE 1

X K REPRESENTATIONS, CERTIFICATIONS AND OTHER 14

X F DELIVERIES OR PERFORMANCE 1 STATEMENT$ OF OFFERORS

X G CONTRACT ADMINISTRATION DATA s X L INSTRSRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS 11

X H SPECIAL CONTRACT REQUIREMENTS 19 X M EVALUATION FACTORS FOR AWARD 16

OFFER (Must be #tiny completed by oll'erol1 NOTE: Item 12 does not apply lftt,e sollcl1allon Includes the provisions at52.214-16, Minimum Bid Aocep1anoe Period.

12. In com pl lance wltt, the above, tt,e undersigned agrees, W tt,ls offer Is aooepted within _________ calendar days {60 calendar days unless a diffenJnt period Is lnselted by the offerotj from the date for rvcelpt of offers specified above, to furnish any or all ttems upon which prices are offered at tt,e price set opposlle each ll&m, delivered at tt,e designated polnt(s), within tt,e time specified In tt,e schedule.

13. DISCOUNT FOR PROMPT PAYMENT 10 CALENDAR DAYS (%) 120 CALENDAR DAYS(%) 30 CALENDAR DAYS(%) 10 CALENDAR DAYS(%) (See S.Clioll I, Clause Number 52232-8) 0.00% 0.00% 0.00% 0.00%

14. ACKNOWLEDGEMENT OF AMENDMENTS AMENDMENT NUMBER DATE AMENDMENT NUMBER DATE

(The oflo,or .,;know/odgN roooipt o1.,..-.

lo lhe SOLICITATION for oflorora and related dooumenfs numbered and da18d):

CODE I I FACILITY I 16. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

15A. NAME AND

OFFER (Type or Print)

ADDRESS

OF

OFFEROR

158. TELEPHONE NUMBER 15C. CHECK IF REMITTANCE ADDRESS IS 17. SIGNATURE

AREA CODE INUMBER IEXTENSION □ DIFFERENT FROM ABOVE - ENTER

SUCH ADDRESS IN SCHEDULE.

AWARD (To be comnt..ted bv Go,,.,.,,mentl

19. ACCEPTED AS TO ITEMS NUMBERED

20.AMOUNT 21. ACCOUNTING AND APPROPRIATION

22. AUTl-tORITY FOR USING OTl-tER THAN FULL OPEN COMPETITION 23. SUBMIT INVOICES TO ADDRESS SHOWN IN UNDER Tl-IE UNITED STATES CODE AT:

□ 10 u.s.c. 3204(8) ( )

24. ADMINISTERED BY Pfolherlhan !fem 7)

□ 41 u.s.c. 3304(8) ( )

CODEI

26. NAME OF CONTRACTING OFFICER (Type orprtnt) Burke, Ryan F.

(4 copies unless otherwise specified)

25. PAYMENT WILL BE MADE BY

27. UNITED STATES OF AMERICA

/Si!,,atute of Conlra<mg Officer)

IMPORTANT -AWllrd wlll be m ... on thl• Form, or on 8blnct.rcl Form 29, or by other •uthortz.cl offlGl•I wrtU.n notice.

18. OFFER DATE

ITEM

CODE

28. AWARD DATE

AUTHORIZED FOR LOCAL REPRODUCTION

PnJviOIJs edl/Jon Is unusable

STANDARD FORM 33 (REV. 12/2022)

Presalbed by GSA - FAR (48 CFR) 53.214(c)

15DDHQ24R00000041 Section B

PART I – THE SCHEDULE

SECTION B- SUPPLIES OR SERVICES AND PRICES/COSTS

B.1 DEFINITION OF RATES –

BASE YEAR (1/01/2025 – 12/31/2025)

CLIN Labor Category QTY Unit Unit Amount

Price

0001 Total Costs – Cost- Reimbursable Supplies/Services

1 LOT

Fixed Fee

1 LOT

Travel Costs (Not to exceed $500,000.00)

LOT $500,000.00 $500,000.00

0004 Seasonal/Surge

Support/Unscheduled

Aircraft Modification Costs

(Optional CLIN) (Not to exceed $900,000.00)

1 LOT $900,000.00 $900,000.00

OPTION PERIOD I (1/01/2026 – 12/31/2026)

CLIN Labor Category Quantity Unit Unit Amount

Price

1001 Total Costs – Cost- Reimbursable Supplies/Services

1 LOT

Fixed Fee

1 LOT

Travel Costs (Not to exceed $500,000.00)

LOT $500,000.00 $500,000.00

1004 Seasonal/Surge

Support/Unscheduled

Aircraft Modification

Costs (Optional CLIN)

(Not to exceed

$900,000.00)

1 LOT $900,000.00 $900,000.00

OPTION PERIOD II (1/01/2027 – 12/31/2027)

CLIN Labor Category Quantity Unit Unit Amount

Price

2001 Total Costs – Cost- Reimbursable Supplies/Services

1 LOT

Fixed Fee

1 LOT

Travel Costs (Not to exceed $500,000.00)

LOT $500,000.00 $500,000.00

2004 Seasonal/Surge

Support/Unscheduled

Aircraft Modification

Costs (Optional CLIN)

(Not to exceed

$900,000.00)

1 LOT $900,000.00 $900,000.00

OPTION PERIOD III (1/01/2028 – 12/31/2028)

CLIN Labor Category Quantity Unit Unit Amount

Price

3001 Total Costs – Cost- Reimbursable Supplies/Services

1 LOT

Fixed Fee

1 LOT

Travel Costs (Not to exceed $500,000.00)

LOT $500,000.00 $500,000.00

3004 Seasonal/Surge

Support/Unscheduled

Aircraft Modification

Costs (Optional CLIN)

(Not to exceed

$900,000.00)

1 LOT $900,000.00 $900,000.00

OPTION PERIOD IV (1/01/2029 – 12/31/2029)

CLIN Labor Category Quantity Unit Unit Amount

Price

4001 Total Costs – Cost- Reimbursable Supplies/Services

1 LOT

Fixed Fee

1 LOT

Travel Costs (Not to exceed $500,000.00)

LOT $500,000.00 $500,000.00

4004 Seasonal/Surge

Support/Unscheduled

Aircraft Modification

Costs (Optional CLIN)

(Not to exceed

$900,000.00)

1 LOT $900,000.00 $900,000.00

NOTE: As referenced in Section L of the solicitation, the Offeror shall propose a single rate per contract line item number (CLIN). This "single rate" per CLIN shall represent the total estimated cost per CLIN. The offeror shall include a separate breakdown of ALL estimated costs associated with each CLIN in the schedule excluding "Travel Costs" – i.e. wages (Base & fully-burdened rates), supply costs, overhead, general and administrative expenses (G&A) and profit for each CLIN.

[End of Section B]

15DDHQ24R00000041 Section C

SECTION C - DESCRIPTION/SPECIFICATIONS/WORK STATEMENT

C.1 INTRODUCTION

The mission of the Drug Enforcement Administration (DEA) is to enforce the controlled substances laws and regulations of the United States and to bring to the criminal and civil justice systems those organizations and/or individuals involved in the growing, manufacture, or distribution of controlled substances appearing in or destined for illicit traffic in the United

States and its territories. DEA mission responsibilities are worldwide. The Aviation

Division’s role in this mission is to provide total aviation support to DEA Field Divisions and other law enforcement agencies in all aspects of Drug Law Enforcement. The provision of a total aviation support system will ensure that the security and integrity of all flight-related systems and support functions are maintained. In addition to domestic operations, the

DEA Aviation Division operates outside the United States in cooperation with individual host countries, and as such, conducts flight missions the nature of which vary from country-to-country.

C.2 BACKGROUND

The Aviation Division is an IS-BAO SMS Stage 3 certified operator, who’s mission includes, but is not limited to aerial surveillance, intelligence gathering, flight training, special operations, cargo delivery, personnel transport, administrative and maintenance operations. DEA has no spare aircraft for mission support during maintenance events; therefore, timely inspections, modifications, overhaul and accurate diagnosis and repair of discrepancies are critical.

The Aviation Division has historically flown annually approximately 29,000 hours, made approximately 4100 purchases for aircraft maintenance, training and support, and completed approximately 350 annual training events. The Aviation Division has 139 Special

Agent/Pilot positions. Actual on board varies from year to year. The Aviation Division has historically performed approximately 1200 maintenance events each year.

The DEA assets include a variety of commercial aircraft consisting of single and twin turbine rotorcraft, as well as, single and twin-engine piston, single and twin turbo-prop and twin-engine jet fixed wing platforms, many of which are modified and equipped with state- of-the-art, highly sophisticated sensor equipment and designed to facilitate detection and apprehension of violators. DEA aviation operations are primarily spontaneous on demand with few, if any, regularly scheduled missions. The Aviation Division currently has a fleet of 109 aircraft; comprised of 81 fixed wing and 28 rotor wing. The average age of this fleet is approximately 20 years old. Aviation Division operations are conducted under FAA FAR

Part 61, 65 and 91.

C.3 SCOPE OF WORK

The Aviation Division’s mission is to provide tactical, technical, and administrative aviation support to enhance and enable DEA’s worldwide mission. These capabilities are critical to

DEA’s strategic goal of disrupting and dismantling Drug Trafficking. Such support includes air and ground surveillance, maritime surveillance, electronic surveillance, photographic reconnaissance, undercover operations, marijuana eradication, prisoner transport and special helicopter operations for DEA’s global enforcement operations. By providing immediate technical, and administrative aviation support, the Aviation Division is a vital force multiplier not only for DEA, but for our interagency and international partners, as well. The purpose of this contract is to provide the Aviation Division, with mission support for the full range of aviation operations, to include: Program Management, Aircraft Maintenance, Flight

Simulators & Avionics, Training, Logistical, Inventory Management, and Administrative

Support necessary to sustain the worldwide DEA aircraft fleet in a safe, reliable and full mission capable condition. The Contractor shall provide aircraft and/or equipment, pilot services and special operations support as required.

C.4 DEFINITIONS

C.4.1 Aircraft: Any manned or unmanned vehicle which requires FAA approvals to operate in the national airspace system.

C.4.2 Best Commercial Practice: - Refers to the methods, processes, procedures, systems, and/or usage that are commonly implemented in industry, and generally have produced the most satisfactory or desirable continuous outcomes.

C.4.3 Betterment: Any non-routine modification that enhances the useful life and/or the functionality of the aircraft.

C.4.4 Beyond Economical Repair (BER): This is defined as when the expected cost of repairs in parts and labor exceeds the value of the tool in question.

C.4.5 Calibration: The comparison between items of equipment, one of which is a measurement standard of known accuracy, to detect, correlate, adjust and report any variation in the accuracy of the other.

C.4.6 Calibration Certificate: A document stating the traceability to the National Institute of

Standards and Technology (NIST).

C.4.7 Common Hand Tool: Any locally available tool of the aviation maintenance trade that requires no calibration or non-destructive inspection (NDI) and is not a specialized tool required for a specific task or project.

C.4.8 Consolidation: The placing of one hazardous waste container inside another container meeting applicable Federal, state and local regulations (see “Repackage” for comparison).

C.4.9 Consumable: Any item or substance which, upon installation, loses its identity and/or is normally consumed in use (such as nuts, bolts, gaskets, washers, paint, fuel, lubricants, and cleaning and preserving materials; includes Pre-Ex bin-type items) or cannot be economically repaired.

C.4.10 Depot-Level Maintenance: Includes, but not limited to major inspection, repair, major modification, fabrication, overhaul, disassembly/reassembly, refurbishment, upgrading, of aircraft, aircraft components and subcomponents. Depot Level Maintenance includes the enhancement, modification, and upgrading of software, avionics, and special mission equipment.

C.4.11 Essential Chemical: Any of those hazardous waste chemicals defined in 21 CFR

1310.02(b).

C.4.12 Field-Level Maintenance: Includes, but not limited to, minor inspections, repairs, servicing, lubricating, and adjusting as well as the replacement of parts, minor assemblies and subassemblies. This level of maintenance may be performed in the field, on the flight line, or at the location of the aircraft or equipment.

C.4.13 Flight Hours: The number of hours of flight logged during any reportable period.

C.4.14 Hazardous Waste: Any hazardous materials, hazardous substance, waste chemicals, waste containing controlled substances, contaminated debris, equipment, apparatus, etc. or waste chemicals from Office of Aviation Operations maintenance work site or other waste generating activity.

C.4.15 Incoming Manifest: The hazardous waste manifest prepared at the work site for the shipment of hazardous waste to the initial permitted treatment, storage, or disposal facility.

C.4.16 Induction: The date Contractor begins work on aircraft or component. This date shall be the first day of in-process time.

C.4.17 Intermediate-Level Maintenance: Includes, but not limited to, intermediate inspections, replacement, repair, or calibration of unserviceable aircraft, parts, assemblies.

This work also includes the fabrication and manufacture of parts, and technical assistance.

C.4.18 Lab Pack: Two or more hazardous waste containers of compatible waste or one container placed in a Department of Transportation (DOT) specification container and protected by absorbent and/or protective material.

C.4.19 Mission Capable: The material condition of an aircraft indicating that it is safe for flight and can perform all of its designated missions.

C.4.20 Mission Hours: The number of hours reported by the pilot in support of missions.

C.4.21 Neutralization: The treatment of liquid hazardous waste that is defined as a

“corrosive: according to 40 CFR 261.22, whose treatment adjusts the pH to between 5 and 9, inclusive, and whose treatment is in accordance with the treatment facility’s permit.

C.4.22 New: Previously unused or composed of previously unused materials and may include unused residual inventory or unused former government surplus property.

C.4.23 Non-Mission Capable Maintenance: An aircraft is not safe for flight and or is not capable of performing the required mission due to on-going maintenance of aircraft or systems.

C.4.24 Non-Mission Capable Supply: An aircraft is not safe for flight or is not capable of performing the required mission due to maintenance work stoppage for the non-availability of parts.

C.4.25 Non-Reporting Time: Time that is not counted against the operational readiness rate due to an Excusable Delay (Clause 52.249-14), Government directed modification or mandate that the aircraft is grounded. Federal Aviation Administration (FAA) Air worthiness

Directives will not be considered Non- Reporting Time. It is requested by the Contractor to the Contracting Officer’s Representative (COR) and is approved with the concurrence of the

Maintenance Supervisor or his designee.

C.4.26 Operational Readiness Rate: The percentage of total days all aircraft were available for mission performance during the reporting period.

C.4.27 Other than New: Includes, but is not limited to, recycled, recovered, remanufactured, used, and reconditioned.

C.4.28 Outgoing Manifest: The hazardous waste manifest prepared for the shipment of hazardous waste shipped from a permitted storage facility to a permitted treatment, storage or disposal facility.

C.4.29 Precursor: Any chemicals defined in 21 CFR 1310.02(a).

C.4.30 Quality Assurance (QA): Is defined as “a planned and systematic pattern of all actions necessary to provide adequate confidence that an item or product conforms to established technical requirements.” QA can be broken down into two main areas: product assurance and process assurance.

Product Assurance involves making sure that the final product meets design specifications of form, fit and function. And verifying the requirements are correct, the design meets the requirements including implementation reflects the design.

Process Assurance validates/verifies the process used to create final products that are effectively planned, followed and implemented including best practices. QA provides management with objective feedback regarding compliance to approved plans, procedures, standards and analyses.

C.4.31 Rebuild: Factory rebuilt to new equipment performance specifications and used subsequent to rebuilding.

C.4.32 Repackage: The removing of hazardous waste from one container and placing or pouring (decanting) it into another container (see “Consolidation” for comparison).

C.4.33 Repaired: Restored to an earlier normal operating condition by readjustments and replacement of parts.

C.4.34 Rework: Any corrections of defective work, either before, during or after inspection.

C.4.35 Scheduled Completion Date: Calendar date determined by adding the in-process time to the induction date.

C.4.36 Shall: Denotes the imperative.

C.4.37 Should: Indicates a desire, though not required outcome.

C.4.38 Special Mission Equipment: Equipment installed in aircraft for mission performance, not required or directly related to aircraft operation (i.e. Gyro-stabilized camera systems and associated equipment, Law Enforcement Specific communication systems).

C.4.39 Special Tool: Tool required by maintenance manual, designed for special use in accordance with drawings, sketches, or prints and any tool requiring calibration or nondestructive inspection.

C.4.40 Stabilization: The treatment of any liquid or solid in accordance with the treatment facilities permit in such a way as to bind the liquid or solid in a concrete/fly ash-type matrix, diminish the recoverability and leachability of any of the constituents, and minimize the diversion of any of the constituents - especially precursor and essential chemicals, and waste continuing controller substances.

C.5 APPLICABLE STANDARDS AND REGULATIONS

The Contractor shall comply with all applicable local, state, county, Federal, Agency, and

Office of Aviation Operations standards, laws, codes and regulations in the performance of this requirement and the City of Fort Worth, Tarrant County, Texas to include all facility, environmental, security, safety, human engineering, and other related industry entities.

The Contractor shall perform all work and maintain conformance with all standards, regulations, codes, policies and procedures applicable to the requirements stated herein to include, but not limited to the following:

• Airborne Law Enforcement Standard, Public Safety Aviation Accreditation

Commission (PSAAC)

• Department of Justice (DOJ) Order 264.2F

• Department of Labor (DOL)

• Department of State (DOS)

• Department of Transportation (DOT)

• DEA Aviation Operations Manual (AOM)

• DEA Aviation Maintenance Manual (AMM)

• DEA Property Management Handbook

• DEA Records System Information (DEARIS) Handbook

• DEA Aviation Division Fleet Campaigns

• FAA Order VS8000.367

• FAA Order 8000.369

• FAA Order 8000.370

• FAA AC 120-92A

• Property Management Regulations (FPMR)

• General Services Administration (GSA)

• International Business Aviation Council, International Standard for Business

Aircraft Operations

• International Convention Aviation Organization (ICAO)

• ICAO ANNEX 6

• ICAO Safety Management Manual, Document 9859

• Joint Federal Travel Regulations

• National Aerospace Standard 412, Foreign Object Damage/ Foreign Object

Debris Prevention

• National Fire Protection Association (NFPA)

• National Institute of Standards and Technology (NIST) 800 series Special

Publications (SP)

• Occupational Safety and Health Administration (OSHA)

• Office of Management and Budget (OMB) Circular A-130

• Title 5 Code of Federal Regulations (CFR), Administrative Personnel

• Title 14 CFR, Aeronautics and Space

• Title 29 CFR, Labor

• Title 21 CFR, Food and Drugs

• Title 40 CFR, Environmental Protection Administration (EPA)

• Title 41 CFR, Rules and Regulations Governing Conduct on Federal Property

• Title 48 CFR, Federal Acquisition Regulations (FAR)

• Title 49 CFR, Transportation

C.6 TRANSITION

The Contractor shall address transition of all services defined in this contract with minimal cost and without impacting operational availability. The Contractor shall include the specific requirements of this contract section. The transition plan of the successful offeror shall be incorporated into the contract.

C.6.1 Transition Phase-In

The Contractor’s proposal shall include a plan for assuming 100 percent responsibility for services required in performance of this contract. The plan shall include a timeline for completion of all phase-in activities using 30-day completion intervals, with total completion within 120 days. Transition is an integral part of contract start up. The intent of providing

120 days for transition is to provide additional time for analysis of the program and databases currently in use, and security background completion for new employees. Transitioning of incumbent employees to the new contract should be completed in the first 30 days. The plan for transition shall include, but is not limited to:

• Management of Phase-In Activities

• Initial Manning Levels and Timeline to achieve Full Manning Level

• Development and Dissemination of Operational Instructions, Procedures, and

Control Directives

• Prevention of Disrupting Work and Operations in Progress

• Transfer of Government Furnished Property, Material, Equipment and Data

• Transfer of subscription-based programs and services

• Manage and maintain the Maintenance, Repair and Overhaul (MRO) automated computerized system, without disruption of operations.

• Obtain FAA Part 145 Repair Station Certificate

The Contractor shall conduct a 100 percent transition-in inventory at all contract performance locations, to be conducted jointly with the Government within the first 120 days of contract start date. Any discrepancies in inventories will be handled on a case by case basis on the value of the items that are not found in the inventories.

The Contractor shall conduct an in-depth analysis of the Government provided inventory, and make required changes to maximize the efficiency and cost effectiveness of the inventory with particular emphasis placed on; reducing excess, eliminating unnecessary repair actions that create an overstock condition, improving repair/replenishment pipelines and reducing overall material costs. The Contractor shall provide the Contracting Officer and the COR with a cost proposal identifying cost savings and work process efficiencies to be implemented.

C.6.2 Transition Phase-Out

The Contractor’s proposal shall develop a plan for a transition-out period, in the event that the Contractor is not selected for a follow-on contract, or if the Government elects not to exercise any options to extend the performance period. This plan shall be reviewed, updated to assure all guidance and changes have been incorporated and submitted to the COR for review and approval within the first 30 days of each exercised option period.

The plan for transition-out shall include, but is not limited to:

• Transferring of all data used in the performance of this contract.

• Transfer of subscription-based programs and services

• Providing all completed reports, permits, documents, forms, and technical data used in contract performance as approved by the CO.

• Return of all materials (serviceable, repairable and consumable inventory) to the

Government in quantities established and approved during the contract period.

• Cooperation with the Government and/or new Contractor(s) in: conducting wall-to-wall inventories, ensuring continuity of on-going maintenance operations during the transition period, and executing transfer of responsibility and custody of Government

Furnished Property (GFP), Government Furnished Material (GFM), and Government

Furnished Equipment (GFE) to a new contractor.

• Return all pilot support equipment and material to the Government.

• Provide MRO Training

All technical data developed under this contract shall be marked “Property of the U.S.

Government.” All data pertaining to the MRO becomes the property of the Government and shall be turned over prior to the expiration of the contract.

The Contractor shall provide copies of all documents pertaining to the DEA-generated waste within thirty (30) days of the end of each year of performance and extension periods, if any.

C.7 ADMINISTRATIVE INFORMATION

C.7.1 General

The Contractor shall operate in accordance with all Federal, State, Local, International and

DEA regulations, and shall be responsible for obtaining any rights-of-way, permits, waivers, approvals or licenses and/or certificates required in connection with the operation, maintenance and related support services at the DEA-owned Alliance Facility.

C.7.2 Facility Access

The required Contractor personnel shall have access to the DEA Fort Worth, Texas, Aviation

Operations Center (AOC) Monday through Friday, from 5:30 a.m. to 7:00 p.m. The

Contractor shall ensure that all personnel involved in operations and maintenance services, and related work thereof, meet the security requirements identified in Section H of this contract, prior to the commencement of work.

C.7.3 Hours of Operations

Normal hours of operation for DEA are Monday through Friday from 8:30 a.m. to 5:00 p.m., which allows one-half hour for lunch. The Contractors’ work schedules shall be in accordance with the reporting DEA offices’ hours of operation. Personnel assigned to work space located on the main floor (hangar, offices, and shops) shall work hours that closely mirror the domestic work site supported. The Contractor shall assess the requirements of personnel requiring access to the DEA administrative area (second floor). Upon completion of this assessment, the Contractor shall propose a work schedule that provides the necessary support with supervision (if applicable) for the respective Aviation Division department.

This proposal shall be reviewed annually and submitted to the COR for approval. The

Government reserves the right to change the normal hours of operation for DEA offices.

Contractor personnel may be required to be available at earlier or later times than the normal access hours. The Contractor shall obtain prior written approval from the COR for all support services that require other than normal access hours or weekend access to the Government facility.

Specific support hours of operation for all off-site locations, including ARO’s shall be proposed in writing. All Aviation Resident Office (ARO) and field site contract employees shall have access to their respective work facilities.

C.7.4 Alternate Work Hours

The Contractor may request approval for alternate work hours for contractor employees working in areas without air conditioning during seasons where temperatures exceed 95 degrees Fahrenheit. Application for approval shall be submitted to the COR for concurrence from the DEA Supervisor for the area where services are provided. The contractor shall assure adequate support remains available during the normal hours of operation to support Aviation Division operations.

C.7.5 Remote/Telework

Contract personnel who can perform their duties at a remote location may participate in telework on a situational basis only, and must have advance approval. Application for approval shall be submitted to the COR for concurrence from the DEA representative for the area where services are provided, and approval by the Aviation Division Special Agent in

Charge. Situational telework is allowed for, but are not limited to, extreme weather, facility closures and epidemic or pandemic illness situations.

C.7.6 Disruption to Facility Occupants

The Contractor shall coordinate with the COR and DEA Maintenance Officer for all scheduled maintenance support requirements 24 hours in advance of any work performance that may be disruptive to facility occupants or interfere with normal facility operations.

C.7.7 Housekeeping

Contractor personnel shall maintain good housekeeping practices in all office, shop areas, maintenance and supply areas, the hangar floor, flight line and other maintenance work areas to minimize the production of industrial scrap and waste. Spills shall be cleaned immediately.

Housekeeping function in maintenance and hangar space to include shop areas shall include operations necessary to present a neat, clean appearance at all times thereby preventing safety and health hazards. All rubbish and waste materials shall be properly removed and disposed of at the end of each day.

C.7.8 Distinctive Attire and Safety Apparel

The Contractor shall be responsible for providing contract personnel directly associated with aircraft maintenance safety apparel and distinctive work attire, such as uniform shirt and trousers or shorts, to allow easy identification from a distance. The uniform shall have the contract employee’s name permanently affixed thereon. Contractor personnel indirectly associated with aircraft maintenance, with the exception of administrative personnel, shall wear distinctive work attire, such as polo shirts with Contractor logo permanently affixed thereon. All contractor personnel with assigned work spaces shall have their work space identified with the employee name, position, and contractor’s company name or logo. Emails must have a signature identifying the individual’s Contractor Company and position. The

Contractor shall be responsible for requirements of and ensuring the use of all safety apparel and equipment by Contractor personnel when required by OSHA or other Government regulations.

C.7.9 Forms

The Contractor shall propose all forms for use in contract compliance. All forms developed for use on this contract shall be submitted to the COR for review. The COR will coordinate with the appropriate DEA official to evaluate the proposed forms. The COR will in turn notify the Contractor of approval or disapproval. Approval by the COR shall be obtained prior to any form being implemented. Once approved, these forms shall become the property of DEA.

Electronic forms are preferable to paper.

C.7.10 Document Support

The Contractor shall maintain copies of all documents prepared as part of this contract for a minimum of five (5) years after closeout, unless otherwise specifically extended or otherwise revised in writing by the CO, or required by Law. The Contractor’s records shall include an identifier and a method for distinguishing DEA manifest from the other client’s manifests.

C.7.11 Safety

The Contractor shall perform all operations in a prudent, conscientious, safe and professional manner. The Contractor shall coordinate and align policies and procedures to support the

Aviation Division IS-BAO Stage 3 SMS Program. The Contractor shall comply with all safety requirements set forth in applicable Federal, State and Local laws, standards and regulations and ensure employees and subcontractors perform the work in a safe manner.

C.8 GOVERNMENT FURNISHED PROPERTY

The Government will provide only the Property and Material set forth in Exhibits VI, VII, VIII, IX, X, XI, XII for use in the performance of this contract. Government Furnished

Material means property that may be incorporated into or attached to a deliverable end item or that may be consumed or expanded in performing this contract.

C.8.1 Equipment, Material, and Space

For Contractor personnel performing work on Government premises, the Government will provide: on-site office space, furniture, telephone service. All other supplies and equipment determined necessary shall be requested and approved by the COR.

The Government will provide supplies and equipment (if available) to include aircraft spares, repair parts, ground support equipment, aircraft tools, and other associated aircraft supplies and equipment at contract start to sustain the operational tempo at the required level. The

Contractor shall use, maintain and replenish as necessary Government Furnished Property for aircraft services, supplies and equipment support. The Contractor shall purchase additional material, supplies or equipment required for contract performance. All material, supplies and equipment will become property of the Government upon receipt and reimbursement.

Available Government Furnished Property is identified in Exhibits VI, VII, VIII, IX, X, XI, XII.

C.8.2 Facility Storage Space

The Government will provide facility storage space for any Contractor/Contractor employee-owned hand tools, required ground support equipment used by the Contractor, hangar space and utilities on a no charge for use basis.

C.8.3 Technical Publications

The Government shall provide technical publications to support the requirements herein. The

Contractor shall use, update and maintain the government-furnished technical publications.

All technical material purchased by the Contractor for contract performance shall become government property and part of the Technical Publication Library upon receipt and reimbursement. The Contractor shall maximize utilization of electronic technical publications to minimize environmental impact and maximize efficiency and cost savings.

Paper technical publications/manuals, and any related subscription cost, unless required by

Law, Regulation or Manufacturer, must be submitted in advance to the COR with concurrence from the DEA Supervisor for the area supported.

C.8.4 Subscription Based Aircraft Support Programs and Services

The Government subscribes to several cost per-flight-hour offerings that provide flexibility and cost predictability benefits on an annual basis. These programs and services contribute to sustaining an acceptable level of Operational Readiness and Aircraft Availability by providing 24/7 Customer Support and access to exclusive OEM rotable inventories.

Additionally, various aircraft in the DEA Aviation Division fleet are equipped with cloud-based Health Usage and Monitoring Systems, (HUMS), Flight Data Monitoring (FDM), and Rotor Track and Balance (RTB) systems. These systems enable Aviation Division to remotely monitor the health of aircraft, engines, components and subcomponents and also provide maintenance personnel with the ability to troubleshoot, predict and perform corrective actions necessary to maintain continued airworthiness.

The Contractor shall be responsible for administering, sustaining, and maximizing the use of all Subscription Based Aircraft Support Programs and Services on aircraft and parts with coverage as listed in Exhibit XXIV. The Contractor shall determine optimal rotable inventory levels required to facilitate operational readiness and parts availability while assuring lower operating cost so as to encourage use of these programs and services. The period of performance (PoP) for such programs and services shall provide consideration for annual funding allotments for continuation.

All Contractor generated data recorded utilizing the Subscription Based Aircraft Support

Programs and Services shall be considered government property.

C.8.5 Government Furnished Data

The Government shall provide to the Contractor the data currently residing on the

Government provided MRO computer system. Title to Government Furnished Data shall remain with the Government throughout contract performance. The Contractor shall use the

Government Furnished Data only in connection with this contract.

C.8.6 Automated Aviation Maintenance, Repair, and Overhaul System

The Government’s Aviation MRO system is IBM Maximo for Aviation (MfA). MfA is provided as GFE; however, the Contractor shall be responsible for the on-site operation, administration, development, maintenance, documentation, and security support services to maintain the operation and enhancement of the system.

The Contractor shall utilize DEA’s Aviation MRO system as its primary source to track all aspects of contract performance including time and manpower. Other computer systems may be utilized to perform corporate functions such as financial system of record and payroll.

Transfer of financial, time and manpower data will be allowed from the primary MRO to the

Contractor’s system, if needed. All contractor generated data developed utilizing the

Government Furnished MRO System shall be considered government property.

The Contractor shall ensure that all information contained in the MRO system is accurate and up-to-date. The Contractor shall maintain the capability to produce reports from the MRO system at any time the government requests. The Contractor shall provide personnel that have experience with MfA or a similar/like large scale enterprise wide aviation tracking system to ensure that the data is maintained with 100 percent accuracy.

C.8.7 Automated Flight Tracking System

The Government’s current Flight Tracking system shall be maintained on-site at the Aviation

Division Office.

The Contractor shall utilize the Aviation Flight Tracking System to track all aspects of flight following and aircraft tracking. The Contractor shall ensure that all information contained in the database is accurate and up-to-date.

C.9 CONTRACTOR FURNISHED PROPERTY

The Contractor shall be responsible for obtaining and providing all property support (i.e.

uniforms, cell phones, etc.) necessary to perform the requirements stated herein, unless specifically stated otherwise. All contractor generated data entered utilizing the Government

Furnished MRO or Tracking System shall be considered government property.

All Contractor employees shall utilize their own common hand tools in the performance of work at no cost to the Government.

C.10 DIRECTION AUTHORITY

NOTE: In Domestic or Foreign locations, operational directional authority does not include authority to change any of the terms and conditions, costs or scope of the Contract. Only the Contracting Officer has the authority to change any of the terms and conditions or costs of the contract.

C.10.1 Domestic Operations

Domestic Operations fall under the directional authority of the Contracting Officer (CO). In the domestic locations, the Contractor receives guidance and/or technical direction through the Contracting Officer’s Representative (COR), and/or authorized Office of Aviation

Operations representative. A full range of Government personnel, to include operations, maintenance, training, safety, administrative, quality and contract administration personnel will be co-located at the main operating site, Alliance Facility, to assist in providing oversight and evaluation of contract performance. The COR will provide the Contractor with a list of authorized representatives.

C.10.2 Foreign Operations

Foreign operational direction authority lies with the Host Country. However, in the host country, the principal advisor for guidance and/or technical direction remains with the COR, and/or authorized representative as stated in paragraph C.10.1 above.

C.11 ADMINISTRATIVE REQUIREMENTS

The Contractor shall develop an administrative plan to support contract requirement performance and ensure compliance with all applicable Federal and State Regulations and

Government Policy.

The Contractor may propose any philosophy that will result in streamlining procedures and enhancing timeliness, accuracy and cost savings.

C.11.1 Main Operating Site

The government-owned, Aviation Operations Center (AOC) at Alliance Airport in Fort

Worth, Texas serves as the primary management facility for all Aviation Division operations and support, and shall be operated as an FAA Part 145 Repair Station, while also maintaining a line maintenance capability to support operational aircraft assigned to AOC and other transient aircraft. The Contractor shall maintain accurate documentation, electronic and/or manual records, of all aircraft and equipment maintenance performed.

Main Operating Site Level Maintenance shall include scheduled and unscheduled maintenance and inspections including the capability of field, intermediate and depot level maintenance, major repair, alteration, fabrication and overhaul of aircraft, engines, systems, components, equipment, avionics components, specialized mission equipment and ground service equipment.

C.11.1.1 Hangar Space

The Contractor shall develop and maintain a hangar floor plan at the Aviation

Operations Center with a continuous methodology for improvement and productivity.

The floor plan shall include designated maintenance bays to maximize efficiency and standardization for the following maintenance requirements:

• Two (2) B300/B300C Phase inspections (performed concurrently)

• Two (2) rotor-wing major maintenance inspections (performed concurrently)

• Two (2) Cessna 206 50-Hour inspections (performed concurrently)

• Two (2) special mission equipment installs (performed concurrently)

C.11.2 Foreign and Domestic Field Operating Sites

Field Operating Site Maintenance shall include capabilities as defined in C.11.3 to maintain aircraft in a mission capable condition.

Satellite Part 145 Repair Station locations may be proposed; however, personnel manning these locations must be properly licensed, certificated and/or authorized (i.e. FAA Airframe, Powerplant, Inspection Authorization, Repairman, etc.) to perform the adequate level of maintenance, inspection and repair activities at each location. All tasks shall be coordinated and performed in a manner to minimize daily mission impact.

Field operating sites shall be equipped with adequate resources to perform quality checks of critical tasks and tool control verification upon completion of all aircraft inspection, maintenance and repair activities.

Field work sites identified below in both domestic and foreign locations, are government provided facilities. However, foreign location contract employee lodging/housing accommodations, where necessary, shall be provided by the Contractor.

C.11.3 Work Sites

The Contractor shall provide maintenance support at all Aviation Division designated work sites. The Aviation Division has four (4) Domestic Aviation Resident Office (AROs) work sites, and three (3) foreign work site locations. Support may be required at other locations in instances where it is not feasible to perform the work at a DEA facility.

The Contractor shall provide personnel as a permanent duty assignment to appropriately conduct operations at the sites listed below. Contractor personnel assigned to foreign locations are not guaranteed tax free status by the Government.

Repositioning of aircraft for maintenance purposes shall be provided by government authorized pilots.

C.11.3.1 Work Sites – Domestic

C.11.3.1.1 TEXAS

Fort Worth - Aviation Operations Center (AOC): Field, Intermediate and Heavy/Depot Level Aircraft, Engine, Avionics, Component and Special Mission Equipment Maintenance, Repair, Overhaul, Inspection, Installation, Modification, Fabrication, ATR Crew Chief/Attendant Support, Ground Service Equipment (GSE) maintenance and Logistics Support Facility.

The Contractor shall provide personnel required to assure continuous support of the AOC capabilities during routine/special mission, and mobile maintenance deployment support.

The Contractor shall assure continuous ATR Crew Chief/Attendant availability.

Conroe: Field and Intermediate Level Aircraft, Engine, Avionics, and Special Mission

Equipment Maintenance, Inspection, and Repair capabilities, with GSE maintenance, Inventory and Logistics support Facility.

The Contractor shall provide personnel required to assure continuous support of the Conroe

Field Site capabilities. The Contractor shall maximize utilization of the Conroe facility capabilities to support aircraft assigned to this geographical region and minimize sub-contractor requirements to the greatest extent possible.

C.11.3.1.2 CALIFORNIA:

Long Beach: Field and Intermediate Level Aircraft, Engine, Avionics, and Special Mission

The Contractor shall provide personnel required to assure continuous support of the Long

Beach Field Site capabilities. The Contractor shall maximize utilization of the Long Beach facility capabilities to support aircraft assigned to this geographical region and minimize sub-contractor requirements to the greatest extent possible.

C.11.3.1.3 FLORIDA:

Fort Lauderdale: Field and Intermediate Level Aircraft, Engine, Avionics, and Special

Mission Equipment Maintenance, Inspection, and Repair capabilities, with ATR Crew

Chief/Attendant Support, GSE maintenance, Inventory and Logistics support Facility.

The Contractor shall provide personnel required to assure continuous support of the Fort

Lauderdale Field Site capabilities. The Contractor shall assure continuous ATR Crew

Chief/Attendant availability, and maximize utilization of the Fort Lauderdale facility

C.11.3.1.4 NEW JERSEY:

Fairfield: Field and Intermediate Level Aircraft, Engine, Avionics, and Special Mission

The Contractor shall provide personnel…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .