Questions and Answers - 2 - BOP RFP 15BRRC27R00000002.pdf
PDF 86 KB Posted
- Solicitation number
- 15BRRC27R00000002
About this file
This document is a Questions and Answers (Q&A) response sheet for federal contract solicitation 15BRRC27R00000002, posted by the Bureau of Prisons on November 16, 2026. The Q&A addresses contractor inquiries regarding key personnel changes, price evaluation, standards compliance, litigation notification, staffing requirements, performance deductions, and proposal evaluation criteria. Regarding key personnel replacements, replacement staff must meet qualifications specified in both the Statement of Work and the approved Position Description submitted in the Technical Proposal. The contractor retains the right to request equitable adjustments for costs associated with changes to applicable standards after contract signing, though per diem rates remain based on estimated maximums noted at contract start. For contract performance issues, the contractor must notify the Bureau of Prisons as soon as possible upon learning of litigation, deductions are based on the Performance Summary Table included with the solicitation, and adverse actions for non-compliance are guided by the Federal Acquisition Regulation, SOW, and solicitation terms. The contractor receives ample notice of non-compliance prior to deductions or withholding implementation, with withholding amounts determined on a case-by-case basis and ranging from 0 to 30 percent of invoices. Regarding staffing adjustments, if Average Monthly Population exceeds original estimates by 25 percent for three consecutive months, contractors must add staff proportional to the staff-to-offender ratio and may request equitable adjustments, though per diem rates remain based on estimated maximums. Amendment 0001 deleted language regarding smartphone GPS tracking and biometric capabilities from the proposal evaluation factor, though this revision did not change the meaning of Section M.4 regarding overall evaluation criteria.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions and Answers #2
15BRRC27R00000002 Posted November 16, 2026
Q: Solicitation Document, Section H, H.1 RRC Change in Key Personnel
The contractor is required to submit evidence that the qualifications of the prospective replacement key personnel are equal to or greater than the personnel vacating the position. Because the vacating key personnel's qualifications may exceed the minimum requirements set forth in the Statement of Work (SOW), will the Bureau please revise this section to clarify that replacement personnel are required to meet the qualifications in the SOW?
A: The qualifications of the replacement key personnel must meet the qualifications set forth in the SOW and the Position Description submitted and approved in the Technical Proposal.
Q: Solicitation Document, Section M, 3.0 Price Evaluation Area
Please confirm the calculation for the price evaluation.
A: Price evaluation will follow section M.3
Statement of Work
Q: The contractor is required to comply with the "most current" version of specified standards, including federal, state, and local laws, regulations, orders, codes, bulletins, BOP policies and program statements, and ACA standards. Please confirm that the contractor has the right to request an equitable adjustment, as provided in the second paragraph of the Contract
Performance section on page 18 of 173, if there are costs associated with any changes to applicable standards after the contract is signed.
A: Yes, the contractor has the right to request an equitable adjustment. This request will be reviewed at the time of submission.
Q: The contractor is required to notify the Contracting Officer (CO) in writing of all litigation pertaining to the contract and provide pleadings within five working days of the filing. In most instances, the contractor is not served with pleadings within five days of the litigation being filed.
Accordingly, we request revising this sentence to require the contractor to notify the CO within five days of being served with such litigation.
A: The verbiage of the SOW will remain the same. It is the responsibility of the contractor to notify the BOP as soon as possible after learning of the litigation.
Q: The contractor is subject to "negative contract action including, but not limited to, deficiencies or deductions" for failing to replace key personnel within the required timeframes. Please confirm that deductions will be based on the salary and benefits of the vacant position. If deductions will not be based on the salary and benefits of the vacant key personnel position, please explain how deductions will be calculated.
A: Deductions are based on the Performance Summary Table included with the solicitation.
Q: The contractor is subject to "adverse action" for failing to maintain negotiated staffing patterns. Please clarify what adverse action may occur.
A: Appropriate actions for non-compliance can vary and are guided by the FAR, SOW, and the solicitation.
Q: The contractor is required to add staff consistent with the staff/offender ratio if the Average Monthly Population (AMP) exceeds the original estimate by 25 percent for three consecutive months. Please confirm that the contractor has the right to request an equitable adjustment, as provided in the second paragraph of the Contract Performance section on page 18 of 173, if additional staff are required.
A: Contractors can always request an equitable adjustment, which will be reviewed at the time of submission. However, per-diem rates are based upon the estimated maximum as noted within the solicitation at the start of the contract.
Q: The contractor is subject to potential deductions for failing to resolve non-compliance issues within a specified timeframe.
a. Please explain how deductions will be calculated.
A: Please see the Performance Summary Table.
b. Please confirm that the contractor will have a minimum of 30 days after notice to resolve non-compliance issues.
A: As stated in the SOW, the contractor will be notified of a pending deduction if they do not comply within the specified time. Each non-compliance issue will be reviewed individually.
Q: Performance Summary Table: This attachment provides that the contractor's failure to adhere to contract requirements may result in amounts being withheld from invoice payments. The withholding amounts range from 0 to 30 percent of the invoice.
a. Please confirm that the contractor will have a minimum of 30 days after notice to resolve non-compliance issues before any withholding is implemented.
A: The contractor will have ample notice of non-compliance prior to deductions being taken.
b. What is the process for determining the appropriate withholding amount within the respective range for each contract requirement?
A: Withholding amounts are determined on a case-by-case basis.
Q: Amendment 0001, Section M.4, Paragraph 2.2, Factor: Accountability deleted the final sentence: "This factor will also evaluate the option for the
Government to require the contractor to provide smartphones to residents, which have GPS tracking and utilize biometrics (option to be exercised at time of award)." Please confirm whether this revision excludes smartphone GPS tracking and biometrics from proposal evaluation but still requires the contractor to provide these capabilities to residents after award.
A: This revision deleted the sentence without changing the meaning of Section
M.4.
File details come from the government source that posted it. Updated .